PARK LANE SOUTH
Presentation to Kew Gardens Civic Association
February 15, 2017
1
![Page 2: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/2.jpg)
nyc.gov/dot 2
1 Project Background
![Page 3: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/3.jpg)
nyc.gov/dot 3
PROJECT AREA
• 68 total injuries
(2011-2015)
• 14 pedestrians (1
severe)
• 1 Motorcycle
fatality (July
2015)
• Myrtle Ave and
Metropolitan Av are
Vision Zero priority
corridors
![Page 4: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/4.jpg)
nyc.gov/dot 4
COMMUNITY CONCERNS
• Community Board 9 requested Park Lane S traffic safety study in July 2014
• Numerous citizen requests to improve safety at Park Lane S / Beverly Rd
• Elected official requests to improve pedestrian safety at Lefferts Blvd / Grenfell St
• Council Member Karen Koslowitz requested in May 2015
• State Senator Joseph Addabo, Jr. requested in June 2015
• Elected official request to improve pedestrian safety at Park Lane S / Myrtle Ave
• Assembly Member Michael Miller requested in June 2016
• Online petition to improve safety at Metropolitan Av / Park Lane S
![Page 5: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/5.jpg)
nyc.gov/dot 5
2016 RESURFACING AND MARKINGS
Before – Beverly Rd to Metropolitan Av
After – Beverly Rd to Metropolitan Av
Wide parking lanes installed on Park Lane S
between Beverly Rd and Metropolitan Av after
resurfacing to calm traffic
Treatment will be continued between Metropolitan
Av and Myrtle Av after repaving in 2017
January 2016 speed study
found significant speeding
between Metropolitan Av
and Myrtle Ave
![Page 6: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/6.jpg)
nyc.gov/dot 6
2 2017 Proposal – Park Lane S Corridor
![Page 7: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/7.jpg)
nyc.gov/dot 7
1
2
3
N
Proposed Improvements: 1) Beverly Rd/Onslow Pl 2) Metropolitan Av 3) 115 St 4) Myrtle Av
2017 PROJECT AREA – PARK LANE S
4
Forest Park
![Page 8: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/8.jpg)
nyc.gov/dot 8
EXISTING ISSUES – BEVERLY RD
Uncontrolled slip
lane in front of park
entrance stairs
Free flowing elbow
traffic movement
makes it difficult to
find gaps for
stopped vehicles
and crossing
pedestrians
![Page 9: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/9.jpg)
nyc.gov/dot 9
EXISTING ISSUES – BEVERLY RD
No crosswalks for
pedestrian desire
paths to park
Long crossing
distance (42’)
![Page 10: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/10.jpg)
nyc.gov/dot 10
EXISTING CONDITIONS – BEVERLY RD
Uncontrolled slip
lane in front of
park entrance
stairs
1
No crossings for
pedestrians across
Park Lane S
Vehicles stopped
at intersection
have difficulty
finding gaps
![Page 11: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/11.jpg)
nyc.gov/dot 11
PROPOSAL – BEVERLY RD
1
Signalize intersection and
provide pedestrian crossings Remove 3 parking
spaces to install
right turn bay
Restrict
northbound
left turn (5 vehicles during
rush hours)
Expand concrete
triangle island
![Page 12: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/12.jpg)
nyc.gov/dot 12
EXISTING ISSUES – METROPOLITAN AV
Aggressive left turning
vehicles do not yield to
pedestrians
Northbound Q37
bus blocks thru
traffic when
stopped
![Page 13: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/13.jpg)
nyc.gov/dot 13
EXISTING CONDITIONS – METROPOLITAN AV
2
Aggressive left turning
vehicles do not yield to
pedestrians (430 vehicles in AM rush hour)
Northbound Q37
bus blocks thru
traffic when
stopped
![Page 14: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/14.jpg)
nyc.gov/dot 14
PROPOSAL – METROPOLITAN AV
2
Restrict southbound
left turn (25-30 vehicles during rush
hours)
Add Qwick Kurb to
calm left turns Relocate northbound
bus stop to ease
traffic congestion
Switch northbound
protected turn (left green
arrow phase) from
“leading” to “lagging”
Add leading
pedestrian interval
(LPI) to north-south
crossing
![Page 15: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/15.jpg)
nyc.gov/dot 15
EXISTING ISSUES – 115 ST
Uncontrolled slip
lane in front of park
entrance stairs
No crosswalks at
intersection
Vehicles stopped at
intersection have
difficulty finding gaps
Free flowing elbow movement
encourages speeding
Existing Qwick Kurb
hit frequently by
vehicles
No pedestrian
crossing at Q37
bus stop locations
![Page 16: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/16.jpg)
nyc.gov/dot 16
EXISTING CONDITIONS – 115 ST
3
Free flowing
elbow movement
encourages
speeding
No pedestrian
crossing at Q37
bus stop location Existing Qwick Kurb hit frequently by
vehicles
![Page 17: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/17.jpg)
nyc.gov/dot 17
PROPOSAL – 115 ST
3
Traffic signal
under
investigation
Maintain
existing turn
restriction
Add southbound
thru movement
Add pedestrian
crossings
Add concrete
triangle island
Loss of 3
parking spaces
![Page 18: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/18.jpg)
nyc.gov/dot 18
EXISTING ISSUES – MYRTLE AV
Underutilized space Long crossing distances
![Page 19: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/19.jpg)
nyc.gov/dot 19
EXISTING CONDITIONS – MYRTLE AV
4
Large
underutilized
space
Wide entrance
only used by
Parks vehicles
Long crossing
distances
Visibility issues between
crossing pedestrians and
turning vehicles
![Page 20: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/20.jpg)
nyc.gov/dot 20
PROPOSAL – MYRTLE AV
4
Relocate stop bar to
allow for easier bus
turns Build channelization
with pavers and narrow
entryway to park
Add crosswalk
Restrict eastbound
right turn (1-5 vehicles during rush
hours)
Widen crosswalk to
accommodate
pedestrian desire paths
to park
![Page 21: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/21.jpg)
nyc.gov/dot
3 Proposal – Grenfell St Improvements
21
![Page 22: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/22.jpg)
nyc.gov/dot 22
6
5
N
Proposed Improvements: 5) Lefferts Blvd /
Grenfell St 6) Onslow Pl /
Grenfell St / 82 Av
2017 PROJECT AREA – GRENFELL ST
Forest Park
![Page 23: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/23.jpg)
nyc.gov/dot
Pedestrian desire
lines not
accommodated by
existing crossings
23
EXISTING ISSUES –
LEFFERTS BLVD / GRENFELL ST
![Page 24: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/24.jpg)
nyc.gov/dot 24
EXISTING ISSUES –
LEFFERTS BLVD / GRENFELL ST
Southbound vehicles on
Grenfell St block those
attempting to head north
MTA cited this issue as a cause
of congestion for westbound
traffic, creating delays for Q10
![Page 25: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/25.jpg)
nyc.gov/dot 25
EXISTING CONDITIONS –
LEFFERTS BLVD / GRENFELL ST
Grenfell St is narrow for
two-way traffic.
Southbound vehicles
block those attempting to
head north
Dani’s
C Town
Chase
Giorgio’s
Salon Pedestrian desire line
not accommodated by
existing crosswalks
5
![Page 26: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/26.jpg)
nyc.gov/dot
Dani’s
C Town
Chase
Giorgio’s
Salon
26
PEDESTRIAN COUNTS –
LEFFERTS BLVD / GRENFELL ST
5
AM / PM / WKND
![Page 27: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/27.jpg)
nyc.gov/dot 27
PROPOSAL –
LEFFERTS BLVD / GRENFELL ST
Dani’s
C Town
Chase
Giorgio’s
Salon
5
Change Grenfell St
to one-way
northbound
Install new
crosswalk
Add speed bumps
to Grenfell St
![Page 28: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/28.jpg)
nyc.gov/dot 28
EXISTING STREET NETWORK – GRENFELL ST
![Page 29: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/29.jpg)
nyc.gov/dot 29
PROPOSED STREET NETWORK – GRENFELL ST
Add speed bumps
to Grenfell St
between Lefferts
Blvd and 82 Av
Diverted SB
Grenfell St Vehicles
AM Peak – 145
(20 from train station)
PM Peak – 115
(25 from train station)
![Page 30: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/30.jpg)
nyc.gov/dot
Vehicles often do not comply with stop
signs and speed around corner from
Onslow Pl to 82 Av Bridge
30
EXISTING ISSUES – ONSLOW PL
No pedestrian
crossings
![Page 31: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/31.jpg)
nyc.gov/dot 31
EXISTING CONDITIONS – ONSLOW PL
No pedestrian crossings
6
Vehicles often do not comply
with stop signs and speed
around corner from Onslow Pl
to 82 Av Bridge Narrow Grenfell St
blocks traffic flow
![Page 32: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/32.jpg)
nyc.gov/dot 32
PROPOSAL – ONSLOW PL
6
Total parking loss
of 8 spaces
Change Grenfell
St to one-way
northbound
Add crosswalks
Install concrete traffic
circles to calm traffic
![Page 33: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/33.jpg)
nyc.gov/dot 33
Project Benefits
• Improves safety for all roadway users
• Calms traffic
• Shortens crossing distances for pedestrians
• Provides direct pedestrian crossings
• Clarifies traffic movements
• Improves traffic flow
PROJECT BENEFITS
![Page 34: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/34.jpg)
nyc.gov/dot 34
Project Benefits NEXT STEPS
Develop plan for
implementation in
2017 and 2018
Revise plan in
response to
comments
Revise plan based
on comments
Present to
Community Board 9
Kew Gardens Civic
Association
![Page 35: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality](https://reader034.vdocuments.mx/reader034/viewer/2022042710/5f5f1f33e30a1e103b78907b/html5/thumbnails/35.jpg)
nyc.gov/dot 35
Questions?
Thank you
NYC DOT NYC DOT nyc_dot NYC DOT