part 8: jharkhand state pollution control board

18
PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD NOTIFICATIONS SNO PARTICULARS DATE PAGE NO 1 Industries under ‘Green Category’ exempted from obtaining Environmental Clearances Pollution Control certificates not a pre- requisite for obtaining electricity connection 01 May 2015 215 – 215 2 Submission of Inspection reports within 72 hours 01 May 2015 216 – 216 3 Categorization of Industries into ‘Red’, ‘Orange’, ‘Green’ Validity of CTO & Inspection timeline for each category 15 Jun 2015 217 – 218 CIRCULARS & OTHERS SNO PARTICULARS DATE PAGE NO 4 Online Register Maintenance Provision of CTE 1 , CTO 2 , Authorization Under Biomedical Waste, Municipal Solid Waste and Hazardous Waste through ‘Online Consent Management & Monitoring System’ 15 Jun 2015 219 – 219 5 Timelines for CTE, CTO and Authorization Approvals 15 Jun 2015 220 – 220 6 Surprise Inspections 15 Jun 2015 221 – 221 7 Auto renewal of consents based on self certification 29 Jun 2015 222 – 225 8 Procedure for Submitting Online Application using Consent Management System 226 – 231 CTE : Consent To Establish CTO : Consent To Operate

Upload: hoangduong

Post on 01-Jan-2017

247 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD

PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD

NOTIFICATIONS

SNO PARTICULARS DATE PAGE NO

1 Industries under ‘Green Category’ exempted from obtaining Environmental Clearances Pollution Control certificates not a pre-requisite for obtaining electricity connection

01 May 2015 215 – 215

2 Submission of Inspection reports within 72 hours

01 May 2015 216 – 216

3 Categorization of Industries into ‘Red’, ‘Orange’, ‘Green’ Validity of CTO & Inspection timeline for each category

15 Jun 2015 217 – 218

CIRCULARS & OTHERS

SNO PARTICULARS DATE PAGE NO

4 Online Register Maintenance Provision of CTE1, CTO2, Authorization Under Biomedical Waste, Municipal Solid Waste and Hazardous Waste through ‘Online Consent Management & Monitoring System’

15 Jun 2015 219 – 219

5 Timelines for CTE, CTO and Authorization Approvals

15 Jun 2015 220 – 220

6 Surprise Inspections 15 Jun 2015 221 – 221

7 Auto renewal of consents based on self certification

29 Jun 2015 222 – 225

8 Procedure for Submitting Online Application using Consent Management System

226 – 231

CTE : Consent To Establish

CTO : Consent To Operate

Page 2: PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD

215

Page 3: PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD

216

Page 4: PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD

217

Page 5: PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD

218

Page 6: PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD

219

Page 7: PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD

220

Page 8: PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD

221

Page 9: PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD

13

grccrrsw\t7zffi@

Enwus {rq gqqnT fu-dur q{-{JHARKHAND STATE POLLUTION CONTROL BOARI)

T.A Division Building (Ground Floor) HEC Campus, Dhurwa, Ranchi- 834004.

Phone No:-0651- 2400852.2400851. Fax No:- 2400850..

Ref. No.-

Office order

Sub:- Scheme of auto renewal of consents based on self certification

Board intends to initiate auto renewal ofconsent to operate for Green (investment more than 50

lakhs) and Orange categories ofindustries which will submit a self certification on compliance of

Environmental regulations. The strategies for effective implementations of environmental

regulations include enforcement and compliance aspects which are being handled simultaneously

with the consent.

In order to expedite the consent, it is now proposed to emphasis enforcement aiid compliance as

discrete activities along with the responsibility ofdeclaring the compliance ofregulations by the

industry while seeking renewal ofconsent. Initially the proposed scheme of auto renewal of

consent based on self certification will be rolled out for the Green and Orange categories of

industries.

The key features of this scheme are as under:

I .The auto renewal of consent will be applicable tbr the industries when there is no increase in

overall production capacity and also in pollution load.

2.In case there is increase in capltal investment the industry shall submit corresponding fees for

consent to establish ancl also difference in consent to operate fees.

$ - ttT. Dated,Ranchi---?-? ) { 119

*

222

Page 10: PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD

3.ln case, the capital investment is decreased, then the industry need to apply in prescribed

application form.

4.Industry will have to submit a self certification on compliance ofearlier consent conditions.

This self certification shall be submitted by the authorized offrcial of the industry,duly authorized

by the owner/board ofdirectors.

5.The auto renewal will be availed for maximum 5 terms subject to payment of requisite fees.

6.The format of self certification by industries is enclosed as Arurexure-'A'.

( Sanjay Kumar Suman)Member Secretary

Memo No.-

Copy to Regional Officer,JSPCB Ranchi/Dhanbad,/Hazibagh/Jamshedpur/Dumka,all sectionhead,Head Office for information and necessary action

( Sanjay K Suman)Member Secretary

B - r,t- Ranchi,dated- 2-7 / 6 // S

'+

(

I

223

Page 11: PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD

DRAFT FORMATE FOR SELF CERTIFICATION OF COMPLIANCE BY THEINDUSTRY FOR AUTO.RENEWAL OF THE CONSENT TO OPERATE

To

The Member SecretaryJharkhand State Pollution Control BoardRanchi

Sub: Self Certification of Compliance for Auto Renewal ofthe Consent to Operate

Ref: Consent issued by the Board vide letter No.--Dated-------------- which is valid up to--------

Sir,

We are submitting our consent renewal application iorm in prescribed format along with-

the necessary fees for the same. We wish to apply for auto renewal of our existing

consent referred above.We undertake the following:

I . We have valid consent to operate from JSPCB vide above refened letter and copy of

the same is enclosed.The present details ofthe manufacturing process and all other

information as required under the prescribed consent application form are same as

per the earlier consent application submitted for above referred consent and therefore

the same may be considered for present application.

2. The capital investment of the industry, as the earlier consent granted by JSPCB vide

above refened consent was Rs.-------------lakhs. The Capital investment for the

proposed consent auto-renewal is Rs.----------------------lakhs.(The change in capital

investment, if any, is only due to investrnents in infrastructure development,

clean technology,pollution control system and better production management.There

is no increase in production or pollution load than as referred in the earlier granted

consent. We are submitting corresponding fees for consent to establish and

i

I

t

224

Page 12: PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD

also,difference in consent to operate fees since the block year the capital investment is

made on pro-rata basis,duly supported by the chartered Accountants certificate to that

effect.)

3. The production or manufacturing was as per the consented limits during the validity

period of the earlier consent for which renewal has been applied.

4. We are complying with the consent conditions.

5. We undertake to comply with any further condition which may stipulated by JSPCB

in future and also, undertake to pay all the charges/fees/demands in future.

6. This unde(aking has the approval ofthe Board of Directors ofthe industry and copy

ofthe resolution of the Board is attached herewith.

11 is rquested to approve the auto-renewal of the consent.

Thanking You.

Authorized Signatory

Name and designationWith phone and email address

And seal of the company

I

225

Page 13: PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD

ONLINE CONSENT MANAGEMENT & MONITORING SYSTEM

Feature of OCMMS

This is a highly interactive menu driven, user friendly customized package for non specialist end users at local level. It has following features:

Online Industry Registration Online Submission of Application, Approval,

Clarification and other activities for CTE/CTO for all category of Industries/Institutions

Online Scheme Monitoring and Evaluation System User management at all level, reviewers and

approvals Online Workflow Management Decision Support System – Guidelines,

Alert/Notifications, Issues and Risk Management Reports / Query Download Facility – Forms, Documents etc. Multi level Security Enabled System Role based application access State Specific Customization

Consent Management-

Consent To Establish for Red , Orange & Green Industries Including; Mines, Bio-medical Institutions/ Hospitals for Small, Medium and Large size industries.

226

Page 14: PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD

Consent To Operate for Red , Orange & Green Industries Including; Mines, Bio-medical Institutions/ Hospitals for Small, Medium and Large size industries.

Waste Management System (BMW, HWM, MSW) CESS Administration System Laboratory Management System Monitoring & Evaluation System Delivery System- Information, Alert and Notification

through eMail etc. Advisory System – Bulletin Board, News etc. Report/Queries Frequently Asked Questions (FAQ)

Procedure for submissing online Applications

P1.For making an application for obtaining consent to operate the

applicant shall go through the State Pollution Control Board website at URL www.jspcb.org or http://jhkocmms.nic.in in the home page of the URL. Please click on “online application”.

2.Registration : Before submitting the application online, the applicant

has to register , for the new users user ID and password is to e generated by clicking on the “ New Industry Link of the website” .

3.The existing users who has ID and password they can login directly to

OCMMS.

227

Page 15: PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD

Home Page - Online Consent Management & monitoring system

Industry user need to select “Industrial login” after registration to fill up their application immediately after signing up with OCMMS website and same login and password is to be used for subsequent applications. STEPS FOR ENTERING INDUSTRY DETAIL INFORMATION FOR NEW INDUSTRY REGISTRATION

1.After filling all details of Industry Details there is an option to fill up Occupier details. In occupier details “Hint Question” is very important for user because it is required in the case of change in password or when password is forgotten.

2.E mail address is also important in occupier details. Because of this mail address user will receive information from OCMMS.

3.The next important point is “Do you want to send login credential in mail?” To receive information by E-mail ‘Yes’ is selected .

Change Password Option

On home page, the industrial user has to select “industrial login”, and user ID and password with captcha code are to be entered and login to be clicked . The first login shall be with auto generated password, however this password should be changed for security aspects.

228

Page 16: PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD

STEPS FOR FILING OF APPLICATION ONLINE

1.The applicant can apply their consent application by clicking on “apply for consent”. The applicant has to select CTO,CTE and Authorisation under Hazardous waste (Managementy,Handling & Transbounday)Rule,2008.

2. Similarly the applicant can register under Health Care Unit for Authorisation under Bio-Medical Waste( M & H) Rule,1998 and Municipal Solid Waste (M & H ) Rule,2000.

- Workflow MPART - A 3.The user can save this application in his account for making some changes in application, user need to save this application by selecting “In progress”(at the bottom of page). 4.In progress application will not submitted to JSPCB office and can be modified by the user. 5.Once the applicant filled up the application form completely and upload all the required documents the applicant can select button ‘completed’ and followed by ‘save’. 6.Then window will open for online payment option.The applicant can select option for payment either by Credit Card/Debit Card/Internet Banking. 7. After successful online payment the application will reach to JSPCB Office. 8.Then application will be automatically submitted to the Regional Office. 9.Then scruitiny of application alongwith supporting documents is done and subsequent inspection is carried out.

229

Page 17: PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD

10. On successful completion completion of inspection application is approved/rejected. 11. Upon approval certificate is issued online to the applicant. 12. The certificate can be downloaded by the applicant. NOTE- Please note down the application number for future reference.

for obtaining consent to operate the applicant shall go through the State Pollution Control Board

230

Page 18: PART 8: JHARKHAND STATE POLLUTION CONTROL BOARD

website at URL http://www.ospcboard.org or http://www. the home page of the URL. Please click on “online application”. 2.

231