patrons of st. columban foundation
DESCRIPTION
PATRONS OF ST. COLUMBAN FOUNDATION. The goal of the foundation is to raise funds through bequests, government grants, personal donations and fundraising events to be used for capitol projects. - PowerPoint PPT PresentationTRANSCRIPT
PATRONS PATRONS OF OF
ST. COLUMBAN ST. COLUMBAN
FOUNDATIONFOUNDATION
The goal of the foundation is to The goal of the foundation is to raise funds through bequests, raise funds through bequests, government grants, personal government grants, personal donations and fundraising events donations and fundraising events to be used for capitol projects. to be used for capitol projects.
Long term projects will include Long term projects will include the repointing of the exterior the repointing of the exterior walls, roof replacement, chimney walls, roof replacement, chimney and steeple work. and steeple work.
A five year plan is in placeA five year plan is in place
Phase 1 – 2008 Phase 1 – 2008 A- Total replacement of the Cornice and repairs to A- Total replacement of the Cornice and repairs to
the roof valleys where some leakage has occurred. the roof valleys where some leakage has occurred.
B- Front (south) Tower Section Wall Elevation. Work B- Front (south) Tower Section Wall Elevation. Work involves repointing all joints, repair and/replace involves repointing all joints, repair and/replace damaged stones, reinstate relevant stone details, damaged stones, reinstate relevant stone details, caulk windows and replace accessible tower caulk windows and replace accessible tower flashing. flashing.
Some work Some work has been has been
completedcompleted
Stone work Stone work & &
re-pointingre-pointing
Gaps between stonesGaps between stones
Needs Needs repairrepair
Stone Stone needing needing repairrepair
Mortar neededMortar needed
Mortar work Mortar work donedone
Stone needing Stone needing repairrepair
Repaired stoneRepaired stone
Stone work to be done Stone work to be done
Stone repaired & re-Stone repaired & re-pointedpointed
Re-pointing Re-pointing donedone
NoNo gaps between stones gaps between stones
Re-pointing Re-pointing donedone
Stone needing Stone needing replacementreplacement
New New stonestone
New stoneNew stone
No gapsNo gaps
Stonework re-Stonework re-pointedpointed
ScaffoldingScaffolding&&
FasciaFascia
Restoration in Restoration in progressprogress
Flashing coming awayFlashing coming away
Fascia needing Fascia needing repairrepair
Restored FasciaRestored Fascia
Re-pointing doneRe-pointing done
Restored FasciaRestored Fascia
Restored Restored FasciaFascia
Plan for 2009Plan for 2009
Phase 2 -2009 Phase 2 -2009
Front (southeast and southwest) wall Front (southeast and southwest) wall elevations. Work involves re-pointing elevations. Work involves re-pointing all joints, repair and/replace all joints, repair and/replace damaged stones, reinstate relevant damaged stones, reinstate relevant stone details, caulk windows and stone details, caulk windows and doors and stabilize southwest corner. doors and stabilize southwest corner.
The 5 Year PlanThe 5 Year Plan Phase 3 -2010 Phase 3 -2010 Phase 4 -2011 Phase 4 -2011 Phase 5 -2012Phase 5 -2012
More detail about the five year plan can be More detail about the five year plan can be found on our website:found on our website:
www.stcolumbans.comwww.stcolumbans.com
PLEASE PLEASE CONSIDERCONSIDER
MAKING MAKING AA
DONATION DONATION