Date: 07/26/2016
To: Company: HGBM Person: Document Control
Submitted on Behalf of: NOAB
Document Title: OSI WPM-DSl-0031 (RFl-00679)
Number of Copies: One (1) Electronic
Action:
Transmittal #: 03862-006-0l
From: Company: PB Person: Jim Stievater
Delivered Via: Email
D No Cost/Time Impact. Proceed with the work indicated. Advise within 14 days if there is any Cost or Time Impact.
D Cost Decrease. Proceed with the work. Submit credit proposal for Review. D Cost Increase. Proceed with the work on a T&M Basis. Cost to be submitted when work is complete. ~ Cost Increase. Proceed with the work. Submit proposal. D Cost Increase. Do not proceed with work. Submit proposal. D VE/Conformed Documents Implementation
Comments: Additional clarifying detail provided for a few joist supports at concourses.
Attached: NT SG 5231 , CCAT WPM-DSl-0031 , RFI 00679
Construction Manager Approv~---=-~-=.._l._ ._.~ ....... --"'=CJL, ......,.,.k,"-=-..___ _______ 1..,./_u__,p,_,-=L'-James T. Stievater - Parsons Brinckerhoff Date
CC: File PB-Chris Spann Document Control @HGBM-JV.com [email protected]
Attachments: Partial sheets:
None
Reissued full sheets:
NT SG 5231
By: Kiran Tamvada Engineer
DESIGNER SUPPLEMENTAL INSTRUCTIONS DSI NO. WPM-DSI-0031 DDAATTEE:: 0077//2255//22001166
PPRROOJJEECCTT NNAAMMEE:: NNOOAABB PPrroojjeecctt ## 88991100--0011223333
LLoouuiiss AArrmmssttrroonngg NNeeww OOrrlleeaannss IInntteerrnnaattiioonnaall AAiirrppoorrtt NNoorrtthh TTeerrmmiinnaall DDeevveellooppmmeenntt PPrrooggrraamm PPhhaassee 11
Note: if the following information is deemed to have an impact on GMP Price or time, submit a proposal for Owner approval before proceeding with this DSI. If approved by Owner, the resulting contract change will be incorporated in the next formal Change Order.
11.. Additional clarifying detail provided for a few joist supports at concourses
From: Dean Schuerman To: Cedric Johnson CC: Daniel Taylor, David Daileda, Jason Levy, David Zelig, Sara Delahoussaye, Raymond Symanski, Kiran Tamvada, Bret Busse,
Kevin Anderson
RFI 00679 From Kiet Vo
To Dean Schuerman
CC Frans Labranche, Morris Wallace, Cedric Johnson, Cindy Shields, David Daileda, Sara Delahoussaye, Kiet Vo, Cinda Denoux, Daniel Taylor, Jason Levy, Raymond Symanski, Scott Rydin
Project North Terminal Project - NOLA (MSY) Construction Subject Volume 3.1/NT SC 1221A/Concourse B & C /Lower Roof - Special Joist to Beam Connection Required
Subject: Volume 3.1/NT SC 1221A/Concourse B & C /Lower Roof - Special Joist to Beam Connection Required Date Required: 2016-07-25 Cost Impact: Potentially Cost Amount: Question: At the concourse low roof the 'kinked' W30x90 beams and the 'skew' W24x55 beams highlighted on the attached plan are set at
underside of roof deck level. Note that the W30x90 beam has moment connection at each end so needs to be set at this underside of roof deck level. MBJ connection details are also based on these beam elevations. The incoming joists will need a special seating bracket added to the support beams to allow for the joist to bear on the seat and field weld. Please provide suitable details. Note that revising any beam levels in this roof area will create additional detailing rework hence it is preferred that a special detail is developed for the connection of the roof joists.
Suggestion: Answer: NOTE: An RFI response cannot change the requirements of the Contract Documents. Response By: Kiran Tamvada Date: 07/25/2016 CCAT Response: See attached WPM-DSI-0031 for the special detail requested at these joist locations.
Cost Impact: None Pursuant to paragraph 4.2.14 of the General Conditions of the Contract, the Engineer of Record provides the following response to the referenced RFI. This RFI response does not constitute a Construction Change Directive, and does not authorize changes in project scope, contract price or time. Refer also to Article 7 of the General Conditions and for AIP work to Article 50-16 of the FAA General Provisions. RFI’s are to be returned for reconsideration if there is a cost or schedule impact.
R E Q U E S T F O R I N T E R P R E T A T I O N
AA BB
AA
AA
S
STEEL JOIST LL3x3x1/4 FOR S<= 4'-0"L5x3x1/4 (LLV) FOR4'-0" < S <= 6'-6"
L3x3x1/4 FOR L<= 4'-0"L5x3x1/4 (LLV) FOR4'-0" < L <= 6'-6"
PLAN
CL PANELPOINT
A
NOTE 2
STEEL ANGLES
SECTION A-A
PROVIDE BRACES WHERE "A"DIMENSION EXCEEDS 3",REFER TO DETAIL TITLED"TYPICAL STIFFENING OF JOISTFOR CONCENTRATED LOADS"
NOTES:1. REFER TO ENGINEER FOR OPENINGS LARGERTHAN 6'-6".2. THE OPENINGS IN THE STEEL DECK ARE NOT TOBE CUT AND REMOVED UNTIL THE OPENING ISNEEDED.
SECTION B-B
STEEL JOIST TOP CHORD
CUT AND CHIP VERTICAL LEG OFANGLE TO CLEAR TOP CHORD OFSTEEL JOIST
3/16
3/161/2" MAXIMUM
BOTTOM OF DECK
REFER TO PLAN
AND ASSOCIATES, INC.© COPYRIGHT WALTER P. MOORE
2010
05200-RF-SJST-06
SECTION B
STEEL JOIST TOP CHORD
L4x4x3/8 CUT AND CHIP VERTICAL LEG OFANGLE TO CLEAR TOP CHORD OF STEEL JOIST.ATTACH TO TOP CHORD OF STEEL JOIST ATPANEL POINTS
3/16
1/2" MAXIMUM
CL OF BEAM AND COLUMN
PANEL POINT
STEEL BEAM
STEEL COLUMN
CAP PLATE
3/8" STIFFENER PLATES
3/16TYPICAL
BRACE L2 1/2x2 1/2x1/4
PROVIDE BOLTEDCONNECTION ASREQUIRED STEEL COLUMN
CAP PLATE, AS REQUIRED(1/2" MINIMUM)
STIFFENEREACH SIDE OFBEAM
STEELJOIST
BRACE
CL OF COLUMN CL OF BEAM CONNECTION
NOTE 3
ELEVATION
REFER TO ARCHITECTURAL DRAWINGSAND GENERAL NOTES FOR ROOFCONSTRUCTION
STEEL ROOF DECKREFER TO PLAN
SECTION A
SECTION C
3/4"
MA
XIM
UM2" MINIMUM
SECTION C
SECTION B
3/16
3 SIDES,TYPICAL
BOTTOM OF DECK
REFER TO PLAN
NOTES:1. INSTALL ALL BRACES BEFORE STEEL DECK IS INSTALLED.2. REFER TO TYPICAL DETAILS FOR BRACE CONNECTIONS TO STEEL JOISTS.3. STEEL JOISTS BRIDGING AS REQUIRED BY STEEL JOIST INSTITUTE SPECIFICATIONS AND AS SHOWN ON PLAN.4. STEEL JOISTS BEARING DEPTH SHALL BE BASED ON STEEL JOIST INSTITUTE REQUIREMENTS.
PROVIDE BOLTEDCONNECTION, ASREQUIRED
WEB CONNECTION
PROVIDE WELDS,AS REQUIRED
AND ASSOCIATES, INC.© COPYRIGHT WALTER P. MOORE
2012
05200-RF-SJST-X15
NO
TE
4
0
6" MAXIMUMFROM JOISTTO BRACE
NOTES:1. REFER TO PLAN OR DETAILS FOR BEAMS
REQUIRING COLLECTORS.2. WT 2.5x8 FOR K SERIES JOIST WT 5x7.5 FOR LH
AND DLH JOIST. ADJUST AS NECESSARY FOROTHER JOIST SEAT DEPTHS.
3. ROTATE WT AS REQUIRED TO MATCH DECKCROSS SLOPE.
4. AT CONTRACTORS OPTION, PROVIDE BUILT UPPLATE SECTION IN LEIU OF WT. SECTION A-A
WT DECK SUPPORTWELD STEEL DECK TO WT, REFER TO GENERALNOTES FOR ATTACHMENT
3/16 3-12
3/16 3-12
2" CLEAR
NOTE 2ELEVATION
REFER TO PLAN
TOP OF ROOF DECK
AND ASSOCIATES, INC.© COPYRIGHT WALTER P. MOORE
2010
05200-FL-SJST-18
CONT LIGHT GAGE CLOSURE/RIDGE PLATEREF 9/SG 5231
NOTES:1. ATTACHMENT PATTERN AND FASTENERS SHALL BE PER GENERAL NOTES.2. RIDGE PLATE DECK ATTACHMENT TO DEVELOP FULL DIAPHRAGM STRENGTH OF DECK GAGE PER PLAN WITH A 5'-0" MAXIMUM SPAN.3. RIDGE PLATE GAGE SHALL BE NO LESS THAN THE DECK GAGE OF THE DECK BEING SPLICED.
AND ASSOCIATES, INC.© COPYRIGHT WALTER P. MOORE
2012
05200-RF-SJST-13
ROOF GIRDER
SLOPED JOISTSEAT
FASTENER CENTER TOCENTER DISTANCE NOT TOEXCEED RIB SPACING
CONTINUOUS LIGHTGAGE RIDGE PLATE
0
AND ASSOCIATES, INC.© COPYRIGHT WALTER P. MOORE
2011
05300-RF-STLDK-01
DETAIL A
CL BEAM OR GIRDER
REFERENCEELEVATION
USE FLAT BAR TOACHIEVE SLOPE
0
1/2"1/2"
000
1/2"1/2"
DETAIL A DETAIL AALTERNATE
1/8" BENT PLATECONTINUOUS
STEEL DECK
WELD STEEL DECK TOPLATE
1/8 1 1/2-12 1/8 1 1/2-12
NOTE: THIS DETAIL APPLIES WHEN THE DECK SLOPE EXCEEDS 5% .
BOT OF DECK
JOIST SEAT
1/2" SEAT PLATE TOACCOMMODATE THEJOIST SEAT
3/8" STIFFENERWITH 1/4" FILLETALL 3-SIDES NS & FS
DSI-0031
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2014
PROJECT NO.
BY
A
B
C
D
1
A
B
C
D
2 3 4 5
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
1 2 3 4 5
CONFORMED SET 02-08-2016
7/2
5/2
016
12
:43:5
3 P
M
PROJECT ADDRESSKENNER, LOUISANA ZIP
CITY OF NEW ORLEANS
STEEL ROOF FRAMING TYPICALDETAILS
NT SG 5231
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT
051-10250-000
02-08-2016
BB
RCW
GT
BH
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
ISSUED FOR CONSTRUCTION
S01-12002-04
VOLUME 3.1
1" = 1'-0"2
TYPICAL ROOF OPENINGFOR JOIST CONSTRUCTION
NO SCALE4EXAMPLE CANTILEVERED BEAM WITH JOIST AT WIDE FLANGE COLUMN
NO SCALE8
TYPICAL DECK SUPPORT DETAILAT DECK DIRECTION TRANSITION
NO SCALE9
TYPICAL DECK RIDGE PLATE DETAILINTERIOR STEEL BEAM
NO SCALE7
TYPICAL SLOPING STEEL DECK SUPPORTON BEAM WITH VERTICAL WEB
Signature: Date:
NO. DESCRIPTION DATE
C ADDENDUM 3 07-24-2015
WPM-DSI-0031 07-25-2016
NO SCALE10
JOIST FRAMING AT KINKED BEAMAT CONCOURSES
WPMDSI0031DSI0031 07252016