pembroke - trains 2014

28
PEMBROKE MAKING IT UP AS I GO ALONG RENE GOURLEY NOVEMBER 9, 2014 Software development

Upload: rene-gourley

Post on 14-Jul-2015

815 views

Category:

Presentations & Public Speaking


3 download

TRANSCRIPT

Page 1: Pembroke - Trains 2014

PEMBROKE

MAKING IT UP AS I GO ALONG

RENE GOURLEY

NOVEMBER 9, 2014

Software development

Page 2: Pembroke - Trains 2014

Q1: WHERE’S

PEMBROKE?

Page 3: Pembroke - Trains 2014

Q2: WHY PEMBROKE?

Page 4: Pembroke - Trains 2014

THE LONG ANSWER…

Canada Atlantic

Railway

1905

Scratchbuilding

Branchline

Pembroke

Proto:87

Page 5: Pembroke - Trains 2014

PROTO:87

Page 6: Pembroke - Trains 2014

Started 1997

Model Railroad Planning

For 10x10 bedroom

Built to move

Problem section joint

In the river

Not tight

Limited operations

Limited information

Based on Goad plan

VERSION 1

Page 7: Pembroke - Trains 2014

Dam is not that high

Bank near station

was not square

THEN THIS…

Uninteresting shoreline

Page 8: Pembroke - Trains 2014

YOU SHOULD

NEVER

INSTALL

VERSION 1

AND I WAS TURNING THAT AGE!

Page 9: Pembroke - Trains 2014

THE SPACE (2011)

Version 1 (for nine years)

Modelling desk

Home office

Storage

Guest room

No insulation

Ugly lighting

Kid’s model

Page 10: Pembroke - Trains 2014

THE SPACE (2012)

Insulation

Insulated Floor

5’ high shelf at

top of foundation

Page 11: Pembroke - Trains 2014

THE SPACE (2013)

5’ high shelf at

top of foundation

Guest room

Cork floor

Page 12: Pembroke - Trains 2014

THE SPACE (2014)

Storage

Nice lighting

Storage

Home office

Modelling desk

Layout

Page 13: Pembroke - Trains 2014

TRACK PLAN

Alternative to

computer!

Version 1

ended here

Roundhouse

Staging

Total of 16

turnouts

Influenced by Lance Mindheim,

Trevor Marshall, Mike Cougill

“Freedom Layout”

Page 14: Pembroke - Trains 2014

Take advantage of sick kid

“proof of concept”

Learned a lot!

EARLY

OPERATIONS

These tracks need

to be long!

Ran out of

staging tracks

Roundhouse and

turntable make

this layout a lot

of fun!

Page 15: Pembroke - Trains 2014

WHAT’S THE

WORST THAT

CAN

HAPPEN?DE-RISK FIRST WITH A PROOF OF

CONCEPT

Page 16: Pembroke - Trains 2014

3D PRINTED SWITCH

TIES

Rail braces and slide

plates printed on ties

Ideal for 3D printing

- Quality less of a concern

- Thousands of possible

combinations

- Costs continue to come down

Half tie

Page 17: Pembroke - Trains 2014

HIDDEN THROW ROD

Throw rod hidden

under tie switch

rods to scale

P87 Stores point

reinforcing

Hard to get this right

Points want to rotate

Page 18: Pembroke - Trains 2014

3D PRINTED

TURNOUT PARTS Near scale switch rods

Finally settled on

plastic shim

Page 19: Pembroke - Trains 2014

BALLAST GROUT

Real dirt from ROW

in Pembroke Lots of dust

Mica

50:50 grout:dirt

Page 20: Pembroke - Trains 2014

PAPER SHELL

SCENERYPacking paper secured

with hot glue

Gaps open at edges

Page 21: Pembroke - Trains 2014

REFINE AS

YOU GO

AVOID ANALYSIS PARALYSIS

Page 22: Pembroke - Trains 2014

WORKING SWITCH

STAND TARGETS

Bullfrog

Switch stand target

Egregious hack!

More elegant solution

After 10 of them

(mostly all different) I

was pretty good at it

Page 23: Pembroke - Trains 2014

LED LIGHTING

“Warm” white

“Cool” white

Inexpensive on ebay!

Low profile

No layout

Started with three, added

one, then another before

happy

Page 24: Pembroke - Trains 2014

TURNOUT CONTROLS

Lego POC

3D printed in

sintered nylon

Needs to be thicker

Probably didn’t

need Bullfrogs

Page 25: Pembroke - Trains 2014

SKY EFFECTS

RGB Wash to

simulate sunrise

and sunset

Eliminate

shadowsNot purple

Purple

Waterproof 5050

RGB LED strip

Page 26: Pembroke - Trains 2014

Flip switches

ZERO-PROFILE

STAGING

Should look more

like a window sill

than staging yard

No ties. Code 55

PC board

rabbeted into

plywood

“Honey, why are

there a bunch of

tracks on the

windowsill?”

Page 27: Pembroke - Trains 2014

WHAT’S NEXT…

Lazy susan staging turntable base

Magnet-driven roundhouse doors

Hand-cranked turntable

Locomotive “kits”

Two controllers per train

Lots of debugging!

Page 28: Pembroke - Trains 2014

TAKEAWAYS

Don’t let your layout languish

• Either have a layout or a shelf

Proof of concept

• Explore new ideas, materials,…

• Verify if you have the skils

Damn the torpedoes!

• Refine on the layout

• Make progress