package ii part ii.5.2 boq 25 users pre-fabricated septic tank
TRANSCRIPT
-
7/29/2019 Package II Part II.5.2 BOQ 25 Users Pre-Fabricated Septic Tank
1/2
PackageII PartII PH Works
25 USERS PREFABRICATED SEPTIC TANK
SL. NO. QUANTITY DESCRIPTION OF ITEM UNITRATE (in Figures &
Words)AMOUNT
II.5.2. 25 Users Pre-Fabricated Septic Tank
1 Earthwork in excavation OVER AREAS (exceeding
30cms in depth, 1.50mtr width as well as 10 sqm on
plan) in ALL KINDS OF SOIL including disposal of
excavated earth, lead upto 50m and lift upto 1.50m
etc., complete all as per specifications. (Disposed
earth to be levelled by breaking clods if any and neatly
dressed .a) 16 Depth upto 1.5m Cu.M
b) 16 Depth below 1.5m and upto 3.0m Cu.M
2 10 Filling available excavated approved earth (excluding
rock) in trenches, sides of foundations, plinth, etc, in
layers not exceeding 15cms depth breaking clods,
consolidating each deposited layer by ramming,
watering and dressing, etc., complete for lead upto 50m
and all lifts etc., complete as per specifications.
Cu.M
3 1 Providing and fixing SINTEX or approved equivalent
make FRP Anaerobic Septic tank for 25 users with
Each
,
inlet, outlet, vent and necessary FRP Straps, Eye bolt,
wire rope, turn buckle for anchoring and factory made
concrete blocks to counter buoyancy etc all complete
for finished item of work to the satisfaction of EIC.
Product code : PWTS - AM - 600 - 01
Dispersion Trench
4 3 Providing dispersion trench of width 1mtr and
necessary depth with open jointed stoneware pipes of
100mm dia with specials, filtering media, bamboo
matting etc., as follows: (A) Earth excavation in the
strata met with for trenches of 1m width and required
depth including dewatering subsoil and rain water to
keep the area of excavation dry, shoring and strutting
wherever necessary, trimming bottom and levelling to
correct grade and alignment and back filling trenches
with selected excavated material upto a lead of 50m as
specified and directed, supplying and dry filling granite
stone metal of 20mm maximum size including
depositing neatly in layers and level to width of one
metre and depth of 0.45m as directed. (B) Stoneware
glazed pipes and specials of 100mm dia such as tees,
bends etc., as per IS 651 and laying in loose jointswithout any jointing materials,sockets facing down the
gradient with a slope of 1 in 300, open joints held in
place by suitable stone wedges to proper line and level
etc., complete all as specified and directed
Rmt
Page 1 of 2
-
7/29/2019 Package II Part II.5.2 BOQ 25 Users Pre-Fabricated Septic Tank
2/2
PackageII PartII PH Works
25 USERS PREFABRICATED SEPTIC TANK
SL. NO. QUANTITY DESCRIPTION OF ITEM UNITRATE (in Figures &
Words)AMOUNT
C) Supplying and dry filling of granite stone metal
12mm average size including depositing neatly in
layers and levels of dimensions 1m x 0.15m for filter
beds as specified and directed. (D) supply and laying
in position two layers of bamboo matting with surface
treated with bitumen and joints staggered on filter beds
all as directed and specified. (E) Supply and laying of
one layers of 1000 gauge (250 microns) thick LDPE
film conforming to IS 2508 - 1977 over the bamboo
matting all as specified and directed.
TOTAL
Page 2 of 2