pathumthani bangkok : area 1,568.7 km population 5.69 ... · 3. financial • bma 1. onsite wwtp...

5
300 Sampling Points in 165 major canals and 9 Sampling Points in Chao Praya River Major Sources of Wastewater 1 . Domestic 75 % 2 . Industry 20 % 3 . Agriculture 5% Measures undertaken Water Quality Monitoring Program in Bangkok Year 2014 1. Construction - Onsite WWTP - Community WWTP - Central WWTP 2 . Non - construction - Law - Public Relation 75% 20% 5% NONTHABURI PATHUMTHANI SAMUT PRAKAN SAMUT SONGKRAM BANGKOK THAILAND BANGKOK MAP Bangkok : Area 1,568.7 km 2 Population 5.69 million (2014) Surface Water: Canal 1,682 canals Length 2,604 km Chao Pra y a River 372 km (Total Length ) Bangkok 35 km Source of Water Supply to Bangkok and vicinity: Upstream of Chao Praya River at Sam Lae , Pathum Thani Water Consumption Rate in Bangkok (2014) : 2.5 mil. m3/day

Upload: others

Post on 19-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PATHUMTHANI Bangkok : Area 1,568.7 km Population 5.69 ... · 3. Financial • BMA 1. Onsite WWTP (Household) Regulation control 2. Community WWTP (NHA) 3. Central WWTP Control by

• 300 Sampling Points in 165 major canals and9 Sampling Points in Chao Praya River

• Major Sources of Wastewater 1. Domestic 75%2. Industry 20%3. Agriculture 5%

• Measures undertaken

Water Quality Monitoring Program in Bangkok

Year 2014

1. Construction- Onsite WWTP- Community WWTP- Central WWTP

2. Non-construction- Law - Public Relation

75%

20%

5%

NONTHABURI

PATHUMTHANI

SAMUT PRAKAN

SAMUT SONGKRAM

BANGKOK

THAILANDBANGKOK MAP

• Bangkok : Area 1,568.7 km2 Population 5.69 million (2014)

• Surface Water: Canal 1,682 canals Length 2,604 km• Chao Praya River 372 km (Total Length) Bangkok 35 km • Source of Water Supply to Bangkok and vicinity:

Upstream of Chao Praya River at Sam Lae, Pathum Thani • Water Consumption Rate in Bangkok (2014) : 2.5 mil.

m3/day

Page 2: PATHUMTHANI Bangkok : Area 1,568.7 km Population 5.69 ... · 3. Financial • BMA 1. Onsite WWTP (Household) Regulation control 2. Community WWTP (NHA) 3. Central WWTP Control by

BangsueEECC

1.Year of

operation:

August 2014

2.Service

Area:

20.7km2

3.Population

223,990

4.Capacity120,000

m3

/d

Source: JICA, 2011

4 WWTPs Implementation 15 WWTPs in Future Plan8 WWTPs under O&M

• Capacity 1.12 mil m3/d• 71.3% of WW generation• Construction Cost 34,088 mil B• O&M Cost 485 mil. Baht/year

• Capacity 1.12 mil m3/d• 96.7% of WW generation• Construction Cost 71,033 milB• O&M Cost 1,190 mil. Baht/year

Wastewater 2.5 mil m3/d

Wastewater 2.54 mil m3/d

Future Wastewater 3.55 mil m3/d

Year 2014Year 2022 Year 2042

• To serve WWTP 100% of developed area in Bangkok

1. Policy Target

•Domestic WW(75%) and Agriculture(5%) are responsible by “BMA”

•Industrial WW(20%)responsible by Ministry of Industry

2. Institutional

• Construction cost sharing of Central Government and BMA vary between 75:25 to 40:60

• O&M Cost 100% by BMA

3. Financial• BMA

1. Onsite WWTP(Household) Regulation control2. Community WWTP (NHA)3. Central WWTP Control by BMA

4. Good Practices

• Capacity 1.12 mil m3/d• 45.5% of WW generation• Construction Cost 24,603 milB• O&M Cost 559 mil. Baht/year

Page 3: PATHUMTHANI Bangkok : Area 1,568.7 km Population 5.69 ... · 3. Financial • BMA 1. Onsite WWTP (Household) Regulation control 2. Community WWTP (NHA) 3. Central WWTP Control by

Bangsue Education and Environmental Conservation Center

• The 1st underground WWTP of Bangkok with capacity 120,000 m3/day (2,000 m3/day treated by membrane technology and use for water fall in front of the building and supply to the park)

• Construction Year 2008 to 2014 and Construction Cost 4,732 million Baht from BMA (year 2008 to 2014)

• Education and Environmental Conservation Center (Meeting room, Exhibition hall, History room of Sewerage System and Water Quality Management and Environmental Library)

• Royal initiated project (the Chaipattanaaerator, and growing plant in the pond for wastewater treatment purpose)

Page 4: PATHUMTHANI Bangkok : Area 1,568.7 km Population 5.69 ... · 3. Financial • BMA 1. Onsite WWTP (Household) Regulation control 2. Community WWTP (NHA) 3. Central WWTP Control by

Both Community WWTP and Central WWTP should be served to all developed area in Bangkok

• “Public Private Partnership (PPP)” should be implemented for the future projects in order to solve the financial problems

• “Collecting fee” is another source of fund for the operation and maintenance of wastewater treatment projects

• “Treated Wastewater” is the alternative water for using in some specific activities (6% of treated wastewater using for watering plant, cleaning the road, flushing system etc.)

• “People Participation” will pay an important role to improve the surface water quality

• “Energy Saving Technology” for Wastewater Treatment System should be studied and applied for solving global warming

Page 5: PATHUMTHANI Bangkok : Area 1,568.7 km Population 5.69 ... · 3. Financial • BMA 1. Onsite WWTP (Household) Regulation control 2. Community WWTP (NHA) 3. Central WWTP Control by

• Wastewater Treatment Plant implementation and O&M are the good practice not only for engineers, scientists, students and people in Thailand but also in various countries especially in ASEAN countries

• Cooperation among experts, officials, administrators or policy markers in various activities, for example : Training Program, StudyVisit, Seminar, Research andStudy, Sharing technologyetc.