pampanga furniture city

15
www.tlrc.gov.ph Years after the eruption of Mt. Pinatubo in June 1991, the Chamber of Furniture of the Philippines (CFIP –Pampanga Chapter) has initiated the establishment of Pampanga Furniture City Project to support the furniture manufacturers rise above these ruins.

Upload: jessica-welch

Post on 01-Jan-2016

48 views

Category:

Documents


2 download

DESCRIPTION

Years after the eruption of Mt. Pinatubo in June 1991, the Chamber of Furniture of the Philippines (CFIP –Pampanga Chapter) has initiated the establishment of Pampanga Furniture City Project to support the furniture manufacturers rise above these ruins. Pampanga Furniture City. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Pampanga Furniture City

www.tlrc.gov.ph

Years after the eruption of Mt. Pinatubo in June 1991, the Chamber of Furniture of the Philippines (CFIP –Pampanga Chapter) has

initiated the establishment of Pampanga Furniture City Project to support the

furniture manufacturers rise above these ruins.

Page 2: Pampanga Furniture City

www.tlrc.gov.ph

Pampanga Furniture City

To assist CFIP – Pampanga members in high risk and medium risk areas in relocating to safer areas;To preserve and secure the various asset like machinery and equipment;To ensure continuous and strengthened livelihood of furniture workers of affected firms;To generate job opportunities for the lahar victims in the resettlement area;To protect a strong furniture industry presence in the province.

Page 3: Pampanga Furniture City

www.tlrc.gov.ph

Needs AssessmentFurniture City

MadapdapResettlement

Sta LuciaResettlement

Page 4: Pampanga Furniture City

www.tlrc.gov.ph

Furniture City Location Map

Page 5: Pampanga Furniture City

www.tlrc.gov.ph

TECHNO CENTERS

Botolan Techno Center in ZambalesHermosa Techno Center in BataanPorac, Mexico, and Floridablanca Techno Center in PampangaCapas and Concepcion Techno Center in Tarlac

(39 bldgs @ 1,260sqm)

Page 6: Pampanga Furniture City

www.tlrc.gov.ph

TECHNO CENTERSConstruction Progress

Completed 1,260 sqm bldg

Page 7: Pampanga Furniture City

www.tlrc.gov.ph

TECHNO CENTERS

Mabalacat TC Phase I in Pampanga(12 bldgs @ 1,440sqm)

Mabalacat TC Phase II in Pampanga(18 bldgs @ 1,350sqm)

Page 8: Pampanga Furniture City

www.tlrc.gov.ph

TECHNO CENTERSConstruction Progress Mabalacat

Page 9: Pampanga Furniture City

www.tlrc.gov.ph

TECHNO CENTERSPhase I Completed Mabalacat

Page 10: Pampanga Furniture City

www.tlrc.gov.ph

Support Facilities

w/ Administration Bldg 2 elevated water tank Basketball Court Three Phase Power Lines Digitel land line, SMART

wireless Internet Water distribution

system Concrete Road and

Drainage network

w/ Administration Bldg Three Phase Power Lines SMART wireless Internet Water distribution system Concrete Road and

Drainage network

Page 11: Pampanga Furniture City

www.tlrc.gov.ph

Typical Admin BldgBotolan HermosaPoracFloridablancaMexicoConcepcionCapas

Page 12: Pampanga Furniture City

www.tlrc.gov.ph

Main Admin Bldg

Page 13: Pampanga Furniture City

www.tlrc.gov.ph

Mabalacat TCSize:1,440 and

1,350 sqm

Page 14: Pampanga Furniture City

www.tlrc.gov.ph

32 locators48 buildings occupied70% occupancy rate

With new and improved lease rates plus additional incentives to locators, TRC targets an 80%

occupancy rate for 2008

Page 15: Pampanga Furniture City

www.tlrc.gov.ph