panthera wip v16
DESCRIPTION
Panthera Group 2012 Power Point PresentationTRANSCRIPT
The Complete Site Establishment Company
Brief Overview of Panthera
Challenges of Establishing a Construction Site
What are the Impacts?
Panthera Have the Solution
Benefits of our Solution
Why Panthera?
Energy Efficient Lighting
What our Clients are Saying
Vision2018
Ultimate Benefits
Q&A
About Panthera
Established
2004
ServiceLondon & Home
Counties
Who WeWork For
Complete Site Establishment Company
The Challenges of Establishing a Construction Site
PaymentsHealth &
Safety ProgrammeCommunication
CoordinationProcurement
Estimating
Multiple Trades
The Impact
Multiple Trade
Contractors
Time Consuming
Costly
Inefficient
Risk
Missed Deadlines
Drain on Resources
Distraction From Main Build
Panthera Have the Solution
Initial Survey
Outline Design
Detailed Tenders
Engineer & Design Calculations
CAD Site Layout Drawings
Consultation with Local Service
Providers
Site Specific RAMS
Panthera Have the Solution
Scaffold & Site Hoarding
Temporary & Permanent Security Fencing
School & Leisure Fencing
Section 12 LU Approved Hoarding
Commercial & Domestic
Fencing
Acoustic & Fire Rated Screens
Bespoke Site Entrances
Internal MFC Screens
Panthera Have the Solution
Earth Moving
Site Clearance
Temporary Roads & Paths
Concrete Hardstandings
Tar Macadam Surfacing
Trench & Ducting
Panthera Have the Solution
Traffic Management
Pedestrian Management
Safety & Fire Signage
First AidStations
Fire CallPoints
Traffic Marshall/ Banksman
Panthera Have the Solution
Site Offices
Meeting Rooms
Canteens
Drying Rooms
Changing Rooms
WC Units
Shower Units
Security Huts
Effluent Tanks
Stairs & Platforms
Panthera Have the Solution
HV & LV Installations
Temporary Generators
Temporary Lighting Towers
Emergency Lighting
Evacuation Systems
LED Site-Wide Lighting
Data & Voice Installations
Battery Charging Lockers
Temporary Plumbing &
Drainage
NICEIC Testing & Inspections
Maintenance
Panthera Have the Solution
Scaffold Alarms
Site Alarms
Mains-Free Alarms & Hoist Alarms
Security Lighting
Class 3 High Security Alarms
Central Station Monitoring
Insurance Certificated
Systems
Panthera Have the Solution
CCTV Systems
Wire-Free CCTV
Proximity Card Access Control
Bio-Metric Access Control
IQ Pass Access Control Cabin
Turnstiles
Remote Video Monitoring
Public Address Systems
Panthera Have the Solution
Reception Security
Event Security
Construction Site Security
Alarm Response
Mobile Patrols
Dog Handlers
EmergencyCover
Panthera Have the Solution
Design Service
Campaign Planning
Full Installation
Support
Maintenance
Panthera Have the Solution
Small Goods
Large Goods
Goods and Passenger Hoists
Mast Climbing Work Platforms
Scaffold Hoists
Gantry Hoists
Panthera Have the Solution
Scaffoldings
Buildings
Bridges
Internal Dust Screens
Asbestos Enclosures
Benefits of our Solution
Partnering Agreement
One Quote For Multiple Services
One Contract to Place
Panthera Project Management
SMSTS & SSSTS Supervisors
Health & Safety and Fire Management
Reduced EstimatingTime & Costs
Reduced Package Management Resources
Reduced Administrative Burden
Streamlined Communication & Coordination
Supporting Incident Free Projects
Ensures Compliance & Mitigates Risk
Why Panthera
Environmentally Friendly Hoardings
IQ Pass Access Control Cabin
Intelligent Premier Range
Remote EYE CCTV
Energy Efficient Site Lighting
LED Energy Efficient Lighting
Longer Lamp Life – 50,000 HoursReduced On-site Maintenance CostsHigher Quality Light Output
Reduced Electricity BillsLED Lamps Are Non Hazardous WasteGreatly Reduced CO2
Total savingsTotal percentage savings
£1,029.30
72%
Total savings
Total percentage savings
5527.3472%
£1,600
£1,200
£1,000
£800
£600
£400
£200
£0
£1,400
5FT Fluorescent Tube 5FT Led Tube
Total cost to run per year (50 lamps)
£1,423.50
£394.20
8,000
6,000
5,000
4,000
3,000
2,000
1,000
0
7,000
5FT Fluorescent Tube 5FT Led Tube
Total kg of CO2 per year (50 lamps)
7,644.20
2116.85
9,000
5ft 58w Fluorescent
V
5ft 18w Equivalent LED
64% increase in fitting cost
BUT…
£1,600
£1,200
£1,000
£800
£600
£400
£200
£0
£1,400
400w Metal Halide 100w LED Flood
Total cost to run per year (10 lamps)
£1,752.00
£438.00
8,000
6,000
5,000
4,000
3,000
2,000
1,000
0
7,000
400w Metal Halide 100w LED Flood
Total kg of CO2 per year (10 lamps)
9,408.24
2352.06
9,000
£1,800 10,000
55%increase in fitting cost
BUT…
LED Energy Efficient Lighting
Total savingsTotal percentage savings
£1,182.60
90%
Total savings
Total percentage savings
6350.5690%
60w Bulkhead
V
6w Equivalent LED
Total savingsTotal percentage savings
£1,314.00
75%
Total savings
Total percentage savings
7056,1875%
400w Metal Halide
V
100w Equivalent LED
£1,200
£1,000
£800
£600
£400
£200
£0
£1,400
Standard 60w Bulkheads 6w LED
Total cost to run per year (50 lamps)
£1,182.60
£131.40
8,000
6,000
5,000
4,000
3,000
2,000
1,000
0
7,000
Standard 60w Bulkheads 6w LED
Total kg of CO2 per year (50 lamps)
7056.18
705.62
70% increase in fitting cost
BUT…
Vision 2018 l Our Vision For Your Future
Reduce CO2 by 78% across all site lighting
All welfare cabins to be ECO friendly
Procure only FSC and PEFC timber
Ensure that 100% of timber waste is recycled
Waste paint sent to the Community Paint Project
Vision 2018 l Our Vision For Your Future
Highly trained and dedicated team to provide an exceptional
customer experience
Develop new services through client consultation
Continue commitment to innovation & technical
advancements
Vision 2018 l Our Vision For Your Future
Committed to staff training and personal development
Support and encourage staff ideas
Promote staff wellbeing with gym membership
Support Staff Chosen Charities
In Summary – The Benefits To You
Saves Time
Reduces Costs
Improves Efficiency
Meet the Programme
Mitigates Risk Concentrate on the Main Build
Organisational Chart
Organisational Chart
Group Operations Director
Director responsible for Health and safety
Financial Director
Group Operations Manager
On Site Supervisors
Site Operatives
Sales andMarketing
Business Development
Manager
Health and Safety Executive
Complete Health and safety
Professional Safety Bodies
On Site Supervisors Sub-Contractors Suppliers
Contracts Management team
Office Employees
PantheraBoard of directors
Accounts Manager
Accounts Team
Site Operatives
Divisional Management
Group Managing Director
Line of AdviceDirect Communication
Testimonials
University College London
Toureen Mangan
“Panthera were recommended to us by another contractor and from the outset we could tell we were dealing with a professional company, from advice and management expertise, quality tender submission, health and safety through to installation of the works and project management I can honestly say that in all aspects myself and my team were impressed. In particular I would like to comment on the huge benefits we have found that come with working with a company who provide multiple specialist services that are required to set up a construction site.
I looked forward to working closely with Panthera on all my future projects and would personally like to thank all the team who were a part of our project at UCL Howland Street; you all played a major part in making it a successful and enjoyable contract.”
Martin Maloney Director
Testimonials
HarrodsStonewest
“I would like to say a big thank you to you and all your guys for their continued support and hard work at the various Harrods projects during 2011; without their continued commitment and quality of work on these projects my job as project manager would have been far more difficult than it was. I received glowing reports from my team as well as the client who were impressed with your teams ‘can do’ attitude and ability to install work of the highest quality whilst under immense pressure due to the time restraints on the façade works contract.
All aspects of your works on these contracts i.e. hoarding, security, electrical and plumbing were installed to the highest standard and with not one health and safety issue, demonstrates the professionalism of your company. Another major point I would like to commend you on is the rapid response you provided on two occasions when called upon; this is the level of service that Harrods expect and you without question provided.
It is far too easy to complain when things go wrong but I must give credit and praise to all the team, I look forward to working with you all in 2012 on my future projects.”
Steve MorganProject Manager
Testimonials
Jubilee GardensFrost
Landscapes
“We found Panthera while looking for a London based hoarding company for a large forthcoming project at Jubilee Gardens directly next to the London Eye. This project had many multiple trade service requirements from welfare units, site offices , temporary electrics, plumbing and drainage. Due to the high security risk of the site, 24 hour manned security was needed along with a sophisticated web based CCTV system and a turnstile with access control system . The site also required a substantial amount of timber hoarding and tree protection which we arranged with Panthera to look at.
At the site visit I was immediately impressed with their knowledge and the option of sustainable timber hoarding along with the various fixing methods they proposed that would suit our works. I was also enthusiastically made aware of the other services that Panthera can provide, all of which were of great interest as they were needed on this contract.
I soon received a fully itemised and detailed quotation for all our site establishment requirements. After careful review we instructed Panthera on one order to provide over 40 individual items. The benefits of this are obvious but one major plus point for us was that Panthera not only install all of these services but they programme and manage the entire site set-up themselves whilst keeping our project manager informed throughout the complete process.
I can honestly say from myself and my team that it has been a pleasure working with Panthera and would highly recommend their services; it is not often you work with a company that actively look to add value to your project.”
Ken WhiteCommercial Director
Testimonials
Olympic Shooting Range
John Sisk
“Thank you to all the team at Panthera who worked on the Woolwich Shooting Range project for John Sisk, I would particularly like to the management team of Neal, Simon, Adam and Mark of who all played a big part in each of their divisions making this project a great success. This contract was very high profile and required close attention throughout which was fully understood by Panthera management and obviously communicated through to the workforce.
As a quantity surveyor I have found that there have been huge benefits in procuring multiple trade services through one company; cost, time and personnel resources are all areas that benefitted. I understand from our site management team that you also helped in the planning of your services which again made it easier for us all. Attitude towards health & safety, working within strict guidelines and to a high quality were all areas your team excelled and should be congratulated on.
I would without hesitation recommend your services and would actively look to work with you on my future projects.”
Paul WalshSenior Qs