Bill Wright
Corporate Energy and Environment Manager,
John Lewis plc
![Page 2: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/2.jpg)
John Lewis and Waitrose
• 27 Department Stores
• 179 Supermarkets – and growing
• 3 Factories
• Farm
• Leisure Facilities – including a castle!
![Page 3: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/3.jpg)
ENERGY COSTS
Combined energy bill of over £35M!
OUCH!!!!!!
![Page 4: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/4.jpg)
COST OF ENERGY
• Over the past three years 100% cost increase
• Straight off bottom line
• Now a major overhead
![Page 5: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/5.jpg)
CARING FOR OUR ENVIRONMENT
D
![Page 6: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/6.jpg)
CARING FOR OUR ENVIRONMENT
D
1kwh electricity = 0.43kg CO21kwh gas = 0.19kg CO2
![Page 7: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/7.jpg)
CARING FOR OUR ENVIRONMENT
D
1kwh electricity = 0.43kg CO21kwh gas = 0.19kg CO2
JL Oxford St produces OVER 4000 tons of CO2 each year
And JL Victoria produces OVER 3000 tons
![Page 8: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/8.jpg)
OUR AIMS
• Build efficiently
![Page 9: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/9.jpg)
OUR AIMS
• Build efficiently
• Reduce operating costs
![Page 10: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/10.jpg)
OUR AIMS
• Reduce consumption
• Reduce costs
•Reduce emissions
![Page 11: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/11.jpg)
DOCUMENT L2A
• Applies to new build
• Reduce CO2 emissions
• Improve building performance
• Provide final user information
![Page 12: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/12.jpg)
SERVICES DESIGN
• Design for energy efficiency
• Be aware of new regulations
• Install meters to enable 90% of energy usage to be monitored.
• If over 1000m2 use automatic meter reading
![Page 13: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/13.jpg)
Lighting
• Use efficient lighting sources
HF ballasts, T5, CDMT spotlights etc
• Zone and time controls essential
• Assess lighting level required
• Use natural daylight where possible
• Switch off lights when not required - PIR
![Page 14: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/14.jpg)
![Page 15: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/15.jpg)
![Page 16: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/16.jpg)
ELECTRIC MOTORS
• Use efficient motors
• Use variable speed drives – WHERE PRACTICABLE
• Size motor correctly
• ECA list?
![Page 17: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/17.jpg)
![Page 18: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/18.jpg)
BUILDING MANAGEMENT SYSTEMS
• Can control all building functions.
• Keep it simple!
• They are not the answer to everything!
![Page 19: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/19.jpg)
INFORMATION
• Estimate power consumption.
• Provide customer with good records.
• Energy Log Book?
![Page 20: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/20.jpg)
PART L2B
• Applies to existing buildings and extensions.
• Does not apply if work only involves replacement equipment, or a few additional lights to existing circuits.
![Page 21: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/21.jpg)
CONSEQUENTIAL IMPROVEMENTS!
• Applies to building work associated with an existing building over 1000m2 in area.
• Improvements to original building of 10% of cost of additional work.
• Compliance can be upgrading existing services and / or controls.
• Upgrade lighting if necessary.
![Page 22: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/22.jpg)
RENEWABLE ENERGY
• Requires renewable energy sources to be considered.
• Some local authorities now require a minimum 10% renewable energy sources on site for planning approval.
• Difficult to achieve economically
![Page 23: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/23.jpg)
RENEWABLE ENERGY SOURCES
• Wind power
• Photo-voltaic
• Solar Thermal
• Ground Source heat pumps
• CHP ( Combined heating and power)
• Biomass boilers
![Page 24: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/24.jpg)
ECONOMICS
• None of renewable sources are truly economic
• Assess sources for customer
![Page 25: PART L Problem or opportunity?](https://reader035.vdocuments.mx/reader035/viewer/2022062315/568151be550346895dbff0c7/html5/thumbnails/25.jpg)
CONCLUSION
• Gain knowledge of Building Regulations requirements
• Design accordingly
• Be pragmatic
• Commission thoroughly all installations
• Provide all necessary information.
• It is not that difficult!