Page 1: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

Pay Now or Pay ForeverPay Now or Pay ForeverCommissioning the Design of Control System SoftwareCommissioning the Design of Control System Software

Bill GnerreInterval Data Systems

May 2, 2007

Page 2: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

The Classic StruggleThe Classic Struggle

ConstructionFirst costDesign it rightPay now

OperationsLifetime costFix it laterPay forever

Page 3: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

Case Study BackgroundCase Study Background

University business school building110K sqft3 AHUs218 VAVs

All with reheatSome fan powered

Central plant provides chilled water & steamJCI Metasys with 8,150 points

Page 4: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

Good Intent, Bad DesignGood Intent, Bad Design

43%40%

17%

Control design intent issues

Control operator errors

Controls implementation issues

Page 5: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

Software Software ≠≠ HardwareHardware

Hardware Hardware Hardware Hardware

Hardware

& Software Hardware

& Software Software Software

Page 6: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

Example: WarmExample: Warm--Up ControlUp Control

Morning warmup sequence will be performed based on the lowest room temperature served by this air handler. The AHU will be commanded into “morning warmup” up to an hour (adjustable) before the scheduled occupied time is to occur. The amount of time the unit will be in “morning warmup” will be based on how far the lowest zone temperature is away from 68 degf. That amount of time will be based on the following table.

64 zone temperature (adjustable in GPL) 60 minutes (adjustable in GPL)68 zone temperature (adjustable in GPL) 0 minutes (adjustable in GPL)

The following will occur when unit is commanded into “morning Warmup”• The Differential CFM between the supply & return fan will be adjusted to 0 CFM.• The mixed air dampers will go to 0% ODA.• The supply air setpoint will be adjusted to 95 degf (adjustable).• Morning warmup will end if the unit is commanded into the occupied mode or if

the zone temperature reaches its target setpoint (adjustable).

Morning warmup sequence will be performed based on the lowest room temperature served by this air handler. The AHU will be commanded into “morning warmup” up to an hour (adjustable) before the scheduled occupied time is to occur. The amount of time the unit will be in “morning warmup” will be based on how far the lowest zone temperature is away from 68 degf. That amount of time will be based on the following table.

64 zone temperature (adjustable in GPL) 60 minutes (adjustable in GPL)68 zone temperature (adjustable in GPL) 0 minutes (adjustable in GPL)

The following will occur when unit is commanded into “morning Warmup”• The Differential CFM between the supply & return fan will be adjusted to 0 CFM.• The mixed air dampers will go to 0% ODA.• The supply air setpoint will be adjusted to 95 degf (adjustable).• Morning warmup will end if the unit is commanded into the occupied mode or if

the zone temperature reaches its target setpoint (adjustable).

Page 7: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

Example: WarmExample: Warm--Up ControlUp Control

Warm-up command triggered off one of few rooms below setpoint

Room temps rise to 80°+ as VAVs try to cool with

hot air

Warm-up command setpoint

AHU increases supply air temp to mid-90°s, but

does not tell VAVs that warm-up is in progress

Page 8: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

A PandemicA Pandemic

Issues like these exist everywhere

Page 9: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

An Operational Design Specification An Operational Design Specification

“Design is not just what it looks like and feels like. Design is how it works.”

– Steve Jobs

Page 10: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

An Operational Design Specification An Operational Design Specification

Goals for specification:Minimize the mystery Minimize technical jargonDefine integration detailsDescribe facilities’ business obligations Provide integrated organizational approachAddress cultural barriers

Page 11: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

An Operational Design Specification An Operational Design Specification

Goals for building/operations:

1. Achieve comfort and IAQ in every space

2. Meet #1 at the lowest possible cost

3. Operate automatically, without operator assistance, 24x365

Page 12: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

Anatomy of an Operational SpecAnatomy of an Operational Spec

Six main sections:PhilosophyComfort / IAQHardwarePointsControl strategiesAcceptance

Page 13: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

PhilosophyPhilosophy

Overview of approachNon-technical and technical audienceFramework for rest of specification

Page 14: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

Comfort / IAQComfort / IAQ

Define comfort & IAQ requirements in non-ambiguous termsASHRAE standards

55-200462.1-2004

Methodology for measurement

Page 15: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

Hardware Hardware

Sensors SelectionLocation Calibration

Explain the need/value of each sensor

Page 16: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

PointsPoints

Name standardizationList points to be exposed and why

Expose points for operatorsExpose points for data collection/historical recordCollection intervalPoints used for calculations

Page 17: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

Control Control Strategies Strategies

Detailed spec for software programs

PredictableRepeatable

Identify all points of integrationLogic diagrams with English descriptionsTied to specific hardware selection

Page 18: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

AcceptanceAcceptance

Assure system meets customer obligationsVerify operations, not a hardware functional test

Space conditionsComponent operationsSystem-level (integration) operations

Page 19: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

Operations ManualOperations Manual

Train operatorsHow system works (not just howindividual components work)How to address issues/complaints

Reduce/eliminate the 17% self-inflicted errorsIncrease persistence

17%

Control operator errors

Page 20: Pay Now or Pay Forever - BCxA · Pay Now or Pay Forever Commissioning the Design of Control System Software Bill Gnerre Interval Data Systems May 2, 2007. The Classic Struggle

ConclusionsConclusions

Software is a critical component of control systemsSeparate from hardwareRequires its own specification

Must improve over typical sequence of operations to ensure predictable, repeatable resultOpportunity exists for design stage CxChallenge exists to deal with sophisticated software design and developmentWe must get the software right before DDC will finally deliver on its potential