SL.NO Particulars Unit Materials rate in Rs. Labour charges (Casual) in Rs 1 2 3 4 5 RCC Poles a) 9.5 M 350kg WL Nos. 7675 1373 b) 9M 145kg WL Nos. 5941 1060 c) 9M 150kg WL Square section Nos. 7210 1060 d) 8M 115kg WL Nos. 4351 848 PCC Poles 8M PCC Poles 140kg WL Nos. 2495 848 PSC Poles a) 11M 365kg WL Nos. 7924 1552 b) 9M 200kg WL Nos. 3401 1060 d) 8M 200kg WL Nos. 2942 848 Pre-Stressed Tubular Spun Pole 11M Long Nos. 15800 2353 PSCC Poles 9M PSCC pole WL 300Kg Nos. 4578 1060 9M PSCC pole 160Kg WL in Transverse direction and 136Kg WL in Longitudinal directional Nos. 3558 1060 Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure Grounding a) 9M RCC Poles Set 15910 3252 b) 8M RCC Poles Set 12730 3104 c) 9M PSCC Poles with 300Kg WL Set 13184 3252 Three Pole structure complete including 5 KG , 8SWG G.I. Wire for Structure Grounding a) 9M RCC Poles Set 27446 6271 b) 8M RCC Poles Set 22676 6049 c) 9M PSCC Poles with 300Kg WL Set 23357 6271 VII Transformer Structure complete with cross arms braces, clamps, bolt&nuts and washers, For 25/63 kVA a) Using 2nos 9M RCC Poles Set 19271 4115 b) Using 2 nos 8M RCC Poles Set 16091 3560 c) 9M PSCC Poles with 300Kg WL Set 16545 4115 For 25/63 kVA- Star Rated Transformers III Rates of various Line materials and Labour charges used in cost sheets for general works I II IV V VII 1)

Upload: others

Post on 28-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

SL.NO Particulars Unit Materials rate in Rs.

Labour charges

(Casual) in Rs

1 2 3 4 5RCC Polesa) 9.5 M 350kg WL Nos. 7675 1373b) 9M 145kg WL Nos. 5941 1060c) 9M 150kg WL Square section Nos. 7210 1060d) 8M 115kg WL Nos. 4351 848PCC Poles 8M PCC Poles 140kg WL Nos. 2495 848PSC Polesa) 11M 365kg WL Nos. 7924 1552b) 9M 200kg WL Nos. 3401 1060d) 8M 200kg WL Nos. 2942 848Pre-Stressed Tubular Spun Pole 11M Long Nos. 15800 2353PSCC Poles9M PSCC pole WL 300Kg Nos. 4578 10609M PSCC pole 160Kg WL in Transverse direction and 136Kg WL in Longitudinal directional

Nos. 3558 1060

Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure Groundinga) 9M RCC Poles Set 15910 3252b) 8M RCC Poles Set 12730 3104c) 9M PSCC Poles with 300Kg WL Set 13184 3252Three Pole structure complete including 5 KG , 8SWG G.I. Wire for Structure Groundinga) 9M RCC Poles Set 27446 6271b) 8M RCC Poles Set 22676 6049c) 9M PSCC Poles with 300Kg WL Set 23357 6271

VIITransformer Structure complete with cross arms braces, clamps, bolt&nuts and washers, For 25/63 kVAa) Using 2nos 9M RCC Poles Set 19271 4115b) Using 2 nos 8M RCC Poles Set 16091 3560c) 9M PSCC Poles with 300Kg WL Set 16545 4115For 25/63 kVA- Star Rated Transformers

III

Rates of various Line materials and Labour charges used in cost sheets for general works

I

II

IV

V

VII

1)

Page 2: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

a) Using 2nos 9M RCC Poles Set 22532 4115b) Using 2 nos 8M RCC Poles Set 19352 3560c) 9M PSCC Poles with 300Kg WL Set 19806 4115For 100 / 250 kVAa) Using 2nos 9M RCC Poles Set 24575 4238b) Using 2 nos 8M RCC Poles Set 21395 3816c) 9M PSCC Poles with 300Kg WL Set 21849 4238

Fixing Single pole mounted transformer kit on 9 mtr RCC pole (square sec) / 9 Mtr PSCC pole 300KG WL (Excluding Errection of pole) for 25/63kVA Transformer Set 4088 1016for 100kVA Transformer Set 6129 1016

4)

For Single pole mounted transformer kit for 100/250kVA on 11 mtr spun pole (Excluding Errection of pole)

Set 23035 2033

11 kV Horizontal cross arm with H.T.Single top support, clamp,bolts, nuts and washers MSa) For RCC Poles Set 382 99b) For PSC Poles Set 377 99b) For PCC Poles Set 374 99

11 kV Horizontal cross arm with H.T.Single top support, clamp,bolts, nuts and washers GIa) For RCC Poles Set 505 99b) For PSC Poles Set 498 99b) For PCC Poles Set 493 9911 kV Horizontal cross arm, clamp,bolts, nuts and washers for DC Lines MSa) For RCC Poles each 316 81b) For PSC Poles each 311 81b) For PCC Poles each 308 8111 kV Horizontal cross arm, clamp,bolts, nuts and washers for DC Lines GIa) For RCC Poles each 422 81b) For PSC Poles each 415 81b) For PCC Poles each 411 81

3)

1)

2)

Note: The items V, VI, includes the cost of poles, structure materials & 5 kgs of G.I wire required for earthing of structure materials.

VIII

IX

Page 3: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

4-Pin cross arm with pole clamp , bolts, nuts and washers with braces MSa) RCC Poles Set 263 96b) For PSC Poles Set 258 96b) PCC Poles Set 255 964-Pin cross arm with pole clamp , bolts, nuts and washers with braces GIa) RCC Poles Set 352 96b) For PSC Poles Set 345 96b) PCC Poles Set 340 962-Pin cross arm with pole clamp , bolts, nuts and washers with braces MSa) RCC Poles Set 162 96b) For PSC Poles Set 157 96b) PCC Poles Set 154 962-Pin cross arm with pole clamp , bolts, nuts and washers with braces GIa) RCC Poles Set 219 96b) For PSC Poles Set 212 96b) PCC Poles Set 207 96

XIILT Cross arm for vertical configuration with clamps,bolts,nuts and washers

Set 626 287

XIII HT Single Top support with bolt,nuts and washers Set 89 64

XIV LT Single Top support with bolt,nuts and washers Set 69 64

Insulatorsa) 11kV Ceramic Pin insulator with GI pin No 94b) No.15 Strain Insulator No 33c) No.8 Strain Insulator No 14

d) 1.1 KV Ceramic Pin Insulator With GI pin No 38

11 KV, 5KN composite / polymeric Pin Insulator (20mm dia FP rod)

No 165

11 KV, 5KN composite / polymeric Pin Insulator (24mm dia FP rod)

No 195

e) 45 kN Disc Insulator No 290f) 70 kN Disc Insulator(Ball&Socket type) No 490g) 90 kN Disc Insulator(Ball&Socket type) No 490h) 11 kV Solid core Insulator No 152

X

XI

Included in stringing

Page 4: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

i) Silcon rubber composite insulator / 11KV 45 KN Polymeric Insulator.

No 170

j)11KV 70 KN Polymeric insulator. No 287G I Wires & Guy Wires7/10 SWG Guy Wire MT 562678 SWG GI Wire MT 5467410 SWG GI Wire MT 57683GI Barbed Wire 12 SWG MT 67882Conductora) Weasel ACSR km 20100 1913b) Rabbit ACSR km 33676 2608c) Coyote ACSR km 92708 4555

Providing guarding at Road Crossings, Telephone Line Crossings . (Including labour for fixing of necessary cross arms)

mtr 68 603

(each upto a span of 60 mtrs)

Providing guarding between HT & LT line. (Including labour fixing of necessary cross arms)

mtr 68

603 (each upto a

span of 40 mtrs)

Providing guarding between HT & LT line. (Including labour fixing of necessary cross arms)

mtr 68 1059 ( span of

above 40 mtrs)

a) Guy set with No.15 strain insulator & Concreting materials as per Drwg No. BESCOM/GM/CP/7/Dt; 24.10.07

Set 742 354

b) Guy set with 2Nos. 15 strain insulator & Concreting materials as per Drwg No. BESCOM/GM/CP/7/Dt; 24.10.07

Set 775 374

b) Guy set with No. 8 strain insulator & Concreting materials as per Drwg No. BESCOM/GM/CP/7/Dt; 24.10.07

Set 723 354

XX EG Stirrup With GI Lacing Set/2Nos. 370 99XXI Spiral Earth Electrode Set 207 55

Anti climbing device (12 Mtrs GI Barbed wire) Nos. 64 25

XXII Caution / Danger Board Nos. 120 49Distribution Transformer, 3-Phase, 11kV/433 V with oila) 15 kVA (Copper wound) Nos. 49980 682b) 25 kVA (Aluminium wound) Nos. 56480 682c) 25kVA BEE - 3 Star rated (Aluminium wound) Nos. 51560 682c) 25kVA BEE - 4 Star rated (Aluminium wound)

Nos. 54969 682

d) 63 kVA (Aluminium wound) Nos. 81440 682e) 63kVA BEE - 3 Star rated (Aluminium wound) Nos. 93726 682e) 63kVA BEE - 4 Star rated (Aluminium wound)

Nos. 94757 682

f) 100 kVA (Aluminium wound) Nos. 101570 910

XVI

XVII

XVIII

XXII

Page 5: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

f) 100 kVA (Aluminium wound) BEE 3-Star rated Nos. 121422 910f) 100 kVA (Aluminium wound) BEE 3-Star rated

Nos. 125856 910

g) 250 kVA (Aluminium wound) Nos. 228340 1365

h) 250KVA BEE 3 star rated/Energy Efficient Nos. 292467 1365

h) 500 kVA (Aluminium wound) Nos. 361707 181911 kV G O Sa) 200 A Single break Set 6951 636b) 400 A Double break Set 15637 706c) 200 A Single break vertical operation Set 10096 636

XXV 11 kV Solid Core HG Fuse Unit Set (3 Nos) 827 423XXVI 11kV Class DOLO Cutouts Set (3 Nos) 4288 423XXVI 11kV Class DOLO Cutouts(REC design) Set (3 Nos) 3396 423XXVII Lightning Arresters

i) 9 kV , 5kA Metal oxide Type 3 Nos 2070 71ii) 9 kV , 5kA Polymeric Type 3 Nos 3441 71

Transformer grounding a) Pipe Type ( G.I. Pipe B -class with Strips bolt nuts and washers,salt, charcoal etc.,) Per Electrode 1277 573

b) Rod Type Set 2000 Included in Material cost

Concreting with Material & Labour

Base concreting CC 1:4:8 a) Pole base 11/9.5/9/8 mtrs Pole supports 500x650x150 mm 229 -b)Pole base 9 mtrs square pole 650x650x150 mm 298 -c)Pole base 11 mtrs spun pole 1000x1000x150 mm 704 -

Pole concreting CC 1:2:4 (without coping) -

a) 9.5 Supports(pole concreting) 650x500x1850 mm 2792a) 9M Supports(pole concreting) 650x500x1700 mm 2566 -a) 9M Square Supports(pole concreting) 650X650x1700 mm 3214b) 11M Tubular Supports(pole concreting) 1000x1000x2500 11378c) 11 mtr PSC 650x500x2000 mm 2721c) 7.5 / 8 M Supports 400x400x1500 mm 982 -

a) Guy concreting with Boulders, Mud & Sand As per Drawing No. BESCOM/GM/CP/7

/dt: 24.10.07158

Providing Coping for Poles with CC 1:2:4 (As per actuals) - - -

a) 150mm around poles for a height of 300mm for RCC, PSC, PCC Poles/ I-Beem/Rail steel sections.

each 444

b)390mm all around the pole for an height of 300mm for Spun Poles each 1050

Guy concreting in Marshy area:XXIX

XXIV

XXVIII

XXIX

Page 6: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

a) Providing cement concrete 1:2:4 for Anchor Rod in Marshy/Black Cotton Soil 600x600x450mm

each 824

11 kV , 3 Core XLPE UG Cable (Flat armoured)a) 3X95 Sq mm km 548860 35797b) 3X240 Sq.mm km 1038890 37786c)3X 400 Sq.mm km 1565000 39774

XXXI

Fixing 3-phase LT Capacitor housed in a enclosure with necessary Fuses, wiring, mounting arrangement for

1 15/25 kVA DTC, 3 kVAr No. 725 3822 63 kVA DTC, 9 kVAr No. 1131 3823 100 kVA DTC, 18 kVAr No. 1933 4504 250 kVA DTC, 27 kVAr No. 2958 5255 500 kVA DTC, 54 kVAr No. 5083 549

XXXII

Providing Electronic Trivector Meters with associated CT's Metering Box etc., on LT side of Distribution Transformer Center (including cost of energy meter)

1 for 15/25 kVA DTC with CT ratio 50/5A Set 7912 11452 for 50/63 kVA DTC with CT ratio 100/5A Set 7474 11453 for 100 kVA DTC with CT ratio 150/5A Set 7168 11454 for 250 kVA DTC with CT ratio 400/5 A Set 7330 11455 for 500 kVA DTC with CT ratio 800/5A Set 7465 1145

XXIX

XXX

Page 7: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Total cost of Estimate

(In Rs.)

Labour Chargesonly casual

(In Rs.)Material + Labour

(Both casual and Regular)

Labour

1 11 kV 3-Ph SC line with 40 mtrs span on 9 mtr supports using Rabbit conductor Km 298088 45973

2 11 kV 3-Ph SC line with 50 mtrs span on 9 mtr supports using Rabbit conductor

Km 266555 39283

3 11 kV 3-Ph SC line with 50 mtrs span on 8 mtr supports using Rabbit conductor

Km 240466 35107

4 11 kV 3-Ph SC line with 40 mtrs span on 9 mtr supports using coyote conductor

Km 512054 54072

511 kV 3 Ph. SC Line and 3 phase - 4 wire LT line on 9.0 mtr supports with an average span of 50mtrs using Rabbit Conductor for H.T. and WEASEL for L.T Lines

Km 435455 59809

611 kV 3 Ph. SC Line and 3 phase - 4 wire LT line on 9.0 mtr supports with an average span of 40 mtrs using Rabbit Conductor for H.T. and L.T Lines

Km 544198 72369

7 3 Ph. 4 wire LT line on 8 mtr supports with 60 mtrs span using weasel Conductor (IP Set installations) Km 182277 29031

8 3 Ph. 4 wire LT line on 8 mtr Supports with 40 mtrs span using Rabbit Conductor

Km 271584 39020

9 3 Ph. 4 wire LT line on 9 mtr Supports with 40 mtrs span using Rabbit Conductor

Km 301278 44320

10

3 Ph. 5 wire LT line on 9.0 mtr supports Using Rabbit conductor for phase and nutral and weasel for street light with a span of 40mtrs (For Cities, Towns and Residential layouts)

Km 356148 50319

11 3 Ph. 5 wire LT line with 8.0 mtr Supports Using Rabbit conductor with a span of 50 mtrs

Km 298281 39412

12 3 Ph. 5 wire LT line with 8.0 mtr Supports Using Weasel with a span of 40 mtrs

Km 213223 37702

13

L.T 3 Ph. 5 wire LT line with continuous earth wire on 9.0 mtr supports using RABBIT for phase, neutral and weasel for street light control and 8 SWG G.I. wire for continuous ground wire with 40 mtrs span in vertical configuration

Km 379568 56395

1411 kV 3 ph. SC line on 9 mtr supports using Rabbit conductor with 40 mtrs span with vertical configuration in congested area

Km 511632 85797

15 Providing 2 pole structrue at the tapping point using RCC polea) 8 mtr RCC Per unit 46366 6408b) 9 mtr RCC Per unit 49274 6586

16 Providing 3 Pole Structure using 9 Mtrs RCC Poles Per unit 42426 7671

17 Providing Metering to IP Set installations using SMC Box Nos 6992

18Laying of 1km length of 11kV 3 core 95 Sq.mm XLPE UG Cable using Horizontal drilling method a.Flat armourb. Round Armour

Km17606461886896

977303977303

19

Laying of 1km length of 11kV 3 core 95 Sq.mm XLPE UG Cable using Conventional laying involving excavation of soil a. Flat armourb. Round Armour

Km984811111106

207609207609

ABSTRACT OF COMMON SR 2016-17 COST DATA SHEETS CSR 2016-17

Cost Data

Sheet No.PARTICULARS Unit

Page 8: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

20

Laying of 1km length of 11kV 3 core 240 Sq.mm XLPE UG Cable using Horizontal drilling method a. Flat armourb. Round Armour

Km 22502102491270

977402977402

21

Laying of 1km length of 11kV 3 core 240 Sq.mm XLPE UG Cable using Conventional laying involving excavation of soila. Flat armourb. Round Armour

Km14823851723445

209598209598

22

Laying of 1km length of 11kV 3 core 400 Sq.mm XLPE UG Cable using Horizontal drilling method a. Flat armourb. Round Armour

Km 27810443172044

977502977502

23

Laying of 1km length of 11kV 3 core 400 Sq.mm XLPE UG Cable using Conventional laying involving excavation of soil a. Flat armourb. Round Armour

Km20154852406485

211586211586

a) Erection of 3-ph, 11 kV/433V Distribution Transformer center using 8mtr DPTs (For BEE 3 Star Rated Transformers)

24 i) 25 kVA Per unit 125215 1052325 ii) 63 kVA Per unit 171471 10728

iii) 100 kVA (with Distribution Box) Per unit 218184 11257iv) 100kVA (with LT protection kit) Per unit 204584 11212

b) Erection of 3-ph, 11 kV/433V Distribution Transformer center using 9mtr DPTs (For BEE Star Rated Transformers)

24 a i) 25 kVA Per unit 129616 1107825 a ii) 63 kVA Per unit 175872 11283

iii) 100 kVA (with Distribution Box) Per unit 222293 11679iv) 100kVA (with LT protection kit) Per unit 208693 11634

27 Erection of 3-ph, 11 kV/433V 250 kVA Distribution Transformer center using 8mtr DPTs

Per unit 378675 10675

27 a Erection of 3-ph, 11 kV/433V 250 kVA Distribution Transformer center using 9mtr DPTs

Per unit 382506 10971

28Erection of 25 kVA , BEE 3 Star Rated 11kV/433V, Single pole mounted transformer centre on 9mtr RCC pole Square section

Per unit 104759 7952

29Erection of 63 kVA, BEE 3 Star Rated11kV/433V, Single pole mounted transformer centre on 9 mtr RCC pole Square section

Per unit 150810 8157

Erection of 100 kVA, BEE 3 Star Rated 11kV/433V, Single pole mounted transformer centre on 9mtr RCC pole Square sectiona) With LT Distribution Box Per unit 196685 8430b) With LT Protection Kit Per unit 183130 8385

31Erection of 250 kVA, 11kV/433V, Single pole mounted Distribution Transformer on 11mtrs spun pole with 3 GOS system

Per unit 388095 13378

32 Providing Compact RMU 11kV class VCB/SF6 Type(1 Incomer+2 Breakers+1 Outgoing)

a Schenider Make Per unitb ABB Make Per unitc Seimens Make Per unitd MEI Per unit

33 Providing Compact RMU 11kV class VCB/SF6 Type (1 Incomer+1Breakers+1 Outgoing)

a Schenider Make Per unitb ABB Make Per unitc Seimens Make Per unitd MEI Per unit

34 Providing Compact RMU 11kV class VCB/SF6 Type(1 OD)

a Schenider Make Per unit

Will be furnished after committee report

Will be furnished after committee

report

26

26 a

30

Page 9: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

b ABB Make Per unitc Seimens Make Per unitd MEI Per unit

35 Providing Compact RMU 11kV class VCB/SF6 Type (1VL)

a Schenider Make Per unitb ABB Make Per unitc Seimens Make Per unitd MEI Per unit

36Running Single Circuit 11 kV 3 Phase Power line on 9 mtr RCC supports with average span of 30 mtrs using 3x95 Sqmm+1x70Sqmm Aerial Bunched Cables (ABC)

Km 956804 80892

37

Running Single Circuit 1.1 kV 3 Phase 5 wire Power line on 9 mtr RCC supports with average span of 40 mtrs using 3x95 +1x16 +1x70 Sqmm Aerial Bunched Cables (ABC)

Km 728597 81519

38 Installing RLMU for the existing 15/25 KVA Distribution Transformer Center

Per unit 53747 3483

39 Installing RLMU for the existing 63 KVA Distribution Transformer Center

Per unit 58292 3483

40 Installing RLMU for the existing 100 KVA Distribution Transformer Center

Per unit 65925 3483

Erection of Compact Pre-fabricated Packaged Sub-station 11kV / 433 Va) With 100 kVA oil cooled transformer Per unitb) With 250 kVA oil cooled transformer Per unitc) With 500 kVA oil cooled transformer Per unitd) With 750 kVA oil cooled transformer Per unite) With 990 kVA oil cooled transformer Per unitf) With 100 kVA dry type transformer Per unitg) With 250 kVA dry type transformer Per unith) With 500 kVA dry type transformer Per uniti) With 750 kVA dry type transformer Per unitj) With 990 kVA dry type transformer Per unit

42providing Electronic Trivector Meters with associated CT's Metering Box etc., on LT side of Distribution Transformer Centeri) 15/25 kVA (with meter) 7912 1145ii)15/25 kVA (without meter) 5662 514i) 50/63 kVA (with meter) 7474 1145ii) 50/63 kVA (without meter) 5224 514i) 100 kVA (with meter) 7168 1145ii) 100 kVA (without meter) 4918 514i) 250 kVA (with meter) 7330 1145ii)250 kVA (without meter) 5080 514i) 500 kVA (with meter) 7465 1145ii) 500 kVA (without meter) 5215 514

providing LT Capacitors to the Distribution Transformers

a) 3 kVAr for 15/25KVA DTCs Per unit 1107 382b) 9 kVAr for 63KVA DTCs Per unit 1513 382c) 18 kVAr for 100KVA DTCs Per unit 2383 450d) 27 kVAr for 250KVA DTCs Per unit 3483 525e) 54 kVAr for 300/500KVA DTCs Per unit 5632 549

44 For carrying out 1 to 2 poles works in respect of Ganga Kalyana and Drinking Water Supply Works only. Per Work 8829

45 For carrying out 3 to 5 poles works in respect of Ganga Kalyana and Drinking Water Supply Works only. Per Work 13949

e) Per unit

43

46 For carrying out 1 to 4 (One to four) poles works in respect of service main connection and E & I works only

b) Per unit

c) Per unit

d) Per unit

41 Will be furnished after committee

report

a) Per unit

Will be furnished after committee report

Page 10: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

a Works involving ONE pole Per Work 4238

b Works involving TWO poles Per Work 5650

c Works involving THREE poles Per Work 7063

d Works involving FOUR poles Per Work 8475

47

Consolidated Labour charges for shifting of conductor terminations and all other fittings existing on the deteriorated pole while replaceing termination(cut point) poles(Does not include labour chages for releasing and erection of pole)

per pole 3000

48

Consolidated Labour charges for shifting of conductor and all other fittings existing on the deteriorated pole while replaceing intermediate poles(Does not include labour chages for releasing and erection of pole)

per pole 2200

49Standard Requirement of Materials for providing LT Wiring for Distribution Transformer Centers of various capacities

Per Work

50

Running Single Circuit 11 kV, 3-Phase Power Line on 9.0 Mtr Supports with an Average Span of 50 Mtrs Using Rabbit ACSR Conductor and PSCC poles of 300 Kg WL for dead ends and DP structure

Per unit 293994 45973

51

Running Single Circuit 11 kV, 3-Phase Power Line on 9.0 Mtr Supports with an Average Span of 40 Mtrs Using COYOTE ACSR conductor and PSCC poles of 300 Kg WL for dead ends and DP structure

Per unit 262461 39283

52

Running Single Circuit 11 kV, 3-Phase Power Line on 9.0 Mtr Supports with an Average Span of 40 Mtrs Using COYOTE ACSR conductor and PSCC poles of 300 Kg WL for dead ends and DP structure

Per unit 505234 54072

53

Running Single Circuit 11 kV 3 Phase Power Line and 3 Phase - 4 Wire Secondary Line on 9 Mtr Supports with an Average Span of 50 Mtrs using RABBIT Conductor for HT and WEASEL for LT Lines and using PSCC poles of 300 Kg WL for dead ends and DP structure

Per unit 431356 59809

54

Running Single Circuit 11 kV, 3-Phase Power Line & 3 Phase 4 Wire Secondary Line on 9.0 Mtr Supports with an Average Span of 40 Mtrs Using RABBIT ACSR conductor for HT & LT Lines and using PSCC poles of 300 Kg WL for dead ends and DP structure

Per unit 540099 72369

55

Running LT, 3-Phase 4 Wire Power Line on 9.0 Mtr Supports Using RABBIT ACSR Conductor with an Average Span of 40 Mtrs and using PSCC poles of 300 Kg WL for dead ends and DP structure

Per unit 299982 44320

56

Running LT, 3-Phase 5 Wire for Power Line on 9.0 Mtr Supports Using RABBIT ACSR Conductor for Phase and Neutral, and WEASEL Conductor or Street Light with an Average Span of 40 Mtrs and using PSCC poles of 300 Kg WL for dead ends and Anchor Points (For Cities, Towns and Residential Layouts)

Per unit 348020 50319

CDS for Distribution Line & Transformer works using 9mtrs PSCC poles of 300kg WL for Dead Ends Anchor points & Structures

Page 11: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

57

Running LT, 3-Phase 5 Wire Power Line with Continuous Earth Wire on 9.0 Mtr Supports Using RABBIT ACSR for Phase and Neutral, and WEASEL Conductor for Street Light and 8 SWG GI Wire for Continuous Earth Wire with an Average Span of 40 Mtrs in Vertical Configuration and using PSCC poles of 300 Kg WL for dead ends and Anchor Points

Per unit 371390 56395

58

Running Single Circuit 11 kV, 3-phase Power Line on 9.0 Mtr Supports Using RABBIT ACSR Conductorand using PSCC poles of 300 Kg WL for dead ends and Anchor Points, With an Average Span of 40 Mtrs in Vertical Configuration in Congested Areas

Per unit 507543 85797

59 Providing 2 Pole Structrues at the Tapping Point Using 9Mtrs PSCC Poles of 300.Kg WL Per unit 46998 5488

60 Erection of 3 Pole Structure With 9 Mtr PSCC Poles of 300Kg WL Per unit 38337 7671

61Erection of 3 Phase, 11kV/433V, 25kVA BEE – 3 Star Rated Distribution Transformer Centre Using DPTS With 9 Mtrs PSCC Pole 300Kg WL

Per unit 115812 11078

62Erection of 3 Phase, 11kV/433V, 63kVA BEE – 3 Star Rated Distribution Transformer Centre Using DPTS With 9 Mtrs PSCC Pole 300Kg WL

Per unit 161863 11283

63(a)Erection of 3 Phase, 11kV/433V, 100kVA BEE – 3 Star Rated Distribution Transformer Centre Using DPTS With 9 Mtrs PSCC Pole 300Kg WL

Per unit 194333 11634

63 (b)Erection of 3 Phase, 11kV/433V, 100kVA BEE – 3 Star Rated Distribution Transformer Centre Using DPTS With 9 Mtrs PSCC Pole 300Kg WL

Per unit 207888 11679

64Erection of 3 Phase, 11kV/433V, 250kVA BEE – 3 Star Rated Distribution Transformer Centre Using DPTS With 9 Mtrs PSCC Pole 300Kg WL

Per unit 368809 10971

65Erection of 3 Phase, 11kV/433V, 25kVA BEE 3 Star Rated Single Pole Mounted Transformer Centre on 9 Mtrs PSCC Pole 300kg WL

Per unit 101410 7952

66Erection of 3 Phase, 11kV/433V, 63kVA BEE 3 Star Rated Single Pole Mounted Transformer Centre on 9 Mtrs PSCC Pole 300kg WL

Per unit 147461 8157

67(a)Erection of 3 Phase, 11kV/433V, 100kVA BEE 3 Star Rated Single Pole Mounted Transformer Centre on 9 Mtrs PSCC Pole 300kg WL (with LT Distribution Box )

Per unit 193336 8430

67(b)Erection of 3 Phase, 11kV/433V, 100kVA BEE 3 Star Rated Single Pole Mounted Transformer Centre on 9 Mtrs PSCC Pole 300kg WL (with LT Protection KIT)

Per unit 179781 8385

68

Running Single Circuit 11kV, 3 Phase Power Line on 9 Mtr Supports with an Average Span of 30 Mtrs Using 3x95 Sqmm + 1x70 Sqmm Aerial Bunched Cables (ABC) using 9mtr PSCC pole of 300kg WL for Dead Ends and Anchor Points

Per unit 943174 80892

69

Running Single Circuit 1.1 kV 3 Phase 5 Wire Power Line on 9 Mtr Supports with Average Span of 40 Mtrs Using 3x95 + 1x16 + 1x70 Sqmm Aerial Bunched Cables (ABC) using 9mtr PSCC pole of 300kg WL for Dead Ends and Anchor Points

Per unit 714967 81519

Page 12: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt

1 11kV Class 3x400 Sqmm XLPE UG Cable (Flat Armoured) Km 1 1565000 1565000

2 11kV Class 3x400 Sqmm XLPE UG Cable (Round Armoured) Km 1 1956000 1956000

3 Straight Through Jointing Kits HS Type suitable for 3x400 Sqmm Cable Nos 3 8050 24150

4 Per Kit 1 3940 3940

5 Per Kit 1 3540 3540

6 Cable Covering Tiles 250x125x40 mm or 125x125x40 mm Nos 4000 / 8000 10/5 40000

7 Sand Cmt 60 1700 102000

8 RCC Hume Pipe, 2000mm Long, 150mm Dia Nos 30 300 9000

9 Collars for RCC Hume Pipe Nos 30 80 2400

10 GI Pipe, 150 mm Dia for drain crossing, cable raising etc., Mtrs 8 1144 9152

11 Route and Joint indicating stones Nos 20 120 2400

Total (Flat Armoured) 1761582

Total (Round Armoured) 2152582

10 Labour charges

a) Cable trench excavation, 1000x0.6x1=600, Ordinary soil Cmt 600 205 123000

b) Laying of cable in trench Km 1 39774 39774

c) Refilling and consolidation Cmt 550 45 24750

d) Making of straight through joints Nos 3 1695 5085

e) Making of cable terminations Nos 2 1554 3108

f) Covering the cable with tiles Km 1 2603 2603

g) Spreading Sand and forming with Sand round the cable Km 1 9146 9146

h) Laying of RCC Hume pipes Mtrs 60 40 2400

i) Laying of GI Pipe Mtrs 8 45 360

j) Laying of Route and Joint indicating stones Nos 20 68 1360

Total Labour Charges

a) Casual 211586

b) Regular 42317

2015485

2406485

11 Add rates for Reinstatements of Roads

1)

2)

3)

While preparing estimates for turnkey / total tunkey projects please refer to Sl. No. ......... of General Guidelines vide a to .... in Page No. ...........

When multiples cables have to be laid in the common trench the following excavation is to be followed: a) 0.75 Mtrs x 1 Mtrs for 2 cables. b) 1 Mtr x 1 Mtr for 3 cables. c) 1.25 Mtr x 1 Mtr for 4 nos. of cables and so on (As per Ltr No. BESCOM/BC-14/F-45

Where cables are laid using trenchless technology, there may be a necessity to lay the cable in open trench excavation. Hence provisionshall be made for both in the estimate and the bills shall be paid as per actual inventory taken.

Total Cost/Km in Rs. (Flat Armoured)

As per prevailing rates prescribed by local bodies (Corporations/

Municipalities/VPs)

NOTE

Total Cost/Km in Rs. (Round Armoured)

Cable Termination Kit Indoor HS Type Suitable for 3x400 Sqmm Cable

COST DATA SHEET - 23For laying of 1 Km Length of 11kV, 3 Core, 400 Sqmm XLPE UG Cable

Using Conventional Laying with Excavation in Soil

SL. No Particulars Unit Qty

Material cost

Cable Termination Kit Outdoor HS Type Suitable for 3x400 Sqmm Cable

Page 13: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt

Material Cost

1 11kV Class 3x400 Sqmm XLPE UG Cable (Flat Armoured) Km 1 1565000 1565000

2 11kV Class 3x400 Sqmm XLPE UG Cable (Round Armoured) Km 1 1956000 1956000

3 Straight Through Jointing Kits HS Type suitable for 400 Sqmm Cable Nos 3 8050 24150

4 Per Kit 1 3940 3940

5 Per Kit 1 3540 3540

6 RCC Hume Pipe, 2000 mm Long, 150 mm Dia Nos 3 300 900

7 Collars for RCC Hume pipe Nos 2 80 160

8 GI Pipe, 150 mm Dia for drain crossing, cable raising etc., Mtrs 8 1144 9152

9 Route and Joint Indicating Stones Nos 10 120 1200

Total (Flat Armoured) 1608042

Total (Round Armoured) 1999042

10 Labour charges

a) Laying of cable in trench in wherever necessary Mtrs 50 39774 1989

b) Labour chargers for horizontal drilling with 6 inches bore size

i) Without HDPE Pipe Rmtr 50 706 35300

ii) With HDPE pipe Rmtr 900 1031 927900

c) Making of straight through joints Nos 3 1695 5085

d) Making of cable terminations Nos 2 1554 3108

e) Laying of RCC Hume pipes Nos 60 40 2400

f) Laying of GI Pipe Mtr 8 45 360

gj) Laying of Route and Joint indicating stones Nos 20 68 1360

Total Labour Charges 977502

a) Casual 977502

b) Regular 195500

2781044

3172044

11 Add rates for Reinstatements of Roads

1)

2)

3)

Cable Termination Kit Indoor HS Type Suitable for 400 Sqmm Cable

COST DATA SHEET - 22For laying of 1 Km Length of 11kV, 3 Core, 400 Sqmm XLPE UG Cable

Using Horizontal Drilling

SL. No Particulars Unit Qty

Material cost

Cable Termination Kit Outdoor HS Type Suitable for 400 Sqmm Cable

When multiples cables have to be laid in the common trench the following excavation is to be followed: a) 0.75 Mtrs x 1 Mtrs for 2 cables. b) 1 Mtr x 1 Mtr for 3 cables. c) 1.25 Mtr x 1 Mtr for 4 nos. of cables and so on (As per Ltr No. BESCOM/BC-14/F-45

Where cables are laid using trenchless technology, there may be a necessity to lay the cable in open trench excavation. Hence provisionshall be made for both in the estimate and the bills shall be paid as per actual inventory taken.

Total Cost/Km in Rs. (Flat Armoured)

As per prevailing rates prescribed by local bodies

(Corporations/Municipalities/VPs)

NOTE

While preparing estimates for turnkey / total tunkey projects please refer to Sl. No. ......... of General Guidelines vide a to .... in Page No. ...........

Total Cost/Km in Rs. (Round Armoured)

Page 14: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt

1 11kV Class 3x240 Sqmm XLPE UG Cable (Flat Armoured) Km 1 1038890 1038890

2 11kV Class 3x240 Sqmm XLPE UG Cable (Round Armoured) Km 1 1279950 1279950

2 Straight Through Jointing Kits HS Type suitable for 3x240 Sqmm Cable Nos 3 6555 19665

3 Per Kit 1 3910 3910

Per Kit 1 3450 3450

4 Cable Covering Tiles 250x125x40 mm or 125x125x40 mm Nos 4000 / 8000 10/5 40000

5 Sand Cmt 60 1700 102000

6 RCC Hume pipe, 2000 mm Long, 150 mm Dia Nos 30 300 9000

7 Collars for RCC Hume Pipe Nos 30 80 2400

8 GI Pipe, 100 mm Dia for drain crossing, cable raising etc., Mtrs 8 1144 9152

9 Route and Joint Indicating Stones Nos 20 120 2400

Total (Flat Armoured) 1230867

Total (Round Armoured) 1471927

10 Labour chargesa) Cable trench excavation, 1000x0.6x1=600, Ordinary soil Cmt 600 205 123000

b) Laying of cable in trench Km 1 37786 37786

c) Refilling and consolidation Cmt 550 45 24750

d) Making of straight through joints Nos 3 1695 5085

e) Making of cable terminations Nos 2 1554 3108

f) Covering the cable with tiles Km 1 2603 2603

g) Spreading Sand and forming with Sand round the cable Km 1 9146 9146

h) Laying of RCC Hume pipes Mtr 60 40 2400

i) Laying of GI Pipe Mtr 8 45 360

j) Laying of Route and Joint indicating stones Nos 20 68 1360

Total Labour Charges

a) Casual 209598

b) Regular 41920

1482385

1723445

11 Add Rates for Reinstatements of Roads

1)

2)

3)

Cable termination kit Indoor HS Type Suitable for 3x240 Sqmm Cable

Total Cost/Km in Rs. (Round Armoured)

Total Cost/Km in Rs. (Flat Armoured)

Where cables are laid using trenchless technology, there may be a necessity to lay the cable in open trench excavation. Hence provisionshall be made for both in the estimate and the bills shall be paid as per actual inventory taken.

As per prevailing rates prescribed by local bodies (Corporations/Municipalities/VPS as applicable)

NOTE

While preparing estimates for turnkey / total tunkey projects please refer to Sl. No. ......... of General Guidelines vide a to .... in Page No. ...........

When multiples cables have to be laid in the common trench the following excavation is to be followed: a) 0.75 Mtrs x 1 Mtrs for 2 cables. b) 1 Mtr x 1 Mtr for 3 cables. c) 1.25 Mtr x 1 Mtr for 4 nos. of cables and so on (As per Ltr No. BESCOM/BC-14/F-45

Cable termination kit Outdoor HS Type Suitable for 3x240 Sqmm Cable

COST DATA SHEET - 21For Laying of 1 Km Length of 11kV, 3 Core, 240 Sqmm XLPE UG Cable

Using Conventional Laying with Excavation in Soil

SL. No Particulars Unit Qty

Material cost

Page 15: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt

Material Cost

111kV Class 3x240 Sqmm XLPE UG Cable (Flat Armoured)

Km 1 1038890 1038890

211kV Class 3x240 Sqmm XLPE UG Cable (Round Armoured)

Km 1 1279950 1279950

3Straight Through Jointing Kits HS Type suitable for 240 Sqmm Cable

Nos 3 6555 19665

4 Per Kit 1 3910 3910

Per Kit 1 3450 3450

5 RCC Hume Pipe, 2000 mm Long, 150 mm Dia Nos 3 300 900

6 Collars for RCC Hume pipe Nos 2 80 160

7GI Pipe, 100 mm Dia for drain crossing, cable raising etc.,

Mtrs 8 1144 9152

8 Route and Joint Indicating Stones Nos 10 120 1200

Total (Flat Armoured) 1077327

Total (Round Armoured) 1318387

9 Labour charges

a) Laying of cable in trench in wherever necessary Mtrs 50 37786 1889

b) Labour chargers for horizontal drilling with 6 inches bore size

i) Without HDPE Pipe Rmtr 50 706 35300

ii) With HDPE pipe Rmtr 900 1031 927900

c) Making of straight through joints Nos 3 1695 5085

d) Making of cable terminations Nos 2 1554 3108

e) Laying of RCC Hume pipes Nos 60 40 2400

f) Laying of GI Pipe Mtrs 8 45 360

g) Laying of Route and Joint indicating stones Nos 20 68 1360

Total Labour Charges 977402

a) Casual 977402

b) Regular 195480

2250210

2491270

10 Add Rates for Reinstatements of Roads

1)

2)

3)

When multiples cables have to be laid in the common trench the following excavation is to be followed: a) 0.75 Mtrs x 1 Mtrs for 2 cables. b) 1 Mtr x 1 Mtr for 3 cables. c) 1.25 Mtr x 1 Mtr for 4 nos. of cables and so on (As per Ltr No. BESCOM/BC-14/F-45

QtyMaterial cost

Unit

While preparing estimates for turnkey / total tunkey projects please refer to Sl. No. ......... of General Guidelines vide a to .... in Page No. ...........

Where cables are laid using trenchless technology, there may be a necessity to lay the cable in open trench excavation. Hence provision shall be made for both in the estimate and the bills shall be paid as per actual inventory taken.

Total Cost/Km in Rs. (Flat Armoured)

As per prevailing rates prescribed by local bodies (Corporations/Municipalities/

VPS as applicable)

NOTE

COST DATA SHEET - 20

For Laying of 1 Km Length of 11kV, 3 Core, 240 Sqmm XLPE UG Cable Using Horizontal Drilling

SL. No Particulars

Cable Termination Kit Outdoor/Indoor HS Type Suitable for 240 Sqmm Cable

Cable Termination Kit Outdoor/Indoor HS Type Suitable for 240 Sqmm Cable

Total Cost/Km in Rs. (Round Armoured)

Page 16: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate AmtMaterial Cost

111kV Class 3x95 Sqmm XLPE UG Cable (Flat Armoured)

Km 1 548860 548860

211kV Class 3x95 Sqmm XLPE UG Cable (Round Armoured)

Km 1 675110 675110

3Straight Through Jointing Kits HS Type suitable for 95 Sqmm Cable

Nos 3 5375 16125

4 Per Kit 1 2990 2990

Per Kit 1 2753 2753

5Cable covering tiles 250x125x40 mm or 125x125x40 mm

Nos4000/8000

10/5 40000

6 Sand Cmt 60 1700 102000

7 RCC Hume Pipe, 2000 mm Long, 150 mm Dia Nos 30 300 9000

8 Collars for RCC Hume Pipe Nos 30 80 2400

9GI Pipe, 100 mm Dia for drain crossing, cable raising etc.,

Mtrs 8 1144 9152

10 Route and Joint Indicating Stones Nos 20 120 2400

Total (Flat Armoured) 735680

Total (Round Armoured) 861930

11 Labour charges

a) Cable trench excavation, 1000x0.6x1=600, Ordinary soil

Cmt 600 205 123000

b) Laying of cable in trench km 1 35797 35797

c) Refilling and consolidation Cmt 550 45 24750

d) Making of straight through joints No 3 1695 5085

e) Making of cable terminations No 2 1554 3108

f) Covering the cable with tiles km 1 2603 2603

g) Spreading Sand and forming with Sand round the cable

km 1 9146 9146

h) Laying of RCC Hume pipes mtr 60 40 2400

i) Laying of GI Pipe mtr 8 45 360

j) Laying of Route and Joint indicating stones No 20 68 1360

Total Labour Charges 207609a) Casual 207609

b) Regular 41522

984811

1111061

12 Add Rates for Reinstatements of Roads

1)

2)

3)

Cable Termination Kit Indoor HS Type Suitable for 95 Sqmm Cable

Cable Termination Kit Outdoor HS Type Suitable for 95 Sqmm Cable

When multiples cables have to be laid in the common trench the following excavation is to be followed: a) 0.75 Mtrs x 1 Mtrs for 2 cables. b) 1 Mtr x 1 Mtr for 3 cables. c) 1.25 Mtr x 1 Mtr for 4 nos. of cables and so on (As per Ltr No. BESCOM/BC-14/F-45

Unit QtyMaterial cost

As per prevailing rates prescribed by local bodies (Corporations/Municipalities/

VPS as applicable)

Where cables are laid using trenchless technology, there may be a necessity to lay the cable in open trench excavation. Hence provision shall be made for both in the estimate and the bills shall be paid as per actual inventory taken.

Total Cost/Km in Rs. (Flat Armoured)

NOTE

While preparing estimates for turnkey / total tunkey projects please refer to Sl. No. ......... of General Guidelines vide a to .... in Page No. ...........

COST DATA SHEET - 19For Laying of 1 Km Length of 11kV, 3 Core, 95 Sqmm XLPE UG Cable

Using Conventional Laying with Excavation of Soil

SL. No Particulars

Total Cost/Km in Rs. (Round Armoured)

Page 17: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt

Material Cost

1 11kV Class 3x95 Sqmm XLPE UG Cable (Flat Armoured) Km 1 548860 548860

2 11kV Class 3x95 Sqmm XLPE UG Cable (Round Armoured) Km 1 675110 675110

3 Straight Through Jointing Kits HS Type suitable for 95 Sqmm Cable Nos 3 5375 16125

4 Per Kit 2 2990 5980

Per Kit 2 2753 5506

5 RCC Hume Pipe, 2000 mm Long, 150 mm Dia Nos 3 300 900

6 Collars for RCC Hume Pipe Nos 2 80 160

7 GI Pipe, 100 mm Dia for drain crossing, cable raising etc., Mtrs 8 1144 9152

8 Route and Joint Indicating Stones Nos 10 120 1200

Total (Flat Armoured) 587883

Total (Round Armoured) 714133

9 Labour charges

a) Laying of cable in trench in wherever necessary Mtrs 50 35797 1790

b) Labour chargers for horizontal drilling with 6 inches bore size

i) Without HDPE Pipe Rmtr 50 706 35300

ii) With HDPE pipe Rmtr 900 1031 927900

c) Making of straight through joints Nos 3 1695 5085

d) Making of cable terminations Nos 2 1554 3108

e) Laying of RCC Hume pipes Nos 60 40 2400

f) Laying of GI Pipe Mtrs 8 45 360

g) Laying of Route and Joint indicating stones Nos 20 68 1360

Total Labour Charges 977303

a) Casual 977303

b) Regular 195461

1760646

1886896

10 Add Rates for Reinstatements of Roads

Note:

1)

2)

3)

Cable Termination Kit Indoor HS Type suitable for 95 Sqmm Cable

Cable Termination Kit Outdoor HS Type suitable for 95 Sqmm Cable

COST DATA SHEET - 18For laying of 1 Km Length of 11kV, 3 Core 95 Sqmm XLPE UG Cable

Using Horizontal Drilling

SL. No Particulars Unit Qty

Material cost

When multiples cables have to be laid in the common trench the following excavation is to be followed: a) 0.75 Mtrs x 1 Mtrs for 2 cables. b) 1 Mtr x 1 Mtr for 3 cables. c) 1.25 Mtr x 1 Mtr for 4 nos. of cables and so on (As per Ltr No. BESCOM/BC-14/F-45

Where cables are laid using trenchless technology, there may be a necessity to lay the cable in open trench excavation. Hence provision shall be made for both in the estimate and the bills shall be paid as per actual inventory taken.

Total Cost/Km in Rs. (Flat Armoured)

While preparing estimates for turnkey/total tunkey projects please refer to Sl. No. ......... of General Guidelines vide a to .... in Page No. ...........

Total Cost/Km in Rs. (Round Armoured)

As per prevailing rates prescribed by local bodies (Corporations/Municipalities/

VPS as applicable)

Page 18: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt

1 Whole Current Meter 10-60A 3 Phase (Static Meter)Class-1 Accuracy Nos 1 3000 3000

2 SMC Meter Housing box with 6 mm hylam sheet Nos 1 2100 2100

4 16 Sqmm Alluminium Single Core/Multi Core of Grade 650/1100V (16 Mts) Set 1 368 368

5 PVC Pipe of 2 mm Thick 40mm Dia Mtrs 4 50 200

6 3 Nos Porcelain Cutouts 60A with Wooden Plank Set 1 474 474

7 Misc materials such as water tight bends and aluminium pins/bullets LS LS - 150

8 Labour Charges (Lump sum) LS LS - 700

Total 6992

COST DATA SHEET -17

Estimate for Providing Metering to IP Set Installations Using SMC Box

SL. No Paritculars Unit Qty

Material cost

Page 19: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

SL. No Paritculars Unit Qty

Rate Amt Rate Amt

13 Pole Structure complete using 9 Mtrs RCC Poles ( Including Cost of Poles) Set 1 27446 27446 6271 6271

2 Spiral Earth Electrode Nos 3 207 621 55 165

3 Guy Set With No.15 Strain Insulator Complete Sets 3 742 2226 354 1062

4 45kN Disc Insulators Nos 6 290 1740 0 0

5 11kV Pin Insulators with GI Pins Nos 3 94 282 0 0

6 Concrete for Guy set (without cement) Nos 3 158 474 0 0

7Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07 Nos 2 120 240 49 98

8Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum Kgs 3 64 192 25 75

9 Total Material cost 33221

10 Labour Charges

a) Casual 7671

b) Regular 1534

42426

Note:

Part-A: LINES

Total Cost/Unit in Rs.

1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports

2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

COST DATA SHEET -16

Erection of 3 Pole Structure With 9 Mtr RCC Pole

Material cost Labour Cost

Page 20: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

SL. No Paritculars Unit Qty

Rate Amt Rate Amt

1 RCC DP Structure using 9 Mtrs RCC Pole with WL 145 kg

Set 1 15910 15910 3252 3252

2RCC DP Structure using 8 Mtrs RCC Pole with WL 115 kg Set 1 12730 12730 3104 3104

3 45kN Disc Insulators Nos 6 290 1740 0 0

4 Guy Set Complete Sets 2 742 1484 354 708

5 Spiral Earth Electrode Nos 2 207 414 55 110

6 Concrete for Guy Set (without Cement) Nos 2 158 316 0 0

7 Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07

No 1 120 120 49 48

8 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kgs 2 64 128 25 50

Total Part A

Using 8 Mtrs RCC Pole 16932 4020

Using 9 Mtrs RCC Pole 20112 4168

Part-B: SWITCH GEAR

10 11kV 400A D/B GOS Set 1 15637 15637 706 706

11 H-Frame for mounting GOS No 1 2895 2895 191 191

12 DOLO Cut Out Set/3 Nos 1 4494 4494 423 423

Total Part B 23026 1320

13 Material Cost using 8 Mtrs RCC Pole (A+B) 39958

Labour Charges

a) Casual 5340

b) Regular 1068

14 Material cost using 9 Mtrs RCC Pole (A+B) 43138

Labour Charges

a) Casual 5488

b) Regular 1098

15 46366 6408

49724 6586

Note:

COST DATA SHEET -15Providing 2 Pole Structrue at the Tapping Point Using RCC Poles

Total Cost of Estimate using 9 Mtrs RCC Pole

1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports

2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

Material cost Labour Cost

Part-A: LINES

Total Cost of Estimate using 8 Mtrs RCC Pole

Page 21: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 RCC Pole - 9 Mtrs Long, 145 kg WL (for Deadend, Anchor points)

Nos 1 5941 5941 1060 1060

2 PSC Pole -9 Mtrs Long, 200 kg WL (for Intermediate Poles)

Nos 23 3401 78223 1060 24380

3 Set 1 15910 15910 3252 3252

4 Special cross arm with cross arm for EG Stirrups, braces, clamps, bolts nuts and washers complete

Sets 23 1122 25806 316 7268

5 Nos 69 94 6486 0 0

6 45kN Disc Insulators Nos 6 290 1740 0 0

7 Guy Set Complete Sets 9 742 6678 354 3186

8 Rabbit ACSR Conductor Kms 3.045 33676 102543 2608 7941

9 Spiral Earth Electrode Nos 26 207 5382 55 1430

10 EG Stirrups with GI wire lacing Set of 2 No's 370 424 156880 99 36630

11 Concreting Materials for guy sets (Without Cement) Nos 9 158 1422 0 0

12 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kgs 26 64 1664 25 650

Total 408675 85797

13 Labour charges

a) Casual 85797

b) Regular 17159

511632

Note:

COST DATA SHEET - 14Running Single Circuit 11 kV, 3-phase Power Line on 9.0 Mtr Supports Using RABBIT ACSR Conductor With an Average Span of

40 Mtrs in Vertical Configuration in Congested Areas

SL. No Particulars Unit Qty

Material cost Labour Cost

DP Structure using 9 Mtrs RCC poles

11kV ceramic Pin Insulators with GI Pins

Total Cost/Km in Rs.

a) Special cross arms 50x50x6 mm MS 0.715 mtr long 3-Nos

b) Support piece for fixing EG stirrup 50x50x6 mm MS Angle 0.865 mtr long - 1 No

Item 4 includes, the following

1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports

2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

c) Brace 50x50x6 mm MS Angle 0.850 mtr long - 1 No

d) 50x6 mm Flat 1.8 mtr, long - 1No

e) RCC Pole Clamps - 5 Nos

f) Cross Arm for fixing EG Stirrup - 1 No

Page 22: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1RCC Pole - 9 Mtrs Long, 145 kg WL (for Deadend, Anchor points) Nos 6 5941 35646 1060 6360

2 PSC Pole -9 Mtrs Long, 200 kg WL (for Intermediate Poles)

Nos 19 3401 64619 1060 20140

3 Sets 30 626 18780 287 8610

4 Nos 100 38 3800 0 0

5 Nos 50 14 700 0 0

6 Guy Set Complete Sets 12 723 8676 354 4248

7 Rabbit ACSR Conductor Kms 4.06 33676 136725 2608 10588

8 Weasel ACSR Conductor Kms 1.015 20100 20402 1913 1942

9 No.8 SWG GI wire for continuous earth wire Kms 1.015 (103 kgs)

54.674 5631 1913 1942

10 8 SWG GI wire for guard loops Kgs 26 54.674 1422 0 0

11 Spiral Earth Electrode Nos 25 207 5175 55 1375

12 Concreting Materials for guy sets (Without Cement) Nos 8 140 1120 0 0

13SMC Street Lighting Metering Box with Automatic Control Swith, Contactors with Single Phase 5-30 Amps meter & 50/5A CT including wiring

Nos 1 6500 6500 565 565

14 PVC Pipe 40 mm Dia Mtrs 6 50 300 0 0

15 PVC Insulated wire 25 Sqmm Single Core Multi Stranded

Mtrs 25 32 800 0 0

16Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum Kgs 25 64 1600 25 625

Total 311895 56395

17 Labour charges

a) Casual 56395

b) Regular 11279

379568

Note:

COST DATA SHEET - 13Running LT, 3-Phase 5 Wire Power Line with Continuous Earth Wire on 9.0 Mtr Supports Using RABBIT ACSR for Phase and

Neutral, and WEASEL Conductor for Street Light and 8 SWG GI Wire for Continuous Earth Wire with an Average Span of 40 Mtrs in Vertical Configuration

SL. No Particulars Unit Qty

Material cost Labour Cost

Total Cost/Km in Rs.

1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports

2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

Fabricated Vertical Cross Arms with pole, clamps, bolts, nuts and washers

1.1kV Pin Insulators with GI Pins

No.8 Strain Insulators

Page 23: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1RCC Pole - 8 Mtrs Long, 115 kg WL (for Deadend, Anchor points) Nos 5 4351 21755 848 4240

2 PCC Pole - 8 Mtrs Long, 200 kg WL (for Intermediate Poles)

Nos 20 2495 49900 848 16960

3 Set 5 263 1315 96 480

4 Sets 25 255 6375 96 2400

5 Set 5 162 810 96 480

6 Sets 20 154 3080 96 1920

7 Nos 48 38 1824 0 0

8 Nos 21 14 294 0 0

9 Guy Set Complete Sets 8 723 5784 354 2832

10 Weasel ACSR Conductor Kms 3.045 20100 61205 1913 5825

11 Spiral Earth Electrode Nos 25 207 5175 55 1375

12 Concreting Materials for guy sets (without cement) Nos 8 158 1264 0 0

13SMC Street Lighting Metering Box with Automatic Control Swith, Contactors with Single Phase 5-30 Amps meter & 50/5A CT including wiring

Nos 1 6500 6500 565 565

14 PVC Pipe 40 mm Dia Mtrs 6 50 300 0 0

15 PVC Insulated wire 25 Sqmm Single Core Multi Stranded

Mtrs 25 32 800 0 0

16 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kgs 25 64 1600 25 625

Total 167981 37702

17 Labour charges

a) Casual 37702

b) Regular 7540

213223

Note:

2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for RCC poles)

LT 2 Pin cross arms, with pole clamps, bolts, nuts (for RCC poles)

LT 2 Pin cross arms, with pole clamps, bolts, nuts (for PCC poles)

1.1kV Pin Insulators with GI Pins

No.8 Strain Insulators

Total Cost/Km in Rs.

1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for PCC poles)

COST DATA SHEET - 12Running LT, Single Phase 3 Wire Power Line on 8.0 Mtr Supports with an Average Span of 40 Mtrs

Using WEASEL ACSR Conductor

ParticularsSL. No Unit Qty

Material cost Labour Cost

Page 24: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 RCC Pole - 8 Mtrs Long, 115 kg WL (for Deadend, Anchor points.)

Nos 5 4351 21755 848 4240

2 PCC Pole - 8 Mtrs Long, 200 kg WL (for Intermediate Poles)

Nos 15 2495 37425 848 12720

3 Set 5 263 1315 96 480

4 Sets 20 255 5100 96 1920

5 Set 5 162 810 96 480

6 Sets 20 154 3080 96 1920

7 Nos 95 38 3610 0 0

8 Nos 50 14 700 0 0

9 Guy Set Complete Sets 8 723 5784 354 2832

10 Rabbit ACSR Conductor Kms 4.06 33636 136562 2608 10588

11 Weasel ACSR Conductor Kms 1.015 20100 20402 1913 1942

12 Spiral Earth Electrode Nos 20 207 4140 55 1100

13 Concreting Materials for guy sets (Without Cement) Nos 8 158 1264 0 0

14SMC Street Lighting Metering Box with Automatic Control Swith, Contactors with Single Phase 5-30 Amps meter & 50/5A CT including wiring

Nos 1 6500 6500 565 565

15 PVC Pipe 40 mm Dia Mtrs 6 50 300 0 0

16PVC Insulated wire 25 Sqmm Single Core Multi Stranded Mtrs 20 32 640 0 0

17 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kgs 25 64 1600 25 625

Total 250987 39412

18 Labour charges

a) Casual 39412

b) Regular 7882

298281

Note:

COST DATA SHEET - 11

Note: The no. of RCC poles and PCC poles have to be used as per field conditions and hence estimates have to be prepared accordingly.

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for RCC poles)

1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports

Running LT, 3 Phase 5 Wire for Power Line on 8.0 Mtr Supports Using RABBIT ACSR Conductor for Phase and Neutral, and WEASEL Conductor for Street Light with an Average Span of 50 mtrs

Total Cost/Km in Rs.

SL. No Particulars

Material costQty

2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

Labour CostUnit

LT 2 Pin cross arms, with pole clamps, bolts, nuts (for PCC poles)

No.8 Strain Insulators

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for PCC poles)

1.1kV Pin Insulators with GI Pins

LT 2 Pin cross arms, with pole clamps, bolts, nuts (for RCC poles)

Page 25: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 RCC Pole - 9 Mtrs Long, 145 kg WL (for Deadend, Anchor points)

Nos 6 5941 35646 1060 6360

2 PSC Pole - 9 Mtrs Long, 200 kg WL (for Intermediate Poles)

Nos 19 3401 64619 1060 20140

3 Sets 7 263 1841 96 672

4 Sets 22 255 5610 96 2112

5 Sets 7 162 1134 96 672

6 Sets 18 154 2772 96 1728

7 Nos 95 38 3610 0 0

8 Nos 50 14 700 0 0

9 Guy Set Complete Sets 10 723 7230 354 3540

10 Rabbit ACSR Conductor Kms 4.06 33636 136562 2608 10588

11 Weasel ACSR Conductor Kms 1.015 20100 20402 1913 1942

12 Spiral Earth Electrode Nos 25 207 5175 55 1375

13 Concreting Materials for guy sets (without Cement) No's 8 158 1264 0 0

14SMC Street Lighting Metering Box with Automatic Control Swith, Contactors with Single Phase 5-30 Amps meter & 50/5A CT including wiring

No's 1 6500 6500 565 565

15 PVC Pipe 40 mm Dia Mtrs 6 50 300 0 0

16PVC Insulated wire 25 Sqmm Single Core Multi stranded Mtrs 25 32 800 0 0

17Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum Kgs 25 64 1600 25 625

Total 295765 50319

18 Labour charges

a) Casual 50319

b) Regular 10064

356148

Note:

COST DATA SHEET - 10

2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

1.1kV Pin Insulators with GI Pins

Running LT, 3-Phase 5 Wire for Power Line on 9.0 Mtr Supports Using RABBIT ACSR Conductor for Phase and Neutral, and WEASEL Conductor or Street Light with an Average Span of 40 Mtrs (For Cities, Towns and Residential Layouts)

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for RCC poles)

SL. No Particulars

Labour Cost

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for PSC poles)

QtyMaterial cost

1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports

No.8 Strain Insulators

Total Cost/Km in Rs.

LT 2 Pin cross arms, with pole clamps, bolts, nuts (for RCC poles)

Unit

LT 2 Pin cross arms, with pole clamps, bolts, nuts (for PSC poles)

Page 26: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 RCC Pole - 9 Mtrs Long, 145 kg WL Nos 1 5941 5941 1060 1060

2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 24 3401 81624 1060 25440

3 Set 1 263 263 96 96

4 Sets 24 255 6120 96 2304

5 Nos 96 38 3648 0 0

6 Nos 8 14 112 0 0

7 Guy Set Complete Sets 8 723 5784 354 2832

8 Rabbit ACSR Conductor Kms 4.06 33636 136562 2608 10588

9 Spiral Earth Electrode Nos 25 207 5175 55 1375

10 Concreting materials for guy sets without cement Nos 8 158 1264 0 0

11 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kgs 25 64 1600 25 625

Total 248093 44320

12 Labour charges

a) Casual 44320

b) Regular 8864

301278

Note:

COST DATA SHEET - 9Running LT, 3-Phase 4 Wire Power Line on 9.0 Mtr Supports Using RABBIT ACSR Conductor with an

Average Span of 40 Mtrs

SL. No Particulars

Labour CostUnit Qty

Material cost

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for RCC poles)

1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports

2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

1.1kV Pin Insulators with GI Pins

No.8 Strain Insulators

Total Cost/Km in Rs.

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for PSC poles)

Page 27: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 RCC Pole - 8 Mtrs Long, 145 kg WL Nos 1 4351 4351 848 848

2 PCC Pole - 8 Mtrs Long, 200 kg WL Nos 24 2495 59880 848 20352

3 Set 1 263 263 96 96

4 Sets 24 255 6120 96 2304

5 Nos 96 38 3648 0 0

6 Nos 8 14 112 0 0

7 Guy Set Complete Sets 8 723 5784 354 2832

8 Rabbit ACSR Conductor Kms 4.06 33636 136562 2608 10588

9 Spiral Earth Electrode Nos 25 207 5175 55 1375

10 Concreting materials for guy sets without cement Nos 8 158 1264 0 0

11Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum Kgs 25 64 1600 25 625

Total 224759 39020

12 Labour charges

a) Casual 39020

b) Regular 7804

271584

Note: 1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports

2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

Total Cost/Km in Rs.

Unit Qty

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for PCC poles)

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for RCC poles)

COST DATA SHEET - 8Running LT , 3-Phase 4 Wire Power Line on 8.0 Mtr Supports Using RABBIT ACSR Conductor with an

Average Span of 40 Mtrs

SL. No

No.8 Strain Insulators

Material cost Labour Cost

1.1kV Pin Insulators with GI Pins

Particulars

Page 28: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 RCC Pole - 8 Mtrs Long, 145 kg WL Nos 1 4351 4351 848 848

2 PCC Pole - 8 Mtrs Long, 200 kg WL Nos 17 2495 42415 848 14416

3 Set 1 263 263 96 96

4 Sets 17 255 4335 96 1632

5 Nos 64 38 2432 0 0

6 Nos 8 14 112 0 0

7 Guy Set Complete Sets 8 723 5784 354 2832

8 Weasel ACSR Conductor Kms 4.06 20100 81606 1913 7767

9 Spiral Earth Electrode Nos 18 207 3726 55 990

10 Concreting materials for guy sets without cement Nos 8 158 1264 0 0

11Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum Kgs 18 64 1152 25 450

Total 147440 29031

12 Labour charges

a) Casual 29031

b) Regular 5806

182277

Note:

COST DATA SHEET - 7Running LT, 3-Phase 4 Wire Power Line on 8.0 Mtr Supports Using WEASEL ACSR Conductor with an

Average Span of 60 Mtrs (IP Installations)

Unit

2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

Total Cost/Km in Rs.

1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports

1.1 kV Pin Insulators with GI Pins

No.8 Strain Insulators

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for PCC poles)

QtyMaterial cost Labour Cost

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for RCC poles)

SL. No Particulars

Page 29: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 RCC Pole - 9 Mtrs Long, 145 kg WL Nos 1 5941 5941 1060 1060

2 PSC Pole - 9 Mtrs Long, 200 kg WL No's 23 3401 78223 1060 24380

3 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (for RCC poles)

Set 1 382 382 99 99

4Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (for PSC poles) Sets 23 377 8671 99 2277

5 Set 1 263 263 96 96

6 Sets 24 258 6192 96 2304

7 DP Structure with 9 mtr RCC Poles Set 1 15910 15910 3252 3252

8 Nos 72 94 6768 0 0

9 Nos 96 38 3648 0 0

10 Nos 6 290 1740 0 0

11 Nos 8 14 112 0 0

12 Sets 8 742 5936 354 2832

13 Rabbit ACSR Conductor Kms 7.105 33676 239268 2608 18530

14 PG Clamps for Rabbit conductor Nos 6 76 456 0 0

15 Spiral Earth Electrode Nos 26 207 5382 55 1430

16

Span 25 2720 68000 603 15075

Sets 25 263 6575 0 0

17 Concreting materials for guy sets without cement Nos 8 158 1264 0 0

18Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07 Nos 8 120 960 48 384

19 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kgs 26 64 1664 25 650

Total 457355 72369

20 Labour charges

a) Casual 72369

b) Regular 14474

544198

Note:

b) 4 Pin cross arms with clamps,bolts, nuts and washers.

Total Cost/Km in Rs.

Unit Qty

2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

No.8 Strain Insulators

Guarding between HT & LT Lines

1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers(for PSC poles)

a) Guarding Materials

1.1kV Pin Insulators with GI Pins

11kV Pin Insulators with GI pins

45kN Disc Insulators

Guy Set Complete

COST DATA SHEET - 6

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for RCC poles)

Running Single Circuit 11 kV, 3-Phase Power Line & 3 Phase 4 Wire Secondary Line on 9.0 Mtr Supports with an Average Span of 40 Mtrs Using RABBIT ACSR conductor for HT & LT Lines

SL. No

Material cost Labour CostParticulars

Page 30: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 RCC Pole - 9 Mtrs Long, 145 kg WL Nos 1 5941 5941 1060 1060

2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 18 3401 61218 1060 19080

3 Set 1 382 382 99 99

4 Sets 18 377 6786 99 1782

5 Set 1 263 263 96 96

6 Sets 19 258 4902 96 1824

7 Set 1 15910 15910 3252 3252

8 Nos 57 94 5358 0 0

9 Nos 76 38 2888 0 0

10 Nos 6 290 1740 0 0

11 Nos 8 14 112 0 0

12 Sets 8 742 5936 354 2832

13 Kms 3.045 33676 102543 2608 7941

14 Kms 4.06 20100 81606 1913 7767

15 Nos 21 207 4347 55 1155

16

Span 20 2720 54400 603 12060

b) 4 Pin cross arms with clamps,bolts, nuts and washers.

Sets 20 263 5260 0 0

17 PG Clamps for Rabbit conductor Nos 6 158 948 0 0

18 Nos 8 120 960 0 0

19 Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07

Nos 7 120 840 48 336

20 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kgs 21 64 1344 25 525

Total 363684 59809

21

59809

11962

435455

Note:

COST DATA SHEET - 5

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for RCC poles)

Unit

11kV Horizontal cross arms with clamps, HTST Supports, bolts, nuts and washers (for PSC poles)

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for PSC poles)

45kN Disc Insulators

1.1kV Pin Insulators with GI Pins

11kV Pin Insulators with GI pins

DP Structure with 9 mtr RCC Poles

Sl No

Running Single Circuit 11 kV 3 Phase Power Line and 3 Phase - 4 Wire Secondary Line on 9 Mtr Supports with an Average Span of 50 Mtrs using RABBIT Conductor for HT and WEASEL for LT Lines

11kV Horizontal cross arms with clamps, HTST Supports, bolts, nuts and washers (for RCC poles)

QtyLabour CostMaterial cost

Particulars

b) Regular *

1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports

Concreting Materials for guy sets

Labour charges

a) casual

2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

Total Cost/Km in Rs

a) Guarding Materials

Rabbit ACSR for HT Lines

Spiral Earth Electrode

No.8 Strain Insulators

Weasel ACSR for LT lines

Guy Set Complete

Guarding between HT & LT Lines

Page 31: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 RCC Pole - 9 Mtrs Long, 145 kg WL Nos 1 5941 5941 1060 1060

2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 22 3401 74822 1060 23320

3 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (for RCC poles) Set 1 382 382 99 99

4 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (for PSC poles) Sets 22 377 8294 99 2178

5 DP Structure with 9 Mtrs RCC Poles Sets 2 15910 31820 3252 6504

6 11kV Pin Insulators with GI pins Nos 69 94 6486 0 0

7 70/90 kN Disc Insulators Nos 12 490 5880 0 0

8 Strain Clamp 3 bolt type for Disc Insulator Nos 12 468 5616 0 0

9 Guy Set Complete Sets 6 742 4452 354 2124

10 Coyote ACSR Conductor Kms 3.045 92708 282296 4555 13870

11 PG Clamps for Coyote Conductor Nos 12 267 3204 0 0

12 Spiral Earth Electrode Nos 27 207 5589 55 1485

13 EG Stirrups with GI wire lacing Set of 2 Nos 23 370 8510 99 2277

14 Concreting materials for guy sets without cement Nos 6 158 948 0 0

15 Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07 Nos 10 120 1200 48 480

16 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum Kgs 27 64 1728 25 675

Total 447168 54072

17 Labour charges

a) Casual 54072

b) Regular 10814

512054

Note:

Material cost Labour Cost

Total Cost/Km in Rs.

Qty

1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports

2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

COST DATA SHEET - 4Running Single Circuit 11 kV, 3-Phase Power Line on 9.0 Mtr Supports with an Average Span of 40 Mtrs Using COYOTE ACSR

conductor

SL. No Particulars Unit

Page 32: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 RCC Pole - 8.0M Long, 145 kg WL Nos 1 4351 4351 848 848

2 PCC Pole - 8.0M Long, 200 kg WL Nos 18 2495 44910 848 15264

3 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (for RCC poles)

Set 1 382 382 99 99

4 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (for PCC poles)

Sets 18 377 6786 99 1782

5 DP Structure with 8 Mtrs RCC Poles Set 1 12730 12730 3104 3104

6 11kV Pin Insulators with GI pins Nos 57 94 5358 0 0

7 45kN Disc Insulators Nos 6 290 1740 0 0

8 Guy Set Complete Sets 6 742 4452 354 2124

9 Rabbit ACSR Conductor Kms 3.045 33676 102543 2608 7941

10 PG Clamps for Rabbit Conductor Nos 6 76 456 0 0

11 Spiral Earth Electrode Nos 21 207 4347 55 1155

12 EG Stirrups with GI wire lacing Set of 2 Nos

19 370 7030 99 1881

13 Concreting materials for guy sets without cement Nos 6 158 948 0 0

14 Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07

Nos 8 120 960 48 384

15 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kgs 21 64 1344 25 525

Total 198337 35107

16 Labour charges

a) Casual 35107

b) Regular 7021

240466

Note:

Unit Qty

2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

Labour Cost

Total Cost/Km in Rs.

Running Single Circuit 11 kV , 3-Phase Power Line on 8.0 Mtr Supports with an Average Span of 50 Mtrs Using RABBIT ACSR Conductor

1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports

COST DATA SHEET - 3

SL. No Particulars

Material cost

Page 33: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 RCC Pole - 9 Mtrs Long, 145 kg WL Nos 1 5941 5941 1060 1060

2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 18 3401 61218 1060 19080

3 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (for RCC poles)

Set 1 382 382 99 99

4 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (for PSC poles)

Set 18 377 6786 99 1782

5 DP Structure with 9 Mtrs RCC Poles Set 1 15910 15910 3252 3252

6 11kV Pin Insulators with GI pins Nos 57 94 5358 0 0

7 45kN Disc Insulators Nos 6 290 1740 0 0

8 Guy Set Complete Sets 6 742 4452 354 2124

9 Rabbit ACSR Conductor Kms 3.045 33676 102543 2608 7941

10 PG Clamps for Rabbit conductor Nos 6 76 456 0 0

11 Spiral Earth Electrode Nos 21 207 4347 55 1155

12 EG Stirrups with GI wire lacing Set of 2 Nos

19 370 7030 99 1881

13 Concreting materials for guy sets without cement Nos 6 158 948 0 0

14 Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07

Nos 8 120 960 48 384

15 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kg 21 64 1344 25 525

Total 219415 39283

16 Labour charges

a) Casual 39283

b) Regular 7857

266555

Note:

COST DATA SHEET - 2Running Single Circuit 11 kV, 3-Phase Power Line on 9.0 Mtr Supports with an Average Span of 50 Mtrs Using Rabbit ACSR

Conductor

Unit QtyMaterial cost Labour Cost

1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports

2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

SL. No Particulars

Total Cost/Km in Rs.

Page 34: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 RCC Pole - 9 Mtrs Long, 145 kg WL Nos 1 5941 5941 1060 1060

2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 23 3401 78223 1060 24380

3 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers for RCC poles Set 1 382 382 99 99

4 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers for PSC poles Set 23 377 8671 99 2277

5 DP Structure with 9 Mtrs RCC Poles Set 1 15910 15910 3252 3252

6 11 kV Pin Insulators with GI pins Nos 72 94 6768 0 0

7 45 kN Disc Insulators Nos 6 290 1740 0 0

8 Guy Set Complete Sets 6 742 4452 354 2124

9 Rabbit ACSR Conductor Kms 3.045 33676 102543 2608 7941

10 PG Clamps for Rabbit Conductor Nos 6 76 456 0 0

11 Spiral Earth Electrode Nos 26 207 5382 55 1430

12 EG Stirrups with GI wire lacing Set of 2 Nos 24 370 8880 99 2376

13 Concreting materials for guy sets without cement Nos 6 158 948 0 0

14 Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07 Nos 8 120 960 48 384

15 Anti Climbing Device (10mtrs/1 Kg GI Barbed Wire) Lumpsum Nos 26 64 1664 25 650

Total 242920 45973

16 Labour charges

a) Casual 45973

b) Regular 9195

298088

Note:

COST DATA SHEET - 1

1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports

2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

Running Single Circuit 11kV, 3 Phase Power Line On 9.0 Mtr Supports With An Average Span Of 40 Mtrs Using Rabbit ACSR Conductor

ParticularsSL. No Qty

Material costUnit

Total Cost/Km in Rs.

Labour Cost

Page 35: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Sl No Material Unit Rate/Unit(in Rs)

1 Al Lead Wire - 240 Sqmm Mtrs 2002 Copper lugs - 240 Sqmm Nos 1843 PG Clamps - Rabbit to 240 Sqmm Nos 3074 Spacers for DTC Wiring Nos 38

5 4 Pin Cross Arm with necessary Clamps,bolts & nuts etc complete (Galvanised )

Nos 352

6 Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised )

Nos 155

Sl No Material Unit Rate/Unit(in Rs)

1 Al Lead Wire - 120 Sqmm Mtrs 1082 Copper lugs - 120 Sqmm Nos 773 PG Clamps - Rabbit to 120 Sqmm Nos 2044 Spacers for DTC Wiring Nos 38

5 4 Pin Cross Arm with necessary Clamps,bolts & nuts etc complete (Galvanised )

Nos 352

6 Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised )

Nos 155

Sl No Material Unit Rate/Unit(in Rs)

1 Al Lead Wire - 95 Sqmm Mtrs 822 Copper lugs - 95 Sqmm Nos 713 PG Clamps - Rabbit to 95 Sqmm Nos 1054 Spacers for DTC Wiring Nos 38

5 4 Pin Cross Arm with necessary Clamps,bolts & nuts etc complete (Galvanised )

Nos 352

Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised )

Nos 155

Sl No Material Unit Rate/Unit(in Rs)

1 Al Lead Wire - 50 Sqmm Mtrs 452 Copper lugs - 50 Sqmm Nos 303 PG Clamps - Rabbit to 50 Sqmm Nos 664 Spacers for DTC Wiring Nos 38

5 4 Pin Cross Arm with necessary Clamps,bolts & nuts etc complete (Galvanised )

Nos 352

6 Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised )

Nos 155

COST DATA SHEET - 49

The size of the lead wire provisioned are as per Standard requirement depending on the Ampere rating of the transformer.The Size of the cable mabe modified to suite field requirement where ever necessary.

Standard Requirement of Materials for providing LT Wiring for Distribution Transformer Centers of various capacities

LT Wiring for - 250/500 KVA

LT Wiring for - 100 KVA

LT Wiring for - 63 KVA

LT Wiring for - 25 KVA

Page 36: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Sl. No. Description of the work Unit Labour

charges of the work

1

Consolidated Labour charges forshifting of the existing conductor,including all works associated withshifting of the conductor such as anyfittings, aerial fuse boards, cut outs,service main (UG cable and over head)etc., on the existing deterioratedintermediate pole to new pole erected.

Per Pole Rs.2200/-

COST DATA SHEET - 48

Consolidated Labour charges for shifting of conductor and all other fittings existing on the deteriorated pole while replaceing intermediate poles(Does not include labour chages for releasing and erection of pole)

Page 37: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Sl. No. Description of the work Unit Labour charges of the work

1

Consolidated Labour charges for shiftingof the conductor terminations(existing cutpoints) in deteriorated existing poles tonew poles erected. Work includes allworks associated with shifting of theterminations, like shifting of aerial fuseboards, cut outs, service main(UG cableand over head) and any other existingfitting.

Per Pole Rs.3000/-

COST DATA SHEET - 47

Consolidated Labour charges for shifting of conductor terminations and all other fittings existing on the deteriorated pole while replaceing termination(cut point)

poles(Does not include labour chages for releasing and erection of pole)

Page 38: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

PART-A (Materials)

1 Material cost Estimate shall be prepared as per site requirement

PART-B (Labour)Nos 1 4238

Nos 2 5650

Nos 3 7063

Nos 4 8475

5 & Above

as per Common SR 2016-17

Note:-

1

2

3

4

5

No. of Pole

Works Involved

Consolidated Amount in Rs.

The labour charges includes all works such as digging of pits, Erection of Poles, Fixing of Cross Arms, Strining of conductor, fixing of Conductore accessories, insulators, Fixing guy sets, Anti climbing device, spiral earth electrode and danger board etc complete

Consolidated labour charges for works 1 to 4 (ONE to FOUR) poles including excavation of pit, pole erection, fixing of cross arms, stringing of conductor, fixing of conductor accessories, fixing guy sets, fixing of anti climbing device, spiral earth electrode, danger board etc if any (Applicable for both HT & LT Line)

2

No other labour charges or any other charges towards special locality allowance LC Charges, additional labour charges, transportation charges etc., are payable.

The above rates are not applicable for works awarded on tender

COST DATA SHEET - 46

Estimate for carrying out 1 to 4 (ONE to FOUR) poles works in respect of Service Main Connection and E&I Works only

Estimate shall not split to bring them into this category

Certificate has to be furnished by the section officer who prepares the estimate that the estimates are not split to claim the above labour charges

(Not applicaple for any other type of work)

SL. No Paritculars Unit

Page 39: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

PART-A (Materials)

1 Material cost Estimate shall be prepared as per site requirement

PART-B (Labour)

2

Consolidated labour charges involving 3 to 5 (THREE to FIVE) pole works for Ganga Kalyana and Drinking Water supply works only.

Nos 1

Note:-

1

2

3

4

5

13949

The labour charges includes all works such as digging of pits, Errection of Poles, Fixing of Cross Arms, insulators, Strining of wire, providing guy sets.

No other labour charges or any other charges towards special locality allowance LC Charges, additional labour charges, transportation charges etc., are payable.

Estimates coverig more than 3 pole works shall not split to bring them into this catageory.

The above rates are not applicable for works awarded on tender

Certificate has to be furnished by the section officer who prepares the estimate that the estimates are not split to claim the above labour charges

COST DATA SHEET - 45

Estimate for Carrying Out 3 to 5 (THREE to FIVE) Poles Works in respect of Ganga Kalyana and Drinking Water Supply Works only

(Not applicaple for any other type of work)SL. No Paritculars Unit Qty Consolidated

Amount in Rs.

Page 40: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

PART-A (Materials)

1 Material cost Estimate shall be prepared as per site requirement

PART-B (Labour)

2

Consolidated labour charges involving 1 to 2 (ONE to TWO) pole works for Ganga Kalyana and Drinking Water supply works only.

Nos 1

Note:-

1

2

3

4

5

COST DATA SHEET - 44

Estimate for Carrying Out 1 to 2 (One to Two) Poles Works in respect of Ganga Kalyana and Drinking Water Supply Works only

(Not applicaple for any other type of work)SL. No Paritculars Unit Qty Consolidated

Amount in Rs.

8829

The labour charges includes all works such as digging of pits, Erection of Poles, Fixing of Cross Arms, insulators, Strining of wire, providing guy sets.

The above rates are not applicable for works awarded on tender

No other labour charges or any other charges towards special locality allowance LC Charges, additional labour charges, transportation charges etc., are payable.

Estimates coverig more than 2 pole works shall not split to bring them into this catageory.

Certificate has to be furnished by the section officer who prepares the estimate that the estimates are not split to claim the above labour charges

Page 41: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1

Fixing 3 kVAr, 3 Phase, LT Capacitor housed in a enclosure with necessary Fuses, wiring, mounting arrangement for 15/25kVA DTC (including connection to transformer, grounding etc., complete)

Set 1 525 525 382 382

2

Fixing 9 kVAr, 3 Phase, LT Capacitor housed in a enclosure with necessary Fuses, wiring, mounting arrangement for 63kVA DTC (including connection to transformer, grounding etc., complete)

Set 1 931 931 382 382

3

Fixing 18 kVAr, 3 Phase, LT Capacitor housed in a enclosure with necessary Fuses, wiring, mounting arrangement for 100kVA DTC (including connection to transformer, grounding etc., complete)

Set 1 1733 1733 450 450

4

Fixing 27 kVAr, 3 Phase, LT Capacitor housed in a enclosure with necessary Fuses, wiring, mounting arrangement for 250kVA DTC (including connection to transformer, grounding etc., complete)

Set 1 2758 2758 525 525

5

Fixing 54 kVAr, 3 Phase, LT Capacitor housed in a enclosure with necessary Fuses, wiring, mounting arrangement for 300/500 kVA DTC (including connection to transformer, grounding etc., complete)

Set 1 4883 4883 549 549

6

Wiring Materials for connecting the Capacitors to the Transformer (16 Sqmm Single Core PVC insulated sheathed aluminium wire, aluminium lugs, 2mm thick 40mm dia PVC pipe with Bend) and connecting the capacitor box to existing grounding

Set 1 200 200 0 0

Total Material + Labour Material Labour

a) For 25KVA Transformer 1107 725 382

b) For 63KVA Transformer 1513 1131 382

c) For 100KVA Transformer 2383 1933 450

d) For 250KVA Transformer 3483 2958 525

e) For 300/500 KVA Transformer 5632 5083 549

1 While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general guidelines vide a to …. page No. ……. To ……..

Qty

COST DATA SHEET - 43For providing LT Capacitor to the Distribution Transformer

Material cost Labour CostSl. No Materials Unit

Page 42: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1LT CT's Class - 1 Accuracy Ring Type Ratio 50/5 for 15/25kVA DTC

Nos 3 554 1662 63 189

2LT CT's Class - 0.5 Accuracy Ring Type Ratio 100/5 for 50/63kVA DTC

Nos 3 408 1224 63 189

3LT CT's Class - 0.5 Accuracy Ring Type Ratio 150/5 for 100kVA DTC

Nos 3 306 918 63 189

4LT CT's Class - 0.5 Accuracy Ring Type Ratio 400/5 for 250kVA DTC

Nos 3 360 1080 63 189

5LT CT's Class - 0.5 Accuracy Ring Type Ratio 800/5 for 500 kVA DTC

Nos 3 405 1215 63 189

6Electronic Trivector Meter 3 Phase, 4 Wire, Accuracy 0.5 Cl

No 1 2250 2250 631 631

7

Weather Proof, Verming Proof LT Metering Box with clamping arrangement for mounting on the Transformer structure with necessary terminal strip and CT mounting arrangement for housing the ETV Meters and connecting to the existing ground.

No 1 4000 4000 325 325

Total Cost in Rs.

a) 15/25kVA DTC 1145 514

b) 63kVA DTC 1145 514

c) 100kVA DTC 1145 514

d) 250kVA DTC 1145 514

e) 500kVA DTC 1145 514

1

7465

QtySl. No

While preparing estimates for turnkey/total turnkey projects please refere to Sl. No. …….. To general guidelines vide a to …. page No. ……. To ……..

Materials

5215

7168

5662

5224

4918

5080

7912

For Providing Electronic Trivector Meters with Associated CT's Metering Box etc., on LT Side of Distribution Transformer Center

7474

7330

COST DATA SHEET - 42

With Meter Without Meter

Material cost Labour CostUnit

Page 43: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

SlNo Unit Total Cost

1

Set

Set

Set

Set

Set

Set

Set

Set

Set

Set

2

1

2

(vi) With 100kVA Dry Type Transformer

(vii) With 250kVA Dry Type Transformer

(viii) With 500kVA Dry Type Transformer

(ix) With 750kVA Dry Type Transformer

(x) With 990kVA Dry Type Transformer

Installing & fixing the compact pre-fabricated packaged sub-station 100/250/500/750/ 990 kVA transformer on the existing concrete plinth.(This does not include the cost of

Note :

While preparing estimates for turnkey/total turnkey projects please refere to Sl. No. …….. To general guidelines vide a to …. page No. ……. To ……..

Revised Cost Data Sheet will be furnished after the rates for CSS, RMU etc. are finalised by the committee.

COST DATA SHEET - 41Providing Compact Pre-fabricated Packaged Sub-station 11kV/433V

Particulars

Packaged Sub-station 11kV/433V consisting of 3 Way SF6/VCB insulated Compact RMU, Oil cooled type Copper Wound Transformer and LT section with one ACB as incoming and 7

(i) With 100kVA oil cooled Transformer

Will be Furnished after the report of

the committee

(ii) With 250kVA oil cooled Transformer

(iii) With 500kVA oil cooled Transformer

(iv) With 750kVA oil cooled Transformer

(v) With 990kVA oil cooled Transformer

Page 44: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt

1 Metallic Enclosure with Busbars No 1 10752 10752

2Programmable Logic Controllers with communication ports

No 1 19339 19339

3 GSM Modem No 1 7642 7642

4 MCCB - 150 Amps for 100 kVA DTC No 1 1700 1700

5 MCB 6 amps No 1 210 210

6 Contactors - 160 Amps for 100 kVA DTC No 2 5775 11550

7 Current Transformers 150/5 amps for 100 kVA DTC No 3 306 918

8Electronic Trivector Meter 3 Phase, 4 Wire, Accuracy 0.5 Cl

No 1 2250 2250

9Transformer wiring kit to Connect RLM Unit box to the transformer using PVC sheathed aluminium lead wire, Lugs etc.,

Kit 1 7322 7322

10 Miscellaneous materials LS LS 62 62

Total Cost (Material) 61745

11 Labour Charges

a) Casual 3483

b) Regular 697

12

1)

Qty

Material cost

Total Cost 65925

While preparing estimates for turnkey / total tunkey projects please refer to Sl. No. ......... of General Guidelines vide a to .... in Page No. ...........

COST DATA SHEET - 40

Installing RLMU for the Existing 100kVA Distribution Transformer Center

Sl No Particulars Unit

Page 45: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt

1 Metallic Enclosure with Busbars No 1 10752 10752

2 Programmable Logic Controllers with communication ports No 1 19339 19339

3 GSM Modem No 1 7642 7642

4 MCCB - 100 Amps for 63 kVA DTC No 1 1500 1500

5 MCB 6 amps No 1 210 210

6 Contactors - 100 Amps for 63 kVA DTC No 2 3280 6560

7 Current Transformers 100/5 amps for 63 kVA DTC No 3 408 1224

8 Electronic Trivector Meter 3 Phase, 4 Wire, Accuracy 0.5 Cl No 1 2250 2250

9Transformer wiring kit to Connect RLM Unit box to the transformer using PVC sheathed aluminium lead wire, Lugs etc.,

Kit 1 4612 4612

10 Miscellaneous materials LS LS 23 23

Total Cost (Material) 54112

11 Labour Charges

a) Casual 3483

b) Regular 697

1)

Material cost

Total Cost 58292

While preparing estimates for turnkey/total tunkey projects please refer to Sl. No. ......... of General Guidelines vide a to .... in Page No. ...........

COST DATA SHEET - 39Installing RLMU for the Existing 63 kVA Distribution Transformer Center

Sl No Particulars Unit Qty

Page 46: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt

1 Metallic Enclosure with Busbars No 1 10752 10752

2 Programmable Logic Controllers with communication ports No 1 19339 19339

3 GSM Modem No 1 7642 7642

4 MCCB - 40 Amps for 15/25 kVA DTC No 1 1485 1485

5 MCB 6 amps No 1 210 210

6 Contactors - 40 Amps for 15/25 kVA DTC No 2 2010 4020

7 Current Transformers 50/5 amps for 15/25 kVA DTC No 3 554 1662

8 Electronic Trivector Meter 3 Phase, 4 Wire, Accuracy 0.5 Cl No 1 2250 2250

9Transformer wiring kit to Connect RLM Unit box to the transformer using PVC sheathed aluminium lead wire, Lugs etc.,

Kit 1 2060 2060

10 Miscellaneous materials LS LS 147 147

Total Cost of Material 49567

11 Labour Charges

a) Casual 3483

b) Regular 697

Note:

1)

QtyMaterial cost

Total Cost 53747

(1) For 15 /25 kVA Transformer feeding to individual IP sets, use only one contactor & without MCCB .

While preparing estimates for turnkey / total tunkey projects please refer to Sl. No. ......... of General Guidelines vide a to .... in Page No. ...........

COST DATA SHEET - 38Installing RLMU for the Existing 15/25kVA Distribution Transformer Center

Sl No Particulars Unit

Page 47: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 RCC Poles 9 Mtr long with 145 Kg WL Nos 10 5941 59410 1060 10600

2 PSC Poles 9 Mtr long with 200 Kg WL Nos 15 3401 51015 1060 15900

Note:

31.1kV Class 3 Phase Aerial Bunched Cable of size 3x95+1x16+1x70 Sqmm

kms 1.015 410000 416150 20426 20732

4 Three Phase Distribution box for 6 Connections Nos 20 2065 41300 538 10760

5Piercing connector suitable for 16 Sqmm - 95 Sqmm AB Cable - Service Connections

Nos 60 228 13680 77 4620

6Piercing connector suitable for 16 Sqmm - 95 Sqmm AB Cable - Street Light Connections

Nos 25 160 4000 54 1350

7Suspension Clamp Assembly 16 to 70 mm ( Excluding pole clamp & Eye Hook )

Sets 20 190 3800 115 2300

8 Pole clamp for HT/LT AB cable Sets 20 100 2000 192 3840

Eye Hook (Flat type) for fixing Clamps Sets 20 90 1800 0 0

8Dead End Clamp/Anchor Clamp Assembly 25 to 95 Sq mm (excluding pole clamps and Eye hook)

Sets 16 200 3200 115 1840

9 Universal Hook, Bolts & nuts Nos 16 305 4880 115 1840

10 T-connector KZ3 95 Nos 8 338 2704 130 1040

11Cable Straight thru' joint kits suitable for 95 Sqmm

Sets 5 310 1550 192 960

12 Pre-Insulated lugs-CPTAU for 95 Sqmm Nos 8 338 2704 160 1280

13 End cap for 50/70 Sqmm Nos 50 19 950 5 250

14 Guy Set Complete Sets 8 723 5784 354 2832

15 Concreting for Guy sets (without cement) Sets 8 158 1264 0 0

16 PVC Insulated wire 16/25 Sqmm Mtrs 400 23.52 9408 0 0

17 Spiral Earth Electrodes Nos 25 207 5175 55 1375

Total Cost of Materials 630774

18 Labour Charges

a) Casual 81519

b) Regular 16304

728597

1

COST DATA SHEET - 37Running Single Circuit 1.1 kV 3 Phase 5 Wire Power Line on 9 Mtr Supports with Average Span of 40 Mtrs Using

3x95 + 1x16 + 1x70 Sqmm Aerial Bunched Cables (ABC)

SL. No Particulars Unit

Labour Cost

While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general guidelines vide a to …. page No. ……. To ……..

RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports and hence the quantity of RCC and PSC poles may be revised as per field condition.

QtyMaterial cost

Total Cost/Km in Rs.

Page 48: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 RCC Poles 9 Mtr long with 145 Kg WL Nos 10 5941 59410 1060 10600

2 PSC Poles 9 Mtr long with 200 Kg WL Nos 24 3401 81624 1060 25440

Note:

311kV Class 3 phase Aerial Bunched Cable 3x95 + 70 Sqmm

Kms 1.015 631000 640465 20426 20732

4Cable Straight thru' joint kits suitable for 95 Sqmm

Nos 6 5650 33900 828 4968

611 KV AB CableTermination Kits fo 95 to 120 Sqmm

Nos 6 2100 12600 700 4200

7Suspension Clamp Assembly 16 to 70 mm ( Excluding pole clamp & Eye Hook )

Sets 30 190 5700 115 3450

Pole clamp for HT/LT AB cable Sets 30 100 3000 192 5760

8 Eye Hook (Flat type) for fixing Clamps Sets 30 90 2700 0 0

Dead End Clamp/Anchor Clamp Assembly 25 to 95 Sq mm (excluding pole clamps and Eye hook)

Sets 12 200 2400 115 1380

9 End Caps Nos 10 19 190 5 50

1011kV Lightning Arrester, Metal Oxide9kV, 5kA

Set (3Nos) 2 2409 4818 107 214

11 Guy Set Complete Sets 6 742 4452 354 2124

12 Concreting for Guy sets (without cement) Sets 6 158 948 0 0

13 Grounding connection for messenger wire Nos 4 122 488 26 104

15 Spiral Earth Electrodes Nos 34 207 7038 55 1870

Total Cost of Material 859733

16 Labour Charges

a) Casual 80892.4

b) Regular 16178.5

17 956803.9

While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general guidelines vide a to …. page No. ……. To ……..

Total Cost/Km in Rs.

Labour Cost

RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports and hence the quantity of RCC and PSC poles may be revised as per field condition.

QtyMaterial cost

COST DATA SHEET - 36Running Single Circuit 11kV, 3 Phase Power Line on 9 Mtr Supports with an Average Span of 30 Mtrs Using 3x95

Sqmm + 1x70 Sqmm Aerial Bunched Cables (ABC)

SL. No Particulars Unit

Page 49: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Qty Amt Qty Amt Qty Amt Qty Amt

1 No Will be intimated 1 Will be

intimated 1 Will be intimated 1 Will be

intimated 1 Will be intimated

2 Cmt 5084 0.07 355.88 0.09 457.56 0.1 508.4 0.16 813.44

3 Cmt 5084 0.29 1474.36 0.36 1830.24 0.14 711.76 0 0

4 Kgs 60.1 10 600.8 3.5 210.28 6 360.48 0 0

5 Cmt 5084 0 0 0 0 0 0 0.02 101.68

6 Cmt 3829 0 0 0 0 0 0 0.14 536.06

7 Kgs 50 12 600 12 600 12 600 12 600

8 No 2000 2 4000 2 4000 2 4000 2 4000

9 No 596 1 596 1 596 1 596 1 596

7627.04 7694.08 6776.64 6647.18

1 cmt 178 0.57 101.46 0.83 147.74 0.63 112.14 1.37 243.86

2 No. 2836 1 2836 1 2836 1 2836 1 2836

2937.46 2983.74 2948.14 3079.86

2937 2984 2948 3080

587 597 590 616

Total cost of material.(Excluding RMU) 11152 11275 10314 10343

Note:-

1

2

3 Revised Cost Data Sheet will be furnished after the rates for CSS, RMU etc. are finalised by the committee.

Labour charges for Fixing foundation frame of MS channel 100X50mm and MS angle 40X40X5mm welding, fixing in concrete, aligning the RMU on foundation bed, assembly of units, connecting Bus Bars from panel to panel etc., complete.

Labour Charges

a) Casual

b) Regular

The measurements for Earth work and concreting works have been provision as per the dimensions of the equipments of makes which are in use at present in BESCOM. Detail for the measurement are furnished in the data sheet furnished in Page No. ………..

While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general guidelines vide a to …. page No. ……. To ……..

Supplying of Frame of MS Channel 100x50mm and MS angle 40x40x5mm welding etc., complete.

Rod type earthing with 40 mm Dia, 3 Mtrs long MS rod as per specification & drawing (enclosed)

Lettering the RMU with enamel paint and also writing single line diagram of each panel, caution Board, Danger Board etc., including cost of Paint, Brush etc.,

Total cost of material.(Excluding Item No.1)

Labour Charges

Earth Excavation for R.M.U. Foundation depositing of earth on bank up to a lead of 50 mtrs and with a lift up to 1.5 mtrs

RMU 1 VL, 350 MVA, 630Amps

Bed Conceting with CC 1:2:4 as per Labour Charges

Foundation with Reinforcement CC 1:2:4 as per Labour Charges

Providing Reinforcement as per Labour Charges Item No. 28.1

Providing Plinth with CC 1:2:4 on the Stone Masonary

Construction of Stone Masonary

COST DATA SHEET-35Providing Compact RMU 11kV Class SF6/VCB Type (1VL)

Sl. No Materials Unit Rate

Schenider Make ABB Make Siemens Make MEI

Page 50: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Qty Amt Qty Amt Qty Amt Qty Amt

1 NoWill be intimate

d1

Will be intimat

ed1

Will be intimate

d1

Will be intimate

d1

Will be intimate

d

2 Cmt 5084 0.07 355.88 0.09 457.56 0.1 508.4 0.16 813.44

3 Cmt 5084 0.29 1474.36 0.36 1830.24 0.14 711.76 0 0

4 Kgs 60.1 10 600.8 3.5 210.28 6 360.48 0 0

5 Cmt 5084 0 0 0 0 0 0 0.02 101.68

6 Cmt 3829 0 0 0 0 0 0 0.14 536.06

7 Kgs 50 12 600 12 600 12 600 12 600

8 No 2000 2 4000 2 4000 2 4000 2 4000

9 No 596 1 596 1 596 1 596 1 596

7627 7694.08 6776.64 6647.18

1 cmt 178 0.57 101.46 0.83 147.74 0.63 112.14 1.37 243.86

2 No. 2836 1 2836 1 2836 1 2836 1 2836

2937.5 2983.74 2948.14 3079.86

2937 2984 2948 3080

587 597 590 616

Total cost of material.(Excluding RMU) 11152 11275 10314 10343

Note:-

1

2

3 Revised Cost Data Sheet will be furnished after the rates for CSS, RMU etc. are finalised by the committee.

Earth Excavation for R.M.U. Foundation depositing of earth on bank up to a lead of 50 mtrs and with a lift up to 1.5 mtrsLabour charges for Fixing foundation frame of MS channel 100X50mm and MS angle 40X40X5mm welding, fixing in concrete, aligning the RMU on foundation bed, assembly of units, connecting Bus

Labour Charges

a) Casual

b) Regular

The measurements for Earth work and concreting works have been provision as per the dimensions of the equipments of makes which are in use at present in BESCOM. Detail for the measurement are furnished in the data sheet furnished in Page No. ………..

Supplying of Frame of MS Channel 100x50mm and MS angle 40x40x5mm welding etc., complete.

Rod type earthing with 40 mm Dia, 3 Mtrs long MS rod as per specification & drawing (enclosed)

Lettering the RMU with enamel paint and also writing single line diagram of each panel, caution Board, Danger Board etc., including cost of Paint, Brush etc.,

Total cost of material.(Excluding Item No.1)

Labour Charges

While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general guidelines vide a to …. page No. ……. To ……..

RMU 1 OD , 350 MVA, 630Amps

Bed Conceting with CC 1:2:4 as per Labour Charges

Foundation with Reinforcement CC 1:2:4 as per Labour Charges

Providing Reinforcement as per Labour Charges Item No. 28.1

Providing Plinth with CC 1:2:4 on the Stone Masonary

Construction of Stone Masonary

COST DATA SHEET-34Providing Compact RMU 11kV Class SF6/VCB Type (1OD)

Materials Rate

Schenider Make ABB Make Siemens MakeSl. No Unit

MEI

Page 51: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Qty Amt Qty Amt Qty Amt Qty Amt

1 NoWill be intimate

d1

Will be intimat

ed1

Will be intimate

d1

Will be intimate

d1

Will be intimated

2 Cmt 5084 0.08 406.72 0.28 1423.52 0.43 2186.12 0.48 2440.32

3 Cmt 5084 0.36 1830.24 1.08 5490.72 0.42 2135.28 0 0

4 Kgs 60.1 30 1802.4 10 600.8 17 1021.36 0 0

5 Cmt 5084 0 0 0 0 0 0 0.06 305.04

6 Cmt 3829 0 0 0 0 0 0 0.43 1646.47

7 Kgs 50 40 2000 40 2000 40 2000 40 2000

8 No 2000 2 4000 2 4000 2 4000 2 4000

9 No 596 1 596 1 596 1 596 1 596

10635 14111 11938.8 10987.83

1 cmt 178 0.72 128.16 2.5 445 2 356 4.35 774.3

2 No. 2836 3 8508 3 8508 3 8508 3 8508

8636.2 8953 8864 9282.3

8636 8953 8864 9282

1727 1791 1773 1856

Total cost of material.(Excluding RMU) 20999 24855 22576 22127

Note:-

1

2

3 Revised Cost Data Sheet will be furnished after the rates for CSS, RMU etc. are finalised by the committee.

Earth Excavation for R.M.U. Foundation depositing of earth on bank up to a lead of 50 mtrs and with a lift up to 1.5 mtrsLabour charges for Fixing foundation frame of MS channel 100X50mm and MS angle 40X40X5mm welding, fixing in concrete, aligning the RMU on

Labour Charges

a) Casual

b) Regular

The measurements for Earth work and concreting works have been provision as per the dimensions of the equipments of makes which are in use at present in BESCOM. Detail for the measurement are furnished in the data sheet furnished in Page No. ………..

Supplying of Frame of MS Channel 100x50mm and MS angle 40x40x5mm welding etc., complete.

Rod type earthing with 40 mm Dia, 3 Mtrs long MS rod as per specification & drawing (enclosed)

Lettering the RMU with enamel paint and also writing single line diagram of each panel, caution Board, Danger Board etc., including cost of Paint,

Total cost of material.(Excluding Item No.1)

Labour Charges

While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general guidelines vide a to …. page No. ……. To ……..

RMU (3 Way), One Incomer + Two Breakers + One outgoing (2OD + 1VL), 350 MVA, 630Amps

Bed Conceting with CC 1:2:4 as per Labour Charges

Foundation with Reinforcement CC 1:2:4 as per Labour Charges

Providing Reinforcement as per Labour Charges Item No. 28.1

Providing Plinth with CC 1:2:4 on the Stone Masonary

Construction of Stone Masonary

COST DATA SHEET-33Providing Compact RMU 11kV Class SF6/VCB Type (1 Incomer +1 Breaker +1 Outgoing)

Materials Rate

Schenider Make ABB Make Siemens MakeSl. No Unit

MEI

Page 52: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Qty Amt Qty Amt Qty Amt Qty Amt

1 NoWill be

intimated 1Will be

intimated 1Will be

intimated 1Will be

intimated 1Will be

intimated

2 Cmt 5084 0.15 762.6 0.37 1881.08 0.53 2694.52 0.64 3253.76

3 Cmt 5084 0.65 3304.6 1.44 7320.96 0.56 2847.04 0 0

4 Kgs 60.1 40 2403.2 14 841.12 23 1381.84 0 0

5 Cmt 5084 0 0 0 0 0 0 0.08 406.72

6 Cmt 3829 0 0 0 0 0 0 0.57 2182.53

7 Kgs 50 50 2500 50 2500 50 2500 50 2500

8 No 2000 2 4000 2 4000 2 4000 2 4000

9 No 596 1 596 1 596 1 596 1 596

13566.4 17139 14019.4 12939.01

1 cmt 178 1.29 229.62 3.33 592.74 2.63 468.14 5.72 1018.16

2 No. 2836 4 11344 4 11344 4 11344 4 11344

11574 11937 11812 12362

11574 11937 11812 12362

2315 2387 2362 2472

Total cost of material.(Excluding RMU) 27455 31463 28194 27774

1

2

3

While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general guidelines vide a to …. page No. ……. To ……..

Revised Cost Data Sheet will be furnished after the rates for CSS, RMU etc. are finalised by the committee.

Earth Excavation for R.M.U. Foundation depositing of earth on bank up to a lead of 50 mtrs and with a lift up to 1.5 mtrsLabour charges for Fixing foundation frame of MS channel 100X50mm and MS angle 40X40X5mm welding, fixing in concrete, aligning the RMU on foundation bed, assembly of units, connecting

Labour Charges

a) Casual

b) Regular

Note:-

Supplying of Frame of MS Channel 100x50mm and MS angle 40x40x5mm welding etc., complete.

Rod type earthing with 40 mm Dia, 3 Mtrs long MS rod as per specification & drawing (enclosed)

Lettering the RMU with enamel paint and also writing single line diagram of each panel, caution Board, Danger Board etc., including cost of Paint,

Total cost of material.(Excluding Item No.1)

Labour Charges

The measurements for Earth work and concreting works have been provision as per the dimensions of the equipments of makes which are in use at present in BESCOM. Detail for the measurement are furnished in the data sheet furnished in Page No. ………..

RMU (3 Way), One Incomer + Two Breakers + One out going (2OD + 2VL), 350 MVA, 630Amps

Bed Conceting with CC 1:2:4 as per Labour Charges

Foundation with Reinforcement CC 1:2:4 as per Labour Charges

Providing Reinforcement as per Labour Charges Item No. 28.1

Providing Plinth with CC 1:2:4 on the Stone Masonary

Construction of Stone Masonary

COST DATA SHEET-32Providing Compact RMU 11kV Class SF6/VCB Type (1 Incomer + 2 Breaker + 1 Outgoing)

Materials RateSchenider Make ABB Make Siemens Make

Sl. No Unit

MEI

Page 53: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 Spun pole 11.0 Mtr Long No 1 15800 15800 2353 2353

2 Single Pole Transformer Structure Kit for 250kVA Set 1 23035 23035 2033 2033

3 HT Single Top Support with bolts, nuts & washers Sets 9 89 801 64 576

4 11kV Pin Insulator with pins Nos 9 94 846 0 0

5 Rabbit ACSR Conductor for jumps Mtrs 50 33.68 1684 0 0

6 Alkathene Tube 19mm Dia and in coils of 30 Mtrs Coils 2 500 1000 0 0

7 Concreting materials for 11 Mtrs Spun Pole

a) Base concreting 1:4:8, 1000x1000x150mm Each 1 704 704 0 0

b) Pole concreting 1:2:4, 1000x1000x2500 mm Each 1 11378 11378 0 0

c) Coping 1:2:4 (as per actuals) Each 1 1050 1050 0 0

8 GI Wire 10 SWG Kgs 5 57.7 288 0 0

9 Guy Wire 7/10 SWG Kgs 10 56.267 563 0 0

10 GI Pipe 100 mm Dia Mtrs 10 1143 11430 0 0

11 PVC Pipe 150 mm Dia Mtrs 20 291 5820 0 0

12 PVC Bend 150 mm Dia Nos 8 200 1600 0 0

13 PVC Pipe 25mm Dia Mtrs 40 27 1080 0 0

14 11kV/433V, 250kVA, 3 Phase, 50 Cys Distribution Transformer with oil

No 1 228340 228340 1365 1365

15 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 827 827 423 423

16 11kV, 200Amps, Single Break GOS Nos 3 6951 20853 636 1908

17Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/Dt: 24.10.07.

Single Electrode

with accessories

3 1277 3831 573 1719

a) LT Distribution Box for 250kVA with MCCB No 1 16705 16705 455 455

b) LT Wiring (From DTC to LT Line via Metering Box & LT Protection Kit) SINGLE CIRCUIT No 1

i. Al Lead Wire - 240 Sqmm Mtrs 45 199 8955

ii. Copper lugs - 240 Sqmm Nos 12 184 2208

iii. PG Clamps - Rabbit to 240 Sqmm Nos 4 307 1228

iv. Spacers for DTC Wiring Nos 8 38 304v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised)

Nos 2 155 310

c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42) No 1 5080 5080 514 514

d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy

No 1 2250 2250 631 631

19 11kV Lightning Arester, Metal Oxide, 9kV, 5kA Set/3 Nos 1 2070 2070 71 71

20 PVC Insulation Tape in rolls of 10 mtrs Roll 3 10 30 0 0

21 Horizontal Cross Arms nos 4 316 1264 81 324

22 MS Fish plate Nos 9 51 459 20 180

23Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07 No 1 120 120 48 48

24 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kg 2 64 128 25 50

Total cost of Material 37204125 Labour Charges

a) Casual 13378

b) Regular 2676

Labour CostSl No Unit

COST DATA SHEET-31

Qty

Total Cost in Rs 388095

Erection of 3 Phase, 11kV/433V, 250 kVA Single Pole Mounted Distribution Transformer on 11.0 Mtr Spun Pole With 3 GOS System

MaterialsMaterial cost

18 728 728

Page 54: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 9 Mtr long RCC pole (Square Section) No 1 7210 7210 1060 1060

2 11kV Pin Insulators with pins Nos 3 94 282 0 0

3 45kN Disc Insulator Nos 3 290 870 0 0

4 Guy Set Complete Set 1 742 742 354 354

5Single pole TC set suitable for 100 kVA Transformer

Set 1 6129 6129 1016 1016

611kV/433V, 100kVA, 3 Phase, 50 Cys Distribution Transformer BEE-3 Star Rated with Oil

No 1 121422 121422 910 910

7Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/Dt: 24.10.07.

Nos 3 1277 3831 573 1719

8 Providing Concreting for 9 mtr RCC Pole 0

a) Base concreting 1:4:8, 500x650x150 mm Each 1 298 298 0 0

b) Pole concreting 1:2:4, 500x500x1700 Each 1 3214 3214 0 0

c) Coping 1:2:4 (as per actuals) Each 1 444 444 0 0

9Concreting materials for Guy sets (without cement )

No 1 158 158 0 0

10 GI Wire 8 SWG Kgs 5 54.67 273.35 0 0

11 Guy Wire 7/10 SWG Kgs 10 57.7 577 0 0

1211kV Lightning Arester, Metal Oxide9kV, 5kA

Set/3 Nos 1 2070 2070 71 71

a) LT Protection Kit No 2 1602 3204 205 410

b) LT Distribution Box for 100kVA with MCB No 1 16705 16705 455 455

c) LT Wiring (From DTC to LT Line Through Merering Box & LT Protection Kit/LT Distribution Box) SINGLE CIRCUIT

No 1

i. Al Lead Wire - 120 Sqmm Mtrs 45 108 4860

ii. Copper lugs - 120 Sqmm Nos 12 77 924

iii. PG Clamps - Rabbit to 120 Sqmm Nos 4 204 816

iv. Spacers for DTC Wiring Nos 8 38 304

v. Fish Plate with necessary Clamps, bolts & nuts etc complete (Galvanised)

Nos 2 155 310

d) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42)

No 1 4918 4918 514 514

e) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy

No 1 2250 2250 631 631

14 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 827 827 423 423

15 11kV, 200Amps, Single Break GOS Nos 1 6951 6951 636 636

16Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07

No 1 120 120 48 48

17Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kg 1 64 64 25 25

18 Total Material Cost

a) With LT Distribution Box 186569

b) With LT Protection Kit 173068

19 Labour Charges

a) Casual 8430 8385

b) Regular 1686 1677

Total

196685

183130

Total Cost for Erection of a Single Pole Mounted 100kVA Transformer with LT Distribution Box in Rs

Erection of 3 Phase, 11kV/433V, 100kVA BEE 3 Star Rated Single Pole Mounted Transformer Centre on 9 Mtrs RCC Pole (Square Section)

COST DATA SHEET - 30

Sl. No

for LT Protection Kit

13

Total Cost for Erection of a Single Pole Mounted 100kVA Transformer with LT Protection KIT in Rs

UnitLabour Cost

QtyMaterial cost

for LT Distribution Box

568 568

Materials

Page 55: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 9 Mtr long RCC pole (Square Section) No 1 7210 7210 1060 1060

2 11kV Pin Insulators with pins Nos 3 94 282 0 0

3 45kN Disc Insulator Nos 3 290 870 0 0

4 Guy Set Complete Set 1 742 742 354 354

5Single pole TC set suitable for 63 kVA Transformer

Set 1 4088 4088 1016 1016

611kV/433V, 63kVA, 3 Phase, 50 Cys Distribution Transformer BEE-3 Star Rated with Oil

No 1 93726 93726 682 682

7Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07

Single Electrode

with accessories

3 1277 3831 573 1719

8 Concreting materials for 9 mtr RCC Pole

a) Base concreting 1:4:8, 650x650x150 mm Each 1 298 298 0 0

b) Pole concreting 1:2:4, 500x500x1650 Each 1 3214 3214 0 0

c) Coping 1:2:4 (as per actuals) Each 1 444 444 0 0

9Concreting materials for Guy sets (without cement )

No 1 158 158 0 0

10 GI Wire 8 SWG Kgs 5 54.67 273.35 0 0

11 Guy Wire 7/10 SWG Kgs 10 57.7 577 0 0

1211kV Lightning Arester, Metal Oxide9kV, 5kA

Set/3 Nos 1 2070 2070 71 71

a) LT Protection Kit for 63 kVA Nos 2 1602 3204 205 410

b) LT Wiring (From DTC to LT Line Through Merering Box & LT Protection Kit) SINGLE CIRCUIT

No 1

i. Al Lead Wire - 95 Sqmm Mtrs 40 82 3280

ii. Copper lugs - 95 Sqmm Nos 4 71 284

iii. PG Clamps - Rabbit to 95 Sqmm Nos 4 105 420

iv. Spacers for DTC Wiring Nos 8 38 304

v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised)

Nos 2 155 310

c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42)

No 1 5224 5224 514 514

d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy

No 1 2250 2250 631 631

14 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 827 827 423 423

15 11kV, 200Amps, Single Break GOS Nos 1 6951 6951 636 636

16Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07

No 1 120 120 48 48

17Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kg 1 64 64 25 25

18 Total material cost 141021

19 Labour Charges

a) Casual 8157

b) Regular 1631

150810

Sl. No

Total cost for Erection of a Single Pole Mounted 63kVA Transformer in Rs

13 568 568

COST DATA SHEET - 29Erection of 3 Phase, 11kV/433V, 63kVA BEE 3 Star Rated Single Pole Mounted Transformer

Centre on 9 Mtrs RCC Pole (Square Section)

Materials Unit QtyMaterial cost Labour Cost

Page 56: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 9 Mtr long RCC pole (Square Section) No 1 7210 7210 1060 1060

2 11kV Pin Insulators with pins Nos 3 94 282 0 0

3 45kN Disc Insulator Nos 3 290 870 0 0

4 Guy Set Complete Set 1 742 742 354 354

5Single pole TC set suitable for 25 kVA Transformer

Set 1 4088 4088 1016 1016

511kV/433V, 25kVA, 3 Phase, 50 Cys Distribution Transformer BEE-3 Star Rated with Oil

No 1 51560 51560 682 682

7Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07

Single Electrode

with accessories

3 1277 3831 573 1719

8 Concreting materials for 9 mtr RCC Pole

a) Base concreting 1:4:8, 650x650x150 mm Each 1 298 298 0 0

b) Pole concreting 1:2:4, 500x500x1650 Each 1 3214 3214 0 0

c) Coping 1:2:4 (as per actuals) Each 1 444 444 0 0

9Concreting materials for Guy sets (without cement)

No 1 158 158 0 0

10 GI Wire 8 SWG Kgs 5 54.67 273.35 0 0

11 Guy Wire 7/10 SWG Kgs 10 57.7 577 0 0

1211kV Lightning Arester, Metal Oxide9kV, 5kA

Set/3 Nos 1 2070 2070 71 71

a) LT Protection Kit for 25 kVA No 1 1602 1602 205 205

b) LT Wiring (From DTC to LT Line Through Metering Box & LT Protection Kit) SINGLE CIRCUIT

No 1

i. Al Lead Wire - 50 Sqmm Mtrs 25 45 1125

ii. Copper lugs - 50 Sqmm Nos 4 30 120

iii. PG Clamps - Rabbit to 50 Sqmm Nos 4 66 264

iv. Spacers for DTC Wiring Nos 8 38 304

v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised)

Nos 2 155 310

c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42)

No 1 5662 5662 514 514

d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy

No 1 2250 2250 631 631

14 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 827 827 423 423

15 11kV, 200Amps, Single Break GOS Nos 1 6951 6951 636 636

16Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07

No 1 120 120 48 48

17Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kg 1 64 64 25 25

18 Total Material Cost 95216.2

Labour Charges

a) Casual 7952

b) Regular 1590

104759

COST DATA SHEET - 28Erection of 3 Phase, 11kV/433V, 25kVA BEE 3 Star Rated Single Pole Mounted Transformer Centre

on 9 Mtrs RCC Pole (Square Section)

UnitLabour Cost

QtyMaterial cost

568

Total cost for erection of a single pole mounted 25kVA Transformer in Rs

Sl. No Materials

13 568

Page 57: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 Part-A: TRANSFORMER

a) 9 Mtr RCC DP Transformer Structure (Using 9 Mtr RCC Poles)

No 1 24575 24575 4238 2999

b) 8 Mtr RCC DP Transformer Structure (Using 8 Mtr RCC Poles)

No 1 21395 21395 3816 2703

2 11kV Pin Insulators Sets 3 94 282 0 0

3 45kN Disc Insulators Sets 3 290 870 0 0

4 Guy Set Complete Nos 4 742 2968 354 1416

511kV/433V, 250kVA, 3 Phase, 50 Cys Distribution Transformer with oil

No 1 277240 277240 1365 1365

6Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07

Single Electrode

with accessories

3 1277 3831 573 1719

7Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07

No 1 120 120 48 48

8Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kgs 2 64 128 25 50

9 Concreting for Guy sets without cement Nos 4 158 632 0 0

10 GI Wire 8 SWG Kgs 5 54.67 273 0 0

11 Guy wire 7/10 SWG Kgs 10 56.26 563 0 0

Total using 9 mtr Poles 311482 7597

Total using 8 mtr Poles 308302 7301

12 Labour Charges

i) using 9 mtr Poles

a) Casual 7597

b) Regular 1519

ii) using 8 mtr poles

a) Casual 7301

b) Regular 1460

13 Total for Part-A

I) Using 9 mtr Poles 320598

ii) using 8 mtr poles 317063

Material cost

COST DATA SHEET - 27

250 KVA

Erection of 3 Phase, 11kV/433V, 250kVA 3 Star rated Distribution Transformer Centre Using DPTS

Particulars Labour CostUnit QtySl.No

Page 58: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Part-B:

1411kV Lightning Arester, Metal Oxide9kV, 5kA

Set of 3 Nos 1 2070 2070 71 71

15 Labour Charges

a) Casual 71

b) Regular 14

16 Total for Part-B 2155

Part-C: SWITCH GEAR

a) LT Distribution box for 250kVA with MCCB No 1 16705 16705 455 455

b) LT Wiring (From DTC to LT Line via Metering Box & LT Protection Kit) SINGLE CIRCUIT No 1

i. Al Lead Wire - 240 Sqmm Mtrs 45 199 8955

ii. Copper lugs - 240 Sqmm Nos 12 184 2208

iii. PG Clamps - Rabbit to 240 Sqmm Nos 4 307 1228

iv. Spacers for DTC Wiring Nos 8 38 304

v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised)

Nos 2 155 310

c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42)

No 1 5080 5080 514 514

d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy

Nos. 1 2250 2250 631 631

18 11kV Solid Core Type HG Fuse Unit Set/ 3 nos 1 827 827 423 423

19 11kV, 200Amps, Single Break GOS No 1 6951 6951 636 636

Total Cost (Material) 44818

20 Labour Charges

a) Casual 3303

b) Regular 661

21 Total for Part-C 48782

22 Total (A+B+C)

1) Using 9 mtr Poles 371535

Labour Charges:

a) Casual 10971

b) Regular 2194

2) Using 8 mtr Poles 368000

Labour Charges:

a) Casual 10675

b) Regular 2135

17

Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11 kV Pin Insulators ACSR/AAA Conductor, Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate separately for

644 644

Page 59: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

1 While preparing estimates for turnkey / total tunkey projects please refer to Sl. No. ......... of General Guidelines vide a to .... in Page No. ...........

Page 60: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 Part-A: TRANSFORMER

a) 9 Mtr RCC DP Transformer Structure (Using 9 Mtr RCC Poles)

No 1 24575 24575 4238 4238

b) 8 Mtr RCC DP Transformer Structure (Using 8 Mtr RCC Poles)

No 1 21395 21395 3816 3816

2 11kV Pin Insulators Sets 3 94 282 0 0

3 45kN Disc Insulators Sets 3 290 870 0 0

4 Guy Set Complete Nos 4 742 2968 354 1416

511kV/433V, 100kVA, 3 Phase 50 Cys Distribution Transformer BEE - 3 Star Rated with Oil

No 1 121422 121422 910 910

6Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07

Single Electrode

with accessories

3 1277 3831 573 1719

7 Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07

No 1 120 120 48 48

8 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kgs 2 64 128 25 50

9 Concreting for Guy sets without cement Nos 4 158 632 0 0

10 GI Wire 8 SWG Kgs 5 54.67 273 0 0

11 Guy wire 7/10 SWG Kgs 10 56.26 563 0 0

Total using 9 mtr Poles 155664 8381

Total using 8 mtr Poles 152484 7959

12 Labour Charges

I) using 9 mtr Poles

a) Casual 8381

b) Regular 1676

ii) using 8 mtr poles

a) Casual 7959

b) Regular 1592

13 Total for Part-A

I) Using 9 mtr Poles 165721

ii) using 8 mtr poles 162035

Part-B:

14 11kV Lightning Arester, Metal Oxide9kV, 5kA

Set of 3 Nos 1 2070 2070 71 71

15 Labour Charges

a) Casual 71

Material cost Labour Cost

Erection of 3 Phase, 11kV/433 V, 100kVA BEE – 3 Star Rated Distribution Transformer Centre Using DPTS

COST DATA SHEET -26

ParticularsSl No Unit Qty

100 KVA

Page 61: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

b) Regular 14

16 Total for Part-B 2155

Part-C: SWITCH GEAR

a) LT Protection Kit Nos 2 1602 3204 205 410

b) LT Distribution box for 100 kVA with MCB No 1 16705 16705 455 455

c) LT Wiring (From DTC to LT Line Through Merering Box & LT Protection Kit/LT Distribution Box) SINGLE CIRCUIT

No 1

i. Al Lead Wire - 120 Sqmm Mtrs 45 108 4860

ii. Copper lugs - 120 Sqmm Nos 12 77 924

iii. PG Clamps - Rabbit to 120 Sqmm Nos 4 204 816

iv. Spacers for DTC Wiring Nos 8 38 304

v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised) Nos 2 155 310

d) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42)

No 1 4918 4918 514 514

e) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy

Nos 1 2250 2250 631 631

18 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 827 827 423 423

19 11kV, 200Amps, Single Break GOS No 1 6951 6951 636 636

Total Cost (Material) 25364 38865

20 Labour Charges

a) Casual 3182 3227

b) Regular 636 645

21 Total for Part-C 29182 42737

22 Total (A+B+C)

1) Using 9 mtr Poles 197059 210614

Labour Charges:

a) Casual 11634 11679

b) Regular 2327 2336

2) Using 8 mtr Poles 193372 206927

Labour Charges:

a) Casual 11212 11257

b) Regular 2242 2251

Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11kV Pin Insulators ACSR/AAA Conductor, Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate separately for

17

With LT Protection kit With Distribution Box

568 568

Page 62: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 Part-A: TRANSFORMER

a) 9 Mtr RCC DP Transformer Structure (Using 9 Mtr RCC Poles) No 1 22532 22532 4115 4115

b) 8 Mtr RCC DP Transformer Structure (Using 8 Mtr RCC Poles) No 1 19352 19352 3560 3560

2 11kV Pin Insulators Sets 3 94 282 0 0

3 45kN Disc Insulators Sets 3 290 870 0 0

4 Guy Set Complete Nos 4 742 2968 354 1416

5 11kV/433V, 63kVA, 3 Phase, 50 Cys Distribution Transformer BEE - 3 Star Rated with Oil

No 1 93726 93726 682 682

6Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07

Single Electrode

with accessories

3 1277 3831 573 1719

7 Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07

No 1 120 120 48 48

8 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kgs 2 64 128 25 50

9 Concreting for Guy sets without cement Nos 4 158 632 0 0

10 GI Wire 8 SWG Kgs 5 54.67 273 0 0

11 Guy wire 7/10 SWG Kgs 10 56.26 563 0 0

Total using 9 mtr Poles 125925 8030

Total using 8 mtr Poles 122745 7475

12 Labour Charges

i) using 9 mtr Poles

a) Casual 8030

b) Regular 1606

ii) using 8 mtr Poles

a) Casual 7475

b) Regular 1495

13 Total for Part-A

I) Using 9 mtr Poles 135561

ii) using 8 mtr Poles 131715

Part-B:

COST DATA SHEET -25Erection of 3 Phase, 11kV/433V, 63kVA BEE – 3 Star Rated Distribution Transformer Centre

Using DPTS

SlNo Particulars Unit Qty

63 KVA

Material Cost Labour Cost

Page 63: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

1411kV Lightning Arester, Metal Oxide9kV, 5kA Set of 3 Nos 1 2070 2070 71 71

15 Labour Charges

a) Casual 71

b) Regular 14

16 Total for Part-B 2155

Part-C: SWITCH GEAR

a) LT Protection Kit for 63 kVA Nos 2 1602 3204 205 410

b) LT Wiring (From DTC to LT Line Through Metering Box & LT Protection Kit) SINGLE CIRCUIT

No 1

i. Al Lead Wire - 95 Sqmm Mtrs 40 82 3280

ii. Copper Lugs - 95 Sqmm Nos 4 71 284

iii. PG Clamps - Rabbit to 95 Sqmm Nos 4 105 420

iv. Spacers for DTC Wiring Nos 8 38 304

v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised) Nos 2 155 310

c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42) No 1 5224 5224 514 514

d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy No 1 2250 2250 631 631

18 11kV Solid Core Type HG Fuse Unit Set/ 3 nos 1 827 827 423 423

19 11kV, 200Amps, Single Break GOS No 1 6951 6951 636 636

Total Cost (Material) for Part-C 23054

20 Labour Charges

a) Casual 3182

b) Regular 636

21 Total for Part-C 26872

22 Total (A+B+C)

1) Using 9 mtr Poles 164589

Labour Charges:

a) Casual 11283

b) Regular 2257

2) Using 8 mtr Poles 160743

Labour Charges:

a) Casual 10728

b) Regular 2146

17 568 568

Page 64: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11kV Pin Insulators ACSR/AAA Conductor, Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate separately for

Page 65: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 Part-A: TRANSFORMER

a) 9 Mtr RCC DP Transformer Structure (Using 9 Mtr RCC Poles) No 1 22532 22532 4115 4115

b) 8 Mtr RCC DP Transformer Structure (Using 8 Mtr RCC Poles) No 1 19352 19352 3560 3560

2 11kV Pin Insulators Sets 3 94 282 0 0

3 45kN Disc Insulators Sets 3 290 870 0 0

4 Guy Set Complete Nos 4 742 2968 354 1416

511kV/433V, 25KVA, 3 Phase, 50 Cys Distribution Transformer BEE-3 Star Rated with Oil No 1 51560 51560 682 682

6Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07

Single Electrode

with accessories

3 1277 3831 573 1719

7 Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07

No 1 120 120 48 48

8 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kgs 2 64 128 25 50

9 Concreting for Guy sets without cement Nos 4 158 632 0 0

10 GI Wire 8 SWG Kgs 5 54.67 273.35 0 0

11 Guy wire 7/10 SWG Kgs 10 56.26 563 0 0

Total using 9 mtr Poles 83759 8030

Total using 8 mtr Poles 80579 7475

12 Labour Charges

i) using 9 mtr Poles

a) Casual 8030

b) Regular 1606

ii) using 8 mtr Poles

a) Casual 7475

b) Regular 1495

13 Total for Part-A

I) Using 9 mtr Poles 93395

ii) using 8 mtr Poles 89549

Part-B:

Unit Qty

25 KVA

COST DATA SHEET - 24

Material Cost Labour Cost

Erection of 3 Phase, 11kV/433V, 25kVA BEE – 3 Star Rated Distribution Transformer Centre Using DPTS

SlNo Particulars

Page 66: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

1411kV Lightning Arester, Metal oxide, 9kV, 5kA Set of 3 Nos 1 2070 2070 71 71

15 Labour Charges

a) Casual 71

b) Regular 14

16 Total for Part-B 2155

Part-C: SWITCH GEAR

a) LT Protection Kit for 25 kVA No 1 1602 1602 205 205

b) LT Wiring (From DTC to LT Line Through Metering Box & LT Protection Kit) SINGLE CIRCUIT

No 1

i. Al Lead Wire - 50 Sqmm Mtrs 25 45 1125

ii. Copper Lugs - 50 Sqmm Nos 4 30 120

iii. PG Clamps - Rabbit to 50 Sqmm Nos 4 66 264

iv. Spacers for DTC Wiring Nos 8 38 304

v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised) Nos 2 155 310

c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42) No 1 5662 5662 514 514

d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy No 1 2250 2250 631 631

18 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 827 827 423 423

19 11kV, 200Amps, Single Break GOS No 1 6951 6951 636 636

Total Cost (Material) for Part-C 19415

20 Labour Charges

a) Casual 2977

b) Regular 595

21 Total for Part-C 22987

22 Total (A+B+C)

118538

Labour Charges:

a) Casual 11078

b) Regular 2216

114692

Labour Charges:

a) Casual 10523

b) Regular 2105

56817

1) Using 9 mtr Poles

2) Using 8 mtr Poles

568

Page 67: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11kV Pin Insulators ACSR/AAA Conductor, Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate separately for

Page 68: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

SL. No Paritculars Unit Qty

Rate Amt Rate Amt

13 Pole Structure complete using 9 Mtrs PSCC Poles of 300kg WL ( Including Cost of Poles) Set 1 23357 23357 6271 6271

2 Spiral Earth Electrode Nos 3 207 621 55 165

3 Guy Set With No.15 Strain Insulator Complete Sets 3 742 2226 354 1062

4 45kN Disc Insulators Nos 6 290 1740 0 0

5 11kV Pin Insulators with GI Pins Nos 3 94 282 0 0

6 Concrete for Guy set (without cement) Nos 3 158 474 0 0

7Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07 Nos 2 120 240 49 98

8Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum Kgs 3 64 192 25 75

9 Total Material cost 29132

10 Labour Charges

a) Casual 7671

b) Regular 1534

38337

Note: 1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

COST DATA SHEET -60

Erection of 3 Pole Structure With 9 Mtr PSCC Poles of 300Kg WL

Material cost Labour Cost

Part-A: LINES

Total Cost/Unit in Rs.

Page 69: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

SL. No Paritculars Unit Qty

Rate Amt Rate Amt

1 DP Structure using 9 Mtrs PSCC Poles of 300Kg WL Set 1 13184 13184 3252 3252

2 45kN Disc Insulators Nos 6 290 1740 0 0

3 Guy Set Complete Sets 2 742 1484 354 708

4 Spiral Earth Electrode Nos 2 207 414 55 110

5 Concrete for Guy Set (without Cement) Nos 2 158 316 0 0

6 Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07 No 1 120 120 49 48

7 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum Kgs 2 64 128 25 50

Total Part A 17386 4168

Part-B: SWITCH GEAR

9 11kV 400A D/B GOS Set 1 15637 15637 706 706

10 H-Frame for mounting GOS No 1 2895 2895 191 191

11 DOLO Cut Out Set/3 Nos 1 4494 4494 423 423

Total Part B 23026 1320

Total Material cost (A+B) 40412

Labour Charges

a) Casual 5488

b) Regular 1098

46998

Note:

Total Cost of Estimate using 9 Mtrs PSCC PoleoF 300Kg WL

1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

COST DATA SHEET -59

Providing 2 Pole Structrues at the Tapping Point Using 9Mtrs PSCC Poles of 300.Kg WL

Material cost Labour Cost

Part-A: LINES

Page 70: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 PSCC Pole - 9 Mtrs Long, 300 kg WL (for Deadend, Anchor points)

Nos 1 4578 4578 1060 1060

2 PSC Pole -9 Mtrs Long, 200 kg WL (for Intermediate Poles)

Nos 23 3401 78223 1060 24380

3 Set 1 13184 13184 3252 3252

4 Special cross arm with cross arm for EG Stirrups, braces, clamps, bolts nuts and washers complete

Sets 23 1122 25806 316 7268

5 Nos 69 94 6486 0 0

6 45kN Disc Insulators Nos 6 290 1740 0 0

7 Guy Set Complete Sets 9 742 6678 354 3186

8 Rabbit ACSR Conductor Kms 3.045 33676 102543 2608 7941

9 Spiral Earth Electrode Nos 26 207 5382 55 1430

10 EG Stirrups with GI wire lacing Set of 2 No's 370 424 156880 99 36630

11 Concreting Materials for guy sets (Without Cement) Nos 9 158 1422 0 0

12 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kgs 26 64 1664 25 650

Total 404586 85797

13 Labour charges

a) Casual 85797

b) Regular 17159

507543

Note:

COST DATA SHEET - 58

Running Single Circuit 11 kV, 3-phase Power Line on 9.0 Mtr Supports Using RABBIT ACSR Conductorand using PSCC poles of 300 Kg WL for dead ends and Anchor Points, With an Average Span of 40 Mtrs in Vertical Configuration in Congested Areas

SL. No Particulars

11kV ceramic Pin Insulators with GI Pins

Qty

Total Cost/Km in Rs.

Labour Cost

b) Support piece for fixing EG stirrup 50x50x6 mm MS Angle 0.865 mtr long - 1 No

Item 4 includes, the following

Unit

a) Special cross arms 50x50x6 mm MS 0.715 mtr long 3-Nos

Material cost

1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

c) Brace 50x50x6 mm MS Angle 0.850 mtr long - 1 No

d) 50x6 mm Flat 1.8 mtr, long - 1No

e) RCC Pole Clamps - 5 Nos

f) Cross Arm for fixing EG Stirrup - 1 No

DP Structure using 9 Mtrs RCC poles

Page 71: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 PSCC Pole - 9 Mtrs Long, 300 kg WL (for Deadend, Anchor points) Nos 6 4578 27468 1060 6360

2 PSC Pole -9 Mtrs Long, 200 kg WL (for Intermediate Poles) Nos 19 3401 64619 1060 20140

3 Sets 30 626 18780 287 8610

4 Nos 100 38 3800 0 0

5 Nos 50 14 700 0 0

6 Guy Set Complete Sets 12 723 8676 354 4248

7 Rabbit ACSR Conductor Kms 4.06 33676 136725 2608 10588

8 Weasel ACSR Conductor Kms 1.015 20100 20402 1913 1942

9 No.8 SWG GI wire for continuous earth wire Kms 1.015 (103 kgs) 54.674 5631 1913 1942

10 8 SWG GI wire for guard loops Kgs 26 54.674 1422 0 0

11 Spiral Earth Electrode Nos 25 207 5175 55 1375

12 Concreting Materials for guy sets (Without Cement) Nos 8 140 1120 0 0

13SMC Street Lighting Metering Box with Automatic Control Swith, Contactors with Single Phase 5-30 Amps meter & 50/5A CT including wiring

Nos 1 6500 6500 565 565

14 PVC Pipe 40 mm Dia Mtrs 6 50 300 0 0

15 PVC Insulated wire 25 Sqmm Single Core Multi Stranded Mtrs 25 32 800 0 0

16 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum Kgs 25 64 1600 25 625

Total 303717 56395

17 Labour charges

a) Casual 56395

b) Regular 11279

371390

Note:

COST DATA SHEET - 57

Running LT, 3-Phase 5 Wire Power Line with Continuous Earth Wire on 9.0 Mtr Supports Using RABBIT ACSR for Phase and Neutral, and WEASEL Conductor for Street Light and 8 SWG GI Wire for Continuous Earth Wire with an Average Span of 40 Mtrs in

Vertical Configuration and using PSCC poles of 300 Kg WL for dead ends and Anchor Points

SL. No Particulars Unit Qty

Material cost Labour Cost

Total Cost/Km in Rs.

1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

Fabricated Vertical Cross Arms with pole, clamps, bolts, nuts and washers

1.1kV Pin Insulators with GI Pins

No.8 Strain Insulators

Page 72: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 PSCC Pole - 9 Mtrs Long, 300 kg WL (for Deadend, Anchor points)

Nos 6 4578 27468 1060 6360

2 PSC Pole - 9 Mtrs Long, 200 kg WL (for Intermediate Poles)

Nos 19 3401 64619 1060 20140

3 Sets 7 258 1806 96 672

4 Sets 22 258 5676 96 2112

5 Sets 7 157 1099 96 672

6 Sets 18 157 2826 96 1728

7 Nos 95 38 3610 0 0

8 Nos 50 14 700 0 0

9 Guy Set Complete Sets 10 723 7230 354 3540

10 Rabbit ACSR Conductor Kms 4.06 33636 136562 2608 10588

11 Weasel ACSR Conductor Kms 1.015 20100 20402 1913 1942

12 Spiral Earth Electrode Nos 25 207 5175 55 1375

13 Concreting Materials for guy sets (without Cement) No's 8 158 1264 0 0

14SMC Street Lighting Metering Box with Automatic Control Swith, Contactors with Single Phase 5-30 Amps meter & 50/5A CT including wiring

No's 1 6500 6500 565 565

15 PVC Pipe 40 mm Dia Mtrs 6 50 300 0 0

16PVC Insulated wire 25 Sqmm Single Core Multi stranded Mtrs 25 32 800 0 0

17Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum Kgs 25 64 1600 25 625

Total 287637 50319

18 Labour charges

a) Casual 50319

b) Regular 10064

348020

Note:

Total Cost/Km in Rs.

1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for PSCC poles)

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for PSC poles)

LT 2 Pin cross arms, with pole clamps, bolts, nuts (for PSCC poles)

LT 2 Pin cross arms, with pole clamps, bolts, nuts (for PSC poles)

1.1kV Pin Insulators with GI Pins

No.8 Strain Insulators

COST DATA SHEET - 56Running LT, 3-Phase 5 Wire for Power Line on 9.0 Mtr Supports Using RABBIT ACSR Conductor for Phase and Neutral, and WEASEL Conductor or Street Light with an Average Span of 40 Mtrs and using PSCC poles of 300 Kg WL for dead ends and

Anchor Points (For Cities, Towns and Residential Layouts)

SL. No Particulars Unit Qty

Material cost Labour Cost

Page 73: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 PSCC Pole - 9 Mtrs Long, 300 kg WL Nos 1 4578 4578 1060 1060

2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 24 3401 81624 1060 25440

3 Set 1 258 258 96 96

4 Sets 24 258 6192 96 2304

5 Nos 96 38 3648 0 0

6 Nos 8 14 112 0 0

7 Guy Set Complete Sets 8 723 5784 354 2832

8 Rabbit ACSR Conductor Kms 4.06 33636 136562 2608 10588

9 Spiral Earth Electrode Nos 25 207 5175 55 1375

10 Concreting materials for guy sets without cement Nos 8 158 1264 0 0

11 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum Kgs 25 64 1600 25 625

Total 246797 44320

12 Labour charges

a) Casual 44320

b) Regular 8864

299982

Note: 1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for PSCC poles)

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for PSC poles)

1.1kV Pin Insulators with GI Pins

No.8 Strain Insulators

Total Cost/Km in Rs.

COST DATA SHEET - 55Running LT, 3-Phase 4 Wire Power Line on 9.0 Mtr Supports Using RABBIT ACSR Conductor with an

Average Span of 40 Mtrs and using PSCC poles of 300 Kg WL for dead ends and DP structure

SL. No Particulars Unit Qty

Material cost Labour Cost

Page 74: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 PSCC Pole - 9 Mtrs Long, 300 kg WL Nos 1 4578 4578 1060 1060

2 PSC Pole - 9 Mtrs Long, 200 kg WL No's 23 3401 78223 1060 24380

3 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (for PSCC poles)

Set 1 377 377 99 99

4Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (for PSC poles) Sets 23 377 8671 99 2277

5 Set 1 258 258 96 96

6 Sets 24 258 6192 96 2304

7 Set 1 13184 13184 3252 3252

8 Nos 72 94 6768 0 0

9 Nos 96 38 3648 0 0

10 Nos 6 290 1740 0 0

11 Nos 8 14 112 0 0

12 Sets 8 742 5936 354 2832

13 Rabbit ACSR Conductor Kms 7.105 33676 239268 2608 18530

14 PG Clamps for Rabbit conductor Nos 6 76 456 0 0

15 Spiral Earth Electrode Nos 26 207 5382 55 1430

16

Span 25 2720 68000 603 15075

Sets 25 263 6575 0 0

17 Concreting materials for guy sets without cement Nos 8 158 1264 0 0

18Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07 Nos 8 120 960 48 384

19 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kgs 26 64 1664 25 650

Total 453256 72369

20 Labour charges

a) Casual 72369

b) Regular 14474

540099

Note: 1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

DP Structure with 9 Mtrs PSCC Poles of 300Kg WL

Guy Set Complete

Guarding between HT & LT Lines

a) Guarding Materials

b) 4 Pin cross arms with clamps,bolts, nuts and washers.

Total Cost/Km in Rs.

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for PSCC poles)

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers(for PSC poles)

11kV Pin Insulators with GI pins

1.1kV Pin Insulators with GI Pins

45kN Disc Insulators

No.8 Strain Insulators

COST DATA SHEET - 54Running Single Circuit 11 kV, 3-Phase Power Line & 3 Phase 4 Wire Secondary Line on 9.0 Mtr Supports with an Average Span of

40 Mtrs Using RABBIT ACSR conductor for HT & LT Lines and using PSCC poles of 300 Kg WL for dead ends and DP structure

SL. No Particulars Unit Qty

Material cost Labour Cost

Page 75: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 PSCC Pole - 9 Mtrs Long, 300 kg WL Nos 1 4578 4578 1060 1060

2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 18 3401 61218 1060 19080

3 Set 1 377 377 99 99

4 Sets 18 377 6786 99 1782

5 Set 1 258 258 96 96

6 Sets 19 258 4902 96 1824

7 Set 1 13184 13184 3252 3252

8 Nos 57 94 5358 0 0

9 Nos 76 38 2888 0 0

10 Nos 6 290 1740 0 0

11 Nos 8 14 112 0 0

12 Sets 8 742 5936 354 2832

13 Kms 3.045 33676 102543 2608 7941

14 Kms 4.06 20100 81606 1913 7767

15 Nos 21 207 4347 55 1155

16

Span 20 2720 54400 603 12060

b) 4 Pin cross arms with clamps,bolts, nuts and washers.

Sets 20 263 5260 0 0

17 PG Clamps for Rabbit conductor Nos 6 158 948 0 0

18 Nos 8 120 960 0 0

19 Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07

Nos 7 120 840 48 336

20 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kgs 21 64 1344 25 525

Total 359585 59809

21

59809

11962

431356

Note:

b) Regular *

Total Cost/Km in Rs

1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

Spiral Earth Electrode

Guarding between HT & LT Lines

a) Guarding Materials

Concreting Materials for guy sets

Labour charges

a) casual

1.1kV Pin Insulators with GI Pins

45kN Disc Insulators

No.8 Strain Insulators

Guy Set Complete

Rabbit ACSR for HT Lines

Weasel ACSR for LT lines

11kV Horizontal cross arms with clamps, HTST Supports, bolts, nuts and washers (for PSCC poles)

11kV Horizontal cross arms with clamps, HTST Supports, bolts, nuts and washers (for PSC poles)

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for PSCC poles)

LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for PSC poles)

DP Structure with 9 Mtrs PSCC Poles of 300Kg WL

11kV Pin Insulators with GI pins

COST DATA SHEET - 53Running Single Circuit 11 kV 3 Phase Power Line and 3 Phase - 4 Wire Secondary Line on 9 Mtr Supports with an Average Span of

50 Mtrs using RABBIT Conductor for HT and WEASEL for LT Lines and using PSCC poles of 300 Kg WL for dead ends and DP structure

Sl No Particulars Unit Qty Material cost Labour Cost

Page 76: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 PSCC Pole - 9 Mtrs Long, 300 kg WL Nos 1 4578 4578 1060 1060

2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 22 3401 74822 1060 23320

3 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (for PSCC poles) Set 1 377 377 99 99

4 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (for PSC poles) Sets 22 377 8294 99 2178

5 DP Structure with 9 Mtrs PSCC Poles of 300Kg WL Sets 2 13184 26368 3252 6504

6 11kV Pin Insulators with GI pins Nos 69 94 6486 0 0

7 70/90 kN Disc Insulators Nos 12 490 5880 0 0

8 Strain Clamp 3 bolt type for Disc Insulator Nos 12 468 5616 0 0

9 Guy Set Complete Sets 6 742 4452 354 2124

10 Coyote ACSR Conductor Kms 3.045 92708 282296 4555 13870

11 PG Clamps for Coyote Conductor Nos 12 267 3204 0 0

12 Spiral Earth Electrode Nos 27 207 5589 55 1485

13 EG Stirrups with GI wire lacing Set of 2 Nos 23 370 8510 99 2277

14 Concreting materials for guy sets without cement Nos 6 158 948 0 0

15 Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07 Nos 10 120 1200 48 480

16 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum Kgs 27 64 1728 25 675

Total 440348 54072

17 Labour charges

a) Casual 54072

b) Regular 10814

505234

Note:

Unit QtyMaterial cost Labour Cost

Total Cost/Km in Rs.

1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

COST DATA SHEET - 52Running Single Circuit 11 kV, 3-Phase Power Line on 9.0 Mtr Supports with an Average Span of 40 Mtrs Using COYOTE ACSR

conductor and PSCC poles of 300 Kg WL for dead ends and DP structure

SL. No Particulars

Page 77: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 PSCC Pole - 9 Mtrs Long, 300 kg WL Nos 1 4578 4578 1060 1060

2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 18 3401 61218 1060 19080

3 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (for PSCC poles)

Set 1 377 377 99 99

4 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (for PSC poles)

Set 18 377 6786 99 1782

5 DP Structure with 9 Mtrs PSCC Poles of 300Kg WL Set 1 13184 13184 3252 3252

6 11kV Pin Insulators with GI pins Nos 57 94 5358 0 0

7 45kN Disc Insulators Nos 6 290 1740 0 0

8 Guy Set Complete Sets 6 742 4452 354 2124

9 Rabbit ACSR Conductor Kms 3.045 33676 102543 2608 7941

10 PG Clamps for Rabbit conductor Nos 6 76 456 0 0

11 Spiral Earth Electrode Nos 21 207 4347 55 1155

12 EG Stirrups with GI wire lacing Set of 2 Nos

19 370 7030 99 1881

13 Concreting materials for guy sets without cement Nos 6 158 948 0 0

14 Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07

Nos 8 120 960 48 384

15 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kg 21 64 1344 25 525

Total 215321 39283

16 Labour charges

a) Casual 39283

b) Regular 7857

262461

Note

COST DATA SHEET - 51Running Single Circuit 11 kV, 3-Phase Power Line on 9.0 Mtr Supports with an Average Span of 50 Mtrs Using Rabbit ACSR

Conductor and PSCC poles of 300 Kg WL for dead ends and DP structure

SL. No Particulars Unit Qty

Material cost Labour Cost

Total Cost/Km in Rs.

1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

Page 78: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 PSCC Pole - 9 Mtrs Long, 300 kg WL Nos 1 4578 4578 1060 1060

2 PSC Pole - 9 Mtrs Long, 200 kg WL Nos 23 3401 78223 1060 24380

3 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers for PSCC poles Set 1 377 377 99 99

4 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers for PSC poles Set 23 377 8671 99 2277

5 DP Structure with 9 Mtrs PSCC Poles of 300Kg WL Set 1 13184 13184 3252 3252

6 11 kV Pin Insulators with GI pins Nos 72 94 6768 0 0

7 45 kN Disc Insulators Nos 6 290 1740 0 0

8 Guy Set Complete Sets 6 742 4452 354 2124

9 Rabbit ACSR Conductor Kms 3.045 33676 102543 2608 7941

10 PG Clamps for Rabbit Conductor Nos 6 76 456 0 0

11 Spiral Earth Electrode Nos 26 207 5382 55 1430

12 EG Stirrups with GI wire lacing Set of 2 Nos 24 370 8880 99 2376

13 Concreting materials for guy sets without cement Nos 6 158 948 0 0

14 Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24.10.07 Nos 8 120 960 48 384

15 Anti Climbing Device (10mtrs/1 Kg GI Barbed Wire) Lumpsum Nos 26 64 1664 25 650

Total 238826 45973

16 Labour charges

a) Casual 45973

b) Regular 9195

293994

Note:

COST DATA SHEET -50Running Single Circuit 11kV, 3 Phase Power Line On 9.0 Mtr Supports With An Average Span Of 40 Mtrs Using Rabbit ACSR

Conductor and PSCC poles of 300 Kg WL for dead ends and DP structure

SL. No Particulars Unit Qty

Material cost Labour Cost

Total Cost/Km in Rs.

1) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet

Page 79: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 PSCC Poles 9 Mtr long with 300 Kg WL Nos 10 4578 45780 1060 10600

2 PSC Poles 9 Mtr long with 200 Kg WL Nos 15 3401 51015 1060 15900

31.1kV Class 3 Phase Aerial Bunched Cable of size 3x95+1x16+1x70 Sqmm

kms 1.015 410000 416150 20426 20732

4 Three Phase Distribution box for 6 Connections Nos 20 2065 41300 538 10760

5Piercing connector suitable for 16 Sqmm - 95 Sqmm AB Cable - Service Connections

Nos 60 228 13680 77 4620

6Piercing connector suitable for 16 Sqmm - 95 Sqmm AB Cable - Street Light Connections

Nos 25 160 4000 54 1350

7Suspension Clamp Assembly 16 to 70 mm ( Excluding pole clamp & Eye Hook )

Sets 20 190 3800 115 2300

8 Pole clamp for HT/LT AB cable Sets 20 100 2000 192 3840

Eye Hook (Flat type) for fixing Clamps Sets 20 90 1800 0 0

8Dead End Clamp/Anchor Clamp Assembly 25 to 95 Sq mm (excluding pole clamps and Eye hook)

Sets 16 200 3200 115 1840

9 Universal Hook, Bolts & nuts Nos 16 305 4880 115 1840

10 T-connector KZ3 95 Nos 8 338 2704 130 1040

11Cable Straight thru' joint kits suitable for 95 Sqmm

Sets 5 310 1550 192 960

12 Pre-Insulated lugs-CPTAU for 95 Sqmm Nos 8 338 2704 160 1280

13 End cap for 50/70 Sqmm Nos 50 19 950 5 250

14 Guy Set Complete Sets 8 723 5784 354 2832

15 Concreting for Guy sets (without cement) Sets 8 158 1264 0 0

16 PVC Insulated wire 16/25 Sqmm Mtrs 400 23.52 9408 0 0

17 Spiral Earth Electrodes Nos 25 207 5175 55 1375

Total Cost of Materials 617144

18 Labour Charges

a) Casual 81519

b) Regular 16304

714967

1While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general guidelines vide a to …. page No. ……. To ……..

COST DATA SHEET - 69Running Single Circuit 1.1 kV 3 Phase 5 Wire Power Line on 9 Mtr Supports with Average Span of 40 Mtrs Using 3x95 + 1x16 + 1x70 Sqmm Aerial Bunched Cables (ABC) using 9mtr PSCC pole of 300kg WL for Dead Ends and

Anchor Points

SL. No Particulars Unit Qty

Material cost Labour Cost

Total Cost/Km in Rs.

Page 80: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 PSCC Poles 9 Mtr long with 300 Kg WL Nos 10 4578 45780 1060 10600

2 PSC Poles 9 Mtr long with 200 Kg WL Nos 24 3401 81624 1060 25440

311kV Class 3 phase Aerial Bunched Cable 3x95 + 70 Sqmm

Kms 1.015 631000 640465 20426 20732

4Cable Straight thru' joint kits suitable for 95 Sqmm

Nos 6 5650 33900 828 4968

611 KV AB CableTermination Kits fo 95 to 120 Sqmm

Nos 6 2100 12600 700 4200

7Suspension Clamp Assembly 16 to 70 mm ( Excluding pole clamp & Eye Hook )

Sets 30 190 5700 115 3450

Pole clamp for HT/LT AB cable Sets 30 100 3000 192 5760

8 Eye Hook (Flat type) for fixing Clamps Sets 30 90 2700 0 0

Dead End Clamp/Anchor Clamp Assembly 25 to 95 Sq mm (excluding pole clamps and Eye hook)

Sets 12 200 2400 115 1380

9 End Caps Nos 10 19 190 5 50

1011kV Lightning Arrester, Metal Oxide9kV, 5kA

Set (3Nos) 2 2409 4818 107 214

11 Guy Set Complete Sets 6 742 4452 354 2124

12 Concreting for Guy sets (without cement) Sets 6 158 948 0 0

13 Grounding connection for messenger wire Nos 4 122 488 26 104

15 Spiral Earth Electrodes Nos 34 207 7038 55 1870

Total Cost of Material 846103

16 Labour Charges

a) Casual 80892.4

b) Regular 16178.5

17 943173.9

Material cost Labour Cost

Total Cost/Km in Rs.

While preparing estimates for turnkey / total turnkey projects please refere to Sl. No. …….. To general guidelines vide a to …. page No. ……. To ……..

COST DATA SHEET - 68Running Single Circuit 11kV, 3 Phase Power Line on 9 Mtr Supports with an Average Span of 30 Mtrs Using 3x95 Sqmm + 1x70 Sqmm Aerial Bunched Cables (ABC) using 9mtr PSCC pole of 300kg WL for Dead Ends and Anchor

Points

SL. No Particulars Unit Qty

Page 81: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 9 Mtr long PSCC pole of 300kg WL No 1 4578 4578 1060 1060

2 11kV Pin Insulators with pins Nos 3 94 282 0 0

3 45kN Disc Insulator Nos 3 290 870 0 0

4 Guy Set Complete Set 1 742 742 354 354

5Single pole TC set suitable for 100 kVA Transformer

Set 1 6129 6129 1016 1016

611kV/433V, 100kVA, 3 Phase, 50 Cys Distribution Transformer BEE-3 Star Rated with Oil

No 1 121422 121422 910 910

7Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/Dt: 24.10.07.

Nos 3 1277 3831 573 1719

8 Providing Concreting for 9 mtr RCC Pole 0

a) Base concreting 1:4:8, 500x650x150 mm Each 1 229 229 0 0

b) Pole concreting 1:2:4, 650x500x1700 Each 1 2566 2566 0 0

c) Coping 1:2:4 (as per actuals) Each 1 444 444 0 0

9Concreting materials for Guy sets (without cement )

No 1 158 158 0 0

10 GI Wire 8 SWG Kgs 5 54.67 273.35 0 0

11 Guy Wire 7/10 SWG Kgs 10 57.7 577 0 0

1211kV Lightning Arester, Metal Oxide9kV, 5kA

Set/3 Nos 1 2070 2070 71 71

a) LT Protection Kit No 2 1602 3204 205 410

b) LT Distribution Box for 100kVA with MCB No 1 16705 16705 455 455

c) LT Wiring (From DTC to LT Line Through Merering Box & LT Protection Kit/LT Distribution Box) SINGLE CIRCUIT

No 1

i. Al Lead Wire - 120 Sqmm Mtrs 45 108 4860

ii. Copper lugs - 120 Sqmm Nos 12 77 924

iii. PG Clamps - Rabbit to 120 Sqmm Nos 4 204 816

iv. Spacers for DTC Wiring Nos 8 38 304

v. Fish Plate with necessary Clamps, bolts & nuts etc complete (Galvanised)

Nos 2 155 310

d) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42)

No 1 4918 4918 514 514

e) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy

No 1 2250 2250 631 631

14 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 827 827 423 423

15 11kV, 200Amps, Single Break GOS Nos 1 6951 6951 636 636

16Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07

No 1 120 120 48 48

17Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kg 1 64 64 25 25

18 Total Material Cost

a) With LT Distribution Box 183220

b) With LT Protection Kit 169719

19 Labour Charges

a) Casual 8430 8385

b) Regular 1686 1677

Total

193336

179781Total Cost for Erection of a Single Pole Mounted 100kVA Transformer with LT Protection KIT in Rs

13568 568

for LT Distribution Box for LT Protection Kit

Total Cost for Erection of a Single Pole Mounted 100kVA Transformer with LT Distribution Box in Rs

COST DATA SHEET - 67Erection of 3 Phase, 11kV/433V, 100kVA BEE 3 Star Rated Single Pole Mounted Transformer

Centre on 9 Mtrs PSCC Pole 300kg WL

Sl. No Materials Unit Qty

Material cost Labour Cost

Page 82: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 9 Mtr long PSCC pole of 300kg WL No 1 4578 4578 1060 1060

2 11kV Pin Insulators with pins Nos 3 94 282 0 0

3 45kN Disc Insulator Nos 3 290 870 0 0

4 Guy Set Complete Set 1 742 742 354 354

5Single pole TC set suitable for 63 kVA Transformer

Set 1 4088 4088 1016 1016

611kV/433V, 63kVA, 3 Phase, 50 Cys Distribution Transformer BEE-3 Star Rated with Oil

No 1 93726 93726 682 682

7Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07

Single Electrode

with accessories

3 1277 3831 573 1719

8 Concreting materials for 9 mtr RCC Pole

a) Base concreting 1:4:8, 500x650x150 mm Each 1 229 229 0 0

b) Pole concreting 1:2:4, 650x500x1700 Each 1 2566 2566 0 0

c) Coping 1:2:4 (as per actuals) Each 1 444 444 0 0

9Concreting materials for Guy sets (without cement )

No 1 158 158 0 0

10 GI Wire 8 SWG Kgs 5 54.67 273.35 0 0

11 Guy Wire 7/10 SWG Kgs 10 57.7 577 0 0

1211kV Lightning Arester, Metal Oxide9kV, 5kA

Set/3 Nos 1 2070 2070 71 71

a) LT Protection Kit for 63 kVA Nos 2 1602 3204 205 410

b) LT Wiring (From DTC to LT Line Through Merering Box & LT Protection Kit) SINGLE CIRCUIT

No 1

i. Al Lead Wire - 95 Sqmm Mtrs 40 82 3280

ii. Copper lugs - 95 Sqmm Nos 4 71 284

iii. PG Clamps - Rabbit to 95 Sqmm Nos 4 105 420

iv. Spacers for DTC Wiring Nos 8 38 304

v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised)

Nos 2 155 310

c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42)

No 1 5224 5224 514 514

d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy

No 1 2250 2250 631 631

14 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 827 827 423 423

15 11kV, 200Amps, Single Break GOS Nos 1 6951 6951 636 636

16Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07

No 1 120 120 48 48

17Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kg 1 64 64 25 25

18 Total material cost 137672

19 Labour Charges

a) Casual 8157

b) Regular 1631

147461

13 568 568

Total cost for Erection of a Single Pole Mounted 63kVA Transformer in Rs

COST DATA SHEET - 66Erection of 3 Phase, 11kV/433V, 63kVA BEE 3 Star Rated Single Pole Mounted Transformer

Centre on 9 Mtrs PSCC Pole 300kg WL

Sl. No Materials Unit Qty

Material cost Labour Cost

Page 83: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 9 Mtr long PSCC pole of 300kg WL No 1 4578 4578 1060 1060

2 11kV Pin Insulators with pins Nos 3 94 282 0 0

3 45kN Disc Insulator Nos 3 290 870 0 0

4 Guy Set Complete Set 1 742 742 354 354

5Single pole TC set suitable for 25 kVA Transformer

Set 1 4088 4088 1016 1016

511kV/433V, 25kVA, 3 Phase, 50 Cys Distribution Transformer BEE-3 Star Rated with Oil

No 1 51560 51560 682 682

7Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07

Single Electrode

with accessories

3 1277 3831 573 1719

8 Concreting materials for 9 mtr PSCC Pole

a) Base concreting 1:4:8, 500x650x150 mm Each 1 229 229 0 0

b) Pole concreting 1:2:4, 650x500x1700 Each 1 2566 2566 0 0

c) Coping 1:2:4 (as per actuals) Each 1 444 444 0 0

9Concreting materials for Guy sets (without cement)

No 1 158 158 0 0

10 GI Wire 8 SWG Kgs 5 54.67 273.35 0 0

11 Guy Wire 7/10 SWG Kgs 10 57.7 577 0 0

1211kV Lightning Arester, Metal Oxide9kV, 5kA

Set/3 Nos 1 2070 2070 71 71

a) LT Protection Kit for 25 kVA No 1 1602 1602 205 205

b) LT Wiring (From DTC to LT Line Through Metering Box & LT Protection Kit) SINGLE CIRCUIT

No 1

i. Al Lead Wire - 50 Sqmm Mtrs 25 45 1125

ii. Copper lugs - 50 Sqmm Nos 4 30 120

iii. PG Clamps - Rabbit to 50 Sqmm Nos 4 66 264

iv. Spacers for DTC Wiring Nos 8 38 304

v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised)

Nos 2 155 310

c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42)

No 1 5662 5662 514 514

d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy

No 1 2250 2250 631 631

14 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 827 827 423 423

15 11kV, 200Amps, Single Break GOS Nos 1 6951 6951 636 636

16Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07

No 1 120 120 48 48

17Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kg 1 64 64 25 25

18 Total Material Cost 91867.2

Labour Charges

a) Casual 7952

b) Regular 1590

101410

COST DATA SHEET - 65Erection of 3 Phase, 11kV/433V, 25kVA BEE 3 Star Rated Single Pole Mounted Transformer Centre

on 9 Mtrs PSCC Pole 300kg WL

Sl. No Materials Unit Qty

Material cost Labour Cost

13 568 568

Total cost for erection of a single pole mounted 25kVA Transformer in Rs

Page 84: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 Part-A: TRANSFORMER

a) 9 Mtr PSCC DP Transformer Structure (Using 9 Mtr PSCC Poles of 300Kg WL)

No 1 21849 21849 4238 2999

b) 8 Mtr RCC DP Transformer Structure (Using 8 Mtr PSC Poles 200kg WL)

No 1 Will be intimated

Will be intimated

3816 2703

2 11kV Pin Insulators Sets 3 94 282 0 0

3 45kN Disc Insulators Sets 3 290 870 0 0

4 Guy Set Complete Nos 4 742 2968 354 1416

511kV/433V, 250kVA, 3 Phase, 50 Cys Distribution Transformer with oil No 1 277240 277240 1365 1365

6Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07

Single Electrode

with accessories

3 1277 3831 573 1719

7 Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07

No 1 120 120 48 48

8 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kgs 2 64 128 25 50

9 Concreting for Guy sets without cement Nos 4 158 632 0 0

10 GI Wire 8 SWG Kgs 5 54.67 273 0 0

11 Guy wire 7/10 SWG Kgs 10 56.26 563 0 0

Total using 9 mtr PSCC Poles of 300Kg WL 308756 7597

Total using 8 mtr PSC Poles 200kg WL 286907 7301

12 Labour Charges

Total using 9 mtr PSCC Poles of 300Kg WL

a) Casual 7597

b) Regular 1519

ii) using 8 mtr poles

a) Casual 7301

b) Regular 1460

13 Total for Part-A

Total using 9 mtr PSCC Poles of 300Kg WL 317872

Total using 8 mtr PSC Poles 200kg WL Will be intimated

COST DATA SHEET - 64Erection of 3 Phase, 11kV/433V, 250kVA BEE – 3 Star Rated Distribution Transformer Centre Using

DPTS With 9 Mtrs PSCC Pole 300Kg WL

Sl.No Particulars Unit Qty250 KVA

Material cost Labour Cost

Page 85: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Part-B:

14 11kV Lightning Arester, Metal Oxide9kV, 5kA

Set of 3 Nos 1 2070 2070 71 71

15 Labour Charges

a) Casual 71

b) Regular 14

16 Total for Part-B 2155

Part-C: SWITCH GEAR

a) LT Distribution box for 250kVA with MCCB No 1 16705 16705 455 455

b) LT Wiring (From DTC to LT Line via Metering Box & LT Protection Kit) SINGLE CIRCUIT No 1

i. Al Lead Wire - 240 Sqmm Mtrs 45 199 8955

ii. Copper lugs - 240 Sqmm Nos 12 184 2208

iii. PG Clamps - Rabbit to 240 Sqmm Nos 4 307 1228

iv. Spacers for DTC Wiring Nos 8 38 304

v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised) Nos 2 155 310

c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42)

No 1 5080 5080 514 514

d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy

Nos. 1 2250 2250 631 631

18 11kV Solid Core Type HG Fuse Unit Set/ 3 nos 1 827 827 423 423

19 11kV, 200Amps, Single Break GOS No 1 6951 6951 636 636

Total Cost (Material) 44818

20 Labour Charges

a) Casual 3303

b) Regular 661

21 Total for Part-C 48782

22 Total (A+B+C)

Total using 9 mtr PSCC Poles of 300Kg WL 368809

Labour Charges:

a) Casual 10971

b) Regular 2194

Total using 8 mtr PSC Poles 200kg WL Will be intimated

Labour Charges:

a) Casual 10675

b) Regular 2135

Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11 kV Pin Insulators ACSR/AAA Conductor, Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate separately for

17 644 644

Page 86: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

1 While preparing estimates for turnkey / total tunkey projects please refer to Sl. No. ......... of General Guidelines vide a to .... in Page No. ...........

Page 87: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 Part-A: TRANSFORMER

a) 9 Mtr PSCC DP Transformer Structure (Using 9 Mtr PSCC Poles of 300Kg WL)

No 1 21849 21849 4238 4238

b) 8 Mtr RCC DP Transformer Structure (Using 8 Mtr PSC Poles 200kg WL)

No 1Will be

intimatedWill be

intimated3816 3816

2 11kV Pin Insulators Sets 3 94 282 0 0

3 45kN Disc Insulators Sets 3 290 870 0 0

4 Guy Set Complete Nos 4 742 2968 354 1416

511kV/433V, 100kVA, 3 Phase 50 Cys Distribution Transformer BEE - 3 Star Rated with Oil

No 1 121422 121422 910 910

6Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07

Single Electrode

with accessories

3 1277 3831 573 1719

7Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07

No 1 120 120 48 48

8Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kgs 2 64 128 25 50

9 Concreting for Guy sets without cement Nos 4 158 632 0 0

10 GI Wire 8 SWG Kgs 5 54.67 273 0 0

11 Guy wire 7/10 SWG Kgs 10 56.26 563 0 0

Total using 9 mtr PSCC Poles of 300Kg WL 152938 8381

Total using 8 mtr PSC Poles 200kg WL Will be intimated

7959

12 Labour Charges

Total using 9 mtr PSCC Poles of 300Kg WL

a) Casual 8381

b) Regular 1676

Total using 8 mtr PSC Poles 200kg WL

a) Casual 7959

b) Regular 1592

13 Total for Part-A

Total using 9 mtr PSCC Poles of 300Kg WL 162995

Total using 8 mtr PSC Poles 200kg WL Will be intimated

Part-B:

1411kV Lightning Arester, Metal Oxide9kV, 5kA

Set of 3 Nos 1 2070 2070 71 71

15 Labour Charges

a) Casual 71

COST DATA SHEET -63Erection of 3 Phase, 11kV/433V, 100kVA BEE – 3 Star Rated Distribution Transformer Centre Using

DPTS With 9 Mtrs PSCC Pole 300Kg WL

Sl No Particulars Unit Qty

100 KVA

Material cost Labour Cost

Page 88: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

b) Regular 14

16 Total for Part-B 2155

Part-C: SWITCH GEAR

a) LT Protection Kit Nos 2 1602 3204 205 410

b) LT Distribution box for 100 kVA with MCB No 1 16705 16705 455 455

c) LT Wiring (From DTC to LT Line Through Merering Box & LT Protection Kit/LT Distribution Box) SINGLE CIRCUIT

No 1

i. Al Lead Wire - 120 Sqmm Mtrs 45 108 4860

ii. Copper lugs - 120 Sqmm Nos 12 77 924

iii. PG Clamps - Rabbit to 120 Sqmm Nos 4 204 816

iv. Spacers for DTC Wiring Nos 8 38 304

v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised)

Nos 2 155 310

d) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42)

No 1 4918 4918 514 514

e) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy

Nos 1 2250 2250 631 631

18 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 827 827 423 423

19 11kV, 200Amps, Single Break GOS No 1 6951 6951 636 636

Total Cost (Material) 25364 38865

20 Labour Charges

a) Casual 3182 3227

b) Regular 636 645

21 Total for Part-C 29182 42737

22 Total (A+B+C)

Total using 9 mtr PSCC Poles of 300Kg WL 194333 207888

Labour Charges:

a) Casual 11634 11679

b) Regular 2327 2336

Total using 8 mtr PSC Poles 200kg WL Will be intimated

Will be intimated

Labour Charges:

a) Casual 11212 11257

b) Regular 2242 2251

17

568 568

With LT Protection kit With Distribution Box

Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11kV Pin Insulators ACSR/AAA Conductor, Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate separately for

Page 89: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 Part-A: TRANSFORMER

a) 9 Mtr PSCC DP Transformer Structure (Using 9 Mtr PSCC Poles of 300Kg WL)

No 1 19806 19806 4115 4115

b) 8 Mtr RCC DP Transformer Structure (Using 8 Mtr PSC Poles 200kg WL)

No 1 Will be intimated

Will be intimated

3560 3560

2 11kV Pin Insulators Sets 3 94 282 0 0

3 45kN Disc Insulators Sets 3 290 870 0 0

4 Guy Set Complete Nos 4 742 2968 354 1416

511kV/433V, 63kVA, 3 Phase, 50 Cys Distribution Transformer BEE - 3 Star Rated with Oil No 1 93726 93726 682 682

6Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07

Single Electrode

with accessories

3 1277 3831 573 1719

7 Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07

No 1 120 120 48 48

8 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kgs 2 64 128 25 50

9 Concreting for Guy sets without cement Nos 4 158 632 0 0

10 GI Wire 8 SWG Kgs 5 54.67 273 0 0

11 Guy wire 7/10 SWG Kgs 10 56.26 563 0 0

Total using 9 mtr PSCC Poles of 300Kg WL 123199 8030

Total using 8 mtr PSC Poles 200kg WL Will be intimated

7475

12 Labour Charges

Total using 9 mtr PSCC Poles of 300Kg WL

a) Casual 8030

b) Regular 1606

Total using 8 mtr PSC Poles 200kg WL

a) Casual 7475

b) Regular 1495

13 Total for Part-A

Total using 9 mtr PSCC Poles of 300Kg WL 132835

Total using 8 mtr PSC Poles 200kg WL Will be intimated

Part-B:

14 11kV Lightning Arester, Metal Oxide9kV, 5kA

Set of 3 Nos 1 2070 2070 71 71

15 Labour Charges

COST DATA SHEET -62Erection of 3 Phase, 11kV/433V, 63kVA BEE – 3 Star Rated Distribution Transformer Centre Using

DPTS With 9 Mtrs PSCC Pole 300Kg WL

SlNo Particulars Unit Qty

63 KVA

Material Cost Labour Cost

Page 90: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

a) Casual 71

b) Regular 14

16 Total for Part-B 2155

Part-C: SWITCH GEAR

a) LT Protection Kit for 63 kVA Nos 2 1602 3204 205 410

b) LT Wiring (From DTC to LT Line Through Metering Box & LT Protection Kit) SINGLE CIRCUIT

No 1

i. Al Lead Wire - 95 Sqmm Mtrs 40 82 3280

ii. Copper Lugs - 95 Sqmm Nos 4 71 284

iii. PG Clamps - Rabbit to 95 Sqmm Nos 4 105 420

iv. Spacers for DTC Wiring Nos 8 38 304

v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised) Nos 2 155 310

c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42)

No 1 5224 5224 514 514

d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy

No 1 2250 2250 631 631

18 11kV Solid Core Type HG Fuse Unit Set/ 3 nos 1 827 827 423 423

19 11kV, 200Amps, Single Break GOS No 1 6951 6951 636 636

Total Cost (Material) for Part-C 23054

20 Labour Charges

a) Casual 3182

b) Regular 636

21 Total for Part-C 26872

22 Total (A+B+C)

Total using 9 mtr PSCC Poles of 300Kg WL 161863

Labour Charges:

a) Casual 11283

b) Regular 2257

Total using 8 mtr PSC Poles 200kg WL Will be intimated

Labour Charges:

a) Casual 10728

b) Regular 2146

Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11kV Pin Insulators ACSR/AAA Conductor, Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate separately for

17 568 568

Page 91: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Rate Amt Rate Amt

1 Part-A: TRANSFORMER

a) 9 Mtr PSCC DP Transformer Structure (Using 9 Mtr PSCC Poles of 300Kg WL)

No 1 19806 19806 4115 4115

b) 8 Mtr RCC DP Transformer Structure (Using 8 Mtr PSC Poles 200kg WL)

No 1 will be intimated

will be intimated

3560 3560

2 11kV Pin Insulators Sets 3 94 282 0 0

3 45kN Disc Insulators Sets 3 290 870 0 0

4 Guy Set Complete Nos 4 742 2968 354 1416

511kV/433V, 25KVA, 3 Phase, 50 Cys Distribution Transformer BEE-3 Star Rated with Oil

No 1 51560 51560 682 682

6Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07

Single Electrode

with accessories

3 1277 3831 573 1719

7 Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/ Dt: 24.10.07

No 1 120 120 48 48

8 Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum

Kgs 2 64 128 25 50

9 Concreting for Guy sets without cement Nos 4 158 632 0 0

10 GI Wire 8 SWG Kgs 5 54.67 273.35 0 0

11 Guy wire 7/10 SWG Kgs 10 56.26 563 0 0

Total using 9 mtr PSCC Poles of 300Kg WL 81033 8030

Total using 8 mtr PSC Poles 200kg WL will be intimated 7475

12 Labour Charges

Total using 9 mtr PSCC Poles of 300Kg WL

a) Casual 8030

b) Regular 1606

Total using 8 mtr PSC Poles 200kg WL

a) Casual 7475

b) Regular 1495

13 Total for Part-A

Total using 9 mtr PSCC Poles of 300Kg WL 90669

Total using 8 mtr PSC Poles 200kg WL will be intimated

Part-B:

14 11kV Lightning Arester, Metal oxide, 9kV, 5kA

Set of 3 Nos 1 2070 2070 71 71

15 Labour Charges

a) Casual 71

COST DATA SHEET - 61

Material Cost Labour Cost

Erection of 3 Phase, 11kV/433V, 25kVA BEE – 3 Star Rated Distribution Transformer Centre Using DPTS With 9 Mtrs PSCC Pole 300Kg WL

SlNo Particulars Unit Qty

25 KVA

Page 92: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

b) Regular 14

16 Total for Part-B 2155

Part-C: SWITCH GEAR

a) LT Protection Kit for 25 kVA No 1 1602 1602 205 205

b) LT Wiring (From DTC to LT Line Through Metering Box & LT Protection Kit) SINGLE CIRCUIT

No 1

i. Al Lead Wire - 50 Sqmm Mtrs 25 45 1125

ii. Copper Lugs - 50 Sqmm Nos 4 30 120

iii. PG Clamps - Rabbit to 50 Sqmm Nos 4 66 264

iv. Spacers for DTC Wiring Nos 8 38 304

v. Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised) Nos 2 155 310

c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42)

No 1 5662 5662 514 514

d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy

No 1 2250 2250 631 631

18 11kV Solid Core Type HG Fuse Unit Set/3 Nos 1 827 827 423 423

19 11kV, 200Amps, Single Break GOS No 1 6951 6951 636 636

Total Cost (Material) for Part-C 19415

20 Labour Charges

a) Casual 2977

b) Regular 595

21 Total for Part-C 22987

22 Total (A+B+C)

115812

Labour Charges:

a) Casual 11078

b) Regular 2216

will be intimated

Labour Charges:

a) Casual 10523

b) Regular 2105

Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 11kV Pin Insulators ACSR/AAA Conductor, Transparent Alkathine Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate separately for

17

Total using 9 mtr PSCC Poles of 300Kg WL

Total using 8 mtr PSC Poles 200kg WL

568 568

Page 93: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

SlNo

ItemNo Name of the Material Material

Code UoM

Common SR 2014-15

in Rs FORD Rates inclusive

of duties taxes & F&I

Common SR 2016-17

in Rs FORD Rates inclusive

of duties taxes & F&I

1 Line Supports (POLES)1 1.01 RCC Pole - 9 Mtr Long, 145 Kg WL 200105 No 5941 5941

2 1.02 RCC Pole - 9 Mtr Long, 150 Kg WL Sq Section 200106 No 7210 7210

3 1.03 RCC Pole - 8 Mtr Long, 115 Kg WL 200103 No 4324 43514 1.04 PCC Pole - 8 Mtr Long, 140 Kg WL 200003 No 2297 24955 1.05 PSCC Pole - 8 Mtr Long, 200 Kg WL 200004 No 2814 29426 1.06 PSCC Pole - 9 Mtr Long, 200 Kg WL 200006 No 3278 3401

7 1.07 PSCC Pole - 9 Mtr Long, 160 Kg WL in Transverse Direction & 136 Kg WL in Longitudinal Direction

200007 No 3558 3558

8 1.08 Pre - Stressed Tubular Spun Pole 11 Mtr Long - 500Kg WL

200120 No 15800 15800

9 1.09 RCC Pole - 9.5 Mtr Long, 350 Kg WL for 33kV Lines

200107 No 7675 7675

10 1.10 11Mtrs Long PSC pole of working Load 365 Kg for intermediate poles only

200010 No 7924 7924

11 1.11 9 Mtr PSCC Pole with working load of 300Kg 4578 4578

12 1.12 Guy less poles New Item Will be intimated

13 1.13Strut pole made of released MS Rail pole or Tubular pole along with clamp fish plate, bolts & nuts

200514 No 2310 2008

14 1.14 11Mtrs Long pole made of I Beam (MS) section size 200x100mm 25.9 Kg/mtr

200621 No 18009 15657

15 1.15 11Mtrs Long pole made of I Beam (MS) section size 175x85mm 19.5 Kg/mtr

200610 No 12321 10712

2 Cross Arms (MS & GI)16 2.01 11kV Horizontal X Arms - Mild Steel (MS) 279020 No 281 238

17 2.02 11kV Horizontal X Arms - Galvanised Iron (GI) 280020 No 359 315

18 2.03 11kV Special 3 Pin X Arm - MS 279013 No 664 56119 2.04 11kV Special 3 Pin X Arm - GI 280013 No 848 74520 2.05 LT 4 Pin X Arms - MS 279014 No 218 18521 2.06 LT 4 Pin X Arms - GI 280014 No 278 24522 2.07 LT 2 Pin X Arms - MS 279012 No 100 8423 2.08 LT 2 Pin X Arms - GI 280012 No 127 112

24 2.09 2 Pin Cross Arm with pole clamp, bolt & nuts & washers for RCC Pole - MS

- No 200 162

25 2.10 2 Pin Cross Arm with pole clamp, bolt & nuts & washers for RCC Pole - GI

248 219

26 2.11 2 Pin Cross Arm with pole clamp, bolt & nuts & washers for PSC Pole - MS

- No 194 157

27 2.12 2 Pin Cross Arm with pole clamp, bolt & nuts & washers for PSC Pole - GI

240 212

Schedule of Rate for Standard Stock Materials Common SR 2016-17 (11kV System)

Page 94: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

28 2.13 4 Pin Cross Arm with pole clamp, bolt & nuts & washers for RCC Pole - MS

- No 318 263

29 2.14 4 Pin Cross Arm with pole clamp, bolt & nuts & washers for RCC Pole - GI

399 352

30 2.15 4 Pin Cross Arm with pole clamp, bolt & nuts & washers for PSC Pole - MS

- No 312 258

31 2.16 4 Pin Cross Arm with pole clamp, bolt & nuts & washers for PSC Pole - GI

391 345

32 2.1711 kV Horizontal Cross Arm with single top support, clamp, Bolt & Nuts with washers for RCC Poles - MS

- No 449 382

33 2.1811 kV Horizontal Cross Arm with single top support, clamp, Bolt & Nuts with washers for RCC Poles - GI

567 505

34 2.1911 kV Horizontal Cross Arm with single top support, clamp, Bolt & Nuts with washers for PSCC Poles - MS

- No 443 377

35 2.2011 kV Horizontal Cross Arm with single top support, clamp, Bolt & Nuts with washers for PSCC Poles - GI

559 498

36 2.21 Special 3 Pin Cross Arm, clamp and Bolt & Nuts for RCC Poles - MS

- No 764 639

37 2.22 Special 3 Pin Cross Arm, clamp and Bolt & Nuts for RCC Poles - GI

969 852

38 2.23 LT ST Support 50x6mm Flat - MS 279091 No 50 4339 2.24 LT ST Support 50x6mm Flat - GI 280091 No 64 5640 2.25 HT ST Support 50x6mm Flat - MS 279092 No 68 5941 2.26 HT ST Support 50x6mm Flat - GI 280092 No 87 7642 2.27 Brace for LT 4pin X arm (600mm long) - MS 279082 No 215 18743 2.28 Brace for LT 4pin X arm (600mm long) - GI 280082 No 269 234

44 2.29 Brace for 11 kV special 3pin X arm (900mm long) - MS

279083 No 299 260

45 2.30 Brace for 11 kV special 3pin X arm (900mm long) - GI

280083 No 374 325

46 2.31 LT Cross arms for vertical Configuration - MS 279017 No 720 62647 2.32 LT Cross arms for vertical Configuration - GI 280017 No 901 78448 2.33 EG Stirrups (MS) with GI wire lacing 279130 No 212 18549 2.34 Spiral Earth Electrode 281683 No 238 207

3 SMC Line Materials

50 3.01 11KV Cross arm with HT top support (glass reinforced hot pressed SMC compound)

279090 No 750 750

4 Anticlimbing Device51 4.01 Spike type GI About 3.0 Kg in weight 278910 No 151 13152 4.02 GI Barbed wire (12mtrs/Kg) 278911 Each 73 64

5 Clamps (MS & GI)53 5.01 RCC Pole clamp - MS 279523 No 60 5054 5.02 RCC Pole clamp - GI 280523 No 76 6755 5.03 PCC Pole clamp - MS 279503 No 50 4256 5.04 PCC Pole clamp - GI 280503 No 63 5557 5.05 PSCC Pole clamp - MS 279510 No 54 4558 5.06 PSCC Pole clamp - GI 280510 No 68 6059 5.07 PCC Pole clamp type A for LT X arm - MS 279502 No 53 4460 5.08 PCC Pole clamp type A for LT X arm - GI 280502 No 66 58

61 5.09 PCC Pole clamp type A for X arm upto 1M from pole top - MS

279522 No 53 44

62 5.10 PCC Pole clamp type A for X arm upto 1M from pole top - GI

280522 No 66 58

63 5.11 Clamps for fixing MV Lamp control box, fuse box/St light fixture on rail pole - MS

279550 No 61 53

Page 95: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

64 5.12 Guy clamp - MS 279650 No 59 5065 5.13 Guy clamp - GI 280650 No 75 6666 5.14 Turn buckle (GI) 279146 No 183 159

67 5.15 Anchor Rod using 12mm rounds/Guy Rod - MS 279140 No 191 162

68 5.16 Anchor Rod using 12mm rounds/Guy Rod - GI 280140 No 244 215

69 5.17 RCC pole type C clamp for GOS Operating Handle 279524 No 61 53

70 5.18 MS Fish Plate 279800 No 59 5171 5.19 GI Fish Plate 280800 No 67 58

72 5.20 Strain Clamps, 3 Bolt type for 70/90 kN Disc Insulator

285076 No 546 468

6 Insulators73 6.01 11kV Ceramic Pin Insulator (Shell only) 283005 No 49 47

74 6.02 11kV GI Pin for 11kV Ceramic Shell Insulators 283055 No 54 47

75 6.03 1.1kV Ceramic Pin Insulator (Shell only) 283003 No 15 15

76 6.04 1.1kV GI Pin FOR 11kV Cermaic shell Insulator 283053 No 26 23

77 6.05 11kV, 5KN Composite/Polymeric Pin Insulator(20mm dia FP Rod)

283007 No 169 165

78 6.06 11kV, 5KN Composite/Polymeric Pin Insulator(24mm dia FP Rod)

New Item 195

79 6.07 No.8 Strain Insulator 283158 No 14 1480 6.08 No.15 Strain Insulator 283166 No 34 3381 6.09 DISC Insulator 45kN 283040 No 300 29082 6.10 DISC Insulator 70kN, Ball & Socket type 283017 No 506 49083 6.11 DISC Insulator 90kN, Ball & Socket type 283018 No 506 49084 6.12 DISC Insulator 120kN, Ball & Socket type 283021 No 506 49085 6.13 11kV Solid Core Insulator 283315 No 157 15286 6.14 11kV Post Insulator 283101 No 371 359

87 6.15 Silcon Rubber Composite Insulator/11kV 45kN Polymeric Insulator

283320 No 170 170

88 6.16 11kV, 70kN Composite/Polymeric Insulator 283045 No 287 2877 Accessories for composite insulator

89 7.01 Cross Arm Strap (MS) 279030 No 80 6990 7.02 Strain Clamp up to Rabbit ACSR 285058 No 190 16391 7.03 Strain Clamp for Coyote ACSR 285066 No 411 353

8 Conductor

92 8.01 Weasel ACSR 284105 Km 21900 20100

93 8.02 Rabbit ACSR 284108 Km 36810 3367694 8.03 Coyote ACSR 284116 Km 93860 9270895 8.04 Lynx ACSR 284120 Km 139000 137290

9 Guy Wire & GI Wire96 9.01 7/10 SWG Guy Wire 281110 MT 64630 5626797 9.02 8 SWG GI Wire 281008 MT 62800 5467498 9.03 10 SWG GI Wire 281010 MT 66256 5768399 9.04 GI Barbed Wire 12 SWG 281205 MT 77972 67882

10 PG Clamps100 10.01 PG clamps for Lynx ACSR 285518 No 304 261101 10.02 Coyote to Coyote 285515 No 276 267102 10.03 Rabbit to Rabbit 285508 No 89 76103 10.04 Weasel to Rabbit 285549 No 77 66104 10.05 Weasel to Weasel 285509 No 60 52105 10.06 Squirrel to Weasel 285548 No 56 48

11 PG Clamps Rabbit to Insulated Wire106 11.01 95 Sqmm 285555 No 122 105

Page 96: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

107 11.02 120 Sqmm 285557 No 238 204108 11.03 150 Sqmm 285559 No 280 241109 11.04 185 Sqmm 285562 No 308 264110 11.05 240 Sqmm 285565 No 357 307

111 11.06 T - Clamps for Rabbit conductor with hot dipped galvanized bolts, Nuts and Washers

285600 Set 276 237

112 11.07 T - Clamps for Coyote conductor with hot dipped galvanized bolts, Nuts and Washers

285605 Set 366 314

113 11.08 T - Clamps for Lynx to Lynx with hot dipped galvanized bolts, Nuts and Washers

285610 Set 383 328

114 11.09 Single Tension Clamp Suitable for Rabbit 285068 No 567 487115 11.10 Single Tension Clamp Suitable for Coyote 285079 No 799 685116 11.11 Pad Clamps for Rabbit ACSR 285723 No 439 376117 11.12 Pad Clamps for Lynx ACSR 285726 No 606 520118 11.13 Pad Clamps for Coyote ACSR 285724 No 544 467

119 11.14 C - Type wedge connector + 2 hole padle for Rabbit ACSR

285661 No 412 354

120 11.15 C - Type wedge connector + 2 hole padle for Coyote ACSR

285662 No 1712 1468

121 11.16 C - Type wedge connector + 4 hole padle for Coyote ACSR

285663 No 1966 1686

122 11.17 C - Type wedge connector + 2 hole padle for Lynx ACSR

285664 No 2600 2230

123 11.18 C - Type wedge connector + 4 hole padle for Lynx ACSR

285665 No 2853 2447

12 C - Type wedge connector 124 12.01 Rabbit to Rabbit ACSR 285670 No 142 122125 12.02 Rabbit to Coyote ACSR 285671 No 740 635126 12.03 Rabbit to Lynx ACSR 285673 No 740 635127 12.04 Coyote to Coyote ACSR 285676 No 740 635128 12.05 Rabbit to 240 Sqmm Lead Wire 285694 No 740 635129 12.06 Coyote to 240 Sqmm Lead Wire 285695 No 740 635130 12.07 Coyote to Lynx ACSR 285678 No 1305 1120131 12.08 Lynx to Lynx ACSR 285680 No 1305 1120

132 12.09C wedge connector for connecting main wire of size 2.5/4/6/10 Sqmm from OH Squirrel/Weasel line to AFB/Cutouts

285691 No 78 67

133 12.10C wedge connector for connecting main wire of size 16/25 Sqmm from OH Rabbit line to AFB/Cutouts

285692 No 99 86

13 Distribution Transformers - 3 Phase, 11kV/433V - Stacked Core with Oil

134 A. OPEN BUSHING TYPE135 13.01 15kVA, Copper Winding 321301 No 53003 49980136 13.02 25kVA, Aluminum Wdg (Conventional) 321304 No 58794 56480

137 13.03 25kVA, Aluminum Wdg, BEE 3 Star Rated 321433 No 64455 51560

138 13.04 25kVA, Aluminum Wdg, BEE 4 Star Rated 54969 54969139 13.05 63kVA, Aluminum Wdg 321306 No 84780 81440140 13.06 63kVA, Aluminum Wdg, BEE 3 Star Rated 321434 No 109635 93726141 13.07 63kVA, Aluminum Wdg, BEE 4 Star Rated 94757 94757142 13.08 100kVA, Aluminum Wdg 321310 No 105730 101570143 13.09 100kVA, Aluminium Wdg, BEE 3 Star Rated 321435 No 146408 121422144 13.10 100kVA, Aluminium Wdg, BEE 4 Star Rated 125856 125856145 13.11 250kVA, Aluminum Wdg 321325 No 237696 228340146 13.12 250kVA, BEE 3 Star Rated/Energy Efficient 321436 No 292467 277240147 13.13 500kVA, Aluminum Wdg 321350 No 376532 361707

148 13.14 500kVA, BEE 3 star rated No New Item Will be intimated

Page 97: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

149 13.15Special Design Transformer 354.2kVA for Niranthara Jyothi Works (11KV AUTO Transformer)

321400 No 171030 Deleted

B. CABLE ENTRY TYPE150 13.16 25kVA, Aluminum Wdg, BEE 3 Star Rated 321441 No 71455 78455151 13.17 25kVA, Aluminum Wdg, BEE 4 Star Rated 61969152 13.18 63kVA, Aluminum Wdg, BEE 3 Star Rated 321442 No 117635 125635153 13.19 63kVA, Aluminum Wdg, BEE 4 Star Rated 102757154 13.20 100kVA, Aluminium Wdg, BEE 3 Star Rated 321443 No 156408 166408155 13.21 100kVA, Aluminium Wdg, BEE 4 Star Rated 135856156 13.22 250kVA, Aluminum Wdg 321444 No 249696 236700157 13.23 500kVA, Aluminum Wdg 321445 No 391532 371150

14 Distribution Transformer - 3 Phase, 11kV/433V - Amorphous Core with Oil

A. OPEN BUSHING TYPE158 14.01 25kVA, BEE 3 Star Rated 321376 No 62536159 14.02 25kVA, BEE 5 Star Rated160 14.03 63kVA, BEE 3 Star Rated 321377 No 105071161 14.04 63kVA, BEE 5 Star Rated162 14.05 100kVA, BEE 3 Star Rated 321380 No 136410163 14.06 100kVA, BEE 5 Star Rated164 14.07 200kVA, BEE 3 Star Rated 321381 No 251888165 14.08 500kVA, BEE 3 Star Rated 321382 No 751584

B. CABLE ENTRY TYPE166 14.09 25kVA, BEE 3 Star Rated 321390 No 69536167 14.10 63kVA, BEE 3 Star Rated 321391 No 113071168 14.11 100kVA, BEE 3 Star Rated 321392 No 146410169 14.12 200kVA, BEE 3 Star Rated 321393 No 263888170 14.13 500kVA, BEE 3 Star Rated 321394 No 766584

15 Distribution Transformer Self Protected 11kV/433V, 3 Phase

171 15.01 100 kVA 321365 No 121059172 15.02 250 kVA 321370 No 241188

16 DTs - Single Phase, 11kV/250V173 16.01 15kVA, Copper Wound with MCCB 321302 No 62890

174 16.02 15kVA, Amorphous Core Copper Winding with MCCB

321303 No 72770

175 16.03 10kVA, Copper winding with MCCB 321300 No 44517

17 11kV/433V, 3 Phase, Dry Type Transformers

176 17.01 25KVA 321483 No 221400 215780177 17.02 63KVA 321484 No 274420 267460178 17.03 100KVA 321485 No 360150 351000179 17.04 250KVA 321486 No 614200 598620180 17.05 500KVA 321487 No 891540 86890

18 Transformer Oil181 18.01 EHV Grade Transformer oil - New 601400 kLtr 77820 59004182 18.02 Reclaimed oil 601410 kLtr 42801 32452183 18.03 Contaminated oil 601420 kLtr 28015 21241

19 LT Protection184 19.01 LT Protection kit 301107 No 1679 1602

20 LT Distribution Box

185 20.01 LT Distribution Box for 100/250 kVA DTC with MCCB's (Sheet Metal)

301230 No 16705 16705

186 20.02 LT Distribution Box for 100/250 kVA DTC with MCCB's (SMC)

301060 No 24715 24715

21 LT Wiring kit for LT protection kit

Will be Intimated

Will be Intimated

Will be Intimated

Page 98: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

187 21.01 For 25 kVA DTC Single Circuit 301151 Set Deleted Deleted188 21.02 For 63 kVA DTC Single Circuit 301207 Set Deleted Deleted189 21.03 For 63 kVA DTC Double Circuit 301152 Set Deleted Deleted

22 LT Wiring kit through Distribution Box

190 22.01 For 100 kVA DTC Single Circuit 301163 Set Deleted Deleted191 22.02 For 100 kVA DTC Double Circuit 301153 Set Deleted Deleted192 22.03 For 250 kVA DTC Single Circuit 301164 Set Deleted Deleted193 22.04 For 250KVA DTC Double Circuit 301154 Set Deleted Deleted

194 22.05 LT Wiring kit for 63kVA Transformers (MESCOM Specification)

301155 Set Deleted Deleted

195 22.06 LT Wiring kit for 25kVA Transformers (MESCOM Specification)

301156 Set Deleted Deleted

23 Lightning Aresters196 23.01 LA 9kV, 5kA, Metal Oxide 303200 No 761 690197 23.02 LA 9kV, 5kA, Polymeric Type 303205 No 1164 1147

24 HG Fuse Unit

198 24.01 11kV Class, HG Fuse Unit with Solid Core Insulators

302122 Set/3 No

871 827

25 Double Pole TC Sets199 25.01 For 25/63kVA Transformer - MS 279110 Set 8500 7389200 25.02 For 25/63kVA Transformer - GI 280110 Set 10780 9386201 25.03 For 25/63kVA Star Rated Transformer - MS 279111 Set 12250 10650202 25.04 For 25/63kVA Star Rated Transformer - GI 280111 Set 15545 13533203 25.05 For 100/300kVA Transformer - MS 279120 Set 14600 12693204 25.06 For 100/300kVA Transformer - GI 280120 Set 18562 16160

26 Single Pole Mounted Transformer Kit for 250kVA on 11 Mtr Spun Poles

205 26.01Single H Frame with Transformer Seating and Seating angle support X arm for 11 mtr Spun Pole for 25kVA (OH Line) - MS

279127 Set 19534 16983

206 26.02Single H Frame with Transformer Seating and Seating angle support X arm for 11 mtr Spun Pole for 25kVA (OH Line) - GI

280117 Set 24799 21590

207 26.03Three H Frame with Transformer Seating and Seating angle support X arm for 11 mtr Spun Pole for 25kVA (UG Cable) - MS

279128 Set 26496 23035

208 26.04Three H Frame with Transformer Seating and Seating angle support X arm for 11 mtr Spun Pole for 25kVA (UG Cable) - GI

280128 Set 33669 29312

209 26.05Single H Frame without Transformer Seating and Seating angle support X arm for 11 mtr Spun Pole for 63/100/250/500kVA (OH Line) - MS

279129 Set 10106 8786

210 26.06Single H Frame without Transformer Seating and Seating angle support X arm for 11 mtr Spun Pole for 63/100/250/500kVA (OH Line) - GI

280129 Set 12809 11151

211 26.07Three H Frame without Transformer Seating and Seating angle support X arm for 11 mtr Spun Pole for 63/100/250/500kVA (UG Cable) - MS

279131 Set 16204 14087

212 26.08Three H Frame without Transformer Seating and Seating angle support X arm for 11 mtr Spun Pole for 63/100/250/500kVA (UG Cable) - GI

280131 Set 20594 17929

27 SPMT Materials

Page 99: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

213 27.01 Single Pole Mounted Transformer kit for 25/63 kVA on 9 mtr RCC Poles (Square Section) - MS

279115 Set 4703 4088

214 27.02 Single Pole Mounted Transformer kit for 25/63 kVA on 9 mtr RCC Poles (Square Section) - GI

280115 Set 5967 5195

215 27.03 Single Pole Mounted Transformer kit for 100 kVA on 9 mtr RCC Poles - MS

279125 Set 7050 6129

216 27.04 Single Pole Mounted Transformer kit for 100 kVA on 9 mtr RCC Poles - GI

280125 Set 8954 7795

217 27.05 Single Pole Mounted Transformer kit for 25 kVA on 9 mtr PSCC Poles of 300kG WL - MS

- Set New Item 6167

218 27.06 Single Pole Mounted Transformer kit for 25 kVA on 9 mtr PSCC Poles of 300kG WL - GI

- Set New Item 8151

28 GOS219 28.01 11kV, 200Amps Single Break GOS 304212 Set 7320 6951

220 28.02 11kV, 200Amps Single Break GOS(Modified for making footpath free)

New Item Will be included on the proc rate

221 28.03 11kV, 200Amps Single Break GOS, Vertically Operated

304213 Set 10632 10096

222 28.04 11kV, 400Amps Double Break GOS 304224 Set 16467 15637

223 28.05 H - Frame Set for 11kV, 200Amps Single Break GOS Mounting - MS

279149 Set 3330 2895

224 28.06 H - Frame Set for 11kV, 200Amps Single Break GOS Mounting - GI

280149 Set 4220 3674

225 28.07 Male and Female contacts with B&N for 11kV 200A GOS (3 Male & 3 Female contacts each)

503000 Set 2518 2518

226 28.08 11kV 400Amps Special Roaster GOS 304204 Set 12613 11977227 28.09 Insulated GOS Rods 503211 No 342 342

29 DOLO Cutouts

228 29.01 11kV DOLO Cutouts Conventional to Erstwhile KEB Specification

302011 Set/3 No

4288 4494

229 29.02 11kV DOLO Cutouts REC Specification 302021 Set/3 No

3396 3396

30 DP Sets (2 Pole Strucrure Kit)230 30.01 DP Sets - MS 279100 Set 4475 3755231 30.02 DP Sets - GI 280100 Set 5669 4935

31 3 Pole Structure Kit232 31.01 3 Pole Structure Material - MS 279015 Set 10755 9350233 31.02 3 Pole Structure Material - GI 280015 Set 13617 11855

32 C - Type Wedge Connectors (Fired)234 32.01 Rabbit to Rabbit ACSR 285570 Set 391 338235 32.02 Coyote to Coyote ACSR 285575 Set 969 836236 32.03 Rabbit to Coyote ACSR 285571 Set 976 842

33 H - Clamps237 33.01 Rabbit to Rabbit ACSR 285585 No 80 69238 33.02 Coyote to Coyote ACSR 285587 No 398 344239 33.03 Rabbit to Coyote ACSR 285586 No 377 325240 33.04 Two Hole Paddle (Rabbit ACSR) 285590 No 311 268241 33.05 Microwedge Connector 285594 No 101 88

34 LT Feeder Piller Box242 34.01 LT Feeder Piller Box 8 Way with Cutouts 300308 No 40000 40000243 34.02 LT Feeder Piller Box 12 Way with Cutouts 300312 No 48000 48000

244 34.03 Low Voltage Link Box - 2 Way 300315 No Will be intimated

245 34.04 Low Voltage Link Box - 4 Way 300316 No 146025

Page 100: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

35 LT Spacers246 35.01 LT Line Spacers (4 Wire) 284502 No 41 65

247 35.02 LT Line Spacers (2 Wire) 281504 No 25 39

248 35.03 LT Spacer for TC Wiring 284503 No 24 38

36 Armoured XLPE insulated LT UG Cable 1.1kV Class as per specification

249 36.01 6 Sqmm, 2 Core 287054 Km 43057

250 36.02 10 Sqmm, 2 Core 287055 Km 54334

251 36.03 10 Sqmm, 4 Core 287205 Km 71551

252 36.04 16 Sqmm, 2 Core 287056 Km 56956

253 36.05 16 Sqmm, 4 Core 287206 Km 90529

254 36.06 25 Sqmm, 2 Core 287057 Km 81930

255 36.07 25 Sqmm, 4 Core 287207 Km 109778

256 36.08 50 Sqmm, 4 Core 287209 Km 144591

257 36.09 70 Sqmm, 3.5 Core 287210 Km 241512

258 36.10 95 Sqmm, 3.5 Core 287211 Km 339689

259 36.11 120 Sqmm, 3.5 Core 287212 Km 378559

260 36.12 150 Sqmm, 3.5 Core 287213 Km 430906

261 36.13 185 Sqmm, 3.5 Core 287214 Km 546711

262 36.14 240 Sqmm, 3.5 Core 287216 Km 751939

263 36.15 400 Sqmm, 3.5 Core 287218 Km 1040069

37Compression type Aluminium Tubular in Line Connector for Aluminum Conductor

265 37.01 10 Sqmm 288605 No 3 3266 37.02 16 Sqmm 288606 No 3 3267 37.03 25 Sqmm 288607 No 4 4268 37.04 35 Sqmm 288608 No 4 4269 37.05 50 Sqmm 288609 No 6 6270 37.06 70 Sqmm 288610 No 10 10271 37.07 95 Sqmm 288611 No 11 11272 37.08 120 Sqmm 288612 No 16 16273 37.09 150 Sqmm 288613 No 24 24274 37.10 185 Sqmm 288614 No 29 29275 37.11 240 Sqmm 288616 No 48 48276 37.12 400 Sqmm 288617 No 100 100

38 Straight Through Jointing Kits Suitable for 1.1kV Class LT UG Cables

Epoxy Type277 38.01 10 Sqmm, 2 Core 288170 Set 553 553278 38.02 10 Sqmm, 4 Core 288174 Set 553 553279 38.03 16 Sqmm, 2 Core 288171 Set 553 553280 38.04 16 Sqmm, 4 Core 288175 Set 553 553281 38.05 25 Sqmm, 2 Core 288172 Set 553 553282 38.06 25 Sqmm, 4 Core 288176 Set 595 595283 38.07 50 Sqmm, 4 Core 288178 Set 678 678

Will be finalised by committee

Page 101: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

284 38.08 70 Sqmm, 3.5/4 Core 288179 Set 836 836285 38.09 95 Sqmm, 3.5/4 Core 288180 Set 836 836286 38.1 120 Sqmm, 3.5/4 Core 288181 Set 1319 1319287 38.11 185 Sqmm, 3.5/4 Core 288183 Set 1362 1362288 38.12 240 Sqmm,3.5/4 Core 288185 Set 1737 1737289 38.13 400 Sqmm 3.5/4 Core 288187 Set 2573 2573

HS Type290 38.14 up to 6 Sqmm 288190 Kit 500 500291 38.15 10 to 16 Sqmm 288191 Kit 500 500292 38.16 25 to 35 Sqmm 288192 Kit 650 650293 38.17 50 to 95 Sqmm 288193 Kit 1000 1000294 38.18 120 to 225 Sqmm 288194 Kit 1200 1200295 38.19 240 to 300 Sqmm 288195 Kit 1400 1400296 38.20 400 Sqmm 288196 Kit 2000 2000

39 Epoxy Terminating Kit (Pothead) suitable for 1.1kV Class LT UG Cables

297 39.01 Up to 4C x 50 Sqmm 288150 Set 307 307298 39.02 3.5 x 70/95/120 Sqmm 288159 Set 362 362299 39.03 3.5 x 150/185 Sqmm 288163 Set 455 455300 39.04 3.5 x 225/240/300 Sqmm 288165 Set 557 557301 39.05 3.5 x 400/500 Sqmm 288166 Set 678 678

40 Cast Iron Terminating Kit (Pothead) Suitable for 1.1kV Class LT UG Cables

302 40.01 2.5 to 25 Sqmm 288168 Set 186 186303 40.02 35 to 95 Sqmm 288169 Set 289 289

41 11kV, 3 Core, XLPE HTUG Cable (FLAT Armoured)

304 41.01 95 Sqmm 287340 Km 548860 548860305 41.02 120 Sqmm 287342 Km 843170 697000306 41.03 240 Sqmm 287345 Km 1038890 1038890307 41.04 400 Sqmm 287350 Km 1632500 1565000

42 11kV, 3 Core, XLPE HTUG Cable (ROUND Armoured)

308 42.01 95 Sqmm 287400 Km 675110 675110309 42.02 120 Sqmm 287402 Km 1040920 871000310 42.03 240 Sqmm 287405 Km 1279950 1279950311 42.04 400 Sqmm 287410 Km 2015220 1956000312 42.05 11kV Cables Fault Locating Equipments 440300 No 4222800 4222800

43 1.1kV, XLPE LTUG Cable313 43.01 3.5C x 25 Sqmm 287257 Km 138000 122300314 43.02 3.5C x 95 Sqmm 287261 Km 371000 319500315 43.03 3.5C x 150 Sqmm 287262 Km 548000 468100316 43.04 3.5C x 185 Sqmm 287263 Km 680000 579500317 43.05 3.5C x 240 Sqmm 287264 Km 849000 718800

4411kV Auto Reclosures and Sectionalizers with Remote Communication Facility

318 44.01

11kV, 630A, 12.5KA Auto reclosures with control pannel including necessary hardware structure protection system etc., as per specification (MESCOM)

302510 Set 918356 918356

319 44.0211kV, 12.5KA Sectionalizer with control box having control logic with necessary hardware etc., as per specification (MESCOM)

312550 Set 677499 677499

320 44.03 11kV, 230V, 2 Phase, 300VA control transformer for providing auxillary power

312551 Set 12945 12945

Page 102: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

321 44.0411kV/√3/110V/√3, 1 Phase metering PT class - 1, 100VA per Phase for measurement of voltage

312552 Set 35303 35303

322 44.05 GSM modem with connecting cable for remote communicating capabilities

312553 Set 14121 14121

323 44.06 Fabrication & supply of structrual steel including painting etc.,

312554 Set 7825 7825

324 44.07 9.6kV, 200A long duration porcelien housed Surge arrestors

312555 Each 1569 1569

45 Conventional RMUs (VCB Type) DAS Compatable

325 45.01 3 Way RMU, 2OD + 1VL (One Incomer + One Breakers + One Outgoing) with DAS Specification

302480 Set 1341910

326 45.02 4 Way RMU, 2OD + 2VL (One Incomer + Two Breakers + One Outgoing) with DAS Specification

302481 Set 1756090

327 45.03 5 Way RMU, 2OD + 3VL (One Incomer + Three Breakers + One Outgoing) with DAS Specification

302482 Set 2170280

328 45.04 6 Way RMU, 2OD + 4VL (One Incomer + Four Breakers + One Outgoing) with DAS Specification

302483 Set 2584460

329 45.05 Single I/C Panel with DAS Specification 302484 Set 364210

330 45.065 Way RMU, 2OD + 3VL (One Incomer + Three Breakers + One Outgoing), 350MVA, 800Amps with Cu Busbar

302310 Set 1638232

331 45.075 Way RMU, 2OD + 3VL (One Incomer + Three Breakers + One Outgoing), 350MVA, 800Amps with Al Busbar

302311 Set 1584750

332 45.08 4 Way RMU, 2OD + 2VL (One Incomer + Two Breakers + One Outgoing)

302312 Set 1316970

333 45.09 3 Way RMU, 2OD + 1VL (One Incomer + One Breakers + One Outgoing)

302313 Set 620090

46 Conventional RMUs OD

334 46.01 One Breaker (VL) Panel with Cu Busbar 302315 No 333789

335 46.02 One Breaker (VL) Panel with Al Busbar 302316 No 320445

336 46.033 Way RMU, 2OD + 1VL (One Incomer + One Breakers + One Outgoing), 350MVA, 800Amps with Cu Busbar

302320 Set 983160

337 46.043 Way RMU, 2OD + 1VL (One Incomer + One Breakers + One Outgoing), 350MVA, 800Amps with Al Busbar

302321 Set 943860

338 46.053 Way RMU, 2OD + 1VL (One Incomer + One Breakers + One Outgoing), 250MVA, 400Amps, VCB Type with Cu Busbar

302325 Set 908480

339 46.063 Way RMU, 2OD + 1VL (One Incomer + One Breakers + One Outgoing), 250MVA, 400Amps, VCB Type with Al Busbar

302326 Set 876297

340 46.07 Retrofitting of MEI make oil switch type OD with VCB

302470 No 171590

47 Conventional RMU Spares (VCB Type)

341 47.01 Bus Support Insulator with Stem 506505 No 1095 To be deleted

342 47.02 CTs Trom Bone Type, 11kV Class, 200 - 100/5A, VA - 15, Class 5P - 10

506520 No 18755 To be deleted

343 47.03 CTs resin cast, 11kV Class,400 - 200/5A, UA15, Class 5P - 10

506525 No 18755 To be deleted

Will be intimated

Will be intimated

Page 103: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

344 47.04 Spout Grid Insulator Assembly (Back) 506530 No 4247 To be deleted345 47.05 Spout Grid Insulator Assembly (Front) 506535 No 4247 To be deleted346 47.06 PT Insulator (Spout) 3 Nos 506540 No 448 To be deleted347 47.07 Shunt Trip Coil 506545 No 757 To be deleted348 47.08 Closing Coil 506550 No 757 To be deleted349 47.09 Plug Assembly for grid 800A, 6 Nos 506555 No 1579 To be deleted350 47.10 Para Plast Compound 506560 No 750 To be deleted

351 47.11 PT Fuse(NT) 11kV/V3 Amps without Stem, VTF Type - 11

506565 No 2837 To be deleted

352 47.12 Insulated Housing 506510 No 27386 To be deleted353 47.13 Switch Insulators Left/Right/Centre 506515 No 5963 To be deleted354 47.14 Vacuum Interruptor 20kA 506570 No 23958 To be deleted355 47.15 Flower Contact 506580 No 1065 To be deleted

48 For Schneider make RMU To be deleted356 48.01 Tripping Coil 506445 No 9345 To be deleted357 48.02 VIP Relay 506481 No 51398 To be deleted358 48.03 Live Cable Indicator 440615 No 3894 To be deleted

359 48.04 11KV Fault Passage Indicator for Overhead Line 302580 No 14810 14810

49 Compact RMUs, (VCB/SF6 Type) with Al Busbar

360 49.01 3 Way RMU, 2OD + 1VL, One Incomer + One Breaker + One Outgoing, 350MVA, 650Amps

302340 Unit 739453

361 49.02 4 Way RMU, 2OD + 2VL (One Incomer + Two Breakers + One Outgoing), 350MVA, 650Amps

302345 Unit 1050370

362 49.03 5 Way RMU, 2OD + 3VL (One Incomer + Three Breakers + One Outgoing), 350MVA, 650Amps

302350 Unit 1355749

363 49.04 6 Way RMU, 2OD + 4 VL (One Incomer + Four Breakers + One Outgoing), 350MVA, 650Amps

302355 Unit 1661128

364 49.05 1OD for RMU 302335 Unit 266070365 49.06 1VL for 350MVA, 650Amps RMU 302358 Unit 310917

50 Load Break Switches

366 50.01 Load Break Switches Only Without Panel 506491 Unit 41210

367 50.02 Load Break Switches with Panel 506492 Unit 89830368 50.03 3 Way Load Break Switch 506493 Unit 290610

51 Aerial Bunched Cable (ABC)369 11kV, HT Aerial Bunched Cable

370 51.01 3x95+1x70 Sqmm (Bare/Insulated messenger wire)

284791 Km 700820 631000

371 51.02 3x120+1x95 Sqmm (Bare/Insulated messenger wire)

284792 Km 811368 769000

LT Aerial Bunched Cable

372 51.03 3x95+1x70+1x16 Sqmm Street light (Insulated messenger cum Neutral)

284819 Km 345902 410000

373 51.04 3x95+1x70+1x25 Sqmm Street light (Insulated messenger cum Neutral)

284811 Km 356375 422400

374 51.05 3x95+1x70+1x35 Sqmm Street light (Insulated messenger cum Neutral)

284812 Km 365685 433300

52 Covered Conducor

375 52.01 Covered Conductor Km Will be intimated Will be Intimated

53 Accessories for ABC Cables

376 53.01Suspension clamp suitable for insulated Messsenger wire of size 25 to 95Sq mm

No New Item 325

Will be intimated

Will be intimated

Page 104: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

377 53.02 11kV, AB Cable Straight thru' joint kit suitable for 95 Sqmm

284853 No 2963 deleted

378 53.03 11kV, AB Cable Straight thru' joint kit suitable for 95 Sqmm

set / 3 nos

New Item 5650

379 53.04 11kV, AB Cable Straight thru' joint kit suitable for 120 Sqmm

set / 3 nos

New Item 6000

380 53.05 11kV ABC - T Jointing kit 95 - 120 Sqmm 284863 No 3757 deleted381 53.06 11kV ABC Termination kit 95 - 120 Sqmm 284873 No 1879 2100382 53.07 Surge Arester( for AB Cable) 303100 No 803 593383 53.08 Ground Connection for Messenger Wire 284880 No 122 122384 53.09 Anchor Sleeve for Messenger Wire 284885 No 23 Deleted

385 53.1 Single Phase Distribution Box for 20 Connections(SMC)

284820 No 1806 2065

386 53.11 Single Phase Distribution Box for 10 Connections(SMC/polycarbonate)

284818 No 2065 1950

387 53.12 Three Phase Distribution Box for 5 Connections(SMC/Polycarbonate)

284815 No 2065 2065

388 53.13 Three Phase Distribution Box for 6 Connections(SMC)

1987 2065

389 53.14 Piercing Connector Suitable for 16 Sqmm - 95 Sqmm AB Cable - Service Connections

284822 No 228 228

390 53.15 Piercing Connector Suitable for 16 Sqmm - 95 Sqmm AB Cable - Street Light Connections

284223 No 160 160

391 53.16 Piercing Connector Suitable for 25 Sqmm - 95 Sqmm AB Cable - Main to Main Connections

284855 No 267 267

392 53.17 Piercing Connector Suitable for 50 Sqmm - 150 Sqmm AB Cable - Main to Main Connections

284865 No 267 300

393 53.18 Universal Hook and Bolts & Nuts 284284 No 305 305

394 53.19Dead End Clamp/Anchor Clamp Assembly 25 to 95 Sqmm Bare Messenger(Exclusive of pole clamp and eye hook)

284825 No 152 131

395 53.20Dead End Clamp/Anchor Clamp Assembly 16 to 70 Sqmm Bare Messenger(Exclusive of pole clamp and eye hook)

New Item 200

396 53.21Dead End Clamp/Anchor Clamp Assembly 70 to 210 Sqmm Bare Messenger(Exclusive of pole clamp and eye hook)

New Item 300

397 53.22Suspension Clamp Assembly 25 to 95 Sqmm Bare Messenger 284826 No 305 deleted

398 53.23 Suspension Clamp Assembly16 to 70 Sqmm Bare Messenger(Exclusive of pole clamp and eye hook)

New Item 190

399 53.24Suspension Clamp Assembly 70 to 210 Sqmm Bare Messenger(Exclusive of pole clamp and eye hook)

New Item 305

400 53.25 Pre - Insulated lugs - CPTAU for 120 Sqmm 284836 No 446 385401 53.26 Pre - Insulated Lugs - CPTAU for 95 Sqmm 284837 No 392 338402 53.27 Pre - Insulated Lugs - CPTAU for 70 Sqmm 284827 No 343 295403 53.28 Pre - Insulated Lugs - CPTAU for 50 Sqmm 284828 No 305 262404 53.29 Pre - Insulated Lugs - CPTAU for 25 Sqmm 284834 No 286 246405 53.30 Pre - Insulated Lugs - CPTAU for 16 Sqmm 284835 No 141 122406 53.31 Tee - Connectors - KZ3 95 284829 No 392 338

407 53.32 Straight Joints Suitable for 95 Sqmm, LT ABC - MJPT Type

284832 No 310 310

408 53.33 Straight Joints Suitable for 70 Sqmm, LT ABC - MJPT Type

284830 No/ 1 core

289 289

Page 105: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

409 53.34 Straight Joints Suitable for50 Sqmm, LT ABC - MJPT Type

284831 No 271 271

410 53.35 Straight Joints Suitable for 25 Sqmm, LT ABC - MJPT Type

No New Item 250

411 53.36 Straight Joints Suitable for 16 Sqmm, LT, ABC - MJPT Type

284840 No 181 181

412 53.37 End Cap for 50/70 Sqmm 284833 No 19 19

413 53.38 Nylon cable Tie 100 Nos

New Item 400

414 53.39 Pole Clamp for HT/LT AB cables New Item 100

415 53.40 Eye Hook (Flat Type) for fixing clamps New Item 90

54 11kV Jointing and Cable Termination Kits Heat Shrinkable Type Transition Jointing Kit for XLPE Cable

416 54.01 3x95 Sqmm 288312 Set 8815 8815417 54.02 3x240 Sqmm 288314 Set 10894 10894418 54.03 3x400 Sqmm 288315 Set 11095 11095

Heat Shrinkable Indoor Type Cable Termination Kit for XLPE Cable

419 54.04 3x95 Sqmm 288332 Set 2753 2753420 54.05 3x240 Sqmm 288334 Set 3450 3450421 54.06 3x400 Sqmm 288336 Set 3540 3540

Heat Shrinkable Outdoor Type Cable Termination Kit for XLPE Cable

422 54.07 3x95 Sqmm 288302 Set 2990 2990423 54.08 3x240 Sqmm 288304 Set 3910 3910424 54.09 3x400 Sqmm 288305 Set 3940 3940

Heat Shrinkable Indoor Type Cable Termination Kit for PILC Cable

425 54.10 3x95 Sqmm 288462 Set 2307 2307426 54.11 3x240 Sqmm 288464 Set 2478 2478427 54.12 3x400 Sqmm 288465 Set 2530 2530

Heat Shrinkable Outdoor Type Cable Termination Kit for PILC Cable

428 54.13 3x95 Sqmm 288456 Set 2924 2924429 54.14 3x240 Sqmm 288458 Set 3669 3669430 54.15 3x400 Sqmm 288460 Set 3685 3685

Heat Shrinkable Straight Through Jointing Kits for XLPE Cable with Copper Lugs & Al Ferrules

431 54.16 3x95 Sqmm 288322 Set 5375 5375432 54.17 3x240 Sqmm 288324 Set 6555 6555433 54.18 3x400 Sqmm 288329 Set 8050 8050

Heat Shrinkable Straight Through Jointing Kits for PILC Cable with Copper Lugs & Al Ferrules

434 54.19 3x95 Sqmm 288450 Set 5734 5734435 54.20 3x240 Sqmm 288452 Set 6479 6479436 54.21 3x400 Sqmm 288453 Set 7827 7827

55 Service Connection Accessories

437 55.01 Pole Mounted Fibre Glass Reinforced Aerial Fuse Board 60Amps - 3 Way

612614 No 1022 1022

438 55.02 Pole Mounted Fibre Glass Reinforced Aerial Fuse Board 30Amps - 3 Way

612615 No 730 730

Page 106: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

439 55.03 FGRP Aerial Fuse Boards 30Amps - 4 Way 612617 No 952 952440 55.04 FGRP Aerial Fuse Boards 30Amps - 5 Way 612618 No 1077 1077441 55.05 FGRP Aerial Fuse Boards 30Amps - 6 Way 612616 No 1180 1180

56 LT Service Connector442 56.01 For Weasel 288502 No 33 28443 56.02 For Rabbit 288503 No 33 28

57 PVC PipesA. Pipes

444 57.01 PVC Pipe - 20 mm Dia 778020 Mtr 21 21445 57.02 PVC Pipe - 25 mm Dia 778025 Mtr 27 27446 57.03 PVC Pipe - 32 mm Dia 778032 Mtr 45 45447 57.04 PVC Pipe - 40 mm Dia 778040 Mtr 50 50448 57.05 PVC Pipe - 50 mm Dia 778050 Mtr 56 56449 57.06 PVC Pipe - 63 mm Dia 778063 Mtr 74 74450 57.07 PVC Pipe - 75 mm Dia 778075 Mtr 88 88451 57.08 PVC Pipe - 80 mm Dia 778080 Mtr 123 123452 57.09 PVC Pipe - 100 mm Dia 778100 Mtr 140 140453 57.10 PVC Pipe - 150 mm Dia 778105 Mtr 291 291454 57.11 PVC Pipe - 200 mm Dia 778110 Mtr 440 440

B. Bends455 57.12 PVC Bend - 20 mm Dia 778000 No 7 7456 57.13 PVC Bend - 25 mm Dia 778001 No 10 10457 57.14 PVC Bend - 32 mm Dia 778002 No 22 22458 57.15 PVC Bend - 40 mm Dia 778003 No 35 35459 57.16 PVC Bend - 50 mm Dia 778004 No 54 54460 57.17 PVC Bend - 63 mm Dia 778005 No 65 65461 57.18 PVC Bend - 75 mm Dia 778006 No 71 71462 57.19 PVC Bend - 80 mm Dia 778007 No 100 100463 57.20 PVC Bend - 100 mm Dia 778008 No 151 151464 57.21 PVC Bend - 150 mm Dia 778009 No 200 200465 57.22 PVC Bend - 200 mm Dia 778010 No 254 254

58 GI Pipes B - Class466 58.01 GI Pipe - 20 mm Dia 768040 Mtr 110 110467 58.02 GI Pipe - 25 mm Dia 768042 Mtr 155 155468 58.03 GI Pipe - 32 mm Dia 768043 Mtr 209 209469 58.04 GI Pipe - 40 mm Dia 768044 Mtr 220 220470 58.05 GI Pipe - 50 mm Dia 768046 Mtr 286 286471 58.06 GI Pipe - 63 mm Dia 768047 Mtr 310 310472 58.07 GI Pipe - 65 mm Dia 768048 Mtr 409 409473 58.08 GI Pipe - 100 mm Dia 768052 Mtr 1143 1143474 58.09 GI Pipe - 150 mm Dia 768058 Mtr 1144 1144

59PVC Insulated & Sheathed Aluminium Wires, Single Core Multistrand 1.1 kV Class

475 59.01 PVC Wire - 2.5 Sqmm 289022 100 Mtr

863 880

476 59.02 PVC Wire - 4 Sqmm 289023 100 Mtr

1045 1065

477 59.03 PVC Wire - 6 Sqmm 289024 100 Mtr

1264 1288

478 59.04 PVC Wire - 10 Sqmm 289025 100 Mtr

1713 1747

60PVC Insulated & Un-Sheathed Aluminium Wires, Single Core Multistrand 1.1 kV class

479 60.01 PVC Wire - 16 Sqmm 289026 100 Mtr

2306 2352

Page 107: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

480 60.02 PVC Wire - 25 Sqmm 289027 100 Mtr

3182 3246

481 60.03 PVC Wire - 35 Sqmm 289028 100 Mtr

3552 3624

482 60.04 PVC Wire - 50 Sqmm 289029 100 Mtr

4364 4451

483 60.05 PVC Wire - 70 Sqmm 289030 100 Mtr

6548 6680

484 60.06 PVC Wire - 95 Sqmm 289031 100 Mtr

8059 8200

485 60.07 PVC Wire - 120 Sqmm 289032 100 Mtr

10558 10753

486 60.08 PVC Wire - 150 Sqmm 289033 100 Mtr

12981 13240

487 60.09 PVC Wire - 185 Sqmm 289034 100 Mtr

14978 15277

488 60.10 PVC Wire - 240 Sqmm 289036 Coil 19424 1994561 Fuse Wires

489 61.01 Tinned Copper Fuse Wire, 5A 625020 Kg 780 700490 61.02 Tinned Copper Fuse Wire, 10A 625230 Kg 780 700491 61.03 Tinned Copper Fuse Wire, 20A 625250 Kg 780 700492 61.04 Tinned Copper Fuse Wire, 100A 625075 Kg 780 700

62 Porcelain cut outs (500 Volts)493 62.01 15/16A 300003 No 38 38494 62.02 30/32A 300005 No 53 53495 62.03 60/63A 300007 No 158 158496 62.04 100A 300010 No 283 283497 62.05 200A 300020 No 450 450498 64.06 300A 300030 No 825 825

65 Grounding Materials for RMUs & TransformersPipe Grounding

499 65.01GI Grounding pipe, B - Class, 40mm dia, 2.5mtrs long, 2.9mm thick with bolts nuts, GI Strips and washers complete

281674 No 605 527

500 65.02GI Grounding pipe, B - Class, 40mm dia, 2.5mtrs long, 3.2mm thick with bolts nuts, GI Strips and washers complete

No New Item Will be Intimated

501 65.03Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bags of 30kg each

600095 No 450 450

502 65.04 Good Quality Salt for grounding purposes packed in 50kg gunny bags

607054 Bag 300 300

Rod Earthing

503 65.04

Rod type of earthing using 40mm dia, 3mtr long MS rod as ground rod, in earth pit of 300mm width and 3300mm depth and using 50x6mm flat welded to ground rod as terminal & connected to equipment ground terminal using pvc Al wire as specified

281685 No 2000 2000

504 65.05 Bentonite clay slurry for earthing in 50 kg bags 607220 50 kg Bag

400 400

66 Alkathine tube

505 66.01 Transparent Alkathine tube 19mm dia, 2mm thick in coils of 30 mtrs

821900 Coil 500 500

67 Measuring Equipments

506 67.01High precision Single phase Electromechanical meters with magnetic suspension 2.5 - 10A, Class-2 accuracy

357001 No Deleted Deleted

Page 108: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

507 67.02High precision 3 phase Electromechanical meters with magnetic suspension 5-20A, Class-2 accuracy

357021 No Deleted Deleted

508 67.03 LT Electronic Tri - Vector Meter 5A, Class-0.5/1.0 accuracy

357511 No Deleted Deleted

509 67.04 LT Electronic Tri - Vector Meter 5A, Class-0.5 accuracy

357510 No 3000 2250

510 67.05 HT Electronic Tri - Vector Meter 5A, Class-0.5 accuracy

357512 No 3463 2600

511 67.06 HT Electronic Tri - Vector Meter 5A, Class-0.2 accuracy with ABT features

357500 No 15750 11658

512 67.07 Electronic Meter, 5-10A/5-20A, SPh Class-1 Accuracy

357003 No Deleted Deleted

513 67.08 LT Single phase 5-30A, DLMS complaint static energy meter, class-1.0 Accuracy

357006 No 905 733

514 67.09 Electronic Meter, 2.5-10A/5-20A, 3 Ph Class-1 Accuracy

357205 No Deleted Deleted

515 67.10LT AC Three Phase 4 wire, 5-30A Static whole unidirectional complaint energy meter, Class – 1.0 Accuracy

357531 No 2499 2450

516 67.11 Electronic Meter, 10-40A, 3 Ph Class-1 Accuracy 357201 No Deleted Deleted

517 67.12 LT Three phase, 4wire, CT Operated DLMS complaint ETV meter-/5, class 05s Accuracy

357519 No 3000 2450

518 67.13 Electronic Meter, 5-20/30A, 3 Ph 4 wire Class - 1 Accuracy (whole current)

357200 No Deleted Deleted

519 67.14 Electronic Meter, 10-40/60A, 3 Ph Class-1, 4 wire Accuracy (whole current)

357206 No Deleted Deleted

520 67.15 Electromechanical Energy Meter - 3 Ph, 5-20A, Class-2 Accuracy, for IP Sets

357122 No Deleted Deleted

521 67.16 LT, S.Ph, 5-30 A Static Energy Meter of Accuracy Class in retail out lets of BESCOM

357015 No Deleted Deleted

522 67.17 Pre - paid Energy meter single phase, 5-30A 357580 No 10733 10733523 67.18 Pre - paid Energy meter three phase, 5-30A 357585 No 13532 13532

524 67.193 phase 4 wire static meter (CT, PT operated) 3 x 63.5 V, 5 Amps or 1 Amps class 0.2s with Rs - 485 & ABT features

357514 No 14745 14745

525 67.20

LT Three phase Four Wire 5-30A Thread through type composite Meter Housing Box consisting of ETV Meter with AMR comply and LTCT with built in GSM/GPRS modem (as per technical specification ) upto 100kVA Distribution Transformer.

357515 No 19135 19135

526 67.21 Numerical Over Current & Earth Fault Protecion Relay with Accessories

357517 No 10126 10126

68 Meter Protection/Tamper Proof Boxes (MS) for LT Installations above 40 HP

527 68.01Meter Protection/Tamper Proof box with busbar, for LT 3 Ph with CT Ratio 50/5A, Class-1 Accuracy

358040 No 6720 6720

528 68.02Meter Protection/Tamper Proof box with busbar, for LT 3 Ph with CT Ratio 75/5A, Class-1 Accuracy

358023 No 6240 6240

529 68.03Meter Protection/Tamper Proof box with busbar, for LT 3 Ph with CT Ratio 100/5A, Class-1 Accuracy

358030 No 5952 5952

530 68.04 LT Metering Box for housing the ETV Meters without CT's busbar wiring etc;

358050 No 4000 4000

Page 109: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

531 68.05 Pillfer proof box for below 40HP Installations 612655 No 322 322

532 68.06 SMC Meter protection box 358005 No 480 will be intimated

533 68.07

LT SMC Metering box without CTs with wiring arrangement Modems compatible for DLMS meters with RS232 for LT installation 358076 No 4545 4000

534 68.08SMC Street Lighting Metering Box with Automatic Control Swith, Contactors with Single Phase 5-30 Amps meter & 50/5A CT

358078 No 6500 will be intimated

535 68.09 Numerical Poly Carbonate Seals 626234 No 8 8536 68.10 Meter Sealing Wire 626500 Kg 167 167537 68.11 High security label seal 357590 No 6 6538 68.12 Poly carbonate sealing bits with out number 626233 No 6 6

69 LT Current Transformers

539 69.01 CT Ratio - 25/5A, Class-1 Accuracy, 3.75 VA, Ring type

336005 No 619 558

540 69.02 CT Ratio - 30/5A, Class-1 Accuracy, 3.75 VA, Ring type

336006 No 619 558

541 69.03 CT Ratio - 50/5A, Class-1 Accuracy, 3.75 VA, Ring type

336010 No 615 554

542 69.04 CT Ratio - 75/5A, Class-1 Accuracy, 3.75 VA, Ring type

336015 No 512 461

543 69.05 CT Ratio - 50/5A, Class-0.5 Accuracy, 3.75 VA, Ring type

New Item 550

544 69.06 CT Ratio - 75/5A, Class-0.5 Accuracy, 3.75 VA, Ring type

New Item 350

545 69.07 CT Ratio - 100/5A, Class-0.5 Accuracy, 3.75 VA, Ring type

336020 No 454 408

546 69.08 CT Ratio - 150/5A, Class-0.5 Accuracy, 3.75 VA, Ring type

336025 No 341 306

547 69.09 CT Ratio - 200/5A, Class-0.5 Accuracy, 3.75 VA, Ring type

336030 No 400 360

548 69.10 CT Ratio - 300/5A, Class-0.5 Accuracy, 3.75VA, Ring type

336035 No 400 360

549 69.11 CT Ratio - 400/5A, Class-0.5 Accuracy, 3.75 VA, Ring type

336040 No 400 360

550 69.12 CT Ratio - 600/5A, Class-0.5 Accuracy, 3.75VA, Ring type

336046 No 450 405

551 69.13 CT Ratio - 800/5A, Class-0.5 Accuracy, 3.75 VA, Ring type

336050 No 450 405

70 Instrument Transformers (PTs & CTs)

11KV PTs

552 70.01 PT 11kV/110V, 50VA, Insulation level 15/35/95 kV as per IS 3156, Accuracy class 0.5

335230 No 8631 8631

553 70.02 PT 11KV/rt3/110V/rt3, 25VA, Insulation level 15/35/95 kV as per IS 3156, Accuracy class 0.2

No New Item 9200

554 70.03 PT 11kV Station Type 335220 No 24110 24110

71 11KV CTs (Secondary -5A) for 3 phase-3 wire Metering

555 71.01 CT - 11kV, 2.5/5A, Accuracy Class 0.5 336292 No 4000 4000556 71.02 CT - 11kV, 5/5A, Accuracy Class 0.5 336294 No 4000 4000557 71.03 CT - 11kV, 7.5/5A, Accuracy Class 0.5 336296 No 4000 4000558 71.04 CT - 11kV, 10/5A, Accuracy Class 0.5 336302 No 4000 4000559 71.05 CT - 11kV, 12.5/5A, Accuracy Class 0.5 336303 No 4000 4000

Page 110: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

560 71.06 CT - 11kV, 15/5A, Accuracy Class 0.5 336304 No 4000 4000561 71.07 CT - 11kV, 20/5A, Accuracy Class 0.5 336306 No 4250 4250562 71.08 CT - 11kV, 25/5A, Accuracy Class 0.5 336308 No 4250 4250563 71.09 CT - 11kV, 30/5A, Accuracy Class 0.5 336310 No 4250 4250564 71.10 CT - 11kV, 40/5A, Accuracy Class 0.5 336341 No 4250 4250565 71.11 CT - 11kV, 50/5A, Accuracy Class 0.5 336309 No 4250 4250566 71.12 CT - 11kV, 60/5A, Accuracy Class 0.5 336342 No 4250 4250567 71.13 CT - 11kV, 75/5A, Accuracy Class 0.5 336315 No 4500 4500568 71.14 CT - 11kV, 100/5A, Accuracy Class 0.5 336321 No 4500 4500569 71.15 CT - 11kV, 150/5A, Accuracy Class 0.5 336375 No 4500 4500570 71.16 CT - 11kV, 200/5A, Accuracy Class 0.5 336325 No 4500 4500571 71.17 CT - 11kV, 400/5A, Accuracy Class 0.5 336335 No 4750 4750572 71.18 11 KV CTs (Secondary 1A)

573 71.19 CT-11KV, 1.25/1A to 2.5/1A, Burden:2.5VA Accuracy Class 0.2

No New Item 8120

574 71.20 CT-11KV, 5/1A to 100/1A, Burden:2.5VA Accuracy Class 0.2

No New Item 6960

575 71.21 CT-11KV, 125/1A to 200/1A, Burden:2.5VA Accuracy Class 0.2

No New Item 7450

576 71.22 CT-11KV, 225/1A to 400/1A, Burden:2.5VA Accuracy Class 0.2

No New Item 8120

72 HT Metering Equipments

HT Metering cubicle, 11kV Class, All single ratio CTs including ETV Meter (2CT 2PT)

577 72.01 Without Load Break Switch 358350 No 63840 63840578 72.02 With Load Break Switch 358320 No 124500 124500

579 72.03

11kV HT Metering Panel 3 CT 3 PT for 3 Phase 4 Wire Metering With Transparent Cover TTB, with 30x8mm Cu Bus bars (HT Metering Box Fabricated out of 3mm MS Sheet duly epoxy powder coated, Without Meter)

358355 No 135585 135585

580 72.04

11kV HT Metering Panel 3 CT 3 PT for 3 Phase 4 Wire Metering With Transparent Cover TTB, with 30x8mm Cu Bus bars (HT Metering Box Fabricated out of 3mm MS Sheet duly epoxy powder coated, With Modem)

New Item 140585

581 72.05 0.2 S Class ETV Meter with ABT Feature & DLMS Protocal with ToD for above

357518 No 20000 20000

73 UPS on Line582 73.01 1KVA 344901 Set 24821 24821583 73.02 5KVA 344905 Set 91050 91050

74 Heavy Duty Copper Terminals584 74.01 25 Sqmm Copper Terminals 288507 No 22 20585 74.02 35 Sqmm Copper Terminals 288508 No 23 21586 74.03 50 Sqmm Copper Terminals 288509 No 34 30587 74.04 70 Sqmm Copper Terminals 288510 No 55 49588 74.05 95 Sqmm Copper Terminals 288511 No 79 71589 74.06 120 Sqmm Copper Terminals 288512 No 86 77590 74.07 150 Sqmm Copper Terminals 288513 No 114 101591 74.08 185 Sqmm Copper Terminals 288514 No 159 141592 74.09 225 Sqmm Copper Terminals 288515 No 204 182593 74.10 240 Sqmm Copper Terminals 288516 No 207 184594 74.11 300 Sqmm Copper Terminals 288517 No 298 266595 74.12 400 Sqmm Copper Terminals 288518 No 501 446

75 Heavy Duty Copper Terminals Long Barrel

Page 111: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

596 75.01 25 Sqmm Copper Terminals 288527 No 22 20597 75.02 35 Sqmm Copper Terminals 288528 No 30 27598 75.03 50 Sqmm Copper Terminals 288529 No 45 40599 75.04 70 Sqmm Copper Terminals 288530 No 70 62600 75.05 95 Sqmm Copper Terminals 288531 No 100 89601 75.06 120 Sqmm Copper Terminals 288532 No 110 98602 75.07 150 Sqmm Copper Terminals 288533 No 145 129603 75.08 185 Sqmm Copper Terminals 288534 No 215 192604 75.09 225 Sqmm Copper Terminals 288535 No 275 245605 75.10 240 Sqmm Copper Terminals 288536 No 280 249606 75.11 300 Sqmm Copper Terminals 288537 No 405 361607 75.12 400 Sqmm Copper Terminals 288538 No 680 606

76 Al End Terminals (Lugs)608 76.01 10 Sqmm 288630 No 3 3609 76.02 16 Sqmm 288631 No 3 3610 76.03 25 Sqmm 288632 No 4 4611 76.04 32 Sqmm 288633 No 5 5612 76.05 50 Sqmm 288634 No 9 8613 76.06 70 Sqmm 288635 No 13 12614 76.07 95 Sqmm 288636 No 17 15615 76.08 120 Sqmm 288637 No 22 19616 76.09 150 Sqmm 288638 No 26 22617 76.10 185 Sqmm 288639 No 40 35618 76.11 225 Sqmm 288640 No 44 38619 76.12 240 Sqmm 288641 No 65 56620 76.13 300 Sqmm 288642 No 77 66621 76.14 400 Sqmm 288643 No 100 86

77 TOOLS AND PLANT622 77.01 Battery Hydrometer 429810 No 100 100623 77.02 Multimeter Electronic Type 359215 No 900 900624 77.03 Multimeter Electromechanical Type 359210 No 1619 1619

625 77.04Rubber Hand gloves 15kV, SEAMLESS Confirming to ISS (Sample to be verified for seamless before approval) for electrical purpose

427252 Pair 985 985

626 77.05 Thermometer (Wall Mounted) 430395 No 231 231627 77.06 Portable Drilling Machine 410020 No 2150 2150628 77.07 Megger 500 V 359400 No 2250 2250629 77.08 Megger 2.5kV - 5kV 359450 No 4500 4500630 77.09 Silica Gel 607056 Kg 170 170631 77.10 Grounding Sticks/Rods (Earthing Rods) 427210 Set 1710 1710632 77.11 Telescopic Earthing Rods 427215 Nos 1254 1254633 77.12 Panel Indication Lamps 611972 No 12 12634 77.13 Ring Spanners 424000 Set 1577 1577635 77.14 Tube Spanners 424150 Set 600 600636 77.15 Pipe Wrench 24 Inches Size 424410 No 788 788637 77.16 Pipe Wrench 18 Inches Size 424408 No 300 300638 77.17 Double End Spanner 424300 Set 283 283639 77.18 Hack Saw Frames + B185 418170 No 100 100640 77.19 Hand Torch 5 Celled 427405 No 120 120641 77.20 Hand Torch 3 Celled 427403 No 60 60642 77.21 Rechargable LED Hand Torch 427408 No 681 681

643 77.22 Portable Inflatable Emergency Lighting System 427435 No 1898135 deleted

644 77.23 Insulated cutting pilers 12 inches size 425040 No 200 200645 77.24 Insulated cutting pilers 8 inches size 425041 No 152 152646 77.25 Live Line Tester (HT) 440000 No 70 70647 77.26 LT Line Tester 440005 No 38 38648 77.27 High Voltage Detector 440008 No 15863 15863

Page 112: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

649 77.28 Screw driver 18 Inches Size 425522 No 80 80650 77.29 Screw driver 12 Inches Size 425521 No 69 69651 77.30 Screw driver 8 Inches Size 425518 No 72 72652 77.31 Hammer 8 Lbs 418141 No 200 200653 77.32 Hammer 2 Lbs 418100 No 150 150654 77.33 Allen Keys 424260 No 192 192655 77.34 Adjustabale Screw Spanner 8 Inches 424364 No 142 142656 77.35 Adjustabale Screw Spanner 12 Inches 424365 No 227 227657 77.36 Box Spanners 424120 Set 2000 2000658 77.37 Transil Oil Dielectric Breakdown Test Kit 440060 No 63000 63000659 77.38 SF6 Gas Leak Detector 440830 No 31539 31539660 77.39 DC Volt Meter Range - 3V to +5V 359180 No 450 450661 77.40 Hydrometer syrings suitable for vent holes 422811 No 150 150662 77.41 Specific Gravity Correction Chart 620172 No 150 150663 77.42 Wall Mounting Type Holder for Hydrometer 430311 No 100 100664 77.43 Earth Resistance Tester 359481 No 5400 5400665 77.44 Rubber Appron 427341 No 185 185666 77.45 Pippette 430140 No 350 350667 77.46 Protective Goggle 427330 No 350 350668 77.47 Acid Resisting jars (4 Pint capacity) 429814 No 375 375669 77.48 Rain Coats with Hoods 427300 No 439 439670 77.49 Rubber Shoes Knee Height 427360 No 504 504671 77.50 Glass Funnel 430200 No 105 105672 77.51 Hickery Rods 427120 No 957 957

673 77.52 Manilla Rope 1" 406226 Mtr (100)

2200 2200

674 77.53 Manilla Rope 3/4" 406220 Mtr (100)

1800 1800

675 77.54 Polypropyline Rope of 26mm dia 406351 Kg 211 211676 77.55 Files of sizes 426000 Set 250 250677 77.56 Safety Belts 427320 No 610 610678 77.57 Safety Belts with Accessories Set New Item679 77.58 Safety Helmets 427310 No 112 112

680 77.59 Electrical Safety (FRP) Helmets attached with electronic induction tester (FRP)

427311 811 811

681 77.60 Hand Operated Crimping tool 25 Sqmm to 400 Sqmm

425320 No 7870 7870

682 77.61 Common Meter Reading Instrument 358361 No 25925 25925683 77.62 Thermal Imaging Camera 440661 No 357000 357000

684 77.63 Hydraulic Crimping Tool with suitable Dies for crimping lugs of size upto 400Sqmm

425360 Set 9500 9500

685 77.64 Hi Visibility Reflective Jackets 407301 No 672 672686 77.65 Hi Visibility Reflective Rain Wear 407302 No 2939

687 77.66 Protective Eye Wear for Safety with integral hands free LED Lighting

407303 No 847

688 77.67 Leather Shoes 407304 Pair 933689 77.68 Socks 407305 Pair 90690 77.69 Safety shoes with socks Pair New Item691 77.70 Waist Leather Belt 407306 No 469

692 77.71

Chain saw (Motorised), extremely robust and long lasting chain saw. Highly suitably for cutting firewood, thinning shrubs and bushes and shaping trees.

414371 Set 24793 24793

693 77.72 FRP wall extension ladder 427075 Set New Item

694 77.73 Search Lights (Hand Held & Fixable to Vehicle) 427440 No Will be Intimated Will be Intimated

695 77.74 LDPE Safety Cone with ESCOMs Logo 407370 No Will be Intimated Will be Intimated

Will be intimated

Page 113: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

696 77.75HM HDPE Flexible Poly Film Barricade Tape of 50 Microns with ESCOMs Logo, Caution, Danger & Men At Work

407375 Mtr Will be Intimated Will be Intimated

697 77.76 Men at work Sign Board 407380 No Will be Intimated Will be Intimated

698 77.77 Insulated Crowbars 404065 No Will be Intimated Will be Intimated

699 77.78 Helmet with Miner Light 427312 No Will be Intimated Will be Intimated

700 77.79 Foldable Insulated Fibre Ladder 427076 No Will be Intimated Will be Intimated

701 77.80 Head Torch 427447 No Will be Intimated Will be Intimated

702 77.81 Insulated GOS Operating Handle/Rod for Redesigned & Modified GOS

503215 No 1900 1900

78 Miscellaneous Materials

703 78.01 Cable Covering Tiles 125x250x40 mm 801035 Per 1000

10000 10000

704 78.02 Cable Covering Tiles 125x125x40 mm 801034 Per 1000

5000 5000

705 78.03 RCC Hume Pipes 2000mm long 150mm dia 820672 No 300 300706 78.04 RCC Hume Pipes 2000mm long 200mm dia 820673 No 380 380707 78.05 Collars for RCC hume pipe 150mm dia 820703 No 80 80708 78.06 Collars for RCC hume pipe 200mm dia 820704 No 100 100709 78.07 MS Pipe 200mm dia with collars 765050 Mtr 937 937710 78.08 Burnt Bricks (class 35 modular) 802005 No 5 6711 78.09 Wire cut bricks (Class 75 Modular) 802006 No 10 13

712 78.10 Pre - cast hollow blocks (40x20x20 cms) grade 30 802007 No 26 38

713 78.11 River Sand 800650 Cmt 2000 1700

714 78.12 Artificial Sand/Manufacture Sand 800651 Cmt 950 1700715 78.13 Cement in 50kg bags 800030 Bag 330 335716 78.14 Ready Mix concrete M20 (1:1.5:3) 800660 Cmt 3450 4600717 78.15 Ready Mix concrete M25 (1:1:2) 800661 Cmt 3850 4800718 78.16 Spall (Jelly used for packing) 800662 Cmt 50 400719 78.17 Stone Spalls 800663 Cmt 130 300720 78.18 Stone Boulders 800664 Cmt 200 600

721 78.19 Route & Joint indicating stone with MS Anchor rod

802460 No 120 120

722 78.20 Black Cambric tape 25 mm wide 10mil thick and in rolls of 50 Mtr

622675 Roll 120 120

723 78.21 Yellow Cambric tape 25 mm wide 7mil thick and in rolls of 50 Mtr

622620 Roll 110 110

724 78.22 PVC Insulation Tapes19 mm wide and in rolls of 10 Mtrs

622720 Roll 10 10

725 78.23 ACB Paint 632030 Ltr 120 132726 78.24 Aluminium Paint 632013 Ltr 180 198727 78.25 Grey Enamel Paint smoke/battle ship 632050 Ltr 250 250728 78.26 Red Oxide Paint 632020 Ltr 90 99

729 78.27 Cotton Tapes 19 mm wide and in rolls of 50 Mtrs 622124 Roll 35 35

730 78.28 Cotton Waste 627520 Kg 50 50731 78.29 Hack saw blade 300x12.5 mm 418185 No 7 7

732 78.30TW plate 300x300x25 mmwith 20mm dia holes at the corners and coated with two coats of varnish on one side/SMC board.

612621 No 230 230

733 78.31 TW Meter Board, 300x300x75mm, coated with varnish/SMC board

612623 No 110 110

Page 114: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

734 78.32 Monoplast 506559 100 Gms

55 55

735 78.33 Bitumen Compound 604060 Kg 65 6579 Copper Control cables 1.1 kV Class

736 79.01 2 Core, 2.5 Sqmm 289352 Km 42486 60000737 79.02 4 Core, 2.5 Sqmm 289354 Km 74211 85342738 79.03 10 Core, 2.5 Sqmm 289360 Km 161561 193000739 79.04 14 Core, 2.5 Sqmm 289364 Km 234500 267646740 79.05 19 Core, 2.5 Sqmm 289369 Km 313615 360657741 79.06 2 Core, 4 Sqmm Km New Item 82000742 79.07 2 Core, 6 Sqmm 289452 Km 92508 103999743 79.08 2 Core, 10 Sqmm 289472 Km 117438 135054744 79.09 4 Core, 4 Sqmm 289404 Km 152675 175576745 79.10 4 Core, 6 Sqmm 289454 Km 153608 169999746 79.11 4 Core, 10 Sqmm 289474 Km 248481 285752747 79.12 4 Core, 16 Sqmm 289484 Km 367781 422948748 79.13 Flurocent Light Fitting 446024 No 255 255749 79.14 Flurocent tube 611530 No 40 40

750 79.15 T-5 Tubelight fitting Complete 28 watts with tube - 4 feet

446040 No 440 440

751 79.16 Floracent Lamp for above 446037 No 102 102

752 79.17 T-5 Tubelight Fitting Complete 14 watts with tube - 2 feet

446038 No 425 425

753 79.18 Floracent Lamp for above 611730 No 90 90754 79.19 Sodium Vapour Lamp (250W) 612645 No 650 650755 79.20 Automatic Switches for Street Lights 446044 No 1850 1850756 79.21 GI Bracket for Flurocent Tube 612240 No 300 300

757 79.22 Sodium Vapour lamp Ignitors 278832/278811

No 225 225

758 79.23 Caution/Danger Board 613050 No 120 120759 79.24 Standard Torch Cell 1.5V 612660 No 11 11

760 79.25 Street light metering box made of MS sheet steel 358012 No 1913 1913

761 79.26 Street light metering box made of SMC 1700 170080 Compact Fluorescent Lamps

762 80.01 5 Watts 611545 No 100 100763 80.02 8 Watts 611548 No 104 104764 80.03 11 Watts 611551 No 120 120765 80.04 14 Watts 611554 No 116 116766 80.05 18 Watts 611558 No 148 148767 80.06 23 Watts 611563 No 168 168

81 Bolts & NutsMS

768 81.01 B & N Size 16x40mm 733612 MT 74102 63000769 81.02 B & N Size 16x50mm 733613 MT 74102 63000770 81.03 B & N Size 16x65mm 733616 MT 74102 63000771 81.04 B & N Size 16x75mm 733618 MT 74102 63000772 81.05 B & N Size 16x85mm 733620 MT 74102 63000773 81.06 B & N Size 16x100mm 733623 MT 74102 63000774 81.07 B & N Size 16x125mm 733625 MT 74102 63000775 81.08 B & N Size 16x150mm 733628 MT 74102 63000776 81.09 B & N Size 16x175mm 733630 MT 74102 63000777 81.10 B & N Size 16x200mm 733633 MT 74102 63000778 81.11 B & N Size 16x225mm 733634 MT 74102 63000

GI779 81.12 B & N Size 16x40mm 280612 MT 90102 85000780 81.13 B & N Size 16x50mm 280613 MT 90102 85000781 81.14 B & N Size 16x65mm 280616 MT 90102 85000782 81.15 B & N Size 16x75mm 280618 MT 90102 85000

Page 115: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

783 81.16 B & N Size 16x85mm 280620 MT 90102 85000784 81.17 B & N Size 16x100mm 280623 MT 90102 85000785 81.18 B & N Size 16x125mm 280625 MT 90102 85000786 81.19 B & N Size 16x150mm 280628 MT 90102 85000787 81.20 B & N Size 16x175mm 280630 MT 90102 85000788 81.21 B & N Size 16x200mm 280633 MT 90102 85000789 81.22 B & N Size 16x225mm 280634 MT 90102 85000

82LT Brass Terminal Connector for Transformer (630 Amps, Aprrox. Weight 0.790kg)

780 82.01 250 kVA 542180 No 822 822781 82.02 500 kVA 542185 No 822 822

83 Brass Cable Glands782 83.01 25mm 542190 No 62 62783 83.02 32mm 542192 No 75 75784 83.03 40mm 542194 No 117 117785 83.04 45mm 542196 No 156 156

84

LT Capacitor 3 Ph Housed in a encloser with necessary fusses, wiring, mounting arrangement as per tech Spec

786 84.01 3 kVAr 333103 Set 525 725787 84.02 9 kVAr 333109 Set 931 1131788 84.03 18 kVAr 333118 Set 1733 1933789 84.04 27 kVAr 333127 Set 2758 2958790 84.05 54 kVAr 333154 Set 4883 5083

85

FOR DISTRIBUTION TRANSFORMER CENTRES MS Box for housing the ETV Meter 3 phase 4 wire 5A, with associated LT CTs class 0.5 accuracy, ring type, with wiring clamps, B&N and all other accessories required. (EXCLUDING ETV METER)

791 85.01 With CT Ratio 50/5 for 15/25kVA Distribution Transformer Centre

358055 Set 5845 5662

792 85.02 With CT Ratio 100/5 for 50/63kVA Distribution Transformer Centre

358060 Set 5362 5224

793 85.03 With CT Ratio 150/5 for 100kVA Distribution Transformer Centre

358065 Set 5023 4918

794 85.04 With CT Ratio 400/5 for 250kVA Distribution Transformer Centre

358070 Set 5200 5080

795 85.05 With CT Ratio 800/5 for 500kVA Distribution Transformer Centre

358075 Set 5350 5215

SMC metering box as above

796 85.06 With CT Ratio 50/5 for 15/25kVA Distribution Transformer Centre

358056 Set 6390 5662

797 85.07 With CT Ratio 100/5 for 50/63kVA Distribution Transformer Centre

358061 Set 5907 5224

798 85.08 With CT Ratio 150/5 for 100kVA Distribution Transformer Centre

358066 Set 5568 4918

799 85.09 With CT Ratio 400/5 for 250kVA Distribution Transformer Centre

358071 Set 5745 5080

800 85.10 With CT Ratio 800/5 for 500kVA Distribution Transformer Centre

358077 Set 5895 5215

86 Installing RLMU for the Existing Distribution Transformer Center

Page 116: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

801 86.01

Providing RLM Unit with necessary wiring for housing PLC, MCCB, MCB, Energy Meter, CTs, Cotactors etc., as per specification in Metallic Enclousure

358086 No 10752 10752

802 86.02 Programmable Logic Controllers with communication ports

358098 Set 19339 19339

803 86.03 GSM Modem 447662 No 7642 7642MCCB

804 86.04 For 25 kVA, 40/60 Amps 358088 No 1485 1485805 86.05 For 63 kVA, 100 Amps 358090 No 1500 1500806 86.06 For 100 kVA,160 Amps 358092 No 1700 1700807 86.07 For 100 kVA, 250 Amps 358093 No 5486 5486808 86.08 For 250 kVA, 400 Amps 358095 No 9752 9752809 86.09 For 500 kVA, 630 Amps 358096 No 16450 16450810 86.10 MCB 6 Amps 358094 No 210 210

Contactors 811 86.11 For 25 kVA, 40 Amps 352440 No 2010 2010812 86.12 For 63 kVA, 100 Amps 352460 No 3280 3280813 86.13 For 100 kVA, 160 Amps 352480 No 5775 5775814 86.14 For 100 kVA, 225 Amps 352485 No 11390 11390

87 Compact Pre - fabricated Packaged Sub - station 11kV/433 V

Packaged Sub - Station 11kv/433V consisting of 3 way SF6/VCB insulated compact RMU, oil cooled/dry type copper wound transformer and L.T. section with one ACB as incoming and 7 No outgoing MCCB feeders and with encloser made of electronically Galvanized

815 87.01 With 100 kVA Oil Cooled Transformer 276530 No 1132904816 87.02 With 250 kVA Oil Cooled Transformer 276540 No 1491923817 87.03 With 500 kVA Oil Cooled Transformer 276550 No 2009325818 87.04 With 750 kVA Oil Cooled Transformer 276575 No 2415622819 87.05 With 990 kVA Oil Cooled Transformer 276590 No 2821919820 87.06 With 100 kVA Dry Type Transformer 276531 No 1182768821 87.07 With 250 kVA Dry Type Transformer 276541 No 1611596822 87.08 With 500 kVA Dry Type Transformer 276560 No 2212473823 87.09 With 750 kVA Dry Type Transformer 276585 No 2711112824 87.10 With 990 kVA Dry Type Transformer 276599 No 3191280

87.11 Breakup prices Copper wound Oil Cooled Distribution Transformer

825 87.12 500 kVA 321450 No 805743826 87.13 750 kVA 321475 No 997537827 87.14 990 kVA 321490 No 1331175828 87.15 LT ACB 2000A 310520 No 115716829 87.16 MCCB 400A 358097 No 14100

85 SCRAP MATERIALSNote: The rates are indicative and the respective zones are authorized to fix the floor price suitabaly as approved in the Common SR 2012-13 meeting held on 09.11.2012 and confirmed vide proceedings CEE/T&P/KPTCL - 6998 - 7013 Dt: 15.11.2012

830 85.01 Copper Wire 791210 Kg 512 518

831 85.02 Released Copper winding released from failed distribution transformers

731211 Kg 192 192

Will be intimated

Will be intimated

Page 117: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

832 85.03 Copper Conductor 791200 Kg 512 518833 85.04 Copper Ingots 791205 Kg 358 358834 85.05 Copper Cable with Leads 791207 Kg 248 248835 85.06 Aluminium 791010 Kg 124 124836 85.07 Aluminium wire in pieces 791100 Kg 85 88837 85.08 ACSR Conductor in Rings/Coils New Item 100

838 85.09 Released Aluminium winding released from failed distribution transformers

791175 Kg 100 130

839 85.10 Scrap HT/LT Aluminium Winding New Item 161840 85.11 ACSR Conductor 791101 Kg 89 100841 85.12 Alumininium UG cable 791531 Kg 103 103842 85.13 Scrap Al Released From UG Cable 791530 Kg 88 88

Iron Items843 85.14 a) SM Rail Pole, I beam 790100 Kg 20 32844 85.15 b) Ladder Pole, Tower Parts, Tubular Poles 790101 Kg 20 18845 85.16 c) Cross arms,Clamps etc 790104 Kg 20 20

846 85.17 d) Released steel from RCC Poles (Skeleton rods) 790103 Kg 20 20

847 85.18 e) Barbed/Ground wire/Zinc sheet etc 790102 Kg 20 20848 85.19 Transformer Empty tanks of different capacity 790300 No Deleted NA849 85.20 Transformer Empty tanks of different capacity 790300 Kg 18 17850 85.21 Scrap GOS with Insulators 790401 Kg 25 25851 85.22 Broken Steel Furniture 790402 Kg 26 26852 85.23 Brass 791300 Kg 176 176853 85.24 Baliga Poles 793510 Rmtr 72 72854 85.25 Scrap Wooden Furniture 793501 Kg 16 16855 85.26 Empty Barrel of 210 Litres Capacity - Good 442120 No 440 455856 85.27 Empty Barrel of 210 Litres Capacity - Bad 795030 No 292 284857 85.28 Lead 791400 Kg 80 80

858 85.29 HT Metering Cubicle, Distribution Boxes, Feeder Piller Boxes etc

795240 Kg 20 18

859 85.30 Energy Meters (Electro Mech) Single Phase 795910 Kg 46 75860 85.31 Energy Meters (Electro Mech) 3 Phase 795920 Kg 46 75861 85.32 Single/3 Phase Electronic Meters 795925 Kg 51 75862 85.33 CTs & PTs 795500 Kg 67 67

Scrap Distribution Transformer of Aluminium Winding (without oil)

863 85.34 15 kVA 795102 Each 4754 4757864 85.35 25 kVA 795104 Each 5857 5857865 85.36 63 kVA 795106 Each 8570 8681866 85.37 100 kVA 795110 Each 12052 15539867 85.38 200 kVA 795120 Each 27500 27500868 85.39 250 kVA 795125 Each 28600 37524869 85.40 300 kVA 795130 Each 30250 30250870 85.41 500 kVA 795150 Each 36575 36575

Scrap Distribution Transformer of Copper Winding ( without oil)

871 85.42 15 kVA 795101 Each 9740 9740872 85.43 25 kVA 795164 Each 26066 26066873 85.44 50 kVA 795165 Each 25126 25126874 85.45 63 kVA 795166 Each 35000 35000875 85.46 100 kVA 795170 Each 45402 45402876 85.47 200 kVA 795180 Each 76004 76004877 85.48 250 kVA 795182 Each 85000 85000878 85.49 300 kVA 795190 Each 91767 91767879 85.50 500 kVA 795195 Each 152393 152393880 85.51 5 MVA 795198 Each 915000 915000

Page 118: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Scrap CSP 11kV Distribution Transformer

881 85.52 15 kVA 795157 Each 9736 9736882 85.53 25 kVA 795158 Each 6000 6000883 85.54 63 kVA 795160 Each 10000 10000

Scrap Wooden Reels884 85.55 In good condition 793504 Kg 14 14

885 85.56 Empty Wooden Reel Deteriorated and with iron Rods

793550 No 77 77

886 85.57 Scrap Aluminium Lead Wire

887 85.58Scrap RMU with/without breaker(rusted & borken panles)MEI Make

Ton NEW ITEM 43165

888 85.59Scrap RMU with/without breaker(rusted & borken panles)MEI Make

Ton NEW ITEM 22000

Page 119: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Sl No Item No Particulars Unit

Common SR 2014-15 in Rs

Common SR 2016-17 in Rs

1 1

2 1.1Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/RCC/PSC supports as per approved Drawing.

3 1.1.1 Ordinary Soil Per pit 334 378

4 1.1.2 Hard Soil Per pit 1145 12945 1.1.3 Hard latterite Soil Per pit 1270 14356 1.1.4 Hard Rock (By Chizling and/Or Wedging) Per pit 2172 2454

7 1.2Digging of Pits 1.5 mtr depth for erection of 7.5/8 mtr Long Steel/RCC/PSC/PCC supports as per approved Drawing.

8 1.2.1 Ordinary Soil Per pit 269 304

9 1.2.2 Hard Soil Per pit 926 104610 1.2.3 Hard latterite Soil Per pit 1025 115811 1.2.4 Hard Rock Per pit 1751 1979

12 1.3Digging of Pits 2.0 mtr depth for errection of 9.5mtr Long RCC supports (350Kg Working load for 33KV) as per approved Drawing.

13 1.3.1 Ordinary Soil Per pit 366 413

14 1.3.2 Hard Soil Per pit 1159 131015 1.3.3 Hard latterite Soil Per pit 1379 155816 1.3.4 Hard Rock Per pit 2378 2688

17 1.4 Digging of Pits 2.2 mtr depth for errection of 11mtr Long RCC/PSC supports as per approved Drawing.

18 1.4.1 Ordinary Soil Per pit 410 464

19 1.4.2 Hard Soil Per pit 1554 175620 1.4.3 Hard latterite Soil Per pit 1554 175621 1.4.4 Hard Rock Per pit 2668 3015

22 1.5 Digging of Pit 2.5 mtr depth for errection of 11mtr long tubular spun pole as per approved Drawing.

23 1.5.1 Ordinary Soil Per pit 1007 1137

24 1.5.2 Hard Soil Per pit 2013 227525 1.5.3 Hard latterite Soil Per pit 2013 227526 1.5.4 Hard Rock Per pit 6542 7393

1.6 Digging of pit. For providing GI Pipe type Earthing

27 1.6.1 Ordinary Soil Per pit 404 457

28 1.6.2 Hard Soil Per pit 1586 179229 1.6.3 Hard latterite Soil Per pit 1757 198630 1.6.4 Hard Rock Per pit 2627 2968

1.7 Digging of Pit for GUY SET

31 1.7.1 Ordinary Soil Per pit 173 195

32 1.7.2 Hard Soil Per pit 441 49933 1.7.3 Hard latterite Soil Per pit 487 55034 1.7.4 Hard Rock Per pit 1124 1270

LABOUR RATES FOR COMMON SR 2016-17 for 11 kV SYSTEM

Digging of Pits

Page 120: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

35

Note: For Hard Latterite Soil and Hard Rock Soil works have to be classified and certified by Executive Engineer, where ever these types of soil is encountered.Concrete works

36Providing cement conccrete to poles and Guy sets with material and labour including necessary curing etc., complete (cost does not include excavation)

A) Base concrteing with CC 1:4: 8

37 a) Pole base for 11/9.5/9/8 mt supports (500x650x150mm)

Each 194 229

38 b) Pole based for 9mtrs square pole (650x650x150mm)

Each 252 298

39 c) Pole base 11mtr spun pole (1000x1000x150mm) Each 596 704

B) Pole concreting with CC 1:2:4 (without coping)

40 a) 9mtrs support (650x500x1700mm) Each 2185 2566

41 b) 9.5 mtrs support (650x500x1850mm) Each 2373 279242 c) 11 mtrs PSC support (650x500x2000mm) Each 2312 272143 d) 9 mtrs Square pole (650x650x1700 mm) Each 2731 321444 e) 11 mtrs Spun pole (1000x1000x2500mm) Each 9668 1137845 f) 8mtrs support (400x400x1500mm) Each 835 982

46g) Guy concreting with Boulders, Mud & Sand As per Drawing No. BESCOM/GM/CP/7/dt: 24.10.07. (with out cement)

Each 140 158

C) providing coping for pole with CC 1:2:4 (As per actuals)

47 a) 150mm around poles for a height of 300mm for RCC, PSC, PCC poles/I-beam/Rail steel sections

Each 403 444

48 b) 390mm all around the pole for an height of 300mm for Spun poles

Each 906 1040

D) Guy concreting in Marshy area

49 a) Providing cement concrete 1:2:4 for Anchor Rod in Marshy/Black Cotton Soil 600x600x450mm

Each 798 824

2

50 2.1

Erection of steel supports 9.0 to 10.00 mtr long such as 22.68 kg (50 lbs) Rail, 27.22 kg (60 Lbs) Rail I Beam of sizes 200x100mm, 175x90 mm, 125x100 mm. Fabricates poles tubular poles in pits of 1.8 mtr Depth, Aligning, Refilling with soil and ramming as approved drawing

No 269 304

51 2.2Same as above but erection of 7.5 to 8.0 mtr long steel supports (18.75 kgs., /41Lbs) Rail, 125x75 mm, I beam in pit of 1.5 mtr depth.

No 240 271

52 2.3 Same as above but erection of RCC/PCC/PSC poles of 7.5 to 8 mtr long in pit of 1.5 mtr depth.

No 482 544

53 2.4 Erection of RCC/PSCC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth

No 603 682

54 2.5 Erection of RCC poles 9.5 mtr long 350Kg WL but in a pit of 2.0 mtr depth for 33KV lines

No 850 960

55 2.6 Erection of 11 mtr PSC pole with working load of 365kg in a pit of 2.2 mtrs depth.

No 963 1088

Erection of Poles

1.8

1.8.1

1.8.2

1.8.3

1.8.4

Page 121: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

56 2.7 Erection of 11mtr long Concrete spun pole in a pit of 2.5 mtr depth.(Manual Labour)

No 1077 1216

57 2.8 Erection of 11mtr long Concrete spun pole in a pit of 2.5 mtr depth.(Mechnised Labour)

No New Item 1500

58 2.9 11KV Pin Insulators No 25 28

59 2.10 11KV Dead End Insulators Disc, Strain etc No 30 34

60 2.11

Erection of 2 pole structure formed out of SM rails or I -Beam of sizes 200x100 175x90 mm, 225x100mm of 9 to 10 mtr long in pits of 1.8 mtr depth for line deviation with necessary foundation, inclusive of fixing of cross Arms, Braces, Strain Insulators.

Per structure 1686 1906

61 2.12 Same as above using RCC poles 9 mtr to 10 mtr long Per structure 2209 2496

62 2.13 Same as above using RCC poles 7.5/8 mtr long in pits of 1.5 mtr depth.

Per structure 2209 2496

63 2.14 providing spiral earth electrode type earthing along with pole (without charcoal, salt etc.,)

No 49 55

64 2.15 Errection of H Frame. No 169 191

65 2.16

Erection of Double pole transformers structure

including fixing of structural materials, erection of

poles etc., complete for mounting of transformers as

per approved drawing using I-Beems or MS Rail 8

mtrs. long.

Per structure 2216 2504

2.17 Same as item above with RCC pole 9/8 mtr. long.

Upto 63 kVA

66 2.18 with 9 mtrs. RCC pole 2973 3359

67 2.19 with 8 mtrs. RCC pole 2612 2952100 to 250 kVA

68 2.20 with 9 mtrs. RCC pole 3081 3482

69 2.21 with 8 mtrs. RCC pole 2839 3208Above 250 kVA

70 2.22 with 9 mtrs. RCC pole 3405 3848

71 2.23 with 8 mtrs. RCC pole 3050 3447

3 Erection of single pole mounted Transformer structures

72 3.1 for 250 kVA Transformer on the existing 11 mtrs. Spun pole (excluding erection of pole)

Per structure 1799 2033

73 3.2 for 100 kVA on the existing 9 mtrs. RCC pole (Squre Section) (excluding erection of pole)

Per structure 899 1016

74 3.3 for 25/63 kVA on the existing 9 mtrs. RCC pole (Square Section) (excluding erection of pole)

Per structure 899 1016

75 3.4 For 25kVA transformer existing 9mtr PSCC Pole of 300Kg WL.(excluding erection of pole)

Per structure New Item 1575

Releasing and Replacing Insulators

Per structure

Per structure

Per structure

Page 122: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

76 3.5

3 Pole structure: Erection of 3 pole structure formed with 3 Nos 9 mtr RCC Pole with platform for mounting 100 to 500 kVA transformers as per approved Drawing including fixing structure materials, erection of poles etc., complete. (excluding excavation charges)

Per structure 4546 5137

77 3.6

4 Pole Structure: Erection of 4 pole structure formed with SM Rail or I Beam of size 200x100 mm 175x90 mm, 225x100 mm size, 9 to 10 mtr long in pits for line deviation with necessary foundation, including fixing of cross arm, braces, strain/disc insulators.

Per structure 3753 4241

78 3.7Erection of 4 Pole structure as in item above with platform for mounting of Transformer. (excluding excavation charges)

Per structure 4299

79 4

Construction of platform with size stone, cement concert for erection of 500 kVA Transformer/Metering cubicle/Heavy Equipment.Construction of platform (1.5x1.5x1.2) mtr in size stone, for erection of transformers/Heavy equipment including all materials, labour.Excavation of (1.5x1.5x1) mt pit for foundation providing and laying cement concrete 1:4:8 for foundation laid in 10 cm thick layers, well compacted curing etc., complete providing and construction of stone masonary 0.9m below ground level and 1.2m above ground level neatly hammer dressed in cement morter 1:6.Providing and Laying cement concrete slab 1.5x1.5x0.10Mtr with cement concrete of 1:2:4 mix forming & cutting complete, providing pointing to stone masonary in cement morter 1:3 after racking joint & nisely lining curing etc., plastering the concrete surfaces in cement morter 1:4 including smooth randering curing etc., curing at every stages completely.

Per structure 17972 25192

80 4.1 Fixing of 2 Pin cross arm with insulator and Braces fixing

Each 85 96

81 4.2 Fixing of 4 Pin cross arm with insulator and Braces fixing

Each 85 96

82 4.3 Fixing of V-Shape/Horizontal cross arm including single top support Braces and Insulators fixing

Each 88 99

83 4.4Fixing of V-Shape/Horizontal cross arm for DC Line including Braces and Insulators fixing. (Without Single Top Support)

Each 72 81

84 4.5 Fixing of 4 Pin double cross arm including braces and insulators.

Set 148 168

85 4.6 Fixing of HT/LT single top support . Each 56 6486 4.7 Fixing of Earth Guard Stirrup Set of 2 nos 88 99

5

87 5.1 Spike Type per Set 20 23

88 5.2 GI Barbed Wire (12 mtrs/1kg) No 23 25

Fixing of Anticlimbing Device

Page 123: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

89

a) Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT)

per Set 141 159

90 b) Same as above but using 2 strain insulators (No.15)

per Set 158 179

91 5.4Fixing guarding including fixing of necessary cross arms for existing HT and LT line at Road Crossing, Telephone Line Crossings up to span of 60 mtrs.

per Set 533 603

92 5.5Fixing guarding including fixing of necessary cross arms between HT and LT line up to a span of 40 mtrs per Set 533 603

93 5.6 Above 40 Mtrs. Span per Set 938 105994 5.7 Fixing of Danger Board Unit 43 48

95 5.8

Stringing of conductor wren, squirrel, weasel, binding of conductor on each insulator and dead ending on strain or disc/strain insulator by means of clamps.

per km/wire 1693 1913

96 5.9 do - for Rabbit ACSR per km/wire 2308 2608

97 5.10 do - for Coyote ACSR per km/wire 4031 4555

6 Rates for LT Reconductoring Works

98 6.1 Stringing of conductor (including pin binding, providing jumps, dead ending, etc.,)

99 6.2 Weasel per km/wire 2296

100 6.3 Rabbit per km/wire 3130

101 6.4 Coyote per km/wire 5466

102 6.5 Releasing of conductor

103 6.6 Weasel per km/wire 1722

104 6.7 Rabbit per km/wire 2347

105 6.8 Coyote per km/wire 4100

106 6.9

Releasing & Refixing of over head service mains (single phase/3 phase) (While executing reconductoring works only) Per connection/installation

per connection

main35 35

107 6.10Releasing & Refixing of over head service mains (single phase/3 phase) (While replacing existing pole)

per connection

main53 53

NOTE:

108 1. Labour charges for releasing conductor is 90% ofthe corresponding stringing rates for New Lines

1092. Special Locality Allowance as applicable shall be loaded to the labour charges

New Item

5.3

New Item

Page 124: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

1103. For new conductor required for LT Reconductoring 3% sag is allowed

1114. Quantity of returnable release conductor shall be as per circular No: BESCOM/GM(T)/BC-20/F-664/05-06/Cys-174 dtd:10.01.2006

112

7

113 7.1 a) Erection of 25 to 63 kVA Transformer on Transformer structure.

Each 603 682

114 7.2 -do- 100 kVA Transformer Each 805 910115 7.3 -do- 200-250 kVA Transformer Each 1208 1365116 7.4 -do- 300-500 kVA Transformer Each 1610 1819

117 7.5Providing GI Pipe Earthing for lightning arresters Transformer Neutral and Transformer Metal parts (Excluding digging of pits)

per Set of 1 no. of

electrode103 116

118 7.6

Hiring of crane for erection of 250/500 kVA Transformer (applicable for maintenance works only and in case of non -availability of departmental crane)

Per TFR 4025 2500

119 7.7

Hiring of crane for releasing existing Transformer and erection of NEW 250 to 500kVA Transformers. (applicable for maintenance works only and in case of non -availability of departmental crane)

No 4200 2500

120 7.8

Hiring of crane for releasing existing Transformer and erection of NEW 250 to 500kVA Transformers. In case of failure and agumentation, (applicable for maintenance works only and in case of non -availability of departmental crane)

No 4200 2500

121

8

122 8.1 Erection of HT metering Cubicle on Platform. No 1208 1364

Erection of LT Feeder piller box including necessary civil works like soil excavation & concreting etc. complete

123 8.2 upto 8 ways No 875 989124 8.3 above 8 ways No 946 1069

9

125 9.1 Fixing LT Distribution box for 100/250/500 KVA DTCs (Excluding wiring)

Per box 403 455

10

126 10.1 Rabbit to Rabbit No 64 72

127 10.2 Coyote to Coyote No 85 96128 10.3 Rabbit to Coyote No 85 96

129 10.4Additional cost for making termination using H- Clamps along with 2 hole Paddle/In-Line Connector/Micro wedge connector.

Set 175 198

5. HT Recondutoring works: Reconductring for the HT is to be followed on the stringing rates for new conductor and releasing rates for old.Erection of Transformer

NOTE:- When the awards are issued for erection of New Transformers under labour awards, Hire charges are not payable for cranes hired. By the agencies.

HT Metering

Distribution Box for DTCs

Additional cost for making termination using H/Wedge Clamps

Page 125: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

11

130 11.1 25/63 kVA TC per Set 1014 1145

131 11.2 100 kVA TC per Set 1014 1145132 11.3 250 kVA TC per Set 1014 1145133 11.4 300/500 kVA TC per Set 1014 1145

12

134 12.1 15/25 kVA DTC, 3 kVAr per Set 338 382

135 12.2 63 kVA DTC, 9 kVAr per Set 338 382136 12.3 100 kVA DTC, 18 kVAr per Set 398 450137 12.4 250 kVA DTC, 27 kVAr per Set 465 525138 12.5 500 kVA DTC, 54 kVAr per Set 486 549

13

139 13.1 Erection of fabricated steel structure for Seating Auto reclosures and Sectionalizers

per Set 350 396

140 13.2

Erection of 11kV Auto reclosures with control box GSM modem, connecting cable, control transformer, wiring testing and commissioning including parameterisation

per Set 2450 2769

141 13.3Erection of 11kV sectionalizers with control box GSM modem, connecting cable, PTs wiring testing and commissioning including parameterisation

per Set 2100 2373

14

142 14.1 for 25 kVA per Set 3083 3483

143 14.2 for 63 kVA per Set 3083 3483144 14.3 for 100 kVA per Set 3083 3483

145 14.4 Fixing DOLO cutouts/Horn Gap Fuses including fixing of cross arms and wiring

Each 125 141

146 14.5 Fixing of GOS including wiring (11kV SB 200A) Set 563 636

147 14.6 Fixing of GOS including wiring (11kV DB 400A) 625 706

148 14.7Fixing of 11KV GOS SB or DB including wiring on old existing structure (were only fixing of GOS work is involved)

1250 1413

149 14.8

Modification of GOS Operating System for making Foot path free for pedestrian(Work involves cutting of existing vertical GOS Pipe and fixing the cuppling plate by welding, grinding etc., for operating the GOS

Per GOS 1979 1979

150 14.9 Fixing of 3 Nos lightning arrestors including wiring. Set/3 No's 63 71

151 14.10 Fixing Pole Fuse Board No 76 86

152 14.11

Fixing PVC pipe for taking the leads form the conductor to the pole fuse board (including taking the lead wire inside the PVC pipe & giving connection to the overhead line & pole fuse box/Aerial fuse Board).

Set 116 131

153 14.12 Fixing of LT Line spacers No 36 41

Fixing Metering Box for housing the ETV Meter 3-ph 4 wire along with CT's, Meter & wiring for DTC's

Fixing 3-phase LT Capacitor housed in a enclosure with necessary Fuses, wiring, mounting arrangement for

Erection & Commmissioning of 11kV Auto reclosures and Sectionalizers with remote communication capability

Installing RLM Unit for the existing Distribution TC including wiring

Page 126: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

154 14.13

Releasing & Refixing of over head service mains (single phase/three phase) for consumer installation and street lighting and similar work (While executing reconductoring work)

Per connection/ installation

35 40

155 14.14

Releasing & Refixing of over head service mains (single phase/three phase) for consumer installation and street lighting and similar work (While replacing existing pole)

Per connection/ installation

53 59

15 Supplying and fixing conduit

156 15.1

Supplying heavy guage PVC pipe 25mm dia 2mm thick confirming to IS 2509 with suitable size bends, junction box, adhesive paste etc and fixing using inverted wood plug in case RCC ceiling & RCC Wall stone structure are rawal plugs in case of brick walls and cement plastering damaged portion using heavy gaauge saddles at an intervel of 700mm using NF Screws (2/1)

Mtr 68 70

157 15.2

Wiring for lighting/power circuit using one of FRLS PVC insulted 1100 volts grade multi strand copper with low conductor resistance 2.5Sq mm single core wire in open are concealed system of wiring with specified IS-694-1990 and conform into GTP of group A

Mtr 12 29.20

158 15.3

Wiring for lighting/power circuit using one of FRLS PVC insulted 1100 volts grade multi strand copper with low conductor resistance 4Sq mm single core wire in open are concealed system of wiring with specified IS-694-1990 and conform into GTP of group A

Mtr 39 42.10

159 15.4

Supplying and fixing of porcelain fuse channel with cut out 16 Amps on existing wooden/panel using necessary nuts, bolts, and washers etc complee (32/3)

No 69 120

160 15.5 Fixing and Wiring of Single/Three Meter phase meter on the existing meter board

Per connection

90 90

161 15.6 Releasing of Single/Three Phase Meter Per connection

60 60

16 Street Light and Other Works

162 16.1 Fixing and Wiring Incandescent street Light Fitting with two Clamps.

Set 334 176

163 16.2

Fixing and Wiring of FTL with suitable clamps bracket bolts and nuts using departmental material and departmental ladder vehicle under supervision of departmental Staff.

Set 334 176

164 16.3

Fixing and Wiring as SV/M.V light Fittins with suitable clamps Brackets, lamps, Bolts and nuts using departmental Materials and departmental Lader vehicle under supervision of departmental Staff.

Set 535 176

165 16.4 Fixing of Mercury Vapour Lamp fitting/Ornamental Light Fitting with Control Boxes etc.,

Set 393 393

166 16.5 Fixing of LT Protection Kit Per Kit 181 205

Page 127: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

167 16.6

(a) Wiring of One circuit of LT Wiring for for 25/63/100 KVA DTC to the existing LT protection Kit/Distribution Box via metering box. (includes fixing of necessary supports like 2 Pin X-arms, Spacers etc)

Set 503 568

168 16.7

(b) Wiring of Two circuits of LT Wiring for for 25/63/100 KVA DTC to the existing LT protection Kit/Distribution Box via metering box.(includes fixing of necessary supports like 2 Pin X-arms, Spacers etc)

Set 805 910

169 16.8Fixing One Circuit of LT Wiring for 250/500 KVA Transformers via metering box. (includes fixing of necessary supports like 2 Pin X-arms, Spacers etc)

Per Circuit 644 728

170 16.9Surveying for construction of HT and LT Lines duly furnishing single line diagram indicating pole locations

Km 500 565

171 16.10 Numbering and Scheduling of poles Km 379 428172 16.11 Magpying (Excluding Cost of paint etc.,) Km 150 170

173 16.12 Dismanting of Steel/I- Beam No

90% of the pole

erection charges.

90% of the pole

erection charges.

174 16.13 Releasing of baliga pole No

85% of the 8 Mtrs. RCC

Pole erection charges.

85% of the 8 Mtrs. RCC

Pole erection charges.

17

175 17.1

Tightening of loose spansa) Weasel/Squirrelb) Rabbitc) Coyote

Km

90% of the corresponding stringing

charges.

90% of the corresponding stringing

charges.

176 17.2 Straightening of slant/bent poles No

75% of the correspondin

g erection charges.

75% of the corresponding erection

charges.

Note: Above works (3.53) has to be recorded in register maintained at SO/SD/Division office. Record has to be verified by the Executive Engineer (Ele) before issuing approval for work orders /awards.

177 17.3 Dismantling of 2 B&S to I/O copper or equivalent Km 664 750

178 17.4 Dismantling of copper conductor above 2 B&S. Km 1070 1209

179 17.5 Any Dismantling work No

90% of the correspondin

g erection charges.

90% of the corresponding erection

charges.

18

180 Trimming of trees and branches and clearing as per IE Rules.

Releasing & Restringing of loose spans, binding, straightening of

Jungle Clearing: 3 mtrs corridor (1.5 mtrs on either side of line)

Page 128: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

181 18.1In Malnad/hilly areas if Jungle/trees/Plants/Shrubs exists only (once in two years)

Km 2715 3068

182 18.2 In Maidan (In accordance with necessity) Km 958 1082

19As above for construction of new line including Trimming of Trees, if Jungle/Tree/Plant/Shrubs Exists.

183 19.1 Malnad/Hill Area Km 4855 5486184 19.2 Maidan Area Km 2901 3278

20.0Cutting, Clearing of Vegetation Grass/shrubs such other small plants, including removal of Roots etc., in station yard/store yard.

185 20.1 Maidan Area (Twice in year) Sqmt 4 5

186 20.2 Malnad Area (Once in Three Months) Sqmt 4 521 Transportation Rates:

Transporation by Head Load where ever there is no accessability for transporation by vechicle

187 21.1 Poles: for Transporting one pole (Not payable for distance less than 25 Mtrs)

No 123

188 21.2Conductor: For Transporting 1 km Length Conductor (Not payable for distance less than 25 Mtrs)

per km 53

189 21.3Transformer: For Transportation 25 kVA Transformer (Not payable for distance less than 25 Mtrs)

No 263

190 21.4Transformer: For Transportation 63 kVA transformer (Not payable for distance less than 25 Mtrs)

No 438

191 21.5Transformer: For Transportation 100 kVA Transformer (Not payable for distance less than 25 Mtrs)

No 438

22 Poles 192 22.1 Upto 25Mtrs included in the Rates

193 22.2 25 to 105Mtrs per pole 170

194 22.3 105 to 185 Mtrs per pole 185195 22.4 Above 185 Mtrs per pole 210

25 ACSR Conductor

196 25.1 Upto 25Mtrs included in the Rates NIL197 25.2 25 to 105Mtrs 74198 25.3 105 to 185 Mtrs 81199 25.4 Above 185 Mtrs 90

26 Distribution Transformer 25KVA

200 26.1 Upto 25Mtrs included in the Rates NIL

201 26.2 25 to 105Mtrs 335202 26.3 105 to 185 Mtrs 415203 26.4 Above 185 Mtrs 450

Distribution Transformer 63 KVA & 100KVA204 26.5 Upto 25Mtrs included in the Rates NIL

205 26.6 25 to 105Mtrs 550206 26.7 105 to 185 Mtrs 650207 26.8 Above 185 Mtrs 750

New Item

per KM of conductor

New Item

per Transformer

New Item

per Transformer New Item

See New item

furnished below`

NIL

Page 129: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

27

Hire Charges (These charges have to be specifically approved by the Corporate Office in respect of repair to transformers when applicable)

208 27.1 Transportation using 7.5/10 Tons Lorry Km

Rs. 23 per Kms

subjected to a minimum

of Rs. 1200/- per

day

Rs. 23 per Kms

subjected to a minimum

of Rs. 1200/- per

day

209 27.2 Transportation using mini Lorry/Tempo Km

Rs. 17 per Kms

subjected to a minimum

of Rs. 1000/- per

day

Rs. 17 per Kms

subjected to a minimum

of Rs. 1000/- per

day

210 27.3 Loading of any type of material not covered specifically (cost includes crane charges if any).

MT 1043 1178

211 27.4 UnLoading of any type of material not covered specifically (cost includes crane charges if any).

MT 1043 1178

212 27.5Loading of Power Transformer and other similar materials like switchgear cable drums, Drake /Lynx, conductors etc., (cost includes crane charges if any).

MT 1158 1308

213 27.6Unloading of Power Transformer and other similar materials like switchgear cable drums, Drake/Lynx conductors etc., (cost includes crane charges if any).

MT 1158 1308

28

a) Loading and unloading of poles (loading of poles to vehicles at stores and unloading at workspot) NOTE:- Consolidated amount for both loading and unloading.

214 28.1 8 mtr RCC/PSC poles No 56 63

215 28.2 9 mtr RCC/PSC poles No 75 84216 28.3 8 mtr PCC pole No 47 53

29

217 29.1 25 kVA No 144 162

218 29.2 63 kVA No 144 162219 29.3 100 kVA No 216 244220 29.4 250/300 kVA No 360 407221 29.5 500 kVA No 719 812

b) Un loading of Transformer222 29.6 25 kVA No 144 162223 29.7 63 kVA No 144 162224 29.8 100 kVA No 216 244225 29.9 250/300 kVA No 360 407226 29.10 500 kVA No 719 812

a) Loading of Transformer(when maintaince men for loading and unloading are not available in store)

Page 130: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

30

227 31.1 Fixing Single phase Energy meter to IP Sets fixed inside Pump House

Per IP Set 693 783

228 31.2 Fixing 3 ph Energy meter to IP Sets fixed in Pump House

Per IP Set 958 1082

229 31.3

Fixing of Energy meters to IP sets, (where there is no pumphouse) where power supply is availed directly from the pole to the IP set and weather proof meter housing box is required (including cost of WP box).

Per IP Set 3201 3617

32

230 32.1

Earth work excavation for cable trench of 0.5 to 0.75 mtr. Width and Depth upto 1 mtr. including trial pits, depositing on bank upto a lead of 50 mtrs, Supplying and Displaying necessary Danger Boards and Lighting, Using sight Rails and Sign Boards at every 100mtrs wherever necessary as directed.

231 32.2 In Ordinary Soil Cmt 181 205

232 32.3 In Hard Soil Cmt 271 307233 32.4 In Ordinary Rock without Blasting Cmt 241 273234 32.5 In Ordinary Rock with Blasting Cmt 396 448235 32.6 Hard Rock/Latterite Rock latterite Soil Cmt 976 1103

Note: *Soil classification has to be certified by the concerned Executive Engineer Elc.

20% over & above may be given if depth is more than 1 m

236 32.7

Refilling the cable trenches with selected available earth from trench excavation including watering, consolidation in layers of 15 cm. Thickness including depositing of the surplus earth with a lead of 200 Mtrs.

Cmt 40 45

237 32.8

Cutting of Road surface for cable trenches and disposing of the excavated earth, as directed including Barricading, Danger Lighting then Refilling the Cable Trenches.

238 32.9 Macadam Road Cmt 228 257239 32.10 Tar Road Cmt 375 424240 32.11 Cement Concrete Road Cmt 754 852

241 32.12

Removing the Existing Stone Slabs pavement and stocking the materials for excavating the trench with a lead of 50 mtr Refixing the stone slab after refilling the trenches as in item 2

Sqmt 101 114

242 32.13Laying and Jointing the pipes (100-150 mm), dia including lowering in Position: Fixing Collars etc., Joining with mud mortor complete

243 32.14 RCC Pipe Mtr 35 40244 32.15 Stone Ware Pipe Mtr 28 31

Fixing of energy meter to non-metered IP sets 10HP and below: Including cost of all the materials like Meter Board, Channel cutouts and necessary wires required for the work.

UG Cable Works

Page 131: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

245 32.16

Laying the GI Pipe 80mm to 150 mm dia at Drainage Water Supply Crossing including fixing collars elbows, bends, Tees and other fitting with Cuts and Threads wherever necessary complete.

Mtr 40 45

246 32.17

Removing and Refixing stone Masonary with necessary patch up and cementing drain works for Cluvert, Water Valve Crossing etc., including cost of materials.

Cmt 525 593

247 32.18 Covering cable with Tiles Km 2304 2603

248 32.19Spreading and forming with sand all round the cable to a depth of 75 mm and width of 500 mm. (Does not include cost of sand).

Km 8094 9146

249 32.20 Removing the kerb Stones and Refixing at the original place with necessary earthwork

Rmtr 8 8

250 32.21 Fixing of Route Joint indicating Slabs No 60 68

33Transporting HT cable from Store to work spot including loading and unloading (including Crane and other equipment charges if any)

251 33.1 3x95 to 150 Sqmm per Km of cable

10120 11436

252 33.2 3x185 to 3x240 Sqmm per Km of cable

12145 13724

253 33.3 1x300 to 1x1000 Sqmm (Single Core) per Km of cable

12145 13724

254 33.4 3x300 to 3x500 Sqmm per Km of cable

14168 16009

-do- for LT Cables

255 33.5 2.5 to 25 Sqmm (Single Core, 4 Core, 3.5 Core) per Km of cable

625 706

256 33.6 35 to 95 Sqmm (4 Core/3.5 Core) per Km of cable

1250 1413

257 33.7 120 to 240 Sqmm (4 Core/3.5 Core) per Km of cable

1375 1554

34HT Cable

258 34.1 3x95 to 150 Sqmm Km 31679 35797

259 34.2 3x185 to 240 Sqmm Km 33439 37786260 34.3 1x1000 Sqmm Km 33439 37786261 34.4 3x300 to 3x500 Sqmm Km 35198 39774

35 LT Cable

262 35.1 2.5 to 25 Sqmm Km 11304 12774

263 35.2 35 to 95 Sqmm Km 16543 18694264 35.3 120 to 240 Sqmm Km 16893 19089

36 Cable Joint and wiring(for HT Cable only)36.1 Epoxy straight through joint

265 36.2 3x95 to 3x150 Sqmm No 875 989

266 36.3 3x185 to 3x240 Sqmm No 875 989267 36.4 3x300 to 3x400 Sqmm No 875 989

37 Heat shrinkable straight through joint

268 37.1 3x95 to 3x150 Sqmm No 1500 1695

269 37.2 3x185 to 3x240 Sqmm No 1500 1695270 37.3 3x300 to 3x400 Sqmm No 1500 1695

Laying of cable in Existing trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the

Page 132: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

38Epoxy type

271 38.1 3x95 to 3x150 Sqmm No 875 989

272 38.2 3x185 to 3x240 Sqmm No 875 989273 38.3 3x300 to 3x400 Sqmm No 875 989

39 Heat shrinkable type

274 39.1 3x95 to 3x150 Sqmm No 1375 1554

275 39.2 3x185 to 3x240 Sqmm No 1375 1554276 39.3 3x300 to 3x400 Sqmm No 1375 1554

277 39.4 Releasing of HT cable after excavation refilling, consolidation Rewinding to the drum etc.,

Km 31678 35796

278 39.5 -do- for LT cable Km 10884 12299

40

279 40.1 Ordinary Soil Cmt 141 178

280 40.2 In hard soil Cmt 211 267

281 40.3 In ordinary/soft Rock without Blasting Cmt 270 831282 40.4 In ordinary/soft Rock with Blasting Cmt 289 475

283 40.5 Hard Rock/Lattirite Rock/Lattirite Soft (Chistling & Wedging)

Cmt 941 1192

Note: Soil classifications has to be decided by respective Executive Engineer

284 40.6

KSRB 2-4 Refilling the RMU foundation with the approved new earth with initial lead of 50 mtr including watering and tamping layers of 15 cm thick etc., complete.

Cmt 56 72

285 40.7 Lifting of Excess Earth up to distance of 10 km Cmt 206 233

286 40.8

KSRB 4-1.3: Providing and Laying in position plain cement cocrente of mix M7.5 (1:4:8) with OPC Cement @ 180 Kgs, with 40mm and down size graded granite metal coarse aggregates @ 0.85 cum and fine aggregtes @ 0.57 cum machine mixed, machine mixed, concrete laid in layers not exceeding 15 cms. thick well compacted, in foundation and plinth, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. SPECIFICATION No. KBS 4.1, 4.2

Cmt 3973 4695

287 40.9

KSRB 4-1.6: Providing and Laying in position plain cement cocrente of mix M15 (1:2:4) with Cement @ 240 Kgs, with 20mm and down size graded granite metal coarse aggregates @ 0.878 cum and fine aggregtes @ 0.459 cum machine mixed concrete laid in layers not exceeding 15 cms. thick well compacted, in foundation and plinth and cills, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. SPECIFICATION No. KBS 4.1, 4.2

Cmt 4425 5084

Making and Fixing pot head for HT Cable only

Earth Excavation for R.M.U. Foundation Depositing of earth on Bank up to a lead of 50 mtr and with a lift up to 1.5 mtr

Page 133: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

288 41

KSRB 4.9.1: Providing mild steel reinforcement for RCC work including straightening, cutting, bending, hooking, placing in position, lapping and /or welding wherever required, and Laying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid)cost of materials labour, HOM of machinery complete as per specifications. SPECIFICATION No. KBS 4.6.3

Quintal 6830 6008

289 41.1

KSRB 5.2-3: Providing and constructing granite/trap/basalt size stone masonry in foundtaio with cement mortar 1:6 edges of stones chistle dressed in courses not less than 15 cms high, bond stones at two m. apart in each course including cost of materials, labour curing complete as per specifications. KBS 5.1.13

Cmt 3776 3829

290 41.2

KSRB 5.2-3: Providing and constructing granite/trap/basalt size stone masonry in foundation cement mortar 1:8 stones hammered dressed in courses not less than 20 cms high, bond stones at two m. apart in each course including cost of materials, labour curing complete as per specifications. KSB 5.1.13

Cmt 3287 3689

291 41.3

KSRB 5-8.5: Providing quoin dressing to stone masonry and stone slabs, two line 5 Cms wide on each face as per specifications. (measurement including mortar joints) KSB 5.1.13

Mtr 68 86

292 41.4KSRB 15-3.11Plastering concrete surface in cement mortar 1:4, 20 mm thick inclusive of smooth rendering curing etc., complete.

Sqmt 188 222

293 41.5

KSRB 6-2.2 Providing and constructing Burnt Brick Masonary with approved quality of Non-modular bricks of standard size of class designation 50 (table moulded) with cement mortar 1:8 for basement and superstructure including cost of materials, labour charges, scaffolding, curing complete as per specifications. Specification No. KBS 6.2

Cmt 5189 6141

1. Transporting RMU (Coventional) unit from store to work spot including loading, unloading. (No separate crane charges)

295 41.6 5 panels No 11338 12811

296 41.7 1 panel No 2268 25621. Transporting RMU (Compact) unit from store to work spot including loading, unloading. (No separate crane charges)

297 41.8 5 panels per set 6000 6780

298 41.9 3 panel per set 4000 4520

Page 134: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

2. Fixing foundation frame of channels and angle iron welding fixing in concrete aligning the RMU on foundation bed, assembly of units, connecting Bus Bars from panel to panel initial filling of oil etc., complete.

299 41.10 5 panels No 12553 14184300 41.11 1 panel No 2510 2836

301 42

Lettering the RMU with enamel paint and also writing single line diagram of each panel, caution Board, Danger Board etc., including cost of Paint, Brush etc.,

per panel 528 596

302 43 Cleaning of Bitumen type pothead bus joint (All sizes) No 835 944

303 44 Breaking and cleaning of straight through joint (All sizes)

No 835 944

45 Sealing of cable ends including supply of plumbing lead, plumbing materials.

304 45.1 PILC No 808 912

305 45 XLPE No 150 170

46 LABOUR for Aerial Bunched Conductor & AccessoriesItem Description

306 46.1Stringing of 11kV grade aerial bunched 3 core cable of XLPE insulation of size 3x95 Sqmm+1x70 Sqmm with bare/insulated messenger wire

Km 18076 20426

307 46.2Stringing of 11kV grade aerial bunched 3 core cable of XLPE insulation of size 3x120 Sqmm+1x95 Sqmm with bare/insulated messenger wire

Km 18076 20426

308 46.3

Stringing of 1.1kV grade aerial bunched 3 core cable of XLPE insulation of size (3x95) (for Phase conductor) + (1x70) (insulated messenger neutral) + (1x16) street light control.

Km 13441 20426

309 46.4

Stringing of 1.1kV grade aerial bunched 3 core cable of XLPE insulation of size (3x95) (for Phase conductor) + (1x70) (insulated messenger neutral) + (1x25) for street light control.

Km 13441 20426

310 46.5

Stringing of 1.1kV grade aerial bunched 3 core cable of XLPE insulation of size (3x95) (for Phase conductor) + (1x70) (insulated messenger neutral) + (1x35) for street light control.

Km 13441 20426

311 46.6 Erection of Suspension Clamp - 25 to 95 sqmm bare messenger

No 102 115

312 46.7 Erection of Anchor Clamp - 25 to 95 Sq. mm bare messenger

No 102 115

313 46.8 Erection of Suspension Clamp - 25 to 95 sqmm insulated messenger with bracket

No 136 154

314 46.9 Erection of Anchor Clamp - 25 to 95 Sq. mm insulated messenger with bracket

No 136 154

315 46.10 Fixing of Universal Hook No 102 115

316 46.11 Pole Clamp-145mm x 95 No 170 192

Page 135: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

317 46.12Installation of Insulation piercing connector for main to street lightMain : 16-95sqmm, Tap : 1.5-10sqmm(EP95)

No 48 54

318 46.13Installation of Insulation piercing connector for main to service lineMain : 16-95sqmm, Tap : 4-35sqmm(P2X95)

No 68 77

319 46.14Installation of Insulation piercing connector for main to service lineMain : 25-95sqmm, Tap : 25-95sqmm(P3X95)

No 68 77

320 46.15Installation of Insulation piercing connector for main to service lineMain : 50-150sqmm, Tap : 4-35sqmm(P4X150D)

No 68 77

321 46.16 Installation of Pre-insulated straight thru' joints-MJPT for 16 Sqmm cable

No 136 154

322 46.17 Installation of Pre-insulated straight thru' joints-MJPT for 25 Sqmm cable

No 136 154

323 46.18 Installation of Pre-insulated straight thru' joints-MJPT for 50 Sqmm cable

No 136 154

324 46.19 Installation of Pre-insulated straight thru' joints-MJPT for 70 Sqmm cable

No 136 154

325 46.20 Installation of Pre-insulated straight thru' joints-MJPT for 120 Sqmm cable

No 170 192

326 46.21 Installation of Pre-insulated lugs-CPTAU for 16 Sqmm No 136 154

327 46.22 Installation of Pre-insulated lugs-CPTAU for 25 Sqmm No 136 154

328 46.23 Installation of Pre-insulated lugs-CPTAU for 50 Sqmm No 136 154

329 46.24 Installation of Pre-insulated lugs-CPTAU for 70 Sqmm No 136 154

330 46.25 Installation of Pre-insulated lugs-CPTAU for 95 Sqmm

No 142 160

331 46.26 Installation of Pre-insulated lugs-CPTAU for 120 Sqmm

No 176 199

332 46.27 Distribution box suitable for 20 single phase connections

No 340 384

333 46.28 Distribution box suitable for 6 3 phase connections No 476 538

334 46.29 T-connector KZ3 95 No 115 130

335 46.30 End cap for 50/70 Sqmm No 4 5

336 46.31 11kV AB Cable T-joint installation for 3 Core No's 916 1035

337 46.32 11kV AB Cable Straight thru' joint installation for 3 Core

No's 733 828

338 46.33 11kV AB Cable Termination installation for 3 Core No's 620 700

339 46.34 Surge Arrester for ABC No 95 107

340 46.35 Ground connection for messenger wire No 23 26

341 46.39 Anchor sleeve for messenger wire No 4 5

47

342 Without HDPE Pipe343 47.1 i) Normal soil 5'' bore size Rmtr 625 706

Laying of UG Cables by trenchless technology by adopting horizontal boring & Drawing of cable including preparation at site

Page 136: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

344 47.2 ii) Rock soil 5'' bore size Rmtr 1088 1229345 47.3 iii) Normal soil 6" bore size Rmtr 625 706346 47.4 iv) Rock soil 6" bore size Rmtr 1088 1229347 47.5 v) Normal soil 8'' bore size Rmtr Deleted Deleted348 47.6 vi) Rock soil 8'' bore size Rmtr Deleted Deleted

48 With HDPE Pipe349 48.1 i) Normal soil 5'' bore size Rmtr 750 848350 48.2 ii) Rock soil 5'' bore size Rmtr 1213 1370351 48.3 iii) Normal soil 6'' bore size Rmtr 913 1031352 48.4 iv) Rock soil 6'' bore size Rmtr 1425 1610353 48.5 v) Normal soil 8'' bore size Rmtr Deleted Deleted354 48.6 vi) Rock soil 8'' bore size Rmtr Deleted Deleted

355 49

Providing chain link fencing 50mm size of 8 guage properly stretched between rectangular poles and fixed with suitable bolts & nuts, the free ends shall be welded to the pole and block pipe at top and bottom as required including cost of all materials, labour, lead and lifts, cutting, bending wherever necessary, wastage and lapping etc., complete as per the direction of the engineer incharge for work including two coats of approved quality paint over one coat of primer paint.

Sqmt 780 780

356 50

LTFP box Painting (including scrubbing of old paint, supplying and applying primer and two coats of aluminium /enamel paint including minor repair to box)

LS 1294 1462

357 51

Spun Pole Painting (supplying and applying two coats of enamel paints to 11Mtrs spun pole) and painting all the metal parts of the structure with two coats of aluminium paint over primer

Pole 5555 6277

358 52 Spun Pole Painting (supplying & applying two coats of enamel paints to 11Mtrs spun pole) and painting

Pole 2381 2690

359 53Repairing the broken damaged door of RMU with necessary hinges, welding etc., with necessary paint touch up including supply of paint for touch up.

per door 571 646

360 54

Repairing the broken damaged door of LT feeder box with necessary hinges, welding etc.with necessary paint touch up including supply of paint for touch up.

per box 381 431

361 55

Repairing the broken damaged door of LT distribution box fixed to DTC with necessary hinges, welding etc. with necessary paint touch up including supply of paint for touch up.

per box 286 323

56

362 56.1

Installing & fixing the compact pre-fabricated packaged sub-station 100/250/500/750/990 kVA transformer on the existing concrete plinth.(This does not include the cost of plinth, cable duct, laying & termination of cable etc. provision for the same shall be made)

Set 8467 9568

Erection of Compact Pre-fabricated Packaged Sub-station 11kV/433 V

Page 137: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Labour Charges towards Station Works (As per Prevailing KPTCL SR with effect from 01.09.06)

57

363 57.1

Erection, alignment and fixing to the foundation, indoor/outdoor 11KV switchgear panel/unit including movement from the point of unloading to thr point of erction.

364 57.2 11KV Indoor/outdoor switchgear 1839 2078365 57.3 11KV Kiosk 1530 1729

58Wiring & assisting in testing &

Commissioning366 58.1 11KV indoor/outdoor switchgear 610 689367 58.2 11KV Kiosk 610 689

59 a) Wiring b)Testing & Commissioning

368 59.1Identification of wires, Ferruling Crimping & Termination of wires fir annunciation, etc., Testing of Relays, CTs, PTs, & Breaker for operation.

369 59.2 For indoor /outdoor panel comprising of 2I +8F+1BC+1AP3

Per Set 69753 65503

370 59.3 For single 11KV panel indoor/outdoor type /kiosk Each 13950 13098

371 59.4 For additional 11KV panel (indoor type) Each 6975 6544372 59.5 For single 11KV panel outdoor type/Kiosk Each 10661 10009

373 60Consolidated labour charges involving 1 to 2 (ONE to TWO) pole works for Ganga Kalyana and Drinking Water supply works only.

Set 7813 8829

374 61Consolidated labour charges involving 3 to 5 (THREE to FIVE) pole works for Ganga Kalyana and Drinking Water supply works only.

Set 12344 13949

62

Consolidated labour charges for works 1 to 4 (ONE to FOUR) poles including excavation of pit, pole erection, fixing of cross arms, stringing of conductor, fixing of conductor accessories, fixing guy sets, fixing of anti climbing device, spiral earth electrode, danger board etc if any (Applicable for both HT & LT Line)

375 62.1 For work involing 1 pole Set 3750 4238

376 62.2 For work involing 2 pole Set 5000 5650

377 62.3 For work involing 3 pole Set 6250 7063

378 62.4 For work involing 4 pole Set 7500 8475

11KV SWITCHGEAR

Per Panel

Page 138: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

379 62.5 For work involing 5 & above pole works Set

Estimates are to be

prepared as per SR

Estimates are to be

prepared as per SR

380 63

Consolidated Labour charges for shifting of theconductor terminations(existing cut points) indeteriorated existing poles to new poles erected.Work includes all works associated with shifting ofthe terminations, like shifting of aerial fuse boards,cut outs, service main(UG cable and over head) andany other existing fitting.

per pole New Item Rs.3000/-

381 64

Consolidated Labour charges for shifting of theexisting conductor, including all works associatedwith shifting of the conductor such as any fittings,aerial fuse boards, cut outs, service main (UG cableand over head) etc., on the existing deterioratedintermediate pole to new pole erected.

per pole New Item Rs.2200/-

1

2

3

4

5

6

Note:- (1) These labour charges are applicable for 1 to 2 pole and 3 to 5 poles in respect of Ganga Kalyana and Water Works

(2) These rates are applicable only when 1 to 2 pole and 3 to 5 poles are involved and no other associated works.

For Poles - As per the rates provided for Loading and unloading of poles in the SR

For all other materials excluding transformers and conductors - 10% of the rates provisioned for Loading and unloading of poles in the estimate.

For Transformers and Conductor - As per the rates provided in the S.R.

The Labour charges for erection of Poles, Guy Sets, DP Structures etc., involving excavation of soil provided in the cost sheet for general works is for ordinary soil only. Wherever other type of soil is encountered, the difference in rates for excavation in such soil provided in the Schedule of labour shall be worked out and adopted.

Special labour charges for Ganga Kalyna and Water Works, Drinking Water Works and SC & E&I Works: (These rates are Applicable for works carried out under labour awards only. THESE RATES SHALL NOT BE OPERATED FOR RATE CONTRACT AWRADS AND OTHER TENDERED AWARDS).

The loading and unloading charges shall be included at the following rates in all estimates for the works which are proposed to be taken up on labour contract.

NOTE:

Page 139: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

The Labour charges are all inclusive i.e., digging of pits, erretion of poles, fixing of cross arms, insulators, stringing of wires, providing of guy sets, fixing of spiral earthrodes, Etc.,

No other labour charges or any other charges towards special locality allowance, LC charges, additional labour charges, Transportation charges, etc., are payable.

(4) Certificate has to be furnished by the section officer who prepares the estimate that the estimates are not split to claim the above labour charges.

Labour Charges for one to two pole and three to five pole works in respect of all types of works wherein other works such as DTC erection etc., and other works are not involved.

(3) These rates are applicable only when 1 to 4 pole works for Service Main and E&I Works

Page 140: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Name of the Material UoM

1 No.

1 1.1 5 MVA No. 322205 4557570 3865685

2 1.2 10 MVA No. 322210 10267860

3 1.3 12.5MVA 6659932

2 Circuit Breakers

4 2.1 33 kV Circuit Breaker SF6 type 800A, 25kA No. 311601 349540 306000

3 11kV Switch Gear

5 3.1 Set 7616045 7367300

6 3.2 Set 4020640 3889300

7 3.3 Set 309204 8466226 8189700

Schedule of Rate for Standard Stock Materials Common SR 2016-17 (33kV System)

SlNo

ItemNo

Material Code

Common SR 2014-

15 in Rs FORD Rates

inclusive of duties taxes &

F&I

Common SR 2016-

17 in Rs FORD Rates

inclusive of duties taxes &

F&I33/11 kV Transformer with all fittings and accessories, OLTC, RTCC, First filling of oil and 10 % Spare oil

Will be intimated

by independe

nt committee

11KV 500MVA (1600A, for two incomer & two capacitor bank and 1250A for eight feeders) indoor type switchgear comprising 2IC+10F+1BC+2AP VCB's all of 25KA repturing capacity as per technical specification

11KV 500MVA (1600A, for one incomer & one capacitor bank and 1250A for four feeders) indoor type switchgear comprising 1IC+5F+1BC+1AP VCB's all of 25KA repturing capacity as per technical specification

11 kV, 500 MVA, (1600A, for incomer & 1250 A for feeder) outdoor Switch gear, comprising of 2I+1BC+12 f + 1 AP3 VCBs

Page 141: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

8 3.4 Set 309202 7371572 7130800

9 3.5 Set 309200 6204295 6001700

10 3.6 Set 309206 3393560 3282700

11 3.7 No. 309208 565355 551000

12 3.8 Set 309210 3451053 3338400

4 11kV Kiosk

13 4.1 Set 309214 2151078 2080800

14 4.2 No. 309218 317530 308500

15 4.3 sets NEW ITEM 2307515

16 4.4 sets NEW ITEM 1921908

17 4.5 2I/C+6F+1AP, PCVCB sets NEW ITEM 3789748

18 4.6 2I/C+8F+1AP to 33 KV I/E station sets NEW ITEM 4566276

19 4.7 sets NEW ITEM 8431730

20 4.8 sets NEW ITEM 2309181

21 4.9 sets NEW ITEM 3760310

5 Instrument Transformers

5.1 Current Transformers22 5.1.1 220kV CT's No. 298147 302250

23 5.1.2 No. 256000

24 5.1.3 a. CT ratio 100-75-1A No. 113861 115430

11 kV, 500 MVA, (1600A, for incomer & 1250 A for feedder) outdoor Switch gear, comprising of 2I+1BC+10 f + 1 AP3 VCBs

11 KV, 500 MVA, 1250 A, (I/C) and 800 A (feeder), outdoor Switch Gear, comprising of 21+1BC+8F+1AP3 VCBs

11 kV Switch gear, 350 MVA, 800 Amps Outdoor MCVCB comprising of 1 I + 5 f + 1 AP3

11 KV 500 MVA 1250 Amps 25 KA feeder panel11 KV 500 MVA 1250 Amps SWG 11+5F+1AP3 MCVCB

11 kV 350 MVA, 800A Outdoor Type, kiosk comprising of 1 I + 4 f + 1 AP3 PCVCB

11 kV, 350 MVA, 800A Outdoor type, kiosk PCVCB

1I/C+4F+1AP, PCVCB to 33KV Kv Kaginele Station1I/C+3F+1AP, PCVCB to 33KV Kv Mallur Station

11kV, 500 MVA, Outdoor type Switchgear with 21C+8F+2CB+1BC+1AP provided with VCB's, 1600A for incomer & capacitor Bank, 1250 A for outgoing feeders, all of 25 KA rupturing capacity as per technical specification and SCADA compatible Procurment of PCVCBs to Batkal Station(1I/C+4F+1AP)Procurement of PCVCBs to 33/11 KV station Kahanagaon Belagaum

220kV class 1200-800-600-400-300/1-1-1-1-1110 kV 0.2 class accuracy CT with all accessiories for metering purpose

Page 142: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

25 5.1.4 b. CT ratio 100-50-75-5A No. 114606 116180

26 5.1.5 c. CT ratio 100-5A No. 113864 115430

27 5.1.6 No. 336470 28721 29120

28 5.1.7 No. 336473 28721 29120

29 5.1.8 33 kV class CT 30/5A No. 336400 17956 18200

30 5.1.10 33 KV Oudoor CT's 400/200/1-1 No. 35136 35620

31 5.1.11 33 KV Oudoor CT's 200/100/1-1 No. 35136 35620

32 5.1.12 11 KV Oudoor CT's 800/400/1-1-1 No. 29704 30110

33 5.1.13 11 KV Oudoor CT's 600/300/1-1-1 No. 26734 27100

34 5.1.14 11 KV Oudoor CT's 400/200/1-1-1 No. 27848 28230

35 5.1.15 11 KV Oudoor CT's 200/100/1-1 No. 23392 23710

36 5.1.16 No. 330210 17956 30000

37 5.1.17 11kV NCTs 600-300/1-1-1A (for PCVCBs) No. 330220 17956 43000

6 Potential Transformers38 6.1 220kV PT's No 672122 681370

39 6.1.1 220kV /√-3/110V/√.3-110V/√3-110V No 224000

40 6.1.2 Nos. 151568 98000

41 6.1.3 No. 335512 38335 34000

42 6.1.4 33 KV Oudoor PT's No.

43 6.1.5 No. 335220 8607 8730

44 6.1.6 11 KV Oudoor PT's No

7 Lightning Arrester

45 7.1 No. 303510 12225 9000

46 7.2 No. 303512 8784 7970

47 7.3 No. 303520 11096 10950

8 Isolators

48 8.1 Set 304536 78367 78000

33 kV class CT With 0.2 accuracy class 400 - 200/1-1A for lines33 kV class CT With 0.2 accuracy class 200 - 100/1-1-1A for Transformer

11kV NCTs 800-400/1-1-1A (for 350 MVA SWG)

110 KV 0.2 class accuracy PT with all accessiories for metering purpose33kV Voltage Transformer 33kV √3 110√3- 110√3

11kV Voltage Transformer 11kV / 110V-110V(3 phase)

a) 30 kV Lightning Arrester Normal Duty Metal oxide (Discharge Class-2)b) 30 kV Lightning Arrester Normal Duty Metal oxide (Discharge Class-3)30 kV Lightning Arrester Normal Duty polymeric

Isolators 33kV 800A, 25kA Upright with Earth Switch complete metallic portion with insulator

Page 143: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

49 8.2 Set 304524 72978 59000

50 8.3 Set 304525 78388 80000

9 Battery Set/Battery Charger

51 9.1 Battery Set (Tubular) 48 V, 100 Ah Set 344007 75600 136956

52 9.2 Battery Set (Tubular) 110 V, 100 Ah Set 344011 165600 300000

53 9.3 Set 344107 38400 69565

54 9.4 Set 344111 82800 15000

55 9.5 Battery Charger 48 V, 100 Ah Set 344416 42135 58854

56 9.6 Set 344426 78750 110000

57 9.7 Set 333424 403200 403200

10 Panel 58 10.1 33 kV Line Panel (Simplex) No. 339500 402800 326000

59 10.2 33/11kV Transformer Panel (Simplex) No. 339530 584000 472631

60 10.3 33 kV Capacitor Bank Panel No. 339540 321900 260513

11 Towers

61 11.1 M.T. 201050 102614 94000

62 11.2 M.T. 201055 87203 85000

63 11.3 c) Supply of galvanised Bolts & Nuts M.T. 736002 102614 119000

64 11.4 d) Supply of stub templates M.T. 210080 102614 89336

12

65 12.1 Meter box suitable for fixing 6 ETV meters No. 358046 14371 14371

Isolators 33kV 800A, 25kA Upright without Earth Switch complete metallic portion with insulator (live point height 3750mm)

Isolators 33kV 800A, 25kA Upright without Earth Switch complete metallic portion with insulator (live point height 4750mm)

Battery Set (Maintance free VRLA) 48 V, 100 AhBattery Set (Maintance free VRLA) 110 V,100 Ah

Battery Charger 110V, 100 Ah (with float cum boost charger working on 230V 1ph AC supply along with integral DCDB consisting 4 nos. O/G feeders as per specifications)

Capacitor Bank with 0.2% Series reactor & NCT 12.1kV 2.5 MVAr star connected Capacitor Bank

a) Design,fabrication,galvansing and supply of transmission line tower materials including stubs

b) Fabrication,galvanization and supply of mild steel tower materials

Outdoor type meter box to house ETV meters, made of CRCA steel mounted on angle iron frame work

Page 144: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

66 12.2 Meter box suitable for fixing 4 ETV meters No. 358044 8784 8784

67 12.3 Meter box suitable for fixing 3 ETV meters No. 358043 6149 6149

13 Insulators

68 13.4 Solid Core Insulator 33kV No. 283125 3253 3149

69 13.2 33 kV Pin Insulator (Shell only) No. 283006 437 520

70 13.3 33 kV Pin Insulator (Pin only) No. 283056 162 208

71 13.4 33kV Composit Disc Insulator No. 283433 728 704

72 13.5 33kV Polymer Pin Insulator New Item 962

73 13.6 New Item 585

14

14.1 Bolted Type Tension Clamp

74 14.1.1 Single Lynx ACSR conductor 70/90 kN 16mm No. 285080 1015 963

75 14.1.2 No. 285079 913 905

76 14.1.3 No. 285078 698 681

14.2 Bolted Type Suspension Clamp

77 14.2.1 Single Lynx ACSR conductor 70/90 kN 16mm No. 285050 799 860

78 14.2.2 No. 258046 723 780

79 14.2.3 No. 285038 571 624

14.3 Ground Wire Clamp 7/3.15mm 2 bolt No. 281410 723 882

14.4 Post Insulator Clamp

80 14.4.1 Single Lynx ACSR conductor 127/76mm No. 285699 596 643

81 14.4.2 Single Coyote ACSR conductor 127/76mm No. 285697 545 595

82 14.4.3 Single Rabbit ACSR conductor 76mm No. 285696 507 445

14.5 "T" Clamp for ACSR Conductor

83 14.5.1 Single Lynx to Single Lynx No. 285610 343 366

84 14.5.2 Single Coyote to Single Coyote No. 285605 317 436

14.6

85 14.6.1 Single Lynx No. 282620 539 586

86 14.6.2 Single Coyote No. 282616 463 504

33kV 70 KL Polymer Insulator (Ball & socket type)HARDWARE CLAMPS FOR STATION MATERIALS

Single Coyote ACSR conductor 70/90 kN 16mmSingle Rabbit ACSR conductor 70/90 kN 16mm

Single Coyote ACSR conductor 70/90 kN 16mmSingle Rabbit ACSR conductor 70/90 kN 16mm

Terminal connector clamp for ACSR Conductor

Page 145: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

15 STATION STRUCTURES

87 15.1 MT 276110 143591 125010

88 15.2 Supply of galvanized Bolts & Nuts MT 130648 113742

89 15.3 Double pole structure for 33kV Set 279103 5672 4931

90 15.4 V-Shape X arm for 33 kV No. 279016 846 736

91 15.5 HT ST Support for 33 kV No. 279093 353 307

92 15.6 Clamp 9.5M RCC Pole for 33kV No. 279526 93 81

16

93 16.1 33 kV 3 Core XLPE UG Cable- 95 Sq.mm km 287451 2286860

94 16.2 33 kV 3 Core XLPE UG Cable- 150 Sq.mm km 287453 2689630

95 16.3 33 kV 3 Core XLPE UG Cable-240Sq.mm km 287456 2973570

96 16.4 33 kV 3 Core XLPE UG Cable-300Sq.mm km 287457 3938710

97 16.5 33 kV 3 Core XLPE UG Cable-400Sq.mm km 287458 4553100

17

17.1

98 17.1.1 33 kV 3 Core XLPE UG Cable- 95 Sq.mm No. 288050 23100 23100

99 17.1.2 33 kV 3 Core XLPE UG Cable- 150 Sq.mm No. 288052 23100 23100

100 17.1.3 33 kV 3 Core XLPE UG Cable-240Sq.mm No. 288054 34060 34060

101 17.1.4 33 kV 3 Core XLPE UG Cable-300Sq.mm No. 288055 34060 34060

102 17.1.5 33 kV 3 Core XLPE UG Cable-400Sq.mm No. 288056 39500 39500

17.2

103 17.2.1 33 kV 3 Core XLPE UG Cable- 95 Sq.mm No. 288060 5840 5840

104 17.2.2 33 kV 3 Core XLPE UG Cable- 150 Sq.mm No. 288062 5840 5840

105 17.2.3 33 kV 3 Core XLPE UG Cable-240Sq.mm No. 288064 7990 7990

106 17.2.4 33 kV 3 Core XLPE UG Cable-300Sq.mm No. 288065 7990 7990

107 17.2.5 33 kV 3 Core XLPE UG Cable-400Sq.mm No. 288066 8740 8740

17.3

108 17.3.1 33 kV 3 Core XLPE UG Cable- 95 Sq.mm No. 288070 7255 7255

109 17.3.2 33 kV 3 Core XLPE UG Cable- 150 Sq.mm No. 288072 7255 7255

110 17.3.3 33 kV 3 Core XLPE UG Cable-240Sq.mm No. 288074 9030 9030

111 17.3.4 33 kV 3 Core XLPE UG Cable-300Sq.mm No. 288075 9030 9030

Fabrication, galvanization and supply of Station Structures

33 kV 3 Core XLPE UG Insulated Aluminium Cable

Will be intimated

by independe

nt committee

33kV Jointing and Cable termination kits for XLPE cable Heat Shrinkable type transition jointing kit

Heat Shrinkable indoor type cable termination kit

Heat Shrinkable outdoor type cable termination kit

Page 146: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

112 17.3.5 33 kV 3 Core XLPE UG Cable-400Sq.mm No. 288076 10730 10730

17.4

113 17.4.1 33 kV 3 Core XLPE UG Cable- 95 Sq.mm No. 288080 18920 18920

114 17.4.2 33 kV 3 Core XLPE UG Cable- 150 Sq.mm No. 288082 18920 18920

115 17.4.3 33 kV 3 Core XLPE UG Cable-240Sq.mm No. 288084 25320 25320

116 17.4.4 33 kV 3 Core XLPE UG Cable-300Sq.mm No. 288085 25320 25320

117 17.4.5 33 kV 3 Core XLPE UG Cable-400Sq.mm No. 288086 30160 30160

Heat Shrinkable Straight through jointing kits with Aluminum lugs& ferrules

Page 147: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Sl No

Item No Description Unit

Common SR 2014-15

in Rs FORD Rates inclusive of duties

taxes & F&I

Common SR 2016-17

in Rs FORD Rates inclusive

of duties taxes & F&I

1 Detailed Surveying on Turn-Key:

1

i)

Reconnaissance Survey-cum-walk over Survey along with Departmental Staff to determine the feasible route of the line on topo sheet. An alternate route if available should be indicated. The route of the line is to be indicated and got approved by the competent authority (Rates include the cost of Toposheet and Transportation)

2 a) Hilly terrain km 795 8983 b) Plain terrain km 773 873

4 ii)

Detailed Survey, fixing anchor points and taking levels at 20 mtrs intervels drawing route profile on Graph paper indicating geographical features like Nalas, Rivers, Gardens, P&T Lines, Railway-crossings etc., and enroute villages.

5 a) Hilly terrain km 3934 44456 b) Plain terrain km 2626 2968

7 iii)

Fixing marking stones of size 200X200 x 1000 mm with approved marks including painting above the ground level and Yellow Lettering and marking the direction of incoming line and out going lines are to be clearly marked on the top with red colour. If the distance between two anchor points is more than I km, one more directional stone is to be fixed. So also for the road crossing, railway crossing ,River crossing , HT crossing and nala crossing for all on both the sides.

Per Stone 391 442

8 iv)Burgie details for identification for all Anchor towers with existing permanent marks like poles, telephone lines, buildings, etc.,

Per Anchor Tower

354 400

9 v) v) Conducting soil resistivity tests Per Test 678 766

vi)

Clearing of bushes, tree branches of trees crops and shrubs wherever encountered for detailed survey to enroute the corridor width of 3 mtrs (including viewing for fixing anchor towers etc.,)

10 a) Hilly terrain KM 1174 132611 b) Plain terrain KM 784 886

12 vii)

a) Submission of reports in the form of good binding including the preparation of sketches for burgie details for each anchor points, scheduling of line details, S.R. values, soil classification reports, tower schedule, abstract of towers etc., complete.

Per set 239 270

LABOUR RATES FOR COMMON SR 2016-17 for 33 kV SYSTEM

Page 148: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

13 viii)

b) Drawing the route profile on graph sheet, including geographic feature like Nalas, rivers, gardens, P&T lines railway crossing etc, inclusive of all stationaries. (Normal requirement is 5 Sets)

Per set 239 270

xi) Preparing the Schedules:

14 a)

PTCC Proposal : Containing PTCC questionaire, topo sheet extracts with marking of the proposed line, SR Report, tower sketch, station single line diagram etc., (30 Copies/Sets)

Set 946 1069

15 b)Railway Crossing proposal with drawing are inclusive of graph sheets and other stationery materials, labour etc., (10 Sets)

Per crossing

946 1069

16 c)

Tree Schedule Containing the details like name of tree, girth size of tree, distance from central line of the alignment, approximate height of the tree etc., complete

Per Hectare

678 766

d)

Forest proposals: Inclusive of all works like fixing of stones at every 20 mtrs in the centre line and both ends of the corridor, painting of each tree after chipping, writing the numbers on the tree, taking girth size of all the trees coming in the corridor at 1 mtr height from GL, approximate height of the tree and forest clearance proposals etc., complete (10 Sets). Note: This applies to forest area only.

Km 4411 4985

2 Check Survey by using their own Equipment

17 a) Hilly terrain KM 2034 229818 b) Plain Terrain KM 1361 1538

3 Taking block levels for Sub-staitons:

19

a)

Running Peripheral Theodolite traverse along periphery and coordinating and heightening of all corners/turning points, establishing permanent co-ordinate axis formation of grids at 50m intervals for northing and easting with reference to already established permanent co-ordinate axis levels at 50m grid intersection for preparing plot plan of the entire area with contours. Including existing structure location.

Acre 1309 1479

20 b)

Establishing datum level and bench marks at every 100m/50m intervals both longitudinal and laterally and all corners/turning points with stone pillars of size not less than 0.2mx2mx1.0m buried on the ground and exposed top engraved for painting RL, and coordinates of that point.

No 1309 1479

21 c)Taking level at 5M suitable grid interval in the sub-station area for plotting block levels, contour map.

No 29 32

Page 149: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

22 d)

Preparation of CAD drawings, generating the contours using appropriate software and submission of 6 sets of blue prints and one tracing sheet (original) and one soft copy etc. Complete.

Per Project

13080 14780

23 e) Furnishing cutting and filling quantities using appropriate software for earth work calculation.

Per Project

3924 4434

24 f)

Super imposing GA drawings on contour maps in Co-ordination with departmental engineers and supply of 12 sets of blue print drawings etc., complete.

Per Project

10463 11823

4 Geo Technical Investigations:

25 a)

Making 150mm nominal diameter bore holes at various locations in soil using suitable approved method of boring including, cleaning providing Bore holes at interval and at change of strata, collections of water samples, observation such as ground water etc., Collection of undisturbed soild samples at ever 2.0m/3.0m interval and at change of strata, transportation of all the collected samples to the laboratory and back filling of bore holes on completion of the work, complete as per sepcification and instruction of the engineers, for depths up to 6.0 m below natural ground level or refusal strata.

Mtrs 1958 2212

26 b)

Conducting various laboratory tests on soil samples at approved laboratory including preparation of soil samples for determination of soil, Proparties etc., Complete as per specification. Note: Laboratory identified shall be approved by ESCOM Engineers not below the rank of EE(Civil).

27 i) Bulk density and moisture content Each 784 88628 ii) Sieve analysis Each 784 88629 iii) Hydrometer Analysis Each 784 88630 iv) Liquid limit and plastic limit Each 784 88631 v) Shrinkage limits Each 916 103532 iv) Specific gravity Each 916 103533 vii) Standard proctor density test Each 916 103534 viii) Swell pressure Each 1050 118735 ix) Free swell index Each 1050 118736 x) Uncombined Compressive strength Each 1050 118737 xi) Triaxial shear test Each 1050 1187

38 xii) One dimensional consolidation test Each 1050 1187

39 xiii) California bearing ratio Each 1050 1187

40 C)

Submitting final report in 6 copies including all field records and laboratory test results, graphs and recommendations etc., complete as per specifications.

Per Job 15698 17738

Page 150: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

41

Note: The above rates are inclusive of mobilization of Plant Equipment & Materials for, Topographical survey, block leveling and Geotechnical investigation works, and Demobilization. No extra rate is admisible for mobilization & Demobilization

5 Excavation for station structure:

43 i) Normal Soil CmtLatest KPWD SR Rates for hard soil

Latest KPWD SR Rates for hard

soil

44 ii) B.C. Soil CmtLatest KPWD SR

Rates for Ordinary soil

Latest KPWD SR Rates for

Ordinary soil

1) Corresponding rates in KPWD SR

as mentioned against each classification below shall be

adopted. 2) Area weightages applicable for the respective areas

as per latest KPWD SR shall be allowed to arrive

at Final Rate. 3) Extra

for excavation under water

conditions and/or foul conditions

including bailing/pumping

out, removing slush add 20% of

the rate of the respective rate on account of slow progress of work

under these conditions. (The extra percentage indicated here

shall be as indicated in the

relevant KPWD SR)

1) Corresponding rates in KPWD SR as mentioned against each classification below shall be adopted. 2) Area weightages applicable for the respective areas as per latest KPWD SR shall be allowed to arrive at Final Rate. 3) Extra for excavation under water conditions and/or foul conditions including bailing/pumping out, removing slush add 20% of the rate of the respective rate on account of slow progress of work under these conditions. (The extra percentage indicated here shall be as indicated in the relevant KPWD SR)

Excavation of pits as per specifications for lattice type of station structures, Tr. Plinth, control

panels, mounting structures for breakers, CT's, PT's Isolators, LA's etc., Excavation of trenches for control cables, U.G. Cables, Groundmat etc.,

42

Page 151: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

45 iii) Partially Submerged soil CmtLatest KPWD SR

Rates for Ordinary soil

Latest KPWD SR Rates for

Ordinary soil

46 iv) Fully submerged soil CmtLatest KPWD SR

Rates for Ordinary soil

Latest KPWD SR Rates for

Ordinary soil

47 v) Wet black cotton soil Cmt

Rate for ordinary rock (Without

blasting) of latest KPWD SR

Rate for ordinary rock (Without

blasting) of latest KPWD SR

48 iv) Dry fissured/Ordinary rock CmtLatest KPWD SR

Rates for Ordinary soil

Latest KPWD SR Rates for

Ordinary soil

49 vii) Latterite soil Cmt

Rate for ordinary rock (Without

blasting) of latest KPWD SR

Rate for ordinary rock (Without

blasting) of latest KPWD SR

50 viii) Hard rock with blasting/Hard latterite Cmt

Rate for ordinary rock (With

blasting) of latest KPWD SR

Rate for ordinary rock (With

blasting) of latest KPWD SR

Note 1: For Excavation purposes measurement shall be as per actuals. 2: For foundation purposes predominant soil shall be considered.

6 Excavation (For Tr. Line Tower)51 i) Normal Soil Cmt52 ii) B.C. Soil Cmt53 iii) Partially Submerged soil Cmt54 iv) Fully submerged soil Cmt55 v) Wet black cotton soil Cmt56 vi) Dry fissured/Ordinary rock Cmt57 vii) Latterite soil Cmt58 viii) Hard rock with blasting/Hard latterite Cmt

7 Back Filling :

59 i)Back filling with excavated earth available near the tower and consolidation layer by layer of 150 mm depth with adequate quantity of water.

Cmt

Rates as per KPWD SR

applicable to respective area

+10% extra

Rates as per KPWD SR

applicable to respective area

+10% extra

60 ii)Supplying and back filling with external hard murrum soil with proper consolidation including lead and lift.

Cmt

Rates as per KPWD SR

applicable to repective area

+10% extra

Rates as per KPWD SR

applicable to repective area

+10% extra

Note: This item is applicable only when Black cotton, soil, wet black cotton soil, dry fissured rock, ordinary rock, Hard rock are encountered.

8 Concreting and curing (For Both Transmission lines and station structures)

Rates as per item 5 + 50% extra

Rates as per item 5 + 50%

extra

Page 152: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

61 a)

Concreting & curing as per specifications including the cost of materials,T&P materials and labour charges with all lead and lift, for lattice type station structures,Tr. Plinth, control panels, mounting structures for Breakers, CT's PT's Isolators, LA's, etc.,

1) Corresponding rates in latest KPWD SR as

mentioned against each classification shall be adopted. 2) For the above basic

rate add applicable area

weightage as per latest KPWD SR.

1) Corresponding rates in latest KPWD SR as mentioned

against each classification

shall be adopted. 2) For the above basic rate add applicable area

weightage as per latest KPWD SR.

62 i) 1:4:8 concrete (M 7.5) Cmt

Rates under plain concrete for

foundation of latest KPWD SR

Rates under plain concrete

for foundation of latest KPWD SR

63 ii) 1:3:6 concrete (M-10) CmtRates under

basement of latest KPWD SR

Rates under basement of

latest KPWD SR

64 iii) 1:2:4 concrete (M-15) CmtRates under raft

foundation of latest KPWD SR

Rates under raft foundation of

latest KPWD SR

65 iv) 1:1.5: 3 concrete (M-20) CmtRates under raft

foundation of latest KPWD SR

Rates under raft foundation of

latest KPWD SR

66 b)

Concreting and curing as per specifications including the cost of materials, T&P materials and labour charges with all lead and lift, for Tr. line towers.

Cmt

For arriving at the rates for concrete

items for transmission lines

add 25% weightage to the

basic rates of different

proportion of concrete proposed

above.

For arriving at the rates for

concrete items for transmission lines add 25%

weightage to the basic rates of

different proportion of

concrete proposed above.

Note : a) Extra as indicated in the relevant KPWD SR may be allowed for providing concrete in watery situation including cost of bailing out water and removing slush.b) Only machine mixing is to be used for concreting.c) Jelly to be used is 20mm and down size for 1:1.5:3, 1:2:4 and 1:3:6 concrete and 40mm and down size for CC 1:4:8.

9 Towers

Page 153: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

67 a) Sorting of tower parts made of fabricated angle iron

MT 306 346

68 b) Setting up of stubs templates and from one location to another location

Per Location

398 450

69 c)

Assembling and errection of towers including tightening of bolts and nuts including loading,unloading at store and site (Including the Wt. of stubs)

MT 2224 2513

70 d)

Rivetting of tower bolt ends by heating using dry- Acetylene gas and hammering to destroy threads so as to make the tower members theft - prrof (Bolts at nodal points only to be selected and rivetted up to hieght of bottom cross arm, as per the directions of the field engineer)

Per Bolt 10 12

71 e) Welding of bolts and nuts Per Bolt 9 12Note: For tower errections requiring shutdown 25% above S.R. for item 5c to 5e only are to be adopted.

10 Supplying and fixing AC devices:

72 a)

Supplying and fixing G.I. Angle iron 45x45x5 mm (1mtr length) with cleats, bolt & nuts as per specification and fixing above 0.5 mtrs length each at inner and outer surface of the tower to facilitate running of barbed wire.

Per Set 2176 2459

73 b) Supplying and fixing barbed wire as per specification

Rmtr 41 47

11 Fixing of Boards

74 a) Fixing Danger Board Nos 43 48

75 b) Fixing Number Plate Nos 43 48

76 c) Fixing Phase plate Set (3 Nos)

125 141

77 d) Fixing Circuit Plates Nos 43 48

12Stringing conductor with out allowing the conductor to touch the ground and damaging the conductor

A

Paving out the conductor from anchor to anchor normally spaced at 5 spans with 4 tangent towers in between, including providing stays at each anchor points and jointing of conductors, hositing anf fixing of insulator string, armour rods,vibration dampers, including the cost of TY&P materials like comealong, wire ropes, pulley, rollers, suspesnion, clamps, compression jointing machines with bits , drum stands, manila ropes, truckker and jeep etc(Rate of 1 route KM of single conductor)

78 i For hilly tarrian KM 9088 With Coyote ACSR

10269 With Coyote ACSR

79 ii 9088 with Rabbit on towers

10269 with Rabbit on towers

80 i For plain Tarrian KM 6662 With Coyote ACSR

7528 With Coyote ACSR

Page 154: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

81 ii 3330 with Rabitt on towers

3763 with Rabitt on towers

Stringing of Ground Conductor as above82 For hilly tarrian KM 4447 502583 For plain Tarrian KM 3331 3764

Note:

84

II) For shut down works 50% more than the above rates of the Work (This is applicable to shutdown of 33 kV and above lines only. 11 kV and LT lines shutdown not included).

50% more above the rates specified for normal works is admissible for shutdown works

of 33 kV and above lines, CTs,

PTs, Las only. This is not

applicable for 11 kV and LT Line

shut down works.

50% more above the rates

specified for normal works is admissible for

shutdown works of 33 kV and

above lines, CTs, PTs, Las only.

This is not applicable for 11 kV and LT Line

shut down works.

85III) (A) River Crossing works(B) Railway Crossing Works(C) Breakdown works in substations & lines

100% extra 100% extra

86 IV) 2nd Circuit stringing with 1st circuit under live condition

75% extra 75% extra

87

V) (A) National highway and State highway crossing works(B) Works under shutdown condition in both substation and lines (Pre-programed works)

50% extra 50% extra

13

Stringing Conductors for short lengths: These Rates are applicable only when total Length of the entire Line is less than 3 spans (River crossing, railway crossing Etc.,).

A) Stringing of conductors in special conditions where normal 5 spans between anchor to anchor are not encountered, whereas anchors are provided at single/ two/ three spans with average span intervals of 267/320 Mtrs, (rate for spans of single conductor)

i) For hilly terrian

88 a) Anchoring single span upto 320 mtrs. 1 Span 5128 With Coyote 5795 With Coyote

89 2511 With Rabitt 2837 With Rabitt

90 b) Anchoring 2 span interval upto 640 mtrs with 1 tangent tower only

2 Spans 6358 With Coyote 7185 With Coyote

91 3037 With Rabitt 3432 With Rabitt

92 c) Anchoring 3 span interval up to 960 mtrs with two tangent towers only

3 Spans 7456 With Coyote 8425 With Coyote

93 3588 With Rabitt 4054 With Rabitt

ii) For plain terrian

Page 155: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

94 a) Anchoring single span up to 320 Mtrs 1 Span 3847 With Coyote 4347 With Coyote

95 1853 With Rabitt 2094 With Rabitt

96 b) Anchoring 2 span interval upto 640 Mtrs with 1 tangent tower only

2 Spans 4926 With Coyote 5566 With Coyote

97 2272 With Rabitt 2567 With Rabitt

98 c) Anchoring 3 span interval up to 960 mtrs with two tangent towers only

3 Spans 5519 With Coyote 6236 With Coyote

99 2665 With Rabitt 3011 With Rabitt

14Rates for Short span stringing in Normal length of the line of more than 3 spans comprising of short spans

A) Stringing of conductors in special conditions where normal 5 spans between anchor to anchor are not encountered, where as anchors are provided at single/ two/ three spans with average span intervals of 275/320 Mtrs (Rate for spans of Single Conductor)

i) For hilly terrian100 a) Anchoring single span upto 320 Mtrs 1 Span 764 With Coyote 863 With Coyote

101 374 With Rabbit 423 With Rabbit

102 b) Anchoring 2 span interval upto 640 Mtrs with 1 tangent tower only

2 Spans 1270 With Coyote 1435 With Coyote

103 612 With Rabbit 692 With Rabbit

104 c) Anchoring 3 Span interval up to 960 Mtrs with two tangent towers only

3 Spans 1862 With Coyote 2104 With Coyote

105 898 With Rabbit 1015 With Rabbit

ii) For Plain terrian106 a) Anchoring single span upto 320 Mtrs 1 Span 573 With Coyote 647 With Coyote

107 278 With Rabbit 314 With Rabbit

108 b) Anchoring 2 span interval upto 640 Mtrs with 1 tangent tower only

2 Spans 935 With Coyote 1057 With Coyote

109 458 With Rabbit 518 With Rabbit

110 c) Anchoring 3 Span interval upto 960 Mtrs with two tangent towers only

3 Spans 1383 With Coyote 1563 With Coyote

111 697 With Rabbit 788 With Rabbit

15 Grounding of Towers/Equipments Material + Labour Material + Labour

112

a) Grounding of towers including cost of 40mm dia 2.5 mm thick, class 'C' G.I. Pipe of 3 Mtrs length as per specifications, with 50X6 mm GI Flats 3 Mtr long, salt charcoal, including excavation charges.

Set 3471 3010+832

Page 156: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

113

b) Grounding of towers/Equipments excluding the cost of G.I. Pipe/C.I. Pipe as per specifications with 50X6 mm G.I. Flat 3 Mtr Long (to be supplied departmentally). But salt & Charcoal to be supplied by contractor. The rates include excavation charges.

Set 1670 789+832

114

c) Grounding of equipments by providing cast iron pipe of 100mm ID 13mm thickness, 2.75 Mtrs long with 2 part clamp out of G.I.Flat 50X6mm continuously welded alround the pipe using cast iron welding electrodes as per drawing including the cost of excavation (All materials to be supplied by the contractor)

Set 2334 1582+1055

Note : All the leads from earthmat & equipment should be connected to earth electrode through the GI Flat 50 x 6 mm of suitable length and welded as per specifications.

115 16

Supplying and fixing of counter poise earthing with GI Stranded wire where hard rock is encountered as per specifications. (including excavation charges).

Per Loc 4585 2143+1916

17 Station Structures

116 a) Errection, assembly and alignment of Station structure as per the directions of site Engineer.

MT 2099 2372

117 b)

Erection, alignment & assembly of fabricated steel lattice structure, pedestal structures & Mounting structures, for G.O.S., CT's, PT's LA's etc.,

MT 1956 2210

18 Erection of Transformers

118 a)

Moving the Transformer on to the plinth (Maximum allowable distance is 50 mtrs.) more than 50 mtrs. approval of the CEE, O&M Zone has to be obtained)

Per MT/ Mtr

41 47

119 b)Assembly of Transformer parts like bushings, radiators, filling oil into Tr. etc., (for the total wt. of the Tr.)

MT 938 1059

c) Filling oil to the power Tr., Conservator and radiator (for maintenance purpose only).

120 i) For 5 MVA to 20 MVA Tr. Litre 2 2

121 d) Filtration of oil using filter set of the contractor, to bring the insulation value to I.E. Specifications.

Litre 4 4

122 e) Filtering Oil as above but with the filter set supplied by the ESCOM

Litre 2 2

19

Wiring of Transformer marshalling box, bucholtz relay, fixing Thermometer, OLTC upto control panel and assisting in testing and commissioning by RT/MT/Firm Engineers.

123 i) 5 MVA to 6.3/8 MVA Tr. LS 4314 4875

Page 157: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

20Fabrication of Transformer railing and embedding in Transformer plinth. (Rails to be supplied by the HESCOM)

LS 866 979

21 Fixing of H.T. fuse units & wiring Per Set (3 Nos)

1008 1138

22 Wiring Testing & Commissioning of 5 MVA 33/11 kV Power Transformers

124

a) Wiring: Identification of wires, Ferruling crimping and termination of wires. Wiring of Protective Devices, Cooling fans, Oil flow Pumps, OLTC, RTCC

8370 5917

125

b) Testing: 1. Ratio Test 2. SC test 3. Excitation test 4. Magnetic Balance test 5. Vector group test. 6. induced high voltage test. 7. OLTC operation. 8. Protective devices operation checks. 9. stability checks:- for differential and REFR protection

Each 33481 23668

23 Erection of Breakers / 11 kV Kiosks with CTs on Mounting Structures

a) BREAKERS

126 i)

Erection, assembly, alignment & interpole wiring of breakers with its connected equipments including movement from the point of unloading to the point of erection.

Per Set 4966 6654

127 ii) Assisting in Testing and Commissioning Each 995 1333Testing & Commissioning:

128Wiring: Identification, of wires Ferruling crimping and termination of wires in Breaker & Wiring up to control panel / Relay panels.

Set 41848 5917

129

Testing: Test for insulation level, gas leakage, Testing for travel time, Trip and close timings. Local Trip close Test, Remote trip and close test, Tripping rhrough relays, operation of interlocks etc.,

Set 23668

24 Erection of CTs and PTs

130 a)Erection of CTs and PTs and wiring including movement from the point of unloading to the point of erection.

Set (3 Nos)

1530 1729

131 b) Assisting in Testing and Commissioning Set 460 520c) Testing & Commissioning

Page 158: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

132 i)

Current transformers: Wiring: Indentification of wires Ferruling Crimping of lugs Connections up to marshalling box and Control panel. Current transformers: Tests: Insulation, Polarity, Ratio, Excitation

Set (3 Nos) 13947 9860

133 ii)

Potential Transformers: Wiring: Indentification of wires Ferruling Crimping of lugs Connections up to marshalling box. Potential Transformers: Tests: Insulation, Polarity, Ratio,excitation.

Set (3 Nos)

13947 9860

25 Erection of NCTs

134 a)Erection of NCTs with ground including movement from the point of unloading to the point of erection

Set 443 500

135 b) Assisting in Testing and Commissioning Set 56 6426 Erection of Isolators

136 a)Assembly, Errection alignment and wiring including movement from the point of unloading to the point of erection. (Upright)

Set 920 1040

137 b) Assisting in Testing and Commissioning (Upright) Set 94 106Note : 1) Assisting in testing and commissioning for item No. 13 to 18 means contractors should provide labourers for testing and commissioning by RT/MT/Firm engineers. 2) Testing & Commissioning in item 13 & 18 means the testing will be carried out bythe firms themselves using their own testing equipments and staff in presence of the MRT staff who will witness the tests. 27 Erection of Lightening Arrestors

138Erection of Lightning arrestors and wiring including movement from the point of unloading to the point of erection

Set 230 260

139 28 Fixing of Solid Core insulator Per Stack 76 86

140 29 Testing & Commissioning: Capacitor Bank with reactors Each 18830 15325

Control Cables and U.G. Cables30 Formation of Cable Duct

141 a)

(i) Burnt brick/size stone/RCC Cable duct including form box, back filling the sides, removing the excess escavated soil, duct covering with RCC slabs.

Cmt

As per Latest KPWD electrical SR applicable to respective areas.

As per Latest KPWD electrical SR applicable to respective areas.

Page 159: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

142

(ii) Supplying 300 mm dia 1.5" to 2" thick RCC Hume pipes including loading unloading, and transportation charges and laying at required level and gradient as per the direction of field engineer

Rmtr

As per Latest KPWD electrical SR applicable to respective areas.

As per Latest KPWD electrical SR applicable to respective areas.

143 b)

Providing, laying and jointing PVC pipes conforming to IS 4085-1960, & 7634-1975, and approved makes with necessary specials such as collars, bends, Elbows, Tee, nipples, plugs with cuts and threads using jointing ring with solutions, wherever necessary as per the directions of the field Engineer including all lead and lift.

As per Latest KPWD electrical SR applicable to respective areas.

As per Latest KPWD electrical SR applicable to respective areas.

144 i) 25 mm dia (outer) 2mm to 2.5mm thick Mtr145 ii) 32 mm dia (outer) 2mm to 2.5mm thick Mtr146 ii) 63 mm dia (outer) 2mm to 2.5mm thick Mtr147 iv) 75 mm dia (outer) 2mm to 2.5mm thick Mtr148 v) 90 mm dia (outer) 2mm to 2.5mm thick Mtr149 vi) 110 mm dia (outer) 2mm to 2.5mm thick Mtr150 vii) 140 mm dia (outer) 2mm to 2.5mm thick Mtr151 vii) 160 mm dia (outer) 2mm to 2.5mm thick Mtr

152 d) Supplying & Laying cable trays including welding fixing of supports Material+Labour Material+Labour

153 i) Cable tray of 600mm width (suitable for cable ducts of A,B & C type)

Rmtr 537 302+209

154 ii) Cable tray of 300mm width (suitable for cable ducts of A,B & C type)

Rmtr 383 221+141

155 e) Laying of control cables from equipments to control panels.

Rmtr 8 10

31 Control Panels

156 a)

Erection of control panels, auxilary panels, carrier cabinets etc., alignment and fixing properly to foundation base including movement from the point of unloading to the point of erection.

Per Panel 3055 3452

157 b) Wiring & assisting in testing and commissioning of panels.

Per Panel 4774 5394

158 C)

Test & Commissioning: i) C& R Panels Wiring & Testing: Wiring:Identification, Ferruling, Crimping, termination of wires in C&R panels. Testing: Testing for insulation level, Testing of relays, control operations for closing tripping etc., interlocks Alarm, Annunciation and Indication Checks.

Each 41848 29585

32 11 kV Switchgear

159 a)

Erection, alignment and fixing to the foundation, indoor/outdoor 11kV switchgear Panel/unit including movement from the point of unloading to the point of erection.

160 i) 11kV Indoor/out door switchgear Per Panel 1839 2078

As per Latest KPWD electrical SR applicable to respective areas.

As per Latest KPWD electrical SR applicable to respective areas.

Page 160: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

161 ii) 11kV Kiosk Per Panel 1530 1729

b Wiring & assisting in testing & Commissioning

162 i) 11 kV indoor/ outdoor switchgear Per Panel 610 689

163 ii) 11kV Kiosk Per Panel 610 689

c

Testing & Commissioning: Wiring: Identification of wires, Ferruling Crimping & Termination of wires for annunciation, etc., Testing of Relays, CTs, PTs, & Breaker for operation

164 i) For indoor/outdoor panel comprising of 2I+8F+1BC+1AP3

Per Set 69753 65503

165 ii) For single 11kV panel indoor/outdoor type /Kiosk Nos 13950 13098

166 iii) For additional 11kV panel indoor Nos 6975 6549

167 iv) For each additional 11kV panel out door type/Kiosk

Nos 10661 10009

Note:Assisting in testing & Commissioning for item 19,20 & 21 mean contractors should provide labourers for wiring & Commissioning by RT/MT/Firm Engineers.

33 Busbar Formation

168

Main bus/cross bus (all the three phases in a segment) of using Coyote-single/double conductors with fixing of insulator spacers, levelling of string conductors to the required height above the equipment, including providing jumps to interconnect different segments of the main bus.

169 a) Main Bus/Cross Bus as above using Single Lynx Conductor

2961 6152

170 b) Main Bus/Cross Bus as above using Single Coyote Conductor

2961 6152

171 b)

Formation of cross bus in each individual bay using Lynx/Coyote - Single/Double conductor with fixing of insulators, spacers, levelling the strung conductors to the required height above the equipment including providing jumps to inter-connect different segments of the main bus.

Per Bay 5640 Deleted

172 34 Faradays Cage Formation as per specification: Per Bay 225 254

35 Groundmat

173 a)Laying of M.S. Flats, welding, applying ACB paint to welded portion and covering with sodium bentonite clay

Rmtr 25 33

174 b)

Supplying and laying of MS flats, of various sizes, welding and applying ACB paint to welded portion and covering with sodium bentonite clay, as per the drawing/standard specifications and consolidation.

Rmtr

50x6mm - 26250x8mm - 28075x6mm - 48675x8mm - 51475x12mm - 545

50x6mm - 27350x8mm - 29175x6mm - 56675x8mm - 505 75x12mm - 535

Page 161: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

175 c) Same as above but without sodium bentonite clay Rmtr

50x6mm - 129 50x8mm - 146 75x6mm - 353 75x8mm - 380 75x12mm - 413

50x6mm - 135 50x8mm - 15275x6mm - 36775x8mm - 39575x12mm - 429

176 d)

Grounding of equipment with various sizes, G.I. Flat and connecting Equipment to the earthmat/ground pit. Each point of earthing with all formation works like bending, twisting, drilling of holes and connecting by welding (inclusive of all T&P and consumables) to the earthmat/ ground pit/ point of earth connection,all the materials supplied by the contractor.

Per point

50x6mm - 217 50x8mm - 242 75x6mm - 52075x8mm - 549 75x12mm - 594

50x6mm - 226 50x8mm - 25375x6mm - 54175x8mm - 57175x12mm - 618

177 e)

Providing 25mm dia M.S.rod 1.05 Mtr. Long earthmat spikes including heating, bending top 50mm over lap flattening and making spike edge at one end driving into the earth below the ground level and welding the rod with ground mat flat.

Each 239 260

178 f)

Supplying & Providing 450 mm dia 450 mm height 1.5" to 2" thick hume pipe collar (non pressure type) for earth pits including all lead and lifts etc.,

Each 689 864

36 Providing Deep Bore earthing

179

"Sinking bore of 150mm clear dia using fast rig including fixing of 40mm dia MS rod, including jointing the pipes as per KPTCL standard and providing sodium bentonite treatment in the annular space, including transportation of rig and other supporting vehicles etc., complete, as per the directions of engineer in charge, including cost of MS rod & sodium bentonite".

180 a) Drilling 150mm dia bore Rmtr 547 687

181 b) 40 mm dia MS rod Rmtr 432 541182 c) Bentonite Clay Kgs 14 15

183 d) Cost of GI flat for joining two rods by welding to obtain continuous length

Per joint 525 572

37 Spreading of Jelly

184 Supplying and spreading 100mm thick with 20/25mm jelly with all lead and lifts.

185 i) 20/25 mm Jelly Cmt 1156 1427Note : Only 20/25mm jelly shall be used.

38 Station Yard Lightning

186 a) Supplying and erection of fabricated supporting structures including foundation.

Per Set

As per Latest KPWD electrical SR applicable to respective areas.

As per Latest KPWD electrical SR applicable to respective areas.

Page 162: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

187 b) Supplying and fixing of Sodium Vapour lamp fittings of 250 watts.

Per Fitting

As per Latest KPWD electrical SR applicable to respective areas.

As per Latest KPWD electrical SR applicable to respective areas.

188c) Supplying and laying of 1.1KV, 6 Sqmm PVC cable or any other specified size, testing and commissioning of yard lights.

Rmtr

As per Latest KPWD electrical SR applicable to respective areas.

As per Latest KPWD electrical SR applicable to respective areas.

189 d) Erection of RCC poles with stringing of O.H. conductor/Laying of cable for yard lights.

Furnished in 11kV Works

Furnished in 11kV Works

39 Painting of structures Material+Labour Material+Labour

190a) Supplying and painting of two coats of good quality Red Oxide primer after cleaning and scrapping the surface.

Sq Mtr 62 23+46

191b) As above with 2 coats of good quality Aluminium paint after2 coats of good quality Red Oxide primer.

Sq Mtr 106 50+70

192c) Supplying and painting two coats of aluminium paint after cleaning and scraping the surface wilthout applying Red Oxide primer

Sq Mtr 55 24+39

193 d) As per (b) but with synthetic enamel paint Sq Mtr 121 60+77

194e) Supplying and painting two coats of Synthetic enamel paint after cleaning and scraping the surface without aplying red oxide primer.

Sq Mtr 62 32+37

40 Battery Set and charger

195 a)Installing, assembling, filling of acid, wiring, assisting, test-charging and discharging Battery set.

196 i) 110 Volts Set 7639 8632

197 ii) 48/24 Volts Set 3059 3456198 b) Erection of Battery Charger and wiring

199 i) 110 Volts Set 1220 1379

200 ii) 48/24 Volts Set 1220 1379

c)

Testing & Commissioning of Battery Charger: Wiring: Identification, Ferruling, Crimping & connecting i)AC Supply cable upto 2 sources ii) Load cables, connection at charger end upto 10 load points

Page 163: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Testing: i) AC supply Voltage Phase Sequence. ii) Testing of Output DC Voltages in Boost/Float/Trickle/Variations as per the order/requirement . iii) Testing for Ripple Factor. Commissioning: i) Fixing of Boost Voltage level ii) Fixing of Float Voltage level iii) Fixing of Trickle Volage level iv) Testing of alarm, indication and load ckts, Auto /Manual change overs etc.v) Full load test in Boost & Trickle modes.

201 i) 110V DC: (1 set for 33kV Stations) Per Set 21300 1704241 Fencing :

Colony and Station yard Boundary fencing including erection of supports

202 a) Security fencing using 8SWG chainlink/50mm Mesh

As per KPWD SR applicable to

respective area

As per KPWD SR applicable to

respective area

203 b) Barbed wire fencing ? ?42 PLCC Equipments

204 a) Erection of mounting structures for coupling capacitors

Set 4347 4912

205 b) Erection of Coupling capacitors/wave traps/LMU. Set 1634 1846

206 c) Wiring , testing and commissioning Set 486 48643 Yard Levelling

207 Yard Levelling and filling up of soil and consolidation.

CmtAs per KPWD SR

applicable to respective area

As per KPWD SR applicable to

respective area

44 Watch and Ward

208 Emoluments for watch and ward including pay and DA for 8 hours duty

Per shift 244 276

45 Transportation

209 Transportation of Transformer, CT's, PT's, Breakers, C&R Panels, 11KV Switchgears and EHT LA's only.

a) Using 10 MT Lorry

210 i) 1 to 50 KMsRs. 53/- per KM, subject to a Min.

of Rs.10000/-

Rs. 60/- per KM, subject to a Min.

of Rs.10000/-

211 ii) 51 to 100 KMs Min + Rs.40/- per KM

Min + Rs.45/- per KM

212 iii) 101 to 150 KMs Min + Rs.30/- per KM

Min + Rs.34/- per KM

213 iv) Beyond 150 KMs Min + Rs.19/- per KM

Min + Rs.21/- per KM

b) Using 10 MT Truck & Trailor

Page 164: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

214 i) 1 to 50 KMsRs. 53/- per KM, subject to a Min.

of Rs. 2000/-

Rs. 60/- per KM, subject to a Min.

of Rs. 2000/-

215 ii) 51 to 100 KMs Min + Rs.40/- per KM

Min + Rs.45/- per KM

216 iii) 101 to 150 KMs Min + Rs.30/- per KM

Min + Rs.34/- per KM

217 iv) Beyond 150 KMs Min + Rs.19/- per KM

Min + Rs.21/- per KM

c) Using 20 MT Truck & Trailor.

218 i) 1 to 50 KMsRs. 420/- per KM, subject to a Min.

of Rs. 25000/-

Rs. 475/- per KM, subject to a

Min. of Rs. 25000/-

219 ii) 51 to 100 KMs Min + Rs 350 /- per KM

Min + Rs 396 /- per KM

220 iii) 101 to 150 KMs Min + Rs 190/- per KM

Min + Rs 215/- per KM

221 iv) Beyond 150 KMs Min + Rs 170/- per KM

Min + Rs 192/- per KM

221

Mobilisation charges of IDLE Transportation applicable for places where heavy duty trucks are not available, is admissible in addition to: (a) as far as possible full load shall be transported.

26 30

222 b) Transportation of other materials 27% of the above 27% of the above

223

c) Using light vehicle including fuel, oil, lubricants and crew subject to a minimum of 100 Kms per day in case of break down/ subject to prior approval of CEE.

Per Set Prevailing Board approved Rates

Prevailing Board approved Rates

46 Loading and Unloading

224

a) Loading of Power Trs, CT's. PT's Breakers, C&R Panels, 11KV Switchgears, wavetrap, coupling capacitors, HT UG Cables, Insulators, ACSR Conductor, Ground Conductors, etc.,

MT 1614 1824

225

b) Unloading of power Transformers, CT's PT's Breakers, C&R Panels, 11 KV Switchgears, Wavetrap, coupling capacitors, HT UG Cables, Insulators, ACSR conductor, Ground conductors, etc.,

MT 1614 1824

226 c) Loading of other materials like structural steel, building materials etc.,

MT 286 323

227 d) Unloading of other materials like structural steel, building materials etc.,

MT 286 323

47 Benching, Revetment and Pitching

228

Providing granite rough stone 30 to 50 cms thick dry packing of revetments and pitching side slopes of quadrant including providing the walls, jelly packing, 0.15 cms thick and wedging etc., Complete including cost of conveyance of all materials.

Cmt

For substation works as per

KPWD SR and for Transmission line works Add 25%

extra

For substation works as per

KPWD SR and for Transmission line works Add

25% extra

48 Labour for 33KV lines using 9/9.5 Mtrs Long RCC Poles

Page 165: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

229

a) Erection of 9/9.5 Mtrs RCC Poles 300 Kg working load, in the excavated pit as per the approved drawing specification including the cost of excavation, backfilling(Concreting charges extra)

Nos 1216 1374

230

b) Erection of DP structure including fixing of braces insulators etc., as per the approved drawings and specifications including the cost of excavation, backfilling (Concreting charges extra).

Set 2876 3250

231 c) Fixing of V-Shape cross arms, single top supports and insulators.

Set 85 96

232 d) Fixing of spiral earth electrodes Nos 31 55233 e) Road/P&T Guarding Set 840 1059

234 f) Stringing Rabbit conductor, fixing disc insulator to cross arms etc.,

KM 2308 2608

235 g) Stringing Coyote conductor, fixing disc insulator to cross arms etc.,

KM 4031 4031

236 h) Supplying and fixing of AC devices as per specification

Rmtr As provisioned in 11 kV works

As provisioned in 11 kV works

49 Dismantling

237 i) Dismantling of Power TransformerSame rate as that

of erection of Power Transformer

Same rate as that of erection

of Power Transformer

238 ii) Dismantling charges for conctrete with steel reinforcement

Cmt 707 799

239 iii) Dismantling of concrete only Cmt 345 390

240 iv) Dismantling charges in all other cases 75% of erection charges in general

75% of erection charges in

general

Page 166: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Sl No Particulars MS Angle/Flat in mm Qty Wt/Mtr in

Kgs

Total Wt/Set in kgs

16 mm Hexogonal Bolt &

Nut

Qty

20 mm Class 'A'

GI Pipe in Length

1 2 3 4 5 6 7 8

2 5.8 27.14 175 mm Long 6 120 mm

2 Nos50 mm Long 6 60 mm

3 Nos

2 Brace X-arm (Horizontal member) 50x50x6 size1.6 mtrs Long 2 4.5 14.4 65 mm

Long 8

3 Brace X-arm (cross member) 50x50x6 size 2.8 mtrs Long 2 4.5 25.2 50 mm

long 5

4 Strain Plate 50x8 size 0.375 mtrs Long 3 3.2 3.49

type-CDP-2 2 Nos.

6 mm thick washer 1No.

Note : 1. All holes are of 18 mm for 16 mm bolts 2. All Sllotted holes are of 18x35 mm long 3. The weights given are for raw materials as per ISI structural steel hand book

BILL OF MATERIALS-1For 11 kV DP structure Kit as per Drg No. SIC/DL/WSO 18/29-7-85

Clamps made out of

50x6 mm MS Flat

9

1 HT power x-arm out of 65x65x6 size 2.34 mtrs Long

type-CDP-1 2 Nos.

2.16 kg/set

Page 167: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

SL.No Particulars Qty MS Angle

Flat in mmWt/Mtr in

Kgs

Length/ piece in

mm x Nos

total wt/set in kgs

16 mm dia Hexaganal Bolt & Nut Length in

mm

Qty in No

20 mm dia. Class 'A' GI Pipe Length in mm/Qty

65x65x6 5.8 2,700x2 31.2 175 4 0

50x6 2.4 375x3 2.7 50 6 0

45x45x6 4 2,350x2 18.8 75 4 0

40x40x5 3 340x2 2.04 0 0 0

40x40x5 3 70x4 0.84 0 0 040x40x5 3 60x6 1.08 0 0 0

b) Pin insulator support 1 Set 50x6 2.4 400x3 2.88 0 0 0

50x50x6 4.5 2,350x1 10.58 0 0 0

45x45x6 5 70x2 0.56 0 0 0

65x65x6 5.8 1,025x2 11.86 0 0 0

50x6 2.4 436x2 2.15 65 4 0

e) GOS & LA Supporting Brace 1Set 45x45x6 4 1,260x2 10.08 50 4 0

65x65x6 5.8 2,350x1 13.63 0 0 0

65x65x6 5.8 70x2 0.812 85 2 0

65x65x6 5.8 925x2 10.73 0 0 0

50x6 2.4 496x2 2.27 65 4 4

45x45x6 4 1,360x2 10.88 0 050x6 2.4 463x1 2.41 0 0

0 285x2 1.37 65 4

45x45x6 4 2,700x2 21.6 0 045x45x6 4 500x2 4 40 4

50x6 2.4 493x2 2.44 65 4100x50x4.7 9.2 2,700x2 49.69 225 7 185 mm

65x65x6 5.8 310x2 3.6 0 0 3 No50x6 2.4 523x2 2.44 65 4 0

65x65x6 5.8 1,150x1 5.89 0 0 050x6 2.47 548x1 1.32 65 2 0

b)Handle supporting X-arm brace & clamp for fixing on to pole 1 Set45x45x6

50x6 50x6

42.42.4

1800x1 560x1 320x1

6.110 0

65

0 0 2

0 0 0

Note : 233.962

2 a) GOS Frame 1 No.

BILL OF MATERIALS -2FOR 100 TO 300 kVA TRANSFORMER CENTER KIT (For double pole TC Structure)

1 HT Power Cross arm & strain plate 1 Set

c) LA Fixing X-arm 1 Set

d) GOS & LA Support X-arm & Clamp for fixing on to the pole 1 Set

f) HG Fuse Fixing X-arm 1 Set

g) HG Fuse support X-arm & Clamp for fixing on to pole 1 Set

h) GOS, LA & HG Fuse supporting brace & clamp for fixing to pole 1 Set 4

3 Transformer belting angle Clamp for fixing on to pole 1 Set 0

4 a)Transformer seating channel supporting cleat X-arm & clamp for fixing on to pole GOS (ISMC) 1 Set

5

a) GOS Handle supporting X-arm & clamp for fixing on to pole GOS 1 Set

1) The bill of materials are prepared as per Dgr No..KEB/SIC/WS/022/date :12.9.86

2) The weights given are for raw materials as per ISI structural Hand book.

3) All holes are of 18 mm & solt holes 18x35 mm to suit 16 mm unless otherwise stated

4) Bolts required to fix LA's & G.O.S down take off pipe are not included as the same are to be supplied along with equipments,

5) LT.4 pin X-arm & clamp are also not included as they are readily available.

Page 168: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Sl No Particulars Unit MS Angle

Flat in mm Wt/Mtr in

Kgs

Length /Nos in

mm

Wt/Set in Kgs

1 2 3 4 5 6 7

1 HT Side power Cross-arm and strain plate 1 Set 50x50x6 50x6

4.52.4

1280x3 463x2

17.28 2.22

2 GOS Support Cross arm & Clamp for fixing on to the pole

1 Set 65x65x6 50x6

5.82.4

2000x2 463x2

23.2 2.09

3 GOS Frame 2 Nos

45x45x6 45x45x6 45x45x6 45x45x6

4444

2350x4 310x4 70x8 60x12

37.6 4.96 2.24 2.28

4 GOS Supporting Cross arm and Clamp 1 Set45x45x6

50x6 50x6

42.42.4

1360x4 498x2 285x2

21.76 2.39 1.37

a) GOS Handle Supporting Cross arm Brace and Clamps

1 No 65x65x6 50x6

5.82.4

2000x1 423x2

11.6 1.26

b) GOS Handle Supporting Cross arm brace and Clamps

45x45x6 50x6 50x6

42.42.4

1000x2 50x1 320x1

8.00 1.34 0.77

6 Brace Cross Member and Clamps 1 Set 50x50x6 50x6

4.52.4

2700x2 493x2

24.3 2.31

BILL OF MATERIALS-33 Pole Structure for Transformer

5

Page 169: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Sl. No Particulars Qty MS Angle/

Flat Wt/Mtr in Kgs

1 HT + LT side power X-arm 1 Set 2 No 65x65x6 5.8

2 P.I support X-arm 1 No 50x50x6 4.5

3 Belting cross arm and belting support X-arm 1 Set 4 No

45x45x6 50x50x6

44.5

4 Transformer Seating and Transformer seating angle support X-arm

1 Set 4 No 65x65x6 5.8

5 Distribution box Fixing Clamps 0 06 GI Pipe 0 20x5 7 H Frame Set 0

Note :

BILL OF MATERIALS-4FOR 25 TO 63 kVA TRANSFORMER CENTRE KIT (This BoM is suitable for Conventional Transformer Only, Separate BoM- 6 is furnished for Star Rated

1. The bill of materials are prepared as per DRG No.SIC/WS/017/date 28.6.85.2.The weights given are for raw materials as per ISI structural steel Hand book.3. All holes are of 18 mm for 16 mm bolts.4. All slotted holes are of 18x35 mm long.5. Bolts required to fix Las are not included as the same are to be supplied along with LAs6 Since the D.O.L.O cut out is being fixed on the pervious support of the T.C and depending on whether it is single support & DP structure provision for D.O.L.O fixing X

Page 170: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Length/ Piece in mtr x No

Total Wt/Set in

kgs

16 mm dia Hexgonal

No.Bolt & Nut Qty

20 mm class 'A' GI

pipeQty

Clamp made out of 50x6

mm MS flat No

Qty

2.7x2 31.32 175 7 120 3 0 0

2.7x2(0.06x3) 12.96 65 4 0 0 460 2

2.7x20.5x2 21.6 4.5 50

654 4

00

00

0465

02

2.7x20.285x2

31.323.19

1250

7 4

0160

03

0465

02

0 0 120 0 3 536 2160 0 0 0 3 0 01 No 62.69 0 0 0 0 0 0

BILL OF MATERIALS-4(This BoM is suitable for Conventional Transformer Only, Separate BoM- 6 is furnished for Star Rated

1. The bill of materials are prepared as per DRG No.SIC/WS/017/date 28.6.85.

5. Bolts required to fix Las are not included as the same are to be supplied along with LAs6 Since the D.O.L.O cut out is being fixed on the pervious support of the T.C and depending on whether it is single support & DP structure provision for D.O.L.O fixing X

Page 171: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Wt/Set in Kgs

0

2.16

02.23

02.232.600

(This BoM is suitable for Conventional Transformer Only, Separate BoM- 6 is furnished for Star Rated

6 Since the D.O.L.O cut out is being fixed on the pervious support of the T.C and depending on whether it is single support & DP structure provision for D.O.L.O fixing X

Page 172: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Sl.No Particulars Unit MS Angle

Flat in mmWt/Mtr in Kgs

Length in mm

Wt/Set in Kgs

1 2 3 4 5 6 7No 65x65x6 5.8 1200x2 13.92No 50x6 2.4 473x2 2.27No 45x45x5 3.4 1360x2 9.25No 50x6 2.4 503x2 2.41No 50x6 2.4 285x2 1.37No 45x45x5 3.4 2350x2 15.98No 45x45x5 3.4 310x2 2.11No 45x45x5 3.4 70x4 0.95No 45x45x5 3.4 60x6 1.22

GOS Handle Frame Fixing Cross-arm No 65x65x6 5.8 1100x1 6.38Clamp for above No 50x6 2.4 548x1 1.32

No 45x45x5 3.4 1000x1 3.40No 50x6 2.4 558x1 1.34No 50x6 2.4 320x1 0.77

6 MS Bolts & Nuts 16mm with washers Kgs16*5016*6516*150

3 Nos12 Nos6 Nos

62.69Note

1 The hole have to be provided at locations as mentioned in the drawings2 All holes are in mm and slot holes 18*35 ,, to suit 16mm unless otherwise stated.3 the weight mentioned in the BoM is as per Steel Table4 The Bolts & Nuts shall confirm ISS

BILL OF MATERIALS-5H.FRAME

1 GOS- H Frame Fixing Cross-Arm

2GOS H Frame Fixing Cross arm Clamps Brace Fish

Plate

3 GOS Frame

4

5GOS Handle Frame Fixing Cross set arm Brace

Clamps Fish Plate

Page 173: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Qty/set Approx wt in Kg

MS Angle 65x65x6mm x 2700 mm - HT side Power X arms 5.8 1 NoMS Angle 65x65x6mm x 2700 mm - LT side Power X arms 5.8 1 No

2 MS Angle 50x50x6mm x 2700 mm - PI Support X arms T2 4.5 1 No 12.15MS Cleat 50x50x6mm x 70 mm 4.5 3 Nos 0.945

3 MS Angle 45x45x6mm x 2700 mm Belting X arms DTC-10 4 2 No 21.64 MS Angle 45x45x6mm x 500 mm Belting support X arms DTC-9 4 2 No 4.55 MS Channel 100x50x4.7 (ISMC) mm x 2700mm Transformer seating T4 9.2 2 No 49.686 MS Angle 65x65x6mm x 310 mm Transformers seating support X arms DTC-11 5.8 2 No 3.6

7 MS Flat 50x6mm x 450mm 2 2.4 2 No 2.168 MS Flat 50x6mm x 465mm 3 2.4 4 No 4.469 MS Flat 50x6mm x 535mm 4 2.4 2 No 2.6

10 L&R MS Angle 65x65x6mm x 1025mm GOS & LA Support X-Arms DTC-4 5.8 2 No 11.8911 MS Angle 45x45x5 mm x 1360 mm HG Fuse Support DTC-8 3.4 1+1 No 9.24812 L&R MS Angle 65x65x6mm x 1100 mm GOS Handle Support X arms Brace DTC-13 5.8 1 No 6.3813 L&R MS Angle 45x45x5mm x 1000 mm GOS Handle Support X arms Brace DTC-14 3.4 1 No 3.400

11kV H Frame Set detailsMS Angle of size 45x45x6 mm x 2350 mm 4 2 No Each 18.840x40x5mm 340mm 3 2 No Each 2.0440x40x5mm 70mm 3 4 No Each 0.8440x40x5mm 60mm 3 6 No Each 1.08

Clamps15 MS Flat 50x6mm x 560 mm 5 2.4 2 No 2.716 MS Flat 50x6mm x 498 mm 1 2.4 2 No 2.3917 MS Flat 50x6mm x 465 mm 3 2.4 2 No 2.22

FISH PLATE FOR 'H' Frame - GOS Mounting Framesa) 285 mm 2 No 1.368b) 320 mm 1 No 0.768

TOTAL a) Structure Steel 196.139MS Bolts & Nuts Including H Frame

a) 16mm x 175mm 7 Nob) 16mm x 65mm 12 Noc) 16mm x 200mm 7 Nod) 16mm x 50mm 4 Noe) 12mm x 50mm 4 No

TOTAL b) Bolt and nut 10 Kgs

BILL OF MATERIALS - 625/63 kVA TC Structure suitable for mounting Star Rated 25 & 63kVA Transformers

Sl. No. Part No. Part No. Wt/Mtr in

Kgs

BESCOM for 3 Star Rated Transformers as

approved in PFC/ADB

1810 Kgs

Note: 1) The weight indicated is before punching of the holes.2) Tolerance of ±4% is allowed on the weight.

1 T1 31.32

KIT DETAILS

14 DTC-3

Page 174: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Part No. MS Angle size in mm Length in

mm Quantity Wt / Mtr. Weight in kg.

1 50x50x6 850 1 4.5 3.8252 50x50x6 1150 2 4.5 10.353 50x50x6 850 2 4.5 7.654 45x45x5 5 45x45x5 700 2 3.4 4.76

6 45x45x5 1321 2 3.4 8.987 8th Plate8 65x65x6 485 1 5.8 2.7849 65x65x6 850 2 5.8 9.8610 65x65x6 485 1 5.8 2.78411 45x45x5 1230 2 3.4 8.1612 45x45x5 1000 2 3.4 6.813 65x65x6 with cleat welded on both ends of length 65mm 485 1 5.8 2.9

50x8 550 2 3.1 3.4150x8 480 2 3.1 2.976

16x125mm 816x50 mm 816x50 mm 4

4

BILL OF MATERIALS-7

SINGLE POLE MOUNTED TRANSFORMER STRUCTURAL MATERIALS ON 9 MTRS. LONG RCC POLE ( SQ. SECTION) FOR 25/63 kVA TC SET

Not Applicable

Not Applicable

Clamps

Bolts & Nuts (various sizes)

Page 175: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Part No. MS Angle size in mm Length in

mm Quantity Wt/Mtr Weight in kg.

1 50x50x6 850 3 4.5 11.4752 50x50x6 1150 4 4.5 20.73 50x50x6 850 2 4.5 7.654 45x45x5 900 2 3.4 6.125 45x45x5 1500 2 3.4 10.206 45x45x5 1321 2 3.4 8.98

7 8th PlateNot

Applicable8 65x65x6 485 2 5.8 5.5689 65x65x6 850 2 5.8 9.8610 65x65x6 485 2 5.8 5.56811 45x45x5 1350 2 3.4 9.1812 45x45x5 1000 2 3.4 6.8

1365x65x6 with cleat welded on both ends of length

65mm485 1 5.8 2.9

Clamps50x8 550 2 3.1 3.4150x8 480 2 3.1 2.976

16x125mm 816x50 mm 816x50 mm 4

BILL OF MATERIALS-8

SINGLE POLE MOUNTED TRANSFORMER STRUCTURAL MATERIALS ON 9 MTRS. LONG RCC POLE ( SQ. SECTION) FOR 100 kVA TC SET.

Bolts & Nuts (various sizes)

5

Page 176: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

TOP Bracket1 100x100x8mm MS Angle 850 3 12.1 30.862 75x40x4.8mm MS Channel (MC75/MCP75) 2400 2 7.14 34.273 45x45x5mm MS Angle 850 3 3.4 8.674 75x40x4.8mm MS Channel (MC75/MCP75) 1040 2 7.14 14.855 50x50x6mm MS Angle 1000 2 4.5 96 50x50x6mm MS Angle 1000 2 4.5 97 65x65x6mm MS Angle 1440 2 5.8 16.7

Transformer Center8 130x130x12mm Angle 1110 1 23.4 25.979 100x50x5mm MS Channel (MC100/MCP100) 1200 2 9.56 22.9410 130x130x12mm MS Angle (with side plate) 1110 2 23.4 51.9511 75x75x6mm MS Angle 1750 2 6.8 23.812 65x65x6mm MS Angle 1260 2 5.8 14.6213 75x40x4.8mm MS Channel (MC75/MCP75) 1110 2 7.14 15.85

GOS Mounting Structure (Ladder)14 45x45x5mm MS Angle 1640 2 3.4 11.1515 45x45x5mm MS Angle (Cleat) 60 6 3.4 1.2216 40x40x5mm MS Angle 335 2 3 2.01

Round clamps of different sizes made out of MS flats suitable for fixing the above structural materials to the pole.a) 75x6 MS Flat 1000 6 3.532 21.19

15kgsApprox.

Total in Kgs 329.06

Note

BILL OF MATERIALS – 9

For OH line (Having Single H Frame with Transformer seating and seating angle support x-arm) for 11mtr Spun Pole for 25KVA Transformer.

Sl No Size of the steel section Length (in mm)

Qty (in Nos) Kgs/Mtr Total Wt

1. The weights mentioned are subject to tolerance as per IS 2. The weights mentioned are before drilling of holes

17

18MS Hexagonal bolts, nuts and washers of different sizes to sufficient in quantity for fixing clamps 15

Page 177: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Sl No Size of the steel section Length (in mm)

Qty (in Nos) Kgs/Mtr Total Wt

TOP Bracket1 100x100x8mm MS Angle 850 5 12.1 51.432 75x40x4.8mm MS Channel (MC75/MCP75) 2400 4 7.14 68.543 45x45x5mm MS Angle 850 5 3.4 14.454 75x40x4.8mm MS Channel (MC75/MCP75) 1040 2 7.14 14.855 50x50x6mm MS Angle 2000 2 4.5 186 50x50x6mm MS Angle 1000 2 4.5 97 65x65x6mm MS Angle 1440 2 5.8 16.7

Transformer Center8 130x130x12mm Angle 1110 1 23.4 25.979 100x50x5mm MS Channel (MC100/MCP100) 1200 2 9.56 22.94

10 130x130x12mm MS Angle (with side plate) 1110 2 23.4 51.9511 75x75x6mm MS Angle 1750 2 6.8 23.812 65x65x6mm MS Angle 1260 2 5.8 14.6213 75x40x4.8mm MS Channel (MC75/MCP75) 1110 2 7.14 15.85

GOS Mounting Structure (Ladder)14 45x45x5mm MS Angle 1640 6 3.4 33.4615 45x45x5mm MS Angle (Cleat) 60 18 3.4 3.6716 40x40x5mm MS Angle 335 6 3 6.03

Round clamps of different sizes made out of MS flats suitable for fixing the above structural materials to the pole.a) 75x10 MS Flat 1000 2 5.89 11.77b) 75x6 MS Flat 1000 8 3.53 28.26

17kgsApprox.

Total in Kgs 448.3Note1. The weights mentioned are subject to tolerance as per IS 2. The weights mentioned are before drilling of holes

BILL OF MATERIALS – 10

For UG Cable network (Having 3 Nos H Frame with Transformer seating and seating angle support x-

17

18MS Hexagonal bolts, nuts and washers of different sizes to sufficient in quantity for fixing clamps 17

Page 178: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Sl No Size of the steel section Length(in mm)

Qty (in Nos) Kgs/Mtr Total Wt

TOP Bracket1 100x100x8mm MS Angle 850 3 12.1 30.862 75x40x4.8mm MS Channel (MC75/MCP75) 2400 2 7.14 34.273 45x45x5mm MS Angle 850 3 3.4 8.674 75x40x4.8mm MS Channel (MC75/MCP75) 1040 2 7.14 14.855 50x50x6mm MS Angle 1000 2 4.5 96 50x50x6mm MS Angle 1000 2 4.5 97 65x65x6mm MS Angle 1440 2 5.8 16.7

GOS Mounting Structure (Ladder)8 45x45x5mm MS Angle 1640 2 3.4 11.159 45x45x5mm MS Angle (Cleat) 60 6 3.4 1.2210 40x40x5mm MS Angle 335 2 3.002 2.01

Round clamps of different sizes made out of MS flats suitable for fixing the above structural materials to the pole.a) 75x6 MS Flat 1000 6 3.532 21.19

10kgsApprox.

Total in Kgs 168.93Note1. The weights mentioned are subject to tolerance as per IS 2. The weights mentioned are before drilling of holes

BILL OF MATERIALS – 11For OH line (Having Single H Frame without Transformer seating and seating angle support x-arm)

11

12MS Hexagonal bolts, nuts and washers of different sizes to sufficient in quantity for fixing clamps 10

Page 179: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Sl No Size of the steel section Length(in mm)

Qty (in Nos) Kgs/Mtr Total Wt

TOP Bracket1 100x100x8mm MS Angle 850 5 12.1 51.432 75x40x4.8mm MS Channel (MC75/MCP75) 2400 4 7.14 68.543 45x45x5mm MS Angle 850 5 3.4 14.454 75x40x4.8mm MS Channel (MC75/MCP75) 1040 2 7.14 14.855 50x50x6mm MS Angle 2000 2 4.5 186 50x50x6mm MS Angle 1000 2 4.5 97 65x65x6mm MS Angle 1440 2 5.8 16.7

GOS Mounting Structure (Ladder)8 45x45x5mm MS Angle 1640 6 3.4 33.469 45x45x5mm MS Angle (Cleat) 60 18 3.4 3.6710 40x40x5mm MS Angle 335 6 3 6.03

Round clamps of different sizes made out of MS flats suitable for fixing the above structural materials to the polea) 75x6 MS Flat 1000 8 3.53 28.26

10kgsApprox

Total in Kgs 274.39Note1. The weights mentioned are subject to tolerance as per IS 2. The weights mentioned are before drilling of holes

BILL OF MATERIALS – 12

For UG Cable network (Having 3 Nos H Frame without Transformer seating and seating angle support x-arm) for 11 mtr Spun Pole for 63/100/250/500 KVA Transformer.

11

12MS Hexagonal bolts, nuts and washers of different sizes to sufficient in quantity for fixing clamps 10

Page 180: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

Special Locality Allowance: Locality allowance at the rate noted below is given over and above the schedule of labour for the listed areas.

Sl. No. Name of

ESCOM Area

As

Existing

Percentage over &

above SR

1 BESCOM

Davanagere District:

Channagiri, Honnalli Taluks 20 20

Tumkur District:

Pavagada Taluk. 15 15

All Divisions coming under Bangalore Metropoliton Area Zone

30

30

Anekal, Chandapura, Hosakote & Devanahalli. In BRAZ 20 20

2 MESCOM

South Kanara District: Bantwala, Mangalore, Sulya, Puttur, Belthangadi Taluk

45 45

Udupi District: Udupi, Kundapura, Karkala Taluk 45 45

Chickmagalur District:,Chichmagalur, Koppa, Mudigere,

Narasimharajapura, Sringeri Taluk 35

45

Chickmagalur District:,Kadur, Tarikere Taluk NEW 35

Shimoga District: Hosanagara, Thirthalli, Sagara, Taluk 35 45

Shimoga District: Soraba, Shikaripura 35 35

Shimoga District: Shimoga, Bhadrawathi,Taluks 25 25

3 HESCOM

Dharwad District: a) Kalghatagi

b)Dharwad Taluk

30 20

30

20

Haveri District:

a)Hanagal,Herikerur b)Byadagi,Shiggon,Savanur Taluks

30

20

30 20

Belgaum District: Hukkeri, Belgaum,Bailahongala Soundathi Taluks

20 20

Belgaum District: Khanapura Taluk

20 45

Uttar Kannad District:

Karwar,Joida, Haliyal,Sirsi,Mundagod,Yellapur,Bhatakal, Sidapur,Honnavar,Kumta and Ankola.

40 Modified as

below

Uttar Kannad District:

NEW 45

Page 181: Particulars - online.mesco.inonline.mesco.in/documents/view_document.jsp... · Guy Less Pole Nos. New Item Double Pole Structure complete including 5 KG , 8SWG G.I. Wire for Structure

4 CESCO

Kodagu District:

Madikeri, Virajpet, Somwarpet Taluks 40 40

Mysore District:

H.D.Kote, Hunsur and Piriyapattana 30 30

Chamaraj Nagar District: Gundlupet, Chamarajanagar, Kollegal Taluk

30 30

Chamaraj Nagar District: BR Hills in Yalandur Taluk

NEW 15

Hassan District: Sakaleshpura, Hassan, Arakalagudu, Belur, Alur.

40 40

5 GESCOM

Taluks:

Raichur, Koppal, Bellary, Gangavathi, Sandur, Manvi, Sindhanur, Shahapur, Jewargi, Sedam

15 15

Taluks: Surpur, Devadurga New 25

Note:

In case of civil works where KPWD SR rates are adopted, the locality allowance as applicable in KPWD SR shall be followed.