Parish meeting April 23rd

• Discussion of planning applications –

WYE2 in detail

• Traffic analysis for the Neighbourhood

Plan

• The new Our Place Wye project

Page 2: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

Planning applications for WYE1 and WYE2 challenge the principles agreed for the Neighbourhood Plan

Applications

• Go against the principles agreed at workshops

• Conflict with the agreed outlines for village design

• Fail to include innovative proposals to improve the village

boundaries

• Overlook problems with traffic flow

Both applications attempt to squeeze in more housesthan allocated by Ashford Borough Council

FOCUS ON WYE2 today

Page 3: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

The WYE 2 site Luckley Field

Map of the area highlighting access through Little Chequers

• Site allocated by ABC in the Tenterden and Rural Sites DPD (2010) for 20 houses• Significance of the site as a gateway to Wye• Opportunity to improve the area and enhance the edge of the village

WYE2

Page 4: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

Neighbourhood Plan policy for WYE2

Developed from Workshops and responding to the results of the questionnaire

Workshop in action - reaching consensus over plans for sites

Page 5: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

Images of the Neighbourhood Plan designs for WYE2• overall layout • link to village centre outside 5min walk• inclusion of the cycle route around the village

Page 6: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

Images of the Neighbourhood Plan designs

• Red line village boundary• Two access routes• Transitional zone before houses• Visual and physical links to the countryside

Page 7: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

DHA application proposals for WYE2

General layout with access only through Little Chequers

Page 8: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

More detailed comparison of views into the site

The boundary has been extended in the DHA plans allowing more houses to be built –beyond the authorised red line

Our plan

DHA plan

Page 9: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

Criticism of design features

Guidance in the Village Design Statement and Kent Downs Landscape Design handbook has not been followed

• The VDS guidelines on Design states that“…designs based on a confused mixture of architectural styles and decoration, that mimic but lack the integrity of genuine historic buildings, should not be considered.”

• The Kent Downs Landscape Design Handbook identifies how locally sourced materials can address both local character and sustainability:‘..where possible sustainable materials should be used. In essence this means locally available and where possible renewable’ …’it is important to consider the characteristics of the local character area.’ (p64)‘Clay bricks and tiles are the traditional building materials of the Kent Downs’ (p65)

• The VDS guidelines on Materials states“All materials whether modern or traditional, should be suitable and of the highest quality feasible.”

Page 10: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

The DHA design for WYE2 includes the following features that conflict with guidelines for Wye

• Cul de sac design

• White weatherboarding

• The three storey semi-detached houses proposed are over-dominating

for the edge of village location

• The architectural design takes a historical pastiche approach, with suburban

designs mixed with a few unconvincing references to the Wye style

• Plastic framed windows inappropriate for the important edge of village site

• Poorly designed gable frontages

• Balconies shown are too small and do not fit well into the local vernacular

• Quality is poor due to an attempt to overfill the site with houses

Based on poor design alone this application should be rejected

Page 11: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

General traffic analysis in Wye –Jonathan Rodger MLM

• Modelling traffic flow across the level crossing• Prediction of queues with current closures• Testing various development options

Map of streets with key junctions and development sites marked

Page 12: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

Traffic flows are examined at each junction

This schematic shows recorded data –the model assesses how this will be altered as development takes place

Page 13: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

General traffic analysis in Wye – Jonathan Rodger MLM• Existing constraints within Wye• Quantifying local concerns – railway crossing – junctions - parking

Page 14: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

General traffic analysis in Wye – Jonathan Rodger MLM

• Existing constraints within Wye• Railway – fixed train times – variable closures times

Before HS1

After HS1

Open - 41 secondsClosed – 20 minutes

Page 15: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

General traffic analysis in Wye – Jonathan Rodger MLM

• Testing various development scenarios• Impact associated with additional development within Wye

• Cumulative impact• Queue predictions• Changes in gate closure times• Junction safety (i.e. visibility)

Page 16: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

Traffic concerns

• The Little Chequers/Bridge St junction has very poor visibility

• Access via Little Chequers – parking/general constraints

• Improvement needed with a second access through Long’s Acre

as proposed in Neighbourhood Plan

Page 17: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

The Council objects to the WYE2 application for the following reasons-

• traffic

• design

• treatment of the boundary

• complete lack of consideration of the Principles agreed for the

Neighbourhood plan

Copies of our objection letter are available

Be warned! The developer has already proposed WYE2A another 150 houses south of WYE2

Page 18: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

New application for WYE1 the Wye Court site Key issues, traffic, layout, design and boundary

Page 19: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

Historic links we need to preserve

The Roman Road and view to Wye Court – retaining historical continuity

Page 20: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

The ideas incorporated in the Neighbourhood Plan show what could be achieved on this site

Page 21: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

Disappointing features of the Taylor Wimpey design

• No clear views• Layout does not improve the village boundary• Village Design Statement guidelines have not been followed

Page 22: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

Design features that fail to value the site – more details

• The concept sketch indicates a desire to create Stour Valley views along the ‘main street’ & ‘back lane’ but the proposed site plan blocks or obscures these views with the placement of houses and car barns.

• The site plan is of a generic house-builder type, proposing an inward looking development with a return loop route for vehicles from the single site entrance, this complex layout would be unnecessary if a more creative and distinctive concept had been developed.

• The is no serious consideration of the appearance of the external edge of the village, the north-east edge of the site.

Page 23: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

The edge of the site should integrate with the surrounding environment and link with the proposed cycleway

View from the north looking into the development from Godmersham direction - so much better than garden fences

Page 24: Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project

What can you do?

• Examine the proposals

• Consider how you will be affected and their impact on the

village

• Think about the effect of poor design on the location of

Wye

within the AONB

• Recognise the importance of views into and out of the

village

• Support the cycle path initiative

• Question the impact of extra traffic on safety at the

critical junctions

SEND IN YOUR OBJECTIONS TO ABC PLANNING DEPT !!