ENTRY FILED BY:- PRIDE PURPLE GROUP
Name of the Owner:- Park Xpress Joint Venture Principal Architect: Abhikalpan Architects and Planners Structural Designer : Hansal Parikh and Associates
![Page 2: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/2.jpg)
1) Category of Project:- Residential Building2) Type of project:- Residential 3) Cost of Project:- 100 Cr.4) Area of construction:- BUA 5,00, 000 sqft (Approx.)5) Project Commencement Date:- March 20096) Project Completion Date:- March 2012
![Page 3: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/3.jpg)
Unit plans with efficient use of space; minimal wastage of space in passages.
Thoughtful landscape with all amenities for an enhanced living experience.
Optimal lobby spaces. Designed Building entrance lobbies .Defined traffic circulation movement to avoid conflict points
achieved through efficient planning.
![Page 4: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/4.jpg)
Open foundation resting on hard rock with min SBC 40 T/m2, M 30 concrete
Fiber reinforced concreteUsed fiber mesh 150 e3Std Deviation of concrete cube results = M20,25 in the range of
4N/mm2; for M30and above grade in the range of 5N/mm2Controlled mixed design and concrete by way of having batching plant
at siteUse of hardeners in floor tremix for crack abrasion Use of fly ash in concreteUse of composite construction by Ferrocrete+ MS frameworkPrecast components are used as per architectural requirement
![Page 5: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/5.jpg)
A) Challenges faced:- Water up thrust pressure.
B) Solutions Considered- Raft designed/Rock anchoring with optimal dead load to
sustain water pressure. c) Solution adopted with reason:- Raft designed/Rock anchoring with optimal dead load to
sustain water pressure.
![Page 6: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/6.jpg)
Solar panels (saves electricity -geyser)Rain water harvestingUse of LED ( for less consumption) Ready to use, wet mix self curing adhesive for brick blocks,
wet mix plaster, polymerised grouting mix, AAC blocks.Use of fly ash in concreteDecomposting Machine and STP.Use of treated grey water for flushing and irrigation.Drip irrigation system to ensure optimum use of water, correct
amount of watering for all landscape areas.Contd….
![Page 7: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/7.jpg)
Dual flush tank.Sanitary ware and CP fittings designed for water conservationLarge areas for landscape and pervious surfaces for water
percolation.
![Page 8: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/8.jpg)
CCTV Surveillance for vigilance of all common areas 24 x 7 monitoring.
Guard Tour system 27 x 7 monitoring.Timer based lighting system for all common areas to
optimize consumption of electricity.STPSingle-stack Gaberit Plumbing system with elctro-fusion
joints for long life.Solar water heating– FPC/ETC SystemFire fighting system for high-rise with fire detection and
alarm
Contd….
![Page 9: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/9.jpg)
Reticulated Gas System Drip Irrigation SystemHydro-pneunamtic system for club house water supplyVideo Door Phone for each flatHi-speed elevatorsOperational Kitchen with Modular Furniture, Hob ,Chimney
& Water Purifier
![Page 10: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/10.jpg)
Raft designed for up thrust pressureRock anchoring.
![Page 11: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/11.jpg)
Quality auditsMaterial verification and validation at entry pointsExecution Process checklists for verification and validationQuality Plan and Quality ManualState-of-the-art lab on site with latest equipments for
better quality controlUse of ISI,CE, BIS certified products only Weigh-bridge and batching plant at site to ensure quality
control of concrete
![Page 12: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/12.jpg)
Safety plan and Safety ManualSafety CommitteeSafety AuditsFire drillsFirst Aid compliance and recordsFire fighting equipment compliance and recordsFirst Aid roomSafety Mock DrillsSafety posters
![Page 13: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/13.jpg)
3 layer waterproofing treatment for podiumIdentification and implimentation of various new products
like, Izonyl waterproofing, drain-cells in landscape areasTraining programs for engrs, workers etc.Training programmed with CREDAI for all skilled and unskilled
labors.Periodic safety awareness training.
![Page 14: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/14.jpg)
![Page 15: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/15.jpg)
![Page 16: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/16.jpg)
![Page 17: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/17.jpg)
![Page 18: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/18.jpg)
![Page 19: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/19.jpg)
![Page 20: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/20.jpg)
![Page 21: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/21.jpg)
![Page 22: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/22.jpg)
![Page 23: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/23.jpg)
![Page 24: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/24.jpg)
![Page 25: Park xpress presentation](https://reader035.vdocuments.mx/reader035/viewer/2022081503/58a563701a28ab20528b539f/html5/thumbnails/25.jpg)
THANK YOU