Social Monitoring Report Bi-annual Social Monitoring Report January 2015 PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Multan Electric Power Company, Punjab for the Asian Development Bank.

Upload: others

Post on 11-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

Social Monitoring Report Bi-annual Social Monitoring Report January 2015

PAK: MFF – Power Distribution Enhancement

Investment Program (Tranche 2)

Prepared by Multan Electric Power Company, Punjab for the Asian Development Bank.

Page 2: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

NOTES

(i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and its agencies ends on 30 June.

(ii) In this report “$” refer to US dollars. This social monitoring report is a document of the Borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 3: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

Re: Fw: L-2727, L-2972 PDEIP: Submission of BAEMRs (Jul-Dec 2014) Ashfaq Khokhar to. Liaqat Ali 29/01/2015 02:33 PM Cc: Adrian Tareen, Rizwan Haider

Please disclose both reports but ask EA to provide details of all annexes. Annexes are mentioned in the

report but have no details provided.

Thanks

Ashfaq

Ashfaq Ahmed Khokhar

Sr. Social Safeguard Officer

Pakistan Resident Mission

Asian Development Bank

Tel (92) 051-2087300 Ext 230

Fax. +92 51 260 0365-66/208 7397-98

www.adb.org

ADB

Liaqat All

Dear Ashfaq: The below reports has not yet bee... 29/01/2015 01:51:24 PM

From: Liaqat Ali/PRM/ADB To: Ashfaq Khokhar/PRM/ADB@ADB, Cc: Adnan Tareen/CWRD/ADB@ADB Date: 29/01/2015 01:51 PM Subject: Fw: L-2727. L-2972 PDEIP: Submission of BAEMRs (Jul-Dec 2014)

Dear Ashfaq:

The below reports has not yet been reviewed by you. Please review and provide your comments and approve for disclosure.

Regards,

Liaqat Ali, Project Analyst, Pakistan Resident Mission

Level 8, North, Serena Office Complex. G-5, Islamabad/Pakistan

Tele: (92-51) 2600351-69/2087210 Fax: (92-51) 2600365-66/2087397-98 email: [email protected].

Forwarded by Liaqat Ali/PRM/ADB on 29/01/2015 01:49 PM ---

From: Liaqat Ali/PRM/ADB To: Ashfaq Khokhar/PRM/ADB@ADB, Cc: Imran All Memon/PRM/ADB@ADB, Rizwan Haider/Contractors/ADB@ADB Date: 20/01/2015 02:23 PM Subject: Fw: L-2727, L-2972 PDEIP: Submission of BAEMRs (Jul-Dec 2014)

Dear Ashfaq:

Please review the Social Monitoring Reports for Loans 2727 and 2972 received from MEPCO..

Page 4: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

ADB Tranche-III Biannual Social July-December, 2014(Excluding Photos).docx

ADB Tranche-II Biannual Social July-December, 2014(Excluding Photos).docx

Regards,

Liaqat Ali, Project Analyst, Pakistan Resident Mission

Level 8, North. Serena Office Complex, G-5, Islamabad/Pakistan

Tele: (92-51) 2600351-69/2087210 Fax: (92-51) 2600365-66/2087397-98

email: [email protected].

Forwarded by Liaqat Ali/PRM/ADB on 20/01/2015 02:21 PM

From: Asif Riaz <[email protected]> To: "[email protected]" <[email protected]>, Lali <[email protected]>, Cc: "[email protected]" <[email protected]>, "[email protected]" <[email protected]>,

"[email protected]" <[email protected]>, Jeffrey Bowyer <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]>

Date: 20/01/2015 02:11 PM Subject: Re: L-2727, L-2972 PDEIP: Submission of BAEMRs (Jul-Dec 2014)

Respected Madam & Sir

Kindly find attached following Internal Monitoring Reports in respect of MEPCO Multan

1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report of Tranche-II (L-2727-PK) 3- Bi-Annual Social Monitoring Report of Tranche-Ill (L-2972-PK)

iks1 hegards: Syed Asif Riaz

On Tuesday, January 20, 2015 12:12 PM. "sshafiq.consultant©adb.org" <sshafiq.consultant©adb.org>

wrote:

Dear Asif,

Thank you for the Tranche 2 report. I have not yet received the Tranche 3 report, which was to be sent by Monday, January 19. Please send it at the earliest so that the disclosure deadline may be met.

Regards,

Safia Shafiq

Environment Specialist (Consultant)

Pakistan Resident Mission Asian Development Bank

Page 5: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

Level 8, North Wing, Serena Office Complex.

Khayaban-e-Suhrawardy G-5, Islamabad, Pakistan.

Tel: +92-51-2087300, Ext: 344

Fax: +92-51-2087397-8 & 2600365-6

Cell: +92-333-2154462

Asif Riaz <[email protected]> wrote:

To: "[email protected]" <[email protected]>

From: Asif Riaz <[email protected]>

Date: 01/16/2015 12:13AM

Cc: "[email protected]" <[email protected]>, "[email protected]"

<[email protected]>, "[email protected]" <[email protected]>, Jeffrey Bowyer

<[email protected]>, "[email protected]"

<[email protected]>, "[email protected]" <[email protected]>,

"[email protected]" <[email protected]>

Subject: Re: L-2727, L-2972 PDEIP: Submission of BAEMRs (Jul-Dec 2014)

Respected Madam

Kindly find attached Bi-annual Environment Monitoring Report of Tranche-II subprojects

(L-2727-PK) in respect of MEPCO Multan.

BAEMR of Tranche-Ill (L-2972-PK) shall be submitted on Monday 19-01-2015

Insha-ALLAH.

Rest Regards.

Syed Asif Riaz

On Saturday. January 3. 2015 6:39 PM, Asif Riaz <[email protected]> wrote:

Acknowledged Madam

Best Regards

,Fyed Asif Riaz

On Friday, January 2, 2015 2:27 PM, "sshafiq.consultant©adb.org" <[email protected]> wrote:

Dear Asif,

The Bi-annual Environmental Monitoring Reports (Jul-Dec 2014) of MEPCO under PDEIP

tranches 2 (L-2727) and 3 (L-2972) are due for submission by January 15, 2015. Please note that two separate reports are required, one for each tranche. Kindly ensure that ADB's comments (if any) on the previous BAEMR Jan-Jun 2014 are taken into consideration

while preparing the new reports.

Page 6: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

I look forward to a timely submission.

Regards,

Safia Shafiq

Environment Specialist (Consultant)

Pakistan Resident Mission

Asian Development Bank

Level 8, North Wing, Serena Office Complex,

Khayaban-e-Suhrawardy G-5, Islamabad, Pakistan.

Tel: +92-51-2087300, Ext: 344

Fax: +92-51-2087397-8 & 2600365-6

Cell: +92-333-2154462

[attachment "ADB Tranche-Il Biannual Env. report Jul-Dec, 2014 (excluding

Photos)1.docx" removed by Safia Shafiq/Consultants/ADB]

Page 7: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

PAKISTAN RESIDENT MISSION ISLAMABAD

Project Number: 2727-PK

ASIAN DEVELOPMENT BANK

ADB

Bi-annual Social Safeguard Monitc.ring Report

Islamic Republic of Pakistan: Power Distribution Enhancement Investment

Program, Multi-Tranche Finance Facility (PDEPMFF-Tranche-II)

(Financed by the Asian Development Bank (ADB)

(July-December, 2014)

Prepared by: Muhammad Arif, Assistant Manage! Multan Electric Power Company (MEPCO)

Multan, Pakistan

For Pakistan Electric Power Company (PEPC0)

Multan Electric Power Company (MEPCO)

This report does not necessarily reflect the views of ADF.7, or the Cc-e7hinent concerned. And ADB and

the Government cannot be held liable for its contents.

f.

Asian Development Bank,

Page 8: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

Table of Contents

Subject Page

No.

1. Introduction and Background of the Project 2

1.1 Basic Data 2

1.2 Introduction 3

1.3 Scope of Work 3

2. Project wise Summary of the Subprojects 4

2.1 Miranpur 132 kV New Grid Station 4

2.1 Alipur 132 kV 5

2.3 Fatehpur 132 KV 6

2.4 Kameer 132 kV New Grid Station 7

2.5 Noorsar 132 kV 7

2.6 Monitoring visits of subproject sites 8

3. Summary of Physical Works and Implementation Status 9

4. Involuntary Resettlement and Categorization of Project 10

4.1 Impact of Land Acquisition and Involuntary Resettlement

10

5. Social Safeguard Awareness and Training 13

6. Public Consultation 15

7. Conclusion and Recommendation 16

7.1 Conclusion 16

7.2 Crops Compensation Methodology 17

73. Recommendation 18

Photographs and Annex 19

Page 9: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

INTRODUCTION AND BACKGROUND OF THE PROJECT

BASIC DATA OF TRANCHE-II PROJECT

ADB Loan No.

Project Title

Borrower

Executing Agency

e. Implementing Agency

f. (b)Total Project Cost

a. ADB Loan

Loan Approval Date

Loan Signing Date

Date of Closing

i) Original

ii) Revised

Date of Physical Completion

i) Original

ii) Revised

m. Elapsed Loan Period

i) Original

ii) Revised

2727-PAK

Power Distribution Enhancement

Investment Project Tranche II

Islamic Republic of Pakistan

Pakistan Electric Power Company

(PEPCO)

Multan Electric Power Company Ltd.

(MEPCO)

US $ 43.35 Million (Excluding

contingencies & other charges)

US $ 36.07 Million

September 12, 2008

January 28, 2011

March 31, 2015

Page 10: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

3

1.2 MEPCO Introduction

Multan Electric Power Company (MEPCO) is a Public Limited Utility Company,

established in 1998 under Companies Ordinance 1984, responsible for distribution of

Electric Power within t,:rritc.ial jurisdiction in thirteen districts of Punjab Province. To

meet the increased peer demand and to improve the grid stations and transmission

lines infrastructure MEPCO decided to approach the loaning agencies through

Government of Pakistan like Asian Development Bank, World Bank and other financing

sources to arrange financing. Negotiations were carried out with the Asian Development

Bank and the Bank has agreed to support the program through Multi Tranche Financing

Facility-1 (MFF-1) to be imp!emented in three phases i.e. Tranche-I, II, Ill &IV.

1.3 Scope of Work

Asian Development Bank in Tranche - II is financing overall 20 Nos. of projects. The

detail of the subproject is as under.

i. Construction of 02 No. of New 132KV Grid Stations and allied

Transmission Lines

ii. Conversion of 03 Nos. of Grid Substations from 66kV to 132kV &

Transmission Lines

iii. 14 Nos. c' ,vigmentafions

iv. Capacitors installation

Overall the proposed MFF has been designed to address both investment and

institutional aspects in;electric power sector. Development Objectives/ Project Purpose

will be fully achieved after completion of the proposed Sub-projects.

Construction activities are near to completion at Alipur, Fatehpur, Miranpur

(Gallaywal) & Karrieer subprojects in Tranche-II. Construction activities ar

completed at Noosar conversion subproject. Status of Tranche-II subprojects

enclosed. (Annex- I)

Assistant Manager (Environment) & Assistant Manager (Social) are working in

Environment & Social Cell (ESC) under Chief Engineer (Development) MEPCO

Multan in Project Management Unit (PMU)

vaborAir44511-1201 v:1-Ja.ittriVv, 7.1 .

3

Page 11: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

4

.11

PD(GSC), Contractor(s) and other related staff have been provided continuous

orientation on Environmental Management & Implementation of ADB guideline

and rules/regulations of Government of Fal:stan.

2. PROJECT WISE SUMMARY OF THE PROJECTS UNDER ADB TRANCHE -

II

2.1 Miranpur (Galleywal) 132 kV New Grid Station and allied Transmission Line

(Social Monitoring)

MEPCO has purchase 5.72 acres of land (see annex II) from two landowners on

voluntary saie bases against nenotiated ;-..rIce for construction new grid station and

compensation payment has been paid to the /Affected Persons (see annex III).

Therefore no social impacts associated with the construction of grid station. However,

there are some minor social impacts associated with the construction of 11.5 km.

transmission line that is being passed through four villages and hamlets.

• 37/42 foundations have been completed

• At foundation stage 55 HHs have been affected by the damages of their crops

and trees.

• Crops compensations cheques have been prepared and are being distributed

among the affected persons. Cheques distribution will be completed within a

week or two.

• Public consultation meeting carried out with general public, adjacent community

io grid station site and with the land owners whose land is being affected by the

construction activities of transmissir:n iin

• The fully implementation of Environment and Social Management Plan not

observed at the grid site i.e. Compia;nt register, social monitoring checklists, first

aid box, use of PPEs, solid waste Management, water sprinkling, and tree

plantation. The site supervisor revealed that work is getting completed therefore,

worst condition seems to be observed •

• • •04/...•••

Page 12: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

5

• Contractor was asked to make sure the provision and use of all safety

gadgets/PPEs. Onsite orientation/training session was arranged for the use of

PPEs. They were also instructed to take into the account of local norms and

values.

2.2 Alipur Conversion of 66kV to 132 kV Grid Station and allied Transmission

Line (Social Monitoring)

Although the conversion works are carried out totally within the boundary of the existing

grid station without acquiring additional land. It is a conversion of 66 kV to 132 kV grid

station and all civil works are carried out at existing grid station. 100% civil works of the

grid station have been completed

• 43/47 foundations have been completed

• Crops compensations cheques have been prepared and are being distributed

among the affected persons. Cheques distribution will be completed within a

week or two.

• Public consultation meeting carried out with general public. adjacent community

to grid station site and with the land owners whose land is being affected by the

construction activities of transmission line.

• Contractor was asked to make sure the provision and use of all safety

gadgets/PPEs. Onsite orientation/training session was arranged for the use of

PPEs. They were also instructed to take into the account of local norms and

values.

5

k

Page 13: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

• U.

2.3 Fatehpur Conversion of 66kV to 132 kV Grid Station and allied

Transmission Line (Social Monitoring)

Although the conversion works are carried out totally within the boundary of the existing

grid station without acquiring additional land. The construction of transmission line

passing through the two villages and hamlets have affected 12 HHs at foundation stage,

crops compensation to the all households affected at foundation stage have been paid

• 11/11 foundations have been completed

• At foundation stage 12 HHs have been affected by the damages of their crops

and trees.

• Crops compensations cheques have been paid to all 12 HHs

• 8/11 towers erected, assessment of damages for erection stage is being

executed.

• Public consultation meeting carried out with general public, adjacent community

to grid station site and with the land owners whose land is being affected by the

construction activities of transmission line.

• The fully implementation of Environment and Social Management Plan not

observed at the grid site i.e. Complaint register, social monitoring checklists, first

aid box, use of PPEs, solid waste management, and tree plantation.

• It is observed that contractor do not provide the basic facilities to the workers and

they have to go at petrol station for toilet use.

• The site supervisor revealed 200 Nos of plants were planted but only 12 Nos.

were observed at site.

• Contractor was asked to make sure the provision and use of all safety

gadgets/PPEs. Onsite orientation/training session was arranged for the use of

PPEs. They were also instructed to take into the account of local norms and.

values.

Page 14: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

7

2.4 Kameer 132 kV New Grid Station (DDR) ( Social Monitoring)

MEPCO has purchased land (see annex IV) for construction new grid station on willing-

seller, willing-buyer bases and has paid compensation to the landowner (AP). Therefore

no land acquisition or involuntary resettlement impacts are involved in the construction

of new grid station. The construction of transmission is not involved and have nc.;

impact's on crops and tree therefore DDR has been prepared for this sub projects.

• 100% switch yard foundations completed

• 80% control house building completed

• 60% construction of colony work completed

• Construction of transmission line riot involved therefore, crops compensation not

involved.

• Public consultation meeting carried out wit.!-. general public, adjacent community

to grid station site and with the lanc:•owre..-._ whose and is being affected by the

construction activities of transmission line.

• The fully implementation of Envirunment and Social Management Plan not

observed at the grid site i.e. Complaint register, social monitoring checklists, first

aid box, use of PPEs; solid waste management, and tree plantation.

• Bare electric wires observed at site that may cause any incdent

• Contractor was asked to make sure the provision and use of all safety

gadgets/PPEs. Onsite orientation/training session was arranged for the use of

PPEs. They were also instructed to take into the account of local norms and

values.

2.5 Noorsar Conversation of 66 kV u, 132 kV Grid Station (DDR)

Conversion of the Noorsar grid station is being carried out within the existing boundaries

of it. which is already owned by the MEPCO. Therefore no land acquisition and

resettlement impacts are involved in the conversion of the substation. The construction

of transmission is not involved, therefore DDR has been prepared for this sub projects.

Page 15: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

8

2-.6 Monitoring visits of Project Sites

t: ;

1 - ESC PMU has conducted site monitoring of following site. Detail is as under:

i. New 132kV Kamir Grid Station Site

Date:24-09-14, 19-12-14

ii. New 132 KV Miranpur (Gallaywal) Grid Station Site

Date:28-07-14, 29-08-14, 03-09-14, 30-09-14, 03-10-14, 17-12-14

iii. Conversion of 06KV to 132 KV /-Vipur Gi-A Station and allied Transmission

Line

Date:07-08-14, 16-10-14,

iv. Conversion of 66KV to 132 KV Fathpur Grid Station and allied Transmission

Line

Date:09-09-14, 10-10-14, 03-12-14, 18-12-14

v. Conversion of 66KV to 132 KV Noorsar Grid Station and allied Transmission

Line

n,te:19-0q-14

L. -- • •■•,.......m4/zrv..-..,...enstralrez■rrri Ft'

Page 16: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

9

3. Summary of Physical Works and Compensation Status

Sr.

No. Name of Subproject Compensation

Status Remarks

1 Kameer 132 kV New

Grid Station Paid

2

Norsar '132 kV

1,-ran" -srSati011 from 66

kV to 132 kV) Grid

Station

Not applicable

Grid Station

• Land has been purchased on

willing seller willing buyer basis

and after negotiation

compensation amounting Rs.

6,446,738/- against land acquired has been paid to the

affected person(s).

Transmission Line

• All works are being execute

within the boundary of grid

station therefore land is not

acquired for this subproject.

• All works carried out within the

tuundary of existing grid station

therefore land is not acquired for this subproject.

Grid Station

3

132 kV Miranpur

(Gallyewal) New Grid

Station and Allied T/L

Paid

4

Fatehpur 132 kV

(conversation from 661',

kV to 132 kV) grid

station and allied T/L

Paid

• Compensation payment Rs.

6,435,000/- against the grid

station land has been paid to the

affected person(s).

Transmission Line

• 37/42 foundations have been completed. Crops compensation of the foundation stage has

prepared and is being

distributed to 55 HHs affected at

foundation stage.

Grid station

• All works are-tarried out within

the boundary of existing grid

station therefore land is not

acquired for this subproject.

9

Page 17: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

10

Sr.

No.

Name of Subproject

Compensation

Status

Remarks

Transmission Line

• Foundation works completed

and crops compensation have

been paid to all 12 HHs affected

at foundation stage.

• 8/11 tower erected and crops

damages of erection works

being estimated.

Grid station

Alipur 132

'(conversation from

66 kV i 32 kV) grid

station and T/L

100% civil.

works of grid

station

completed

43/47

foundations

completed for

T/L. Cro

Compensation

cheque,

prepared.

• All works civil works are being

carried out within the boundary

of existing grid station therefore

land is not acquired for this

subproject.

Transmission Line

5

• Civil Works for Transmission

started and 43/47 foundations

completed and their crops

damages has been assessed,

crops compensation cheques

prepared and will be distributed

within a week of two.

4. Invo:Jntary Resettlement Identiii,:ation and Categorize ion

There are 03 out of 20 Projects which fall in Category-B (01 No. of New Grid Stations

and allied T/Lines and 02 No of T/L.ines for conversion of 66 KV to 132 KV grid stations)

requires short LARP preparation, implementation, monitoring and uploading/ posting at

ADB and MEPCO official website. While 02 Nos. of subprojects fall in Category-C,

does not require any LARP as projects are being executed within the boundary of

already existing grid stations.

Page 18: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

Fatehpur

Conversion of

66 kV to 132

kV grid station

are being

executed on

existing grid

station

therefore no

land is

acquired for

this subproject

Name of

Project

• Land

Acquisition

Status

Category of Status of

subpro.,ci. ,j_ARP/DDR

Land for grid

station has

been

purchased

willing seller

willing buyer

bases.

As this

subproject falls

in category B

therefore a

short LARP

has b,-;c11

prepared and

uploaded on

MEPCO

website both

in Urdu and

English

Miranpur

(Galleywal)

132 kV New

Grid Station

This projc..-..t

fall in

category B

This project

fall in

category B

As this

subproject falls

in category B

therefore a

short LARP

has been

prepared and

uploaded on

website both

in Urdu and

English

Status of

1 Compensation

Grid Station

Compensation for

grid station land has

been paid

Transmission Line

37/42 foundations

have been

completed. Crops

compensation of the

foundation stage has

prepared and is

being distributed to

55 HHs affected at

foundation stage.

Grid Station

Compensation for

grid station not

applicable

Transmission Line

• Foundation works completed and crops compensation have been paid to all 12 HHs affected at foundation stage.

8/11 tower erected

and crops damages

of erection works

11

4.1 Impact of Land Acquisition and Involuntary Resettlement

11

Page 19: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

As this

subproject falls

in category B

therefore a

short LARP

has been

r_s!epar9c'.. and

uploaded on

MEPCO

website both

in Urdu and

English

As this

subproject falls

in category C

therefore a

short DDR has

been prepared

and uploaded

on MEPCO

website both

in Urdu and

Status of

LARP/DDR

Status of

Compensation

being estimated.

Grid Station

Compensation for

grid station is not

applicable

Transmission Line

Civil Works for

Transmission started

and 43/47

foundations

completed and their

crops damages has

been assessed,

crops compensation

cheques prepared

and will be

distributed within a

week of two.

Grid Station

Compensation for

grid station has

been paid

Transmission Line

Not Applicable

As this

subproject falls

in category C

therefore a

short DDR has

been prepared

Grid Station

Not Applicable

Transmission Line

Not Applicable

12

Name of

Project

Alipur

Kameer 132

kV new grid

station

Noorsar

Land

Acquisition

Status

Conversion of

66 kV to 132

kV grid station

are being

executed on

existing grid

station

therefore no

land is

acquired for

this subproject

Land for grid

station has

been

purchased

willing seller

willing buyer

bases.

Conversion of

66 kV to 132

kV grid station

are being

executed on

existing grid

Category of

subproject

This project

fall in

catecory B

This project

fall in

category C

This project

fall in

category C

Page 20: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

Name of

Project

Land

Acquisition

Status

Category of

subproject

S

Li

and

on P

web

in U

Eng

station

therefore no

land is

acquired for

this subproject ,

tatus of

~RP/DDR

uploaded

EPCO

site both

rdu and

lish

Status of

Compensation

Site Date Participants Contents

Ccntroctor / C')3C otaff/GSO Staff

Contractor / GSC staff/GSO Staff

Subproject Site

Kamir Subproject Site

Contractor / GSC staff/GSO Staff

• ENIP Implementatier

• RP implernentotign

• Compensation payment p rocedure

• EMP Implementation

• RP Implementation

• Compensation payment procedure

07-08-14 16-10-14

09-09-14 10-10-14 03-12-14 18-12-14

Alipur Cubproject Site

Fatehpur Subproject Site

28-07-14 29-08-14 03-09-14 30-09-14 03-10-14 17-12-14

• EMP Implementation

• RP Implementation

• Compensation payment procedure

Contractor / GSC staff

• EMP Implementation

• RP Implementation;

• Compensation payment procedure

24-09-14 19-12-14

Contractor / GSC staff

• EMP Implementation

• RP Implementation

• Compensation payment procedure

19-09-14

Noorsar Subproject site

13

5. Social Safeguard Awareness & Trainings

15- Several Environmental Training sessions are organized at each subproject site for

implementation of Environmental Managew,ent Plan. Awareness sessions with m/S

Siemens, M/S Al-FazI and M/S NeieAlhussain's subcontractor have conducted for

environmental and social safeguard awareness aid ADB's Environmental guidelines

which need be implemented on subproject sites.

Trainer

• AM(Environment)

• AM(Social)

• AM(Environment)

• AM(Social)

• AM(Environment)

• AM(Social)

• AM(Environment)

• AM(Social)

• AM(Environment)

• AM(Social)

13

Page 21: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

15

6. Public Consultation

Consultation Meetings Conducted with Community Members (Public), Workers and

Displaced Persons of ADB Tranche - II Subprojects.

Public consultation meetings conducted with Displaced/affected Persons and

community members in last quarter are c-Jvcri below subproject wise.

6.1. kiircinpur (Galleyy.T.!) New Grid f.itation and Transmission Line

• Three Nos. of consultation meetings were conducted with community members,

workers and affected persons.

• Majority of community people were found aware about the project activities and

they appreciated the project. Thee had no complaint against the workers/project

activities getting underway.

• The major concern of the people was that of load shedding and over billing

charges which needs to curbed at the earliest.

• Permission/consent from the formers (DPs) taken for the construction of

foundation works of transmission line and all protective measures are being

adopted during foundation work.

• Contractor/workers were instructed to take into the account of local norms and

values.

• Prople were informed about the Crops/trees damages and their compensation

payment and process.

• Some of the owner complaints tIlcl their land not properly restored after

construction activities.

6.2. Alipur Grid station and Transmissic,n Line

• Three Nos. of consultation meetings were conducted with workers and

Displaced/Affected persons of transmission line.

• Permission/consent from the formers (DPs) are being taken for the construction

of foundation works of I..an6mit-,sion line ail pcotective measures are being

adopted during foundation work.

• Contractor/workers were instructed to take into the account of local norms and

values.

15

Page 22: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

• People were informed about the Crops/trees damages and their compensation

payment and process.

6.3. Fatehpur Grid station and Transmission Line

• Three Nos. of consultation meetings were conducted with community members,

workers and affected persons.

• Majority of community peo-ple were found aware about the project activities and

they appreciated the project. They had no complaint against the workers/project

activities getting underwiy.

• The major concern of the people was that of load shedding. which needs to

curbed at the earliest.

• The communities requested for ,riskAn-.1 to semi-skilled jobs during the

construction and operation of the Project activities.

• Landowners showed their consent about the use of their land for transmission

line and they welcomed the project activity.

7. CONCLUSION AND RECOMMENDATIONS

7.1 COI1CIUSIOliS

Crops compensation for foundation stage of all three subprojects has been prepared

and cheques are being distributed to the affected persons. Crops compensation for

Fatepur subproject has been paid and compensation cheques distribution for Alipur and

Miran Pur (Gallewal) subprojects will be completed within a week or two.Civil works for

grid station of all subprojects have been almost completed except kameer grid station

and for transmission lines 91% foundation works have been completed. Contractor was

asked to make sure the provision and use of all safety gadgets/PPEs. Onsite

orientation/training session was arranged for the use of PPEs. They were also

instructed to take into the account of local norms and values.

Page 23: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

17

7.2 Crops Compensation Assessment Methodology

There is no SOP available to pay crops compensation before the damages occurred.

MEPCO use a traditional way to make crops damages assessment and compensation

disbursement. ADB collaboration with WB drafted an SOP for crops compensation but it

remains a draft and still pending to be finalized. MEPCO follow the following 13 points

from assessment of damages to comperis.i.,tion disbursement.

1. The kanoongo visits the sites and measures the damages and types of crops and

tree.

2. After measurement the Kanoongo makes register of these damages crops/trees

compensation

3. The rates of the crops are taken from the Local Revenue Department (Tehsil dar

office)

4. The rates of trees are taken from Local Forest department

5. After verified by the Kanoongo & SDO/XEN concerned. They are sent to PD

(GSC) office.

6. After assessment sanction orders as per book of financial power is issued by the

officers as per their competency (SDO/XEN, PD& CD (development) etc)

7. Claims are prepared as per sanctioned order

8. Pass order by Division and approved by PD/CE

9. The approved pass order sent to Manager (Pr) and finally sent to FD

10.Amount is released. after getting necessary approval from the competent

authority.

11.The amount involved is trqnsferreci to PryGSC) & then same is further send

through cheque to the XEN concerned

12. XEN concerned then prepares cross Cheques in the names of Affected Person

17

Page 24: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

13. The cross cheques in the name of concerned affected persons is distributed as

per their entitlement

MEPCO is reluctant to "pay before damages" as it has to fulfill departmental procedures

and the formalities mentioned above. MEPCO pay crops compensation to the affected

Persons in three installments i.e. Foundation, Erection and String work. Assessment of

the crops damages has been done and crops compensation cheques are being

distributed to the affected persons.

7.3 Recommendations

From the findings of the Monitoring Visits, the following mitigation measures are

proposed to be implemented in order to minirni7e i-iny potentially significant impacts:

• It is also recommended that the procts of communication and consultation with

the community representatives is aggressively maintained.

• Construction work of new T/lines should be planned in accordance with LARPs.

and DDRs to minimize the affect of construction activities.

• Site should restore properly after the completion of construction activities.

• Proper housekeeping can nvoid littering.

• ciVOit.; any acniclent c-Jntracto. should mace the use of PPEs compulsory.

• Timely compensation to the affected persons can avoid any hindrance and may

lead towards in time execution of the project.

• It is also observed that contractor(s) does not give value to environmental and

social aspects and considered them it unnecessary burden over him. Therefore

to make it effective bill payment:, regarding EMP may dully verified through

environmental and Social Safeguard section.

Page 25: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

19

• Photographs

Figure 1: Crops Compensation cheques distribution at Fatehpur subproje

Figure 2:- Crops Compensation Payments paia to the APs of Fatehpur subprojects.

19

Page 26: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

Figure 3:Meetings with the land owners at 132 KV Fatehpur T/L Line

20

Page 27: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

21

Q "1- 4 ■

r ,

Figure 4: Consultation Meetings with the land owners at 132 KV Miranpur

(Gallaywal) T/L

Figure 4: AP made complaint that contractor do not restore the site after excavation at Fatehpur T/L

21

Page 28: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

• 01- t

.ifs

Figure 6: Littering and lack of housekeeping observed at Miranpur Grid Station

Figure 5: Lack of safety measures may cause accident at Miranpur Grid Station

22

Page 29: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

Figur

e; Temporary residence of wcrke Fig

r arkawareness at Kameer grid site

„,47t4w,-

W

5:7, v-r• 41

Figure 8: Orientation awareness

session with workers at Kam

Grid Station

2 3

23

Page 30: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

Plants planted under the big shady trees at Fatepur site

24

, .

efe- i:;;

., ., ,krag- ,,..,

. NJ ).1.4t-L r ; 44 t'l. s- i ,.., _ ... .. 4' L.

49 .1!!! tt-- K. ' • .'4 7-"7r7r -.=. - • , iji 1 •=-N' ''4 "24i ,-:;-!'f.. .•

Before start of civil works this place was Wed with different kinds of fruit trees, neither

site restored nor plantation have been conducted here.(Fatepur site)

Page 31: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

25

ANNEXES

Annex

ADB Tranche-II (Grid Stations & Asbu.iated Transmission Lines)

SR.NO. NAME OF

GRID STATION

Prop:

Voltage KV

1

Kamir a/w T/Line

N

132

REMARKS/PROGRESS

Contract Effective Date - 19.02.2014 Completion Period - 360 Days Contract Completion Date - 13.02.2015 Project Cost — PKR 222,723,971

USD 3,736,698 'EUR 96,096

Released up till now - PKR 160,721,000

USD 158,000 EUR 20,000

Physical Progress

A. Grid Station cs.ivil work 100`)/0 Switch yard foundations completed 80% Control House Building completed 60% Construction of colony work completed Electrical Work 02-No 20/26 MVA PTF erected at site. All main equipment / material available at site Excavation for earthing is in progress

25

Page 32: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

26

ADB Tranche-II (Grid Stations & As7ociatedTransmission Linn)

2 Ali Pur a/w T/Line C 132

Contract E■fc.c~ive Date - 17.05.2013 Completion Period - 360 Days Contract Completion Date:-11.05.2014 Expected completion Date 15.01.2015 Project Cost — PKR 236,642,715 (AJ Pur + Fateh Pur) USD 203,286 -EUR 525,068 Released up till now - PKR 152,927,000 (Ali Pur + Fateh Pur) USD 526,000 EUR 203,000 Physical Progress A. Grid Station:-

Civil Work

95% of CHB completed. 100% Switch yard foundations completed Ele!7,trical Work BO% completed) RemininDlAlgAs

CE.tkt, "g & Wiring Termination, Testing and Commissioning B. Transmission Line: 128% Completed)

Foundations:- 43/47 completed. Erection work pending due to tower material yet not reached at site.

Page 33: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

C

132

3 Fatehpur a/w T/Line

Miran Pur (Galaywal) a/w T/Line on turnkey basis (New)

4

ADB Tranche-II (Grid Stations & Associated Transmission Lines)

Contract Effective Date 17.05.2013 Completion Period - 360 Days Contract Completion Date:- 11.05.2014 LD Notice Issued to Contractor:-Expected Completion Date:-30.12.2014 .

Physical Progress

A. Grid Station Civil work Switch yard foundations completed. Renovation of CHB completed. Electrical Work Completed Remaining Work

esting in progress B. Transmission LineNO% Completed): Foundations:- 11/11 completed. Erection:- 08/11 completed..

Contract Effective Date -11.02.2014 Completion Period - 360 Days Contract Completion Date -5.02.2015 Project Cost -- PKR 162,318,624

USD 1,347,221 Released up till now - PKR 122.780,000

USD 286,000 Physical Progress

A. Grid Station

Civil work Switch yard foundations completed . Control House Building completed 85% construction of colony work completed. Electrical Work 1) 11-KV Panels, Control & Relay Panels have

hew" inPtalled. 2) Earthing mesh laid 3) CTs, PTs, Circuit Breaker, Isolators and LAs

are available at site. 4) Power Transformers are under shipment

132

2x26 M VA T/Bay

2xL/Bays & 1xPT/Bay

27

27

Page 34: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

28

ADB Tranc110•1 (Grid

I

Stations & Associated Transmission Lines)

;:). Transmission Line (25% Compleied):

Foundations:- 37 /42 completed.

5 Noor Sar a/w T/Line

C 132

Contract Signed on 17.02.2012 10% Mobilization advance issued on 25.07.2012 (LCC) and 23.07.2012 (FCC). LC opened on 10.08.2012 (LCC) & 01.11.2012 (FCC) Letter of Committment from ADB issued on 17.05.2013 (LCC & FCC) Contract Effective Date - 17.05.2013 Completion Period - 360 Days Contract Completion Date:- 11.05.2014 Physical Progress

Civil work 100% Switch yard work completed. Elecrtical Work 02 No. 10/13MVA PTF's shifted at site (allocated from 132KV G/S's Chack 211 & Sheikh Fazil) and its erction work r,c0Ipieted, All material of switch yard ir::talled at site except 132KV Surge Arresters which is under shipment.

6 Duniya Pur A 132 Energized.on 06.09.2012.

7 Sheikh Fazal A 132 Energized on 05.11.2012.

basti M2.look /-■ •! 32 !Thergized on 27.1€.2012.

9 Multan Ind: Estate A 132 Energized on 04.12.2012.

10 Baghdad-ul-Jadeed

A 132 Energized on 24.01.2013.

Page 35: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

29

ADb Tranche41 (Grid Stations ,4 Atisociated Transmission Lines)

11 Kot Addu A 132 Energized on 06.12.2012.

12 Noor Pur A 132

132

Energized on 11.12.2012.

13 Layyah . i '‘,4,, _.,

Energized on 20.12.2012.

14 Bahawal Nagar A 132 Energized on 22.01.2013.

15 Chak 2111WB A 132 Energized on 07.01.2013.

16 Multan Qasim Pur A 132 Energized on 31.01.2013.

17 Sadiqabad A 132 Err..mized on 04.02.2013.

18 Vehari Road A 132 Energized on 07.02.2013.

19 D.G.Khan A 132 Energized on 10.07-2012

29

Page 36: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

Annex - II

Land Purchase deed and Comprmsation of Miranpur (Galleywal) New Grid

C TR IC P 01,f ‘M c 0 NJ P. A Ny_ANI_E 2'P.O.074

rifne',... V,4-') r4:220073 • bir,)rt• , I ,■•■<';

! I 09.2 fir s PD

(F.S.S) erCb. fvlulton.

eR0vI.51(..))■LQIT )AyrytE;.--,NT Rr Q.RIL) , ;,, TH)r! LANDS ADE: TRANQHE btli3PROJc.:cr

Your not,n9 datc,t109-0(1-2012

Photecot)10,,,, registry of Inert eittchzv),,d; I- .71110,,l' & 4:3;ciley

Mana0)>7 (PrAc.) mrinc,c) :'1-f:'1_2r 2

k=!)!Alkbgyq

PROJECT nIRECtOR MEM( IV1111LT AN

Page 37: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

57 t-,.) c

i'.36 2 03.-17G1689-5

36203-1762952-3 4

31

Ann(bx - III Land Purchase deed and Corn ensation of Miranpur Gallewal) New Grid Station

31

Page 38: PAK: MFF – Power Distribution Enhancement Investment … · 2016-01-28 · 1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report

4.-5-°r e :?6 ,

-4;3 Le::‘,.);( I. (:;."' •

N(1v 2f;09

?:20.); 1

•0 7 'NOV ZIN

Annex - IV

Land Purchase deed and Compensation of Kameer New Grid Station