parsons brinckerhoff - hunt- · pdf fileparsons brinckerhoff north terminal project ......

21
PARSONS BRINCKERHOFF NORTH TERMINAL PROJECT LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT NEW ORLEANS, LOUISIANA TRANSMITTAL COVER Date : 06/29/2016 To : Company: HGBM Person : Document Control Submitted on Behalf of: NOAB Document Title: OSI - MCA-DSl - 0005 Number of Copies: One (1) Elec tronic Document Attached: Transmittal and 20 pages Action: Transmittal#: 03753-006- 01 From: Company: PB Person: Jim Stievater Delivered Via : Email a No Cost/Time lmP.act. ~roceed with the work indi c ~ted . Advise . withi~ 24 ± ours if there is any Cost or Time Impact. ~L . Cl'"\ \A.... rA..~ du,~~ c..,,f D Cost Decrease. ~ ;~ e work. Submit credi t\ roposal for Revie . 1.-.i "'1 t .. , -I -I~ J:.: ..... D Cost Increase. Proceed with the work on a T&M Basis . Cost to be submi tted when work is complete. ..Ju- D Cost Inc rease. Proceed with the work . Submit a proposal for review. D Cost Increase. Do not proceed with work. Submit proposal. D VE/Conformed Documents Implement a tion Comments: Attachment - NT EG 4001, NT EG 4002, NT EG 4005, NT EG 4006, NT EG 6010, NT EG 6012, NT EG 6013, NT EG 6015, NT EG 6016, NT EG 6017, NT EG 6019, NT EG 6019, NT EG 2111A, NT EG 2112A, NT ET 2112C, NT ET 2 48, NT ET 2114C, NT ET 2114D, NT ET 2115C, UP E 6000 CC: File PB-Chris Spann Document Cont rol @HGBM-JV.com DClawson@HGBM-JV. com Date

Upload: ngodang

Post on 07-Mar-2018

237 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

PARSONS BRINCKERHOFF

NORTH TERMINAL PROJECT

LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT

NEW ORLEANS, LOUISIANA

TRANSMITTAL COVER

Date : 06/29/2016

To: Company: HGBM Person: Document Control

Submitted on Behalf of: NOAB

Document Title: OSI - MCA-DSl-0005

Number of Copies: One (1) Electronic

Document Attached: Transmittal and 20 pages

Action:

Transmittal#: 03753-006-01

From: Company: PB Person: Jim Stievater

Delivered Via: Email

a No Cost/Time lmP.act. ~roceed with the work indic~ted. Advise .withi~ 24± ours if there is any Cost or Time Impact. ~L . Cl'"\ \A....rA..~ du,~~ ·~~~ ~ c..,,f ~

D Cost Decrease. ~ ; ~ e work. Submit credit\roposal for Revie . 1.-.i "'1 t ~ .. ~ , -I -I~ J:.:..... D Cost Increase. Proceed with the work on a T&M Basis. Cost to be submitted when work is complete. ..Ju-D Cost Increase. Proceed with the work. Submit a proposal for review. D Cost Increase. Do not proceed with work. Submit proposal. D VE/Conformed Documents Implementation

Comments: Attachment -NT EG 4001, NT EG 4002, NT EG 4005, NT EG 4006, NT EG 6010, NT EG 6012, NT EG 6013, NT EG 6015, NT EG 6016, NT EG 6017, NT EG 6019, NT EG 6019, NT EG 2111A, NT EG 2112A, NT ET 2112C, NT ET 2 48, NT ET 2114C, NT ET 2114D, NT ET 2115C, UP E 6000

CC: File PB-Chris Spann Document Control @HGBM-JV.com [email protected]

Date

Page 2: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

Attachments: Partial sheets:

None

Reissued full sheets: NNTT EEGG 44000011,, NNTT EEGG 44000022 NNTT EEGG 44000055,, NNTT EEGG 44000066,, NNTT EEGG 66001100,, NNTT EEGG 66001122,, NNTT EEGG 66001133,, NNTT EEGG 66001155,, NNTT EEGG 66001166,, NNTT EEGG 66001177,, NNTT EEGG 66001199,, NNTT EEGG 22111122AA,, NNTT EEGG 22111122CC,, UUPP EE 66000000

Sheets in mark-up form: NNTT EETT 22111111AA,, NNTT EETT 22111144BB,, NNTT EETT 22111144CC,, NNTT EETT 22111144DD,, NNTT EETT 22111155CC

By: Raul Valdes, P.E.

DESIGNER SUPPLEMENTAL INSTRUCTIONS DSI NO. MCA-DSI-0005

DDAATTEE:: 0066//2299//22001166

PPRROOJJEECCTT NNAAMMEE:: NNOOAABB PPrroojjeecctt ## 88991100--0011223333

LLoouuiiss AArrmmssttrroonngg NNeeww OOrrlleeaannss IInntteerrnnaattiioonnaall AAiirrppoorrtt NNoorrtthh TTeerrmmiinnaall DDeevveellooppmmeenntt PPrrooggrraamm PPhhaassee 11

Note: if the following information is deemed to have an impact on GMP Price or time, submit a proposal for Owner approval before proceeding with this DSI. If approved by Owner, the resulting contract change will be incorporated in the next formal Change Order.

CChhaannggeess mmaaddee ttoo eelleeccttrriiccaall ddrraawwiinnggss ttoo rreefflleecctt rreeqquueesstteedd ccoooorrddiinnaattiioonn ooff uunnddeerrggrroouunndd eelleeccttrriiccaall wwiitthh ootthheerr ttrraaddeess aanndd rreevvaalluuaattiioonn ooff eeqquuiippmmeenntt ssiizzeess,, eettcc.. aass aa rreessppoonnssee ttoo cchhaannggee oorrddeerr rreeqquueesstt.. RReevviisseedd ddrraawwiinnggss ffoorr aarreeaa ooff ssuubbssttaattiioonn TTWW ttoo ffoollllooww.. CCoosstt iimmppaacctt:: SShhoouulldd bbee aa rreedduuccttiioonn ttoo cchhaannggee oorrddeerr..

Page 3: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

FE

FE

FE-E

LPT1N3LPT1N1 LPT1N2

HPT1N1

HPT1N2LT-T1N

LTG. T2

HPT1N3

ELEC

1070

EMERGENCY LIGHTINGINVERTER EHT1A (3KVA)

1

HS-T1N

LS-T1N

3

G40

G40

AB

G40.1

LT-T1W-A

ELEC

1370

HPT1W3

HPT1W2

HPT1W1

HS-T1W-A

HS-T1W-B

LT-T1W-BLS-T1W-B

LPT1W1LPT1W2LPT1W3LPT1W4

EMERGENCY LIGHTINGINVERTER EHT1B(1)(8 KVA)

1

EMERGENCY LIGHTINGINVERTER EHT1B(2)(5 KVA)

1

EMERGENCY LIGHTINGINVERTER EHT1B(3)(5 KVA)

1

AB.9

HPT1W4

PLAN NOTES1 EMERGENCY LIGHTING INVERTER SHALL

HAVE KVA RATING AS INDICATED, 277V INPUT,277V OUTPUT, TWO (2) 20A. 1 POLE OUTPUTCIRCUIT BREAKERS, 90 MINUTE BATTERYBACKUP TIME AND NORMALLY ON OUTPUTBUS. PROVIDE (4) 20A/1P CIRCUIT BREAKER INEACH LIGHTING INVERTER.

CONTRACTOR SHALL PROVIDE A SCALEDDRAWING OF EACH ELECTRICAL/COMPUTERROOM SHOWING ALL EXACT EQUIPMENTBEING SUBMITTED FOR THE PROJECT.DRAWING TO BE DIMENSIONED WITH PROPERCLEARANCES IDENTIFIED.

REFER TO SITE LIGHTING DRAWINGS FORFURTHER SPECIFICATION OF PANEL.

2

3

HPT3E2

HPT3E1

LT-T3E

HPT3E3

LS-T3E

LPT3E1

LPT3E2

ELEC

3074

HS-T3E

2'

SCALE : 1/4" = 1'-0"

0 4' 8'

KEY PLAN

REVISIONS

FILE LOG

ACTIVITY

Draw

Design

Manager

Check

STAMP

© LEO A DALY Company 2015

PROJECT NO.

BY

THE NEW ORLEANSAVIATION BOARD

CRESCENT CITYAVIATION TEAM

1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229

A JOINT VENTURE

NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062

THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062

VOLUME 3.3.2

NO. DESCRIPTION DATE

ISSUED FOR CONSTRUCTION

02-08-2016

CONFORMED SET 02-08-2016

6/2

8/2

016

3:2

2:3

9 P

M

CITY OF NEW ORLEANS

ENLARGED ELECTRICAL ROOMPLANS - TERMINAL

NT EG 4001

051-10250-000

SCC

SKA

HLB

T

SCALE: 1/4" = 1'-0"EG 4001

1 ELECTRICAL ROOM 1070

SCALE: 1/4" = 1'-0"EG 4001

2 ELECTRICAL ROOM 1370

EMERGENCY LIGHTINGINVERTER EHT3C(1)(5KVA)

EMERGENCY LIGHTINGINVERTER EHT3C(2)(3KVA)

EMERGENCY LIGHTINGINVERTER EHT3C(3)(5KVA)

1

D Addendum 4 07/30/2015

L.4 Addendum 11.4 12-18-2015

M.1 Addendum 12.1 02-01-2016

DSI-0005

DSI-0005

DSI-0005

DSI-0005 MCA-DSI-0005 06-28-2016

SCALE: 1/4" = 1'-0"EG 4001

3 ELECTRICAL ROOM 3074

1

1

Page 4: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

FE

FE

C

HPT3W1 HPT3W3

LPT3W1LPT3W2

LPT3W3

TL-T3W

HS-T3W HPT3W4

LS-T3W

ELEC

3070

HS-LRSB-T3W1HPT3N2

HPT3N1

LPT3N2LPT3N1

HS-T3N

LPT3N3 PANEL LS-T3N

LT-T3N

PLAN NOTES1 EMERGENCY LIGHTING INVERTER SHALL HAVE

KVA RATING AS INDICATED, 277V INPUT, 277VOUTPUT, TWO (2) 20A. 1 POLE OUTPUT CIRCUITBREAKERS, 90 MINUTE BATTERY BACKUP TIMEAND NORMALLY ON OUTPUT BUS.

CONTRACTOR SHALL PROVIDE A SCALEDDRAWING OF EACH ELECTRICAL/COMPUTERROOM SHOWING ALL EXACT EQUIPMENT BEINGSUBMITTED FOR THE PROJECT. DRAWING TOBE DIMENSIONED WITH PROPER CLEARANCESIDENTIFIED.

2

2'

SCALE : 1/4" = 1'-0"

0 4' 8'

KEY PLAN

REVISIONS

FILE LOG

ACTIVITY

Draw

Design

Manager

Check

STAMP

© LEO A DALY Company 2015

PROJECT NO.

BY

THE NEW ORLEANSAVIATION BOARD

CRESCENT CITYAVIATION TEAM

1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229

A JOINT VENTURE

NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062

THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062

VOLUME 3.3.2

NO. DESCRIPTION DATE

ISSUED FOR CONSTRUCTION

02-08-2016

CONFORMED SET 02-08-2016

6/2

8/2

016

2:4

3:3

5 P

M

CITY OF NEW ORLEANS

ENLARGED ELECTRICAL ROOMPLANS - TERMINAL

NT EG 4002

051-10250-000

SCC

AMG

SCC

SCALE: 1/4" = 1'-0"EG 4002

1 ELECTRICAL ROOM 3070

SCALE: 1/4" = 1'-0"EG 4002

2 ELECTRICAL ROOM 3071

EMERGENCY LIGHTINGINVERTER EHT3A (3KVA)

1

D Addendum 4 07/30/2015

L.4 Addendum 11.4 12-18-2015

1

M.1 Addendum 12.1 02-01-2016

DSI-0005

DSI-0005 MCA-DSI-0005 06-28-2016

DSI-0005

DSI-0005

EMER LTG INV.

Page 5: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

FE

J

J

FE

J

J

J

J

J

FE

JJ

FE

J J

FE

C

FE

J

J

FE

J

J3

(TYP FOR 6)

IG IG

IG

IG

IG

4

2,4,6: LC1090

7,9,11: LC1090

5: LC1090

IG

IG

IG

IG

5: LC1090

5: LC1090

16: LC1090

16: LC1090

5: LC1090

5: LC10905: LC1090

IG

IG

16: LC1090

16: LC1090

16: LC1090

16: LC1090

16: LC1090

LC1090

JJ DA.1

1

5

(TYP FOR 3)

IG

IG

IG

IG

11: LC1390

8: LC1390

9: LC1390

7: LC1390

6: LC1390

10: LC1390IG

IG

2: LC1390

5: LC1390

12,14,16: LC1390

13,15,17: LC1390

3

4

4

4: LC1390

20: LC1390

18: LC1390

(TYP FOR 3)

LC1390

IG

IG

7: LC1390

7: LC1390

IG

IG

LPT1W5

U6.1

PLAN NOTES

1 PROVIDE NEMA L5-30R-IG ISOLATED GROUNDRECEPTACLE MOUNTED IN SERVICE BOXABOVE TELE/COMM RACK.

PROVIDE TWO (2) 5-20R-IG ISOLATED GROUNDRECEPTACLES UNDER COMMON COVERPLATE.

PROVIDE NEMA L5-20R-IG ISOLATED GROUNDRECEPTACLE MOUNTED IN SERVICE BOXABOVE TELE/COMM RACK.

PROVIDE HARDWIRED CONNECTION TO RACKMOUNTED 6KVA UPS. COORDINATE EXACTLOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.

PROVIDE 120V POWER CONNECTION TO FIREALARM SYSTEM PANEL. COORDINATE EXACTLOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.

CONTRACTOR SHALL PROVIDE A SCALEDDRAWING OF EACH ELECTRICAL/COMPUTERROOM SHOWING ALL EXACT EQUIPMENT BEINGSUBMITTED FOR THE PROJECT. DRAWING TOBE DIMENSIONED WITH PROPER CLEARANCESIDENTIFIED.

2

3

4

5

6

1

IG

2

(TYP)IG

IG

(TYP FOR 2)

2: LC13918: LPT1W6

1: LPT1W6

1: LC1391

IG

IG

IG

4: LC1391

3: LC1391

3

LC1391LPT1W7 LPT1W6

A58

IG

IG

IG IG IG

IG

IG

IG

IG

IG2: LC1491 6: LC1491

IG

5,7,9: LC14918,10,12: LC1491

11: LC1491

14: LC1491

16: LC1491

13: LC1491 18: LC149115: LC1491

3

2

(TYP FOR 9)

(TYP)

44

1LC1491

3: LC1491

14: LC149114: LC1491

6: LC1491

6: LC1491

IG

IG

3: LC1491

3: LC1491

IG

IG

2: LC1491

2: LC1491

IG

IG

COMM

1491

IG

2

(TYP)IG

IG

IG

IG

IGIGIG

IG

1

(TYP FOR 3)

8,10,12: LC1091

13,15,17: LC1091

1: LC1091

5: LC1091

4: LC1091

6: LC1091

2: LC1091

3: LC1091

11: LC1091

7: LC1091

9: LC1091

3

4

LC1091

11: LC109111: LC1091

2

(TYP)

IG

IG

IG

IG

IG

IGIGIG

3

IG

IG

IG

10: LC1092

8: LC1092

6: LC1092

9,11,13: LC1092

12,14,16: LC1092

2: LC1092

4: LC1092

7: LC1092

5: LC10925: LC10925: LC1092

3: LC1092

1: LC1092

4

LC1092

4: LC1092

4: LC1092

IGIG

IG

2'

SCALE : 1/4" = 1'-0"

0 4' 8'

KEY PLAN

REVISIONS

FILE LOG

ACTIVITY

Draw

Design

Manager

Check

STAMP

© LEO A DALY Company 2015

PROJECT NO.

BY

THE NEW ORLEANSAVIATION BOARD

CRESCENT CITYAVIATION TEAM

1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229

A JOINT VENTURE

NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062

THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062

VOLUME 3.3.2

NO. DESCRIPTION DATE

D Addendum 4 07-30-2015

E Addendum 5 08-07-2015

C Addendum 3 07-23-2015

CONFORMED SET 02-08-2016

6/2

8/2

016

3:2

4:3

3 P

M

CITY OF NEW ORLEANS

ENLARGED COMMUNICATIONROOM PLANS - TERMINAL

051-10250-00002-08-2016

SCC

SKA

HLB

ISSUED FOR CONSTRUCTION

NT EG 4005

SCALE: 1/4" = 1'-0"EG 4005

1 COMMUNICATION ROOM 1090

SCALE: 1/4" = 1'-0"EG 4005

4 COMMUNICATION ROOM 1390SCALE: 1/4" = 1'-0"EG 4005

5 COMMUNICATION ROOM 1391SCALE: 1/4" = 1'-0"EG 4005

6 COMMUNICATION ROOM 1491

SCALE: 1/4" = 1'-0"EG 4005

2 COMMUNICATION ROOM 1091SCALE: 1/4" = 1'-0"EG 4005

3 COMMUNICATION ROOM 1092

M.1 Addendum 12.1 02-01-2016

DSI-0005

DSI-0005 MCA-DSI-0005 06-28-2016

Page 6: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

FE

J J J J J J

FE M

FE

J

J

FE

FE

J J J J

J

3

2IG

(TYP FOR 3)

(TYP)

IG IG IG

5

(TYP)

13,15,17: LC2090-2 8,10,12: LC2090-27,9,11: LC2090-22,4,6: LC2090-21,3,5: LC2090-2

1: LC2090-1IG IG IG

1

(TYP FOR 15)

<unnamed>: <unnamed>: <unnamed>: <unnamed>:

IG

IG

IG

IG IG

4

(TYP FOR 7)

LPT2W1

LC2090-2 LC2090-2

TL-T2W

LC2090-1

IGIG IGIG

IGIG

IG3: LC2090-1 4: LC2090-1

5: LC2090-1

6: LC2090-1

7: LC2090-1 8: LC2090-1 10: LC2090-19: LC2090-1

IG

IGIG

IGIG

IG

IG

IG

IG

IG

11: LC2090-1 12: LC2090-1

?

13: LC2090-1 14: LC2090-115: LC2090-1

UB

HPT2W1

1

2

NOTE :EQUIPMENT IN THIS ROOM TO BESERVED BY PANEL'LC2090' IN ROOM 2090

(TYP)

IG

IG

(TYP FOR 9)

IG

17: LC2090-1 16: LC2090-1 19: LC2090-1

IG IG

IG

25: LC2090-1

20: LC2090-1

21: LC2090-1 18: LC2090-1

23: LC2090-1

IG

IG

2

(TYP )

IG

IG

IG

IG

IG

5

(TYP )

4

3

7: LC2092

8: LC2092

12: LC2092

10: LC2092

11: LC2092

13,15,17: LC2092

9: LC2092

4: LC2092

IGIGIG

IG

IG

IGIG

HPT2E1

LPT2E1

TL-T2E

LC2092

4: LC2092

4: LC2092

2: LC2092

2: LC2092

2: LC2092

IG

IG

3: LC2092

5: LC2092

14,16,18: LC2092

COMM

2092

LPT2E3

LPT2E2

FIRE ALARM PANELS ANDRELEASING DEVICES

?

?

?

PANEL LS-T2E

2IG

(TYP)

IG

IG

3: LC2093

5: LC2093

1: LC2093

LC2093

LPT2E4

4: LC2093

IG

IG

2: LC2093

TSA COMM

2093

PLAN NOTES1 PROVIDE NEMA L5-30R-IG ISOLATED GROUND

RECEPTACLE MOUNTED IN SURFACE BOXABOVE TELE/COMM RACK.

PROVIDE TWO (2) 5-20R-IG ISOLATED GROUNDRECEPTACLES UNDER COMMON COVERPLATE.

PROVIDE NEMA L5-20R-IG ISOLATED GROUNDRECEPTACLE MOUNTED IN SURFACE BOXABOVE TELE/COMM RACK.

PROVIDE HARDWIRED CONNECTION TO RACKMOUNTED 6KVA UPS. COORDINATE EXACTLOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.

PROVIDE 120V POWER CONNECTION TO FIREALARM SYSTEM PANEL. COORDINATE EXACTLOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.

CONTRACTOR SHALL PROVIDE A SCALEDDRAWING OF EACH ELECTRICAL/COMPUTERROOM SHOWING ALL EXACT EQUIPMENT BEINGSUBMITTED FOR THE PROJECT. DRAWING TO BEDIMENSIONED WITH PROPER CLEARANCESIDENTIFIED.

2

3

4

5

6

A60 E16G61.1

EB.9

1

(TYP FOR 5)

5IG

(TYP)

IG

IG

IGIG IG IG

11: LC1492 6: LC1492 9: LC1492 4: LC1492

27: LC1492IG IG IG IG IG IG IG17: LC1492 8: LC1492

2: LC1492 5: LC1492 3: LC1492 1: LC1492

(TYP FOR 2)

3

4

12: LC1492 10: LC1492

15: LC1492 13: LC1492 18: LC1492 16: LC1492 14: LC1492

19,21,23: LC1492

LC1492

25: LC14927: LC1492

22: LC1492

IG

IG

COMM SERVICE

ENTRANCE

WY

AB.9

2'

SCALE : 1/4" = 1'-0"

0 4' 8'

KEY PLAN

REVISIONS

FILE LOG

ACTIVITY

Draw

Design

Manager

Check

STAMP

© LEO A DALY Company 2015

PROJECT NO.

BY

THE NEW ORLEANSAVIATION BOARD

CRESCENT CITYAVIATION TEAM

1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229

A JOINT VENTURE

NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062

THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062

VOLUME 3.3.2

NO. DESCRIPTION DATE

CONFORMED SET 02-08-2016

6/2

8/2

016

3:2

7:2

0 P

M

CITY OF NEW ORLEANS

ENLARGED COMMUNICATIONROOM PLANS - TERMINAL

051-10250-00002-08-2016

SCC

SKA

AJS

ISSUED FOR CONSTRUCTION

NT EG 4006

SCALE: 1/4" = 1'-0"EG 4006

2 COMMUNICATION ROOM 2090

SCALE: 1/4" = 1'-0"EG 4006

3 COMMUNICATION ROOM 2091SCALE: 1/4" = 1'-0"EG 4006

4 COMMUNICATION ROOM 2092SCALE: 1/4" = 1'-0"EG 4006

5 LEVEL 2 TSA IT SERVER 2093

SCALE: 1/4" = 1'-0"EG 4006

1 COMMUNICATION ROOM 1492

M.1 Addendum 12.1 02-01-2016

DSI-0005

DSI-0005 MCA-DSI-0005 06-28-2016

Page 7: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

A1 BUS TW-A BUS TW-BA2A3A4

XFMR "TH-TW-A"2500 / 2800 / 3125 / 3500 KVA13,800 - 480Y / 277V55°/ 65°/ 55° / 65°KNAN / KNAN / KNAF / KNAF5.75% Z

FED FROM UTILITY PLANT15KV MAIN SWGRBREAKER FB-3A

FED FROM UTILITY PLANT15KV MAIN SWGRBREAKER FB-3B

B1 B2 B3 B4

XFMR "TH-TW-B"2500 / 2800 / 3125 / 3500 KVA13,800 - 480Y / 277V55°/ 65°/ 55° / 65°KNAN / KNAN / KNAF / KNAF5.75% Z

HS-T1W-A HS-T1W-B SPARE 2000AHS-T3WEQUIPPEDSPACE

EQUIPPEDSPACE

LS-T2W

HS-T1N

XFMR225 KVA480V TO120/208V

TW-TIE2500ALSIG

LSIG800AF800AT

TW-A2

LSIG1200AF1200AT

TW-A3

4200A, 480Y/277V, 3PH, 4W, 60HZ, 100KA (SYM)

LSIG

TW-A4

400AF650AT

SPD

ELECTRICAL SUBSTATION "TW"

480VDIST

SWBD

480VDIST

SWBD

SPD

TW-B4

LSIG1200AF1200AT

TW-B3TW-B2TW-B1

480VDIST

SWBD

LSIG

TW-MA

4000AF3500AT

LSIG

TW-MB

4000AF3500AT

TW-A1

LSIG1200AF1200AT

480VDIST

SWBD

208VDIST

SWBD

56565556P6

S6

2/0(G)

2-3"CSTUBBED

UP ATROOM1370

2-3"CSTUBBED

UP ATROOM1370

2-3"CSTUBBED

UP ATROOM1370

K

KEY PLAN

REVISIONS

FILE LOG

ACTIVITY

Draw

Design

Manager

Check

STAMP

© LEO A DALY Company 2015

PROJECT NO.

BY

THE NEW ORLEANSAVIATION BOARD

CRESCENT CITYAVIATION TEAM

1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229

A JOINT VENTURE

NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062

THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062

VOLUME 3.3.2

NO. DESCRIPTION DATE

CONFORMED SET 02-08-2016

6/2

8/2

016

3:4

4:2

5 P

M

CITY OF NEW ORLEANS

TERMINAL ONE LINE -ELECTRICAL SUBSTATION "TW"

051-10250-00002-08-2016

SCC

SKA

SCC

ISSUED FOR CONSTRUCTION

NT EG 6010

E Addendum 4 07-31-2015

M Addendum 12 01-14-2016

DSI-0005 MCA-DSI-0005 06-28-2016

DSI-0005

DSI-0005

DSI-0005

DSI-0005

DSI-0005DSI-0005

rvaldes
Cloud
rvaldes
Line
rvaldes
Cloud
rvaldes
Line
rvaldes
Cloud
rvaldes
Line
Page 8: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

TO SUB-TWSWGR

BKR TW-A3 480Y / 277 VOLT SWITCHBOARD"HS-T1W-A"

1 2 3 4 5 6 7 8

HPT1W1

LS-T1W-A

HPT1W2 HPT2W1 PDP-3BAGGAGE

HANDLING

SYSTEM

SEE

VOLUME

3.4.1

TO SUB-TWSWGR

BKR TW-B3 480Y / 277 VOLT SWITCHBOARD"HS-T1W-B"

1 2 3 4 5 6 7 8

HPT1W4

LS-T1W-B

HPT1W3 PDP-4BAGGAGE

HANDLING

SYSTEM

SEE

VOLUME

3.4.1

PDP-5BAGGAGE

HANDLING

SYSTEM

SEE

VOLUME

3.4.1

125 AT125 AF

MLO

1200A, 480Y/277V, 3PH, 4W, 60HZ, 65KAIC

DISTSWBD

200 AT250 AF

250 AT250 AF

350 AT400 AF

300 AT400 AF

MLO

1200A, 480Y/277V, 3PH, 4W, 60HZ, 65KAIC

DISTSWBD

300 AT400 AF

200 AT250 AF

350 AT400 AF

200 AT250 AF

500 AT800 AF

PANELBOARD

PANELBOARD

PANELBOARD

PANELBOARD

PANELBOARD

43 46 48 46 P6

S6

SPACE SPACE SPACE250 AF 125 AF 125 AF

49 49 46 52 P6

S6

SPACE SPACE SPACE125 AF 250 AF 125 AF

2/0(G)

3" WITH PULLSTRING TO

COMM ROOM2090

3" WITH PULLSTRING TO

COMM ROOM2090

2/0(G)

KEY PLAN

REVISIONS

FILE LOG

ACTIVITY

Draw

Design

Manager

Check

STAMP

© LEO A DALY Company 2015

PROJECT NO.

BY

THE NEW ORLEANSAVIATION BOARD

CRESCENT CITYAVIATION TEAM

1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229

A JOINT VENTURE

NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062

THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062

VOLUME 3.3.2

NO. DESCRIPTION DATE

C Addendum 3 07-24-2015

CONFORMED SET 02-08-2016

6/2

8/2

016

3:4

9:4

1 P

M

CITY OF NEW ORLEANS

TERMINAL ONE-LINE DIAGRAM

051-10250-00002-08-2016

SCC

SKA

SCC

ISSUED FOR CONSTRUCTION

NT EG 6012

M Addendum 12 01-14-2016

DSI-0005 MCA-DSI-0005 06-28-2016

DSI-0005

DSI-0005

DSI-0005

DSI-0005

Page 9: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

TO SUB-TWSWGR

BKR TW-B1 480Y / 277 VOLT SWITCHBOARD"HS-T3W"

1 2 3 4 5 6 7

HPT3W1

LS-T3W

HPT3W3 HPT3W4 HS-LSRB-TW

8 9

200 AT250 AF

MLO

1000A, 480Y/277V, 3PH, 4W, 60HZ, 65KAIC

DISTSWBD

200 AT250 AF

350 AT400 AF

800 AT800 AF

PANEL

BOARD

PANEL

BOARD

500 AT800 AF

PANEL

BOARD

46 54 P6

S6

SPACE400 AF

PANEL

BOARD

100 AT200 AF

52 43

SPACE250 AF

SPACE250 AF

2/0(G)

PLAN NOTES1 PROVIDE CIRCUIT BREAKERS WITH

ELECTRONIC TRIP CONTROLS FOR LOADSHED.

KEY PLAN

REVISIONS

FILE LOG

ACTIVITY

Draw

Design

Manager

Check

STAMP

© LEO A DALY Company 2015

PROJECT NO.

BY

THE NEW ORLEANSAVIATION BOARD

CRESCENT CITYAVIATION TEAM

1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229

A JOINT VENTURE

NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062

THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062

VOLUME 3.3.2

NO. DESCRIPTION DATE

C Addendum 3 07-24-2015

CONFORMED SET 02-08-2016

6/2

8/2

016

3:5

0:2

8 P

M

CITY OF NEW ORLEANS

TERMINAL ONE-LINE DIAGRAM

051-10250-00002-08-2016

SCC

SKA

SCC

ISSUED FOR CONSTRUCTION

NT EG 6013

M Addendum 12 01-14-2016

1 1 1 1 1 1

DSI-0005 MCA-DSI-0005 06-28-2016

DSI-0005

DSI-0005

DSI-0005

Page 10: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

TO 480VSWBD.HS-T1N

208Y / 120 VOLT SWITCHBOARD"LS-T1N"

1 2 3 4 5 6

LPT1N1

XFMR "TL-T1N"225 KVA DRY TYPE480 - 208Y/120V

LC1090LPT1N2 LPT1N3

7 8 9

800A, 208Y / 277V, 3PH, 4W, 60HZ, 22KAIC

800 AT800 AF

PANEL

BOARD

125 AT125 AF

250 AT250 AF

125 AT125 AF

PANEL

BOARD

PANEL

BOARD

PANEL

BOARD

43 43 48 43

125 AT125 AF 200 AF

FUTUREBANKBUILD-

OUT

SPACE200 AF

KEY PLAN

REVISIONS

FILE LOG

ACTIVITY

Draw

Design

Manager

Check

STAMP

© LEO A DALY Company 2015

PROJECT NO.

BY

THE NEW ORLEANSAVIATION BOARD

CRESCENT CITYAVIATION TEAM

1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229

A JOINT VENTURE

NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062

THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062

VOLUME 3.3.2

NO. DESCRIPTION DATE

ISSUED FOR CONSTRUCTION

02-08-2016

CONFORMED SET 02-08-2016

6/2

8/2

016

3:5

1:0

5 P

M

CITY OF NEW ORLEANS

TERMINAL ONE-LINE DIAGRAM

NT EG 6015

051-10250-000

SCC

SKA

SCC

C Addendum 3 07-24-2015

L.13 Addendum 11.13 01-21-2016

M Addendum 12 01-14-2016

DSI-0005 MCA-DSI-0005 06-28-2016

DSI-0005

DSI-0005

DSI-0005

DSI-0005

Page 11: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

TO 480VSWBD.

HS-T1W-A

208Y / 120 VOLT SWITCHBOARD

"LS-T1W-A"

LOCATED IN TERMINAL ELECTRICAL ROOM 1370

1 2 3 4 5 6

LPT1W1

87

SWITCHBOARD LS-T1W-A (CONTINUED)

XFMR "TL-T1W-A"225 KVA DRY TYPE480 - 208Y/120V

LPT1W2 LPT1W5 LC1390

800A, 208Y / 277V, 3PH, 4W, 60HZ, 22KAIC

800 AT800 AF

SEE BELOW

FOR CONTINUATION

SEE ABOVE

FOR CONTINUATION

PANELBOARD

125 AT125 AF

125 AT125 AF

125 AT125 AF

200 AT250 AF

PANELBOARD

PANELBOARD

PANELBOARD

43 43 43 46

SPARESPARE

SPACE

250 AF

SPACE

250 AF

KEY PLAN

REVISIONS

FILE LOG

ACTIVITY

Draw

Design

Manager

Check

STAMP

© LEO A DALY Company 2015

PROJECT NO.

BY

THE NEW ORLEANSAVIATION BOARD

CRESCENT CITYAVIATION TEAM

1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229

A JOINT VENTURE

NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062

THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062

VOLUME 3.3.2

NO. DESCRIPTION DATE

C Addendum 3 07-24-2015

CONFORMED SET 02-08-2016

6/2

8/2

016

3:5

2:0

0 P

M

CITY OF NEW ORLEANS

TERMINAL ONE-LINE DIAGRAM

051-10250-00002-08-2016

SCC

SKA

SCC

ISSUED FOR CONSTRUCTION

NT EG 6016

DSI-0005 MCA-DSI-0005 06-28-2016

DSI-0005

DSI-0005

DSI-0005

1­3"C STUBBEDOUT IN COMMROOM 1391

1­3"C STUBBEDOUT IN COMMROOM 1391

Page 12: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

TO 480VSWBD.

HS-T1W-B

208Y / 120 VOLT SWITCHBOARD"LS-T1W-B"

1 2 3 4 5 6

LPT1W6

87

SWITCHBOARD LS-T1W-B (CONTINUED)

XFMR "TL-T1W-B"225 KVA DRY TYPE480 - 208Y/120V

LPT1W9LPT1W7 LPT1W8 LC1091 LC1391

800A, 208Y / 277V, 3PH, 4W, 60HZ, 22KAIC

800 AT800 AF

SEE BELOW

FOR CONTINUATION

SEE ABOVE

FOR CONTINUATION

PANELBOARD

125 AT125 AF

200 AT250 AF

125 AT125 AF

125 AT125 AF

200 AT250 AF

100 AT125 AF

PANELBOARD

PANELBOARD

PANELBOARD

PANELBOARD

PANELBOARD

4643 43 43 46 43

SPACE

250 AF

SPACE

250 AF

KEY PLAN

REVISIONS

FILE LOG

ACTIVITY

Draw

Design

Manager

Check

STAMP

© LEO A DALY Company 2015

PROJECT NO.

BY

THE NEW ORLEANSAVIATION BOARD

CRESCENT CITYAVIATION TEAM

1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229

A JOINT VENTURE

NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062

THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062

VOLUME 3.3.2

NO. DESCRIPTION DATE

C Addendum 3 07-24-2015

CONFORMED SET 02-08-2016

6/2

8/2

016

3:5

2:3

8 P

M

CITY OF NEW ORLEANS

TERMINAL ONE-LINE DIAGRAM

051-10250-00002-08-2016

SCC

SKA

SCC

ISSUED FOR CONSTRUCTION

NT EG 6017

DSI-0005

DSI-0005

DSI-0005

DSI-0005 MCA-DSI-0005 06-28-2016

1­3"C STUBBEDOUT IN COMMROOM 1091

Page 13: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

TO 480VSWBD.HS-T3W

208Y / 120 VOLT SWITCHBOARD"LS-T3W"

1 2 3 4 5 6

9

LPT3W1

87

SWITCHBOARD LS-T3W (CONTINUED)

XFMR "TL-T3W-B"225kVA DRY TYPE480 - 208Y/120V

LC3090LPT3W2 LPT3W3 RETAIL 3017

208Y / 277V, 3PH, 4W, 60HZ, 22KAIC

800 AT1000 AF

SEE BELOW

FOR CONTINUATION

SEE ABOVE

FOR CONTINUATION

PANELBOARD

125 AT125 AF

125 AT125 AF

150 AT250 AF

125 AT125 AF

PANELBOARD

PANELBOARD

PANELBOARD

43 43 44 43

125 AF

125 AF 125 AF250 AF

FUTUREBUILD-

OUT

250 AF

KEY PLAN

REVISIONS

FILE LOG

ACTIVITY

Draw

Design

Manager

Check

STAMP

© LEO A DALY Company 2015

PROJECT NO.

BY

THE NEW ORLEANSAVIATION BOARD

CRESCENT CITYAVIATION TEAM

1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229

A JOINT VENTURE

NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062

THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062

VOLUME 3.3.2

NO. DESCRIPTION DATE

C Addendum 3 07-24-2015

CONFORMED SET 02-08-2016

6/2

8/2

016

3:5

3:4

7 P

M

CITY OF NEW ORLEANS

TERMINAL ONE-LINE DIAGRAM

051-10250-00002-08-2016

SCC

SKA

SCC

ISSUED FOR CONSTRUCTION

NT EG 6019

L.13 Addendum 11.13 01-21-2016

M Addendum 12 01-14-2016

DSI-0005 MCA-DSI-0005 06-28-2016

DSI-0005

DSI-0005

Page 14: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

AE

DF

EC

FE

TC

TC

TC

FEC

PF

J

J

J

J

J

J

J

JJ

M

S

S

M

M

M

J

JM

DA

D16

DC

EC

E1

DA.5 DB.5 TG

FA

FB

8

1

9

2

4 3

6

7

(TYP.)

EG 40011

WP

MATCH LINE

SEE ET 2112A

MATCH LINE

SEE ET 2111B

MATCH LINE

SEE ET 2112B

AC

5

1: LPT1N1

2: LPT1N1

25: LPT1N1

10: LPT1N1

1: LPT1N1

5: LPT1N1

5: LPT1N1

1: LPT1N1

7: LPT1N1

10: LPT1N1

10: LPT1N1

10: LPT1N1

24: LPT1N1

24: LPT1N1

12: LPT1N1

4: LPT1N1

IG IG IG11: LPT1N1

11: LPT1N1

22: LPT1N1

23: LPT1N1

26: LPT1N1

26: LPT1N1

AC AC

10: LPT1N1

2: LPT1N1

2: LPT1N1

2: LPT1N1

25: LPT1N1

13: LPT1N1

17: LPT1N1

16: LPT1N1 19: LPT1N1

WP

24: LPT1N1

19: LPT1N1

25: LPT1N1

30: LPT1N1

25: LPT1N1

10

22: LPT1N1

8: LPT1N1

EG 34021

ELEC

1070

MEN

1040

MSY BREAK ROOM

1014

OFFICE

1015

STORAGE

1016

STAIR 10

1059

1070

FCU

T1N-1

TX

1011

CUH

18: LPT1N1

20: LPT1N1

1059

CUH

1040

CAV

1014

VAV

11: LPT1N1

1015

VAV

11

ARRIVAL HALL

1000

VEST

1011

12

5: LPT1N1

8

3: LPT1N1

EWH-11,3,5: HPT1N1HWRP-1

13

14: LPT1N1

PLAN NOTES1 PROVIDE 120 VOLT POWER CONNECTION TO

ELECTRIC HAND DRYER. COORDINATELOCATION WITH INSTALLER PRIOR TO ROUGH-IN.

PROVIDE 120 VOLT POWER CONNECTION TOWATER CLOSET AUTO-FLUSH TRANSFORMER.EXTEND LOW VOLTAGE CIRCUITING FROMTRANSFORMER SECONDARY TO WATER CLOSETSENSORS IN BATHROOM. COORDINATE EXACTLOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.

PROVIDE 120 VOLT POWER CONNECTION TOLAVATORY FAUCET SENSOR TRANSFORMER.EXTEND LOW VOLTAGE CIRCUITING FROMTRANSFORMER SECONDARY TO LAVATORYSENSORS IN BATHROOM. COORDINATE EXACTLOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.

PROVIDE 120 VOLT POWER CONNECTION TOSOAP DISPENSER TRANSFORMER. EXTENDLOW VOLTAGE CIRCUITING FROMTRANSFORMER SECONDARY TO SOAPDISPENSER SENSORS IN BATHROOM.COORDINATE EXACT LOCATION ANDREQUIREMENTS WITH INSTALLER PRIOR TOROUGH-IN.

PROVIDE 120 VOLT POWER CONNECTION TOSANITARY TOILET SEAT COVER TRANSFORMER.EXTEND LOW VOLTAGE CIRCUITING FROMTRANSFORMER SECONDARY TO SANITARYTOILET SEAT COVER SENSORS IN BATHROOM.COORDINATE EXACT LOCATION ANDREQUIREMENTS WITH INSTALLER PRIOR TOROUGH-IN.

PROVIDE 120 VOLT POWER CONNECTION TOURINAL AUTO-FLUSH TRANSFORMER. EXTENDLOW VOLTAGE CIRCUITING FROMTRANSFORMER SECONDARY TO URINALSENSORS IN BATHROOM. COORDINATE EXACTLOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.

FOR FIDS/VP MONITORS, PROVIDE ISOLATEDGROUND CONDUCTOR.

PROVIDE 120 VOLT POWER CONNECTION TOAUTOMATIC DOORS. COORDINATEREQUIREMENTS WITH INSTALLER PRIOR TOROUGH-IN.

PROVIDE 120 VOLT POWER CONNECTION TOLUGGAGE CART SYSTEM. COORDINATE EXACTLOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.

PROVIDE RECEPTACLE IN SOFFIT ABOVELOCKERS FOR TELEVISION.

PROVIDE JUNCTION BOX FOR INSTALLATION BYOTHERS OF 120VAC-24VAC TRANSFORMERSERVING VAV/CAV BOXES LOCATED WITHIN50FT OF JUNCTION BOX.

PROVIDE 30A/3P 480 VOLT MOTOR RATEDSWITCH. CONNECT TO UNIT AS REQUIRED ANDVERIFY EXACT LOCATION PRIOR TOINSTALLATION. USE #10'S THROUGHOUTCIRCUIT.

PROVIDE 30A/3P 480 VOLT NON-FUSEDDISCONNECT SWITCH. CONNECT TO UNIT ASREQUIRED AND VERIFY EXACT LOCATION PRIORTO INSTALLATION. USE #10'S THROUGHOUTCIRCUIT.

2

3

4

5

6

7

8

9

10

11

12

13

REVISED CIRCUITS PER MECHANICAL VE

4'

SCALE : 1/8" = 1'-0"

0 8' 16'

T1A

C1A

T2A

T2C

T4A

T4C

T1B

T2B

T2D

T4B

T4D

T5A

T5C T5D

T3B

T3DT3C

C1B

C2A

C2B

C3A

C3B

C4A

C4B

C5A

C5B

C6A

C6B

NTRUENORTH

KEY PLAN

REVISIONS

FILE LOG

ACTIVITY

Draw

Design

Manager

Check

STAMP

© LEO A DALY Company 2015

PROJECT NO.

BY

THE NEW ORLEANSAVIATION BOARD

CRESCENT CITYAVIATION TEAM

1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229

A JOINT VENTURE

NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062

THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062

NO. DESCRIPTION DATE

ISSUED FOR CONSTRUCTION

02-08-2016

CONFORMED SET 02-08-2016

2/1

5/2

016

4:0

9:0

4 P

M

CITY OF NEW ORLEANS

TERMINAL POWER PLAN LEVEL 1 -AREA 1A

NT ET 2111A

051-10250-000

SCC

SKA

SCC

VOLUME 3.3.2

SCALE: 1/8" = 1'-0"ET 2111A

1 TERMINAL POWER PLAN LEVEL 1 - AREA 1A

C Addendum 3 07-24-2015

D Addendum 4 07-30-2015

L Addendum 11 12-11-2015

L.8 Addendum 11.8 12-23-2015

M Addendum 12 01-14-2016

M.1 Addendum 12.1 02-01-2016

CONFORMED SET 02-01-2016

dburley
Rectangle
dburley
Callout
PDP-1 (MEZZANINE)
Page 15: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

TC

TC

TC

TC

TC

J

JS

JS

JS

M

M

S

DA

D16

D15

D14

D13

A50

DBEC

1

WP

1

(TYP.)

SHUTTLE SERVICE 1028FUTURE BUILD-OUT

2

MATCH LINE

SEE ET 2111A

MATCH LINE

SEE ET 2111B

MATCH LINE

SEE ET 2112B

MATCH LINE

SEE ET 2112D

MATCH LINE

SEE ET 2112C

MATCH LINE

SEE ET 2112B

WP

3

(TYP.)

IGIGIG

24: LPT1N1

24: LPT1N1

29: LPT1N3

19: LPT1N119: LPT1N1

29: LPT1N3

29: LPT1N3

5: LPT1N2

5: LPT1N2

(TYP.)

1: LPT1N2

1: LPT1N2

23: LPT1N2

23: LPT1N3

18: LPT1N3

18: LPT1N3

18: LPT1N3

18: LPT1N3

30: LPT1N3

30: LPT1N3

VEST

1005

SHUTTLE SERVICE

1028

VEST

1004

GARDEN

1023C

1005

CUH

1004

CUH

30: LPT1N3ARRIVAL HALL

1000

C22 C23

2

3

PROVIDE 120 VOLT POWER CONNECTION TOAUTOMATIC DOORS. COORDINATEREQUIREMENTS WITH INSTALLER PRIOR TOROUGH-IN.

PROVIDE TWO (2) 120 VOLT 20A DEDICATEDCIRCUITS FROM PANEL "LPT1N1" FOR THISSPACE.

FOR FIDS/VP MONITORS PROVIDE ISOLATEDGROUND CONDUCTORS.

1

PLAN NOTES

REVISED CIRCUITS PER MECHANICAL VE

4'

SCALE : 1/8" = 1'-0"

0 8' 16'

T1A

C1A

T2A

T2C

T4A

T4C

T1B

T2B

T2D

T4B

T4D

T5A

T5C T5D

T3B

T3DT3C

C1B

C2A

C2B

C3A

C3B

C4A

C4B

C5A

C5B

C6A

C6B

NTRUENORTH

KEY PLAN

REVISIONS

FILE LOG

ACTIVITY

Draw

Design

Manager

Check

STAMP

© LEO A DALY Company 2015

PROJECT NO.

BY

THE NEW ORLEANSAVIATION BOARD

CRESCENT CITYAVIATION TEAM

1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229

A JOINT VENTURE

NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062

THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062

NO. DESCRIPTION DATE

ISSUED FOR CONSTRUCTION

02-08-2016

CONFORMED SET 02-08-2016

2/1

5/2

016

4:0

9:1

3 P

M

CITY OF NEW ORLEANS

TERMINAL POWER PLAN LEVEL 1 -AREA 2A

NT ET 2112A

051-10250-000

SCC

SKA

SCC

VOLUME 3.3.2

SCALE: 1/8" = 1'-0"ET 2112A

1 TERMINAL POWER PLAN LEVEL 1 - AREA 2A

L Addendum 11

C Addendum 3 07-24-2015

12-11-2015

L.8 Addendum 11.8 12-23-2015

M Addendum 12 01-14-2016

M.1 Addendum 12.1 02-01-2016

Page 16: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

AE

D

TC

TC

TC

UP

J

JS

JS

J

FB1

S

FB1

FB1

M

FB1

FB1

FB

1

J

DAD13

D11

D10

D9

A50

A49

DB

DC

EC

D12

TD TETB TC TF

1

1

(TYP.)

CURRENCY EXCHANGE 1025FUTURE BUILD-OUT

2

LIMO SERVICE 1026FUTURE BUILD-OUT

2

3

4

(TYP.)

WP

WP

MATCH LINE

SEE ET 2112D

MATCH LINE

SEE ET 2114B

MATCH LINE

SEE ET 2114A

MATCH LINE

SEE ET 2112B

MATCH LINE

SEE ET 2112A

MATCH LINE

SEE ET 2113B

MATCH LINE

SEE ET 2112D

12: LPT1N2

12: LPT1N2

23: LPT1N1

14: LPT1N2

16: LPT1N2

14: LPT1N2

15: LPT1N2

19: LPT1N2

19: LPT1N2

19: LPT1N2

1: LPT1N2

1: LPT1N2

22: LPT1N2

22: LPT1N2

23: LPT1N2

21: LPT1N2

21: LPT1N2

21: LPT1N2

18: LPT1N2

34: LPT1N2

10: LPT1W110: LPT1W1

21: LPT1N2

10: LPT1W1

GARDEN

1023C

INFO CENTER

1027

VEST

1003

LIMO SERVICE

1026

CURRENCY EXCHANGE

1025

GARDEN

1023A

BAND STAND

1022

BAND STAND CIRC

1023

VEST

1002

1003

CUH

11: LPT1W1

28: LPT1W1

28: LPT1W1

35: LPT1W2

34: LPT1W29: LPT1W1

8: LPT1W1

36: LPT1N2

37: LPT1N2

C22

C23

2

3

4

PROVIDE 120 VOLT POWER CONNECTION TOAUTOMATIC DOORS. COORDINATEREQUIREMENTS WITH INSTALLER PRIOR TOROUGH-IN.

PROVIDE TWO (2) 120 VOLT 20A DEDICATEDCIRCUITS FROM PANEL “LPT1W2" FOR THISSPACE.

PROVIDE 120 VOLT POWER CONNECTION TOLUGGAGE CART SYSTEM. COORDINATEEXACT LOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.

PROVIDE TWO COMPARTMENT FLUSH FLOORBOX WITH DUPLEX RECEPTACLE ON RAISEDPLATFORM. FIELD VERIFY EXACT LOCATIONWITH OWNER’S REPRESENTATIVE PRIOR TOROUGH-IN.

1

PLAN NOTES

REVISED CIRCUITS PER MECHANICAL VE

4'

SCALE : 1/8" = 1'-0"

0 8' 16'

T1A

C1A

T2A

T2C

T4A

T4C

T1B

T2B

T2D

T4B

T4D

T5A

T5C T5D

T3B

T3DT3C

C1B

C2A

C2B

C3A

C3B

C4A

C4B

C5A

C5B

C6A

C6B

NTRUENORTH

KEY PLAN

REVISIONS

FILE LOG

ACTIVITY

Draw

Design

Manager

Check

STAMP

© LEO A DALY Company 2015

PROJECT NO.

BY

THE NEW ORLEANSAVIATION BOARD

CRESCENT CITYAVIATION TEAM

1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229

A JOINT VENTURE

NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062

THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062

NO. DESCRIPTION DATE

ISSUED FOR CONSTRUCTION

02-08-2016

CONFORMED SET 02-08-2016

2/1

5/2

016

4:0

9:2

2 P

M

CITY OF NEW ORLEANS

TERMINAL POWER PLAN LEVEL 1 -AREA 2C

NT ET 2112C

051-10250-000

SCC

SKA

SCC

VOLUME 3.3.2

SCALE: 1/8" = 1'-0"ET 2112C

1 TERMINAL POWER PLAN LEVEL 1 - AREA 2C

L Addendum 11 12-11-2015

L.8 Addendum 11.8 12-23-2015

M Addendum 12 01-14-2016

M.1 Addendum 12.1 02-01-2016

Page 17: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

AED

FEC

FEC

FE

TC

TC

TC

TC

TC

TC

J

S

S

S

J

S

JS

J

M

M

S

J J J J J J

M

J

J

J

J

EAA51

A52

A53

A54

EB

EBECE7

E8

E9

E10

T5

CL

T6

EA.1

T4

T3

TJ TL

TM

TN

(TYP.)

5

2

3

MATCH LINE

SEE ET 2112D

FUTUREBUILD-OUT

N.I.C.

FUTUREBUILD-OUT

N.I.C.

FUTUREBUILD-OUT

N.I.C.

MATCH LINE

SEE ET 2112C

MATCH LINE

SEE ET 2114A

MATCH LINE

SEE ET 2115A

MATCH LINE

SEE ET 2114D

MATCH LINE

SEE ET 2114D

MATCH LINE

SEE ET 2114C

MATCH LINE

SEE ET 2112D

1

EG 40053

(TYP.)

4

4

MATCH LINE

SEE ET 2115A

MATCH LINE

SEE ET 2115A

E9

7

(TYP.)

IG

IG

IG

6 6 6

9

(TYP.)

(TYP.)

8 99 8 99 9

FUTUREBUILD-OUT

N.I.C.

25: LPT1E3

25: LPT1E3

25: LPT1E3

28: LPT1E3

15: LPT1E3

14: LPT1E3

21: LPT1E3

27: LPT1E3

18: LC1092

21: LC1092

20: LC1092

22: LPT1E123: LPT1E124: LPT1E125: LPT1E126: LPT1E1

30: LPT1E129: LPT1E132: LPT1E1

29: LPT1E3

29: LPT1E3

22: LPT1E3

22: LPT1E3

32: LPT1E3

32: LPT1E3

22: LPT1E3

22: LPT1E3

26: LPT1E3

18: LC1092

22: LPT1E3

22: LPT1E3

22: LPT1E3

27: LPT1E3

24: LC1092 24: LC1092

22: LC1092

24: LPT1E3

21: LPT1E3

18: LPT1E3

18: LPT1E3

24: LPT1E3

25: LC1092

6: LPT1E3

4: LPT1E3

4: LPT1E3

9: LPT1E3

31: LPT1E3

13: LPT1E3

20: LPT1E3

28: LPT1E3

26: LPT1E3

VEST

1009

CIRCULATION -BAGGAGE CLAIM-2

1021-2

BAGGAGE CART AREA

1058A

STAIR 03

1058

COMM

1092

ELEV T06-T08 CONTROLRM

1094

DELTA BSO

1036

JET BLUE BSO

1035

UNITED BSO

1037

BSO-8

1038

BAGGAGE CLAIM

1020

CIRCULATION -BAGGAGE CLAIM-2

1021-2

ELEV T07

1055

ELEV T08

1056

CIRCULATION -BAGGAGE CLAIM-2

1021-2

7: LPT1W2

1009

CUH

1094

FCU

1021-4

VAV

1021-6

VAV

1021-5

VAV

1092

FCU

22: LC1092

16: LPT1E3

17: LC1092

30: LPT1E3

19: LC1092

15: LC1092

CIRCULATION -

BAGGAGE CLAIM

1021

CIRCULATION -

BAGGAGE CLAIM

1021

10: LPT1E3

11: LPT1E3

1020-2

VAV

1020-3

VAV

10

10

10

C24 C25

11

PLAN NOTES

2

PROVIDE 120V POWER CONNECTION TOAUTOMATIC DOORS. COORDINATEREQUIREMENTS WITH INSTALLER PRIOR TOROUGH-IN.

PROVIDER GFCI RECEPTACLE, AND SWITCH INESCALATOR PIT. LOCATE IN PIT WITHESCALATOR MANUFACTURER/INSTALLER. SEESHRRY ET 1114B FOR TYPE 'L9' LIGHT FIXTURELOCATION.

PROVIDE GFCI RECEPTACLE FOR ESCALATORPIT SUMP PUMP. COORDINATE LOCATION WITHDIVISION 23 AND ESCALATOR SHOPDRAWINGS.

PROVIDE 120V POWER CONNECTION TOLUGGAGE CART SYSTEM. COORDINATE EXACTLOCATION AND REQUIREMENTS WITHINSTALLER PRIOR TO ROUGH-IN.

FOR FIDS/VP MONITORS. PROVIDE ISOLATEDGROUND CONDUCTORS.

FOR BIDS MONITORS. PROVIDE ISOLATEDGROUND CONDUCTORS.

PROVIDE GFCI RECEPTACLE, AND SWITCH INELEVATOR PIT. LOCATE IN PIT WITHESCALATOR MANUFACTURER/INSTALLER. SEESHEET ET 1114B TYPE 'L9' LIGHTING FIXTURELOCATION.

MOUNT RECEPTACLE AT 5'-0" AF.F. FORDIGITAL ADVERTISEMENT MONITOR.

PROVIDE 120V POWER CONNECTION TOCONVEYOR SYSTEM SHUTTER DOORS.COORDINATE ROUGH-IN AND CONNECTIONREQUIREMENTS WITH INSTALLER.

PROVIDE JUNCTION BOX FOR INSTALLATIONBY OTHERS OF 120VAC-24VACTRANSFORMERS SERVING VAV/CAV BOXESLOCATED WITHIN 50FT OF JUNCTION BOX.

ESCALATOR, 480 VOLT PROVIDE 30A/3P 600VOLT FUSED DISCONNECT SWITCH FOR EACHMOTOR FURNISED WITH UNIT. ROUTE 3 #12'S,AND 1 #12G 3/4" TO EACH MOTOR FROMJUNCTION BOX. ROUTE 3#10'S AND 1#12G, 3/4"TO PANEL. WIRING AND CONNECTIONS TO BECONCEALED IN UNIT. VERIFY ELECTRICALREQUIRMENTS WITH ESCALATOR PURCHASEDPRIOR TO ROUGH-IN.

1

3

4

5

6

7

8

9

10

11

REVISED CIRCUITS PER MECHANICAL VE

4'

SCALE : 1/8" = 1'-0"

0 8' 16'

T1A

C1A

T2A

T2C

T4A

T4C

T1B

T2B

T2D

T4B

T4D

T5A

T5C T5D

T3B

T3DT3C

C1B

C2A

C2B

C3A

C3B

C4A

C4B

C5A

C5B

C6A

C6B

NTRUENORTH

KEY PLAN

REVISIONS

FILE LOG

ACTIVITY

Draw

Design

Manager

Check

STAMP

© LEO A DALY Company 2015

PROJECT NO.

BY

THE NEW ORLEANSAVIATION BOARD

CRESCENT CITYAVIATION TEAM

1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229

A JOINT VENTURE

NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062

THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062

VOLUME 3.3.2

NO. DESCRIPTION DATE

ISSUED FOR CONSTRUCTION

02-08-2016

CONFORMED SET 02-08-2016

2/1

5/2

016

4:0

9:5

3 P

M

CITY OF NEW ORLEANS

TERMINAL POWER PLAN LEVEL 1 -AREA 4B

NT ET 2114B

051-10250-000

SCC

SKA

SCC

SCALE: 1/8" = 1'-0"ET 2114B

1 TERMINAL POWER PLAN LEVEL 1 - AREA 4B

L Addendum 11 12-11-2015

L.8 Addendum 11.8 12-23-2015

M Addendum 12 01-14-2016

M.1 Addendum 12.1 02-01-2016

dburley
Rectangle
dburley
Callout
PDP-2 (MEZZANINE)
Page 18: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

FE

FE

FEFE

J

J

M M

MM

M

M

M

JJ

J

M M M

M M

M

M M M

J

D9D8D7

A50A48

A47

AA

DC

AB

E8

E9

GG

TD TE

T3

TATB TC TF

2

1

MATCH LINE

SEE ET 2113BMATCH LINE

SEE ET 2114A

MATCH LINE

SEE ET 2313D

MATCH LINE

SEE ET 2313D

2

3

2

WP

WP

2

WP

WPWP

18: LPT1W8

20: LPT1W8

21: LPT1W8

22: LPT1W8

22: LPT1W8

21: LPT1W8

21: LPT1W8

21: LPT1W8

21: LPT1W8

21: LPT1W8

22: LPT1W6

19: LPT1W6

22: LPT1W6

1: LPT1W2

30: LPT1W8

30: LPT1W830: LPT1W8

1: LPT1W21: LPT1W2

1: LPT1W2

BSO-4

1033 BAGGAGE CLAIM

1020

WEAPON STORAGE

1344

WEAPON CLEARINGROOM

1345

SUPERVISOR'S OFFICE

1342

MUSTER/ TRAININGROOM

1343

MECH

1380

INBOUND BAGGAGE

1101

OUTBOUND BAGGAGEMAKEUP

1100

INBOUND BAGGAGE

1101

1100H

HAC1100G

HAC

1100F

HAC

1100E

HAC1100D

HAC1100C

HAC1100B

HAC

19: LPT1W8 16: LPT1W8

1,3,5: HPT1W3

8,10,12: HPT1W3

27: LPT1W81100-2

UH

1100-1

UH

1100-3

UH

27: LPT1W8

23: LPT1W8

31: LPT1W8

1100-4

UH 1100-6

UH

26: LPT1W8

27: LPT1W8

23: LPT1W81100-5

UH

32: LPT1W8

1380

UH

23: LPT1W8

2,4,6: HPT1W3

2090

CRACCU

25: LPT1W6

5

2090-1

CRAC

2090-2

CRAC

OUTBOUND BAGGAGE

MAKEUP

1100

1100A

HAC

2100-1

VAV

21: LPT1W8

UA

UB

1100-2

BEF1100-1

BEF

29,31,33: HPT1W2 28,30,32: HPT1W2 35,37,39: HPT1W2

7,9,11: HPT1W3 21,23,25: HPT1W4

1100-13

UH

22,24,26: HPT1W4 27,29,31: HPT1W4 28,30,32: HPT1W4

6

6

34: LPT1W6

5

AB.9

DDCCONTROLOUTLET

7

27: LPT1W8

PLAN NOTES

2

PROVIDE 120 VOLT POWER CONNECTION TOCONVEYOR SYSTEM SHUTTER DOORS.COORDINATE ROUGH-IN AND CONNECTIONREQUIREMENTS WITH INSTALLER.

CONNECT TO MOTORIZED DOOR OPERATOR.COORDINATE ROUGH-IN AND CONNECTIONREQUIREMENTS WITH INSTALLER. INSTALL ALLCONDUIT AND WIRE ALL CONTROLS, ETC. ASREQUIRED, INCLUDING 1/2" C FROMCONTROLLER TO ELECTRONIC EYE NEARFLOOR.

BAGGAGE POWER DISTRIBUTION PANEL, 'PDP-I' FOR CURBSIDE AND CLAIM. REFER TO SINGLELINE DIAGRAM ON SHEET NT EG 6011 FORFEEDER REQUIREMENTS. THE ELECTRICALCONTRACTOR SHALL PROVIDE FEEDER IN A20' COIL IN A PULLBOX LOCATED IN CEILINGSTRUCTURE ABOVE THE 'PDP'. EXTENSION OFFEEDER AS WELL AS ALL WORK ASSOCIATEDWITH BAGGAGE SYSTEM POWERCONNECTIONS SHALL BE PERFORMED BY THEBAGGAGE SYSTEM CONTRACTOR.

PROVIDE 15A/3P 480 VOLT NON FUSEDDISCONNECT SWITCH. CONNECT TO UNIT ASREQUIRED AND VERIFY EXACT LOCATIONPRIOR TO INSTALLATION..

PROVIDE JUNCTION BOX FOR INSTALLATION BYOTHERS OF 120 VAC- 24VAC TRANSFORMERSERVING VAV BOXES LOCATED WITHIN 50FT OFJUNCTION BOX.

PROVIDE 30A/3P 480 VOLT NON-FUSEDDISCONNECT SWITCH. CONNECT TO UNIT ASREQUIRED AND VERIFY EXACT LOCATIONPRIOR TO INSTALLATION. USE #10'STHROUGHOUT CIRCUIT.

VARIABLE FREQUENCY DRIVES (VFD’S)FURNISHED BY MECHANICAL DIVISION 23,INSTALLED AND WIRED BY ELECTRICALDIVISION 26. VFD'S SHALL BE WIRED TO UNITWITH MANUFACTURER'S WIRING DIAGRAMFURNISHED IN UNIT.

1

3

4

5

6

7

REVISED CIRCUITS PER MECHANICAL VE

4'

SCALE : 1/8" = 1'-0"

0 8' 16'

T1A

C1A

T2A

T2C

T4A

T4C

T1B

T2B

T2D

T4B

T4D

T5A

T5C T5D

T3B

T3DT3C

C1B

C2A

C2B

C3A

C3B

C4A

C4B

C5A

C5B

C6A

C6B

NTRUENORTH

KEY PLAN

REVISIONS

FILE LOG

ACTIVITY

Draw

Design

Manager

Check

STAMP

© LEO A DALY Company 2015

PROJECT NO.

BY

THE NEW ORLEANSAVIATION BOARD

CRESCENT CITYAVIATION TEAM

1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229

A JOINT VENTURE

NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062

THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062

VOLUME 3.3.2

NO. DESCRIPTION DATE

ISSUED FOR CONSTRUCTION

02-08-2016

CONFORMED SET 02-08-2016

2/1

5/2

016

4:1

0:0

0 P

M

CITY OF NEW ORLEANS

TERMINAL POWER PLAN LEVEL 1 -AREA 4C

NT ET 2114C

051-10250-000

SCC

SKA

SCC

SCALE: 1/8" = 1'-0"ET 2114C

1 TERMINAL POWER PLAN LEVEL 1 - AREA 4C

C Addendum 3 07-24-2015

L Addendum 11 12-11-2015

L.8 Addendum 11.8 12-23-2015

M Addendum 12 01-14-2016

M.1 Addendum 12.1 02-01-2016

dburley
Rectangle
dburley
Callout
PDP-3
dburley
Rectangle
dburley
Rectangle
dburley
Callout
PDP-4
dburley
Callout
PDP5
Page 19: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

FE

FE

FE

FE

FE

J

M M M

M M

M

J

J

M M MM M

M M M

M

D9

D8

AA

A51 A52 A53 A54

EC

AB

E8

E9

E10

E11

CL

L5

T3

TJ TL TM

TN

2

MATCH LINE

SEE ET 2115A

MATCH LINE

SEE ET 2114B

MATCH LINE

SEE ET 2214C

MATCH LINE

SEE ET 2114C

MATCH LINE

SEE ET 2114B

WPWP

WP

WP

1

3

2

MATCH LINE

SEE ET 2115A

MATCH LINE

SEE ET 2115A

227: LPT1E4

27: LPT1E4

OUTBOUND BAGGAGEMAKEUP

1100

INBOUND BAGGAGE

1101

BAGGAGE CLAIM

1020

BSO-8

1038

20: LC1092

20: LC1092

21: LPT1E1

19: LC1491

1100Q

HAC

1100N

HAC

1100M

HAC

1100L

HAC1100K

HAC

1100J

HAC

31: LPT1E1

19: LC1491

19: LC1491

25: LPT1E4

1: LPT1E5

25: LPT1E4

25: LPT1E426: LPT1E4

27: LPT1E426: LPT1E4

1100-7

UH

4: LPT1E5

7: LPT1E5

8: LPT1E51100-8

UH

4: LPT1E5

6: LPT1E5

8: LPT1E5

1100-10

UH

1100-12

UH

8: LPT1E5

5: LPT1E5

1100-11

UH4: LPT1E5

1: LPT1E5

1100P

HAC

13,15,17: HPT1E2

8,10,12: HPT1E2

11: LPT1E5

1100-9

UH

1100R

HAC

OUTBOUND BAGGAGEMAKEUP

1100

OUTBOUND BAGGAGEMAKEUP

1100

OUTBOUND BAGGAGE

MAKEUP

1100

1100-14

UH

2100-2

VAV

UA

UB

1100-3

BEF

8: LPT1E5

6 1100-4

BEF

8,10,12: HPT1E3 9,11,13: HPT1E3 7,9,11: HPT1E227,29,31: HPT1E331,33,35: HPT1E2

32,34,36: HPT1E333,35,37: HPT1E3

5

(TYP.)

4

6

22,24,26: HPT1E3

PLAN NOTES

2

PROVIDE 120 VOLT POWER CONNECTION TOCONVEYOR SYSTEM SHUTTER DOORS.COORDINATE ROUGH-IN AND CONNECTIONREQUIREMENTS WITH INSTALLER.

CONNECT TO MOTORIZED DOOR OPERATOR.COORDINATE ROUGH-IN AND CONNECTIONREQUIREMENTS WITH INSTALLER. INSTALL ALLCONDUIT AND WIRE ALL CONTROLS, ETC. ASREQUIRED, INCLUDING 1/2" C FROMCONTROLLER TO ELECTRONIC EYE NEARFLOOR.

BAGGAGE POWER DISTRIBUTION PANEL, 'PDP-B' FOR CURBSIDE AND CLAIM. REFER TOSINGLE LINE DIAGRAM ON SHEET NT EG 6003FOR FEEDER REQUIREMENTS. THEELECTRICAL CONTRACTOR SHALL PROVIDEFEEDER IN A 20' COIL IN A PULLBOX LOCATEDIN CEILING STRUCTURE ABOVE THE 'PDP'.EXTENSION OF FEEDER AS WELL AS ALLWORK ASSOCIATED WITH BAGGAGE SYSTEMPOWER CONNECTIONS SHALL BEPERFORMED BY THE BAGGAGE SYSTEMCONTRACTOR.

PROVIDE JUNCTION BOX FOR INSTALLATION BYOTHERS OF 120VAC-24VAC TRANSFORMERSERVING VAV BOXES LOCATED WITHIN 50FT OFJUNCTION BOX.

PROVIDE 15A/3P 480 VOLT MOTOR RATEDSWITCH. CONNECT TO UNIT AS REQUIRED ANDVERIFY EXACT LOCATION PRIOR TOINSTALLATION.

PROVIDE 30A/3P 480 VOLT NON-FUSEDDISCONNECT SWITCH. CONNECT TO UNIT ASREQUIRED AND VERIFY EXACT LOCATIONPRIOR TO INSTALLATION. USE #10'STHROUGHOUT CIRCUIT.

1

3

4

5

6

REVISED CIRCUITS PER MECHANICAL VE

2'

SCALE : 3/8" = 1'-0"

0 4' 6'

T1A

C1A

T2A

T2C

T4A

T4C

T1B

T2B

T2D

T4B

T4D

T5A

T5C T5D

T3B

T3DT3C

C1B

C2A

C2B

C3A

C3B

C4A

C4B

C5A

C5B

C6A

C6B

NTRUENORTH

KEY PLAN

REVISIONS

FILE LOG

ACTIVITY

Draw

Design

Manager

Check

STAMP

© LEO A DALY Company 2015

PROJECT NO.

BY

THE NEW ORLEANSAVIATION BOARD

CRESCENT CITYAVIATION TEAM

1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229

A JOINT VENTURE

NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062

THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062

NO. DESCRIPTION DATE

ISSUED FOR CONSTRUCTION

02-08-2016

CONFORMED SET 02-08-2016

2/1

5/2

016

4:1

0:0

6 P

M

CITY OF NEW ORLEANS

TERMINAL POWER PLAN LEVEL 1 -AREA 4D

NT ET 2114D

051-10250-000

SCC

SKA

SCC

VOLUME 3.3.2SCALE: 1/8" = 1'-0"ET 2114D

1 TERMINAL POWER PLAN LEVEL 1 - AREA 4D

L Addendum 11 12-11-2015

L.8 Addendum 11.8 12-23-2015

L.12 Addendum 12 01-14-2016

M Addendum 12 01-14-2016

M.1 Addendum 12.1 02-01-2016

dburley
Rectangle
dburley
Callout
PDP-6
AGuyon
Rectangle
AGuyon
Rectangle
Page 20: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

FEC

FE

FE

FEC

J

J

M

M

M

M

M

J

M

PLAN NOTES

2

CONNECT TO MOTORIZED DOOR OPERATOR.COORDINATE ROUGH-IN AND CONNECTIONREQUIREMENTS WITH INSTALLER. INSTALLALL CONDUIT AND WIRE ALL CONTROLS, ETC.AS REQUIRED, INCLUDING 1/2"C FROMCONTROLLER TO ELECTRONIC EYE NEARFLOOR.

NOTE NOT USED.

BAGGAGE POWER DISTRIBUTION PANEL,'PDP'. THE ELECTRICAL CONTRACTOR SHALLPROVIDE FEEDER IN A 20' COIL IN A PULLBOXLOCATED IN CEILING STRUCTURE ABOVE THE'PDP'. EXTENSION OF FEEDER AS WELL ASALL WORK ASSOCIATED WITH BAGGAGESYSTEM POWER CONNECTIONS SHALL BEPERFORMED BY THE BAGGAGE SYSTEMCONTRACTOR.

PROVIDE 120 VOLT POWER CONNECTION TOWATER CLOSET AUTO-FLUSHTRANSFORMER. EXTEND LOW VOLTAGECIRCUITING FROM TRANSFORMERSECONDARY TO WATER CLOSET SENSORS INBATHROOM. COORDINATE EXACT LOCATIONAND REQUIREMENTS WITH INSTALLER PRIORTO ROUGH-IN.

PROVIDE 120 VOLT POWER CONNECTION TOSANITARY TOILET SEAT COVERTRANSFORMER. EXTEND LOW VOLTAGECIRCUITING FROM TRANSFORMERSECONDARY TO SANITARY TOILET SEATCOVER SENSORS IN BATHROOM.COORDINATE EXACT LOCATION ANDREQUIREMENTS WITH INSTALLER PRIOR TOROUGH-IN.

PROVIDE 480 VOLT, 3PH, 3W, 30A, FEED TOEXAMINER 3DX EXPLOSIVE DETECTIONMACHINE.

PROVIDE JUNCTION BOX FOR INSTALLATIONBY OTHERS OF 120 VAC- 24VACTRANSFORMER SERVING VAV/CAV BOXESLOCATED WITHIN 50FT OF JUNCTION BOX.

1

3

4

5

6

7

MATCH LINE

SEE ET 2114D

MATCH LINE

SEE ET 2114B

MATCH LINE

SEE ET 2114D

MATCH LINE

SEE ET 2115A

MATCH LINE

SEE ET 2115D

MATCH LINE

SEE ET 2115D

WP

MATCH LINE

SEE ET 2115A

4

5

1

BHS SPARE PARTS

1403

BSO-8

1038

1400-2

FCU

4: LPT1E2

3: LPT1E2 4: LPT1E2

28: LPT1E1

28: LPT1E1

19: LC1491

19: LC1491

6: LPT1E2

2: LPT1E7

PDP-8 PDP-9

PDP-10

1400B

HAC

1400A

HAC

1: LPT1E9

1: LPT1E92: LPT1E9

2: LPT1E9

3: LPT1E94: LPT1E9

3: LPT1E9 4: LPT1E9 5: LPT1E96: LPT1E9

5: LPT1E9 6: LPT1E9

7: LPT1E9 8: LPT1E9

7: LPT1E98: LPT1E9 9: LPT1E9

10: LPT1E9 9: LPT1E910: LPT1E9

1401-2

FCU

1400

VAV

1400-1

FCU

1401-1

FCU

19: LC1491

19: LC1491

2: LPT1E7

10: LPT1E2

2: LPT1E7

2: LPT1E7

2: LPT1E7

10: LPT1E2

1,3,5: PDP-8

2,4,6: PDP-8

8,10,12: PDP-8

13,15,17: PDP-8

7,9,11: PDP-8

10: LPT1E2

1,3,5: LPT1E4

BSO-8

1038

MEN

1441

BHS SPARE PARTS

1403

CIRC

1410

CBIS

1400

CBRA

1401

EDS/TSA SPARE PARTS

STOR

1406

BHS OVERSIZED BAG

SCREENING

1402

5: LPT1E2

2,4,6: LPT1E4

1,3,5: HPT1E2

8,10,12: LPT1E4

16: LPT1E7

7,9,11: LPT1E4

6

3

PDP-4PDP-3PDP-2PDP-1

PDP-7PDP-8PDP-9PDP-10

7

REVISED CIRCUITS PER MECHANICAL VE

4'

SCALE : 1/8" = 1'-0"

0 8' 16'

T1A

C1A

T2A

T2C

T4A

T4C

T1B

T2B

T2D

T4B

T4D

T5A

T5C T5D

T3B

T3DT3C

C1B

C2A

C2B

C3A

C3B

C4A

C4B

C5A

C5B

C6A

C6B

NTRUENORTH

KEY PLAN

REVISIONS

FILE LOG

ACTIVITY

Draw

Design

Manager

Check

STAMP

© LEO A DALY Company 2015

PROJECT NO.

BY

THE NEW ORLEANSAVIATION BOARD

CRESCENT CITYAVIATION TEAM

1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229

A JOINT VENTURE

NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062

THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062

NO. DESCRIPTION DATE

ISSUED FOR CONSTRUCTION

02-08-2016

CONFORMED SET 02-08-2016

2/1

5/2

016

4:1

1:5

0 P

M

CITY OF NEW ORLEANS

TERMINAL POWER PLAN LEVEL 1 -AREA 5C

NT ET 2115C

051-10250-000

SCC

SKA

SCC

VOLUME 3.3.2SCALE: 1/8" = 1'-0"ET 2115C

1 TERMINAL POWER PLAN LEVEL 1 - AREA 5C

L Addendum 11 12-11-2015

L.8 Addendum 11.8 12-23-2015

M Addendum 12 01-14-2016

M.1 Addendum 12.1 02-01-2016

dburley
Rectangle
dburley
Callout
PDP-10
dburley
Rectangle
dburley
Callout
PDP-9
dburley
Rectangle
dburley
Callout
PDP-8
dburley
Typewritten Text
X
dburley
Typewritten Text
dburley
Typewritten Text
X
dburley
Typewritten Text
X
dburley
Typewritten Text
X
dburley
Typewritten Text
X
dburley
Typewritten Text
X
dburley
Typewritten Text
X
dburley
Typewritten Text
X
dburley
Typewritten Text
X
dburley
Typewritten Text
X
dburley
Typewritten Text
X
dburley
Typewritten Text
X
dburley
Typewritten Text
X
dburley
Callout
PDP-7
dburley
Typewritten Text
dburley
Typewritten Text
X
dburley
Typewritten Text
X
dburley
Typewritten Text
X
dburley
Typewritten Text
X
dburley
Typewritten Text
X
dburley
Typewritten Text
X
dburley
Typewritten Text
X
dburley
Typewritten Text
X
dburley
Callout
DELETE LOCATION (TYPICAL)
rvaldes
Highlight
rvaldes
Highlight
rvaldes
Highlight
rvaldes
Highlight
rvaldes
Highlight
rvaldes
Highlight
Page 21: PARSONS BRINCKERHOFF - hunt-  · PDF fileparsons brinckerhoff north terminal project ... issued for construction ... inverter eht3c(1) (5kva) emergency lighting

1 GROUND PER NEC 250.30.

2 NOTE NOT USED.

4 30A, 3P, NON-FUSED

5 PROVIDE DRY TYPE TRANSFORMER 480V, 3PH DELTA TO

208Y/120V, 3PH, 4W WYE, 115 DEGREE RISE, 220 DEGREE

CLASS INSULATION AND KVA SIZE AS SHOWN. NEMA TP-1

COMPLIANT.

A. 15KV FEEDERS ABOVE GRADE SHALL BE IN

RIGID GALVANIZED STEEL. BELOW GRADE

SHALL BE IN SCHEDULE 40 PVC.

B. CONTRACTOR SHALL VERIFY MATCHED

ROTATION FOR ALL DUAL SOURCED MEDIUM

VOLTAGE SWITCHGEAR PRIOR TO SYSTEM

ENERGIZATION. PROVIDE PLACARD ON ALL DUAL

SOURCED SWITCHGEAR TO INDICATE "PHASE

ROTATION AND LOAD MUST BE VERIFIED PRIOR

TO SWITCHING TO ALTERNATE SOURCE.”

C. CONTRACTOR SHALL PROVIDE INFORMATIONAL

PLACARD ON DUAL SOURCED 15KV SWITCHGEAR

TO INDICATE “LOAD VERIFICATION REQUIRED

PRIOR TO SWITCHING TO ALTERNATE SOURCE”.

3 VERIFY CB & BRANCH CIRCUIT WIRE SIZE WITH

EQUIPMENT MANUFACTURER'S RECOMMENDATION.

4"-3 #500KCM & 1 #2 GRND

2"-3 #2/0 & 1#6 GRND

2"-3 #3/0 & 1#4 GRND

1-1/4"-3 #4 & 1#8 GRND

1-1/4"-3 #4 & 1#8 GRND

6 LOW RESISTANCE GROUND, 4'x4'x4" APPROXIMATELY 800LBS

COORDINATE LOCATION W/ ARCHITECT PRIOR TO ROUGH

IN.

NOTICE

NOTES

FEEDERNUMBER

DESCRIPTIONCONDUIT AND WIRE SIZE

(75°C CU 600V, 105°C 15 kV)

COMMENTS

H2 15KV PRIMARY FEEDER 4"-3 #2/0 MV105, 133% INSULATION & 1 #2 GRND & 1-4" SPARE

B1 600 V BUS SYSTEM 4000 A, 4W+50% GND, FEEDER, COPPER; WITH FITTINGS

M1 FIRE PUMP FEEDER 2/PHASE: 3" C, 3-#4/0 + 1-#1 GND

F1 1860 A, 480 V DISTRIBUTION PANEL FEEDER 6/PHASE: 3" C, 4-350 kCM + 1-250 kCM GND

M2 CHILLER BRANCH CIRCUIT (1000A OCPD) 3/PHASE: 3" C, 3-400 kCM + 1-2/0 kCM GND

M3 HHWP BRANCH CIRCUIT (125A OCPD) 1 1/4" C, 3-#1 + 1-#6 GND

M5 CTF BRANCH CIRCUIT (150A OCPD) 3"C, 3-250 kCM + 1-#2 GND PANEL TO VFD, SIZED FOR 3% VOLTAGE DROP

M6 CWP BRANCH CIRCUIT (200A OCPD) 2"C, 3-#4/0 + 1-#6 GND

F2 DWBP BRANCH CIRCUIT & LRSB FEEDER (300A OCPD) 2 1/2" C, 3-350 kCM + 1-#4 GND

P1 NHUP-3 BRANCH CIRCUIT (200A OCPD) SIZE GOVERNED BY TRANSFORMER INRUSH

S1 NHUP-3 BRANCH CIRCUIT (125A OCPD) 1 1/4" C, 4-#1 + #6 GND

F3 MCC A FEEDER (400A OCPD) 2/PHASE: 2"C, 3-#3/0 + 1-#3 GND

F4 MCC B FEEDER (600A OCPD) 2/PHASE: 2 1/2"C, 3-350 kCM + 1-#1 GND

P2 NHUP-4 BRANCH CIRCUIT (250A OCPD) SIZE GOVERNED BY TRANSFORMER INRUSH

S2 NHUP-4 BRANCH CIRCUIT (175A OCPD) 2" C, 4-#2/0 +1#4 GND

P3 NDUP-1 BRANCH CIRCUIT (70A OCPD) SIZE GOVERNED BY TRANSFORMER INRUSH

S3 NDUP-1 BRANCH CIRCUIT (100A OCPD)

P4 NDUP-2 BRANCH CIRCUIT (40A OCPD) 3/4" C, 3-#8 + #10 GND SIZE GOVERNED BY TRANSFORMER INRUSH

S4 NDUP-2 BRANCH CIRCUIT (50A OCPD) 3/4" C, 4-#6 + #8 GND

PANEL TO VFD

V3 HHWP BRANCH CIRCUIT 1 1/2" C, ONE 3/C #2 + GND VFD CABLE VFD TO MOTOR (COORDINATE W/ OCPD IN VFD)

M4 CHWP BRANCH CIRCUIT (350A OCPD)

V4 CHWP BRANCH CIRCUIT 3 1/2" C, ONE 3/C 500 kCM + GND VFD CABLE

V5 CTF BRANCH CIRCUIT 2" C, ONE 3/C#1/0 + GND VFD CABLE

PANEL TO VFD

VFD TO MOTOR (COORDINATE W/ OCPD IN VFD)

VFD TO MOTOR

F5 200A, 4 WIRE FEEDER

F6 250A, 4 WIRE FEEDER SIZED FOR 3% VOLTAGE DROP

2"-3 #3/0 & 1 #4 GRND

3"-3 #250KCM & 1 #3 GRND

20 20 A BRANCH 3/4" C, 3-#12 + 1-#12 GND

F7 COOLING TOWER SMALL POWER (50A OCPD) 1 1/4" C, 3-#4 + 1-#6 GND SIZED FOR 3% VOLTAGE DROP

RUN IN UNDERGROUND DUCT

H1 15KV PRIMARY FEEDER 2 - EACH WITH 3-# 4/0 MV105 + 1 #2 GRND

H3 15KV PRIMARY FEEDER 4"-3 #1/0 MV105, 133% INSULATION & 1 #2 GRND & 1-4" SPARE

H4 15KV PRIMARY FEEDER 4"-3 #2 MV105, 133% INSULATION & 1 #6 GRND & 1-4" SPARE

H5 15KV PRIMARY FEEDER 4"-3 #4/0 MV105, 133% INSULATION & 1 #2 GRND & 1-4" SPARE

221.1CHWP-1

221.1CHWP-2

0BLR-1

0BLR-2

0BLR-3

0HHWP-1

0HHWP-2

88.4CTF-1

88.4CTF-2

129.7CWP-1

129.7CWP-2

7.5SDFILT-1

0BH-1

0BH-2

0BH-3

5DC FOR SWITCHGEAR-1

201.7DWBP

45.5NHUP-3

30NDUP-1

1234.7TOTAL

11.6IAC-1

221.1CHWP-3

221.1CHWP-4

0CHWP-5

0BLR-4

0BLR-5

0HHWP-3

0HHWP-4

88.4CTF-3

88.4CTF-4

0CTF-5

129.7CWP-3

129.7

0

0BH-4

0BH-5

0

15

97.4

DC FOR SWITCHGEAR-2

8.9NDUP-2

1004.7TOTAL

5

CWP-4

CWP-5

DIESEL STORAGE-B

COOL TWR

NHUP-4

251.1FP-1

612.7CH-3

612.7CH-4

1004.7NHUP-2

2481.2TOTAL

612.7CH-1

612.7CH-2

0CH-5

1234.7NHUP-1

2460.1TOTAL

CABLE-IN-TRAY OR 1200 A BUS SYSTEM

30 30 A BRANCH 3/4" C, 3-#10 + 1-#10 GND

SIZED FOR 3% VOLTAGE DROP

ACCEPTABLE WITHIN MAIN POWER STATION

FEEDER SCHEDULE

1. SOME FEEDERS MAY NOT BE USED ON THIS PROJECT.2. VOLTAGE DROP MAY REQUIRE THE USE OF A LARGER AMPACITY FEEDER.3. 'A' FEEDERS INDICATE 3PH, 3W SERVICE IN LIEU OF 3PH, 4W.4. CONDUCTORS FOR TERMINATION ON 100% RATED DEVICES SHALL BE 90°C, APPLIED AT 75°C RATINGS.

NHUP-1 (KVA) NHUP-2 (KVA)

SS-UP-B (KVA)SS-UP-A (KVA)

CRITERIA

1. FUTURE LOADS ARE ASSIGNED 0 KVA.

2. NONCOINCIDENT LOADS ARE ASSIGNED 0 KVA.

D. DESIGN IS PREDICATED ON A TOTAL OF FIVE

COOLING TRAINS, OF WHICH NO MORE THAN FOUR

OPERATE SIMULTANEOUSLY. IT REQUIRES THAT; IF

THREE CHILLERS ARE POWERED FROM BUS A,

THREE CHILLED WATER PUMPS WILL BE POWERED

FROM BUS B; THAT, IF TWO CHILLERS ARE POWERED

FROM EACH BUS, THEN TWO CHILLED WATER PUMPS

WILL BE POWERED FROM EACH BUS; AND THAT TWO

COOLING TOWER FANS AND TWO CONDENSER

WATER PUMPS WILL BE POWERED FROM EACH BUS

UNDER ALL CONDITIONS.

KEY PLAN

REVISIONS

FILE LOG

ACTIVITY

Draw

Design

Manager

Check

STAMP

© LEO A DALY Company 2015

PROJECT NO.

BY

THE NEW ORLEANSAVIATION BOARD

CRESCENT CITYAVIATION TEAM

1 GALLERIA BOULEVARD #1516METAIRIE, LA 70001T (504) 303.7535 / F (504) 841.2229

A JOINT VENTURE

NORTH TERMINALLOUIS ARMSTRONGNEW ORLEANSINTERNATIONALAIRPORT900 EAST AIRLINE DRIVEKENNER, LOUISIANA 70062

THE NEW ORLEANS AVIATIONBOARD, 900 EAST AIRLINEDRIVE, KENNER, LA 70062

NO. DESCRIPTION DATE

ISSUED FOR CONSTRUCTION

02-08-2016

CONFORMED SET 02-08-2016

6/2

8/2

016

2:3

7:4

9 P

M

CITY OF NEW ORLEANS

SCHEDULES AND NOTES

UP E 6000

051-10250-000

ACD

SKA

ACD

VOLUME 5

L.11 Addendum 11.11 12-31-2015

M Addendum 12 01-14-2016

M.1 Addendum 12.1 02-01-2016

CS Revision 1 03-01-2016

DSI-0005

DSI-0005 MCA-DSI-0005 06-28-2016