Junction Boxes

Standard Specifications• 8-20.3(6)• 9-29.2 junction boxes• 9-29.2(3) structure mounted JBs• 9-29.2(4) cover markings

NEC Articles 210, 250, 300, 314,

Page 2: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Type 1 Junction BoxStandard Duty

Standard Plan J-11A

Page 3: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Type 2 Junction BoxStandard Duty

Page 4: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Base Plate and JB Type 8Standard Duty

Standard Plan J-11C

Page 5: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Type 8 Junction Box

Page 6: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Type 4 JBLoad Bearing

Page 7: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Type 6 Junction Box(Load bearing box with integral footing)

Standard Plan J-11B

Page 8: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Traffic Temporarily Placed Over Load Bearing Boxes

Page 9: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

JBs and # Inches of Conduit

• Type 1 and Type 4 = 6 in. / Conduit

• Type 2 and Type 5 = 12 in. / Conduit

• Type 3,7,8 and Type 6 = 24 in. / Conduit

Page 10: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Pull Box With Section Out

Page 11: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

8-20.3(6) Adj. JB’sBoth existing and new junction boxes, pull boxes, and

cable vaults shall be adjusted to be flush with the finished grade as well as with the grade during the various construction stages proposed in the Contract.

Page 12: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

JB Too High and Poor Placement

When existing boxes need to be adjusted.Adjustments requiring raising or lowering JBs shall require conduit

modification if the resultant clearance from conduit top, to the lid,becomes less than 6-inches or more than 8-inches.

Standard Specifications 8-20.3(6)

Standard Plans J-10

Page 13: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

New Requirement for Locking Lids Christie’s Prototypes

Page 14: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

H2 Locking Lid Prototype

Page 15: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Western Conc. Prod. Prototype

Page 16: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Secure the Boxes

Page 17: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

JB with Rail - Form Face in Place

Page 18: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

JB Secured to Form Face

Page 19: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Close up of Adjustable JB

Page 20: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Adjustable JB

Adjustable JB Video Clip

Junction boxes installed in structures constructed by slip forming shall be stainless steel NEMA 3R and shall be adjustable for depth,

with depth adjustment bolts, which are accessible from the front faceof the junction box with the lid installed.

Standard Specification 9-29.2(3)

Adjustable JB With About 1.5-Inch of Adjustment

Page 21: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

After the Pour

Page 22: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Inside the Box

Page 23: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit

Page 24: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Lid After It Takes a Direct Hit

Page 25: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Barrier Box With Extension Added

Page 26: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Extension Installed With Epoxy

Page 27: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Plexiglas Spacer and SS Lid Removed

Page 28: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

With Plexiglas Spacer

Standard Specifications requires boxes in the barrier is placed in correct alignment. The face shall not be more than 1/2-inch recessedand uniformly chamfered. NW Region requires within 1/8-inch. 8-20.3(6) Special Provisions

Page 29: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Concrete Made to Fit

Page 30: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Surface JB Hinge Lid

Page 31: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Surface Mount SS JB

Page 32: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Fiber Cable Not Supported

Page 33: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Fiber Cable Supported Correctly

Page 34: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

CV With Load Bearing Lid

Page 35: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Set Pull Box

Page 36: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Junction Box Inspection Checklist

Copy in your books

Page 37: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Wiring

Standard Specifications• 8-20.3(8)• 9-29.3 conductors, cable• 9-29.7 luminaire fusing and connections at

light standards• 9-29.12 electrical splice materials• 9-29.12(1) illumination circuit splices

NEC Articles200, 250, 240, 300, 312,

Page 38: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

#3/0#2#1/0 #6#4 #8 #10 #14#12

#10-Pole and Bracket Cable

Wire Sizes

Page 39: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Mandrels

Page 40: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Pulling Wire

8-20.3(5) ConduitNW Region Special Provisions

In conduit less than2-inch pull ropes forwire installation shall be not less than ¼-inch.In conduits 2-inchdiameter or larger, pull ropes shall be not less than ½-inch.

Ideal yellow lube not recommended

Page 41: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

8-20.3(8)Page 8-82

Pulling pressures on copperDynamometer on Control Unit

Page 42: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Install Duct Seal

NWR SP 8-20.3(5)Traffic Elect. Pg. 46

Page 43: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

NW Region Requires Mechanical Conduit Plugs in All Cabinets

Duct seal is not acceptable.

Page 44: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Wire Connectors and Grounding Clamps

Page 45: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Burndy Crimp and Crimper

Page 46: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

T & B Crimper

Page 47: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Crimping the Ground Wire

Page 48: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Epoxy Splice Kit

9-29.12(1)

Page 49: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Heat Shrink

9-29.12(1)

Page 50: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Heavy-Wall Heat-Shrinkable Tubing• Made of thermally stabilized cross-linked polyolefin, enabling a

recovered wall thickness greater than that of the cable jacket replaced.

• Withstands severe mechanical requirements of U.R.D., submersible, and direct burial installations.

• Tubing, featuring an internally applied sealant, offers protection against moisture, and may be used over lead, steel, aluminum, copper, standard plastic and elastomeric insulating materials.

• Shrink temperature of 120° C.• High-impact, abrasion, corrosion and chemical resistance.• Rated for 600V, 90° C continuous use.• Thermoplastic adhesive liner provides complete environmental

protection and insulation.• Meets: UL® 486D, CSA C22.2 No. 198.2, ANSI C119.1, Western

Underground Guide Numbers 2.4, 2.5, ICEA and NEMA insulation thickness requirements.

• Continuous operating temperature: -55° C to 110° C.

Page 51: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Heat Shrink Splice

Page 52: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Heat Shrink Splices

Page 53: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Splice Illumination Conductors

Page 54: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Use Caution Where You Drive

Page 55: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

ITS

Intelligent Transportation Systems

8-20 & 9-29 Standard Specifications

Page 56: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

ITS 332 Gate

Controller Cabinet

Page 57: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

ITS 332CCTV

Controller Cabinet(Back)

Page 58: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

ITS 332CCTV

Controller Cabinet(Front)

Page 59: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

CCTV Ethernet Switch

Page 60: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

CCTV Fuse Block & Transmitter

Page 61: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

PTZ (Pan, Tilt, & Zoom) CCTV Camera

Page 62: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Signal Bridge where CCTV Camera is Located

Page 63: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

ITS 332ES

Controller Cabinet(Back)

Page 64: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

ITS 332ES

Controller Cabinet(Front)

Page 65: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

ES Cabinet Loop Legend Board

Page 66: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

ES Cabinet Loop Amps

Page 67: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

VMS (Variable Message Sign)

Page 68: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Inside VMS

Page 69: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

VMS Modules

Page 70: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

VMS Outside (Back)

Page 71: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Service, ES, CCTV, & Signal Cabinets

Service ES CCTV Signal

Page 72: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Cabinet Conduit Seals

Page 73: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Cabinet Labeling As Required by NW Region ITS

NWR SP ITSPage 8

Page 74: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Properly done Corrosion Results

Camera Cable Termination

Page 75: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

ITS Manhole, Load Bearing Lid

Page 76: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Fiber Optic Cables and Installation

NEC Articles 770

• Standard Specifications• 9-29.3(1) Fiber Optic Cable• 9-29.3(1)a Single mode Fiber

Optic Cable

Page 77: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Fiber Optic Tugger

Page 78: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

F.O. cable can be pulled at a maximum of 600 LBS. 9-29.3(1)

Dynamometer on Control Unit

Page 79: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Dynamometer Close up

Page 80: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Setting Up

Page 81: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Cable Is Out and Pulling Around the Puller Wheel

Page 82: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Racking Fiber Optic Cable

Hanger and Cable Buffer per J-15a&bSome regions require SS hanger

Page 83: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Figure 8 Fiber Optic Rack in C.V.

Stainless Steel Hanger Missing Cable Buffer per J-15a&b

Page 84: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Stainless Steel Hanger With Cable Buffer per J-15a&b

Page 85: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

F.O. Bend Radius• Manufacturer should specify the bend radius

– Bends during installation (when cable is under tension)

– Long term bends• The minimum bend radius is also a function of

tensile stresses. e.g.while pulling around a sheave

• Common Mfg requirement: Minimum bend radius of not less than 20 times the cable diameter during installation and 10 times the diameter for long term.

Page 86: Part 2 Electrical Training - Washington State … Articles . 210, 250, 300, ... Ground Lug Inside the Box Drain Hole Got Missed Box Has Been Hit. ... Part 2 Electrical Training

Depicts losses in straight fiber

Depicts losses in 60 degree bend

Click the picture below to view a depictionof the signal loss in a 60 degree bend

FO Bends

60 degree bend