  • CCU Engineering Specifications

    Section 002742

    SIDEWALKS, DRIVEWAYS, STREETS, PATHWAYS, PARKING LOTS, CONCRETE GUTTER, CURB

    ELEMENTS, AND TRAFFIC SEPARATOR

    Effective Date: Nov. 1st, 2011

    Page 1 of 21

    PART 1 - GENERAL

    The following specification is intended for use for the design, selection of materials, and construction of sidewalks, driveways, streets, pathways, parking lots, concrete gutter, curb elements, and traffic separator, etc. These construction items shall meet the requirements of Charlotte County Community Development, Engineering Division (CCCDED) and the Florida Department of Transportation (FDOT).

    1.1 SCOPE 1.1.1 General:

    The work specified in this section consists of the preparation of sub-grade, construction of the stabilized sub-base, placement of the base material, and placement of the surfacing material.

    1.1.1 Work Included The Contractor shall, unless specified otherwise, furnish all labor, materials, equipment, tools and all other associated appurtenances, necessary to do the work required as specified in the Contract Documents.

    1.1.2 Location of the Work

    The location of this work is as shown on the contract documents.

    1.1.3 Coordination of Work

    The Contractor shall be responsible for the satisfactory coordination of the placement of these construction items with other construction and activities in the area. Delays in work resulting from lack of such harmony shall not in any way be a cause for extra compensation by any of the parties.

    1.1.4 Working Hours

    The work shall be carried out in accordance with local ordinance and not to cause any unreasonable nuisance to affected residents. Under emergency conditions, this limitation may be waived by the consent of Charlotte County Utilities (CCU).

  • Charlotte County Utilities Section 002742 - Sidewalks, Driveways, Streets, Pathways, Parking Lots, Concrete Gutter, Curb Elements, And Traffic Separator

    Effective Date: Nov. 1st, 2011

    Page 2 of 21

    1.2 METHOD OF MEASUREMENT & PAYMENT

    The work shall be measured and the compensation determined in the following manner:

    1.2.1 Sidewalk

    The sidewalk including removal of existing concrete/bituminous and aggregate base sections, saw cutting of existing concrete/bituminous edges, preparation of subgrade, placement of aggregate base, construction of concrete/bituminous surfacing, testing, necessary permits and all other required appurtenances in accordance with the contract documents shall be measured and paid for on a square yard basis.

    1.2.2 Driveway

    The driveways including removal of existing concrete/bituminous and aggregate base sections, saw cutting of existing concrete/bituminous edges, preparation of subgrade, placement of aggregate base, construction of concrete/bituminous surfacing, testing, necessary permits and all other required appurtenances in accordance with the contract documents shall be measured and paid for on a square yard basis.

    1.2.3 Streets

    The streets including removal of existing concrete/bituminous and aggregate base sections, saw cutting of existing concrete/bituminous edges, preparation of subgrade, placement of aggregate base, construction of concrete/bituminous surfacing, replacement of pavement markings, testing, necessary permits and all other required appurtenances in accordance with the contract documents shall be measured and paid for on a square yard basis.

    1.2.4 Pathways

    The pathways including removal of existing concrete/bituminous and aggregate base sections, saw cutting of existing concrete/bituminous edges, preparation of subgrade, placement of aggregate base, construction of concrete/bituminous surfacing, testing, necessary permits and all other required appurtenances in accordance with the contract documents shall be measured and paid for on a square yard basis.

    1.2.5 Parking Lots

    The parking lots including removal of existing concrete/bituminous and aggregate base sections, saw cutting of existing concrete/bituminous edges, preparation of subgrade, placement of aggregate base, construction of concrete/bituminous surfacing, replacement of pavement markings, testing, necessary permits and all other required appurtenances in accordance with the contract documents shall be measured and paid for on a square yard basis.

    1.2.6 Gutter/Swale

  • Charlotte County Utilities Section 002742 - Sidewalks, Driveways, Streets, Pathways, Parking Lots, Concrete Gutter, Curb Elements, And Traffic Separator

    Effective Date: Nov. 1st, 2011

    Page 3 of 21

    The gutter/swale including removal of existing concrete/bituminous and aggregate base sections, saw cutting of existing concrete/bituminous edges, preparation of subgrade, placement of aggregate base, construction of concrete/bituminous gutter/swale, replacement of pavement markings, testing, necessary permits and all other required appurtenances in accordance with the contract documents shall be measured and paid for on a linear foot basis.

    1.2.7 Curb Elements

    The curbs elements including removal of existing concrete/bituminous and aggregate base sections, saw cutting of existing concrete/bituminous edges, preparation of subgrade, placement of aggregate base, construction of concrete/bituminous curb elements, replacement of pavement markings, testing, necessary permits and all other required appurtenances in accordance with the contract documents shall be measured and paid for on a linear foot basis.

    1.2.8 Traffic separator

    The traffic separator including removal of existing concrete/bituminous and aggregate base sections saw cutting of existing concrete/bituminous edges, preparation of subgrade, placement of aggregate base, construction of concrete/bituminous traffic separator, replacement of pavement markings, testing, necessary permits and all other required appurtenances in accordance with the contract documents shall be measured and paid for on a square yard basis.

    1.2.9 Pavement Markings

    All pavement markings removed during the project construction shall be replaced in kind and shall be considered incidental to the project unless a specific bid item is provided.

    1.2.10 Miscellaneous

    All other items required for the completion of the project and not included as a specific bid item shall be considered incidental to the project and no direct compensation will be made therefore.

    1.3 REFERENCED STANDARDS (latest revisions)

    ACI 301 ASTM A82, A185, C150, D-155 FDOT Standard Specifications for Road and Bridge Construction (applicable sections) FDOT Design Standards FDOT Manual of Uniform Minimum Standards for Design, Construction and Maintenance

    for Streets and Highways also known as the Florida Green Book. FDOT Specifications Division III FDOT Standard Index CCCDED Specifications AASHTO (applicable sections) ADA standards

  • Charlotte County Utilities Section 002742 - Sidewalks, Driveways, Streets, Pathways, Parking Lots, Concrete Gutter, Curb Elements, And Traffic Separator

    Effective Date: Nov. 1st, 2011

    Page 4 of 21

    1.4 PARTIAL LISTING OF RELATED SECTIONS

    001570 - Erosion and Sediment Control 001760 - Surveying and Record Drawings 002240 - Dewatering 002340 - Valves 002530 - Submersible Sewage Pump Lift Station-Package Design 002540 - Submersible Sewage Pump Lift Station- Standard Design 002930 - Grassing 003300 - Precast Concrete Products 009900 - Surface Preparation, Painting and Coating 002310 - Pipe Removal, Disposal, Alteration, Modification or Pipe Abandonment Note: This is only a partial listing of related sections. The Contractor shall be responsible to review the entire contract documents.

    1.5 SUBMITTALS 1.5.1 Submittals are required in accordance with the CCCDED Specifications requirements or as

    required by CCU.

    PART 2 - PRODUCTS

    2.1 MATERIALS 2.1.1 General

    a. The materials used in this work shall be in accordance with the appropriate section of the

    current FDOT Standard Specifications for Road and Bridge Construction.

    b. The materials used in this work shall be all new, and conform to the requirements for class, kind, size and material as specified below.

    c. This specification includes references to designated manufacturers to illustrate minimum

    acceptable requirements for products. d. Material of equal quality, detail, function, and performance may be proposed for

    substitution. All requests for substitutions shall be submitted to Charlotte County Utilities (CCU) for approval.

    2.1.2 Concrete 2.1.2.1 Additives

    The following additives shall not be used unless otherwise approved by CCU:

    Accelerating admixtures. Retarding admixtures.

  • Charlotte County Utilities Section 002742 - Sidewalks, Driveways, Streets, Pathways, Parking Lots, Concrete Gutter, Curb Elements, And Traffic Separator

    Effective Date: Nov. 1st, 2011

    Page 5 of 21

    Damp-proofing admixtures. Water repelling admixtures. Series "100" or "15" type admixtures. Calcium chloride.

    2.1.2.2 Streets

    a. The streets concrete shall meet the requirements specified in FDOT Standard

    Specifications Section 346-3 Class I (Special) having a minimum compressive strength of 3,000 PSI after 28 days, and shall have fibermesh reinforcement. "Reinforcement shall be achieved by the addition and distribution of either glass fibers or virgin polypropylene fibers throughout freshly mixed concrete. ASTM C-1116 establishes standards and covers the mixing of fiber-reinforced concrete at the batching plant and its delivery to the job site. Reinforcing fibers shall be used in str