Page 1: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Part 6 Paving

(including hand laying)

Page 2: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Information you need BEFORE the job starts.....

The contractor’s method statement for the scheme

The laying plant to be used and the asphalt plant which will

supply to the job

Bond coat type – should be a polymer modified emulsion

Name of man in charge ( foreman/supervisor you talk to

especially if things are not done properly)

Delivery and rolling temperatures if a modified bitumen mix is

to be used, otherwise the BS594987 temperatures.

Start and finish times for the Traffic Management. Check all

diversion signs and TM is in place and OK

Page 3: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Check dips written on surface meet thickness requirements Ironwork lifted in good time so concrete is set Laying records to check Rate of spray of bond coats (used for all layers) and correct product Correct material being supplied Delivery times and temperatures Identify delay times and location of paver stoppages. Wind speed, surface and air temperatures (in winter) c.f SHW Cl 945

Page 4: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Density checks with calibrated gauge and

coring base and if possible binder course

Texture depth and rolling straight edge ( if in the

spec)

How much material has been cut off

Painting of kerb faces, ironwork and joints

Page 5: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

NB

Make sure all prepping has been completed

BEFORE paving starts, not whilst it is in progress or after!

(ie setting manhole frames,

gully frames, valve boxes etc)

Page 6: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Pavers

Page 7: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Tracked pavers give the best riding quality but

are not widely used in the UK

Page 8: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Older, 4-wheeled paver, showing main parts very

clearly(These produce more even surfaces than 2 wheeled

pavers but very few are still being used.)

Page 9: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Modern paver, 2 large driving wheels but the

wheels under the hopper are also driven

Page 10: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Another modern paver with built-in bond-coat

tank and integral spray bar

Page 11: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Small paver, note just 2 wheels under the hopper, OK

for non-critical jobs such as factory yards but not roads

Page 12: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Paver hopper (showing the conveyors which feed the asphalt

to the screed and the rollers by which the delivery truck is pushed)

Page 13: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man
Page 14: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Side view of screed (showing auger, tamper, and gas

heater exhaust. Many screeds are now electrically heated)

Page 15: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Hydraulically extended screed (The 2 larger

pistons/cylinders are simply to make the screed more rigid when

extended)

Page 16: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

An older screed’s width being extended (these are

generally more rigid than hydraulically extended screeds)

Page 17: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Delivery of asphalt to the paver

Page 18: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Ideally, on any but the smallest job, start with 60t,

ie 3 trucks, in front of the paver (The paver is meant to

move steadily with no start/stops)

Page 19: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Truck protects asphalt in paver hopper

Page 20: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Don’t let the truck bump into the paver !!!

( this causes a ridge across the new asphalt mat.

Page 21: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

No prizes for spotting this problem !!

Page 22: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Spot the problem!! (Note empty delivery truck at bottom of screen)

Page 23: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Paver hopper (showing un-insulated steel sides (or “wings”))

Page 24: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Thermal image of a “just-laid” mat (Note cold areas of

asphalt from the previous load, from the hopper wings)

Page 25: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

The same mat, 20 metres later

Page 26: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

“Insulated” paver hopper, Tarmac (pity all paver hoppers are not like this)

Page 27: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Checking temperature of hot mix (Today, he would be

wearing safety goggles)

Page 28: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Controlling the thickness of the as-laid

asphalt.

Page 29: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Surface course

Binder Course

String Line

DIPPING TO DETERMINE REQUIRED THICKNESS OF NEXT COURSE

NOTE: The string line must always be parallel to finished road profile

Control pin

Page 30: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Checking the mat thickness

For inlays............. Measure new height of kerb face

Generally Check the dips (thickness) sprayed on carriageway Check the thickness of edges of mat after laying Take a level on site and check some levelling points

Use a screwdriver pushed through the hot mat and hold against a steel rule to measure thickness of hot mats

NB Remember the permitted tolerances

Page 31: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Main paver inputs influencing level control

Page 32: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

A mat-follower also screed control switches (used

by the “screwman” to control the thickness/level of the as-laid

asphalt. Mat followers are not commonly used)

Page 33: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Averaging beam (Gives a better riding quality than the paver alone)

Page 34: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Use of regulating material (Uneven thickness of surface

course will roll down unevenly and result in poor quality ride)

Page 35: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Finer points about laying

Page 36: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Pavers working in echelon (extremely good practice,

central surface course joint is made “hot to hot” no poor joints)

Page 37: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Note neatly cut edge to this first-laid mat ( This now needs painting with hot 50 or 70 pen bitumen before

the next mat is laid)

Page 38: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Attention to joint (1), roller runs on mat 1 with just 150mm overlap onto mat 2.

Page 39: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Attention to joint (2), mat 2 just laid (today, these

men would all be wearing safety helmets)

Page 40: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Good practice, note temporary cover on gully

Page 41: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Removing temporary cover to gully

Page 42: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

ALWAYS hand-tamp around gully

Page 43: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Making good around frame

Page 44: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

VERY poor, lapped joint, not durable, likely to fail

within 4 or 5 years instead of 15 to 20.

Page 45: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Screed extensions incorrectly adjusted

Page 46: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Mat patterns caused by unskilled paver set-up,

(uneven pressure and compaction by screed extensions)

Page 47: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Reflective crack in 2 year old, well-laid surface

course (entirely due to poorly made binder course joint )

Page 48: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Note that IAN 154/12 allows longitudinal

joints between mats may be located

in the middle of the traffic lane,

but must be at least 300mm from any joint

in the layer beneath.

( This is to avoid good asphalt being

planed out when carrying out resurfacing

works.)

Page 49: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Gritting just laid, still hot sma mat

Page 50: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Asphalt lump removed from paver screws

Page 51: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Problem due to cold lumps

Page 52: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Problem, oil in truck body to make asphalt slip off

truck easily, (use soapy water instead)

Page 53: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Hand lay work

Page 54: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Excellent patching, with HRA (see the reflection of the sky in the rain which shows the rain

stays on top, ie no voided areas)

Page 55: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Very poor hand-laid work (see uncompacted areas at

edges,, insufficient asphalt used so it is too low to be rolled)

Page 56: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Very poor work (exiting roller has damaged the transverse

joint PLUS the binder course is finished too high so there is no for

40mm surface course PLUS no sign of joint painting.

Page 57: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Cold areas, poorly compacted

Page 58: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Bobcat job, even base but rough edges (preferred in

USA since gives better interlock with new asphalt)

Page 59: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Sawn edges as preferred in UK (but uneven base to area caused using a pneumatic breaker so

uneven surface finish very likely )

Page 60: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Good practice (Pushing new mix against vertical, bitumen

coated edges. When rolled will make strong vertical joint )

Page 61: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Material must always be workable to be

properly spread and then fully compacted.

If problems, consider use one of the following:-

. hot boxes,

. fluxed mixes

. or Sasobit, a wax additive

. or lay over-thick, ie one layer NOT two

. or use infra-red heaters for repairing patching

Page 62: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

The following slides show how a 85mm thick

reinstatement remains hot, much longer than

the same material laid 30mm thick

In small areas, use surface course asphalt in

binder course and compact then quickly lay

surface course and compact that.

For pre-season patching for surface dress

don’t hesitate to use 55/10 HRA up to 100mm

thick in 2 layers

Page 63: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

View around MH, depth at arrow 85mm, laying

temperature 105oC, air temp 12oC, area shaded.

Page 64: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

View looking back after 5mins (The thicker asphalt is still hot so compaction will not have been a problem)

Page 65: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Hot-box, good but use asphalt on the same day!!

Page 66: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Pathetic job. Greek hand-laid job, car tyres as roller, holiday photo.

Page 67: Part 6 Paving 5 Paving a… · The laying plant to be used and the asphalt plant which will supply to the job Bond coat type – should be a polymer modified emulsion Name of man

Any questions?