page11

1
MF 35 Signature Rebuild December 2010 Crankshaft reground to 10+ Mains & Big end shells fitted, the old starter ring gear wa cut off and a new ring gear heated up and pushed on.

Upload: dave-mann

Post on 26-Mar-2016

214 views

Category:

Documents


1 download

DESCRIPTION

MF 35 Signature Rebuild December 2010 Crankshaft reground to 10+ Mains & Big end shells fitted, the old starter ring gear wa cut off and a new ring gear heated up and pushed on.

TRANSCRIPT

Page 1: page11

MF

35 S

ign

atu

re R

ebu

ild D

ecem

ber

2010

Crankshaft reground to 10+ Mains & Big end shells fitted, the old starter ring gear wa

cut off and a new ring gear heated up and pushed on.