Page 1: Panthera Wip V16

The Complete Site Establishment Company

Page 2: Panthera Wip V16
Page 3: Panthera Wip V16

Brief Overview of Panthera

Challenges of Establishing a Construction Site

What are the Impacts?

Panthera Have the Solution

Benefits of our Solution

Why Panthera?

Energy Efficient Lighting

What our Clients are Saying

Vision2018

Ultimate Benefits

Q&A

Page 4: Panthera Wip V16

About Panthera

Established

2004

ServiceLondon & Home

Counties

Who WeWork For

Complete Site Establishment Company

Page 5: Panthera Wip V16

The Challenges of Establishing a Construction Site

PaymentsHealth &

Safety ProgrammeCommunication

CoordinationProcurement

Estimating

Multiple Trades

Page 6: Panthera Wip V16

The Impact

Multiple Trade

Contractors

Time Consuming

Costly

Inefficient

Risk

Missed Deadlines

Drain on Resources

Distraction From Main Build

Page 7: Panthera Wip V16

Panthera Have the Solution

Initial Survey

Outline Design

Detailed Tenders

Engineer & Design Calculations

CAD Site Layout Drawings

Consultation with Local Service

Providers

Site Specific RAMS

Page 8: Panthera Wip V16

Panthera Have the Solution

Scaffold & Site Hoarding

Temporary & Permanent Security Fencing

School & Leisure Fencing

Section 12 LU Approved Hoarding

Commercial & Domestic

Fencing

Acoustic & Fire Rated Screens

Bespoke Site Entrances

Internal MFC Screens

Page 9: Panthera Wip V16

Panthera Have the Solution

Earth Moving

Site Clearance

Temporary Roads & Paths

Concrete Hardstandings

Tar Macadam Surfacing

Trench & Ducting

Page 10: Panthera Wip V16

Panthera Have the Solution

Traffic Management

Pedestrian Management

Safety & Fire Signage

First AidStations

Fire CallPoints

Traffic Marshall/ Banksman

Page 11: Panthera Wip V16

Panthera Have the Solution

Site Offices

Meeting Rooms

Canteens

Drying Rooms

Changing Rooms

WC Units

Shower Units

Security Huts

Effluent Tanks

Stairs & Platforms

Page 12: Panthera Wip V16

Panthera Have the Solution

HV & LV Installations

Temporary Generators

Temporary Lighting Towers

Emergency Lighting

Evacuation Systems

LED Site-Wide Lighting

Data & Voice Installations

Battery Charging Lockers

Temporary Plumbing &

Drainage

NICEIC Testing & Inspections

Maintenance

Page 13: Panthera Wip V16

Panthera Have the Solution

Scaffold Alarms

Site Alarms

Mains-Free Alarms & Hoist Alarms

Security Lighting

Class 3 High Security Alarms

Central Station Monitoring

Insurance Certificated

Systems

Page 14: Panthera Wip V16

Panthera Have the Solution

CCTV Systems

Wire-Free CCTV

Proximity Card Access Control

Bio-Metric Access Control

IQ Pass Access Control Cabin

Turnstiles

Remote Video Monitoring

Public Address Systems

Page 15: Panthera Wip V16

Panthera Have the Solution

Reception Security

Event Security

Construction Site Security

Alarm Response

Mobile Patrols

Dog Handlers

EmergencyCover

Page 16: Panthera Wip V16

Panthera Have the Solution

Design Service

Campaign Planning

Full Installation

Support

Maintenance

Page 17: Panthera Wip V16

Panthera Have the Solution

Small Goods

Large Goods

Goods and Passenger Hoists

Mast Climbing Work Platforms

Scaffold Hoists

Gantry Hoists

Page 18: Panthera Wip V16

Panthera Have the Solution

Scaffoldings

Buildings

Bridges

Internal Dust Screens

Asbestos Enclosures

Page 19: Panthera Wip V16

Benefits of our Solution

Partnering Agreement

One Quote For Multiple Services

One Contract to Place

Panthera Project Management

SMSTS & SSSTS Supervisors

Health & Safety and Fire Management

Reduced EstimatingTime & Costs

Reduced Package Management Resources

Reduced Administrative Burden

Streamlined Communication & Coordination

Supporting Incident Free Projects

Ensures Compliance & Mitigates Risk

Page 20: Panthera Wip V16

Why Panthera

Environmentally Friendly Hoardings

IQ Pass Access Control Cabin

Intelligent Premier Range

Remote EYE CCTV

Energy Efficient Site Lighting

Page 21: Panthera Wip V16

LED Energy Efficient Lighting

Longer Lamp Life – 50,000 HoursReduced On-site Maintenance CostsHigher Quality Light Output

Reduced Electricity BillsLED Lamps Are Non Hazardous WasteGreatly Reduced CO2

Total savingsTotal percentage savings

£1,029.30

72%

Total savings

Total percentage savings

5527.3472%

£1,600

£1,200

£1,000

£800

£600

£400

£200

£0

£1,400

5FT Fluorescent Tube 5FT Led Tube

Total cost to run per year (50 lamps)

£1,423.50

£394.20

8,000

6,000

5,000

4,000

3,000

2,000

1,000

0

7,000

5FT Fluorescent Tube 5FT Led Tube

Total kg of CO2 per year (50 lamps)

7,644.20

2116.85

9,000

5ft 58w Fluorescent

V

5ft 18w Equivalent LED

64% increase in fitting cost

BUT…

Page 22: Panthera Wip V16

£1,600

£1,200

£1,000

£800

£600

£400

£200

£0

£1,400

400w Metal Halide 100w LED Flood

Total cost to run per year (10 lamps)

£1,752.00

£438.00

8,000

6,000

5,000

4,000

3,000

2,000

1,000

0

7,000

400w Metal Halide 100w LED Flood

Total kg of CO2 per year (10 lamps)

9,408.24

2352.06

9,000

£1,800 10,000

55%increase in fitting cost

BUT…

LED Energy Efficient Lighting

Total savingsTotal percentage savings

£1,182.60

90%

Total savings

Total percentage savings

6350.5690%

60w Bulkhead

V

6w Equivalent LED

Total savingsTotal percentage savings

£1,314.00

75%

Total savings

Total percentage savings

7056,1875%

400w Metal Halide

V

100w Equivalent LED

£1,200

£1,000

£800

£600

£400

£200

£0

£1,400

Standard 60w Bulkheads 6w LED

Total cost to run per year (50 lamps)

£1,182.60

£131.40

8,000

6,000

5,000

4,000

3,000

2,000

1,000

0

7,000

Standard 60w Bulkheads 6w LED

Total kg of CO2 per year (50 lamps)

7056.18

705.62

70% increase in fitting cost

BUT…

Page 23: Panthera Wip V16

Vision 2018 l Our Vision For Your Future

Reduce CO2 by 78% across all site lighting

All welfare cabins to be ECO friendly

Procure only FSC and PEFC timber

Ensure that 100% of timber waste is recycled

Waste paint sent to the Community Paint Project

Page 24: Panthera Wip V16

Vision 2018 l Our Vision For Your Future

Highly trained and dedicated team to provide an exceptional

customer experience

Develop new services through client consultation

Continue commitment to innovation & technical

advancements

Page 25: Panthera Wip V16

Vision 2018 l Our Vision For Your Future

Committed to staff training and personal development

Support and encourage staff ideas

Promote staff wellbeing with gym membership

Support Staff Chosen Charities

Page 26: Panthera Wip V16

In Summary – The Benefits To You

Saves Time

Reduces Costs

Improves Efficiency

Meet the Programme

Mitigates Risk Concentrate on the Main Build

Page 27: Panthera Wip V16

Organisational Chart

Organisational Chart

Group Operations Director

Director responsible for Health and safety

Financial Director

Group Operations Manager

On Site Supervisors

Site Operatives

Sales andMarketing

Business Development

Manager

Health and Safety Executive

Complete Health and safety

Professional Safety Bodies

On Site Supervisors Sub-Contractors Suppliers

Contracts Management team

Office Employees

PantheraBoard of directors

Accounts Manager

Accounts Team

Site Operatives

Divisional Management

Group Managing Director

Line of AdviceDirect Communication

Page 28: Panthera Wip V16

Testimonials

University College London

Toureen Mangan

“Panthera were recommended to us by another contractor and from the outset we could tell we were dealing with a professional company, from advice and management expertise, quality tender submission, health and safety through to installation of the works and project management I can honestly say that in all aspects myself and my team were impressed. In particular I would like to comment on the huge benefits we have found that come with working with a company who provide multiple specialist services that are required to set up a construction site.

I looked forward to working closely with Panthera on all my future projects and would personally like to thank all the team who were a part of our project at UCL Howland Street; you all played a major part in making it a successful and enjoyable contract.”

Martin Maloney Director

Page 29: Panthera Wip V16

Testimonials

HarrodsStonewest

“I would like to say a big thank you to you and all your guys for their continued support and hard work at the various Harrods projects during 2011; without their continued commitment and quality of work on these projects my job as project manager would have been far more difficult than it was. I received glowing reports from my team as well as the client who were impressed with your teams ‘can do’ attitude and ability to install work of the highest quality whilst under immense pressure due to the time restraints on the façade works contract.

All aspects of your works on these contracts i.e. hoarding, security, electrical and plumbing were installed to the highest standard and with not one health and safety issue, demonstrates the professionalism of your company. Another major point I would like to commend you on is the rapid response you provided on two occasions when called upon; this is the level of service that Harrods expect and you without question provided.

It is far too easy to complain when things go wrong but I must give credit and praise to all the team, I look forward to working with you all in 2012 on my future projects.”

Steve MorganProject Manager

Page 30: Panthera Wip V16

Testimonials

Jubilee GardensFrost

Landscapes

“We found Panthera while looking for a London based hoarding company for a large forthcoming project at Jubilee Gardens directly next to the London Eye. This project had many multiple trade service requirements from welfare units, site offices , temporary electrics, plumbing and drainage. Due to the high security risk of the site, 24 hour manned security was needed along with a sophisticated web based CCTV system and a turnstile with access control system . The site also required a substantial amount of timber hoarding and tree protection which we arranged with Panthera to look at.

At the site visit I was immediately impressed with their knowledge and the option of sustainable timber hoarding along with the various fixing methods they proposed that would suit our works. I was also enthusiastically made aware of the other services that Panthera can provide, all of which were of great interest as they were needed on this contract.

I soon received a fully itemised and detailed quotation for all our site establishment requirements. After careful review we instructed Panthera on one order to provide over 40 individual items. The benefits of this are obvious but one major plus point for us was that Panthera not only install all of these services but they programme and manage the entire site set-up themselves whilst keeping our project manager informed throughout the complete process.

I can honestly say from myself and my team that it has been a pleasure working with Panthera and would highly recommend their services; it is not often you work with a company that actively look to add value to your project.”

Ken WhiteCommercial Director

Page 31: Panthera Wip V16

Testimonials

Olympic Shooting Range

John Sisk

“Thank you to all the team at Panthera who worked on the Woolwich Shooting Range project for John Sisk, I would particularly like to the management team of Neal, Simon, Adam and Mark of who all played a big part in each of their divisions making this project a great success. This contract was very high profile and required close attention throughout which was fully understood by Panthera management and obviously communicated through to the workforce.

As a quantity surveyor I have found that there have been huge benefits in procuring multiple trade services through one company; cost, time and personnel resources are all areas that benefitted. I understand from our site management team that you also helped in the planning of your services which again made it easier for us all. Attitude towards health & safety, working within strict guidelines and to a high quality were all areas your team excelled and should be congratulated on.

I would without hesitation recommend your services and would actively look to work with you on my future projects.”

Paul WalshSenior Qs