Amount Date Amount Date Rate Amount 1 2 3 4 5 6 7 8 9 11 12 13 14 16 17 19 20 21 1 Construction of Passenger shed at Kharekuran Dist. Palghar 1.56 09.02.2017 1.49 09.12.2017 MMB 1A 08.03.2017 21.03.2017 M/S. Balaji Construction At Par 1.49 20.04.2017 21.04.2017 21.04.2017 03 Months Work in Progress 2 Construction of Passenger shed & provision of Solor Light at Murbe Satpati Side Dist. Palghar 9.45 28.12.2016 9.04 09.02.2017 MMB 1A 09.02.2017 21.03.2017 Kishor Kulkarni 15.99% Below 7.59 10.04.2017 12.04.2017 12.04.2017 09 Months Work in Progress 3 Repais to PI office at Arnala Tal. Vasai, Dist. Palghar 32.35 30.012.2016 28.94 14.01.2017 MMB 1B 09.02.2017 20.03.2017 Rahul Construction At Par 28.94 20.04.2017 20.04.2017 20.04.2017 09 Months Work in Progress 4 Repais to PI office at Satpati Tal. Palghar, Dist. Palghar 53.07 01.02.2017 47.84 09.02.2017 MMB 1B 09.02.2017 09.03.2017 M/S. Balaji Construction 15.99% Below 40.19 10.04.2017 12.04.2017 12.04.2017 12 Months Work in Progress 5 Construction of Passenger shed & provision of Solor Light at Vaitipada Dist. Palghar 11.97 17.11.2016 11.46 17.11.2016 MMB 1A 25.11.2016 12.05.2016 M/S. Balaji Construction 05.50% Below 10.83 25.01.2017 27.01.2017 27.012017 06 Months 25.05.2017 23.06.2017 9.70 Wock Complete 6 Construction of Passenger shed & provision of Solor Light at Vadhivbet Dist. Palghar 11.97 17.11.2016 11.46 17.11.2016 MMB 1A 25.11.2016 30.12.2016 M/S. Balaji Construction 00.50% Below 11.40 25.01.2017 27.01.2017 27.012017 06 Months 25.05.2017 23.06.2017 10.22 Wock Complete 7 Construction of Passenger shed & provision of Solor Light at Satpati Dist. Palghar 2.83 09.02.2017 2.71 09.02.2017 MMB 1A 09.02.2017 21.03.2017 M/S. Balaji Construction At Par 2.71 06.5.2017 11.05.2017 11.05.2017 09 Months Work in Progress 8 Construction of Passenger shed & provision of Solor Light at Navapur Dist. Palghar 27.53 06.08.2015 26.22 21.08.2015 MMB 1A 06.11.2015 31.12.2015 M/S. Trimurti Enterprisess 22.65% Below 20.28 09.02.2016 09.02.2016 09.02.2016 09 Months Work Order Given 9 Repair to Port Inspector Building at Dahanu Tal. Dahanu, Dist. Palghar. 9.28 17.08.2015 4.44 28.08.2015 MMB 1B 02.11.2015 16.12.2015 M/S. Trimurti Enterprisess 15.65% Below 3.75 09.02.2016 09.02.2016 09.02.2016 09 Months Work Order Given 10 Construction of Approch road to Existing Jetty at Vaitipadabet Tal. Palghar, Dist. Palghar 50.56 19.11.2016 50.57 05.12.2016 DPC 3051 08.012.2016 21.04.2017 M/S. Balaji Construction 12.50% Below 44.00 05.05.2017 11.05.2017 11.05.2017 09 Months Work in Progress 11 Construction of Approch road to Existing Jetty at Vadhivbet Tal. Palghar, Dist. Palghar 41.60 19.11.2016 41.58 05.12.2016 DPC 3051 08.12.2016 21.04.2017 M/S. Balaji Construction 12.25% Below 36.49 05.05.2017 11.05.2017 11.05.2017 09 Months Work in Progress 12 Construction of Passenger Jetty at Doliv Koshimbe Tal. Vasai, Dist. Palghar. 73.41 08.09.2016 67.67 21.11.2016 DPC 3051 07.03.2017 14.04.2017 Sandip Jadhav 11.00% Below 60.22 26.04.2017 23.05.2017 23.05.2017 09 Months Work Order Given 13 Construction of Approch road to Jetty at Navapur Tal. Palghar Dist. Palghar 66.78 17.10.2016 63.73 19.10.2016 DPC 3051 08.11.2017 16.12.2016 N.S. Dhanmeher 16.28% Below 53.20 29.12.2016 29.12.2017 29.12.2017 09 Months Work Order Given 14 Construction of Approch road on Exisitng Bund at Kalamb Tal. Vasai Dist. Palghar 53.89 17.10.2016 52.99 21.10.2016 DPC 3051 07.11.2016 30.12.2016 Arjun Earthmovers 19.00% Below 42.93 CRZ Pending 15 Construction of Approch road on Exisitng Bund at Rajodi Tal. Vasai Dist. Palghar 53.97 17.10.2016 52.99 21.10.2016 DPC 3051 07.11.2016 30.12.2016 M/S. Balaji Construction 19.80% Below 11.47 29.12.2016 29.12.2016 29.12.2017 09 Months CRZ Pending 16 Construction of Passenger Jetty at Darshet Tal. Palghar, Dist. Palghar. 92.02 08.09.2016 87.64 21.10.2016 DPC 3051 07.11.2016 30.12.2016 Arjun Earthmovers 14.25% Below 75.16 03.03.2017 03.03.2017 03.03.2017 09 Months Work in Progress 17 Construction of Passenger Jetty at Umbharpada Tal. Palghar, Dist. Palghar. 67.95 08.09.2016 64.71 21.10.2016 DPC 3051 08.11.2017 08.03.217 M/S. Balaji Construction 13.10% Below 56.23 03.03.2017 03.03.2017 03.03.2017 09 Months Work Order Given Budget Head Charged penalties on completion of late work Date of payment Amount Date of work complition 10 Palghar 2016-17 Time Period including Monsoon Sr. No. Name of Work Administrative Approval Technical Sanction Tender Published Date Commercial Opening Date Name of Contractor Price Bid Submission of security Deposit date Agreement Date Work order Date Remark

Upload: others

Post on 04-Aug-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Palghar 2016-17 - Maharashtra · 2017-07-14 · Existing Jetty at Vaitipadabet Tal. Palghar, Dist. Palghar 50.56 19.11.2016 50.57 05.12.2016 DPC 3051 08.012.2016 21.04.2017 M/S. Balaji

Amount Date Amount Date Rate Amount

1 2 3 4 5 6 7 8 9 11 12 13 14 16 17 19 20 21

1Construction of Passenger shed at

Kharekuran Dist. Palghar1.56 09.02.2017 1.49 09.12.2017 MMB 1A 08.03.2017 21.03.2017

M/S. Balaji

ConstructionAt Par 1.49 20.04.2017 21.04.2017 21.04.2017 03 Months

Work in

Progress

2Construction of Passenger shed &

provision of Solor Light at Murbe

Satpati Side Dist. Palghar

9.45 28.12.2016 9.04 09.02.2017 MMB 1A 09.02.2017 21.03.2017Kishor

Kulkarni

15.99%

Below7.59 10.04.2017 12.04.2017 12.04.2017 09 Months

Work in

Progress

3Repais to PI office at Arnala Tal.

Vasai, Dist. Palghar32.35 30.012.2016 28.94 14.01.2017 MMB 1B 09.02.2017 20.03.2017

Rahul

ConstructionAt Par 28.94 20.04.2017 20.04.2017 20.04.2017 09 Months

Work in

Progress

4Repais to PI office at Satpati Tal.

Palghar, Dist. Palghar53.07 01.02.2017 47.84 09.02.2017 MMB 1B 09.02.2017 09.03.2017

M/S. Balaji

Construction

15.99%

Below40.19 10.04.2017 12.04.2017 12.04.2017 12 Months

Work in

Progress

5Construction of Passenger shed &

provision of Solor Light at Vaitipada

Dist. Palghar

11.97 17.11.2016 11.46 17.11.2016 MMB 1A 25.11.2016 12.05.2016M/S. Balaji

Construction

05.50%

Below10.83 25.01.2017 27.01.2017 27.012017 06 Months 25.05.2017 23.06.2017 9.70

Wock

Complete

6Construction of Passenger shed &

provision of Solor Light at Vadhivbet

Dist. Palghar

11.97 17.11.2016 11.46 17.11.2016 MMB 1A 25.11.2016 30.12.2016M/S. Balaji

Construction

00.50%

Below11.40 25.01.2017 27.01.2017 27.012017 06 Months 25.05.2017 23.06.2017 10.22

Wock

Complete

7Construction of Passenger shed &

provision of Solor Light at Satpati

Dist. Palghar

2.83 09.02.2017 2.71 09.02.2017 MMB 1A 09.02.2017 21.03.2017M/S. Balaji

ConstructionAt Par 2.71 06.5.2017 11.05.2017 11.05.2017 09 Months

Work in

Progress

8

Construction of Passenger shed &

provision of Solor Light at Navapur

Dist. Palghar27.53 06.08.2015 26.22 21.08.2015 MMB 1A 06.11.2015 31.12.2015

M/S. Trimurti

Enterprisess

22.65%

Below20.28 09.02.2016 09.02.2016 09.02.2016 09 Months

Work

Order

Given

9

Repair to Port Inspector Building at

Dahanu Tal. Dahanu, Dist. Palghar. 9.28 17.08.2015 4.44 28.08.2015 MMB 1B 02.11.2015 16.12.2015M/S. Trimurti

Enterprisess

15.65%

Below3.75 09.02.2016 09.02.2016 09.02.2016 09 Months

Work

Order

Given

10Construction of Approch road to

Existing Jetty at Vaitipadabet Tal.

Palghar, Dist. Palghar

50.56 19.11.2016 50.57 05.12.2016 DPC 3051 08.012.2016 21.04.2017M/S. Balaji

Construction

12.50%

Below44.00 05.05.2017 11.05.2017 11.05.2017 09 Months

Work in

Progress

11Construction of Approch road to

Existing Jetty at Vadhivbet Tal.

Palghar, Dist. Palghar

41.60 19.11.2016 41.58 05.12.2016 DPC 3051 08.12.2016 21.04.2017M/S. Balaji

Construction

12.25%

Below36.49 05.05.2017 11.05.2017 11.05.2017 09 Months

Work in

Progress

12

Construction of Passenger Jetty at

Doliv Koshimbe Tal. Vasai, Dist.

Palghar.73.41 08.09.2016 67.67 21.11.2016 DPC 3051 07.03.2017 14.04.2017 Sandip Jadhav

11.00%

Below60.22 26.04.2017 23.05.2017 23.05.2017 09 Months

Work

Order

Given

13

Construction of Approch road to

Jetty at Navapur Tal. Palghar Dist.

Palghar66.78 17.10.2016 63.73 19.10.2016 DPC 3051 08.11.2017 16.12.2016

N.S.

Dhanmeher

16.28%

Below53.20 29.12.2016 29.12.2017 29.12.2017 09 Months

Work

Order

Given

14Construction of Approch road on

Exisitng Bund at Kalamb Tal. Vasai

Dist. Palghar

53.89 17.10.2016 52.99 21.10.2016 DPC 3051 07.11.2016 30.12.2016Arjun

Earthmovers

19.00%

Below42.93

CRZ

Pending

15Construction of Approch road on

Exisitng Bund at Rajodi Tal. Vasai

Dist. Palghar

53.97 17.10.2016 52.99 21.10.2016 DPC 3051 07.11.2016 30.12.2016M/S. Balaji

Construction

19.80%

Below11.47 29.12.2016 29.12.2016 29.12.2017 09 Months

CRZ

Pending

16Construction of Passenger Jetty at

Darshet Tal. Palghar, Dist. Palghar. 92.02 08.09.2016 87.64 21.10.2016 DPC 3051 07.11.2016 30.12.2016Arjun

Earthmovers

14.25%

Below75.16 03.03.2017 03.03.2017 03.03.2017 09 Months

Work in

Progress

17

Construction of Passenger Jetty at

Umbharpada Tal. Palghar, Dist.

Palghar.67.95 08.09.2016 64.71 21.10.2016 DPC 3051 08.11.2017 08.03.217

M/S. Balaji

Construction

13.10%

Below56.23 03.03.2017 03.03.2017 03.03.2017 09 Months

Work

Order

Given

Budget Head

Charged

penalties on

completion of

late work

Date of

payment Amount

Date of work

complition

10

Palghar 2016-17

Time

Period

including

Monsoon

Sr. No. Name of Work

Administrative Approval Technical SanctionTender

Published

Date

Commercial

Opening Date

Name of

Contractor

Price Bid Submission

of security

Deposit

date

Agreement

Date

Work order

DateRemark

Page 2: Palghar 2016-17 - Maharashtra · 2017-07-14 · Existing Jetty at Vaitipadabet Tal. Palghar, Dist. Palghar 50.56 19.11.2016 50.57 05.12.2016 DPC 3051 08.012.2016 21.04.2017 M/S. Balaji

Amount Date Amount Date Rate Amount

1 2 3 4 5 6 7 8 9 11 12 13 14 16 17 19 20 21

1Repairs to Exisitinf Compound Wall at Uttan

Mira Bhaynadar Dist - Thane8.27 05.12.2016 8.05 09.12.2016 MMB 1B 02.03.2017 17.04.2017 Kishor Kulkarni (-) 16.00% 6.77 26.04.2017 23.05.2017 23.05.2017 9 Month

Work Order

Given

2Renovation of Port Inspector Office at Kalyan

Tal - Kalyan Dist - Thane18.00 30.01.2017 16.63 09.02.2017 MMB 1B 29.03.2017 17.04.2017

M/S Pratik

Construction(-) 12.69% 14.49 12.05.2017 31.05.2017 31.05.2017 9 Month

Work Order

Given

3Providing Fencining Work at Saket Plot Tal

Thane Dist Thane18.79 03.09.2016 18.03 27.09.2016 MMB 08.11.2016 08.12.2016

M/S. Yash

Construction(-) 14.50% 15.41 30.12.2016 30.12.2016 30.12.2016 6 Month 27.04.2017 0 05.06.2017 11.83

Work

Completed

4Providing Fencining Work Ganesh Ghat to

Railway Track at Retibunder Tal Thane Dist

Thane

31.67 20.04.2017 27.41 20.04.2017 MMBTender

Prosess

5Providing and fixing stainless steel railing on

Retaning wall at Divale Belapur, Navi Mumbai

Dist Thane

7.06 15.06.2017 MMB 2A

Technical

Sanction

Pending

6Construction of Approach Road to Jetty at

Nandkar Tal - Bhiwandi Dist - Thane145.18 07.12.2016 138.27 06.03.2017 DPC 3051 06.05.2017

Technical

Opening

Pending

7Extention and Strenthening of Jetty near

Railway Bridge Bhayander (E) Tal and Dist -

Thane

143.00 27.01.2016 142.81 05.03.2016 DPC 3051 02.07.2016 19.09.2016M/S Subhash

Construction(-) 12.69% 124.69 07.11.2016 15.11.2017 15.11.2017 9 Month

Work Order

Given

8Construction of Approach Road Retaining

wall and Parking to Jetty at Banglapada -

Malodi Tal - Bhiwandi Dist - Thane

226.23 17.03.2016 224.52 21.04.2016 DPC 3051 02.07.2016 20.09.2016M/S Pratik

Construction(-) 00.69% 222.97 05.10.2016 07.10.2016 07.10.2016 9 Month 05.05.2017 0.00 23.05.2017 123.14

Work

Completed

9Construction of Approach Road and

Retaining Wall from Sarangaon jetty to

Vehele Jetty Tal Bhiwandi and Dist. Thane

175.53 30.09.2016 167.17 19.10.2016 DPC 3051 5.11.2016 07.03.2017M/S Vishal

Construction(-) 14.69% 142.95 12.04.2017 12.04.2017 12.04.2017 09 Months

Work in

Progress

10Construction of Retaining wall, Jetty and

Pathaway at Kalyan from Ganeshghat to

Wadeghar, Tal. Kalyan, Dist. Thane

496.94 06.07.2015 496.94 01.07.2015 DPC 3051 07.08.2015 28.10.2015M/S. Subhash

Construction(-) 03.00% 459.07 30.11.2015 30.11.2015 30.11.2015 12 Months

Work in

Progress

11Extension And Repairs of Existing jetty at

Vehel Tal Bhiwandi and Dist. Thane113.15 30.09.2016 110.99 19.10.2016 DPC 3051 05.11.2016 06.01.2017

M/S Unitech

Construction(-) 16.00% 93.23 27.04.2017 27.04.2017 27.04.2017 9 Month

Work Order

Given

12Extension And Repairs of Existing jetty and

Construction of Retaining Wall to Jetty at

Pimplas Tal Bhiwandi and Dist. Thane

112.46 30.09.2016 110.31 19.10.2016 DPC 3051 05.11.2016 22.12.2016M/S Arjun

EarthmoversAt Par 110.31 26.04.2017 26.04.2017 26.04.2017 9 Month

Work Order

Given

13

Extension And Repairs of Existing jetty and

Construction of Retaining Wall to jetty at

Dombivli west (Mothagaon) Tal Kalyan and

Dist. Thane

116.45 30.09.2016 114.27 19.10.2016 DPC 3051 05.11.2016 26.12.2016M/S Subhash

Construction(-) 05.58% 107.90 05.01.2017 21.03.2017 21.03.2017 9 Month

Work Order

Given

14Providing and Electing Solar lights Pole at

Diwale Koliwada Jetty Belapur Navi Mumbai

Dist Thane

8.70 30.09.2016 8.32 19.10.2016 DPC 3051 08.11.2016 22.12.2016 P.M.Chavan (-) 07.20% 7.73 05.01.2017 27.01.2017 27.01.2017 3 MonthWork Order

Given

15Construction of Approch Road to Passenger

Jetty at Anjur, Tal. Bhiwandi, Dist. Thane.249.20 05.11.2016 245.28 21.11.2016 DPC 3051

Tender

Prosess

16

Providing Facility for Passenger like Pathway,

Retaining wall etc Extension Ramp, at

Khumbharkhanpada (Dombivali), Tal. Kalyan,

Dist. Thane.

355.79 07.12.2016 338.86 16.03.2017 DPC 3051Tender

Prosess

17Development of Gaimukh Bunder as Tourist

Destination, at Thane, Dist. Thane.1308.00 03.09.2013 1269.57 16.01.2014

TMC Diposit

Work08.05.2015 24.06.2015 D.V.Pawar (-) 07.00% 1064.96 02.07.2015 03.07.2017 03.07.2017 18 Months

Work in

Progress

10

RemarkDate of work

complition

Charged

penalties on

completion of

late work

Date of

payment Amount

Time

Period

including

Monsoon

Work order

Date

Thane 2016-17

Commercial

Opening Date

Name of

Contractor

Price Bid Submission

of security

Deposit

date

Agreement

DateSr. No. Name of Work

Administrative Approval Technical SanctionTender

Published

Date

Budget Head

Page 3: Palghar 2016-17 - Maharashtra · 2017-07-14 · Existing Jetty at Vaitipadabet Tal. Palghar, Dist. Palghar 50.56 19.11.2016 50.57 05.12.2016 DPC 3051 08.012.2016 21.04.2017 M/S. Balaji

Amount Date Amount Date Rate Amount

1 2 3 4 5 6 7 8 9 11 12 13 14 15 16 17 18 19 20 21

1

Providing and Installing

Portacabins at Khardanda

Regional Port Office,

Khardanda Mumbai Sub

Urban.

22.17 17.11.2016 21.32 21.11.2017 1A MMB 10.11.2016 02.12.2016

IQRA PORTABLE

SYSTEMS

PVT.LTD.

25.5 31.12.2016 04.01.2017 04.01.2017 02 MONTH04.01.201

7

Work

physically

completed

2

Reconstrucation of bandra

R.P.O. Office Building at

khardanda mumbai.

165.08 14.09.2016 135.26 21.12.2016 1A MMB 10.04.2017 24.05.2017shri.Ram

Enterprise-10% 121.74 19.06.2017 12 MONTH

WORK

ORDER

STAGE

3

Providing fencing work at

Belapur Reti Bunder Land

Tal - Belapur Navi Mumbai

16.46 21.07.2016 15.68 22.07.2016 5 MMB

M/S. YASH

CONSTRUCATIO

N

-1.01% 15.52 07.09.2017 07.09.2017 07.09.2017 06 MONTH07.09.201

7

Work

physically

completed

4

Interior decoration and

furniture work in Head office

second Floor at Ballard

Estate Mumbai

MMBWORKING

IN PORGESS

5

Providing Fencing work

near ulawa Belapur Jetty

area at Ulawa Belapur Navi

Mumbai

8.63 18.11.2016 8.21 21.11.2016 5 MMB 02.03.2017 17.04.2017

NIRAMAN

INFRASTRUCTUR

E

-19.16% 66.43 11.05.2017 23.05.2017 23.05.2017 06 MONTH23.05.201

6

WORKING

IN PORGESS

6

construction of passenger

shade & provision of solar

light at kandarvan tal.

Palghar

14.95 03.09.2016 14.31 19.10.2016 MMB 03.11.2016 08.12.2016BALAJI

CONSTRACTION-19.8 11.47 29.12.2016 29.12.2016 29.12.2017 6 month

29.12.201

6

WORKING

IN PORGESS

7

Construction of Toilet Block

at Lower Koliwada Gorai ,

Mumbai-Suburban..

30.67 16.12.2016 29.21 21.11.2016 DPC 25.11.2016 30.12.2016S.D.ENGINEERIN

G-10% 26.29 05.01.2017 05.01.2017 05.01.2017 06 MONTH

05.01.201

7

Work order

given

8

Construction of Boat

Repairing yard at Madh

Patwadi Tal - Mumbai

suburban

47.41 16.11.2016 45.23 21.11.2016 DPC 25.11.2016 30.12.2016S.D.ENGINEERIN

G-9.99% 40.71 05.01.2017 05.01.2017 05.01.2017 06 MONTH

05.01.201

7

Work order

given

9

Strenthning of Existing

Ramp and Approach Road

at Versova Tal - Mumbai

Suburban 4th Call

30 16.11.2016 28.86 21.11.2016 DPC 25.11.2016 21.01.2017 A.S. JADHAV -18% 23.66 16.03.2017 21.03.2017 21.03.2017 06 MONTH21.03.201

7

Work order

given

10

Beautification and

Protection of Promenade

near Kadeshwar Mandir at

Bandstand Bandra Mumbai

suburb

311.28 22.11.2016 309.01 21.12.2016 DPC 06.01.2016 27.03.2017TECHNICAL

OPEN ONLY

11

Construction of Jetty for

Tourist at Marve, Mumbai

Subub.

DPC23-Mar-2017

12:00 PM

Tender

acceptance

stage

12Repairs to Manori Jetty at

Manori, Mumbai-Suburban44.31 14.01.2016 42.61 16.02.2016 DPC 27.04.2016 04.07.2016 sandeep jadhav -14.03 36.52 15.07.2016 15.07.2016 15.07.2016 09 month

WORKING

IN PORGESS

13

Construction of Toilet Block

at Uppar Koliwada, Gorai,

Mumbai Suburban

41.47 29.02.2016 40.59 08.03.2016 DPC 27.04.2016 10.06.2016 S D ENGINEERS -9.4999 36.74 04.08.2016 02.08.2016 02.08.2016 09 month

WORK

ORDER

GIVEN

14

Erection Of Highmast

(3Nos)at Manori Koliwada ,

Mumbai Suburban

16.11.2016 23.06 21.11.2016 DPC 25.11.2016 17.12.2016

M/S RAIGAD

ELECTRICL

ENG.CO.

-2.43% 22.5 29.12.2016 29.12.2016 29.12.2016 06 MONTH29.12.201

6

Work

physically

completed

Sr.

No.Name of Work

Administrative Approval Technical Sanction

Tender

Published

Date

Mumbai 2016-17

10

Budget

HeadRemark

Date of

Work

start

Date of

work

complition

Name of

Contractor

Price Bid

Date of

Expendi

ture

Expendi

ture

Charged

penalties

on

completion

of late

work

Date of

payme

nt /

measur

ment

registra

Work order

Date

Commercial

Opening Date

Submission of

security

Deposit date

Agreement

Date

Time

Period

including

Monsoon

Page 4: Palghar 2016-17 - Maharashtra · 2017-07-14 · Existing Jetty at Vaitipadabet Tal. Palghar, Dist. Palghar 50.56 19.11.2016 50.57 05.12.2016 DPC 3051 08.012.2016 21.04.2017 M/S. Balaji

Amount Date Amount Date Rate Amount

1 2 3 4 5 6 7 8 9 11 12 13 14 15 16 17 18 19 20 21

Sr.

No.Name of Work

Administrative Approval Technical Sanction

Tender

Published

Date

Mumbai 2016-17

10

Budget

HeadRemark

Date of

Work

start

Date of

work

complition

Name of

Contractor

Price Bid

Date of

Expendi

ture

Expendi

ture

Charged

penalties

on

completion

of late

work

Date of

payme

nt /

measur

ment

registra

Work order

Date

Commercial

Opening Date

Submission of

security

Deposit date

Agreement

Date

Time

Period

including

Monsoon

15

Strengthing of Existing

Sloping Ramp and

Approach Road Near Chai

Pani Hotel at Versova ,

Mumbai Suburban

25.76 16.12.2016 25.47 21.11.2016 DPC 25.11.2016 31.12.2016SHRI.S.D.

ENGINEERS-13.59% 22.01 05.01.2017 05.01.2017 05.01.2017 06 MONTH

05.01.201

7

WORK

ORDER

GIVEN

16

Construction Of Boat

Repairing Yard at Madh

Patwadi Behind Ganesh

Mandir ,Madh Mumbai

Suburban

76.14 16.11.2016 73.76 21.11.2016 DPC 25.11.2016 06.01.2017BALAJI

CONSTRACTION-14.94% 62.74

WORK

ORDER

GIVEN

17

Construction of Toilet Block

at Madh, Vanjaregalli,

Mumbai-Suburban..

30.67 16.12.2016 29.21 21.11.2016 DPC 25.11.2016 30.12.2016SHRI.S.D.

ENGINEERS-4.5 27.89 05.01.2017 05.01.2017 05.01.2017 06 MONTH

05.01.201

7

WORKING

IN PORGESS

18

Construction of Approach

Concrete Road at Manori

Beach Tal - Mumbai

suburban

69.54 05.11.2016 65.18 11/25/16 DPC 25.11.2016 30.12.2016vikash

construcation-14 56.06 01/05/17 05.01.2017 05.01.2017 06 MONTH

05.01.201

7

WORKING

IN PORGESS

19

Strenthning and protection

to existing Approach road to

ramp at Madh patwadi

Mumbai Suburban

78.73 16.11.2016 78.62 21.11.2016 DPC 25.11.2016 06.01.2017BALAJI

CONSTRACTION-14.94 66.88 07.01.2017 07.01.2017 07.01.2017 06 MONTH

07.01.201

7

WORK

ORDER

GIVEN

20

Beautification of Gorai

Beach Promenade at Gorai

Mumbai Suburban

99.09 05.11.2016 98.28 21.11.2016 DPC 25.11.2016 31.12.2016M/S ARJUN

EARTHMOVERS-3 95.33 05.01.2017 05.01.2017 05.01.2017 06 MONTH

05.01.201

7

C R Z

PENDING

21

Construction of Approach

Concrete Road at

Ambedkar Nagar Gorai Tal -

Mumbai suburban

108.19 16.11.2016 103.35 21.11.2016 DPC 25.11.2016 31.12.2016M/S ARJUN

EARTHMOVERS-18.67 84.05 05.01.2017 05.01.2017 05.01.2017 06 MONTH

05.01.201

7

WORKING

IN PORGESS

22

Strenthening of approach

road from Gorai Beach to

shefail Police station at

Gorai Mumbai suburban

115.59 16.11.16 114.09 21.11.16 DPC SHRI.B.R.TALELE -15.53% 96.37 05.01.2017 05.01.2017 05.01.2017 06 MONTH05.01.201

7

WORKING

IN PORGESS

23

REMOVING SUB MARINE

ROCK FROM

NAVIGATIONAL

CHANNEL, AT BELAPUR,

NAVI MUMBAI

DPCWORKING

IN PORGESS

24

Construction of Jetty at

Bandra Worli Sea Link for

coastal security police

Mumbai Suburban

33.73 04.01.2016 32.08 20.01.2016 DPC 27.04.2016 30.06.2016

NIRAMAN

INFRASTRUCTUR

E

-14.00% 27.59 30.08.2016 07.10.2016 07.10.2016 09 month

Work

physically

completed

Page 5: Palghar 2016-17 - Maharashtra · 2017-07-14 · Existing Jetty at Vaitipadabet Tal. Palghar, Dist. Palghar 50.56 19.11.2016 50.57 05.12.2016 DPC 3051 08.012.2016 21.04.2017 M/S. Balaji

Amount Date Amount Date Rate Amount

1 2 3 4 5 6 7 8 9 11 12 13 14 15 16 17 18 19 20 21

Sr.

No.Name of Work

Administrative Approval Technical Sanction

Tender

Published

Date

Mumbai 2016-17

10

Budget

HeadRemark

Date of

Work

start

Date of

work

complition

Name of

Contractor

Price Bid

Date of

Expendi

ture

Expendi

ture

Charged

penalties

on

completion

of late

work

Date of

payme

nt /

measur

ment

registra

Work order

Date

Commercial

Opening Date

Submission of

security

Deposit date

Agreement

Date

Time

Period

including

Monsoon

25

Extension and Repairs of

jetty at Dongari Galli

Varsova Mumbai Suburban

22.22 27.03.2016 21.37 31.03.2016 DPC 17.05.2016 31.12.2016AJAY DILIP

PAWAR-14 18.38 05.01.2017 05.01.2017 05.01.2017 09 MONTH

05.01.201

7

WORK

COMPLET

26

Providing and Electing

Solar lights Pole at Diwale

Koliwada Jetty Belapur Navi

Mumbai Dist Thane

8.7 30.09.2016 8.32 19.10.2016 DPC 05.11.2016 22.12.2016 P.M.CHAVEN -7.20% 7.72 05.01.2017 27.01.2017 27.01.2017 3 MONTH

Work

physically

completed

27

Beautyfication of Aksa

Beach at Madh Mumbai

suburban

DPCC R Z

Rejected

28

CONSTRUCATION OF

PASSENGER JETTY AT

VERSOVA MUMBAI

SUBURBAN DIST

93.57 15.02.2016 49.48 11.03.2016 DPC 29.06.2016 08.09.2016BALAJI

CONSTRACTION-18.99 72.48 18.10.2016 18.10.2016 18.10.2016 09 month

18.10.201

6

C R Z

Clearure

pending

29

Constrruction of shed at

versova Dongri galli, at sea

shore on existing platform

15 19.12.2013 13.57 07.10.2013 DPC 29.01.2014 01.03.2014Giridhar Jayramji

Bhgat-13.1 11.79 04.03.2014 04.03.2014 12 MONTH

Work

physically

completed

30

Construcation of life -Guard

Tower at Gorai Beach ,

mumbai sub-urban.

18.28 19.11.2015 17.58 19.12.2015 DPC 23.12.2015 04.03.2016BALAJI

CONSTRACTION-0.99 17.4 02.04.2016 02.04.2016 05.04.2016 12 MONTH

work in

progress

31

Construcation of fish Drying

Platform at MADH Bhati PART

2 Mumbai suburban

14.7 03.03.2014 13.3 20.02.2014 DPC 30.08.2014 09.10.2014m/s Giridhar

Jayramji Bhagat-17.1 11.03 04.02.2015 04.02.2015 04.02.2015 06 MONTH

Work

physically

completed

32

Constucation of Fish Drying

Platform at Madh Bhati part 1

Mumbai sub

14.7 03.03.2014 13.3 20.02.2014 DPC 30.08.2014 22.10.2014m/s Giridhar

Jayramji Bhagat-11.77 11.03 04.02.2015 04.02.2015 04.02.2015 06 MONTH

Work

physically

completed

33

Beautification at Bandstand

Bandra Promenade(

Balance work)& proveding

basice facilites Bandra w

Mumbai suburb

198.89 05.02.2016 197.05 DPC 08.03.2016 24.08.2016Arjun

earthmovers -14.82 167.85 19.09.2016 22.09.2016 22.09.2016 09mon

work in

progress

34

Protection and

Beautification at carter

Road promenade Bandra w

Tal - Mumbai suburban

192.9 15.02.2016 170.67 01.02.2016 DPC 23.02.2016 04.05.2016BALAJI

CONSTRACTION-14.38 146.13 22.09.2016 28.09.2016 28.09.2016 12 MONTH

work in

progress

35

EXTENSION AND Widening of

exisiting passenger jetty and

Providing other facilities at

madh mumbai sub

50 19.12.2013 47.17 05.12.2013 DPC 29.01.2014 01.03.2014Unitech

Construcation-23.2 36.22 23.01.2015 23.01.2015 23.01.2015

Work

physically

completed

36Reparis to Hydrographer office

at khardanda mumbai51.71 03.12.2015 48.49 23.12.2015 MMB 23.12.2015 01.02.2016

Ankita

enterprise-7.1 45.05 16.03.2016 19.03.2016 19.03.2016

Work order

stage

37Construcation of approach

road at varsova bazargali17.78 30.03.2013 14.84 05.04.2013 DPC 29.01.2014 25.02.2014

SUBHAS

Construcation

co.

-12.69 12.95 04.03.2014 04.03.2014 04.03.2014 6 month

Work

physically

completed

38

Construcation of Drying

Platfrom at versova Bazargali (

SOUTH SIDE )

17.84 30.03.2013 14.81 05.04.2013 DPC 29.01.2014 25.02.2014

SUBHAS

Construcation

co.

-12.69 12.93 28.02.2014 28.02.2014 28.02.2014 6 month

Work

physically

completed

Page 6: Palghar 2016-17 - Maharashtra · 2017-07-14 · Existing Jetty at Vaitipadabet Tal. Palghar, Dist. Palghar 50.56 19.11.2016 50.57 05.12.2016 DPC 3051 08.012.2016 21.04.2017 M/S. Balaji

Amt Date Amt Date Rate Amt

1 2 3 4 5 6 7 8 9 11 12 13 14 15 16 17 18 19 20 21

1Construction of Passenger Shed at Gavhan

Tal. Uran, Dist. Raigad 6.00 20.01.2016 5.78 03.02.2016 MMB (1B) 26.09.2016 25.10.2016 Priyanka Sarvgod (-)02.10% 5.20 19.12.2016 21.12.2016 21.12.2016 9 months 21.12.2016 05.03.2017 05.03.2017 23.03.2017 5.47 Work comp.

2Construction of Approch Road towards

creek, at KUDE Tal. Tala, Dist. Raigad. 4th

Call

5.00 20.01.2016 4.81 16.02.2016 MMB (1B) 24.05.2016 28.06.2016 Saidham M S S 0.00% 4.81 30.08.2016 16.09.2016 16.09.2016 9 months 16.09.2016 12.11.2016 12.11.2016 02.01.2017 3.00 Work comp.

3Construction of Approch Road towards

creek, at AARATHI Tal. Shrivardhan, Dist.

Raigad.

5.00 20.01.2016 4.82 06.02.2016 MMB (2A) 24.05.2016 28.06.2016 Saidham M S S (-)9.99% 4.34 30.08.2016 16.09.2016 16.09.2016 9 months 16.09.2016 12.11.2016 02.07.2017 3.00 Work comp.

4Construction of Approch Road towards

creek, at BAGMANDALA Tal. Mhasala,

Dist. Raigad.

5.00 20.01.2016 4.80 10.02.2016 MMB (2A) 24.05.2016 28.06.2016 Saidham M S S (-)9.99% 4.32 29.09.2016 06.10.2016 06.10.2016 9 months 06.10.2016 15.11.2016 15.11.2016 02.07.2017 3.00 Work comp.

5Construction of approch road at DIGHI Tal.

Shrivardhan Dist. Raigad.108.43 30.03.2016 106.63 16.05.2016 MMB (2A) 26.05.2016 27.06.2016 Subhash Const. (-)15.15% 90.47 30.08.2016 17.10.2016 17.10.2016 9 months 17.10.2016 07.03.2017 07.03.2017 31.03.2017 90.30 Work comp.

6Improvement to Jetty and approach road at

Thal Tal - Alibag Dist - Raigad350.39 02.02.2016 337.51 16.05.2016 MMB (2B) 08.09.2016 07.12.2016 D V P Infra (-)4.00% 324.02 27.12.2016 27.12.2016 27.12.2016 12 months 27.12.2016

…………………………………. 31.03.2017166.52

Work in

progress

7Construction of Retaining wall at Chalmala

Tal. Alibag Dist. Raigad.10.00 30.09.2016 9.85 21.11.2016

DPC

305115.12.2016 08.02.2017

Mayur

Vishwakarma(-) 2.10% 9.64 10.03.2017 20.03.2017 20.03.2017 9 months 20.03.2017 W O given

8Construction of Approch Road at Dagiwala

mandal to Bhardkhol Bunder Tal.

Shrivardhan, Dist. Raigad

5.00 30.09.2016 4.93 21.11.2016DPC

305115.12.2016 05.04.2017 Abhishek jain (-)0.00% 4.93 0

S D not yet

received

9Construction of Approch road towards

Ambet Bunder Tal. Mhasala Dist. Raigad.5.00 07.10.2016 4.90 21.11.2016

DPC

305615.12.2016 05.04.2017 Abhishek jain (-)0.00% 4.90 13.06.2017 16.06.2017 16.06.2017 9 months 16.06.2017 W O given

10Repairs Jetty and increase height at Kane

Tal - Pen Dist - Raigad62.69 17.11.2016 62.40 21.11.2016 MMB (2B) 15.12.2016 13.02.2017 P.M.Chavan (-)0.99% 61..79 0

Tender

Acceptance

11Repairs to Jetty at Ghoda bunder Tal - Pen

Dist - Raigad66.56 17.11.2016 62.15 21.11.2016 MMB (2B) 19.01.2017 0

Technical bid

Opened

12Construction of Compound Wall at Dighi

Tal.Shrivardhan Dist Raigad22.28 17.11.2016 21.41 21.11.2016 MMB (1A) 15.12.2016 19.01.2017 Prasad Const. (-)11.00% 19.06 20.03.2017 21.03.2017 21.03.2017 9 months 21.03.2017 W O given

13Repairs of Jetty at Jite Tal - Pen Dist -

Raigad29.93 17.11.2016 26.97 21.11.2016 MMB (2A) 15.12.2016 16.01.2017 K.S.Pawar 0% 26.97 24.03.2017 29.03.2017 29.03.2017 9 months 29.03.2017 20.04.2017 20.04.2017 19.05.2017 26.85 Work Comp.

14Construction of Meter Room and Generator

Room at Agardanda Tal - Murud Dist -

Raigad

4.70 17.11.2016 4.55 21.11.2016 MMB (1A) 20.12.2016 08.02.2017 Amitabh Pendse (-)11.00% 4.05 25.05.2017 29.05.2017 29.05.2017 3 months 29.05.2017Work in

Progress

15Construction of Meter Room and Generator

Room at Rajpuri Tal - Murud Dist - Raigad4.88 17.11.2016 4.58 21.11.2016 MMB (1A) 20.12.2016 08.02.2017 Amitabh Pendse (-)11.00% 4.07 25.05.2018 29.05.2018 29.05.2018 3 months 29.05.2018

Work in

Progress

16

Construction of Sloping Ramp and Steps

Above Anti Sea Erosion Bund at -

Ranjankhar Davali Navkhar Tal - Alibag Dist

- Raigad

21.68 19.12.2016 21.09 20.12.2016 MMB (2A) 23.12.2016 0Technical

opened

17Repairs to Jetty at Jui Tal - Mahad Dist -

Raigad27.47 22.11.2016 26.74 25.11.2016 MMB (2B) 23.12.2016 09.03.2017 V. B. Pawar (-) 18.80% 21.72 20.03.2017 23.03.2017 23.03.2017 9 months 23.03.2017 05.05.2017 05.05.2017

Put up for final

bill

18Repairs to Street and Campas Lighting with

Solar System at RPO Office Campas

Alibag Tal - Alibag Dsit - Raigad

8.38 22.11.2016 8.02 25.11.2016 MMB (5) 23.12.2016 09.03.2017 Raigad Electr. (-)8.01% 7.38 26.04.2017 27.04.2017 27.04.2017 6 months 27.04.2017Work in

Progress

19Construction of Shed at Theronda

Bazarpada, Tal. Alibag, Dist. Raigad.3.03 07.10.2016 2.99 21.11.2016

DPC

305630.12.2016 0 Tender Stage

20Construction of Sloping Ramp at - Khatvira

Tal - Alibag Dist - Raigad4.99 05.08.2014 4.90 15.07.2014 MMB (2A) 07.01.2017 0 Retender

21Construction of Meter Room and Generator

Room at - Dighi Tal - Murud Dist - Raigad 5.00 17.11.2016 4.79 21.11.2016 MMB (1A) 20.01.2017 08.02.2017 S S Const. (-)10.00% 4.31 16.03.2017 18.03.2017 18.03.2017 18.03.2017

Work Comp.

Final bill yet to

be paid

22Repairs Jetty and increase height at

Bahiram Kotak Tal - Pen Dist - Raigad 24.94 17.11.2016 21.52 21.11.2016 MMB (2B) 03.03.2017 12.06.2017 S. S. Const. (-)11.00% 21.53 0

Tender

Acceptance

Work order

Date

10

Raigad 2016-17

RemarkDate of

Work start

Date of work

complition

Charged

penalties on

completion of

late work

Date of

payment /

measurment

registration

Date of

Expenditure

Expenditu

re

Time Period

including

Monsoon

Sr. No. Name of Work

Administrative Approval Technical Sanction

Tender

Published DateBudget Head

Price Bid

Submission

of security

Deposit date

Agreement

Date

Commercial

Opening Date

Name of

Contractor

Page 7: Palghar 2016-17 - Maharashtra · 2017-07-14 · Existing Jetty at Vaitipadabet Tal. Palghar, Dist. Palghar 50.56 19.11.2016 50.57 05.12.2016 DPC 3051 08.012.2016 21.04.2017 M/S. Balaji

Amt Date Amt Date Rate Amt

1 2 3 4 5 6 7 8 9 11 12 13 14 15 16 17 18 19 20 21

Work order

Date

10

Raigad 2016-17

RemarkDate of

Work start

Date of work

complition

Charged

penalties on

completion of

late work

Date of

payment /

measurment

registration

Date of

Expenditure

Expenditu

re

Time Period

including

Monsoon

Sr. No. Name of Work

Administrative Approval Technical Sanction

Tender

Published DateBudget Head

Price Bid

Submission

of security

Deposit date

Agreement

Date

Commercial

Opening Date

Name of

Contractor

23Construction of Jetty at Mothe vadhav

(Akka Devi Mandir) Tal - Pen Dist - Raigad29.75 17.11.2016 26.46 21.11.2016 MMB (2A) 03.03.2017 12.06.2017 S S Const. (-) 11.00 % 24.44 0

Tender

Acceptance

24Repairs to old passenger jetty at RAJPURI,

Tal. Murud, Dist. Raigad.105.26 03.03.2017 100.24 16.03.2017 MMB (2B) 30.03.2017 30.06.2017

Bhalchandra

Talele(-)13.80% 124.48 0

Tender

Acceptance

25Repairs to old passenger jetty at

AGARDANDA, Tal. Murud, Dist. Raigad.128.53 03.03.2017 122.41 16.08.2017 MMB (2B) 30.03.2017 30.06.2017 Vishal Const. (-)2.70% 119.10 0

Tender

Acceptance

26Repairs to old passenger jetty at DIGHI

(Sea Side), Tal. Murud, Dist. Raigad.119.53 03.03.2017 113.83 16.03.2017 MMB (2B) 30.03.2017 30.06.2017 Amruta Const (-)0.99% 112.71 0

Tender

Acceptance

27Repairs to Existing jetty at Mandwa, Tal.

Alibag Dist. Raigad.150.42 03.03.2017 146.21 18.03.2017 MMB (2B) 30.03.2017 0

Technical bid

opened

28Improvement of Jetty at Mandwa Tal -

Alibag Dist - Raigad154.10 03.03.2017 146.76 18.03.2017 MMB (2B) 30.03.2017 0

Technical bid

opened

29Widening and Increasing height of Existing

old Jetty at Gharapuri,Tal. Uran Dist.

Raigad.

470.04 02.03.2017 448.48 26.03.2017 MMB (2B) 30.03.2017 06.06.2017Arjun

Earthmovers(-)7.77% 413.63 0

Tender

Acceptance

30Construction of New parking area at Mora

Passenger Jetty Tal - Uran Dist - Raigad93.01 03.03.2017 88.47 20.03.2017 MMB (1A) 31.03.2017 0

Technical bid

opened

31Increasing Height of Existing Passenger

Jetty at Karanja Tal. Uran, Dist. Raigad248.37 09.03.2017 236.67 18.03.2017 MMB (2B) 31.03.2017 04.07.2017

Arjun

Earthmovers(-)18.65% 0

Technical bid

opened

32Providing Furniture work in Terminal

Building at Rajpuri Tal. Murud, Dist. Raigad15.80 07.03.2017 15.12 14.03.2017 MMB (1A) 31.03.2017 20.06.2017

Anikeet Cottage

Ind.(-)9.00%` 13.76 0

Tender

Acceptance

33Providing Furniture work in Terminal

Building at Agardanda Tal. Murud, Dist.

Raigad

14.34 07.03.2017 13.72 14.03.2017 MMB (1A) 31.03.2017 20.06.2017Anikeet Cottage

Ind.(-)9.00%` 12.49 0

Tender

Acceptance

34Providing Furniture work in Terminal

Building at Dighi Tal. Shrivardhan, Dist.

Raigad

11.21 07.03.2017 10.72 14.03.2017 MMB (1A) 31.03.2017 20.06.2017Anikeet Cottage

Ind.(-)9.00%` 9.76 0

Tender

Acceptance

35Landscaping work at PI Office Campus

Revdanda at Alibag Dist - Raigad15.28 11.01.2017 14.44 20.02.2017 MMB (1A) 31.03.2017 30.06.2017

Bhalchandra

Talele(-)13.80% 12.45 0

Tender

Acceptance

36Repairs to port Inspector Office and

Construction of weather shed at - Mandwa

Tal - Alibag Dist- Raigad

8.62 03.03.2017 8.45 18.03.2017 MMB (1B) 31.03.2017 12.06.2017 B.S.Pawar (-)7.20% 7.84 0Tender

Acceptance

37Removing submarian rock in Navigation

channel at Thal Tal - Alibag Dist - Raigad152.42 24.03.2017 145.16 30.03.2017 MMB (3) 0

38Repairing of Mora Port Inspector Office

building and Toilet Block at Mora, Tal. Uran,

Dist. Raigad.

42.63 16.03.2017 4064.00 30.03.2017 MMB (1B) 17.05.2017 0Technical bid

opened

39Construction of Jetty at Mandad Tal - Tala

Dist - Raigad39.14 03.01.2017 35.07 20.02.2017 MMB (2A) 29.03.2017 20.06.2017 B.S.Pawar (-)24.11% 26.61 0

Tender

Acceptance

40Construction of Watch Tower for Life Guard

at - Murud Beach Tal - Murud Dist - Raigad10.00 20.12.2016 9.77 09.01.2017 MMB (1A) 01.04.2017 19.06.2017 S.S.Const. (-)0.001% 9.77 0

Tender

Acceptance

41Construction of Approch road at Rahatad

Bus Stop to Bunder Tal. Mhasala Dist.

Raigad.

8.00 07.10.2016 7.88 21.11.2016DPC

305615.12.2016 20.06.2017 Prasad Const. (-)0.9999% 7.80 0

Tender

Acceptance

42Construction of Approch road to Sakalap

Pachgaon Aagari Samaj Mandir to Khari

Bunder Tal. Mhasala Dist. Raigad. 2nd Call

5.00 07.10.2016 4.99 21.11.2016DPC

305615.12.2016 30.06.2017 Prasad Const. (-)0.9999% 4.94 0

Tender

Acceptance

43Providing interior work at Dharamtar Port

office, Tal. Pen, Dist. Raigad43.13 26.12.2016 41.07 29.12.2016 MMB (1B) 11.04.2017 0

Technical bid

opened

Page 8: Palghar 2016-17 - Maharashtra · 2017-07-14 · Existing Jetty at Vaitipadabet Tal. Palghar, Dist. Palghar 50.56 19.11.2016 50.57 05.12.2016 DPC 3051 08.012.2016 21.04.2017 M/S. Balaji

Amt Date Amt Date Rate Amt

1 2 3 4 5 6 7 8 9 11 12 13 14 15 16 17 18 19 20 21

Work order

Date

10

Raigad 2016-17

RemarkDate of

Work start

Date of work

complition

Charged

penalties on

completion of

late work

Date of

payment /

measurment

registration

Date of

Expenditure

Expenditu

re

Time Period

including

Monsoon

Sr. No. Name of Work

Administrative Approval Technical Sanction

Tender

Published DateBudget Head

Price Bid

Submission

of security

Deposit date

Agreement

Date

Commercial

Opening Date

Name of

Contractor

44Construction of Passenger Shed at

Mandwa Jetty Tal Alibag Dist Raigad.35.18 04.03.2014 35.18 21.12.2016 MMB (1A) 11.04.2016 0

Technical bid

opened

45Repairs to Passenger shed at Jivana

bunder Tal - Shrivardhan Dist - Raigad10.12 16.03.2017 9.68 18.03.2017 MMB (1B) 11.04.2017 20.06.2017 Prasad Const. (-)11% 8.62 0

Tender

Acceptance

46Construction of solar system at Dighi Tal

Shriwardhan Dist Raigad17.31 23.02.2017 16.52 14.03.2017 MMB (5) 31.03.2017 0

Technical bid

opened

47Construction of solar system at Rajpuri Tal -

Murud Dist - Raigad36.25 23.02.2017 34.60 14.03.2017 MMB (5) 03.04.2017 0

Technical bid

opened

48Construction of solar system at Agardanda

Tal - Murud Dist - Raigad36.25 23.02.2017 34.60 14.03.2017 MMB (5) 03.04.2017 0

Technical bid

opened

49Repairs to Existing jetty at MORA, Tal.

Uran, Dist. Raigad. 134.57 03.03.2017 127.83 16.03.2017 MMB (2B) 17.05.2017 0

Technical bid

opened

50Repairs to Exisiting Jetty at Rewas Tal -

Alibag Dist - Raigad201.07 26.12.2016 191.02 27.12.2016 MMB (2B) 12.06.2017 0

Technical bid

opened

51Construction of Sloping Ramp at - Alibag

Koliwada Tal - Alibag Dist - Raigad10.00 05.08.2014 9.19 15.07.2014

DPC

440519.06.2017 0 Retender

52Extention to Jetty at Alibag Koliwada Tal -

Alibag Dist - Raigad30.00 10.09.2013 29.34 12.10.2013

DPC

305619.07.2017 0 Tender Stage

53Providing Electriflcations of P.I office and

residence building at Dharmtar port Tal -

Pen Dist - Raigad

8.11 11.04.2016 7.80 11.04.2016 MMB (1B) 21.07.2016 03.09.2016 Jitej Electricals (-)2.00% 7.64 19.10.2016 29.10.2016 29.10.2016 9 months 29.10.2016Work in

Progress

54Construction of Retaining wall at Mandwa

Tal - Alibag Dist - Raigad82.07 18.04.2016 77.91 06.06.2016 MMB (1B) 29.07.2016 27.07.2016 K.S.Pawar (-)12.85% 67.90 18.10.2016 17.10.2016 17.10.2016 9 months 17.10.2016 03.02.2017 31.03.2017 74.18 Work Comp.

55Construction of sloping Ramp at Khamde

Tal. Murud, Dist. Raiad10.00 20.01 9.63 03.02.2016

DPC

305114.03.2016 12.05.2016 Rohit Kotwal (-)10..00% 8.67 04.11.2016 18.11.2016 18.11.2016 9 months W O Given

56Construction of Approch Road at Ganesh

wadi to Jetty ( Shirki Chawl No. 2) towards

creek Tal. Pen Dist. Raigad 2nd call

4.69 10.03.2016 4.49 21.04.2016 MMB (1A) 13.08.2016 28.09.2016 Priyanka Sarvgod (-) 1.50% 4.42 02.11.2016 15.11.2016 15.11.2016 9 months 15.11.2016 02.04.2017 02.04.2017Final Bill Put up

for payment

57Construction of Approch Road towards

creek, at VARSOLI Tal. Alibag, Dist.

Raigad.

5.00 20.01.2016 4.79 18.02.2016 MMB (1A) 14.03.2016 23.06.2016 Saidham M S S (-)9.99% 4.31 30.08.2016 16.09.2016 16.09.2016 9 months 16.09.2016 25.03.2017 25.03.2017 31.03.2017 4.32 Work Comp

58Construction of Retaining Wall with Toe

Protection to Approach Road at Murud

Khora, Tal. Murud, Dist. Raigad

195.76 23.09.2015 188.80 11.01.2016 MMB (2A) 26.02.2016 23.07.2016 Vishal Const. (-)23.40% 144.62 16.08.2016 22.08.2016 22.08.2016 9 months 22.08.2016 31.03.2017 31.03.2017 31.03.2017 408.66 Work Comp

59Repairs to Approch road to jetty at

AGARDANDA Tal. Murud, Dist.Raigad.99.64 17.02.2016 94.89 16.05.2016 MMB (1B) 26.02.2016 25.07.2016 Amruta Const. (-)15.00% 80.66 30.08.2016 06.09.2016 06.09.2016 9 months 06.09.2016 27.02.2017 56.14

Work in

Progress

60Construction of Retaining wall at

SHETBANDER (GHARAPURI) Tal. Uran,

Dist. Raigad.

164.81 24.04.2016 163.07 06.05.2016 MMB (1A) 26.02.2016 26.09.2016 Subhash Const. (-)14.23% 139.86 20.10.2016 17.10.2016 17.10.2016 9 months 17.10.2016Work in

Progress

61Providing tourist amenities at

MURUDKHORA Tal. Murud Dist. Raigad. 126.30 01.04.2016 121.01 16.05.25016 MMB (5) 06.08.2016 26.09.2016 Subhash Const. (-)16.96% 105.65 20.10.2016 17.10.2016 17.10.2016 9 months 17.10.2016 W O Given

Page 9: Palghar 2016-17 - Maharashtra · 2017-07-14 · Existing Jetty at Vaitipadabet Tal. Palghar, Dist. Palghar 50.56 19.11.2016 50.57 05.12.2016 DPC 3051 08.012.2016 21.04.2017 M/S. Balaji

Amt Date Amt Date Rate Amt

1 2 3 4 5 6 7 8 9 11 12 13 14 15 16 17 18 19 20 21

Work order

Date

10

Raigad 2016-17

RemarkDate of

Work start

Date of work

complition

Charged

penalties on

completion of

late work

Date of

payment /

measurment

registration

Date of

Expenditure

Expenditu

re

Time Period

including

Monsoon

Sr. No. Name of Work

Administrative Approval Technical Sanction

Tender

Published DateBudget Head

Price Bid

Submission

of security

Deposit date

Agreement

Date

Commercial

Opening Date

Name of

Contractor

62Construction of Passenger shed at

Kharpada Naka Tal. Panvel , Dist. Raigad.7.20 30.09.2016 7.00 21.11.2016

DPC

305115.12.2016 17.01.2017 Poonam Patil (-)5.00% 6.65 01.03.2017 03.03.2017 03.03.2017 9 months 03.03.2017 10.04.2017 10.04.2017 23.05.2017 6.65 Work Comp

63Construction of Jetty at Ganesh Ghat

(Dasgaon) Tal. Mahad, Dist Raigad40.00 17.11.2016 37.44 21.11.2016 MMB (2A) 15.12.2016 16.01.2017 S P Bhingarde (-)18% 30.70 16.03.2017 12.04.2017 12.04.2017 12.04.2017 W O Given

64Repairs to Passenger Shed and Jetty at

Navkhar Tal - Roha Dist - Raigad24.26 17.11.2016 23.53 21.11.2016 MMB (2B) 15.12.2016 11.01.2017 Ashok Jadhav (-)15.00% 19.88 08.03.2017 18.03.2017 18.03.2017 9 months 18.03.2017 W O Given

65Construction of Compound wall at Rajpuri

passenger Terminal Tal - Murud Dist -

Raigad

26.03 17.11.2016 24.57 21.11.2016 MMB (1A) 15.12.2016 11.01.2017 M.S.Jadhav (-) 14.94% 20.90 04.03.2017 09.03.2017 09.03.2017 9 months 09.03.2017 W O Given

66Repairs to Passenger Jetty at Jivana

Bunder Tal - Shrivardhan Dist - Raigad37.19 17.11.2016 35.50 21.11.2016 MMB (2B) 15.12.2016 11.01.2017 V B Pawar (-)20.21% 28.32 22.03.2017 23.03.2017 23.03.2017 9 months 23.03.2017 17.05.2017 17.05.2017 03.03.2017 27.87 Work Comp

67Construction of Ramp (4 Nos) at Nagaon

Beach Tal - Alibag Dist - Raigad21.23 17.11.2016 20.39 21.11.2016 MMB (2B) 15.12.2016 11.01.2017 S P Bhingarde (-)24.00% 15.50 16.03.2017 21.03.2017 21.03.2017 9 months 21.03.2017 W O Given

68Construction of Compound Wall at

Agardanda Tal.Murud Dist Raigad20.57 17.11.2016 19.78 21.11.2016 MMB (1A) 15.12.2016 10.01.2017 S S Const. (-)14.00% 17.01 03.03.2017 03.03.2017 03.03.2017 9 months 03.03.2017 30.04.2017 30.03.2017 15.05.2017 17.00 Work Comp

69Construction of Jetty protection wall at

Gofan Tal - Roha Dist - Raigad15.00 17.11.2016 14.66 21.11.2016 MMB (2A) 15.12.2016 11.01.2017 Ashok Jadhav (-)13.20% 12.72 20.03.2017 23.03.2017 23.03.2017 9 months 23.03.2017 . W O Given

70Repairs to Jetty at Kharsapoli Tal - Pen Dist

- Raigad21.45 17.11.2016 18.39 21.11.2016 MMB (2A) 15.12.2016 17.01.2017 P M Chavan (-)0.99% 18.21 08.03.2017 09.03.2017 09.03.2017 9 months 09.03.2017 20.04.2017 20.04.2017 19.05.2017 18.13 Work Comp

71Construction of New Jetty at Dasgaon

(Ghanikaran Mata Temple) Tal - Mahad

Dist - Raigad

48.47 28.07.2015 43.62 25.08.2015 MMB (2A) 08.09.2015 20.11.2015 Sandip Jadhav (-)3.50% 42.09 06.05.2017 06.05.2017 06.05.2017 9 months 06.05.2017Work in

Progress

72Repairs of Jetty at Dabhol Mohalla Tal -

Mahad Dist - Raigad17.81 26.12.2016 17.09 29.12.2016 MMB (2A) 07.01.2017 20.03.2017 Sandip Jadhav (-)23.50% 13.08 31.03.2017 31.03.2018 31.03.2018 9 months 31.03.2018

Work comp.

Bill put up for

payment

74Construction of Approach road towards

creek at Pezari, Tal. Alibag, Dist. Raigad2.00 30.09.2016 2.00 21.11.2016

DPC

3051Jivmukt Swami

Maharaj MSS

Letter given M

S S

75Construction of Shed at Shhapur Khadi near

Mhasoba Temple, Tal. Alibag, Dist. Raigad.3.03 07.10.2016 2.99 21.11.2016

DPC

3056Mahadev Adi.

MSS

Letter given M

S S

76Construction of Shed at Theronda

Doryachiwadi, Tal. Alibag, Dist. Raigad.3.00 30.09.2016 2.96 21.11.2016

DPC

3051

Jivmukt Swami

Maharaj MSS

Letter given M

S S

77Providing and Erecting Solar lights pole at

Kaleshree jetty Tal. Pen, Dist. Raigad2.00 13.12.2016 1.91 20.03.2017

DPC

3056

Shri.

Santoshimata

MSS (-)0.00% 1.91 10.04.2017 21.04.2017 21.04.2017 6 months 08.05.2017 08.05.2017 02.06.2017

1.91 work Comp.

78Providing and Erecting Solar lights pole at

Adgaon Fishries jetty Tal. Shrivardhan, Dist.

Raigad

2.50 13.12.2016 2.29 20.03.2017DPC

3056Dyanai MSS (-)0.00% 2.29 06.04.2017 21.04.2017 21.04.2017 6 months 15.05.2017 15.05.2017 02.06.2017

2.29 work Comp.

79Providing and Erecting Solar lights pole at

Bhardkhol Fishries jetty Tal. Shrivardhan,

Dist. Raigad

2.50 13.12.2016 2.29 20.03.2017DPC

3056Dyanai MSS (-)0.00% 2.29 06.04.2017 21.04.2017 21.04.2017 6 months 08.05.2017 08.05.2017 02.06.2017

2.29 work Comp.

80Providing and Erecting Solar lights pole at

Vashi jetty Tal. Pen, Dist. Raigad2.00 13.12.2016 1.91 20.03.2017

DPC

3056 Dyanai MSS (-)0.00% 1.91 06.04.2017 21.04.2017 21.04.2017 6 months 08.05.2017 08.05.2017

Final bill yet to

be paid

81Construction of Approach road towards

creek at Theronda Bazarpada, Tal. Alibag,

Dist. Raigad

2.00 07.10.2016 2.00 21.11.2016DPC

3056Savali MSS

Letter given M

S S

82Construction of Approach Road towards

Jetty at Varedi, Tal. Pen, Dist. Raigad3.50 18.03.2017 2.99 22.04.2017

DPC

3051

Sub Reg.

Officer, Alibag

83

Removing the existing Pontoon system at

New Mandwa Jetty before monsoon &

Reinstalling it after Monsoon with Repairs

and maintance

15.84 15.07.2016 7.75 18.05.2017 MMB(2B) 24.05.2017Technical

opening

Page 10: Palghar 2016-17 - Maharashtra · 2017-07-14 · Existing Jetty at Vaitipadabet Tal. Palghar, Dist. Palghar 50.56 19.11.2016 50.57 05.12.2016 DPC 3051 08.012.2016 21.04.2017 M/S. Balaji

Date Amount Date Amount Rate Amount

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

1

Construction of highmast and

beautification at Dabhol Bunder

and P.I. Office, Tal. Dapoli, Dist.

Ratnagiri.

17.11.2016 60.22 25.11.2016 57.35

Budget Head :-

01 (A)

Bulding

15.12.2016 22.06.2017Vikas

Construction7.11 53.27 - - - 9 Months - - - - -

Tender

Acceptance

Stage

2

Repair of passenger jetty at

Jaitapur Varchi Aagaewadi

Tarbander Tal. Rajapur, Dist.

Ratnagiri.

17.11.2016 47.82 25.11.2016 45.54Budget Head :-

02 (B) Jetty15.12.2016 06.01.2017 Nikhil Gandhi

18.90 %

below36.94 - - - 9 Months - - - - -

Work order

stage

3

Repairs of Passenger Jetty at

Ambolgad Tal - Rajapur Dist -

Ratnagiri

22.11.2016 34.13 25.11.2016 32.50Budget Head :-

02 (B) Jetty15.12.2016 06.01.2017 Unitech Const.

13.50 %

below28.11 - - - 9 Months - - - - -

pending

report from

RPO

4

Repairs to Passenger Jetty and

Approach Road at Navanagar

Katale Tal - Gughagar Dist -

Ratnagiri

22.11.2016 30.47 25.11.2016 29.02Budget Head :-

02 (B) Jetty15.12.2016 05.01.2017 Dinkar Sawant

22.00 %

below22.64 - - - 9 Months - - - - -

Remarks on

file

5

Repairs to Passenger Shed,

Approach Road and Slopping

Ramp at Dhopave Tal - Guhagar

Dist - Ratnagiri

22.11.2016 27.59 25.11.2016 26.28Budget Head :-

02 (B) Jetty15.12.2016 05.01.2017

Deepak M.

Jadhav

22.20 %

below20.45 07.03.2017 15.03.2017 15.03.2017 9 Months - - - - -

Work in

progress

6

Construction of Jetty Approch

road at Tumbad bhoiwadi Tal.

Khed, Dist. Ratnagiri

17.11.2016 25.75 25.11.2016 25.13Budget Head :-

02 (A) Jetty15.12.2016 06.01.2017 B.S. Pawar

23.27 %

below19.29 - - - 9 Months - - - - - Place issue

7

Repairs to Jetty and Construction

of Retaining Wall at Padve Tal -

Guhagar Dist - Ratnagiri

22.11.2016 25.81 29.12.2016 24.71Budget Head :-

02 (B) Jetty15.12.2016 06.01.2017 B.S. Pawar

21.20 %

below19.47 21.04.2017 21.04.2017 21.04.2017 9 Months - - - - -

Work in

progress

8

Repairs of Class IV Quarters, API

Office Jaitapur, Ta. Rajapur, Dist.

Ratnagiri

18.11.2016 25.03 21.11.2016 23.96Budget Head :-

01 (B) Bulding15.12.2016 05.01.2017 Nirman Const.

3.00 %

below23.24 07.02.2017 01.03.2017 01.03.2017 9 Months - - - - -

Work in

progress

9

Repairs of Passenger Jetty at

Burumbewadi Tal. Rajapur, Dist.

Ratnagiri.

17.11.2016 17.57 25.11.2016 16.82Budget Head :-

02 (B) Jetty15.12.2016 06.01.2017 Vinod Const.

10.00 %

below15.14 - - - 9 Months - - - - -

pending

report from

RPO

10

Providing of Electric Supply PI

office Kelshi and Dabhol staff

quarter at API office, Tal. Dapoli,

Dist. Ratnagiri.

18.11.2016 10.24 25.11.2016 9.80

Budget Head :-

01 (A)

Bulding

15.12.2016 05.01.2017Jitej

Electricals

5.00 %

below9.31 14.02.2017 01.03.2017 01.03.2017 9 Months - - - - -

Work in

progress

11Repair to Passenger jetty at

Tonde, Tal and Dist. Ratnagiri17.11.2016 5.54 25.11.2016 5.30

Budget Head :-

02 (B) Jetty15.12.2016 05.01.2017

Parag L

Sawant

16.00 %

below4.45 - - - 9 Months - - - - -

Tender

Acceptance

Stage

12

Butification and repairs of API

office building and quarter

buildings at - Purngad Tal - Dist -

Ratnagiri

28.12.2016 16.77 25.11.2016 16.49

Budget Head :-

01 (A)

Bulding

27.03.2017 22.06.2017Sachin

Bhingarde

1.08 %

below16.31 - - - 9 Months - - - - -

Tender

Acceptance

Stage

13Repairs to PI office Borya Tal -

Guhagar Dist - Ratnagiri17.11.2016 24.59 25.11.2016 23.92

Budget Head :-

01 (B) Bulding15.12.2016 20.02.2017 B.S. Pawar

10.30 %

below20.46 16.03.2017 18.03.2017 18.03.201 9 Months - - - - -

Work in

progress

14Repairs of Passenger Jetty at

Hatis Tal. And Ratnagiri.08.12.2016 17.21 09.12.2016 16.47

Budget Head :-

02 (B) Jetty15.12.2016 05.01.2017 Dinkar Sawant

21.00 %

below13.01 - - - 9 Months - - - - -

Tender

Acceptance

Stage

Submission

of security

Deposit date

RATNAGIRI LIST 2016-2017

Sr.

No.Name of Work

Administrative

Approval

Technical Sanction /

Tender AmountBudget Head

Tender

Published

Date

Commercial

DateRemarks

Name of

Contractor

Charged

penalties on

completion of

late work

Date of

ExpenditureExpenditure

Agreement

Date

Work

Order

Date

Time

Period

including

Monsoon

Price Bid Date of

work

complition

Page 11: Palghar 2016-17 - Maharashtra · 2017-07-14 · Existing Jetty at Vaitipadabet Tal. Palghar, Dist. Palghar 50.56 19.11.2016 50.57 05.12.2016 DPC 3051 08.012.2016 21.04.2017 M/S. Balaji

Date Amount Date Amount Rate Amount

Submission

of security

Deposit date

Sr.

No.Name of Work

Administrative

Approval

Technical Sanction /

Tender AmountBudget Head

Tender

Published

Date

Commercial

DateRemarks

Name of

Contractor

Charged

penalties on

completion of

late work

Date of

ExpenditureExpenditure

Agreement

Date

Work

Order

Date

Time

Period

including

Monsoon

Price Bid Date of

work

complition

15Repairs of Passenger Jetty at Karji

Amshet Tal. Khed Dist. Ratnagiri.08.12.2016 17.68 09.12.2016 16.92

Budget Head :-

02 (B) Jetty15.12.2016 27.02.2017

Sandeep

Jadhav

23.00 %

below13.03 17.03.2017 18.03.2017 18.03.2017 9 Months 26.05.2017 - - 23.06.2017 13.03

work

complete

16Repairs to Jetty at Mandavi,

Tal.and Dist. Ratnagiri08.12.2016 394.02 21.12.2016 360.28

Budget Head :-

02 (B) Jetty24.12.2016 09.03.2017 Nirman Const.

3.90 %

below346.23 23.03.2017 31.03.2017 31.03.2017 15 Months 31.03.2017 - - - -

Work in

progress

17

Construction of Retaining Wall at

MajareKashi, Tal. Chiplun

Dist.Ratnagiri

16.12.2016 14.28 20.12.2016 14.32 DPC- 3051 20.12.2016 24.01.2017 Vishal Const21.60 %

below11.23 02.03.2017 09.03.2017 09.03.2017 9 Months 25.05.2017 - - 15.06.2017 11.23

work

complete

18

Construction of Retaining Wall at

Chinchghar, Tal. Khed ,

Dist.Ratnagiri

16.12.2016 9.30 20.12.2016 9.57 DPC- 3051 20.12.2016 27.02.2017 Ashok Jadhav22.74 %

below7.39 20.03.2017 29.03.2017 29.03.2017 9 Months - - - - -

Work

physcially

complted

bill yet to be

paid

19

Construction of Retaining Wall at

Velneshwar kharviwadi, Tal.

Guhagar Dist.Ratnagiri

16.12.2016 9.90 20.12.2016 8.64 DPC- 3051 20.12.2016 31.01.2017Deepak M.

Jadhav

22.80 %

below6.67 24.03.2017 29.03.2017 29.03.2017 9 Months - - - - -

Work in

progress

20

Construction of Retaining Wall at

Palshet Aagadidevi, Tal. Guhagar

,Dist.Ratnagiri

16.12.2016 15.02 20.12.2016 14.37 DPC- 3051 20.12.2016 24.01.2017 V. B. Pawar25.05%

below10.77 23.02.2017 01.03.2017 01.03.2017 9 Months 18.05.2017 10.77

work

complete

21

Construction of Retaining wall at-

Kasba Near Masjid, Tal.

Sangameshwar, Dist:-Ratnagiri.

16.12.2016 30.63 20.12.2016 29.17 DPC- 3051 20.12.2016 02.02.2017 Ashok Jadhav20.15 %

below23.29 08.03.2017 15.03.2017 15.03.2017 9 Months - - - - -

Work in

progress

22

Providing cement concrete to road

from Ratnagiri city Killa

Hanuman stop to Port At-

Ratnagiri, Tal & Dist-Ratnagiri.

16.12.2016 9.77 20.12.2016 9.35 DPC- 3051 20.12.2016 18.02.2017Kismat

Malpekar

0.96 %

below9.26 12.04.2017 12.04.2017 12.04.2017 9 Months - - - - -

Work in

progress

23

Construction of Retaining wall at

Vilye Manchekar Tarbander Tal.

Rajapur Dist. Ratnagiri.

16.12.2016 9.67 20.12.2016 9.25 DPC- 3051 20.12.2016 20.01.2017 Vinod Const.15 %

below7.86 23.02.2017 09.03.2017 09.03.2017 9 Months - - - - -

Work in

progress

24

Construction of Retaining wall at

Dongar-Muslimwadi Tal. Rajapur

Dist. Ratnagiri.

16.12.2016 9.95 20.12.2016 9.52 DPC- 3051 20.12.2016 24.01.2017 Vinod Const.12.00 %

below8.38 23.02.2017 09.03.2017 09.03.2017 9 Months 30.05.2017 - - 8.21

Work

physcially

complted

bill yet to be

paid

25

Constrction of Retaining wall at

Sarang Smashanbhumi, Tal -

Dapoli, Dist - Ratnagiri

16.12.2016 9.92 20.12.2016 9.49 DPC- 3051 20.12.2016 02.02.2017 Ashok Jadhav17.95 %

below7.79 08.03.2017 21.03.2017 21.03.2017 9 Months -

Work

physcially

complted

bill yet to be

paid

26

Construction of Jetty - Approach

Road at Hodkhard , Tal. Khed.

Dist. Ratnagiri

16.12.2016 9.98 20.12.2016 9.53 DPC- 3051 20.12.2016 20.02.2017 Ashok Jadhav16.34 %

below7.97 30.03.2017 30.03.2017 30.03.2017 9 Months - - - - -

Work in

progress

27

Construction of Jetty - Approach

Road at Ani-Sharewadi To

Bhoiwadi , Tal.-Khed. Dist.

Ratnagiri

16.12.2016 9.99 20.12.2016 9.69 DPC- 3051 20.12.2016 20.02.2017 S.S.Pawaskar4.69 %

below9.24 24.03.2017 30.03.2017 30.03.2017 9 Months - - - - -

Work in

progress

28

Repairs of Passanger Jetty at

Shivne, Tal. Rajapur, Dist:-

Ratnagiri.

16.12.2016 19.59 20.12.2016 18.75 DPC- 3056 20.12.2016 31.01.2017 B.S. Pawar16.36 %

below15.68 02.03.2017 03.03.2017 03.03.2017 9 Months - - - - -

Work in

progress

29

Construction of Jetty at- Jaigad

Sakharmohalla, Tal and Dist -

Ratnagiri

16.12.2016 15.66 20.12.2016 15.03 DPC- 3056 20.12.2016 16.02.2017 Ashok Jadhav20.97%

below11.88 08.03.2017 15.03.2017 15.03.2017 9 Months 10.06.2017 - - - -

Work in

progress

Page 12: Palghar 2016-17 - Maharashtra · 2017-07-14 · Existing Jetty at Vaitipadabet Tal. Palghar, Dist. Palghar 50.56 19.11.2016 50.57 05.12.2016 DPC 3051 08.012.2016 21.04.2017 M/S. Balaji

Date Amount Date Amount Rate Amount

Submission

of security

Deposit date

Sr.

No.Name of Work

Administrative

Approval

Technical Sanction /

Tender AmountBudget Head

Tender

Published

Date

Commercial

DateRemarks

Name of

Contractor

Charged

penalties on

completion of

late work

Date of

ExpenditureExpenditure

Agreement

Date

Work

Order

Date

Time

Period

including

Monsoon

Price Bid Date of

work

complition

30

Construction of Retaining wall at-

Burambad in front of Amneshwar

Mandir , Tal. Sangameshwar,

Dist:-Ratnagiri.

16.12.2016 10.03 20.12.2016 9.59 DPC- 3056 20.12.2016 02.02.2017 Mangesh Khot9.99 %

below8.64 28.02.2017 09.03.2017 09.03.2017 9 Months 15.05.2017 - - 05.06.2017 8.63

work

complete

31

Construction of Jetty - Approach

Road at KondKarul , Tal.

Guhagar. Dist. Ratnagiri

16.12.2016 15.06 20.12.2016 14.56 DPC- 3056 20.12.2016 01.02.2017 V. B. Pawar21.50 %

below11.43 28.02.2017 01.03.2017 01.03.2017 9 Months 20.04.2014 - 18.04.201718.05.2017 11.43

work

complete

32

Construction of Concrete Road at

Juikar Mohalla (Adakhal ), Tal.

Dapoli, Dist. Ratnagiri

16.12.2016 10.00 20.12.2016 9.58 DPC- 3056 20.12.2016 01.02.2017 Ashok Jadhav17.45 %

below7.91 08.03.2017 15.03.2017 15.03.2017 9 Months - - - -

Work

physcially

complted

bill yet to be

paid

33

Construction of Retaining wall at

Paj Pandhari ( from Bhagwan

Kulabkar House) Tal - Dapoli

Dist - Ratnagiri

16.12.2016 4.97 20.12.2016 4.76 DPC- 3056 20.12.2016 20.02.2017 S. S. Pawaskar4.69 %

below4.54 24.03.2017 30.03.2017 30.03.2017 9 Months - - - - -

Work in

progress

34Construction of Retaining Wall at

Bhile, Tal. Chiplun Dist.Ratnagiri16.12.2016 15.01 20.12.2016 14.36 DPC- 3056 20.12.2016 24.01.2017 Vishal Const

21.60 %

below11.26 27.02.2017 09.03.2017 09.03.2017 9 Months 26.05.2017 - 15.06.2017 11.26

work

complete

35

Construction of Retaining wall at

Bandhtivare Smashanbhumi, Tal -

Dapoli, Dist - Ratnagiri

16.12.2016 9.93 20.12.2016 9.51 DPC- 3056 20.12.2016 02.02.2017 Ashok Jadhav17.72 %

below7.82 08.02.2017 15.03.2017 15.03.2017 9 Months -

Work

physcially

complted

bill yet to be

paid

36

Providing B.T. to Kurdhunda

Bunder Road Tal- sangameshwar,

Dist- Ratnagiri

16.12.2016 10.01 20.12.2016 9.58 DPC- 3056 20.12.2016 02.02.2017 Dinkar Sawant2.00 %

below9.38 08.03.2017 21.03.2017 21.03.2017 9 Months - - 14.06.201722.06.2017 9.38

work

complete

37

Repairs and Extention of

Passenger Jetty at Devache

Gothane Tal - Rajapur Dist -

Ratnagiri

08.12.2016 22.43 09.01.2017 21.51Budget Head :-

02 (B) Jetty27.03.2017 28.06.2017

Sachin

Bhingarde

22.95 %

below16.57 - - - 9 Months - - - - -

Tender

Acceptance

Stage

38

Repairs of Rest House Compound

wall and Parking shed at White

Sea Tal and Dist - Ratnagiri

16.03.2017 24.54 16.03.2017 23.37Budget Head :-

02 (B) Jetty27.03.2017 23.07.2017

Sachin

Bhingarde

16.99%

below19.40 - - - 9 Months - - - - -

Tender

Acceptance

Stage

39

Repairs to Passenger Jetty at

Musakaji - Jaitapur Tal - Rajapur

Dist - Ratnagiri

03.03.2017 33.62 14.03.2017 31.70Budget Head :-

02 (B) Jetty27.03.2017 28.06.2017

Sachin

Bhingarde

18.99 %

below25.68 - 9 Months -

Tender

Acceptance

Stage

40

Repairs to Passenger Ferry Ramp

at Dabhol Tal - Dapoli Dist -

Ratnagiri

03.03.2017 36.09 14.03.2017 32.71Budget Head :-

02 (B) Jetty27.03.2017 12.06.2017

Deepak M.

Jadhav

20.00 %

below26.16 - - - 9 Months - - - - -

Tender

Acceptance

Stage

41

Repairs and Extention to existing

Ferry Ramp at - Jaigad Tal - and

Dist - Ratnagiri

03.03.2017 48.15 14.03.2017 41.49Budget Head :-

02 (B) Jetty27.03.2017 23.06.2017

Sachin

Bhingarde

23.04 %

below31.93 - - - 9 Months - - - - -

Tender

Acceptance

Stage

42

Repairs to Passenger Ferry Ramp

at Veshvi Tal - Mandangad Dist -

Ratnagiri

03.03.2017 50.99 14.03.2017 44.51Budget Head :-

02 (B) Jetty27.03.2017 22.06.2017 V.B.Pawar

10.10 %

below40.02 - - - 9 Months - - - - -

Tender

Acceptance

Stage

43

Repairs to Jetty and Construction

of Terminal Building at Tavsal

Tal - Guhagar Dsit - Ratnagiri

03.03.2017 63.01 16.03.2017 60.58Budget Head :-

02 (B) Jetty27.03.2017 22.06.2017 B.S. Pawar

13.00 %

below52.71 - - - 9 Months - - - - -

Tender

Acceptance

Stage

44Repairs API Office at Govalkot

Tal - Chiplun Dist - Ratnagiri16.03.2017 63.01 25.03.2017 57.18

Budget Head :-

01 (B) Bulding27.03.2017 22.06.2017 Mangesh Khot

13.25 %

below49.61 - - - 9 Months - - - - -

Tender

Acceptance

Stage

Page 13: Palghar 2016-17 - Maharashtra · 2017-07-14 · Existing Jetty at Vaitipadabet Tal. Palghar, Dist. Palghar 50.56 19.11.2016 50.57 05.12.2016 DPC 3051 08.012.2016 21.04.2017 M/S. Balaji

Date Amount Date Amount Rate Amount

Submission

of security

Deposit date

Sr.

No.Name of Work

Administrative

Approval

Technical Sanction /

Tender AmountBudget Head

Tender

Published

Date

Commercial

DateRemarks

Name of

Contractor

Charged

penalties on

completion of

late work

Date of

ExpenditureExpenditure

Agreement

Date

Work

Order

Date

Time

Period

including

Monsoon

Price Bid Date of

work

complition

45

Construction of Terminal

Building at Dhopave Tal -

Guhagar Dist - Ratnagiri

02.03.2017 66.02 16.03.2017 61.71Budget Head :-

02 (A) Jetty27.03.2017 22.06.2017 Mangesh Khot

13.00 %

below53.69 - - - 9 Months - - - - -

Tender

Acceptance

Stage

46Repairs to PI Office at Bankot Tal

- Mandangad Dist - Ratnagiri20.03.2017 4.34 14.03.2017 4.16

Budget Head :-

01 (B) Bulding27.03.2017 22.06.2017 Prasad Const.

5.00 %

below3.95 - - - 9 Months - - - - -

Tender

Acceptance

Stage

47Repairs to PI Office at Ratnagiri

Tal and Dist - Ratnagiri29.16.2017 9.67 16.03.2017 9.25

Budget Head :-

01 (B) Bulding27.03.2017 22.06.2017

Sachin

Bhingarde

11.00 %

below8.23 - - - 9 Months - - - - -

Tender

Acceptance

Stage

48Repiars to Quarters at Patharebag

Tal and Dist - Ratnagiri12.01.2017 17.13 16.02.2017 15.25

Budget Head :-

01 (B) Bulding27.03.2017 22.06.2017

Sachin

Bhingarde

11.00 %

below13.57 - - - 9 Months - - - - -

Tender

Acceptance

Stage

49

Repairs to Passenger Jetty at

Mhapral Tari Bunder Tal -

Mandangad Dist - Ratnagiri

28.07.2015 16.63 21.08.2015 15.92Budget Head :-

02 (B) Jetty27.03.2017 12.06.2017 Prasad Const.

18.00%

below13.05 - - - 9 Months - - - - -

Tender

Acceptance

Stage

50

Repairs to Terminal Building at

Ferry Ramp Dabhol Tal - Dapoli

Dist - Ratnagiri

03.03.2017 18.00 16.03.2017 17.23Budget Head :-

01 (B) Bulding27.03.2017 22.06.2017

Anil L

Salunkhe

0.99 %

below17.06 - - - 9 Months - - - - -

Tender

Acceptance

Stage

51

Repairs to Terminal Building at

Ferry Ramp at Veshvi Tal -

Mandangad Dist - Ratnagiri

03.03.2017 18.33 16.03.2017 17.54Budget Head :-

01 (B) Bulding27.03.2017 23.06.2017

Amruta

Construction

0.99 %

below17.36 - - - 9 Months - - - - -

Tender

Acceptance

Stage

52

Repairs to Existing Road from

Mirya Junction to Bhagwati

Bunder Jetty Tal and Dist -

Ratnagiri

01.06.2017 996.47 05.04.2017 929.31

Rail road

Connectivity

3051 0768

06.06.2017 - - - - - - - 12 Month - - - - - Tender Stage

53

Construction of Ro-Ro Jetty at

Parchuri, Tal. Guhaghar Dist.

Ratnagiri

02.02.2016 54.65 15.02.2016 52.35Budget Head :-

02 (A) Jetty24.05.2016 28.06.2016 B.S. Pawar

20.75 %

below41.49 09.08.2016 10.08.2016 10.08.2016 9 Months - - - - -

Work in

progress

54Construction of Ro-Ro Jetty at

Farare, Tal. Dapoli Dist. Ratnagiri02.02.2016 58.04 15.02.2016 56.23

Budget Head :-

02 (A) Jetty24.05.2016 28.06.2016 V.B.Pawar

22.50 %

below43.58 04.08.2016 04.08.2016 04.08.2016 9 Months - - - -

work in

progress

Page 14: Palghar 2016-17 - Maharashtra · 2017-07-14 · Existing Jetty at Vaitipadabet Tal. Palghar, Dist. Palghar 50.56 19.11.2016 50.57 05.12.2016 DPC 3051 08.012.2016 21.04.2017 M/S. Balaji

Amt Date Amt Date Rate Amt

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

1Extension of Exisiting Jetty at Malvan

Port Tal - Malvan Dist - Sindhudurg 499.16 21.09.2016 462.57 23.09.2016

27-Sep-2016

03:00 PM

25-Nov-2016

01:00 PMS.L.Thakur (-)10% 416.31 21.12.16 21.12.16 21.12.16 18 Months

Pending for

CRZ

2Repais to Passenger Jetty at Hadi Tal -

Malvan Dist - Sindhudurg15.10 08.12.16 14.45 09.12.16

15-Dec-2016

10:00 AM21.03.2016 Anand Deshamukh (-)21.22% 11.42 12.04.17 12.04.17 12.04.17 9 Months

1st R.A. put up

for payment

3Construction of Sun shed to Malvan

Jetty at Malvan Bander Tal - Malvan

Dist - Sindhudurg

17.78 03.12.2016 15.39 05.12.2016 2A15-Dec-2016

10:00 AM

23-Jan-2017

12:45 PMNirman Infra (-)11.00% 13.7 05.01.17 05.01.2018 05.01.2018 9 Months Not Yet Started

4Construction of New Passenger Jetty

and approach Road at Masure Marde

Tal - Malvan Dist- sindhudurg 3rd Call

49.78 17.11.2016 47.99 21.11.2016 2A19-Jan-2017

05:45 PM

16-Feb-2017

02:35 PMAkhil Aroskar (-)19.00% 38.88 16.03.2017 16.03.2018 16.03.2018 9 Months Not Yet Started

5

Repiars of Aronda Assistant port

Inspector old office at Aronda Tal -

savantwadi Dist - Sindhudurg42.14 13.02.2017 39.93 14.02.2017 1B

07-Mar-2017

12:00 PM

20-Apr-2017

01:00 PMAdhish Projects (-)10% 35.94 08.06.2017 14.06.2017 14.06.2017 9 Months Not Yet Started

6Repairs of API Office at Nivati Tal -

Vengurla Dist - Sindhudurg 31.06 13.02.17 28.26 14.02.17 1B07-Mar-2017

01:00 PM

19-May-2017

12:50 PMAdhish Projects (-)10% 25.44 Tender Stage

7Repairs of API Office at Aronda Tal.

Savantwadi, Dist. Sindhudurg21.41 27.02.2017 20.48 01.03.2017 1B

07-Mar-2017

01:00 PM

25-Apr-2017

03:45 PMAdhish Projects (-)10% 19.67 01.06.17 14.06.2017 14.06.2017 9 Months Not Yet Started

8Repairs to Malvan Canteen at Malvan

Port, Tal. - Malvan, Dist. - Sindhudurg

2nd Call

43.31 15.02.2017 39.09 16.02.2017 1B23-Mar-2017

12:30 PM

20-Apr-2017

01:20 PMU.M.Mhadalkar (-)12.03 34.39 01.06.17 14.06.2017 14.06.2017 9 Months Not Yet Started

9Repairs to P.I. Office and Store Room

at Malvan Port Tal - Malvan Dist -

sindhudurg.

60.46 14.09.2016 57.58 14.09.2016 1B10-Nov-2016

11:30 AM

05-Dec-2016

11:30 AMM.T. Shirgaonkar (-)13.99% 49.52 16.12.16 17.12.2016 17.12.2016 9 Months

Pending for

CRZ

10Construction of Jetty at Kochra Khadpi

Kharbhoomi near Bund Tal - Vengurla

Dist -Sindhudurg

41.28 03.12.16 39.85 05.12.16 2A06-Jan-2017

12:30 PM

27-Apr-2017

02:55 PMAkhil Aroskar (-)17% 33.07 Tender Stage

11Repairs to Class III quarters at Achra

Tal - Malvan Dist - Sindhudurg 3rd call12.75 28.12.2016 11.04 29.12.2016 1B

01-Feb-2017

02:00 PM

17-Feb-2017

12:20 PMAdhish Projects (-)10% 9.94 29.03.2017 29.09.2017 29.09.2017 9 Months Not Yet Started

12Repairs to API Office at Achra Tal -

Malvan Dist - Sindhudurg6.88 15.02.2017 6.58 14.02.2017 1B

07-Mar-2017

01:00 PM

04-May-2017

04:50 PMBalaji Const. (-)11% 5.86 29.05.2017 29.05.2017 29.05.2017 9 Months Not Yet Started

13Repairs to Dharmashala Building at

Achra Port, Tal. - Malvan, Dist. -

Sindhudurg

10.01 13.02.2017 9.35 16.02.2017 1B07-Mar-2017

01:00 PM

04-May-2017

05:00 PMBalaji Const. (-)11.07% 8.32 29.05.2017 31.05.2017 31.05.2017 9 Months Not Yet Started

14Repairs to Old Dharmashala at Achra,

Tal. - Malvan, Dist. - Sindhudurg17.88 14.02.2017 16.23 15.02.17 1B

07-Mar-2017

01:00 PM

25-Apr-2017

11:45 AMAdhish Projects (-)10% 14.61 Not Yet Started

15Repairs to Dharmashala at Vijaydurg

Port, Vijaydurg Tal. - Devgad, Dist. -

Sindhudurg

21.69 14.02.2017 19.77 15.02.2017 1B07-Mar-2017

01:00 PM

25-Apr-2017

12:00 PMM.T. Shirgaonkar (-)10.00% 17.79 23.05.17 23.05.18 23.05.18 9 Months Not Yet Started

16Construction of Jetty and Approch Road

at Khararebag pendur, Tal.Malvan, Dist.

Sindhudurg

70.22 05.05.17 66.96 22.05.17 2A 01.06.17 27.04.17 Akhil Aroskar (-)17.00% 33.07 Tender Stage

17Repairs to Pile Jetty at Vijaydurg port

Tal - Devgad Dist - Sindhudurg. 3rd Call 180.00 11.02.17 139.00 14.03.17 1B 18.03.17 Tender Stage

18

Repairs of Port Office Toilet Block at

Aronda Tal - Savantwadi Dist -

Sindhudurg. 5.51 10.02.17 5.26 15.02.17 1B 23.05.17 Tender Stage

Status of work in Sindhudurg District. 2016-17.

Time Period

including

Monsoon

Sr. No. Name of Work

Administrative Approval Technical Sanction

Tender

Published Date

Commercial

Opening DateName of Contractor

Price Bid

Submission

of security

Deposit date

Agreement

DateHead

Work order

DateRemark

Date of

work

complition

Sagarmala

30560082

Charged

penalties on

completion

of late work

Date of

payment Amt

Page 15: Palghar 2016-17 - Maharashtra · 2017-07-14 · Existing Jetty at Vaitipadabet Tal. Palghar, Dist. Palghar 50.56 19.11.2016 50.57 05.12.2016 DPC 3051 08.012.2016 21.04.2017 M/S. Balaji

19Providing Drinking Water Facility to

Vijaydurg port office at Vijaydurg Tal.

Devgad Dist. Sindhudurg

26.92 02.02.16 25.63 03.02.15 1B 16.03.16 10.05.16 Bipin Korgavkar (-)0.99% 23.07 09.08.16 12.08.16 12.08.16 9 Months 12.08.16 Not Yet Started

20Construction of Sun shed to Malvan

Jetty at Malvan Fort Tal - Malvan Dist -

Sindhudurg

18.00 03.12.16 15.61 05.12.16 2A 15.12.16 24.01.17M/s. Nirman

Infrastructure(-)11.00% 13.89 01.03.2017 01.03.2017 01.03.2017 9 Months Not Yet Started

21Beautification & Repairing at Vengurla

PI office, Tal.Vengural, Dist.Sindhudurg 200.00 11.12.15 187.49 05.01.16 1A 08.02.16 11.03.16 Prabhu Engineers (-)16.20% 157.12 25.04.16 25.04.16 25.04.16 18 Months 25.04.16

Work is Held

up due to NOC

not obtainded

22Repairs of PI Office at Devagad,

Dist.Sindhudurg 49.83 03.11.15 47.45 20.11.15 1B 23.03.2016 06.05.2016Muddassar

Shirgaonkar(-)10.10% 42.66 30.05.2016 30.05.2016 30.05.2016 9 Months

Work is

physically

completed

23Repairs of Passenger Shet at Sonvade

Taraf Haveli, Tal.Kudal Dist.Sindhudurg 8.00 11.12.15 7.63 01.01.16 1B 09.03.16 06.05.16M/s. Balaji

Construction(-)3.33% 7.37 06.06.16 13.06.16 13.06.16 6 Months 26.03.17 31.03.17 6.39

Work

Completed

24Repairs of API Office at Vijaydurg, Tal.

Devagad, Dist.Sindhudurg57.5 31.10.15 54.68 01.12.15 1B 08.02.16 10.05.16

M/s. Nirman

Infrastructure(-)05.50% 51.68 09.06.16 13.06.16 13.06.16 12 months 30.03.17 31.03.17 49.02

Work

Completed

25Construction of jetty & Retining Wall at

Satrada,

Tal.Sawantwadi,Dist.Sindhudurg

60.00 05.01.16 56.8 11.01.16 2A 09.03.16 28.04.16 Akhil Aroskar (-)15.30% 48.11 17.06.16 17.06.16 17.06.16 9 Months Not Yet Started

26Construction of approach road near

Passenger jetty at Tirlot Varchiwadi,

Tal.Devagad,Dist.Sindhudurg

29.62 24.11.15 28.58 04.01.16 1B 08.02.16 23.03.16 Bipin Korgavkar (-)30.99% 19.72 12.07.16 15.07.16 15.07.16 6 Months Not Yet Started

27

Construction of approach road at

Bandiwade Khurd, Tal.

Malvan,Dist.Sindhudurg47.00 02.02.2016 44.87 03.02.2016 5 16.03.2016 06.05.2016

Muddassar

Shirgaonkar(-)17.00% 37.24 26.07.16 27.07.16 27.07.16 9 Months

Work

completed

28Construction of Box Culvert at

Chivalavel, Tal. Malvan,Dist.Sindhudurg 12.00 11.12.15 10.76 17.12.15 3 08.02.16 06.05.16 Kismat Malpekar (-)3.03% 10.43 02.08.16 04.08.16 04.08.16 6 MonthsWork

completed

29Repairs of Store Room at Devgad, Tal.

Devagad, Dist.Sindhudurg 20.00 15.12.15 19.24 23.12.15 1B 08.02.16 01.06.16Muddassar

Shirgaonkar(-)13.36% 16.66 16.08.16 29.08.16 29.08.16 6 Months

Work

physically

Completed

30

Construction of Warf at Devbag

Mahapurush, Tal.

Malvan,Dist.Sindhudurg 92.33 03.12.16 88.65 03.12.16 2A 05.12.16 04.01.17 Akhil Aroskar (-)26.99% 64.72 05.01.17 05.01.17 05.01.17 9 Months

Work

Completed

Final bill put

up for payment

31

Construction of Retining Wall at

Sidheshwar Sukalbhat,

Tal.Malvan,Dist.Sindhudurg67.54 17.11.16 64.72 22.11.16 2A 09.12.2016 05.01.17 Akhil Aroskar (-)27.99% 46.61 05.01.17 05.01.17 05.01.17 9 Months 23.04.17 19.05.17 46.3

Work in

Progress

32Providing Concreting at Vijaydurg PI

office Tal.Devagad, Dist.Sindhudurg 89.24 17.11.2016 85 21.11.16 2A 09.12.2016 04.01.2017M/s.Nirman

Infrastructure(-)32.00% 57.8 05.01.17 05.01.17 05.01.17 9 Months 24.03.17 31.03.17 57.56

Work

Completed

33Construction of jetty & Retining Wall at

Kochara Datta Mandir, Tal.

Vengurla,Dist.Sindhudurg

80.91 17.11.16 77.73 21.12.16 2A 09.12.16 05.01.17 Akhil Aroskar (-)27.99% 55.97 05.01.17 05.01.17 05.01.17 9 Months1st R.A. put up

for payment

34

Construction of jetty & Developement

Works at Tarkarli Bunder, Tal.

Malvan,Dist.Sindhudurg195.98 17.11.16 186.87 19.11.16 2A 05.12.16 04.01.17

M/s. Nirman

Infrastructure(-)24.90% 140.34 05.01.17 19.05.17 19.05.17 9 Months Not Yet Started

35Repairs of Class IV Qurarters at Achara,

Tal. Malvan, Dist.Sindhudurg 4.51 14.02.2017 4.32 14.02.2017 1B 30.03.2017 25.04.2017M/s.

U.M.Mhadadalkar(-)03.99% 4.15 29.05.2017 14.06.2017 14.06.2017 9 Months Not Yet Started

36Repairs of API old office at Aronda, Tal.

Sawantwadi, Dist.Sindhudurg 21.41 27.02.2017 20.48 01.03.2017 1B 5.042017 25.04.2017 Adhish Projects (-)10.00% 18.44 29.05.17 14.06.17 14.06.17 9 Months Not Yet Started