Page 1: Paw Paw presentation July 2016

Larry Nielsen, Village Manager, Paw PawMickey Bittner, P.E., Wightman & Associates, Inc.

1

Page 2: Paw Paw presentation July 2016

Background InformationWhat workedWhat did notWhy purple?What was learned by doing the projectCurrent statusPlans for the future

2

Page 3: Paw Paw presentation July 2016

• Heart of Michigan’s wine country

• Serves as the County seat for Van Buren County

• Population: 3,534

• Major Streets:• Kalamazoo St./M-40• Michigan Ave./Red Arrow

3

Page 4: Paw Paw presentation July 2016

Public Act 135 of 2010 defines Complete Streets as:“…roadways planned, designed, and constructed to provide appropriate access to all legal users in a manner that promotes safe and efficient movement of people and goods whether by car, truck, transit, assistive device, foot, or bicycle.”

The corridor study extended from Hazen Street to Brown Street along Michigan Avenue in Paw Paw.

4

Page 5: Paw Paw presentation July 2016

First presented in 2009 Adopted in 2010 Goals of the plan include being a community that

people drove to rather than drove through Incorporate Complete Streets Pedestrian accessibility Bicycle accessibility

Target projects identified as part of process Received community input through

committees/commissions/groups Concluded that road diets on Kalamazoo St. &

Michigan Ave. would help accomplish goals5

Page 6: Paw Paw presentation July 2016

• Kalamazoo Street (M-40)• Michigan Avenue (Red Arrow Highway)

6

Page 7: Paw Paw presentation July 2016

7

Page 8: Paw Paw presentation July 2016

8

Page 9: Paw Paw presentation July 2016

9

Page 10: Paw Paw presentation July 2016

Slow the traffic Improve pedestrian accessibility / shorten crosswalks Add bicycle accommodations Add café seating Maximize on-street parking

10

Page 11: Paw Paw presentation July 2016

11

Page 12: Paw Paw presentation July 2016

12

Page 13: Paw Paw presentation July 2016

Rendering of Michigan Avenue looking northwest at Kalamazoo StreetThis image shows a rendering of a few traffic calming strategies that were recommended including reducing the number of vehicular travel lanes, designating bike lanes and introducing reverse angle parking in the down town area. This also introduces the option of added outdoor café space along with landscaping near the intersection.

13

Page 14: Paw Paw presentation July 2016

Rendering of Michigan Avenue looking northeast at Kalamazoo StreetThis image shows a rendering of a few strategies that were incorporated to reduce the number of vehicular travel lanes, designate bike lanes, implement parallel parking and introduce reverse angle parking in the down town area. Landscaping amenities are shown near the intersection and added café seating is also shown for one of the restaurants.

14

Page 15: Paw Paw presentation July 2016

Rendering of Michigan Avenue looking southwest at Kalamazoo StreetThis image is shows a rendering of a few traffic calming strategies that were incorporated including reducing the number of vehicular travel lanes, designating bike lanes, implementing parallel parking and introducing reverse angle parking in the downtown area. This also introduces the option of added outdoor café space.

15

Page 16: Paw Paw presentation July 2016

Rendering of Michigan Avenue looking west across the Briggs Pond BridgeThis image shows a rendering of a few traffic calming strategies that were recommended including reducing the number of vehicular travel lanes, designating bike lanes and implementing parallel parking in the outer area of town. A designated pedestrian crossing is shown to provide improved accessibility from a public parking lot to a waterfront park.

16

Page 17: Paw Paw presentation July 2016

17

Page 18: Paw Paw presentation July 2016

18

Page 19: Paw Paw presentation July 2016

19

Page 20: Paw Paw presentation July 2016

20

Page 21: Paw Paw presentation July 2016

21

Page 22: Paw Paw presentation July 2016

Pedestrian accessibility recommendations from Dan Burden & Disability Network Traffic modeling Major generators included local schools, hospital, County government, St. Julian

Winery (35k visitors annually), as well as Coca-Cola, Ralph Moyle, and other industries

Implementation Options Permanent improvements $1.5M 3 months to construct

Utilize paint for trial period (11 months) – Selected! $80k 2-3 weekends to complete

Coordination with MDOT for signal at Kalamazoo (M-40)

22

Page 23: Paw Paw presentation July 2016

Public Notifications Local publications Facebook Village web page Handout to all businesses

Public Meetings 17 community meetings 2 other presentations (school system) 3 meetings with business managers/owners (90% of businesses attended) 108 people heard the presentations and offered feedback

Property owners, business owners, residents, central business district, DDA, Village, business, and others who drive through

Missed drive thru traffic 23

Page 24: Paw Paw presentation July 2016

Create a place to “drive to” rather than throughAdd pedestrian amenities & greeneryUse pavement markings as a trial periodAdd outdoor café seating for restaurantsAdd bike lanesIncrease on-street parkingAdd back-in angle parking

24

Page 25: Paw Paw presentation July 2016

Back-in angle parking due to lack of awarenessMay block traffic while backing in, even

with bike laneLeft turns may be full during peak timesBicycle lanes may not get much useSchool traffic may cause severe back-upsTruck turning radii

25

Page 26: Paw Paw presentation July 2016

Shared with the following:DDAHistorical CommissionMaster Plan Implementation CommitteePlanning CommissionVillage Council

26

Page 27: Paw Paw presentation July 2016

Completed on weekends in summer during tourism and before school began to observe various traffic demands 27

Page 28: Paw Paw presentation July 2016

Photograph of Michigan Avenue looking northeast at Kalamazoo Street during the trial phaseThis image is showing the completed work after the strategies discussed were implemented. The traffic calming techniques include a reduction of vehicular travel lanes, designation of bike lanes, and implementation of parallel and reverse angle parking in the down town area.

28

Page 29: Paw Paw presentation July 2016

29

Page 30: Paw Paw presentation July 2016

30

Page 31: Paw Paw presentation July 2016

31

Page 32: Paw Paw presentation July 2016

32

Page 33: Paw Paw presentation July 2016

33

Page 34: Paw Paw presentation July 2016

34

Page 35: Paw Paw presentation July 2016

90+ people attended council meetings asking to change it back

Facebook survey Over 1,100 responses

10% Village residents 90% outside of Village

Majority opposition

Businesses complained of customer complaints Traffic back-ups were severe during peak hours, especially

left-turns at Kalamazoo (7:30-8:30, 11:30-1:00, 3:00-4:00) Traffic moved fairly freely other than three peak periods Wal-Mart Opening Independent evaluation from a planner Village Council reverts to original configuration after 11

month trial period35

Page 36: Paw Paw presentation July 2016

Communication with residents and users (notifications, public education, those outside the Village)Timing with other major developments (Wal-Mart)Paint was a feasible optionForum evaluation method failed

36

Page 37: Paw Paw presentation July 2016

Part of street was reconstructed as part of a planned project. Remainder received a microsurface and re-striping at a cost of $64k.

37

Page 38: Paw Paw presentation July 2016

Master Plan update evaluating alternatives to meet Complete Streets objectives

38

Page 39: Paw Paw presentation July 2016

39

Page 40: Paw Paw presentation July 2016

Larry Nielsen, Village [email protected]

Mickey Bittner, P.E., [email protected]

40