Social Monitoring Report Bi-annual Social Monitoring Report January 2015
PAK: MFF – Power Distribution Enhancement
Investment Program (Tranche 3)
Prepared by Quetta Electric Supply Company, Balochistan for the Asian Development Bank.
NOTES
(i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and its agencies ends on 30 June.
(ii) In this report “$” refer to US dollars. This social monitoring report is a document of the Borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Re: Fw: Loans 2727-PAK: and 2972-PAK: PDEIP, Tranche 2 and 3 -Submission of Bi-annual Social and Environmental Monitoring Reports Ashfaq Khokhar icy Liaqat Ali, Adnan Tareen 29,101/2015 11:59 AM
Imran Ali Memon, Rizwan Haider
Please disclose. For next monitoring report please ask EA to use the following reporting format and IR
definitions.
Thanks
Ashfaq
Ashfaq Ahmed Khokhar
Sr. Social Safeguard Officer
Pakistan Resident Mission
Asian Development Bank
Tel (92) 051-2087300 Ext 230
Fax. +92 51 260 0365-66/208 7397-98
www.adb.org
Outline of Monitoring Report.docx IR Terminology with standard definitions.docx
Liaqat Ali
Dear Ashfaq: Please review the Social Monitorin... 20/01/2015 02:27:35 PM
From: Liaqat Ali/PRM/ADB To: Ashfaq Khokhar/PRM/ADB@ADB, Cc: Imran Ali Memon/PRM/ADB@ADB, Rizwan Haider/Contractors/ADB@ADB Date: 20/01/2015 02:27 PM
Subject: Fw: Loans 2727-PAK: and 2972-PAK: PDEIP, Tranche 2 and 3 - Submission of Bi-annual Social and Environmental Monitoring Reports
Dear Ashfaq:
Please review the Social Monitoring report received from QESCO for Loan 2972
Regards,
Liaqat Ali, Project Analyst, Pakistan Resident Mission
Level 8, North, Serena Office Complex, G-5, Islamabad/Pakistan
Tele: (92-51) 2600351-69/2087210 Fax: (92-51) 2600365-66/2087397-98
email: [email protected].
Forwarded by Liaqat Ali/PRM/ADB on 20/01/2015 02:24 PM
From: Chief Engineer Development <[email protected]> To: "[email protected]" <[email protected]>, Date: 20/01/2015 02:17 PM Subject: Re: Loans 2727-PAK: and 2972-PAK: PDEIP, Tranche 2 and 3 - Submission of Bi-annual Social
and Environmental Monitoring Reports
A o A
Find attached BAE&SMR of QESCO Tranche-Ill sub-project for your information
please.
Regards,
Manager (E&S)
PMU QESCO, Quetta
From: "[email protected]" <[email protected]>
To: CE Dev HESCO <[email protected]>; CE Dev IESCO <[email protected]>: CE Dev
LESCO <[email protected]>: CE Dev MEPCO <[email protected]>: CE Dev FESCO <[email protected]>, CE Dev QESCO <[email protected]>; CE Dev GEPCO <[email protected]>; CE Dev PESCO <[email protected]>, ceo qesco
Sent: Monday. December 22. 2014 2:22 PM
Subject: Loans 2727-PAK: and 2972-PAK: PDEIP. Tranche 2 and 3 - Submission of Bi-annual Social and
Environmental Monitoring Reports
Dear Chief Engineer Sahibaans:
The Bi-annual social and environment monitoring report for the period 1 July 2014 to 31 December 2014
are due after 31 December 2014. Would appreciate your submission of the reports by 20 January 2015.
Regards,
Liaqat Ali, Project Analyst, Pakistan Resident Mission
Level 8. North, Serena Office Complex, G-5, Islamabad/Pakistan
Tele: (92-51) 2600351-69/2087210 Fax: (92-51) 2600365-66/2087397-98
email: [email protected].
Bi annual Environemantal and Social July to Dec 2014 Tranche-III.rar
ADB Bi-annual Social Safeguard Monitoring Report
Project Number: ADB Loan No. 2972 — Pak, Tranche Ill
Jul — Dec, 2014
Government of the Islamic Republic of Pakistan
ASIAN DEVELOPMENT BANK (PDEIP)
Power Distribution Enhancement Investment Program,
Tranche-Ill
Prepared by: Environment and Social Safeguard Section PMU QESCO
Quetta (Pakistan)
This report does not necessarily reflect the views of ADB or the Government concerned. and ADB
and the Government can not be held liable for its contents.
ABBREVIATION
A Augmentation
ADB Asian Development Bank
BEPA Balochistan Environmental Protection Agency
BOQs Bill of Quantities
C Conversion
DGS Distribution Grid System
E Extension
EIA Environmental Impact Assessment
EMP Environmental Management Plan
EMS Environmental Management System
SSEMP Social safeguard and Environmental Management Plan
GOP Government of Pakistan
GSC Grid System Construction
HSE Health Safety & Environment
IEE Initial Environmental Examination
LARF Land Acquisition & Resettlement Framework
LARP Land Acquisition & Resettlement Plan
MC&C Monitoring, Controlling & Coordination
MFF Multi Trenches Financing Facility
MM Mitigation Measures
MVA Mega Volts Ampere
PPEs Personal Protection Equipments
PMU Project Management Unit
PDEIP Power Distribution Enhancement Investment Program
PS&C Planning, Scheduling &Coordination
QESCO Quetta Electric Supply Company
STG Secondary Transmission Grid
T/LINE Transmission Line
Table of Contents
Part I (Introduction) Page
No.
1.1 Company 1
1.2 Project Management Unit 1
1.3 Detail of Project 1
1.4 Location of the Project 2
1.5 Objective of the Project 2
1.6 Construction activities and project progress during previous 6 months of T-III 2
1.7 Scope of Work 3
1.8 Physical status of sub projects of T-III 3
1.9 Changes in Project Organization and Environmental Management Team 3
1.10 Relationship with Contractors , and owner lenders etc 3
Part II (Social safeguard Monitoring )
2.1 Social Monitoring 4
2.1.1 Appointment of (E&S) Officers 4
2.1.2 Monitoring 4
2.2 Land Acquisition and Resettlement 4
2.3 Pre-Requisites 4
Part ID ( Social Safeguard Management )
3.1 LARP 5
3.2 Site Inspection & Audits 5
3.3 Non Compliances Notices 5
3.4 Issues Covered 5
3.5 Corrective action Plans 5
3.6 Consultation and Complaints 5
(Annexes)
Letter of EIA Submission for NOC (Annex-A)
Confirmation letter from BEPA for reviewing the EIA (Anne-B)
Organization Chart (Annex-C))
Office Order for up gradation of D.M (E&S) to Manager (E&S) (Annex-D)
Letter for disclosure of LARPs at site (An nex-E)
Lay out plan of T-III sub projects (An nex-F)
Photographs of the proposed T-III sub projects (Annex G)
Part 1- Introduction
1.1 Company:-
Quetta Electric Supply Company (QESCO) is a Public Limited Utility Company.
established in 1998 under Companies Ordinance 1984 and is responsible for distribution of
Electric Power within its territorial jurisdiction and presently serving approximately over 0.5
Million Customers (Domestic. Commercial, Agricultural, Industrial and others) in the thirty
districts of Balochistan.
1.2 Project Management Unit (PMU)
To effectively plan, execute and monitor the project loan No 2972 Power Distribution
Enhancement Investment Program (Tranche III), a Project Management Unit (PMU) has
been established under General Manager (Development) comprising of four sections i.e.
Planning Scheduling & Coordination, Procurement. Project Finance and Environment &
Social Safeguard along with Project Director (GSC).
1.3 Detail of Project
Existing conditions of the QESCO power distribution and transmission system are
inadequate to meet rapidly growing demand for electrical power. To cope with this situation,
the existing power infrastructure has to be improved and upgraded. The overall contribution
of power infrastructure requires institutional arrangements, capacity building that support
strategic management of the sector, planning and management of investments. This
Project is to help increase the efficiency, reliability, and quality of electricity Power in terms
of the overall technical and commercial losses reduction, continuous availability and the
improved voltage profile of electricity
The basic information of the loan No. 2972 is here as under:-
Loan Number:-ADB-2972 PAK
Project Title:- Power Distribution Enhancement Investment Program, Tranche-III
1.4 Location of the Project:-
1. Construction of 132 KV double circuit transmission line with length of 267 Km
form Loralai 220KV Grid station to Muslim Bagh-Khanozai & Psihin-Yaru-Quetta Industrial
Grid Stations. The T/L will pass from four (04) districts of Baluchistan i.e. Loralai, Killa
Saifullah, Pishin and Quetta.
2. Construction of 132 KV double circuit transmission line with the length of 209
Km from Khuzdar 220 KV Grid station to Surab & Kalat-Mangochar-Mastung Grid Stations.
The T/L will pass from four (03) districts of Baluchistan i.e. Khuzdar, Kalat and Mastung
Borrower:- GOP/ QESCO
Executing Agency:-PEPCO
Implementing Agency:-QESCO
Date of Signing Agreement:-09-09-2013
Date of Effectiveness:- 10-12-2013
Date of Loan Closing:-31-12-2016
Date of Last ADB Review Mission: - 17 June, 2014
Amount of Loan: - 81.95 Million US $
1.5 Objectives of the Project
QESCO through GOP has undergone a Project Financing agreement with Asian
Development Bank for:
• Strengthening the capacity of Power Distribution and Transmission networks
• To meet the increasing electricity demand in the selected areas more efficiently
• To upgrade the existing power infrastructure.
1.6 Construction activities and project progress during previous 6 months of
Tranche III
i) Identification of subprojects
ii) Preparation of PC 1
Asian Development Bank
iii) Approval of PC 1 from ADB/PEPCO
v) Environmental Impact Assessment (EIA) report of the sub projects has been submitted
to Balochistan Environmental Protection Agency (BEPA) vide letter No. G.M(Dev)/ QESCO/
PMU/E&S/944-47 dated 22-05-2014 (Annex-A). BEPA is reviewing the report and has
issued a confirmation letter under Schedule-IV to review the report vide letter No. DG
(EPA)/5138/2014 dated 02/10/2014 (Annex-B).
1.7 Scope of Work
There are 02 Nos. of QESCO Turnkey sub projects that include;
1. Procurment of Plant, Design, Supply and installation of 132 KV
double circuit transmission lines on ACSR Rail Conductor (267
KM). along with associated (14 Nos.) line bays from Loralai-
Muslim Bagh-Khanozai & Pishin-Yaru-Quetta Industrial Grid
stations.
2. Procurment of Plant, Design, Supply and installation of 132 KV
double circuit transmission lines on ACSR Rail Conductor (209
KM), along with associated (10 Nos.) line bays from Khuzdar-
Surab & Kalat-Mangochar-Mastung Grid stations.
1.8 Physical Status of Sub Projects Tranche-Ill
Physical work has not been started yet. However, finalizing of root survey is under
process.
1.9 Changes in Project Organization and Environmental Management Team
Up to date organization chart is attached as Annex-C
1.10 Relationships with Contractors, Owner, lenders etc.
Project is at initial stage and design of final rout survey is under process. However.
at initial stage, the relationship between contractors. owners and lenders is found excellent.
No dispute reported during the said period of time.
Asian Development Bank
Part II Social Safeguard Monitoring
2.1 Social Monitoring
2.1.1 Appointment of (E&S) Officers
Environmental and Social officers have been appointed within effective date but
Deputy Manager (E&S) yet to be appointed. However, the post of Deputy Manager (E&S)
has been upgraded as Manager (E&S) vide letter No.CEO/QESCO/D.G
(HR&Admn)/43951-75 dated 20-08-2014 (Annex-D). Manager from Civil Engineering is
working on the post of Manager (E&S).
2.1.2 Monitoring
Physical work has not been started yet. And final rout survey is under process.
2.2 Land Acquisition and Resettlement
No land has been acquired for the sub projects of T-III. Most of proposed rout for
transmission lines is hilly, barren and uncultivated. No physical or economic displacement
is involved in T-III sub projects. However, trees/crop compensation may involve at small
scale.
2.3 Pre-Requisites
Sr. No Activity Status
I Environmental
Approval from EPA
Baluchistan Environmental Protection Agency (BEPA) has issued the
confirmation letter for reviewing the EIA for the construction of two
transmission lines under ADB loan No. 2972-Pak Tranche-III vide
letter No. DG (EPA)/5138/2014 dated 02/10/2014
II
Environmental
Social Complaint
Register
Environmental & Social Complaint Registers and complaint
procedure have been prepared both in order to facilitate the project
affectees and stakeholders to register their complaints.
HI GRC & IMC Grievance Redressal Committee (GRC) & Internal Monitoring
Committee will be constituted soon.
Asian Development Bank
4
Part III Social Safeguard Management
3.1 LARP
LARPs of Tranche-Ill sub projects have been prepared for the construction of two
(02) transmission lines. The prepared LARPs have been approved by Asian Development
Bank (ADB) and concerned authority. LARPs of both sub projects are translated in Urdu
and have been uploaded at QESCO's website within due course of time. LARPs have also
been forwarded to the concerned quarters for disclosure at site vide letter No.
PMU/QESCO/CE/(Dev)/Tramche-3/12156-64 dated 26-11-2012 (Annex-E). After
finalization of rout/tower spotting, the LARPs will be updated and communicated
accordingly.
3.2 Site Inspection and Audits:-
Project is at initial stage and final rout survey is under process. As the result of site
inspection and audits no Social issue has been observed yet. However, with continuous
site inspection and audits if any social issue/ problem will arise that will be communicated
immediately.
3.3 Non Compliances Notices:-
All the project activities are as per contract document and non compliance has not
been observed yet, if so that will be incorporated accordingly.
3.4 Issues Covered:-
No any social issue has been reported / observed yet. However, the tree or crop
compensation might be involved. So tree / crop compensation has been considered and
incorporated in LARP.
3.5 Corrective action Plans:-
Land Acquisition & Resettlement Plan (LARP) is involved in Tranche-Ill sub projects.
The project is at initial stage and corrective action plan will be carried out in updated LARP.
3.6 Consultation and Complaints:-
As the result of consultation with stakeholders none of complaint has been observed during
the said period.
Asian Development Bank
Director General
Balochistan EPA Samungli Road Quetta
Subject:- Submission of EIA Report of QESCO Tranche HI subproject under ADB LAON NO 2972 PAK (TRANCHE-3)
ADB has financed the QESCO's for TRANCIIE 111 subprojects under LAON NO 2972
PAK (TRANCHE-3) and SMEC Int, ADB's Consulting firm have carried out the study of
Enviromental Impact Assessment of this project and prepared the report for the constuction of
following Transmission lines.
a) 132 KV Transmission Line from Loralai to Quetta
b) 132 KV Transmission Line from Khuzdar to Quetta
Documents enclosed arc as under:-
a. Hard copies of F.IA Report -10 No.s b. Soft Copies of EIA Report 02 No.s c. Crossed cheque in favour of DG EPA Baluchistan amounting to Rs 30,000/-
It is therefore requested that necessary approval /NOC in respect of above EIA Report may
kindly be issued.
7/ ai(Engr.B "gh uz Zaman)
GM (Development) PMU QESCO
Nt. 3'70 E› AY )4 (Sig 3c,cerri
D!A (as above)
C.c To.
PD GSC QESCO
II. SO To CEO QESCO. •
Hi. Deputy Manger L&L QESCO
(Annex-A)
QUETTA ELECTRIC 44.11, SUPPLY COMPANY
OFFICE OF THE
PH I 081-9201750
GENERAL MANAGER (DEV) PMU QESCO FAX 1081-9201641
HEAD QUARTERS, EARGHOON ROAD
e-mail : vscocedevywahoo.cum QUETTA GANTT
NO G.M(Dev)/QESCO/PMU/E&S/ c/Lizt_(0-- Dated: 2-1)0C 2014
Asian Development Bank 6
v4,04,4,-71
n thmankhail)
Director (Tech/Lab)
(Annex-B)
OFFICE OF THE DTRECTOR GENERAL BALOCH1STAN
ENVIRONMENTAL PROTECTION AGENCY
GOVERNMENT OF BALOCHISTAN
SAMLINGLI ROAD QUETTA.
Office: 081-9201840 Fax: 081-9201180 Email: epa ballichistaMievahoo.com
No. DC (EPA)/ 12014 attoti: p 2 J p !2014
To,
/Engr.Baligh uz Zaman
Genaeral Manager (Dev)
PMU QESCO Tel:081-9201750
Fax:081 9201641
Subject:- Submission of EIA Report of QESCO Tranche III subproject
under A DB LAON NO 2972 PAK (TRANCHE-3)
The undersigned is directed to refer to your letter
No.G.M(Dev)/QESCO/PMU/(1470) dated 18-08-2014 regarding the captioned subject
along with schedule- IV and demand draft No.5371848dated 18/08/2014 for Rs: 70000/-
as lEE review fee.
The Initial Environmental Examination (LEE) report is complete as per regulation 9 (a) of the Pakistan Environmental Protection Agency review of tEE and EIA
regulation 2000.
Therefore after a preliminary scrutiny, this office confirms the initiation of
review process.
Copy for information to:
1. P.S to the Director General Environmental Protection Agency, Qu
2. Master File.
Deputy Director (Tech/Lab
Asian Development Bank 7
C tB
< - E
0
o 0 >
a_ a;
D• C
1
Consu
lta
nts
4:1) C) (13 C
C ■4= M
E
• < a) cp as a) C ca
C
• a3
> D C
(• >) <
O
a
O
cc
ct
NN
a
0
C C
Asia
n D
evelo
pm
en
t B
an
k
QUETTA ELETRIC SUPPLY COMPANY LIMITED °Mee of the Chief Executive Officer
Zarghoon Road, Quetta Cantt Tel: 9202211, 9202552 a
No. CEO/QESCO/D.G (HR&Admn)/ 4 3 9 5 1 7 5
OFFICE ORDER.
2014
2 0 AUG 2014
In pursuance of BoD QESCO decision against Agenda item No. 19 in its 79th / 3R1 meeting held on 23.07.2014, conveyed by company secretary QESCO, on the recommendation of HR Committee, BoD upgraded the post of Dy Manager Environment & Social Safeguard BPS-18 to Manager (E&SS) BPS-19 in PMU QESCO w.e.f. 01.01.2014..
Copy to:
1"."General Manager (Development) PMU QESCO, Quetta. 2. Director General (CM) Water WAPDA-506 WAPDA House, Lahore
w.r. to our letter No. CEO/QESCO/D.G(HR & Admn)/38738-39 dated 11.07.2014.
3. All Chief Engineers QESCO, Quetta. 4. Finance Director QESCO, Quetta.
5. All SEs/ Managers QESCO. 6. Dy Manager (Environment & Safeguard) Office of GM (Dev) PMU
QESCO, Quetta.
7. Circulation M-File.
ecv 0/o GM(Dcv: QESCO
Diary No
Date:
An nex-D
Asian Development Bank 9
(Annex-E)
5 C.
46-41h. CAA QUETTA ELECTRIC SUPPLY COMPANY
Phone # 081-9201750 OFFICE OF THE
Fax Ot 081-9201641 CHIEF ENGINEER (DEVI PMU QESCO
HEADQUARTER ZARGHOONROADQUETTA
NO. PMU/QESCO/CE(Dev)/Tranche-3/ 1 y I S-6— 4 Dated: ) /Co~,
1. XEN Operation Division
QESCO, Loralai
2. XEN Operation Division
QESCO, Q/Saifullah
3. XEN Operation Division
QESCO, Pishin
4. XEN Operation Division
QESCO, Kalat
5. SDO Op: Subdivision
QESCO, Khuzdar
6. SDO Op: Subdivision
QESCO, Mastung
Subject: Disclosure of Land Acquisition & Resettlement Plan (LARP) for
Construction of 132KV Loralai — Quetta Industrial D/C T/Line and
132KV Khuzdar — Quetta Industrial D/C T/Line (Tranche-I11)
I. Enclosed please find herewith Land Acquisition & Resettlement Plans
(LARPs) for Construction of 132KV Loralai — Quetta Industrial and Khuzdar — Quetta
Industrial D/C Transmission Lines (Tranche-I11).
2. It is therefore requested that the LARPs may please be disclosed for public /
affected persons (APs) of the sub-project areas.
Copy to:
1. So to CEO QESCO Quetta.
2. Mr. Adnan Tarcen, Senior Project Officer (Energy) ADB, Pak Resident
Mission, 0-5 Islamabad.
3. Mr. Khalid Hussain Rai, GM/CE PMU PEPCO, Lahore.
Asian Development Bank
10
EHRI SURA
KIN
BAGHBANA
KHUZDAR
NAL
Lay out Plan of QESCO Tranche III Subprojects (Annex-F)
.12 OUETT I STATION )kV HVDC/ kVHVAC
amr. Z.G.JAN\--" 111F:;MANGO
CHER
KALA
,,.._.....----- - DA a 4-treiiii-k --. WA
1::f1:1-ABAD
11 :Ai" HAD
KUCHA
QUIT- T;i6
a. DHADAR
BHA
UCH - II Pil-r
CHA MANJ SHOR
R.JAMi
_.r J_M-AGSI
Ql. Proposed 132 KV double Circuit T/L form Khuzdar-Surab& Kalat-Manqocher-Mastunq Grid Stations
Q2. Proposed 132 KV double Circuit T/L form Loralai-Muslim Baqh-Khanozai & Pishin-Yaru-Quetta Industrial Grid Stations
Asian Development Bank 1 1
(Proposed In and Out for new 32 KV T/L Khuzdar-Mastung)
•
42,34-11,-,tr•
(Barren area at proposed new 132 KV T/L Khuzdar-Mastung)
(Annex-G)
PHOTOGRAPHS OF EXISTING AND PROPOSED SITES FOR 132 KV T/L KHUZDAR-QUETTA
Asian Development Bank 12
(Proposed Hilly & barren area for new 132 KV T/L Loralai-Quetta)
(Exiting 132 KV T/L Loralai to Quetta)
Asian Development Bank
13