palm oil mill contractor
DESCRIPTION
Compact design & new technology integrated with compostingTRANSCRIPT
COMPANY PROFILE
Pt. berkat mulia wiratamaMedan – Pekanbaru – JAKARTAwww.ptbmw.biz
1
introduction
2
PT. BERKAT MULIA WIRATAMA is a Indonesian based company incorporated in year 2006. It is today palm oil mill engineering Contractor Company specializing in boiler, steam turbine, sterilizer, and all mechanical and electrical works. We install new unit, repair and servicing all equipment in palm oil mill, our founder had been in palm oil mill industry since 1985.
Our concepts are ENVIRONMENT FRIENDLY, we had completed composting project from Empty Fruit Bunch and Effluent for PT. PERKEBUNAN V Pekan Baru. And specialized in ENERGY STATION with Boiler Control System for SCADA Automation, efficient use of steam with VERTICAL STERLIZER.
We have good supported by a team comprising of seasoned engineering professionals with a combined experience involving in the project & design in South East Asia Region.
We have demonstrated our understanding of the demands of the engineering business. Our track record has proven our ability for engineering excellence, completion on time, strict cost control and good project management.
We bring real solutions to real problems for your business and engineering success. Tomorrow, you can count on us to still be working with you.
Company particular
3
Company Name : PT. BERKAT MULIA WIRATAMA Business Reg. :
SIUP No. : 0060/02.13/PM/I/2010TDP No. : 02.12.51.10027SIUJK No. : 1.127985.1275.2.02125 / MSITU : 503/0424/BI/WAS/I/2010
Date of Incorporation : 09 August 2006 Registered Office : 126, Jalan Timor Baru I Medan 20231 Board of director : A. SUMARDI (SU WEN YING) Business occupation : 1. Marketing / Operation Director
2. Project Director Business Address : 6F, Jalan HM Yamin Medan 20111 Business Phone : 061 – 77589588, 4520930 Facsimile No : 061-4579943 E-mail Address : [email protected],
[email protected] Bankers
Company Chart
4
Authorized dealer for BOILER
SALES, INSTALL new unit, foundation civil works and commissioning, MAINTEANCE & REPAIR for other brands : TAKUMA, VICKERS HOISKINS, BOILERMECH, BABCOCK, FRASER, etc with guarantee original parts and technician supervise from abroad graduate. Local technician with INPKK/ Departemen Tenaga Kerja’s certificate We also create control system for boiler such as : automatic water level, automatic rotary feeder, auto combustion, pressure transmitter, steam flow differential, drum level, steam temperature, modulating FD damper, feed water modulating control valve, and SCADA monitoring system.
5
Authorized dealer for steam turbine
We are servicing various type of Turbines, repairs and overhaul : NADROWSKI, TURBODYNE, SHINKO, ELLIOT, and COPPUS.
We have joint operation with In-House and Site Balancing Workshop.
We are represent of HANG ZHOU (Made in China) Turbine for palm oil mill industry
6
Palm oil mill supply & install
7
Masterlinks
Vertical Sterilizer ®
Vertical sterilizer Patent No. PI 20062472 is a new cutting-edge milling technology developed by our principle and manufactured in INDONESIA to fulfill the need of the palm oil industry to stay competitive by maximizing palm products extraction at a reduced cost and at the same time meet the requirements of HACCP, GMP and specific Principals and Criteria of RSPO.
Vertical Sterilization System completely does away with the marshalling yard for rail tracks, sterilizer cages, tippers, capstans, bollards, overhead lifting cranes and much other associated equipments. Fresh fruit bunches (FFB) are now delivered directly from the reception ramp by a conveyor system to the sterilizers. The conveyor system has a special contraption added to separate sand and other foreign particles from the FFB. Due to the new system's simplicity and the integration of automation system, this process is now virtually a one-man operation. As a basic concept of COMPACT DESIGN OF POM.
8
palm oil mill waste management
Composting system with EFB mixed POME to become organic fertilizer produced outdoor areal (Open Composting).
9
Open composting system
10
Indoor composting plant
11
Indoor composting plant 2 nd technogy
12
Organic Content 25-40% > 50%
N,P,K,MgO,B… <10% > 18% (Can Customized)
Storage/Shelf Live 3 – 6 Months > 12 months
Water Retention Good Very Good
Long Effect 3 – 6 Months 6 – 12 Months
Aeration Good Very Good
Nutrition Retention Good Very Good
Application Apply separately Easier Application
Period 2-4 month Within 45 Mins
Weather Depending Yes No
Production Area Big Space Required Saving of space
EFB Processing system (EFB PLANT)
13
Empty fruit brunch (janjangankosong) are waste in palm oil mill which recently used as raw material for feed boiler , commercial briquette and organic composting . Require standard process or plant for EFB processing system until dry (48% moisture)Application equipment :1. High speed hammer mill2. Break-Cutter cum Oil
Extractor3. Single Barrel Fiber Press
Palm kernel machine
Sales new unit and service for palm kernel
Refurbishment machine for improve value of palm kernel extraction’s rate.
14
Exhibition and seminars
15
Join with automation’s principal at westin nusa dua-bali exhibition 7-8 november 2007
16
Exhibition at Wpose mei 2008 JCC - Jakarta
17
Opportunity to meet our customers, business associates, government Officers all around INDONESIA.
Our projects / works experince
18
No Description Location1 Pekerjaan Pengadaan Spare Part Hoisting Crane PKS Rambutan
2Pembangunan Pagar jalan Citra IKD dalam rangka ISPS Code Pelabuhan Belawan
3 Pengadaan Motor Grader merk. Komatsu Type GD 511 A-1 Kebun Madina4 Pembuatan Water Treatment PKO Tandun5 Pengadaan Baru 1 unit Wheel Loader PKO Tandun6 Pengadaan spare part hoisting crane PKS Sosa7 Pengadaan Tractor Roda Ban (TRB) Merk John Deere Kebun Madina
Typr 5715/4wd 8 Pengadaan dan pemasangan baru jaringan pipa air minum PKS Sosa9 Perawatan Gudang Persediaan CFS Pelabuhan Belawan Pelabuhan Belawan
10Pembangunan pagar jalan ujung baru depan 101-113 dalam rangka Pelabuhan Belawanpenerapan ISPS Code
11 Perbaikan 1(satu) unit hoisting crane no.2 Demag PTPN III12 Perawatan gudang CFS Pelabuhan Belawan Pelabuhan Belawan
13Pekerjaan pembuatan Maritime and port security committee Port di terminal penumpang lt III Pelabuhan Belawan
14 Pekerjaan pengadaan kimia boiler Sachemie PTPN V15 Pengadaan 1 (Satu) Unit Backhoe Loader Kebun Lubuk Dalam16 Pengadaan 1 (Satu) Unit Road Greader Kebun Sei Tapung17 Pekerjaan Pengecatan Gedung Kantor Cabang Pelabuhan Pelabuhan Belawan18 Pembuatan Areal Pengomposan Luas 8.4 Ha PKS Terantam19 Pekerjaan Perbaikan/Pengedockan Kapal Pandu AP-016 Pelabuhan Belawan20 Pengadaan dan pemasangan baru automatisasi 2 (dua) unit di PKS Dolok Ilir
St Ketel Uapdan 1(satu) unit di St pembangkit (BPV) 21 Pemasangan water level control system boiler no.1 PKS Terantam22 Pekerjaan Pengadaan Marine Radar ARPA Far 2127 Pelabuhan Belawan23 Pemasangan/Penggantian sistem automatic boiler no.2 PKS Sei Garo24 Pengadaan & pemasangan baru 1(satu) unit electrical PKS Tandun
driven tube cleaning machine 25 Pemasangan baru 1 unit Mild Steel Vacuum Drier Kapasitas PKS Mayang
10 ton /jam
Power plant <10 mwconsultancy & site survey
19
Ready for technical presentation
We are ready for make presentation of company profile and product at your convenient time and place.
Our principal from abroad will join us for technical support presentation at free of charges.
20
Our motto and thank you
21
Copyright 2010 PT BMW. All rights reserved. Selling, re-distributing or reproducing the information on these pages without prior permission from PT BMW is strictly prohibited
22