p12 mughalsarai slip road 5.0 m wide howrah condition of the bridge and its components should be...
TRANSCRIPT
MU
GH
ALS
AR
AI
HO
W
RA
H
DF
CC
TR
AC
K O
N T
HIS
SID
E
EX
IST
ING
RA
ILW
AY
BO
UN
DA
RY
R
O
W
O
F N
H
FU
TU
RE
IR
TR
AC
K-1
IR T
RA
CK
UP
/LIN
E
IR R
EV
ER
SIB
LE
TR
AC
K
IR T
RA
CK
DN
/LIN
E
PR
OP
OS
ED
DF
CC
IL T
RA
CK
-1
PR
OP
OS
ED
DF
CC
IL T
RA
CK
-2
L
C
L
C
L
C
L
C
L
C
L
C
R
O
W
O
F N
H
EX
IST
ING
RA
ILW
AY
BO
UN
DA
RY
-3
00
.0
00
m
-
2
0
0
.
0
0
0
m
-
1
0
0
.0
0
0
m
0
.0
0
0
m
1
0
0
.0
0
0
m
P
1
3
P
1
4
P
1
5
P
1
6
P
1
7
P
1
8
P
1
9
S
L
IP
R
O
A
D
5
.0
M
W
ID
E
S
L
IP
R
O
A
D
5
.0
M
W
ID
E
1
8
0
0
0
1
8
0
0
0
1
8
0
0
0
1
8
0
0
0
1
8
0
0
0
6
3
5
0
0
1
8
0
0
0
1
2
0
0
0
3
1
2
8
0
3
1
2
8
0
2
2
3
8
0
8
5
0
0
P12
P11
P10
P
7
P
6
P
4
P
3
P
2
P
1
A
1
1
8
0
0
0
1
8
0
0
0
1
8
0
0
0
1
8
0
0
0
1
8
0
0
0
1
8
0
0
0
1
8
0
0
0
1
8
0
0
0
S
L
IP
R
O
A
D
5
.0
M
W
ID
E
S
L
IP
R
O
A
D
5
.0
M
W
ID
E
SLIP
RO
AD
5.0 M W
IDE
SLIP
RO
AD
5.0 M W
IDE
1
5
2
6
1
5
0
0
0
STATE GOVT. U.P
DESIGNATIONSIGNATURE
EXECUTIVE ENGINEER
DFCCIL/MGS
DESIGNATIONSIGNATURE
CPM/DFCCIL/MGS
( A K MISHRA)
DY CPM/ENGG/DFCCIL
XEN/BR/HJPDY CE/BR/HJPCBE
REFERENCE RDSO DRAWING NO : RDSO/B -
HQ ECR HJP
MGS DIVISION
Sr. DOM/MGS
Sr. DEN/Co-ORD/MGS
Sr. DEN-I/MGS
Sr. DSTE/MGS
Sr. DEE/TRD/MGS
Sr. DEE/G/MGS
DPM/ENGG/DFCCIL
DFCCIL DRG NO.
ALL THE DIMENSIONS SHOWN ARE TENTATIVE AND MAY UNDERGO CHANGES DURING FINAL DESIGN.
M
U
G
H
A
L
S
A
R
A
I
H
O
W
R
A
H
R
O
W
O
F
N
H
F
U
T
U
R
E
IR
T
R
A
C
K
-1
IR
T
R
A
C
K
U
P
/L
IN
E
IR
R
E
V
E
R
S
IB
L
E
T
R
A
C
K
IR
T
R
A
C
K
D
N
/L
IN
E
P
R
O
P
O
S
E
D
D
F
C
C
IL
T
R
A
C
K
-1
P
R
O
P
O
S
E
D
D
F
C
C
IL
T
R
A
C
K
-2
RAILWAY BOUNDARY
L
C
L
C
L
C
L
C
L
C
L
C
-100.000m
0.000m
5
0
3
8
P13 P14
SLIP ROAD 5.0 M WIDE
SLIP ROAD 5.0 M WIDE
2
4
9
1
11°
5
8
6
8
4
3
0
0
3
1
3
5
4
0
3
5
2
5
0
0
6
7
6
9
1
3
3
0
3
18000 C/C OF PIER63500 C/C OF PIER 18000 C/C OF PIER12000 C/C OF PIER31280 C/C OF PIER31280 C/C OF PIER22380 C/C OF PIER
8500
P
1
2
P
1
1
P
1
0P9P8
4
3
0
0
4
1
2
7
R
O
W
O
F
N
H
5610(SK)
5517(SQ)
5389(SK)
5300(SQ)
6529(SK)
6420(SQ)
4836(SK)
4733(SQ)
7391(SK)
7953(SQ)
1526(SK)
1500(SQ)
4617(SK)
4538(SQ)
6104(SK)
6000(SQ)
19034(SK)
19403(SQ)
1526(SK)
10487(SK)
1500
1526(SK)
20867
1
0
3
0
0
1
2
5
0
0
2
5
0
0
4
3
0
0
1
0
3
0
0
1
2
5
0
0
3000
4300
15000
3000
4300
RAILWAY BOUNDARY
RAILWAY BOUNDARY
RAILWAY BOUNDARY
11°
24011
22148
1500
DFC RAIL LEVEL=76.082
30000 C/C OF BEARING
30900 OVERALL LENGTH OF GIRDER
31280 C/C OF PIER
PROPOSED ROAD LEVEL = 84.940
2305
6553
2500
2000
Ø1500
6500
1500
PR
OP
OS
ED
D
FC
CIL
TR
AC
K-1
L
C
PR
OP
OS
ED
D
FC
CIL
TR
AC
K-2
L
C
Ø1500
18000 C/C OF PIER18000 C/C OF PIER12000 C/C OF PIER
P11 P12 P13 P14
SLOPE 1:30
6500
1500
3600
6200
1800
2000
4617(SK)
4538(SQ)
6104(SK)
6000(SQ)
19034(SK)
18715(SQ)
2500
Ø1500
2150
6000
1500
2000
2500
30000 C/C OF BEARING
30900 OVERALL LENGTH OF GIRDER
31280 C/C OF PIER
P10P8 P9
OVERALL SPAN 63400
ROAD FRL 84.940
EFFECTIVE SPAN 62000
Ø1500
2920
6000
1500
2000
3000
Ø1500
2500
6500
1500
3000
22380 C/C OF PIER
Ø1500
FU
TU
RE
IR
TR
AC
K-1
L
C
IR
T
RA
CK
DN
/LIN
E
L
CIR
R
EV
ER
SIB
LE
TR
AC
K
L
C
IR
T
RA
CK
UP
/LIN
E
L
C
5610(SK)
5517(SQ)
5389(SK)
5300(SQ)
6529(SK)
6420(SQ)
4836(SK)
4733(SQ)
7391(SK)
7953(SQ)
DIAGRAM "A"
6723
2305
PROPOSED ROAD LEVEL = 84.940PROPOSED ROAD LEVEL = 84.940
RO
W O
F N
H
RO
W O
F N
H
PROPOSED ROAD LEVEL = 77.059
6676
1200
IR RAIL LEVEL=75.912
2155
6300 6300
7500
450450
15501550
12000
2.5 % Slope 2.5 % Slope
250MM THK DECK SLAB
65 MM THK WEARING COAT
STEEL CROSS BEAM
RCC CRASH BARRIER
STEEL TIE BEAM
1200
A
DRAIN PIPE
634
PEDESTAL
POT/PTFE
BEARING600
1250
1250
3750
6500
PILE CAP
1500
13300
3000 3000 3000 3000
LADDER
3500 Ø1500Ø1500
5000
37507500
15000
OF GIRDER
C
L
AT OBLIGATORY SPAN
P8
7500200
PILE CAP
6000
1500
2155
250MM THK DECK SLAB
RCC CRASH BARRIER
2500 7000 2500
10300
3000 3000 3000
1500 450 2001500450
11800
2500 2500 2500 2500
LADDER
1000
1150
375
500
438
P10
12000
3500 Ø1500Ø1500
5000
2000
OF GIRDER
C
L
AT OBLIGATORY SPAN
7500
200
PILE CAP
6500
1500
2305
250MM THK DECK SLAB
RCC CRASH BARRIER
2500 7000 2500
10300
3000 3000 3000
AT OBLIGATORY SPAN
1500
450 200
1500450
11800
2500 2500 2500 2500
12000
3500 Ø1500Ø1500
375
1000
1000
500
LADDER
P11
438
OF PIER
C
L
5000
SECTIONAL ELEVATION
(SCALE 1:200)
(SECTION AT AS OF ROAD ALIGNMENT)
C
L
650 3000 650
650
3000
3000
3000
650
4300
10300
Ø
1
5
0
0
Ø
1
5
0
0
2650
5000
2650
2150 2150
PLAN OF PILES & PIER LAYOUT
OF PIER
C
L
SLOPE 1:30
HALF BOTTOM & HALF TOP PLAN
(SCALE 1:200)
KEY PLAN
(SCALE N.T.S.)
200 0 200 400 600cm
SCALE
DATE
SH. NO.
REV.
OCTOBER, 2017
2 OF 3
RITES/RI/RCED/DFC/ROB. 75C/GA.
PROPOSED TWO LANE ROB
SPAN 2x30.00 FOR OBLIGATORY SPAN
IN LIEU OF L-XING NO 75,
(SKEW ANGLE AT IR-11°& DFCC 11°)
(TVU-50707, DT.08/2015)
ON MUGHALSARAI - GAYA SECTION
OF EAST CENTRAL RAILWAY MUGHALSARAI
GENERAL ARRANGEMENT DRAWING
FOR DRAFT
R0
DRG.
NO.
100 0 100 200 300cm
DRAWN BY AM/D JGM/D GGM/D
(SUNEEL KUMAR) (ATIF AHMED) (D.S. NEGI) (A.K. MATHUR)
RITES LTD.
NOTES:-1. ALL DIMENSION ARE IN MM. AND LEVELS ARE IN METERS UNLESS SPECIFIED OTHERWISE.
2. DIMENSION ARE NOT TO BE SCALED ONLY WRITTEN DIMENSION ARE TO BE FOLLOWED.
3. ALL THE DIMENSIONS SHOWN SHOULD BE VERIFIED AT SITE BEFORE TAKING UP DESIGN WORK IN HAND. ANY
DISCREPANCY NOTED SHOULD BE FORWARDED THROUGH ALTERATIONS DULY SIGNED.
4. MAXIMUM SAFE BEARING CAPACITY AT THE FOUNDING LEVEL CONSIDERED AS PER GEOTECHNICAL REPORT. IF
IT IS LESS THAN THE BASE PRESSURE, THE FOUNDATION HAS TO BE REDESIGNED.
5. DRAINAGE SPOUT SHALL BE PROVIDED AS PER MORTH SPECIFICATION.
6. EXPOSURE CONDITION OF THE BRIDGE AND ITS COMPONENTS SHOULD BE DECLARED AS PER IRC 21-2000/IRC
112/IS:456. ALL SPECIFICATION LAID DOWN IN IRC CODE/IS:456 CODE FOR RELEVANT EXPOSURE CONDITION
SHALL BE FOLLOWED.
7. FOR DETAILS OF SUBSTRUCTURE AND FOUNDATION REFER SEPARATE DRAWING DULY APPROVED BY RAILWAY.
8. WORK SHOULD BE CARRIED OUT UNDER THE SUPERVISION OF RAILWAY ENGINEERS WITHIN RAILWAY LAND
LIMIT.
9. SANCTION OF CRS SHOULD BE OBTAINED PRIOR TO EXECUTION OF PROPOSED WORK.
10. TYPE OF BEARING :- POT-PTFE
11. SUITABLE UTILITY DUCTS IF REQUIRED SHOULD BE PROVIDED BELOW FOOTPATH SLAB WITH THE APPROVAL OF
ENGINEER IN CHARGE.
12. DESIGN SHALL BE AS PER LATEST RELEVANT CODE OF IRC INCLUDING SP-33 AND OTHER CODES AS APPROVED
BY M.O.S.T.
13. STATE GOVT./PRIVATE AUTHORITIES SHOULD BE ENSURE DURING EXECUTION OF WORK SAFETY OF RUNNING
RAIL TRAFFIC SHOULD NOT BE AFFECTED.
14. SUITABLE SR, IF REQUIRED SHOULD BE IMPOSED BEFORE TAKING UP THE EXECUTION OF WORK WITH THE
APPROVAL OF ENGINEER IN CHARGE.
15. TEMPORARY SIGNALLING ARRANGEMENT WILL BE DONE AS PER G.R.15.09 (I)D &S.R 15.09 (2) OR GR15.09(2)B &S.R
15.09(2) WHICHEVER IS ADOPTABLE IF REQUIRED.
16. LOADING STANDARD OF ROB AS PER IRC-6:2000.
17. FULL FLEDGED LOAD TEST OF SUPER STRUCTURE SHOULD BE DONE AS PER IRC-SP-5 TO ENSURE QUALITY
WORK.
18. CONCRETE DESIGN MIX.
RCC DECK SLAB : M40 PIER,PIER CAP,PILE,PILE CAP : M35
CRASH BARRIER : M40 PEDESTAL : M40
LEVELING COURSE : M15
19. MANNED LEVEL CROSSING NO 78-C EXIST AT THIS LOCATION.
20. L.C. SHALL BE CLOSED SIMULTANEOUSLY WITH COMMISSIONING OF ROB AND NOC IN THIS REGARD HAS BEEN
ISSUED BY STATE GOVT. VIDE LETTER NO.............................................................. DATED ......./....../.............
21. TVU OF L.C. IS 50707 OF DATED 08/2015.
22. TEMPORARY DIVERSION OF ROAD TRAFFIC DURING CONSTRUCTION OF ROB/RUB WILL BE THROUGH DIVERSION
ROAD. AUTHORITY WILL ENSURE DIVERSION OF EXISTING ROAD TRAFFIC THROUGH THE PROPOSED DIVERSION
BEFORE EXECUTION.
23. REINFORCEMENT SHALL BE TMT DEFORMED BARS GRADE Fe 500 CONFORMING TO IS 1786.
24. PROVISION OF CLAMPS IN THE SUPERSTRUCTURE FOR THE SUPPORTING THE AC TRACTION WIRE TO BE MADE
INVARIABLY IN CONSULTATION WITH CONCERN AUTHORITIES BASED ON TYPICAL DRAWING.
25. ALL R.C.C./P.C.C. WORK SHOULD CONFORM TO RELEVANT IS/IRC CODES & MOST SPECIFICATION.
26. FOR FABRICATION, WORKMANSHIP, INCEPTION & TESTING, PROTECTION AGAINST CORROSION ETC. RELEVANT
PROVISION OF IRC-24-2001 SHALL BE FOLLOWED.
27. THE DEPTH OF FOUNDATION SHOWN IN THIS DRAWING IS TENTATIVE & SHOULD BE DECIDED BY COMPETENT
AUTHORITIES AS PER ACTUAL SOIL PROPERTIES AND DESIGN CALCULATION.
28. REPRESENTATIVE OF TELECOM & SIGNAL DEPARTMENTS SHOULD BE MADE AVAILABLE BEFORE
COMMENCEMENT OF PROPOSED WORK , IN THE VICINITY OF SIGNAL & TELECOM CABLE.
29. TEMPORARY ARRANGEMENT DRAWING OR METHODOLOGY TO LAUNCHING OF GIRDERS OVER RAILWAY TRACK
SHOULD BE GOT APPROVED FROM RAILWAY AUTHORITY BEFORE START THE WORK.
30. DIMENSION GIVEN IN THIS DRAWING MUST BE RECONCILED AT SITE BEFORE START OF WORK FOR FEASIBILITY.
31. PRECAUTIONARY MEASURES FOR CONSTRUCTION OF ROB ON DEPOSIT WORK/COST SHARING WORK WITH
STATE GOVT. AND PRIVATE AGENCY ISSUED BY ADVISOR CIVIL ENGINEERING RAILWAY BOARD LETTER NO.
97/CE-1/BRO/158(POLICY)PT.-II, DATED -16.07.2009, 27.10.2009, 15.02.2011 & 09.07.2012 SHOULD BE STRICTLY
FOLLOWED.
32. NO CONSTRUCTION JOINT SHALL BE NORMALLY ALLOWED IN CONCRETE WORKS WITHOUT SPECIAL
PRECAUTIONS AS PER THE RELEVANT BRIDGE CODES AND SUITABLE PROTECTION PAINTING OF APPROVED
MAKE SHOULD BE USED TO PAINT THE UNDERSIDE OF CONCRETE ROB GIRDERS ALSO TO ENSURE LONG LIFE.
33. CONTROLLED CONCRETE WITH WEIGH BATCHING SHALL BE USED.
34. GUARD RAIL SHOULD BE PROVIDED IN THE TRACK NEAR THE ISOLATED PILLAR OF ROB. NO CONSTRUCTION
JOINT SHALL BE ALLOWED IN PSC OR RCC SLAB OR GIRDER AND CURING OF ALL CONCRETE AND MASONRY
WORKS AS PER THE RELEVANT CODES OF PRACTICE SHALL BE ENSURED BEFORE USE.
35. INSPECTION LADDER/STEPS SHOULD BE PROVIDED TO ENSURE PROPER INSPECTION/ACCESSIBILITY OF ROB.
36. STRUCTURAL STEEL SHALL CONFIRM TO IS:2062 (GRADE - B).
37. STRIP SEAL TYPE EXPANSION JOINTS SHALL BE PROVIDED AS PER LATEST MOST REQUIREMENT, CONTRACTOR
SHOULD FURNISH DESIGN/DRAWING OF EXPANSION JOINTS FROM FIRMS APPROVED BY MOST AT VARIOUS
RELEVANT AMBIENT TEMPERATURE TO SUIT SITE CONDITIONS WITH THE APPROVAL OF ENGINEER IN CHIEF.
38. TO PROTECT THE CONCRETE FROM DAMAGE DUE TO SMOKE OF LOCOMOTIVES, 4.00M WIDE STRIP WITH
POLYSULPHIDE PAINT PREFERABLE IN BLACK COLOUR SHALL BE PROVIDED IN THE SOFFIT OF THE DECK OVER
RUNNING TRACKS.
39. STANDARD MAINTENANCE AGREEMENT SHOULD BE EXECUTED WITH RAILWAY AND STATE GOVT. AUTHORITIES
FOR GRANT OF PERMISSION FOR CONSTRUCTION OF ROB/RUB IN RAILWAY PORTION.
40. ROAD AUTHORITY SHOULD ENSURE THAT BEFORE LAYING OF ANY NEW WEARING COAT IN FUTURE EXISTING
WEARING COAT SHOULD BE COMPLETELY REMOVED.
41. NO WORK SHOULD BE TAKEN UP IN HAND TILL PROOF CHECKED DESIGN AND DRAWING WITHIN RAILWAY
PORTION AREA APPROVED BY RAILWAY.
42. ALL STEEL STRUCTURES SHOULD HAVE ANTI - CORROSIVE PROTECTION OF LONG DURABILITY.
43. FOR DETAILS OF SUPER STRUCTURE OF RAILWAY SPAN OF 30.00M SPAN REFER RDSO'S DRG. NO.
RDSO/B-11755/R, AND FOR 36M GIRDER REFER RDSO'S DRG. NO.RDSO/B-11757/R.
44. ANY CHANGE IN THE GAD FOR RAILWAY PORTION SHOULD BE DONE WITH PRIOR APPROVAL OF RAILWAY.
45. CLEAR COVER TO OUTER MOST STEEL SHALL BE AS UNDER
A. FOR SUPER STRUCTURE - 50MM.
B. FOR FOUNDATION - 75MM.
C. FOR ABUTMENT, DIRT WALL AND RETURN WALL - 50MM.
46. BACK FILLING BEHIND ABUTMENTS SHALL CONSISTS OF SELECTED EARTH CONFORM TO SOIL PROPERTIES C=0.0,
Ø=30° Y =18KN/SQM.
47. FOR JACKING UP THE GIRDER FOR ANY HANDLING REQUIREMENTS IN FUTURE SUCH AS FOR REPLACEMENT OF
BEARING OR ANY OTHER WORK REQUIRED. SUITABLE FEATURES SHOULD BE PROVIDED TO ENABLE JACKING.
48. THE DIMENSIONS & LEVELS SHOWN IN THE GAD ARE SUBJECT TO CHANGES AS PER SITE REQUIREMENT AND
WILL BE DONE WITH PRIOR APPROVAL OF RAILWAY.
49. THE BRIDGE IS DESIGNED FOR SEISMIC ZONE III.
50. DIMENSIONS MAY GET CHANGED AFTER ITS DETAILED DESIGN.
51. AS PER DATA GIVEN BY DFC OFFICIAL, THE DISTANCE BETWEEN PROPOSED DFC TRACK FROM DN LINE AND ITS
PROPOSED LEVEL HAVE BEEN SHOWN IN THE DRAWING.
52. PROVISION OF EXPANSION JOINT SHOULD BE BEYOND THE GIRDER.
53. GIRDER SHALL BE METALISED AS PER IRS-B1-2001
54. VERTICAL CLEARANCE WILL BE TAKEN FROM HIGHEST RAIL LEVEL
55. VERTICAL CURVE WILL BE PROVIDED WHEREVER THERE IS CHANGE IN GRADIENT IN APPROACHES AS PER IRC
SP-23.
56. SAFE BEARING CAPACITY AT FOUNDING LEVEL SHALL BE TAKEN AND TO BE VERIFIED AT SITE IF REQUIRED.
57. RESTRAINER ON BOTH SIDE OF OUTERMOST GIRDER ON PIER CAP & ABUTMENT CAP WILL BE PROVIDED IN
SEISMIC ZONE IV & V.
58. DRAWING FOR SHIFTING OF LC WILL BE GOT APPROVED FROM COMPETENT AUTHORITY BEFORE
START OF WORK.
59. S&T CABLE SHOULD BE SHIFTED BEFORE UNDER TAKING DIGGING OR TRENCHING NEAR IR
TRACK BY S&T/CONSTRUCTION.
60. APPROACH SPAN CONFIGURATION ARE INDICATIVE ONLY. FINAL SPAN OF APPROACH SPAN DECIDED BY
UPSBCL END.
OPERATION SCHEDULE FOR RAILWAY SPAN:1. TRACK SHALL BE PROTECTED SUITABLY DURING THE CONSTRUCTION OF BRIDGE/ROB FOR SAFETY OF
RUNNING TRAIN.
2. ADEQUATE MEASURES SHALL BE TAKEN AT SITE TO ENSURE SAFETY FOR WORKING MEMBERS, MATERIALS,
EQUIPMENTS, TRAFFIC ETC.
3. FOR SHIFTING OF THE MASTS AND SIGNALING EQUIPMENTS, DIVISION MAY BE CONSULTED AS PER EXTANT
RULES.
4. FOR LAUNCHING OF GIRDERS OVER RAILWAY TRACK, SUITABLE BLOCK WILL BE TAKEN WITH ADVANCE
INTIMATION.
5. DETAILED STRUCTURAL DRAWINGS OF THE ROB SHALL BE APPROVED BY COMPETENT AUTHORITY.
6. LAUNCHING SCHEME SHALL BE APPROVED BY CBE/E.C.Rly/HJP BEFORE EXECUTION OF WORK.
7. DRAWING APPROVAL SHALL BE SUBJECTED TO APPROVAL OF ALIGNMENT AND LEVELS BY STATE GOVT.
8. CONSTRUCTION SEQUENCE:-
(i) CONSTRUCTION OF SUITABLE FOUNDATION FOR PIERS.
(ii) CONSTRUCTION OF PIERS, ABUTMENT, PIER CAP AND ABUTMENT CAP.
(iii) CONSTRUCTION OF RCC PEDESTALS.
(iv) FABRICATION OF STEEL GIRDERS, CROSS GIRDERS AND DIAPHRAGMS ETC.
(v) POSITIONING OF CRANES FOR LIFTING AND PLACEMENT OF GIRDERS WITH RAILWAY
TRAFFIC BLOCK IMPOSED AND LAUNCHING OF GIRDERS.
(vi) CASTING OF RCC DECK SLAB WITH SHUTTERING SUPPORTED ON GIRDERS.
(vii) REMOVAL OF STAGING AND SHUTTERING OF DECK SLAB.
(viii) COMPLETION OF ANCILLIARY WORKS LIKE CRASH BARRIER, RAILING, WEARING COURSE, EXPANSION JOINT
ETC.
9. ALL SAFETY RULES SHALL BE FOLLOWED DURING EXECUTION OF WORK
10. RAILWAY AUTHORITIES SHALL BE INFORMED BEFORE STARTING ANY WORK. INSTRUCTIONS GIVEN BY RAILWAY
AUTHORITIES TIME TO TIME DURING EXECUTION SHALL BE FOLLOWED.
SANCTION OF CRS TO BE TAKEN PRIOR TO EXECUTION OF WORKSPECIAL NOTES:
1. LAUNCHING SCHEME OF THE RAILWAY SPAN GIRDER WILL BE SUMITTED SEPARATLY.
2. MAINTENANCE AGREEMENT TO BE EXECUTED BEFORE EXECUTION OF WORK.
3. NO WORK WITHIN RAILWAY BOUNDARY TO BE DONE WITHOUT PRESENCE OF RAILWAY REPRESENTATIVE.
4. GIRDERS OVER ROB PROPER TO BE FABRICATED PREFERABLY BY RDSO APPROVED FIRMS.
5. SEE SEPARATE DRAWING FOR FOUNDATION, SUB STRUCTURE & OTHER STRUCTURAL DETAILS.
6. APPROVAL FOR CONSTRUCTION OF ROB ON PILE FOUNDATION HAS BEEN OBTAINED BY CAO/CON/SOUTH VIDE
NOTE NO. - ECR/CE/CON/S/ROB DATED 22.03.2017.
7. SUITABLE RE WALL/ RE TURN WALL WILL BE PROVIDED AS PER DESIGNE WHERE EVER REQUIRED.
MANAGER/D
(MD. NONAM)
EAST CENTRAL RAILWAY (E.C.RLY)