pages from the national energy and petroleum policy, 2015

2
Table 10.1 Energy Generation Potential in Floriculture Industry District Potential Energy Capacity (kW) Nakuru 35,741 8,160 Thika 8,935 2,040 Kiambu 7,148 1,632 Kajiado 6,552 1,496 Laikipia 4,170 952 Nyandarua 4,170 952 Meru 3,574 816 Gatundu 2,383 544 Machakos 2,383 544 Nyeri 2,383 544 Trans 2,383 544 Athi River 1,787 408 Other 7,150 1,220 Total 88,758 19,852 Source: Updated Rural Electrification Master Plan, 2009 Table 10.2Biogas Potential from Sisal Production Company Generation Potential (h/yr) Capacity * Rea Vipingo 8,750 1500-2000 DWA Estate Ltd. 10,500 1800-2400 Taita Estate 12,600 2150-2870 Mogotio Plantations 6,300 1080- Kilifi Plantations 1,750 300-400 Tabu Estate Ltd. 1,750 300-400 Voi Sisal Estate 700 120-160 Note: * Assuming 12 to 16 hours full load Source: Updated Rural Electrification Master Plan

Upload: romwama

Post on 13-Dec-2015

218 views

Category:

Documents


1 download

DESCRIPTION

hkk

TRANSCRIPT

Chapter 1:

Table 10.1 Energy Generation Potential in Floriculture Industry

DistrictPotential Energy Generation (h/yr)Capacity (kW)

Nakuru35,7418,160

Thika8,9352,040

Kiambu7,1481,632

Kajiado6,5521,496

Laikipia4,170952

Nyandarua4,170952

Meru3,574816

Gatundu2,383544

Machakos2,383544

Nyeri2,383544

Trans Nzoia2,383544

Athi River1,787408

Other7,1501,220

Total88,75819,852

Source: Updated Rural Electrification Master Plan, 2009

Table 10.2Biogas Potential from Sisal Production

CompanyGeneration Potential (h/yr)Capacity*

Rea Vipingo8,7501500-2000

DWA Estate Ltd.10,5001800-2400

Taita Estate12,6002150-2870

Mogotio Plantations6,3001080-

Kilifi Plantations1,750300-400

Tabu Estate Ltd.1,750300-400

Voi Sisal Estate700120-160

Note: *Assuming 12 to 16 hours full loadSource: Updated Rural Electrification Master Plan