TRANSMITTAL COVER
Date : 06/29/2016
To: Company: HGBM Person: Document Control
Submitted on Behalf of: NOAB
Document Title: OSI - MCA-DSl-0005
Number of Copies: One (1) Electronic
Document Attached: Transmittal and 20 pages
Action:
Transmittal#: 03753-006-01
From: Company: PB Person: Jim Stievater
Delivered Via: Email
a No Cost/Time lmP.act. ~roceed with the work indic~ted. Advise .withi~ 24± ours if there is any Cost or Time Impact. ~L . Cl'"\ \A....rA..~ du,~~ ·~~~ ~ c..,,f ~
D Cost Decrease. ~ ; ~ e work. Submit credit\roposal for Revie . 1.-.i "'1 t ~ .. ~ , -I -I~ J:.:..... D Cost Increase. Proceed with the work on a T&M Basis. Cost to be submitted when work is complete. ..Ju-D Cost Increase. Proceed with the work. Submit a proposal for review. D Cost Increase. Do not proceed with work. Submit proposal. D VE/Conformed Documents Implementation
Comments: Attachment -NT EG 4001, NT EG 4002, NT EG 4005, NT EG 4006, NT EG 6010, NT EG 6012, NT EG 6013, NT EG 6015, NT EG 6016, NT EG 6017, NT EG 6019, NT EG 6019, NT EG 2111A, NT EG 2112A, NT ET 2112C, NT ET 2 48, NT ET 2114C, NT ET 2114D, NT ET 2115C, UP E 6000
CC: File PB-Chris Spann Document Control @HGBM-JV.com [email protected]
Date
Attachments: Partial sheets:
None
Reissued full sheets: NNTT EEGG 44000011,, NNTT EEGG 44000022 NNTT EEGG 44000055,, NNTT EEGG 44000066,, NNTT EEGG 66001100,, NNTT EEGG 66001122,, NNTT EEGG 66001133,, NNTT EEGG 66001155,, NNTT EEGG 66001166,, NNTT EEGG 66001177,, NNTT EEGG 66001199,, NNTT EEGG 22111122AA,, NNTT EEGG 22111122CC,, UUPP EE 66000000
Sheets in mark-up form: NNTT EETT 22111111AA,, NNTT EETT 22111144BB,, NNTT EETT 22111144CC,, NNTT EETT 22111144DD,, NNTT EETT 22111155CC
By: Raul Valdes, P.E.
DESIGNER SUPPLEMENTAL INSTRUCTIONS DSI NO. MCA-DSI-0005
DDAATTEE:: 0066//2299//22001166
PPRROOJJEECCTT NNAAMMEE:: NNOOAABB PPrroojjeecctt ## 88991100--0011223333
LLoouuiiss AArrmmssttrroonngg NNeeww OOrrlleeaannss IInntteerrnnaattiioonnaall AAiirrppoorrtt NNoorrtthh TTeerrmmiinnaall DDeevveellooppmmeenntt PPrrooggrraamm PPhhaassee 11
Note: if the following information is deemed to have an impact on GMP Price or time, submit a proposal for Owner approval before proceeding with this DSI. If approved by Owner, the resulting contract change will be incorporated in the next formal Change Order.
CChhaannggeess mmaaddee ttoo eelleeccttrriiccaall ddrraawwiinnggss ttoo rreefflleecctt rreeqquueesstteedd ccoooorrddiinnaattiioonn ooff uunnddeerrggrroouunndd eelleeccttrriiccaall wwiitthh ootthheerr ttrraaddeess aanndd rreevvaalluuaattiioonn ooff eeqquuiippmmeenntt ssiizzeess,, eettcc.. aass aa rreessppoonnssee ttoo cchhaannggee oorrddeerr rreeqquueesstt.. RReevviisseedd ddrraawwiinnggss ffoorr aarreeaa ooff ssuubbssttaattiioonn TTWW ttoo ffoollllooww.. CCoosstt iimmppaacctt:: SShhoouulldd bbee aa rreedduuccttiioonn ttoo cchhaannggee oorrddeerr..
FE
FE
FE-E
LPT1N3LPT1N1 LPT1N2
HPT1N1
HPT1N2LT-T1N
LTG. T2
HPT1N3
ELEC
1070
EMERGENCY LIGHTINGINVERTER EHT1A (3KVA)
1
HS-T1N
LS-T1N
3
G40
G40
AB
G40.1
LT-T1W-A
ELEC
1370
HPT1W3
HPT1W2
HPT1W1
HS-T1W-A
HS-T1W-B
LT-T1W-BLS-T1W-B
LPT1W1LPT1W2LPT1W3LPT1W4
EMERGENCY LIGHTINGINVERTER EHT1B(1)(8 KVA)
1
EMERGENCY LIGHTINGINVERTER EHT1B(2)(5 KVA)
1
EMERGENCY LIGHTINGINVERTER EHT1B(3)(5 KVA)
1
AB.9
HPT1W4
PLAN NOTES1 EMERGENCY LIGHTING INVERTER SHALL
HAVE KVA RATING AS INDICATED, 277V INPUT,277V OUTPUT, TWO (2) 20A. 1 POLE OUTPUTCIRCUIT BREAKERS, 90 MINUTE BATTERYBACKUP TIME AND NORMALLY ON OUTPUTBUS. PROVIDE (4) 20A/1P CIRCUIT BREAKER INEACH LIGHTING INVERTER.
CONTRACTOR SHALL PROVIDE A SCALEDDRAWING OF EACH ELECTRICAL/COMPUTERROOM SHOWING ALL EXACT EQUIPMENTBEING SUBMITTED FOR THE PROJECT.DRAWING TO BE DIMENSIONED WITH PROPERCLEARANCES IDENTIFIED.
REFER TO SITE LIGHTING DRAWINGS FORFURTHER SPECIFICATION OF PANEL.
2
3
HPT3E2
HPT3E1
LT-T3E
HPT3E3
LS-T3E
LPT3E1
LPT3E2
ELEC
3074
HS-T3E
2'
SCALE : 1/4" = 1'-0"
0 4' 8'
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2015
PROJECT NO.
BY
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
VOLUME 3.3.2
NO. DESCRIPTION DATE
ISSUED FOR CONSTRUCTION
02-08-2016
CONFORMED SET 02-08-2016
6/2
8/2
016
3:2
2:3
9 P
M
CITY OF NEW ORLEANS
ENLARGED ELECTRICAL ROOMPLANS - TERMINAL
NT EG 4001
051-10250-000
SCC
SKA
HLB
T
SCALE: 1/4" = 1'-0"EG 4001
1 ELECTRICAL ROOM 1070
SCALE: 1/4" = 1'-0"EG 4001
2 ELECTRICAL ROOM 1370
EMERGENCY LIGHTINGINVERTER EHT3C(1)(5KVA)
EMERGENCY LIGHTINGINVERTER EHT3C(2)(3KVA)
EMERGENCY LIGHTINGINVERTER EHT3C(3)(5KVA)
1
D Addendum 4 07/30/2015
L.4 Addendum 11.4 12-18-2015
M.1 Addendum 12.1 02-01-2016
DSI-0005
DSI-0005
DSI-0005
DSI-0005 MCA-DSI-0005 06-28-2016
SCALE: 1/4" = 1'-0"EG 4001
3 ELECTRICAL ROOM 3074
1
1
FE
FE
C
HPT3W1 HPT3W3
LPT3W1LPT3W2
LPT3W3
TL-T3W
HS-T3W HPT3W4
LS-T3W
ELEC
3070
HS-LRSB-T3W1HPT3N2
HPT3N1
LPT3N2LPT3N1
HS-T3N
LPT3N3 PANEL LS-T3N
LT-T3N
PLAN NOTES1 EMERGENCY LIGHTING INVERTER SHALL HAVE
KVA RATING AS INDICATED, 277V INPUT, 277VOUTPUT, TWO (2) 20A. 1 POLE OUTPUT CIRCUITBREAKERS, 90 MINUTE BATTERY BACKUP TIMEAND NORMALLY ON OUTPUT BUS.
CONTRACTOR SHALL PROVIDE A SCALEDDRAWING OF EACH ELECTRICAL/COMPUTERROOM SHOWING ALL EXACT EQUIPMENT BEINGSUBMITTED FOR THE PROJECT. DRAWING TOBE DIMENSIONED WITH PROPER CLEARANCESIDENTIFIED.
2
2'
SCALE : 1/4" = 1'-0"
0 4' 8'
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2015
PROJECT NO.
BY
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
VOLUME 3.3.2
NO. DESCRIPTION DATE
ISSUED FOR CONSTRUCTION
02-08-2016
CONFORMED SET 02-08-2016
6/2
8/2
016
2:4
3:3
5 P
M
CITY OF NEW ORLEANS
ENLARGED ELECTRICAL ROOMPLANS - TERMINAL
NT EG 4002
051-10250-000
SCC
AMG
SCC
SCALE: 1/4" = 1'-0"EG 4002
1 ELECTRICAL ROOM 3070
SCALE: 1/4" = 1'-0"EG 4002
2 ELECTRICAL ROOM 3071
EMERGENCY LIGHTINGINVERTER EHT3A (3KVA)
1
D Addendum 4 07/30/2015
L.4 Addendum 11.4 12-18-2015
1
M.1 Addendum 12.1 02-01-2016
DSI-0005
DSI-0005 MCA-DSI-0005 06-28-2016
DSI-0005
DSI-0005
EMER LTG INV.
FE
J
J
FE
J
J
J
J
J
FE
JJ
FE
J J
FE
C
FE
J
J
FE
J
J3
(TYP FOR 6)
IG IG
IG
IG
IG
4
2,4,6: LC1090
7,9,11: LC1090
5: LC1090
IG
IG
IG
IG
5: LC1090
5: LC1090
16: LC1090
16: LC1090
5: LC1090
5: LC10905: LC1090
IG
IG
16: LC1090
16: LC1090
16: LC1090
16: LC1090
16: LC1090
LC1090
JJ DA.1
1
5
(TYP FOR 3)
IG
IG
IG
IG
11: LC1390
8: LC1390
9: LC1390
7: LC1390
6: LC1390
10: LC1390IG
IG
2: LC1390
5: LC1390
12,14,16: LC1390
13,15,17: LC1390
3
4
4
4: LC1390
20: LC1390
18: LC1390
(TYP FOR 3)
LC1390
IG
IG
7: LC1390
7: LC1390
IG
IG
LPT1W5
U6.1
PLAN NOTES
1 PROVIDE NEMA L5-30R-IG ISOLATED GROUNDRECEPTACLE MOUNTED IN SERVICE BOXABOVE TELE/COMM RACK.
PROVIDE TWO (2) 5-20R-IG ISOLATED GROUNDRECEPTACLES UNDER COMMON COVERPLATE.
PROVIDE NEMA L5-20R-IG ISOLATED GROUNDRECEPTACLE MOUNTED IN SERVICE BOXABOVE TELE/COMM RACK.
PROVIDE HARDWIRED CONNECTION TO RACKMOUNTED 6KVA UPS. COORDINATE EXACTLOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.
PROVIDE 120V POWER CONNECTION TO FIREALARM SYSTEM PANEL. COORDINATE EXACTLOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.
CONTRACTOR SHALL PROVIDE A SCALEDDRAWING OF EACH ELECTRICAL/COMPUTERROOM SHOWING ALL EXACT EQUIPMENT BEINGSUBMITTED FOR THE PROJECT. DRAWING TOBE DIMENSIONED WITH PROPER CLEARANCESIDENTIFIED.
2
3
4
5
6
1
IG
2
(TYP)IG
IG
(TYP FOR 2)
2: LC13918: LPT1W6
1: LPT1W6
1: LC1391
IG
IG
IG
4: LC1391
3: LC1391
3
LC1391LPT1W7 LPT1W6
A58
IG
IG
IG IG IG
IG
IG
IG
IG
IG2: LC1491 6: LC1491
IG
5,7,9: LC14918,10,12: LC1491
11: LC1491
14: LC1491
16: LC1491
13: LC1491 18: LC149115: LC1491
3
2
(TYP FOR 9)
(TYP)
44
1LC1491
3: LC1491
14: LC149114: LC1491
6: LC1491
6: LC1491
IG
IG
3: LC1491
3: LC1491
IG
IG
2: LC1491
2: LC1491
IG
IG
COMM
1491
IG
2
(TYP)IG
IG
IG
IG
IGIGIG
IG
1
(TYP FOR 3)
8,10,12: LC1091
13,15,17: LC1091
1: LC1091
5: LC1091
4: LC1091
6: LC1091
2: LC1091
3: LC1091
11: LC1091
7: LC1091
9: LC1091
3
4
LC1091
11: LC109111: LC1091
2
(TYP)
IG
IG
IG
IG
IG
IGIGIG
3
IG
IG
IG
10: LC1092
8: LC1092
6: LC1092
9,11,13: LC1092
12,14,16: LC1092
2: LC1092
4: LC1092
7: LC1092
5: LC10925: LC10925: LC1092
3: LC1092
1: LC1092
4
LC1092
4: LC1092
4: LC1092
IGIG
IG
2'
SCALE : 1/4" = 1'-0"
0 4' 8'
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2015
PROJECT NO.
BY
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
VOLUME 3.3.2
NO. DESCRIPTION DATE
D Addendum 4 07-30-2015
E Addendum 5 08-07-2015
C Addendum 3 07-23-2015
CONFORMED SET 02-08-2016
6/2
8/2
016
3:2
4:3
3 P
M
CITY OF NEW ORLEANS
ENLARGED COMMUNICATIONROOM PLANS - TERMINAL
051-10250-00002-08-2016
SCC
SKA
HLB
ISSUED FOR CONSTRUCTION
NT EG 4005
SCALE: 1/4" = 1'-0"EG 4005
1 COMMUNICATION ROOM 1090
SCALE: 1/4" = 1'-0"EG 4005
4 COMMUNICATION ROOM 1390SCALE: 1/4" = 1'-0"EG 4005
5 COMMUNICATION ROOM 1391SCALE: 1/4" = 1'-0"EG 4005
6 COMMUNICATION ROOM 1491
SCALE: 1/4" = 1'-0"EG 4005
2 COMMUNICATION ROOM 1091SCALE: 1/4" = 1'-0"EG 4005
3 COMMUNICATION ROOM 1092
M.1 Addendum 12.1 02-01-2016
DSI-0005
DSI-0005 MCA-DSI-0005 06-28-2016
FE
J J J J J J
FE M
FE
J
J
FE
FE
J J J J
J
3
2IG
(TYP FOR 3)
(TYP)
IG IG IG
5
(TYP)
13,15,17: LC2090-2 8,10,12: LC2090-27,9,11: LC2090-22,4,6: LC2090-21,3,5: LC2090-2
1: LC2090-1IG IG IG
1
(TYP FOR 15)
<unnamed>: <unnamed>: <unnamed>: <unnamed>:
IG
IG
IG
IG IG
4
(TYP FOR 7)
LPT2W1
LC2090-2 LC2090-2
TL-T2W
LC2090-1
IGIG IGIG
IGIG
IG3: LC2090-1 4: LC2090-1
5: LC2090-1
6: LC2090-1
7: LC2090-1 8: LC2090-1 10: LC2090-19: LC2090-1
IG
IGIG
IGIG
IG
IG
IG
IG
IG
11: LC2090-1 12: LC2090-1
?
13: LC2090-1 14: LC2090-115: LC2090-1
UB
HPT2W1
1
2
NOTE :EQUIPMENT IN THIS ROOM TO BESERVED BY PANEL'LC2090' IN ROOM 2090
(TYP)
IG
IG
(TYP FOR 9)
IG
17: LC2090-1 16: LC2090-1 19: LC2090-1
IG IG
IG
25: LC2090-1
20: LC2090-1
21: LC2090-1 18: LC2090-1
23: LC2090-1
IG
IG
2
(TYP )
IG
IG
IG
IG
IG
5
(TYP )
4
3
7: LC2092
8: LC2092
12: LC2092
10: LC2092
11: LC2092
13,15,17: LC2092
9: LC2092
4: LC2092
IGIGIG
IG
IG
IGIG
HPT2E1
LPT2E1
TL-T2E
LC2092
4: LC2092
4: LC2092
2: LC2092
2: LC2092
2: LC2092
IG
IG
3: LC2092
5: LC2092
14,16,18: LC2092
COMM
2092
LPT2E3
LPT2E2
FIRE ALARM PANELS ANDRELEASING DEVICES
?
?
?
PANEL LS-T2E
2IG
(TYP)
IG
IG
3: LC2093
5: LC2093
1: LC2093
LC2093
LPT2E4
4: LC2093
IG
IG
2: LC2093
TSA COMM
2093
PLAN NOTES1 PROVIDE NEMA L5-30R-IG ISOLATED GROUND
RECEPTACLE MOUNTED IN SURFACE BOXABOVE TELE/COMM RACK.
PROVIDE TWO (2) 5-20R-IG ISOLATED GROUNDRECEPTACLES UNDER COMMON COVERPLATE.
PROVIDE NEMA L5-20R-IG ISOLATED GROUNDRECEPTACLE MOUNTED IN SURFACE BOXABOVE TELE/COMM RACK.
PROVIDE HARDWIRED CONNECTION TO RACKMOUNTED 6KVA UPS. COORDINATE EXACTLOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.
PROVIDE 120V POWER CONNECTION TO FIREALARM SYSTEM PANEL. COORDINATE EXACTLOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.
CONTRACTOR SHALL PROVIDE A SCALEDDRAWING OF EACH ELECTRICAL/COMPUTERROOM SHOWING ALL EXACT EQUIPMENT BEINGSUBMITTED FOR THE PROJECT. DRAWING TO BEDIMENSIONED WITH PROPER CLEARANCESIDENTIFIED.
2
3
4
5
6
A60 E16G61.1
EB.9
1
(TYP FOR 5)
5IG
(TYP)
IG
IG
IGIG IG IG
11: LC1492 6: LC1492 9: LC1492 4: LC1492
27: LC1492IG IG IG IG IG IG IG17: LC1492 8: LC1492
2: LC1492 5: LC1492 3: LC1492 1: LC1492
(TYP FOR 2)
3
4
12: LC1492 10: LC1492
15: LC1492 13: LC1492 18: LC1492 16: LC1492 14: LC1492
19,21,23: LC1492
LC1492
25: LC14927: LC1492
22: LC1492
IG
IG
COMM SERVICE
ENTRANCE
WY
AB.9
2'
SCALE : 1/4" = 1'-0"
0 4' 8'
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2015
PROJECT NO.
BY
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
VOLUME 3.3.2
NO. DESCRIPTION DATE
CONFORMED SET 02-08-2016
6/2
8/2
016
3:2
7:2
0 P
M
CITY OF NEW ORLEANS
ENLARGED COMMUNICATIONROOM PLANS - TERMINAL
051-10250-00002-08-2016
SCC
SKA
AJS
ISSUED FOR CONSTRUCTION
NT EG 4006
SCALE: 1/4" = 1'-0"EG 4006
2 COMMUNICATION ROOM 2090
SCALE: 1/4" = 1'-0"EG 4006
3 COMMUNICATION ROOM 2091SCALE: 1/4" = 1'-0"EG 4006
4 COMMUNICATION ROOM 2092SCALE: 1/4" = 1'-0"EG 4006
5 LEVEL 2 TSA IT SERVER 2093
SCALE: 1/4" = 1'-0"EG 4006
1 COMMUNICATION ROOM 1492
M.1 Addendum 12.1 02-01-2016
DSI-0005
DSI-0005 MCA-DSI-0005 06-28-2016
A1 BUS TW-A BUS TW-BA2A3A4
XFMR "TH-TW-A"2500 / 2800 / 3125 / 3500 KVA13,800 - 480Y / 277V55°/ 65°/ 55° / 65°KNAN / KNAN / KNAF / KNAF5.75% Z
FED FROM UTILITY PLANT15KV MAIN SWGRBREAKER FB-3A
FED FROM UTILITY PLANT15KV MAIN SWGRBREAKER FB-3B
B1 B2 B3 B4
XFMR "TH-TW-B"2500 / 2800 / 3125 / 3500 KVA13,800 - 480Y / 277V55°/ 65°/ 55° / 65°KNAN / KNAN / KNAF / KNAF5.75% Z
HS-T1W-A HS-T1W-B SPARE 2000AHS-T3WEQUIPPEDSPACE
EQUIPPEDSPACE
LS-T2W
HS-T1N
XFMR225 KVA480V TO120/208V
TW-TIE2500ALSIG
LSIG800AF800AT
TW-A2
LSIG1200AF1200AT
TW-A3
4200A, 480Y/277V, 3PH, 4W, 60HZ, 100KA (SYM)
LSIG
TW-A4
400AF650AT
SPD
ELECTRICAL SUBSTATION "TW"
480VDIST
SWBD
480VDIST
SWBD
SPD
TW-B4
LSIG1200AF1200AT
TW-B3TW-B2TW-B1
480VDIST
SWBD
LSIG
TW-MA
4000AF3500AT
LSIG
TW-MB
4000AF3500AT
TW-A1
LSIG1200AF1200AT
480VDIST
SWBD
208VDIST
SWBD
56565556P6
S6
2/0(G)
2-3"CSTUBBED
UP ATROOM1370
2-3"CSTUBBED
UP ATROOM1370
2-3"CSTUBBED
UP ATROOM1370
K
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2015
PROJECT NO.
BY
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
VOLUME 3.3.2
NO. DESCRIPTION DATE
CONFORMED SET 02-08-2016
6/2
8/2
016
3:4
4:2
5 P
M
CITY OF NEW ORLEANS
TERMINAL ONE LINE -ELECTRICAL SUBSTATION "TW"
051-10250-00002-08-2016
SCC
SKA
SCC
ISSUED FOR CONSTRUCTION
NT EG 6010
E Addendum 4 07-31-2015
M Addendum 12 01-14-2016
DSI-0005 MCA-DSI-0005 06-28-2016
DSI-0005
DSI-0005
DSI-0005
DSI-0005
DSI-0005DSI-0005
TO SUB-TWSWGR
BKR TW-A3 480Y / 277 VOLT SWITCHBOARD"HS-T1W-A"
1 2 3 4 5 6 7 8
HPT1W1
LS-T1W-A
HPT1W2 HPT2W1 PDP-3BAGGAGE
HANDLING
SYSTEM
SEE
VOLUME
3.4.1
TO SUB-TWSWGR
BKR TW-B3 480Y / 277 VOLT SWITCHBOARD"HS-T1W-B"
1 2 3 4 5 6 7 8
HPT1W4
LS-T1W-B
HPT1W3 PDP-4BAGGAGE
HANDLING
SYSTEM
SEE
VOLUME
3.4.1
PDP-5BAGGAGE
HANDLING
SYSTEM
SEE
VOLUME
3.4.1
125 AT125 AF
MLO
1200A, 480Y/277V, 3PH, 4W, 60HZ, 65KAIC
DISTSWBD
200 AT250 AF
250 AT250 AF
350 AT400 AF
300 AT400 AF
MLO
1200A, 480Y/277V, 3PH, 4W, 60HZ, 65KAIC
DISTSWBD
300 AT400 AF
200 AT250 AF
350 AT400 AF
200 AT250 AF
500 AT800 AF
PANELBOARD
PANELBOARD
PANELBOARD
PANELBOARD
PANELBOARD
43 46 48 46 P6
S6
SPACE SPACE SPACE250 AF 125 AF 125 AF
49 49 46 52 P6
S6
SPACE SPACE SPACE125 AF 250 AF 125 AF
2/0(G)
3" WITH PULLSTRING TO
COMM ROOM2090
3" WITH PULLSTRING TO
COMM ROOM2090
2/0(G)
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2015
PROJECT NO.
BY
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
VOLUME 3.3.2
NO. DESCRIPTION DATE
C Addendum 3 07-24-2015
CONFORMED SET 02-08-2016
6/2
8/2
016
3:4
9:4
1 P
M
CITY OF NEW ORLEANS
TERMINAL ONE-LINE DIAGRAM
051-10250-00002-08-2016
SCC
SKA
SCC
ISSUED FOR CONSTRUCTION
NT EG 6012
M Addendum 12 01-14-2016
DSI-0005 MCA-DSI-0005 06-28-2016
DSI-0005
DSI-0005
DSI-0005
DSI-0005
TO SUB-TWSWGR
BKR TW-B1 480Y / 277 VOLT SWITCHBOARD"HS-T3W"
1 2 3 4 5 6 7
HPT3W1
LS-T3W
HPT3W3 HPT3W4 HS-LSRB-TW
8 9
200 AT250 AF
MLO
1000A, 480Y/277V, 3PH, 4W, 60HZ, 65KAIC
DISTSWBD
200 AT250 AF
350 AT400 AF
800 AT800 AF
PANEL
BOARD
PANEL
BOARD
500 AT800 AF
PANEL
BOARD
46 54 P6
S6
SPACE400 AF
PANEL
BOARD
100 AT200 AF
52 43
SPACE250 AF
SPACE250 AF
2/0(G)
PLAN NOTES1 PROVIDE CIRCUIT BREAKERS WITH
ELECTRONIC TRIP CONTROLS FOR LOADSHED.
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2015
PROJECT NO.
BY
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
VOLUME 3.3.2
NO. DESCRIPTION DATE
C Addendum 3 07-24-2015
CONFORMED SET 02-08-2016
6/2
8/2
016
3:5
0:2
8 P
M
CITY OF NEW ORLEANS
TERMINAL ONE-LINE DIAGRAM
051-10250-00002-08-2016
SCC
SKA
SCC
ISSUED FOR CONSTRUCTION
NT EG 6013
M Addendum 12 01-14-2016
1 1 1 1 1 1
DSI-0005 MCA-DSI-0005 06-28-2016
DSI-0005
DSI-0005
DSI-0005
TO 480VSWBD.HS-T1N
208Y / 120 VOLT SWITCHBOARD"LS-T1N"
1 2 3 4 5 6
LPT1N1
XFMR "TL-T1N"225 KVA DRY TYPE480 - 208Y/120V
LC1090LPT1N2 LPT1N3
7 8 9
800A, 208Y / 277V, 3PH, 4W, 60HZ, 22KAIC
800 AT800 AF
PANEL
BOARD
125 AT125 AF
250 AT250 AF
125 AT125 AF
PANEL
BOARD
PANEL
BOARD
PANEL
BOARD
43 43 48 43
125 AT125 AF 200 AF
FUTUREBANKBUILD-
OUT
SPACE200 AF
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2015
PROJECT NO.
BY
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
VOLUME 3.3.2
NO. DESCRIPTION DATE
ISSUED FOR CONSTRUCTION
02-08-2016
CONFORMED SET 02-08-2016
6/2
8/2
016
3:5
1:0
5 P
M
CITY OF NEW ORLEANS
TERMINAL ONE-LINE DIAGRAM
NT EG 6015
051-10250-000
SCC
SKA
SCC
C Addendum 3 07-24-2015
L.13 Addendum 11.13 01-21-2016
M Addendum 12 01-14-2016
DSI-0005 MCA-DSI-0005 06-28-2016
DSI-0005
DSI-0005
DSI-0005
DSI-0005
TO 480VSWBD.
HS-T1W-A
208Y / 120 VOLT SWITCHBOARD
"LS-T1W-A"
LOCATED IN TERMINAL ELECTRICAL ROOM 1370
1 2 3 4 5 6
LPT1W1
87
SWITCHBOARD LS-T1W-A (CONTINUED)
XFMR "TL-T1W-A"225 KVA DRY TYPE480 - 208Y/120V
LPT1W2 LPT1W5 LC1390
800A, 208Y / 277V, 3PH, 4W, 60HZ, 22KAIC
800 AT800 AF
SEE BELOW
FOR CONTINUATION
SEE ABOVE
FOR CONTINUATION
PANELBOARD
125 AT125 AF
125 AT125 AF
125 AT125 AF
200 AT250 AF
PANELBOARD
PANELBOARD
PANELBOARD
43 43 43 46
SPARESPARE
SPACE
250 AF
SPACE
250 AF
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2015
PROJECT NO.
BY
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
VOLUME 3.3.2
NO. DESCRIPTION DATE
C Addendum 3 07-24-2015
CONFORMED SET 02-08-2016
6/2
8/2
016
3:5
2:0
0 P
M
CITY OF NEW ORLEANS
TERMINAL ONE-LINE DIAGRAM
051-10250-00002-08-2016
SCC
SKA
SCC
ISSUED FOR CONSTRUCTION
NT EG 6016
DSI-0005 MCA-DSI-0005 06-28-2016
DSI-0005
DSI-0005
DSI-0005
13"C STUBBEDOUT IN COMMROOM 1391
13"C STUBBEDOUT IN COMMROOM 1391
TO 480VSWBD.
HS-T1W-B
208Y / 120 VOLT SWITCHBOARD"LS-T1W-B"
1 2 3 4 5 6
LPT1W6
87
SWITCHBOARD LS-T1W-B (CONTINUED)
XFMR "TL-T1W-B"225 KVA DRY TYPE480 - 208Y/120V
LPT1W9LPT1W7 LPT1W8 LC1091 LC1391
800A, 208Y / 277V, 3PH, 4W, 60HZ, 22KAIC
800 AT800 AF
SEE BELOW
FOR CONTINUATION
SEE ABOVE
FOR CONTINUATION
PANELBOARD
125 AT125 AF
200 AT250 AF
125 AT125 AF
125 AT125 AF
200 AT250 AF
100 AT125 AF
PANELBOARD
PANELBOARD
PANELBOARD
PANELBOARD
PANELBOARD
4643 43 43 46 43
SPACE
250 AF
SPACE
250 AF
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2015
PROJECT NO.
BY
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
VOLUME 3.3.2
NO. DESCRIPTION DATE
C Addendum 3 07-24-2015
CONFORMED SET 02-08-2016
6/2
8/2
016
3:5
2:3
8 P
M
CITY OF NEW ORLEANS
TERMINAL ONE-LINE DIAGRAM
051-10250-00002-08-2016
SCC
SKA
SCC
ISSUED FOR CONSTRUCTION
NT EG 6017
DSI-0005
DSI-0005
DSI-0005
DSI-0005 MCA-DSI-0005 06-28-2016
13"C STUBBEDOUT IN COMMROOM 1091
TO 480VSWBD.HS-T3W
208Y / 120 VOLT SWITCHBOARD"LS-T3W"
1 2 3 4 5 6
9
LPT3W1
87
SWITCHBOARD LS-T3W (CONTINUED)
XFMR "TL-T3W-B"225kVA DRY TYPE480 - 208Y/120V
LC3090LPT3W2 LPT3W3 RETAIL 3017
208Y / 277V, 3PH, 4W, 60HZ, 22KAIC
800 AT1000 AF
SEE BELOW
FOR CONTINUATION
SEE ABOVE
FOR CONTINUATION
PANELBOARD
125 AT125 AF
125 AT125 AF
150 AT250 AF
125 AT125 AF
PANELBOARD
PANELBOARD
PANELBOARD
43 43 44 43
125 AF
125 AF 125 AF250 AF
FUTUREBUILD-
OUT
250 AF
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2015
PROJECT NO.
BY
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
VOLUME 3.3.2
NO. DESCRIPTION DATE
C Addendum 3 07-24-2015
CONFORMED SET 02-08-2016
6/2
8/2
016
3:5
3:4
7 P
M
CITY OF NEW ORLEANS
TERMINAL ONE-LINE DIAGRAM
051-10250-00002-08-2016
SCC
SKA
SCC
ISSUED FOR CONSTRUCTION
NT EG 6019
L.13 Addendum 11.13 01-21-2016
M Addendum 12 01-14-2016
DSI-0005 MCA-DSI-0005 06-28-2016
DSI-0005
DSI-0005
AE
DF
EC
FE
TC
TC
TC
FEC
PF
J
J
J
J
J
J
J
JJ
M
S
S
M
M
M
J
JM
DA
D16
DC
EC
E1
DA.5 DB.5 TG
FA
FB
8
1
9
2
4 3
6
7
(TYP.)
EG 40011
WP
MATCH LINE
SEE ET 2112A
MATCH LINE
SEE ET 2111B
MATCH LINE
SEE ET 2112B
AC
5
1: LPT1N1
2: LPT1N1
25: LPT1N1
10: LPT1N1
1: LPT1N1
5: LPT1N1
5: LPT1N1
1: LPT1N1
7: LPT1N1
10: LPT1N1
10: LPT1N1
10: LPT1N1
24: LPT1N1
24: LPT1N1
12: LPT1N1
4: LPT1N1
IG IG IG11: LPT1N1
11: LPT1N1
22: LPT1N1
23: LPT1N1
26: LPT1N1
26: LPT1N1
AC AC
10: LPT1N1
2: LPT1N1
2: LPT1N1
2: LPT1N1
25: LPT1N1
13: LPT1N1
17: LPT1N1
16: LPT1N1 19: LPT1N1
WP
24: LPT1N1
19: LPT1N1
25: LPT1N1
30: LPT1N1
25: LPT1N1
10
22: LPT1N1
8: LPT1N1
EG 34021
ELEC
1070
MEN
1040
MSY BREAK ROOM
1014
OFFICE
1015
STORAGE
1016
STAIR 10
1059
1070
FCU
T1N-1
TX
1011
CUH
18: LPT1N1
20: LPT1N1
1059
CUH
1040
CAV
1014
VAV
11: LPT1N1
1015
VAV
11
ARRIVAL HALL
1000
VEST
1011
12
5: LPT1N1
8
3: LPT1N1
EWH-11,3,5: HPT1N1HWRP-1
13
14: LPT1N1
PLAN NOTES1 PROVIDE 120 VOLT POWER CONNECTION TO
ELECTRIC HAND DRYER. COORDINATELOCATION WITH INSTALLER PRIOR TO ROUGH-IN.
PROVIDE 120 VOLT POWER CONNECTION TOWATER CLOSET AUTO-FLUSH TRANSFORMER.EXTEND LOW VOLTAGE CIRCUITING FROMTRANSFORMER SECONDARY TO WATER CLOSETSENSORS IN BATHROOM. COORDINATE EXACTLOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.
PROVIDE 120 VOLT POWER CONNECTION TOLAVATORY FAUCET SENSOR TRANSFORMER.EXTEND LOW VOLTAGE CIRCUITING FROMTRANSFORMER SECONDARY TO LAVATORYSENSORS IN BATHROOM. COORDINATE EXACTLOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.
PROVIDE 120 VOLT POWER CONNECTION TOSOAP DISPENSER TRANSFORMER. EXTENDLOW VOLTAGE CIRCUITING FROMTRANSFORMER SECONDARY TO SOAPDISPENSER SENSORS IN BATHROOM.COORDINATE EXACT LOCATION ANDREQUIREMENTS WITH INSTALLER PRIOR TOROUGH-IN.
PROVIDE 120 VOLT POWER CONNECTION TOSANITARY TOILET SEAT COVER TRANSFORMER.EXTEND LOW VOLTAGE CIRCUITING FROMTRANSFORMER SECONDARY TO SANITARYTOILET SEAT COVER SENSORS IN BATHROOM.COORDINATE EXACT LOCATION ANDREQUIREMENTS WITH INSTALLER PRIOR TOROUGH-IN.
PROVIDE 120 VOLT POWER CONNECTION TOURINAL AUTO-FLUSH TRANSFORMER. EXTENDLOW VOLTAGE CIRCUITING FROMTRANSFORMER SECONDARY TO URINALSENSORS IN BATHROOM. COORDINATE EXACTLOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.
FOR FIDS/VP MONITORS, PROVIDE ISOLATEDGROUND CONDUCTOR.
PROVIDE 120 VOLT POWER CONNECTION TOAUTOMATIC DOORS. COORDINATEREQUIREMENTS WITH INSTALLER PRIOR TOROUGH-IN.
PROVIDE 120 VOLT POWER CONNECTION TOLUGGAGE CART SYSTEM. COORDINATE EXACTLOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.
PROVIDE RECEPTACLE IN SOFFIT ABOVELOCKERS FOR TELEVISION.
PROVIDE JUNCTION BOX FOR INSTALLATION BYOTHERS OF 120VAC-24VAC TRANSFORMERSERVING VAV/CAV BOXES LOCATED WITHIN50FT OF JUNCTION BOX.
PROVIDE 30A/3P 480 VOLT MOTOR RATEDSWITCH. CONNECT TO UNIT AS REQUIRED ANDVERIFY EXACT LOCATION PRIOR TOINSTALLATION. USE #10'S THROUGHOUTCIRCUIT.
PROVIDE 30A/3P 480 VOLT NON-FUSEDDISCONNECT SWITCH. CONNECT TO UNIT ASREQUIRED AND VERIFY EXACT LOCATION PRIORTO INSTALLATION. USE #10'S THROUGHOUTCIRCUIT.
2
3
4
5
6
7
8
9
10
11
12
13
REVISED CIRCUITS PER MECHANICAL VE
4'
SCALE : 1/8" = 1'-0"
0 8' 16'
T1A
C1A
T2A
T2C
T4A
T4C
T1B
T2B
T2D
T4B
T4D
T5A
T5C T5D
T3B
T3DT3C
C1B
C2A
C2B
C3A
C3B
C4A
C4B
C5A
C5B
C6A
C6B
NTRUENORTH
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2015
PROJECT NO.
BY
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
NO. DESCRIPTION DATE
ISSUED FOR CONSTRUCTION
02-08-2016
CONFORMED SET 02-08-2016
2/1
5/2
016
4:0
9:0
4 P
M
CITY OF NEW ORLEANS
TERMINAL POWER PLAN LEVEL 1 -AREA 1A
NT ET 2111A
051-10250-000
SCC
SKA
SCC
VOLUME 3.3.2
SCALE: 1/8" = 1'-0"ET 2111A
1 TERMINAL POWER PLAN LEVEL 1 - AREA 1A
C Addendum 3 07-24-2015
D Addendum 4 07-30-2015
L Addendum 11 12-11-2015
L.8 Addendum 11.8 12-23-2015
M Addendum 12 01-14-2016
M.1 Addendum 12.1 02-01-2016
CONFORMED SET 02-01-2016
TC
TC
TC
TC
TC
J
JS
JS
JS
M
M
S
DA
D16
D15
D14
D13
A50
DBEC
1
WP
1
(TYP.)
SHUTTLE SERVICE 1028FUTURE BUILD-OUT
2
MATCH LINE
SEE ET 2111A
MATCH LINE
SEE ET 2111B
MATCH LINE
SEE ET 2112B
MATCH LINE
SEE ET 2112D
MATCH LINE
SEE ET 2112C
MATCH LINE
SEE ET 2112B
WP
3
(TYP.)
IGIGIG
24: LPT1N1
24: LPT1N1
29: LPT1N3
19: LPT1N119: LPT1N1
29: LPT1N3
29: LPT1N3
5: LPT1N2
5: LPT1N2
(TYP.)
1: LPT1N2
1: LPT1N2
23: LPT1N2
23: LPT1N3
18: LPT1N3
18: LPT1N3
18: LPT1N3
18: LPT1N3
30: LPT1N3
30: LPT1N3
VEST
1005
SHUTTLE SERVICE
1028
VEST
1004
GARDEN
1023C
1005
CUH
1004
CUH
30: LPT1N3ARRIVAL HALL
1000
C22 C23
2
3
PROVIDE 120 VOLT POWER CONNECTION TOAUTOMATIC DOORS. COORDINATEREQUIREMENTS WITH INSTALLER PRIOR TOROUGH-IN.
PROVIDE TWO (2) 120 VOLT 20A DEDICATEDCIRCUITS FROM PANEL "LPT1N1" FOR THISSPACE.
FOR FIDS/VP MONITORS PROVIDE ISOLATEDGROUND CONDUCTORS.
1
PLAN NOTES
REVISED CIRCUITS PER MECHANICAL VE
4'
SCALE : 1/8" = 1'-0"
0 8' 16'
T1A
C1A
T2A
T2C
T4A
T4C
T1B
T2B
T2D
T4B
T4D
T5A
T5C T5D
T3B
T3DT3C
C1B
C2A
C2B
C3A
C3B
C4A
C4B
C5A
C5B
C6A
C6B
NTRUENORTH
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2015
PROJECT NO.
BY
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
NO. DESCRIPTION DATE
ISSUED FOR CONSTRUCTION
02-08-2016
CONFORMED SET 02-08-2016
2/1
5/2
016
4:0
9:1
3 P
M
CITY OF NEW ORLEANS
TERMINAL POWER PLAN LEVEL 1 -AREA 2A
NT ET 2112A
051-10250-000
SCC
SKA
SCC
VOLUME 3.3.2
SCALE: 1/8" = 1'-0"ET 2112A
1 TERMINAL POWER PLAN LEVEL 1 - AREA 2A
L Addendum 11
C Addendum 3 07-24-2015
12-11-2015
L.8 Addendum 11.8 12-23-2015
M Addendum 12 01-14-2016
M.1 Addendum 12.1 02-01-2016
AE
D
TC
TC
TC
UP
J
JS
JS
J
FB1
S
FB1
FB1
M
FB1
FB1
FB
1
J
DAD13
D11
D10
D9
A50
A49
DB
DC
EC
D12
TD TETB TC TF
1
1
(TYP.)
CURRENCY EXCHANGE 1025FUTURE BUILD-OUT
2
LIMO SERVICE 1026FUTURE BUILD-OUT
2
3
4
(TYP.)
WP
WP
MATCH LINE
SEE ET 2112D
MATCH LINE
SEE ET 2114B
MATCH LINE
SEE ET 2114A
MATCH LINE
SEE ET 2112B
MATCH LINE
SEE ET 2112A
MATCH LINE
SEE ET 2113B
MATCH LINE
SEE ET 2112D
12: LPT1N2
12: LPT1N2
23: LPT1N1
14: LPT1N2
16: LPT1N2
14: LPT1N2
15: LPT1N2
19: LPT1N2
19: LPT1N2
19: LPT1N2
1: LPT1N2
1: LPT1N2
22: LPT1N2
22: LPT1N2
23: LPT1N2
21: LPT1N2
21: LPT1N2
21: LPT1N2
18: LPT1N2
34: LPT1N2
10: LPT1W110: LPT1W1
21: LPT1N2
10: LPT1W1
GARDEN
1023C
INFO CENTER
1027
VEST
1003
LIMO SERVICE
1026
CURRENCY EXCHANGE
1025
GARDEN
1023A
BAND STAND
1022
BAND STAND CIRC
1023
VEST
1002
1003
CUH
11: LPT1W1
28: LPT1W1
28: LPT1W1
35: LPT1W2
34: LPT1W29: LPT1W1
8: LPT1W1
36: LPT1N2
37: LPT1N2
C22
C23
2
3
4
PROVIDE 120 VOLT POWER CONNECTION TOAUTOMATIC DOORS. COORDINATEREQUIREMENTS WITH INSTALLER PRIOR TOROUGH-IN.
PROVIDE TWO (2) 120 VOLT 20A DEDICATEDCIRCUITS FROM PANEL “LPT1W2" FOR THISSPACE.
PROVIDE 120 VOLT POWER CONNECTION TOLUGGAGE CART SYSTEM. COORDINATEEXACT LOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.
PROVIDE TWO COMPARTMENT FLUSH FLOORBOX WITH DUPLEX RECEPTACLE ON RAISEDPLATFORM. FIELD VERIFY EXACT LOCATIONWITH OWNER’S REPRESENTATIVE PRIOR TOROUGH-IN.
1
PLAN NOTES
REVISED CIRCUITS PER MECHANICAL VE
4'
SCALE : 1/8" = 1'-0"
0 8' 16'
T1A
C1A
T2A
T2C
T4A
T4C
T1B
T2B
T2D
T4B
T4D
T5A
T5C T5D
T3B
T3DT3C
C1B
C2A
C2B
C3A
C3B
C4A
C4B
C5A
C5B
C6A
C6B
NTRUENORTH
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2015
PROJECT NO.
BY
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
NO. DESCRIPTION DATE
ISSUED FOR CONSTRUCTION
02-08-2016
CONFORMED SET 02-08-2016
2/1
5/2
016
4:0
9:2
2 P
M
CITY OF NEW ORLEANS
TERMINAL POWER PLAN LEVEL 1 -AREA 2C
NT ET 2112C
051-10250-000
SCC
SKA
SCC
VOLUME 3.3.2
SCALE: 1/8" = 1'-0"ET 2112C
1 TERMINAL POWER PLAN LEVEL 1 - AREA 2C
L Addendum 11 12-11-2015
L.8 Addendum 11.8 12-23-2015
M Addendum 12 01-14-2016
M.1 Addendum 12.1 02-01-2016
AED
FEC
FEC
FE
TC
TC
TC
TC
TC
TC
J
S
S
S
J
S
JS
J
M
M
S
J J J J J J
M
J
J
J
J
EAA51
A52
A53
A54
EB
EBECE7
E8
E9
E10
T5
CL
T6
EA.1
T4
T3
TJ TL
TM
TN
(TYP.)
5
2
3
MATCH LINE
SEE ET 2112D
FUTUREBUILD-OUT
N.I.C.
FUTUREBUILD-OUT
N.I.C.
FUTUREBUILD-OUT
N.I.C.
MATCH LINE
SEE ET 2112C
MATCH LINE
SEE ET 2114A
MATCH LINE
SEE ET 2115A
MATCH LINE
SEE ET 2114D
MATCH LINE
SEE ET 2114D
MATCH LINE
SEE ET 2114C
MATCH LINE
SEE ET 2112D
1
EG 40053
(TYP.)
4
4
MATCH LINE
SEE ET 2115A
MATCH LINE
SEE ET 2115A
E9
7
(TYP.)
IG
IG
IG
6 6 6
9
(TYP.)
(TYP.)
8 99 8 99 9
FUTUREBUILD-OUT
N.I.C.
25: LPT1E3
25: LPT1E3
25: LPT1E3
28: LPT1E3
15: LPT1E3
14: LPT1E3
21: LPT1E3
27: LPT1E3
18: LC1092
21: LC1092
20: LC1092
22: LPT1E123: LPT1E124: LPT1E125: LPT1E126: LPT1E1
30: LPT1E129: LPT1E132: LPT1E1
29: LPT1E3
29: LPT1E3
22: LPT1E3
22: LPT1E3
32: LPT1E3
32: LPT1E3
22: LPT1E3
22: LPT1E3
26: LPT1E3
18: LC1092
22: LPT1E3
22: LPT1E3
22: LPT1E3
27: LPT1E3
24: LC1092 24: LC1092
22: LC1092
24: LPT1E3
21: LPT1E3
18: LPT1E3
18: LPT1E3
24: LPT1E3
25: LC1092
6: LPT1E3
4: LPT1E3
4: LPT1E3
9: LPT1E3
31: LPT1E3
13: LPT1E3
20: LPT1E3
28: LPT1E3
26: LPT1E3
VEST
1009
CIRCULATION -BAGGAGE CLAIM-2
1021-2
BAGGAGE CART AREA
1058A
STAIR 03
1058
COMM
1092
ELEV T06-T08 CONTROLRM
1094
DELTA BSO
1036
JET BLUE BSO
1035
UNITED BSO
1037
BSO-8
1038
BAGGAGE CLAIM
1020
CIRCULATION -BAGGAGE CLAIM-2
1021-2
ELEV T07
1055
ELEV T08
1056
CIRCULATION -BAGGAGE CLAIM-2
1021-2
7: LPT1W2
1009
CUH
1094
FCU
1021-4
VAV
1021-6
VAV
1021-5
VAV
1092
FCU
22: LC1092
16: LPT1E3
17: LC1092
30: LPT1E3
19: LC1092
15: LC1092
CIRCULATION -
BAGGAGE CLAIM
1021
CIRCULATION -
BAGGAGE CLAIM
1021
10: LPT1E3
11: LPT1E3
1020-2
VAV
1020-3
VAV
10
10
10
C24 C25
11
PLAN NOTES
2
PROVIDE 120V POWER CONNECTION TOAUTOMATIC DOORS. COORDINATEREQUIREMENTS WITH INSTALLER PRIOR TOROUGH-IN.
PROVIDER GFCI RECEPTACLE, AND SWITCH INESCALATOR PIT. LOCATE IN PIT WITHESCALATOR MANUFACTURER/INSTALLER. SEESHRRY ET 1114B FOR TYPE 'L9' LIGHT FIXTURELOCATION.
PROVIDE GFCI RECEPTACLE FOR ESCALATORPIT SUMP PUMP. COORDINATE LOCATION WITHDIVISION 23 AND ESCALATOR SHOPDRAWINGS.
PROVIDE 120V POWER CONNECTION TOLUGGAGE CART SYSTEM. COORDINATE EXACTLOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.
FOR FIDS/VP MONITORS. PROVIDE ISOLATEDGROUND CONDUCTORS.
FOR BIDS MONITORS. PROVIDE ISOLATEDGROUND CONDUCTORS.
PROVIDE GFCI RECEPTACLE, AND SWITCH INELEVATOR PIT. LOCATE IN PIT WITHESCALATOR MANUFACTURER/INSTALLER. SEESHEET ET 1114B TYPE 'L9' LIGHTING FIXTURELOCATION.
MOUNT RECEPTACLE AT 5'-0" AF.F. FORDIGITAL ADVERTISEMENT MONITOR.
PROVIDE 120V POWER CONNECTION TOCONVEYOR SYSTEM SHUTTER DOORS.COORDINATE ROUGH-IN AND CONNECTIONREQUIREMENTS WITH INSTALLER.
PROVIDE JUNCTION BOX FOR INSTALLATIONBY OTHERS OF 120VAC-24VACTRANSFORMERS SERVING VAV/CAV BOXESLOCATED WITHIN 50FT OF JUNCTION BOX.
ESCALATOR, 480 VOLT PROVIDE 30A/3P 600VOLT FUSED DISCONNECT SWITCH FOR EACHMOTOR FURNISED WITH UNIT. ROUTE 3 #12'S,AND 1 #12G 3/4" TO EACH MOTOR FROMJUNCTION BOX. ROUTE 3#10'S AND 1#12G, 3/4"TO PANEL. WIRING AND CONNECTIONS TO BECONCEALED IN UNIT. VERIFY ELECTRICALREQUIRMENTS WITH ESCALATOR PURCHASEDPRIOR TO ROUGH-IN.
1
3
4
5
6
7
8
9
10
11
REVISED CIRCUITS PER MECHANICAL VE
4'
SCALE : 1/8" = 1'-0"
0 8' 16'
T1A
C1A
T2A
T2C
T4A
T4C
T1B
T2B
T2D
T4B
T4D
T5A
T5C T5D
T3B
T3DT3C
C1B
C2A
C2B
C3A
C3B
C4A
C4B
C5A
C5B
C6A
C6B
NTRUENORTH
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2015
PROJECT NO.
BY
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
VOLUME 3.3.2
NO. DESCRIPTION DATE
ISSUED FOR CONSTRUCTION
02-08-2016
CONFORMED SET 02-08-2016
2/1
5/2
016
4:0
9:5
3 P
M
CITY OF NEW ORLEANS
TERMINAL POWER PLAN LEVEL 1 -AREA 4B
NT ET 2114B
051-10250-000
SCC
SKA
SCC
SCALE: 1/8" = 1'-0"ET 2114B
1 TERMINAL POWER PLAN LEVEL 1 - AREA 4B
L Addendum 11 12-11-2015
L.8 Addendum 11.8 12-23-2015
M Addendum 12 01-14-2016
M.1 Addendum 12.1 02-01-2016
FE
FE
FEFE
J
J
M M
MM
M
M
M
JJ
J
M M M
M M
M
M M M
J
D9D8D7
A50A48
A47
AA
DC
AB
E8
E9
GG
TD TE
T3
TATB TC TF
2
1
MATCH LINE
SEE ET 2113BMATCH LINE
SEE ET 2114A
MATCH LINE
SEE ET 2313D
MATCH LINE
SEE ET 2313D
2
3
2
WP
WP
2
WP
WPWP
18: LPT1W8
20: LPT1W8
21: LPT1W8
22: LPT1W8
22: LPT1W8
21: LPT1W8
21: LPT1W8
21: LPT1W8
21: LPT1W8
21: LPT1W8
22: LPT1W6
19: LPT1W6
22: LPT1W6
1: LPT1W2
30: LPT1W8
30: LPT1W830: LPT1W8
1: LPT1W21: LPT1W2
1: LPT1W2
BSO-4
1033 BAGGAGE CLAIM
1020
WEAPON STORAGE
1344
WEAPON CLEARINGROOM
1345
SUPERVISOR'S OFFICE
1342
MUSTER/ TRAININGROOM
1343
MECH
1380
INBOUND BAGGAGE
1101
OUTBOUND BAGGAGEMAKEUP
1100
INBOUND BAGGAGE
1101
1100H
HAC1100G
HAC
1100F
HAC
1100E
HAC1100D
HAC1100C
HAC1100B
HAC
19: LPT1W8 16: LPT1W8
1,3,5: HPT1W3
8,10,12: HPT1W3
27: LPT1W81100-2
UH
1100-1
UH
1100-3
UH
27: LPT1W8
23: LPT1W8
31: LPT1W8
1100-4
UH 1100-6
UH
26: LPT1W8
27: LPT1W8
23: LPT1W81100-5
UH
32: LPT1W8
1380
UH
23: LPT1W8
2,4,6: HPT1W3
2090
CRACCU
25: LPT1W6
5
2090-1
CRAC
2090-2
CRAC
OUTBOUND BAGGAGE
MAKEUP
1100
1100A
HAC
2100-1
VAV
21: LPT1W8
UA
UB
1100-2
BEF1100-1
BEF
29,31,33: HPT1W2 28,30,32: HPT1W2 35,37,39: HPT1W2
7,9,11: HPT1W3 21,23,25: HPT1W4
1100-13
UH
22,24,26: HPT1W4 27,29,31: HPT1W4 28,30,32: HPT1W4
6
6
34: LPT1W6
5
AB.9
DDCCONTROLOUTLET
7
27: LPT1W8
PLAN NOTES
2
PROVIDE 120 VOLT POWER CONNECTION TOCONVEYOR SYSTEM SHUTTER DOORS.COORDINATE ROUGH-IN AND CONNECTIONREQUIREMENTS WITH INSTALLER.
CONNECT TO MOTORIZED DOOR OPERATOR.COORDINATE ROUGH-IN AND CONNECTIONREQUIREMENTS WITH INSTALLER. INSTALL ALLCONDUIT AND WIRE ALL CONTROLS, ETC. ASREQUIRED, INCLUDING 1/2" C FROMCONTROLLER TO ELECTRONIC EYE NEARFLOOR.
BAGGAGE POWER DISTRIBUTION PANEL, 'PDP-I' FOR CURBSIDE AND CLAIM. REFER TO SINGLELINE DIAGRAM ON SHEET NT EG 6011 FORFEEDER REQUIREMENTS. THE ELECTRICALCONTRACTOR SHALL PROVIDE FEEDER IN A20' COIL IN A PULLBOX LOCATED IN CEILINGSTRUCTURE ABOVE THE 'PDP'. EXTENSION OFFEEDER AS WELL AS ALL WORK ASSOCIATEDWITH BAGGAGE SYSTEM POWERCONNECTIONS SHALL BE PERFORMED BY THEBAGGAGE SYSTEM CONTRACTOR.
PROVIDE 15A/3P 480 VOLT NON FUSEDDISCONNECT SWITCH. CONNECT TO UNIT ASREQUIRED AND VERIFY EXACT LOCATIONPRIOR TO INSTALLATION..
PROVIDE JUNCTION BOX FOR INSTALLATION BYOTHERS OF 120 VAC- 24VAC TRANSFORMERSERVING VAV BOXES LOCATED WITHIN 50FT OFJUNCTION BOX.
PROVIDE 30A/3P 480 VOLT NON-FUSEDDISCONNECT SWITCH. CONNECT TO UNIT ASREQUIRED AND VERIFY EXACT LOCATIONPRIOR TO INSTALLATION. USE #10'STHROUGHOUT CIRCUIT.
VARIABLE FREQUENCY DRIVES (VFD’S)FURNISHED BY MECHANICAL DIVISION 23,INSTALLED AND WIRED BY ELECTRICALDIVISION 26. VFD'S SHALL BE WIRED TO UNITWITH MANUFACTURER'S WIRING DIAGRAMFURNISHED IN UNIT.
1
3
4
5
6
7
REVISED CIRCUITS PER MECHANICAL VE
4'
SCALE : 1/8" = 1'-0"
0 8' 16'
T1A
C1A
T2A
T2C
T4A
T4C
T1B
T2B
T2D
T4B
T4D
T5A
T5C T5D
T3B
T3DT3C
C1B
C2A
C2B
C3A
C3B
C4A
C4B
C5A
C5B
C6A
C6B
NTRUENORTH
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2015
PROJECT NO.
BY
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
VOLUME 3.3.2
NO. DESCRIPTION DATE
ISSUED FOR CONSTRUCTION
02-08-2016
CONFORMED SET 02-08-2016
2/1
5/2
016
4:1
0:0
0 P
M
CITY OF NEW ORLEANS
TERMINAL POWER PLAN LEVEL 1 -AREA 4C
NT ET 2114C
051-10250-000
SCC
SKA
SCC
SCALE: 1/8" = 1'-0"ET 2114C
1 TERMINAL POWER PLAN LEVEL 1 - AREA 4C
C Addendum 3 07-24-2015
L Addendum 11 12-11-2015
L.8 Addendum 11.8 12-23-2015
M Addendum 12 01-14-2016
M.1 Addendum 12.1 02-01-2016
FE
FE
FE
FE
FE
J
M M M
M M
M
J
J
M M MM M
M M M
M
D9
D8
AA
A51 A52 A53 A54
EC
AB
E8
E9
E10
E11
CL
L5
T3
TJ TL TM
TN
2
MATCH LINE
SEE ET 2115A
MATCH LINE
SEE ET 2114B
MATCH LINE
SEE ET 2214C
MATCH LINE
SEE ET 2114C
MATCH LINE
SEE ET 2114B
WPWP
WP
WP
1
3
2
MATCH LINE
SEE ET 2115A
MATCH LINE
SEE ET 2115A
227: LPT1E4
27: LPT1E4
OUTBOUND BAGGAGEMAKEUP
1100
INBOUND BAGGAGE
1101
BAGGAGE CLAIM
1020
BSO-8
1038
20: LC1092
20: LC1092
21: LPT1E1
19: LC1491
1100Q
HAC
1100N
HAC
1100M
HAC
1100L
HAC1100K
HAC
1100J
HAC
31: LPT1E1
19: LC1491
19: LC1491
25: LPT1E4
1: LPT1E5
25: LPT1E4
25: LPT1E426: LPT1E4
27: LPT1E426: LPT1E4
1100-7
UH
4: LPT1E5
7: LPT1E5
8: LPT1E51100-8
UH
4: LPT1E5
6: LPT1E5
8: LPT1E5
1100-10
UH
1100-12
UH
8: LPT1E5
5: LPT1E5
1100-11
UH4: LPT1E5
1: LPT1E5
1100P
HAC
13,15,17: HPT1E2
8,10,12: HPT1E2
11: LPT1E5
1100-9
UH
1100R
HAC
OUTBOUND BAGGAGEMAKEUP
1100
OUTBOUND BAGGAGEMAKEUP
1100
OUTBOUND BAGGAGE
MAKEUP
1100
1100-14
UH
2100-2
VAV
UA
UB
1100-3
BEF
8: LPT1E5
6 1100-4
BEF
8,10,12: HPT1E3 9,11,13: HPT1E3 7,9,11: HPT1E227,29,31: HPT1E331,33,35: HPT1E2
32,34,36: HPT1E333,35,37: HPT1E3
5
(TYP.)
4
6
22,24,26: HPT1E3
PLAN NOTES
2
PROVIDE 120 VOLT POWER CONNECTION TOCONVEYOR SYSTEM SHUTTER DOORS.COORDINATE ROUGH-IN AND CONNECTIONREQUIREMENTS WITH INSTALLER.
CONNECT TO MOTORIZED DOOR OPERATOR.COORDINATE ROUGH-IN AND CONNECTIONREQUIREMENTS WITH INSTALLER. INSTALL ALLCONDUIT AND WIRE ALL CONTROLS, ETC. ASREQUIRED, INCLUDING 1/2" C FROMCONTROLLER TO ELECTRONIC EYE NEARFLOOR.
BAGGAGE POWER DISTRIBUTION PANEL, 'PDP-B' FOR CURBSIDE AND CLAIM. REFER TOSINGLE LINE DIAGRAM ON SHEET NT EG 6003FOR FEEDER REQUIREMENTS. THEELECTRICAL CONTRACTOR SHALL PROVIDEFEEDER IN A 20' COIL IN A PULLBOX LOCATEDIN CEILING STRUCTURE ABOVE THE 'PDP'.EXTENSION OF FEEDER AS WELL AS ALLWORK ASSOCIATED WITH BAGGAGE SYSTEMPOWER CONNECTIONS SHALL BEPERFORMED BY THE BAGGAGE SYSTEMCONTRACTOR.
PROVIDE JUNCTION BOX FOR INSTALLATION BYOTHERS OF 120VAC-24VAC TRANSFORMERSERVING VAV BOXES LOCATED WITHIN 50FT OFJUNCTION BOX.
PROVIDE 15A/3P 480 VOLT MOTOR RATEDSWITCH. CONNECT TO UNIT AS REQUIRED ANDVERIFY EXACT LOCATION PRIOR TOINSTALLATION.
PROVIDE 30A/3P 480 VOLT NON-FUSEDDISCONNECT SWITCH. CONNECT TO UNIT ASREQUIRED AND VERIFY EXACT LOCATIONPRIOR TO INSTALLATION. USE #10'STHROUGHOUT CIRCUIT.
1
3
4
5
6
REVISED CIRCUITS PER MECHANICAL VE
2'
SCALE : 3/8" = 1'-0"
0 4' 6'
T1A
C1A
T2A
T2C
T4A
T4C
T1B
T2B
T2D
T4B
T4D
T5A
T5C T5D
T3B
T3DT3C
C1B
C2A
C2B
C3A
C3B
C4A
C4B
C5A
C5B
C6A
C6B
NTRUENORTH
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2015
PROJECT NO.
BY
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
NO. DESCRIPTION DATE
ISSUED FOR CONSTRUCTION
02-08-2016
CONFORMED SET 02-08-2016
2/1
5/2
016
4:1
0:0
6 P
M
CITY OF NEW ORLEANS
TERMINAL POWER PLAN LEVEL 1 -AREA 4D
NT ET 2114D
051-10250-000
SCC
SKA
SCC
VOLUME 3.3.2SCALE: 1/8" = 1'-0"ET 2114D
1 TERMINAL POWER PLAN LEVEL 1 - AREA 4D
L Addendum 11 12-11-2015
L.8 Addendum 11.8 12-23-2015
L.12 Addendum 12 01-14-2016
M Addendum 12 01-14-2016
M.1 Addendum 12.1 02-01-2016
FEC
FE
FE
FEC
J
J
M
M
M
M
M
J
M
PLAN NOTES
2
CONNECT TO MOTORIZED DOOR OPERATOR.COORDINATE ROUGH-IN AND CONNECTIONREQUIREMENTS WITH INSTALLER. INSTALLALL CONDUIT AND WIRE ALL CONTROLS, ETC.AS REQUIRED, INCLUDING 1/2"C FROMCONTROLLER TO ELECTRONIC EYE NEARFLOOR.
NOTE NOT USED.
BAGGAGE POWER DISTRIBUTION PANEL,'PDP'. THE ELECTRICAL CONTRACTOR SHALLPROVIDE FEEDER IN A 20' COIL IN A PULLBOXLOCATED IN CEILING STRUCTURE ABOVE THE'PDP'. EXTENSION OF FEEDER AS WELL ASALL WORK ASSOCIATED WITH BAGGAGESYSTEM POWER CONNECTIONS SHALL BEPERFORMED BY THE BAGGAGE SYSTEMCONTRACTOR.
PROVIDE 120 VOLT POWER CONNECTION TOWATER CLOSET AUTO-FLUSHTRANSFORMER. EXTEND LOW VOLTAGECIRCUITING FROM TRANSFORMERSECONDARY TO WATER CLOSET SENSORS INBATHROOM. COORDINATE EXACT LOCATIONAND REQUIREMENTS WITH INSTALLER PRIORTO ROUGH-IN.
PROVIDE 120 VOLT POWER CONNECTION TOSANITARY TOILET SEAT COVERTRANSFORMER. EXTEND LOW VOLTAGECIRCUITING FROM TRANSFORMERSECONDARY TO SANITARY TOILET SEATCOVER SENSORS IN BATHROOM.COORDINATE EXACT LOCATION ANDREQUIREMENTS WITH INSTALLER PRIOR TOROUGH-IN.
PROVIDE 480 VOLT, 3PH, 3W, 30A, FEED TOEXAMINER 3DX EXPLOSIVE DETECTIONMACHINE.
PROVIDE JUNCTION BOX FOR INSTALLATIONBY OTHERS OF 120 VAC- 24VACTRANSFORMER SERVING VAV/CAV BOXESLOCATED WITHIN 50FT OF JUNCTION BOX.
1
3
4
5
6
7
MATCH LINE
SEE ET 2114D
MATCH LINE
SEE ET 2114B
MATCH LINE
SEE ET 2114D
MATCH LINE
SEE ET 2115A
MATCH LINE
SEE ET 2115D
MATCH LINE
SEE ET 2115D
WP
MATCH LINE
SEE ET 2115A
4
5
1
BHS SPARE PARTS
1403
BSO-8
1038
1400-2
FCU
4: LPT1E2
3: LPT1E2 4: LPT1E2
28: LPT1E1
28: LPT1E1
19: LC1491
19: LC1491
6: LPT1E2
2: LPT1E7
PDP-8 PDP-9
PDP-10
1400B
HAC
1400A
HAC
1: LPT1E9
1: LPT1E92: LPT1E9
2: LPT1E9
3: LPT1E94: LPT1E9
3: LPT1E9 4: LPT1E9 5: LPT1E96: LPT1E9
5: LPT1E9 6: LPT1E9
7: LPT1E9 8: LPT1E9
7: LPT1E98: LPT1E9 9: LPT1E9
10: LPT1E9 9: LPT1E910: LPT1E9
1401-2
FCU
1400
VAV
1400-1
FCU
1401-1
FCU
19: LC1491
19: LC1491
2: LPT1E7
10: LPT1E2
2: LPT1E7
2: LPT1E7
2: LPT1E7
10: LPT1E2
1,3,5: PDP-8
2,4,6: PDP-8
8,10,12: PDP-8
13,15,17: PDP-8
7,9,11: PDP-8
10: LPT1E2
1,3,5: LPT1E4
BSO-8
1038
MEN
1441
BHS SPARE PARTS
1403
CIRC
1410
CBIS
1400
CBRA
1401
EDS/TSA SPARE PARTS
STOR
1406
BHS OVERSIZED BAG
SCREENING
1402
5: LPT1E2
2,4,6: LPT1E4
1,3,5: HPT1E2
8,10,12: LPT1E4
16: LPT1E7
7,9,11: LPT1E4
6
3
PDP-4PDP-3PDP-2PDP-1
PDP-7PDP-8PDP-9PDP-10
7
REVISED CIRCUITS PER MECHANICAL VE
4'
SCALE : 1/8" = 1'-0"
0 8' 16'
T1A
C1A
T2A
T2C
T4A
T4C
T1B
T2B
T2D
T4B
T4D
T5A
T5C T5D
T3B
T3DT3C
C1B
C2A
C2B
C3A
C3B
C4A
C4B
C5A
C5B
C6A
C6B
NTRUENORTH
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2015
PROJECT NO.
BY
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
NO. DESCRIPTION DATE
ISSUED FOR CONSTRUCTION
02-08-2016
CONFORMED SET 02-08-2016
2/1
5/2
016
4:1
1:5
0 P
M
CITY OF NEW ORLEANS
TERMINAL POWER PLAN LEVEL 1 -AREA 5C
NT ET 2115C
051-10250-000
SCC
SKA
SCC
VOLUME 3.3.2SCALE: 1/8" = 1'-0"ET 2115C
1 TERMINAL POWER PLAN LEVEL 1 - AREA 5C
L Addendum 11 12-11-2015
L.8 Addendum 11.8 12-23-2015
M Addendum 12 01-14-2016
M.1 Addendum 12.1 02-01-2016
1 GROUND PER NEC 250.30.
2 NOTE NOT USED.
4 30A, 3P, NON-FUSED
5 PROVIDE DRY TYPE TRANSFORMER 480V, 3PH DELTA TO
208Y/120V, 3PH, 4W WYE, 115 DEGREE RISE, 220 DEGREE
CLASS INSULATION AND KVA SIZE AS SHOWN. NEMA TP-1
COMPLIANT.
A. 15KV FEEDERS ABOVE GRADE SHALL BE IN
RIGID GALVANIZED STEEL. BELOW GRADE
SHALL BE IN SCHEDULE 40 PVC.
B. CONTRACTOR SHALL VERIFY MATCHED
ROTATION FOR ALL DUAL SOURCED MEDIUM
VOLTAGE SWITCHGEAR PRIOR TO SYSTEM
ENERGIZATION. PROVIDE PLACARD ON ALL DUAL
SOURCED SWITCHGEAR TO INDICATE "PHASE
ROTATION AND LOAD MUST BE VERIFIED PRIOR
TO SWITCHING TO ALTERNATE SOURCE.”
C. CONTRACTOR SHALL PROVIDE INFORMATIONAL
PLACARD ON DUAL SOURCED 15KV SWITCHGEAR
TO INDICATE “LOAD VERIFICATION REQUIRED
PRIOR TO SWITCHING TO ALTERNATE SOURCE”.
3 VERIFY CB & BRANCH CIRCUIT WIRE SIZE WITH
EQUIPMENT MANUFACTURER'S RECOMMENDATION.
4"-3 #500KCM & 1 #2 GRND
2"-3 #2/0 & 1#6 GRND
2"-3 #3/0 & 1#4 GRND
1-1/4"-3 #4 & 1#8 GRND
1-1/4"-3 #4 & 1#8 GRND
6 LOW RESISTANCE GROUND, 4'x4'x4" APPROXIMATELY 800LBS
COORDINATE LOCATION W/ ARCHITECT PRIOR TO ROUGH
IN.
NOTICE
NOTES
FEEDERNUMBER
DESCRIPTIONCONDUIT AND WIRE SIZE
(75°C CU 600V, 105°C 15 kV)
COMMENTS
H2 15KV PRIMARY FEEDER 4"-3 #2/0 MV105, 133% INSULATION & 1 #2 GRND & 1-4" SPARE
B1 600 V BUS SYSTEM 4000 A, 4W+50% GND, FEEDER, COPPER; WITH FITTINGS
M1 FIRE PUMP FEEDER 2/PHASE: 3" C, 3-#4/0 + 1-#1 GND
F1 1860 A, 480 V DISTRIBUTION PANEL FEEDER 6/PHASE: 3" C, 4-350 kCM + 1-250 kCM GND
M2 CHILLER BRANCH CIRCUIT (1000A OCPD) 3/PHASE: 3" C, 3-400 kCM + 1-2/0 kCM GND
M3 HHWP BRANCH CIRCUIT (125A OCPD) 1 1/4" C, 3-#1 + 1-#6 GND
M5 CTF BRANCH CIRCUIT (150A OCPD) 3"C, 3-250 kCM + 1-#2 GND PANEL TO VFD, SIZED FOR 3% VOLTAGE DROP
M6 CWP BRANCH CIRCUIT (200A OCPD) 2"C, 3-#4/0 + 1-#6 GND
F2 DWBP BRANCH CIRCUIT & LRSB FEEDER (300A OCPD) 2 1/2" C, 3-350 kCM + 1-#4 GND
P1 NHUP-3 BRANCH CIRCUIT (200A OCPD) SIZE GOVERNED BY TRANSFORMER INRUSH
S1 NHUP-3 BRANCH CIRCUIT (125A OCPD) 1 1/4" C, 4-#1 + #6 GND
F3 MCC A FEEDER (400A OCPD) 2/PHASE: 2"C, 3-#3/0 + 1-#3 GND
F4 MCC B FEEDER (600A OCPD) 2/PHASE: 2 1/2"C, 3-350 kCM + 1-#1 GND
P2 NHUP-4 BRANCH CIRCUIT (250A OCPD) SIZE GOVERNED BY TRANSFORMER INRUSH
S2 NHUP-4 BRANCH CIRCUIT (175A OCPD) 2" C, 4-#2/0 +1#4 GND
P3 NDUP-1 BRANCH CIRCUIT (70A OCPD) SIZE GOVERNED BY TRANSFORMER INRUSH
S3 NDUP-1 BRANCH CIRCUIT (100A OCPD)
P4 NDUP-2 BRANCH CIRCUIT (40A OCPD) 3/4" C, 3-#8 + #10 GND SIZE GOVERNED BY TRANSFORMER INRUSH
S4 NDUP-2 BRANCH CIRCUIT (50A OCPD) 3/4" C, 4-#6 + #8 GND
PANEL TO VFD
V3 HHWP BRANCH CIRCUIT 1 1/2" C, ONE 3/C #2 + GND VFD CABLE VFD TO MOTOR (COORDINATE W/ OCPD IN VFD)
M4 CHWP BRANCH CIRCUIT (350A OCPD)
V4 CHWP BRANCH CIRCUIT 3 1/2" C, ONE 3/C 500 kCM + GND VFD CABLE
V5 CTF BRANCH CIRCUIT 2" C, ONE 3/C#1/0 + GND VFD CABLE
PANEL TO VFD
VFD TO MOTOR (COORDINATE W/ OCPD IN VFD)
VFD TO MOTOR
F5 200A, 4 WIRE FEEDER
F6 250A, 4 WIRE FEEDER SIZED FOR 3% VOLTAGE DROP
2"-3 #3/0 & 1 #4 GRND
3"-3 #250KCM & 1 #3 GRND
20 20 A BRANCH 3/4" C, 3-#12 + 1-#12 GND
F7 COOLING TOWER SMALL POWER (50A OCPD) 1 1/4" C, 3-#4 + 1-#6 GND SIZED FOR 3% VOLTAGE DROP
RUN IN UNDERGROUND DUCT
H1 15KV PRIMARY FEEDER 2 - EACH WITH 3-# 4/0 MV105 + 1 #2 GRND
H3 15KV PRIMARY FEEDER 4"-3 #1/0 MV105, 133% INSULATION & 1 #2 GRND & 1-4" SPARE
H4 15KV PRIMARY FEEDER 4"-3 #2 MV105, 133% INSULATION & 1 #6 GRND & 1-4" SPARE
H5 15KV PRIMARY FEEDER 4"-3 #4/0 MV105, 133% INSULATION & 1 #2 GRND & 1-4" SPARE
221.1CHWP-1
221.1CHWP-2
0BLR-1
0BLR-2
0BLR-3
0HHWP-1
0HHWP-2
88.4CTF-1
88.4CTF-2
129.7CWP-1
129.7CWP-2
7.5SDFILT-1
0BH-1
0BH-2
0BH-3
5DC FOR SWITCHGEAR-1
201.7DWBP
45.5NHUP-3
30NDUP-1
1234.7TOTAL
11.6IAC-1
221.1CHWP-3
221.1CHWP-4
0CHWP-5
0BLR-4
0BLR-5
0HHWP-3
0HHWP-4
88.4CTF-3
88.4CTF-4
0CTF-5
129.7CWP-3
129.7
0
0BH-4
0BH-5
0
15
97.4
DC FOR SWITCHGEAR-2
8.9NDUP-2
1004.7TOTAL
5
CWP-4
CWP-5
DIESEL STORAGE-B
COOL TWR
NHUP-4
251.1FP-1
612.7CH-3
612.7CH-4
1004.7NHUP-2
2481.2TOTAL
612.7CH-1
612.7CH-2
0CH-5
1234.7NHUP-1
2460.1TOTAL
CABLE-IN-TRAY OR 1200 A BUS SYSTEM
30 30 A BRANCH 3/4" C, 3-#10 + 1-#10 GND
SIZED FOR 3% VOLTAGE DROP
ACCEPTABLE WITHIN MAIN POWER STATION
FEEDER SCHEDULE
1. SOME FEEDERS MAY NOT BE USED ON THIS PROJECT.2. VOLTAGE DROP MAY REQUIRE THE USE OF A LARGER AMPACITY FEEDER.3. 'A' FEEDERS INDICATE 3PH, 3W SERVICE IN LIEU OF 3PH, 4W.4. CONDUCTORS FOR TERMINATION ON 100% RATED DEVICES SHALL BE 90°C, APPLIED AT 75°C RATINGS.
NHUP-1 (KVA) NHUP-2 (KVA)
SS-UP-B (KVA)SS-UP-A (KVA)
CRITERIA
1. FUTURE LOADS ARE ASSIGNED 0 KVA.
2. NONCOINCIDENT LOADS ARE ASSIGNED 0 KVA.
D. DESIGN IS PREDICATED ON A TOTAL OF FIVE
COOLING TRAINS, OF WHICH NO MORE THAN FOUR
OPERATE SIMULTANEOUSLY. IT REQUIRES THAT; IF
THREE CHILLERS ARE POWERED FROM BUS A,
THREE CHILLED WATER PUMPS WILL BE POWERED
FROM BUS B; THAT, IF TWO CHILLERS ARE POWERED
FROM EACH BUS, THEN TWO CHILLED WATER PUMPS
WILL BE POWERED FROM EACH BUS; AND THAT TWO
COOLING TOWER FANS AND TWO CONDENSER
WATER PUMPS WILL BE POWERED FROM EACH BUS
UNDER ALL CONDITIONS.
KEY PLAN
REVISIONS
FILE LOG
ACTIVITY
Draw
Design
Manager
Check
STAMP
© LEO A DALY Company 2015
PROJECT NO.
BY
THE NEW ORLEANSAVIATION BOARD
CRESCENT CITYAVIATION TEAM
1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229
A JOINT VENTURE
NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062
THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062
NO. DESCRIPTION DATE
ISSUED FOR CONSTRUCTION
02-08-2016
CONFORMED SET 02-08-2016
6/2
8/2
016
2:3
7:4
9 P
M
CITY OF NEW ORLEANS
SCHEDULES AND NOTES
UP E 6000
051-10250-000
ACD
SKA
ACD
VOLUME 5
L.11 Addendum 11.11 12-31-2015
M Addendum 12 01-14-2016
M.1 Addendum 12.1 02-01-2016
CS Revision 1 03-01-2016
DSI-0005
DSI-0005 MCA-DSI-0005 06-28-2016