Page 1: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides

PacificCoastCongressofHarborMaster&PortManagers

Page 2: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides

“Getting It Done” •  TheCrescentCityHarborhasalonghistoryofdamageanddestruc7onfromtsunamis.

•  Thecityexperiencedtsunamicondi7ons317mesbetween1933and2008

•  In1964,12peoplewerekilledand19blocksofthedowntownareawasdestroyed.

•  Todaywe’lldiscusshowtheharborrecoveredfromthe2006and2011tsunamis

Presenters:

•  EllenJohnck,EllenJohnckConsul7ng

•  PatrickBailey,CrescentCityHarborDistrictBoardofHarborCommissioners

•  CharlieHelms,CEO/Harbormaster,CrescentCityHarborDistrict

•  AnitaYao,Wharfinger,PortofSanFrancisco

Page 3: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides

The 2006 Round of Destruction started on November 15

Page 4: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides
Page 5: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides

2006 Tsunami •  The2006tsunamidamagedtheharborbutthetrueseverityofthedamageswerediscoveredoveraperiodofmonths

•  Theoriginaldamagees7matedidnotqualifytheeventforFederalAssistance

•  TheHarborDistricthadtofindawaytoraise$5milliondollarstocoverit’sshareoftherebuild

• CALOfficeofEmergencyServicesdidnotwanttoupgradetheharbor–theirgoalwastoputitbackthewayitwas

•  Theywouldpayforalimitedamountofhazardmi7ga7on–upto15%ofprojectcost

• HoweverCALOESwouldpayforupgradesrequiredbycodesandstandards

Page 6: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides
Page 7: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides

The question was “What are the Codes and Standards for Marina design in a

tsunami zone?” Theanswer:NONE!

•  Therewerenostandardsfortsunamisin2006buttherewereguidelinesforHurricanes

•  Thedesignreturnperiodonhurricanesshouldbebalancedagainsttheexpectedlifeofthemarina,andcompliancewithlocalcodesandordinances.Keepinmindthatcodesareminimumdesigncriteriaandincreasedstrengthandreliabilitymaybemoreeconomicalinthelongrun

•  Therecommendeddesignperiodforhurricanes(windand7dalsurge)isnormally50years(2%probability,inanygivenyear)and25years(4%probabilityinanygivenyear)shouldbeconsideredtheabsoluteminimumdesignperiod.Thisistrueeveniftheexpectedlifeoftheoffshorefacili7esislessthan25years.

Page 8: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides
Page 9: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides

Ben C. Gerwick / COWI Tsunami Study

•  TheHarborDistrict,inanefforttosupportit’sasser7onthatthemostefficientwaytorebuildtheharborwastousethe50yearHurricanestandard,hiredtheBenC.Gerwickengineeringgroup,nowapartoftheCOWIorganiza7on,toconstructapredic7vemodelfortsunamiflowintotheCrescentCityHarbor

•  TheHarborwantedevidencethatitcouldusetoconvincetheCALOfficeofEmergencyServices(CALOES)thatrebuildingtheharbortoafifyyearreturnstandardwouldactuallybemorecostefficientthanjustreconstruc7ngthemarinatoitspriorstate

Page 10: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides
Page 11: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides
Page 12: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides
Page 13: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides

Ben C. Gerwick/COWI Study Results •  Thepreviousslidesshowthepredictedflowandvelocityofatsunamisimilartothe2006tsunamiintheCrescentCityHarbor

•  Flowsofover6meterspersecond(11.6knotsor13.4milesperhour)arepredictedalongtheseawallatthemouthoftheharbor

•  Thehighvelocityflowcon7nuesintotheharboritselfandbringsitsfullforceonto“H”dockandcon7nuestobaier“G”and“F”withsimilarforce

•  Thedestruc7vethenflowsthroughouttheharborinagenerallyclockwiseflowatreducedveloci7es

Page 14: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides

Ben C. Gerwick/COWI Code Findings • Bri=shCode(BS6349-1:2000):“Normallyadesignworkinglifeoftheorderof50yearsisexpected”

• AustralianCode(as3962-2001):"Strengthlimit-stateloadsshouldbecalculatedfora1ina50yearreturnperiodforwind,wave,surgeandfloodingloads“

•  EM(1110-2-1615):"Theeconomicdesignlifeofmostsmallboatprojectsis50years"

•  EuropeanCode(R46):For"portinstalla7onsfor(…)industrialopera7ons(…)only25years[designservicelife]canbefiguredon"

Page 15: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides

2006 to 2011 •  TheHarborDistrictwasabletosecureaCommunityDevelopmentBlockGrant(CDBG)for$5millionwhichwasusedtocovertheharbor’s25%costobliga7onforitsshareofthe2006tsunamirepairs

•  ThegrantwasawardedtotheHarborsothattheDistrictcoulddemonstratetheeconomicimpactthefishingfleetandassociatedbusinesseshadonthecounty

•  Inthemean7me,theHarborDistrictthroughitsDistrictEngineer,StoverEngineering,filedforthepermitsneededtobegintheharborrebuild

•  StoverEngineeringmanagedthedesignandpermiqngprocess

•  ThepermitspathwayconformedtotheCALOESstandardofrebuildingtheharbortoitsformercondi7on

Page 16: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides

The Harbor’s reconstruction permit was issued in late February 2011 – just a few

weeks before the Harbor was completely destroyed

S7llstakenfromUSCGvideofilmedduringthetsunamievent

Page 17: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides

The flow pattern of the 2011 tsunami was an amazing match to what was predicted in the Ben C. Gerwick/ COWI Study

S7llstakenfromUSCGvideosfilmedduringthetsunamievent

Page 18: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides

Following the 2011 tsunami devastation, the California Coastal Commission put the rebuild debate to rest by mandating that a fifty year

tsunami resistant harbor be constructed

Page 19: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides

To meet the fifty year standard, pilings were upgraded from 16 inch diameter to 31 inch diameter pilings which

were driven into bedrock

Page 20: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides

The Bellingham Marine Unibolt concrete dock system was selected for the new harbor

Page 21: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides

After dredging operations were completed in the Inner Boat Basin, the Outer Boat Basin and the federal channel were dredged while the Inner Harbor was being reconstructed

Page 22: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides

Surge suppression dock at Harbor entrance (Photo courtesy of Bellingham Marine)

Page 23: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides

View of Inner Boat Basin Piling Frequency (Photo courtesy of Bellingham Marine)

Page 24: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides

Viewfacing“H”Dock(PhotocourtesyofBellinghamMarine)

Page 25: Pacific Coast Congress of Harbor Master & Port …pccharbormasters.org/wp-content/uploads/2017/08/Rebuilding-after... · Ben C. Gerwick/COWI Study Results • The previous slides

The West Coast’s First Fifty Year Tsunami Resistant Harbor The Crescent City Harbor District

(Photo courtesy of Bellingham Marine)