pasco county: 2040 roadway needs plan documents/pasco 2040_roadway_needs... · c o ri dw lb ev a...
TRANSCRIPT
LegendNumber of Lanes
2 Lanes Divided2 Lanes Undivided3 Lanes One way4 Lanes Divided
4 Lane Freeway4 Lanes Undivided6 Lanes Divided6 Lane Freeway8 Lane Divided
8 Lane Freeway10 Lane Freeway12 Lane Freeway14 Lane Freeway
Committed Interchange
New Overpass, 2019-2040
New Interchange, 2019-2040
2019-2040 Needed ImprovementsExpress Lanes
)p
?í
?ï
!"b$
)v
)¥
TO WE R RD
Potential alignment study for connection in Pasco or Hernando
BOSLEY DRBOWMAN RD
Interchange modification to be considered
Potential re-alignment with airport runway expansion
North/South alternative for LacoocheeBusiness and Manufacturing parkaccess yet to be determined.
S.R. 52
I - 75
U.S. 19
U.S.
41
S.R. 56
U.S.
301 (
N)
U.S. 98
S.R. 54SU
NCOA
ST PK
WY
C.R.
1 (LI
TTLE
RD)
DENTON
SUNL
AKE B
LVD
DARBYHUDSON AVE
PASC
O RD
RIDGE RD EXT
STARKEY
WELLS RD
C.R. 5
4 (E) S.R. 39
HICK
S
20TH
ST
HILLS CO. RD
OLD D
IXIE
MOOG
C.R. 578 (ST. JOE RD)
C.R.
577 (
CURL
EY R
D)
COLLIER PKWY EXT
S.R. 5
81
SHAD
Y HILL
S RD
FIVAY
HAYS
C.R. 578 (COUNTY LINE RD)
OVERPASS RD EXT
DEAN
DAI
RY
HALE
CHANCEY RD EXT
C.R.
41 (F
T KIN
G HW
Y)
OSCE
OLA
MADI
SON
U.S. 30
1 (GAL
L BLVD
)
Z.WEST.EXT
WIRE
RD
C.R. 41 (BLANTON RD)
EAST
RD
ELAM RD
CHANCEY RD
TRINITY BLVD
TOWER RD
RIDGE RD
C.R.
575 (
TRILB
Y RD)
NEW YORK
DECUBELLIS
JOHNSTON RD
ASBEL
23RD
ST
C.R.
595 (
GRAN
D BL
VD)
SUNSHINE RD
KIEFER RD
CLINTON AVE EXT
CONG
RESS
C AVE
JASMINE DR
POWE
R LIN
E RO
AD
C.R.
587 (
MOON
LAKE
)EMBASSY
KITTEN TRAILS
7TH ST
CHAN
CEY (
Z.EAS
T)
WILS
ONMENTMORE
COLO
NY R
D C.R. 35A (OLD LAKELAND HWY)
C.R. 587 (RIDGE)
CONNERTON BLVDMEADOW POINTE BLVD
RIVER GLEN BLVD
PERRINE RANCH
MANS
FIELD OLDWOODS AVE
ROAD
WAY "
A"
PLATHE
COAT
S RD
BAILL
IE'S
BLUF
F RD
MORNINGSIDE DR
ANCLOTE BLVD
C.R.
581MITCHELL BLVD
FOX HOLLOW DR
GULF TRACE
C.R. 35A (BERRY RD)
RAMS
EY
COLL
IER
PKWY
CENTRAL AVE
BOYE
TTE R
D EX
T
CLAY
HILL
RD
BOYE
TTE R
D
STONE RD
BELL LAKE RD
WASH
INGT
ON
LOCK ST
SOFT
WIN
D LN
MICKLER RD
C.R.
587 (
GUNN
HWY
)C.R. 530 (OTTIS ALLEN RD)
C.R. 579A (PROSPECT RD)
OAK GROVE DR
CHRISTIAN RD
MANASSAS
COLL
IER PK
WY
S.R. 54
PASCO RD
TOWER RD
U.S. 98
U.S. 41
S.R. 54
C.R. 54 (E)
HILLS CO. RD
S.R. 56S.R. 54
KIEFER RD
H E R N A N D O C O U N T YH E R N A N D O C O U N T Y
H I L L S B O R O U G H C O U N T YH I L L S B O R O U G H C O U N T Y
P I N E L L A S C O U N T YP I N E L L A S C O U N T Y
Pasco County: 2040 Roadway Needs Plan
Data Source: 2035 Needs Plan, edited
N0 5 102.5 Miles
*Any additional lanes for express tolllane corridors are in addition to themapped number of lanes.Note: All alignments are conceptual.
C AVE
7TH ST
6TH ST
S.R. 54
U.S. 301 (GALL BLVD)C.R. 54 (E)
NORTH AVEGEIGER
SOUTH AVE
EILAND BLVD
COUR
T ST
A AVE
Zephyrhills Inset Map
DRAFT 7/31/14
US 19 improvements based upon future studies and/or recommendations consistent with the vision of the adopted West Market Plan.
Alternative improvements within the SR 54/56 corridor will be evaluated as part of future corridor assessment after adoption of the 2040 Long Range Transportation Plan and will include, but not necessarily be limited to, premium transit improvements, overpasses, and/or elevated lanes. In addition, futurecorridor assessment will include significant public engagement regarding alternative improvements to the SR 54/56 corridor.
US 19 Improvements
SR 54/56 Corridor Improvements
SR 54/56 Corridor ImprovementsConservation/Parks/Public Lands
New Flyover Interchange, 2019-2040
P O L KP O L KC O U N T YC O U N T Y
BEXLEY RANCH
S YMPHONY
DREXEL
EILAN
DBL
VDMO
RRIS
BRID
GEHA
NDC A
RT