penndot update kelly barber, p.e. november 21,...
TRANSCRIPT
1
Technology Tools
PennDOT Update
Kelly Barber, P.E.November 21, 2019
2
Technology Tool Topics
• Current System Enhancements• New Systems• Moving Forward
3
Current System Enhancements
• Mobile Applications• ECMS - Certifications• Asta Powerproject
4
Mobile Applications
MC DOCS
Will be available to Prime and Subcontractors, via the new “B-” Account
5
Mobile Applications
MC Sample ID
• District Pilot• Ability to enter material
information into eCAMMS• Test results available from
Materials Lab
6
Mobile Applications
MC CID
• Retrieve all active Work Items• Supplier and Contractor
information from ECMS Source Of Supply
• Only approved Suppliers and Contractors will be available to select within MC CID
7
Mobile Applications
MC PSA
• Advanced canned comment functionality
• 6 decimal places for LS/PDA work items
• Test Daily Record options to match ECMS
• Material Certification• ECMTS
8
ECMS - Certifications
9
ECMS - Certifications
10
ECMS - Certifications
11
ECMS - Certifications
12
ECMS - Certifications
13
ECMS - Certifications
14
ECMS - Certifications
15
Asta Powerproject
• Upgrading to Version 15
16
New Systems
• Environmental Commitment Mitigation Tracking System (ECMTS)• B- Accounts
17
ECMTS
18
ECMTS
19
B- Accounts
20
Moving Forward
• Unmanned Aircraft System (UAS)• Planless 2025• Training
21
UAS
• Pilot in District 1 and 11• Statewide Steering Committee
22
Planless 2025
Vision Statement:By 2025 construction projects will have the ability to be bid using 3D technology and no longer be in a traditional construction plan format. Projects such as guide rail, RPM’s, crack sealing and bridge preservation, etc. will be exempt.
All Project elements including what would typically be shown on “also plans” will be contained within the CADD model. The 3D model will be the primary document of truth. As-builts will be a deliverable for the contractor and will be an accurate representation of the constructed project.
23
Planless 2025
• Time to Embrace a new way of doing things– Change the mind set of “…but that’s how we’ve always
done it…”• Stop taking “Smart” Data and breaking it into
less meaningful pieces• Rethink how we approach – the outcomes are
limitless
24
Planless 2025
Digital Delivery• Early identification of constructability
issues• Enhanced design coordination and
Quality Control reviews• Improved design accuracy• Reduced construction change orders
3D Signed and Sealed Deliverables• Shift emphasis – 2D plans to 3D
models / BIM• Leverage 3D model thru design and
construction• Reduce contractor risk
25
Planless 2025
Clash Detection / Conflict Resolution
26
Planless 2025
Quantity Takeoff
27
Training
• Classroom• Recorded Videos• Webinars• How to Sessions
28
Questions
• PPCC/Mobile Applications – Mike Lentz• ECMS Certifications– John Burnett• Asta Powerproject – Kristen Swan• B-Accounts – Gerry Schopman• UAS – Mike Loose• Planless 2025 – Allen Melley
29
Thank you!