page13
DESCRIPTION
MF 35 Signature Rebuild December 2010 A couple of base coats are used to get a good covering for the 5 acrylic top coats, quick drying time allows the work to continue without leaving hand marks in the paint, final stages of assembly now to check everything works as it should.TRANSCRIPT
MF
35 S
ign
atu
re R
ebu
ild D
ecem
ber
2010
A couple of base coats are used to get a good covering for the 5 acrylic top coats, quick drying time allows the work to continue without leaving hand marks in the paint, final
stages of assembly now to check everything works as it should.