PACS IIDR, Noordwijk 1-2 Mar 2001
ChopperChopper
R. HofferbertR. Hofferbert
D. Lemke, U. Grözinger, O. Krause, U. KlaasD. Lemke, U. Grözinger, O. Krause, U. Klaas
J. Katzer (ZEISS)J. Katzer (ZEISS)
PACS Instrument Intermediate Design ReviewPACS Instrument Intermediate Design Review1-2 Mar 20011-2 Mar 2001
ESTEC, NoordwijkESTEC, Noordwijk
Max-Planck-Institut für Astronomie, HeidelbergMax-Planck-Institut für Astronomie, Heidelberg
Chopper
PACS IIDR, Noordwijk 1-2 Mar 2001
Overview
• Lifetime Model• LM Tests• New Schedule• Open Points• Conclusion
Chopper
PACS IIDR, Noordwijk 1-2 Mar 2001
Lifetime Model
• LM manufacture started Nov 2000 at MPIA, drawings from Zeiss
• Assembly planned for Mar/Apr 2001 at Zeiss
• Design frozen
Chopper
PACS IIDR, Noordwijk 1-2 Mar 2001
Chopper Overview• Fully manufactured at
MPIA mechanical workshop (A. Böhm and co-workers)
housing
mirror
drive unit with 3 coils
position sensor unit
flexible pivot
temperature sensor
I/F point
pigtail with I/F connector
Chopper
PACS IIDR, Noordwijk 1-2 Mar 2001
Rotor
• Al 6061
• 12g, 3.23x10-7kgm2
integratedlightweight mirror
sensor magnet
drive magnets
balancing masses
Chopper
PACS IIDR, Noordwijk 1-2 Mar 2001
Flexural Pivots
• CuBe, double-stage 12°
• 5Nmm/rad
Chopper
PACS IIDR, Noordwijk 1-2 Mar 2001
New Schedule
Mai
00
J un
00
J ul
00
Aug
00
Sep
00
Okt
00
Nov
00
Dez
00
J an
01
Feb
01
Mrz
01
Apr
01
Mai
01
J un
01
J ul
01
Aug
01
Sep
01
Okt
01
Nov
01
Kick Off
Chopper PDR
Freezing of Specs
LM Manufacture at MPI A
LM Assembly at Zeiss
LM Performance / Functional Tests
Lifetimetest at MPI A
Delivery LM
QM Manufacture at MPI A
QM Assembly at Zeiss
QM Tests
Delivery QM
Chopper CDR
Chopper
PACS IIDR, Noordwijk 1-2 Mar 2001
Work to do
• Consider FPU structural analysis (KT) with respect to vibration loads for the
chopper
• Implementation of “PACS black color” for the chopper
– First test on LM spare cover– Qualification for QM, FM, FS (MPE)
• Formal agreement with MPE for proposed QM/FM test procedures (#axes, temperature level)
Chopper
PACS IIDR, Noordwijk 1-2 Mar 2001
Conclusion• Features of promising MPIA prototype nearly
fully adopted in Chopper design of Zeiss Specs to be achieved
• Optimized choice of materials, dimensions, linkage to be verified in LM and QM tests industrial QA guarantees outcomeof a space qualified system
• Interface to warm electronics nearly specifiedminor effort to fix cable routingand launch lock details
• Start of cold lifetime tests in June 2001• QM to be delivered in October 2001
internal
external
Chopper
PACS IIDR, Noordwijk 1-2 Mar 2001
LM TestsL M tes tp lan
w arm u n it
co ld u n it
7 7 K u n it
-----------------
EMC laboratory
a lignment te lescopecryostat
BB e lectronics
position measuringdevice
alignment te lescope
alignment te lescope
visual check
removal from cryostat
warm function check
warm-up to 300Kventing
life time cycling1/3 opereration1/3 ca libration
cold function check
life time cycling1/3 opereration1/3 ca libration
cold function check
life time cycling1/3 opereration1/3 ca libration
cold function check
cold function check
zero position
inclination anglemodulation functionpower consumption
evacuationcool-down to 4K
warm function check
in tegration in to cryostat
vibration test
EMC test
assembly
warm function check
warm-up to 300Kventing
77K function check
cold vibration x-axis
77K function check
evacuationcool-down to 77K
warm function check
in tegration in tovibration cryostat
in x position
warm function check
vibration test
MPIA