McCARTHY BUILDING COMPANIES NM, 1717 LOUISIANA BLVD NE STE 204, ALBUQUERQUE NM 87110 ALBUQUERQUE PUBLIC SCHOOLS District #12 P.O. BOX 25704 ALBUQUERQUE, NEW MEXICO 87125-0704 Detach at Perforation Before Depositing Check WELLS FARGO BANK, N.A. ALBUQUERQUE, NEW MEXICO 11/24/1210 PAY EXACTLY *0.D 9070 *0.D tO.D gO.D 9070 9070 9070 PAY MCCARTHY BUILDING COMPANIES NM TQTHE 1717 LOUISIANA BLVD NE STE 204 oF ALBUQUERQUE NM 87110 (24807) ALBUQUERQUE PUBLIC SCHOOLS District #12 P.O. BOX 25704 ALBUQUERQUE, NEW MEXICO 87125-0704 (24807) RETURN SERVICE REQUESTED McCARTHY BUILDING COMPANIES NM 1717 LOUISIANA BLVD NE STE 204 ALBUQUERQUE NM 87110 I.QI)]Elialill 11/04/2015 No. 820765 Date: 11 M/15 (24807) *:'*:..i=..0=..·'.w,I; i, 820765 Void After 180 Days NON-NEGOTIABLE ALBUQUERQUE PUBLIC SCHOOLS 1-· Invoice Number Description Invoice Date Gross Amount Discount Amount Net Amount Paid APP 05 - WHERRY ES 3026363 10/31/15 $461,391.00 $0.00 $461,391.00 3 TOTALS: $461,391.00 $0.00 $461,391.00 61% 6.W//Z=.41"%lili%11 $ ***461,391.00

Upload: others

Post on 24-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: p.0.# 40% (034 3 /PAPER 10...Oct 08, 2015  · mccarthy building companies nm, 1717 louisiana blvd ne ste 204, albuquerque nm 87110 albuquerque public schools district #12 p.o. box

McCARTHY BUILDING COMPANIES NM, 1717 LOUISIANA BLVD NE STE 204, ALBUQUERQUE NM 87110

ALBUQUERQUE PUBLIC SCHOOLS

District #12P.O. BOX 25704

ALBUQUERQUE, NEW MEXICO 87125-0704

Detach at Perforation Before Depositing Check

WELLS FARGO BANK, N.A.ALBUQUERQUE, NEW MEXICO11/24/1210

PAY EXACTLY*0.D 9070 *0.D tO.D gO.D 9070 9070 9070

PAY MCCARTHY BUILDING COMPANIES NMTQTHE 1717 LOUISIANA BLVD NE STE 204

oF ALBUQUERQUE NM 87110(24807)

ALBUQUERQUE PUBLIC SCHOOLS

District #12

P.O. BOX 25704

ALBUQUERQUE, NEW MEXICO 87125-0704(24807)

RETURN SERVICE REQUESTED

McCARTHY BUILDING COMPANIES NM

1717 LOUISIANA BLVD NE STE 204

ALBUQUERQUE NM 87110

I.QI)]Elialill

11/04/2015

No. 820765

Date: 11 M/15

(24807)

*:'*:..i=..0=..·'.w,I; i,

820765

Void After 180 Days

NON-NEGOTIABLE

ALBUQUERQUE PUBLIC SCHOOLS

1-·

Invoice Number Description Invoice Date Gross Amount Discount Amount Net Amount Paid

APP 05 - WHERRY ES 3026363 10/31/15 $461,391.00 $0.00 $461,391.00

3

TOTALS: $461,391.00 $0.00 $461,391.00

61% 6.W//Z=.41"%lili%11

$ ***461,391.00

Page 2: p.0.# 40% (034 3 /PAPER 10...Oct 08, 2015  · mccarthy building companies nm, 1717 louisiana blvd ne ste 204, albuquerque nm 87110 albuquerque public schools district #12 p.o. box

To Owner: Albuquerque Public Schools Project :

From Contractor: McCarthy Building Companies NM, Inc. Via Architect :

17,7 Lot·Fi,S#AaA BLvb. NW, Su,72 209ALSUQUERGv€. N,Vi 87 110

Application For Payment SummaryApplication is made for payment, as shown below, in connection with the Contract. ContinuationSheet is attached.

1. ORIGINAL CONTRACT SUM

2. Net Change by Change Orders

3. CONTRACT SUM TO DATE (Line 1 + 2)

4 TOTAL COMPLETED & STORED TO DATE

5. RETAINAGE

a. .00 % of Completed Work

b. .00 % of Stored Material

Total Retainage (Lines Sa+5b or Total in Cont. Sheet)

6. TOTAL EARNED LESS RETAINAGE

(Line 4 Less Line 5 Total)

7. LESS PREVIOUS CERTIFICATES FOR PAYMENT

(Line 6 from Prior Certificate)

8. CURRENT PAYMENT DUE

9. BALANCE TO FINISH, INCLUDING RETAINAGE

(Line 3 Less Line 6)

Change Order Summary

Total changes in previous applications

Total approved this application

Totals

Net Changes by Change Order

APPROVED FOR PAYMENT

FACILITIES, DESIGN & CONSTRUCTIONp.0.# 40% (034 3 /PAPER 10.23·/f

ANNELLE D.ARBY Lfl*j*?/

Additions

0.00

69,170.00

69,170.00

69,170.00

0.00

0.00

0.00

11,259,913.00

69,170.00

11,329,083.00

1,854,284.00

APS Wherry ElementaryFBT

302&663 NG

v 2480/7 8241&4atp Ill

Application For Payment

Application No:

Period To:

Project No:Contract Date:

05

10/31/2015

009019.000

06/02/2015

The undersigned Contractor certifies that to the best of the Contractor's knowledge, information andbelief the Work covered by this Application for Payment has been completed in accordance with theContract Documents, that all amounts have been paid by the Contractor for Work which previousCertificates for Payment were issued and payments received from the Owner, and that currentpayment shown herein is now due.

Contractor : A

Bi. QJJ AT&Ad*Qg Date: 27 Ocr c2O /5

State of: MGW M €*, CO

County of: 86)WA4,4.0Subscribed and sworn * (or affirmed) before me on this 27 day of 0(706€i

2015 by 1?06€17- h(£08*30.- , personally known t) me or proved to me on the basis

of satisfactory(#to be the pbrser,(s) who appeared bin57 --OFFICtAL SEAL 1Notary Public: '1624 -- 2. 7**flMy Commi2§16AExpirds: \1 5 78\2Architect's Certificate For Payment

461,391 ]DO J In accordance with the Contract Documents, based on on-site observations and the datacomprising this application, the Architect certifies to the Owner that to the best of the Architect's

9,474,799,00 knowledge, information and belief the Work has progressed as indicated, the quality of the Work isin accordance with the Contract Documents, and the Contractor is entitled to payment of theAMOUNT CERTIFIED.

1,854,284.00

1,392,893.00

Deductions

0.00

0.00

0.00

Amount Certified : $

(Attach explanation if amount certified difers from [he amount applied for. Initial alt figures on thisApplication and on the Continuation Sheet that ore changed to conform to the amount Certified.)

Architect: FBT

By: Date:

This Certificate is not negtiable. The AMOUNT CERTIFIED is payable only to the Contractor

named herein. Issuance, payment and acceptance of payment are without prejudice to any rights ofthe Owner or Contractor under this Contract.

12©[EVIE

LBgROUNTS PAYABLE Page 1 of lPrinted on: 10/23/2015 16:31:11 PM

M.aCARTHY

Page 3: p.0.# 40% (034 3 /PAPER 10...Oct 08, 2015  · mccarthy building companies nm, 1717 louisiana blvd ne ste 204, albuquerque nm 87110 albuquerque public schools district #12 p.o. box

APS Wherry Elementary

Project No: 009019.000

Contract No: 001

Line No Description

10 Mobilization

20 Demolition

30 Concrete Foundation

40 Slab on Grade & Deck

50 Site Concrete

60 Lightweight Concrete

70 Polished Concrete

80 Masonry90 Structural Steel & Deck

100 Steel Erection

110 Fall Protection

120 Miscellaneous Metal

130 Rough Carpentry

140 Casework

150 Damproofing

160 Insulation

170 Metal & Translucent Panels

180 Asphalt Roofing

190 Metal Roofing

200 Sealants

210 HM Frames

220 Wood & HM Doors

230 Hardware

240 Coiling Door

250 Storefront & Windows

260 Stucco

270 Metal Studs & Drywall280 Acouslical Ceilings

290 Tile

300 Carpet & Reslient Floor

310 Painting & Wall Covering320 FRP & Wall Protection

330 Signage

340 Toilet Partitions

350 Toilet Accessories

360 Misc Specialties & Equipment

370 Kitchen Equipment

Scheduled

Value

154,208.00

268,434.00

529,852,00

240,913,00

242,152.00

110,741.00

78,751 00

177,62700

598,106,00

256,248.00

8,975.00

20,809.00

55,922.00

227,895.00

2,540.00

286,571.00

216,100.00

583,620.00

58,323.00

35,773.00

46,348.00

46,349.00

46,349.00

2,680.00

258,670.00

199,694.00

765,124.00

212,062.00

103,774.00

130,271.00

81,035.00

26,721.00

25,799.00

22,705.00

19,187.00

112,067.00

116,600.00

Work FromPrevious

Applications

154,208.00

124,300.00

148,446.00

95,185.00

17,280.00

0.00

0.00

14,743.00

176,482.00

0.00

0.00

0.00

2,000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5,771.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Work

CompleledThis Invoice

0.00

0.00

3,278.00

3,454.00

0.00

0.00

0.00

21,236.00

151,341:00

99,093.00

8,975.00

0.00 .

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,211.00

46,348.00

0.00

0.00

0.00 -

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total

Stored Completed &Materials Stored To Date

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0,00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

154,208.00

124,3QO.00

151,724.00

98,639.00

17,280.00

0.00

0.00

35,979.00

327,823,00

99,093.00

8,975.00

0.00

2,000.00

0.00

0.00

0.00

0.00

0.00

0.00

1,211.00

46,348.00

0.00

0.00

0.00

0.00

0.00

0.00

5,771.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

%

100.00

46.31

28.64

40.94

7.14

0.00

0.00

20.26

54.81

38.67

100.00

0.00

3.58

0.00

0.00

0.00

0.00

0.00

0.00

3.39

100.00

0.00

0.00

0.00

0.00

0.00

0.00

2.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Application For PaymentContinuation Sheet

Application No:

Application Date:

Period To:

Architect's Project No:

Balance

To Finish

0,00

144,134.00

378,128.00

142.274.00

224,872.00

110.741.00

78,751.00

141,648.00

270,283.00

157,155.00

0.00

20,809,00

53,922.00

227,895.00

2,540.00

286,571.00

216.100.00

583,620.00

58,323.00

34,562.00

0.00

46,349.00

46.349.00

2,680.00

258,670.00

199.694.00

765,124,00

206,291.00

103,774.00

130,271.00

81,035.00

26,721.00

25,799.00

22.705.00

19,187.00

112.067.00

116.600.00

05

10/30/2015

10/31/2015

544

Total

Retainage

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

000

0.00

0.00

0.00

0.00

0.00

0-00

0.00

0.00

0.00

Current

Payment Due

0.00

0.00

3,278.00

3,454.00

0.00

0.00

0.00

21,236.00

151,341.00

99,093.00

8,975.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,211.00

46,348.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Printed on: 10/23/2015 16:30:46PMPage 1 of 2

M.aCARTHY

Page 4: p.0.# 40% (034 3 /PAPER 10...Oct 08, 2015  · mccarthy building companies nm, 1717 louisiana blvd ne ste 204, albuquerque nm 87110 albuquerque public schools district #12 p.o. box

McCarthy Building Companies NM, Inc.

APS Wherry Elementary

Project No: 009019.000

Contract No: 001

Line No Description

380 Gym Equipment

390 Site furnishings

400 Elevator

410 Fire Protectioh

420 Uilities

430 Plumbing Rough-in

440 Plumbing Top Out

450 Plumbing Trim/Final

460 HVAC Piping

470 HVAC Ductwork

480 HVAC Trim -

490 Controls

500 Electrical Site

510 Electrical Under'ground R/1

520 Electrical Wall FVI

530 Electrical Ceiling R/1

540 Electrical Trim/Final

550 PV System

560 Communications

570 Earthwork

580 Fencing590 Bond

600 Insurance

610 Closeout

620 NMGRT 6.0625%

630 Change Order 1

Totals :

Scheduled

Value

1,240.00

5,060.00

67,088.00

158,861.00

116,546.00

225,444.00

225,445.00

211,550.00

313,021 00

442,545.00

97,132.00

122,637.00

158,394.00

124,263.00

130,160.00

124,142.00

529,571.00

339,883.00

57,589.00

247,820.00

24,051.00

67,160.00

127,703.00

330,000.00

643,613.00

69,170.00

11,329,083.00

Work From

Previous

Applications

0.00

0.00

25,834.00

27,832.00

84,017,00

37,368.00

1,000.00

0.00

0.00

2,000.00

0.00

5,000.00

76,296.00

53,657.00

1,296.00

0.00

0.00

0.00

0.00

63,380.00

0.00

67,160.00

127,703.00

0.00

81,935.00

0.00

1,392,893.00

Work

CompletedThis Invoice

0.00

0.00

0.00

2,901.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6,571.00

2,750.00

0.00

0 00

6,050.00

0.00

34,676.00

0.00

0.00

0.00

0.00

24,243.00

49,264.00

461,391.00

Total

Stored Completed &Materials Stored To Date

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25,834.00

30,733.00

84,017.00

37,368.00

1,000.00

0.00

0.00

2,000.00

0.00

5,000.00

76,296.00

60,228.00

4,046.00

0.00

0.00

6,050.00

0.00

98,056.00

0.00

67,160.00

127,703.00

0.00

106,178.00

49,264.00

0.00 1,854,284.00

%

0.00

0.00

38.51

19,35

72.09

16.58

0.44

0.00

0.00

0.45

0.00

4.08

48.17

48.47

3.11

0.00

0.00

1.78

0.00

39.57

0.00

100.00

100.00

0.00

16.50

71.22

Application For PaymentContinuation Sheet

Application No:

Application Date:

Period To:

Architect's Project No:

Balance

To Finish

1,240.00

5,060.00

41,254.00

128.128,00

32,529.00

188.076.00

224,445.00

211.550.00

313,021.00

440,545.00

97,132,00

117,637.00

82,098.00

64,035.00

126,114.00

124,142.00

529,571.00

333,833.00

57,589.00

149,764.00

24,051.00

0,00

0,00

330,000.00

537,435.00

19,906.00

16.37 9,474,799.00

05

10/30/2015

10/31/2015

544

Total

Relainage

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0«00

0.00

0.00

0.00

0.00

0.00

000

0.00

0.00

0.00

0.00

0.00

0 00

0.00

0.00

0.00

0.00

0.00

Current

Payment Due

0.00

0.00

0.00

2,901.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6,571.00

2,750.00

0.00

0.00

6,050.00

0.00

34,676.00

. 0.00

0,00

0.00

0.00

24,243.00

49,264.00

0 00 461,391.00

Printed on: 10/23/2015 16:30:46PM Page 2 of 2

Application For Payment Continuation Sheet

E © [E 0 R# IE NOV 0·2 2015 ACCOUNTS PAYABLE

Page 5: p.0.# 40% (034 3 /PAPER 10...Oct 08, 2015  · mccarthy building companies nm, 1717 louisiana blvd ne ste 204, albuquerque nm 87110 albuquerque public schools district #12 p.o. box

8911!(DY'ID· ., . - Activity Name . -- -9*ker*811 lit;tr'- 158MLIC S.'-hy

, --4 .- M:-3-]lf'*,« «1«-1 ]]']_4, t,» i f,7 S-43-7-43«- f -5]*f _ <34=33}

Aes@ 9 &<Sils,Nfijks@]

Structure 414 1,5-, 1,·t-:5 .1 (13-4 ).l 15 11->,1.-15I Level 1&2 S[ructural Steel

, 27-Nov- 15

Roofing 14-J,i,1-1'6

PI -ROOF-115 ' Mech Curbs/Pene[rations/Roof Drains 1 30-Nov-15

P 1 -ROOF- 125 F/R/P - Lightweight Concrete Deck 3 01-Dec-[5

PI-ROO-135 Pil·apct Frammg / Shcad,ing 4 04-Dec-[5

Pl-ROOF-115 Instull Rout'ing 5 11-Dec-15Pl-ROOF-155 'Milestone: Roof Dry-in 0

P l-ROOF-165 Inscall Coping Cap 3 18-Dec-15 1

P 1-1(OOF-175 Inatall PV Solar 15 23-DeL-15 1 +Jan-16

Exterior Skin 92 16-Nov- 15 25-11!,r-161Pl-ES-115 Install Clips 3 16·Nov-15 18-Nop-15

PI-ES-125 Exicriur Framing R 04-Dec- 15 1 15-Dec-15

PLES-135 Exterior Shea[hing / Insulation / Tyvek 8 10-Dec-15 21-Dce-15

Pl-ES-285 Intall Roll Up Doo, Frame 2 18-Dec-15 21-Dec-15

Pl-ES-[45 -M!1:slone: Ex[crior Dry-ul complcic 0 1 21- Dec- 15

PI-ES-155 Masol,ry Veneer 17 22-Dec- 15 15-Jan-16

Pl-ES-165 Stucco Lath & Browki Cont 10 29-Dec-15 1 12-Jan-16

P 1 -ES- 175 Srucco Swit[Ch Coal 1 13-Jan-16 15-Jun-16

Pt-ES-185 Q.4/OC - Stucco Cure T,111: 5 1 5-Jun- 1 6 22-Jan-16

Pl-ES-[95 Stucco Finish Coat 5 25-JM-16 39-Jun-[6

2-1 1--3-%. 301«-3.-127,39-33 -u-i__4_91-_22016:9333 ya·_».---i

.I!1 »'f'*]1: 15- 1*=ov 1 To 0**:S , -64:.'11,r 'E«*-,111»C Mar 7'lihpri

IP[]145©211,le_15#

, lf,Al,214's_-:.6£DU -IF,LS-rl. J. _-_Lu-_ 1 - _ t

PI-S-115 Level I &2 S[ructural Steel 14 05-Oct-15 4 05-Oct-15 19.Oc[-15

PI-S-145 Install Le,·el 2 Metil Decking 5 20-Oct- 15 26-Oc[- 15

Pl-S-135 Lnstati Stais 3 26-Oct-15 28-Oct- 15

P!-8-155 1 Mechanical Rough-in 2 27-Oct- 15 28-0&15PI-S-165 Electrical Rough-in 29-Oct- 1 5 30-Oct-15

P!-5-175 Mesh & Blockou[s 3 02-Nov-15 04-No,·-15

1,1-S-!85 SOMD Poill 2 05-Nov-15 06-Nov-15

P 1 -S- 195 QA/QC - Concrete Cure 5, 09-Noy-15 13-NOV-15

Pl-S-205 'Milestone· Level 1 SlricIure Complete 0 13-Nov-15

Pi-S-215 Ihibcull Roof Joins 4 !6-Nov-15 19-Nov-IS

PI-S-225 Inscall Roof Decking 5 20-Nov-15 , 27-Nov-15

Pl-S-235 •Milesone: Level 2 Structure Comple[e 0

1 Install Level 2 Metal Decking

W install Stairs

I Mechanical Rough-in

I Electncal Rough-in

1 Mesh & Blockouts

I SOMD Pour

I QA/OC - Concrete Cure

0 *Miles[olie: Level 1 Smicture Co,nplete

I Install Roof-Joists

I In:[i:ll Roof Decking

0 *Milesione: Level 2 Smiciure Coinplere

1 Mc:ch Curbs / Penclra{ions / Roof Drains

I F/R/P Lightweight Concrete Deck

61 Parapel Framii,g / Sheathing

El inst.[1 Roofing

0 •Milesione: Roof Dry-,n

8 1,stall Coping Cap

[-1 Install PV Solar

0 install Clips16;/1 Exictior Framing

G:5?1 Exter,or Shea[hing / Insulation , Tyvek

51 Insiall Roll Up Door Frame

O 'Milestone. Exterior Dry-in Complete

|,R-..=.H Musenry Veneer

51 Slucco Lath & Brown Coal

8 St.:co Stratch Coat

1 QA/OC- StUCCUCure Tinic

1 Stucco Finish Com

-- ir]-AO, 15 130-Nov- 15

03-Dec-15

C)9-Dec- 1 5

1 7-Dec-15

17-Dec-15

23-Dec-15

1

Run Dire -- Remining Level of Effort [ Remainilg Work Wherry Elementary School - Update #1 McCarthy BuildinK 1 of 14

23-Oct-15

I Actual Level of Effort 1 Critical Remainin... CompaniesStatus Update Layout - For McCarthy Use

Duta Date - I Actu;,1 Work 0 0 Milestone

19-Oct-15

Page 6: p.0.# 40% (034 3 /PAPER 10...Oct 08, 2015  · mccarthy building companies nm, 1717 louisiana blvd ne ste 204, albuquerque nm 87110 albuquerque public schools district #12 p.o. box

__V 0 2 2015 11-ACCO-U_NI8_88'(ABLE_

8188*IRP--«= -0185,#.MFPST-«« 2·- -_ ----- =2W-'*sed@14#.|AN,OMN-41$*f&1 :INIF.nA#i R#*,44 di„,Id-IM44haL.04:*..7,1,00647*,L&/1.Ii.r'„1,0,8.,-*:i/-i.-r- 1.- p-uxia/.FIME,/Mt:imilim,89*-3 VE,inim'm#m *Imija/324/WDU,aImmiNAV/:mic.,iqrz! 15.9LIZI]il/*Ell.1131"*tyl#*mP 1 -ES-205 I Exterior Window Framing / Gluzing & M etal Panels 7 01-Feb-16 09- Feb- 16

PI-ES-215 1 Exterior Doors & Hardware (Incl Auto Openers) 5 10-Feb-16 16-Fcb-16

P 1 -ES-225 : Eatcrior Lighdn g & Trim 3 17-Fcb-16

P 1 -ES-235 ; Extcriur Caulking 4 22-Fcb-16

P 1 -ES-245 7, Extedor Painti_(®ri-9fitti Coating) 3 26-Feb-16

P 1 -ES-255 1 Set New· Transformer 1 26-Feb-16

P 1-ES-265 Install Gas Meter Enclosure 8 02-Mar-16

Pl-ES-275 : Concrete S idewalks 10 " 14-Mar-16 |

21 16-Nov- 15 1 17-Nov-15

5 18-Nov-15 | 24-Nov-156 19-Nov-15 , T 27-Nov-15

12' -23-Nov-15 | 1 O9djul 5

1 22-Dcc-15

3 23-Dec-15 28-Dec-15

4 29-Dec-15 04-Jan-16

11 Exenor Winduw Franung /

Exterior Doors & Hardw

8 Exterior Lighting & Trit

0 Exurior Caulking

B Exterior Painting f

1 Set New Transikirm,

BEl Install Gas M,

r-7 A.:ir

1 Mcch Layout

0/H Fire Sprinkler Rough-in

9 0/HMechanical Piping Rough-inBEEEU 0/1-[ Mechanical Ductwork

61 0/H Plumbing Rough-in

- 0/H Electrical Rough-in

I QA/QC - OH MEP Rough-in

03 HVAC Controls Rough-in

E Hardlid Framing

* 'Milestone: 0/H MEP Rough-in 1nspection

9 Framing Layour

9 Install Top Track

int Wall Fraining

1/W Elca Rough-in0 Wall Backing

8 UW Plumbing Rough-in

B Pull F/A Wire

0 Pull S/S Wire

1 QA/QC MEP 1/W Rough-in

gil Elect Branch & System Wire

0 -Milestone: JAM MEE Rough-in }nspect

11 Drywall- One Side

E [/W Insulation

Ml Drywall - 2nd Side

I Scrtw inspection

611 Tape & Texktre

11 Prime & 1 st Coat Point

19-Feb-)6

_ 25-f«}(L' 01-Mar- 16

26-Feb-16

11-Mar- 16

25-Mar- 16

P 1 -L 1 -OH- 1 1 5, Mech Luyout

P 1 -LI -OH- 125 0/H Fire S prinkler Rough-in

P 1 -Ll -OH- 1 3 5 O/H M chanical P iping Ro ugh-mP 1 -L l -OH- 145 0/H Mechanicil Duc[work

P 1-LI-OH-155.0/H Plumbing Rough-in

P 1-Ll -OH-165 0/H Electrical Rough-in

-PI-17-OH-175 QNQC - OH Me Kough-inPl-LI-OH-185 HVAC Controls Rough-in

P l-LI-OH- 195 Hardlid Framing

P 1-Ll-OH-205 *Milestonc: O/H MEP Rough-in inspection

5 27-Nov-15 03-Dec- 15

15 01-Dec-15 21-Dec-15

22-Dec- 15

0 04-Jan-16L

P 1-LI-IW-1 15, Framing Layout

P 1-LIAW-125 Install Top TrackPl-LI-!W-135 Int Wall Framing

P 1 -LI *W-1 45 + 1/W Elect Rough-in

Pl-Ll-1 W-155· Wall Backing

Pl-LI-iW-!65 1/W Plumbing Rough-ii,

P 1-Ll -IW-175 1#U F/AWire

Pl-Ll-IW-185 Pull S/S Wire 09-Dec-15P 1 -L l -i W- 195 1 QA/QC M EP 1/W Rough-in 08-Dec-15

P 1 -Ll-[W-205' Elect Branch & System Wire 8 08-Dec-15 17-Dec-15

Pl-LI-IW-215 *Milestone: 1/W MEP Rough-in inspaf 08-Dec- 15

2 16-Nov-15 1 17-Nov-IS

3 18-Nov-15 20-Nov-15

5 23-Nov-15

10 27-Nov-15

3 01-Dec-15

30-Nov-15

10-Dec- 15

03-Dec-15

4 02-Dec-15 1 07-Dec-15

4 08-Dqc-15 ' 11-Dec-15

2 ON-Dec- 15

1 08-Dec-15

Pl-LI-IN-1"-1 Drywall-One Side 5 23-Dec-15 30-Dec- 15

Pl-Ll-INT-1 1/W Insulation 2 31-Dec-15 » 04-Jan-16

PI-LI-IN'f-1 Drywall- 2nd Side 51 05-Jan-16 - - ' 11 -Jun- 16PI-LI-IN'l'-1. Screw inspection 1, 12-Jan-16 12-Jan. 16

P 1-LI-INT-1 Tape & Texture 7 13-Jau-16 1

Pt-Ll-INT-1 Prime& 1,£Cout Puint 4 22-Jan- 16 [21-Jan-16

27-Ju -16

Run Date - - Remaining Level of Effort [ Remaining Work Wherry Elementary School - Update #1 McCarthy Building 2 of 1423-Oct-15

Actual Level of Effort I Critical Remainin... CompaniesStatus Update Layout - For McCarthy Use

Data Da[e - Illl Actual Work 0 0 Milestone

19-Oct-15

Page 7: p.0.# 40% (034 3 /PAPER 10...Oct 08, 2015  · mccarthy building companies nm, 1717 louisiana blvd ne ste 204, albuquerque nm 87110 albuquerque public schools district #12 p.o. box

1 P 1 -L 1 -PP-125 A/E Punchlist & Corrections

Pl-Ll-PP-1351*Milestone: Levell Complete Level 2 - Interior Buildout

2=T.,31-ji-WI := 29#1 5-..

5 22-Mar-16

5 29-Mar- 16 '

0 1

28-Mar-16 1

04-Apr- 16

04-Apr-]6

' ';Lill,li'!20183«.. 4=f ---92» r.1

FPR*=49s-N Ge*d.IE Ceitilig Grid

@ Fire Alarm Trim

0 Sprinkler Drops

0. Mcch Trim

El Special Sysierns1.-) Elect Lighting & Trim

8 Polish Hoc}rs

0 Install Entrmce Mals

E Millwork

Makcrboards / Mis

9 Flouring I.Curpe

@ Plumbing Trim

0 Drop Ceiling Tili

@ in[ Doors & I

8 Final PRint

1 Signage

m Final Ck:

BES*lgy-7 --+ ,**IM,»Numer t**tull,j#lal#r-·--2;20151. '- 6 =-**$- -02 L .. ---4,,*'FInisn,;;"*'..:.al=..Amillizciq-1N#921573_*12> 4*'P ;

i t-LI -EL- 115, Set Guide Rails / Plagorm

Pt-Ll-EL-125, Elevator MEPRough-{nP 1 -LI-EL-135 Elevaror Cab Builduut

2 04-Dec-15 5 08-Dec-15 '

8 09-Dec-15 1

Pl-LI-INT-1 : Ceiling Grid

P 1 - L 1 - 1 N T- 1 , Fi re ,Alarm TrimPl-Ll-INT-1 Sprinkler Drops 3 02-Fcb-16 1

P 1 -LI -INT-2, Mcch Trim 3 02-Feb-16

P 1 -LI-INT-2 , Special Systems 2 05-Feb-16

Pl-Ll-INT-2 Elect Lighting & Trim 8 05-Feb-16

PI-LI-INT-2 Polish Floon; 5 17-Fcb-16

P 1 -LI -IN'[--2· : install Entrance MaG 3 17-Feb-16

P]-LI-INT-2 Millwork 5 24-Feb-16

P 1 -L I -I NT-2 , Makerbuardj / M isc Specialties 4 24-Fcb-16

PI-LI-INT-2 Flooring (Carpet) 4 02-Mar- [ 6 07-Mar-16 |Pl-Ll-INT-2 , Plumbing Trim 3 i 02-Mar-16 04-Mar-16 |Pi-Lt-INT-2· : Drop Cciling Tile 3 02-Mar-16 04-Mar-16 P 1 -LI -INT-3, inl Doors & Hardware 4 08-Mar-16 11 -Mar- 16

Pl-LI-INT-3 'Final Painz 3 14-Mar-16 ' 16-Mar- 16

Pl-L!-INT-3 :Signage 1 17-Mar-16 | 17-Mar-16

P 1-LI-INT-3 ! Final Clean 2_ 18-Mar-16 21-Mar-16

3 28-Jan-16 01-Feb-16

3 02-Feb-16 04=Feb-16

04-F:b-16

04-Feb-16

08-Feb-16

16-Feb-16

23-Feb-16

19-Feb-16

01-Mar-16

29-Feb-16

f5 18-Dec-15 1 24-Dec-15

2 28-Dec-15 29-Dec-15

10 30-Dec- 15 13-Jan-16

, PI-LI-ELEC- ; FIRIP - Housekeeping Pads 18-Nov-15 1 1 I M-Nov-15

' Pt-Ll-ELEC- Hang&Paint PIywood 2 19-Nov-15 .U-Nu# 1 5 Pl-Ll-EL§C· .Pmd Rough-in 2 22-Dec-15 1 23-Dcc-15

11 Set Guide Rails / Platform

9 Elevator M EP Rough-in

1FE Elevaior Cab Buildout

I FMP - Housekeeping Pads

9 Hang & Paint Plywood

8 Panel Rough-in

Restrooms - Ceramic Tile

El Rextrooms - Tolict P,inition,

E Restrooins - Plumbing Fi,

* *Milestone: Resrrooms C

Devel

Afi

0 *A

I Mcch Layout

li 0/H Fire Sprinkler Rough-in

WN 0/H Mechanical Piping Rough-in

0/H Mechonical Ductwork

P 1-Ll -RR- 1 1 5 ' Restrooms - Ceramic Tile

| ----5:oc:-'p,unobuTriin -P 1 -LI -RR-125 Restrooms - Tolier Partitions & Accessories

9 22-Jan-16 m 03-Feb-16

4 04-Feb-16 09-Feb-16 i

4 10-Feb-16 15-Feb-16 10 15-Feb-16

1 Pl-Ll-PP-1[5 Develop McCarthy Complctioa List

Nr,

Pl-L2-OH-1 1 S Mcch Layout

' Pl-L2-OH-125 0/H Fire Sprinkler Rough-in

- P 03*.tdij6iH Mect,miiUPipingough-inPl-1-2-OH- 145 0/H Mechanical Ductwork

07-Dec- 15 1

18-Dec-15 1

10 11-Dcc-15 24-Dec-15 1

Run Date - -Remaining Level of Effort Remaining Work Wherry Elementary School - Update #1 McCarthy Building 3 of 1423-Oct-15

I Actual Level of Effort I Critical Remainin... CompaniesStatus Update Layout - For McCarthy UseData Date - I Actual Work 0 Mitestone

19-Oct-15

Page 8: p.0.# 40% (034 3 /PAPER 10...Oct 08, 2015  · mccarthy building companies nm, 1717 louisiana blvd ne ste 204, albuquerque nm 87110 albuquerque public schools district #12 p.o. box

1 Framing Layout

I Install Top Track

I inT Wall Fmning

I Owner

I Wall Backing

I 1/W Plumbing Rough-in

9 Pull F/A Wire

i Pull S/S Wire

I QA/QC MEP IAV Rough-in

Elect Branch & System Wire

0 *Milestonc: 1/W,MEP Rough-in inspect

I Drywall - Onc Side

I 1/W insulation

I Drywall - 2nd Side

1 Screw inspection

I Tape & Texture

I Prime & Ist Coat Paint

I Ceiling Grid

I Fire Alarm Trim

I Sprinkler Drops

I Mcch Trim

I Special SFtems

I Elect Lighting & Trim

I Polish Floors

@ insilill En*nce Maa

I Millwork

W Makerboards /Mi

I Flouring C Carp

g Plumbing Trim

9 Drop Ceiling T

I Int Doors &

I Final Pum,

AMM.*10.v - AttlvitviNISs--1 -- 7 ·338*'!«M' lf!fl#i1'£*M,!BlRt* kP!8101/ f·'%m"«'*@e#EkiG+ 51¥*1 *..*kkS,3,1321§.**. ·'i k W.. .,..1 .er: . fon. - · ./ L, __ _ , >_for-.11/- -. =- 1'*t 1®lE11)1194!N2185*00764&=Uf#44041JM*WETE1' 1 -L2-0 H- 155 0/H Plumbing Rough-in 5 16-Dec-15 1 22-Dec- 15 0/H Plumbing Rough-in

PI -Ll-OH-1650/H Electrical Rough-in 11 18-Dec- 15 , 05-Jan-16 6==-2 0/H Electrical Rough-in

Pl-U-OH-175; QA/QC - OH MEP Rough-in_ 1 QA/QC- OH MEP Rough-in

P 1 -U-OH- 1 4HVACControls-Rough-in 91 HVAC:Controls Rough-in

Pl-l.2-OH- 195 Hardlid Framing Gip Hardlid FramingO -Milestone: 0/H MEP Rough-in Insp

4 of 14

IEt IM 11 \Y/ IE 1P, NOV 0 2 2015

ACCOUNTS PAYABLE

1 06-Jar!-16 1

t 3 - --07-jan-irT6 12-Jai, 16 '

Pl-12-011-2(IS -Milestone: 0/H MEP Rough-in Inspection 0

06-Jan-16

11-Jan-16

19-Jan-16

19-Jan-16

Pl-LZ-IW-115 limiting Layout 2 08-Dce-15 09-Dec-15

P 1 -1.2-1 W- 125 Install-1-up Track 3 10-Dec-]5 14-Dcc- 15

Pl-1.2-IW-135 int Wall Framing 5 15-Dec-15 21-Dec-15

P[-1.2-IW-145 04,·uer 5 18-Dec-l5 1 24-Dec-15 f

P 1 -L2-1 W- 1 55: Wall Backing 3 22-Dec- 15 24-Dec-15

P 1 -L2-[W- 165 1 1/W Plumbing Rough-in 4 -3-Dee-15 29-Dec- 15P 1 -L2-!W-175 Pull F/AWire 41 30-Dcc-15 05-Jan-16

P 1 -L2-IW- 1 85 ' Pull- S/S Wire 11 30-Dcc- 15 =F 31-D=15

P 1 -L2-IW- 195 QA/QC MEPI/W Rough-Iii 1 30-Dec- [5 30-Dec-15

1'1-U-/W-21)5 Elect Branch &. S,Sem Wire 7 30-Dec-15 I 08-Jan-16

P 1 -L2-IW-2 1 5 1 *Milestunc: 1/W MEP Ruugh-in Inspect 0 1 30-Dec- 15

PI-L2-INT-1 Drywall - One Side

P [-L2-INT-1 1/W [nsulation

P 1-L2-INT-1 Drywall - 2nd Side 5 12-Jan-16 1

P 1 -L2-INT- 1 Screw inspection I 19-Jan-16 I

Pl-L2-INT-1 ITape&Texture 7 20-Jan- 1 6 U

1'1 -12-INT- 1 1 Prime & I st Coat Paint 4 294an-16 ,

P 1 -L2-INT- 1 ; Ceiling Grid 3 04-10-16 ,Pl-C-IN-Il I Fire Alarm Trim 3 09-Feb-16 '

P 1-LLINT-1 i Sprinkler DAps 3 09-Fet>16

P 1-1-2-INT-2, | Mcch Trim 3 09-Feb- 16

P 1 -L2-INT-2 Special Systeins 2 12-Fet>-16

P 1-U-INT-2 Elect Lighting & Trim 19-Feb-16

PI-U-INT-2 Polish Aours 4 22-Feb- 16 f 25-Feb- 1«6P 1 -L2-INT-2- install Entrance Mars 3 22-Feb-16

Pl-Ll-INT-2 Millwork 5 26-Feb- 16

P 1-L2-INT-2 Makerhoiu·dj / Misc Specialties 02-Mar-16

Pl-U-INT-2 Hooring(Carpet) 09-Mar- 16

P 1-LI-INT-2 Plumbing Trim 3 04-Mar-16 1 08-Mar-16

Pl-L2-INF-2· Drop Ceiling Tile 3 04-Mar-16 08-Mar- 16

P 1-L2-INT-3, :int Doors & Hardware 4 10-Mar-16 15-Mar-16

P 1 -Ll-INT-3 1 nal Paint 1.-- _- _3--15.ME-16 __ - 418-Mml6 |

5 31-Dec-15 07-Jan- 16

2 08-Jaii-16 1 , 1 1-Jan-16

18-Jan-16

19-j=16

28-Jan-16

03-Feb-16

08-Feb-16

11 -Feb- 16

1!-Feb-16

11-Feb-16

15-Feb-16

6 12-Feb- 16

24-Feb-]6

03-Mar-16

4 26-Fcb-16

' 4 04-Mar-16 |

Run Date - .Remaining Level of Effort W Remaining Work Wherry Elementary School - Update #1

23-Oct-15 Actual Level of Effort I Critical Remainin...

Status Update Layout - For McCarthy UseData Date - I Actual Work 0 Milestone

19-Oct-15

McCarthy Building

Companies

Page 9: p.0.# 40% (034 3 /PAPER 10...Oct 08, 2015  · mccarthy building companies nm, 1717 louisiana blvd ne ste 204, albuquerque nm 87110 albuquerque public schools district #12 p.o. box

P 1-1-IVAC-!15 HVAC Controls, Devices. & Programming

P 1 -HVAC-125 I HVAC Bump Star[ Units & ClimatizePl-HVAC- 135 •Milestone Climatization Complete

PI-HVAC-145 HVACTest&811211(C

PI -HVAC-155 ' Commissioning

Lproject Completion / TurnoverTesting & Inspections

PI-TEST- 115 ' FA - Fire Alarm Interface w/ HVAC Concrols

P)-TEST- 125 FA-Prograin Fire Alarm Devies

P 1 -TEST-[35 FA- Pre-Test Fire Alarm System

P 1 -TES'6145 ' FA - Pre-Test Fire Sprinklct·, Firc Protection

P 1 -TES'r- 1 55 FA- Fire Marshall Inspection

P l-TEST- 165 { *Milestone: Cert O f Occupancy

34;. FS =*9%,7*911*'k *84*.: -,1

m'&-419m. *ImaMINiprl,t,ZO•**[email protected]#5*4|*U„-id=: ¢,1,11'trt

1 21-Mar-16 1+

2 22-Mar- 16

5| 26-Feb-16 |

10 04-Mar- 16 (,21 Ir,-\1.i,-1:,

3 24-Mar-16 3 29-Mar-16 |

I| 0 1-Apr- 16 '01 1

41 & 06-Api- 1 6 110' 06-Apr- 16 113_ 20-Apr-1 6 0

15 09-May-16

iv 119-4...11,15| 09-May-16 «0 31-Mity-16M{ 31-May: 16

241 31-Al,Ir I "_ l

01-Apr-16

01-Apr-16

1[J-lilli-1(319-Apr- 16

' 06-May- 16' 06-May-16

27-Mari 6

; 20-Mity- 16

1 Signagc

I Final Cl,

Activityl[) ' - .,Activity Name .r

P 1 -L2-IN'f-3 SignageP 1-U-INT-3 Final Clean

22-F:b-16

1 22-Feb-16

Pl-Ll-PP-115 Develop McCarthy Completion ListP 1 - L'. -P ! 4 25 1 A/E P u n ch l i s t & Corrections 51P 1 -U-PP- 1 35 *Milestone: Level 2 Complete 4

0 6 231

L Substantial CompletionDevelop McConhy Completion List

*Mile:stone: Schools Out 0

Onw cr Relocation 9' 31-M:s>.16

-*Milestone: Owner Relucurion Complere 0,

S ,{.- _ 3 * 23 :'_ » -_L_

Make Safe / Abatement 09-Jun·lb 127-May-16 '

Re-Roof Existing Gym / Cafe

Run Date -

23-Oct-15

21-Mar-16

23-Mar- 16

Pl-Li- RR-115 Restrooms - Ceramic Tile

.P}-Ll-KR- 125 RBoooms - Tolict Partitions & Accessories

P 1 -L2-KR- 1 35 Restrooms - Plumbing Fixtures & Trim

P 1 -Ll-RR- 1451 *Milestone: Reswooms Complete

9! 29-Jan-16' ,

41 -"11-Feb-16 |1- -Restrooins - Ceramic Tile

91 Restrooms - Toliet Paliti

@ Restrooms - Plumbing

0 *Milestone: Restroom

I Deve

· IA;

0 -B

Ml HVAC Controls, Devici

E HVAC Bump Scirt l

O 'Milestone Climatin

il HVACTest & Ba

1-7 Commi:lsic

8 FA- Fgct

@ FA -Prt

Lil FA-1

8 FA-

1 FA-

0 *Mi

10-Feb-16

16-Feb-164 17-Feb-16

0

4' 24-Mg-Jt_1_ 1 29-Mar-16

30-Mar-16 05-Apt· 16

05-Apr-_161 1--M.,1.1(,! 2-1 el,-1(, 1

5' 12-Fcb-16 1 18-Feb-16

5 19-Feb- 16 ' 25-Feb-16

0 25-Feb-16

03-Mar- 16

1 17-Mar-16

11-Ju"-!i,

13| ih-\!,It-|i 1,1.\iii 16

3| 16-Mar-16 i 18-Mar-16

3 21-Mar-16 I 23-Mar-16

28-Mar-16

31-Mu -16

P 1 -CL-1 1 5

Pl-CL-125 A/E Punchlist & Corrections

P 1-CL-135 1 *Mile:zonc: Pha:c l Substantial Completion

P 1 -CL- 145 OwnerActivation

Pl-CL- 155

PI-CL-165

P 1 -CL-175

10-Jun-16

10-Jun-16

Pill-CS- 185 Owner Abate,nent /Make Safe

1'1'12-CS- 115 *Mitcsionc: NTP Phase 2

1'112-CS-125 Demo InIerior Existing Gyin & Cafe 09-Jun-16 |4 1)1-Jul i/,

- Remaining Level of Effort lillili Remaining Work Wherry Elementary School - Update #1 McCarthy Building 5 of 14= Actual Levet of Effort I Critical Remainin. Companies

Status Update Layout - For McCarthy UseData Date - I Actual Work 0 0 Mitestone

19-Oct-15

Page 10: p.0.# 40% (034 3 /PAPER 10...Oct 08, 2015  · mccarthy building companies nm, 1717 louisiana blvd ne ste 204, albuquerque nm 87110 albuquerque public schools district #12 p.o. box

Gym Roofing

Kitchen & Cafe RoofingPH2-CR-115

PHQ-CR-125

Pl-12-CR-135

PH2-IGR-115

PHZ-IGR-205

PH2-IGR-215

PH2-IGR-125

PH2-1GR- 135

PH2-IGR-145

PH2-IGR-245

PHZ-IGR-255

PH2-1GR- 185

PH2-[GR-165

PHZ-tGR-195

PHZ-IGR-235

PH2-IGR- 175

PH2-1GR-155

PH2-!GR-225

PH2-IGR-265

Demo & Replace Existing Cafe Roofing

Set New Unis

Mechanical Connections To RTU's

1/W Plumbing Relocations

Framing Modifications & Hardlids

Dr»val] Patch

Install & Infil New Doors

0/H Elecnical Rough-in

0/H Fire Sprinkler Rough-in

Install Special Systems

Install Fire Alarm

Intirior Paint

Install New Basketball Hoops

Install Ceiling Grid

MEP Trim

Install New Sound Panels

install Flooring (Seated Concrete)

Final Clean

*Milestone: Gym Renovations Complete

Cafe Renovation

PHZ-[CR-145

PHQ-ICR-135

PHZ-ICR- 155

Pl-12-ICR-255

PH2-1CR-265

Pl-12-ICR-275

PH2-ICR-285

PHQ-ICR-295

PH2-1CR-305

0/H Fire Sprinkler Rough-in_0/H Mechanical Ductwork Rough-in

0/H Electrical Rough-in

Ceiling Grid

0/H MEP Trim

interior Paint

Polish Concrete Flooring

Final Clean

*Milestone: Cafe Renovations Complete

Kitchen Renovation

PH2-!CR-115

PH2-1CR- 125

PH2-ICR-165

PH2-!CR-175

Demo Flooring

Saw Cut Existing Slab

U/G Plumbing Rough-in

Concrerc Pourback

1/1/4/58 .._

_25 2.·-10#_ _ - k_= L IS.*11 C:€91_5€ 11 L._2 8Wn*#d.q0*1*||S!1**!Eli|1!" SNIE ',--11*Zltl*kt!*b¥ 111*4BF11*0

3 i 12-Jul-16

2 15-Jul-16

2i ]9-Jul-16

3 21-Jul-16

1 26-Jul-16

0

21 ) .J,ii,-Iii3 20-Jun-16 22-Jun-]6 4

4 23-Jun-16 28-Jun-16

6 29-Jun-16 07-Jul-16 1

3 08-Jul-16 1 12-Jul-16 1

3 13-Jul-16 15-Jul-16 _L_-13 18-Jul-16 20-Jul-16 L_4 21-Jul-16 1 26-Jul-16 i

27-Jul-16 1

27-Jul-16

T.I li)-Juit-If, |2 10-Jun-16 12 14-Jun-]6 1 15-Jun-16

3- 1656-16 F - - -- -36-Jun-16

1 21-Jun-16 21-Jun-16--

A-y'.1,-Ifi 13-Juli-1(,

31-Mar16 15-Jun-16 j1- '2 14.-TI ] 01-jul-lfi

12 02-Jun-16 I 17-Jun-!6

3 20-Jun-16 1 22-Jun-]6

7 23-Jun- 16 01-Jul-16

RLh"/..1/, 'iIi--\LY·[h

11)-Ilin-16 1 ' 2('-Jlt| lf'

13-Jun-16

17-Jun-16

2 10-Jun-16

4 14-Jun-[6

3 20-Jun-16

5

9

4

3

3 l 30-Jun-16

3 07-Jui}C--4 12-Jul-16

18-Jul-16

20-jul-16

22-Jun-16

23-Jun-L6 29-Jun-16

30-Jun-16 13-Jul-16

30-Jun-16 06-Jul-16

30-Jun-16 05-Jul-16

05-Jul-16

1 1-Jul-16 '

15-Jul-16

14-Jul-16

25-Jul-16

26-Jul-16

26-Jul-16 FZ--Jut-11,

1 27-Jul- 16 '

13-Jun-16

Run Date -Remaining Level of Effort I Remaining Work Wherry Elementary School - Update #1 McCarthy Building 6 of 14

23-Oct-15

I Actual Level of Effort I Critical Remainin... CompaniesStatus Update Layout - For McCarthy Use

Dat2 Date - I Actual Work * M itestone

19-Oct-15

15*© 83 0 VE NOV 02 2015ACCOUNTS PAYABLE 1

Page 11: p.0.# 40% (034 3 /PAPER 10...Oct 08, 2015  · mccarthy building companies nm, 1717 louisiana blvd ne ste 204, albuquerque nm 87110 albuquerque public schools district #12 p.o. box

Activity ID

Activity NameP}·12-ICI<-185 ' interior Wall Framing 21

PH.2-ICR-245

PH2-]CR-195

l'HZ-ICI{-205

PHZ-!CR-215

PH2-ICR-22 5

PH2-ICR-235

04-Aug- 16

09-Aug- 1609-Aug- 16

1 22-1il-It,

17 ' 111 -Ally-1 b 14 01-Aug- 16 i

3 10-Aug- l 6

0

9 15-Aug- 16 i

P3-DEMO- 115 Owner Abutcm:n[ 10: 13-Jun-16

P3-DEMO-125 MEPDenio&Sahage 10 27-Jun-16 1

P3-DEMO- 135 Roof Demolitioti 10, 30-Jun-16

P3-1)EMO-145 Building I)emolition |01 |5-J„|-16

Basement Renovations

P3-BR-115 Demo Existing Boiler 10, 27-Jun-16

P3-BK-[25 Lns,(all New Boiler [0' 12-Jul-16 25-Jul-16P3-BR-135 Infill Masonry Walls 10: 26-16,1-16 1 08-Aug-16 ,

-P)-BR- 1-15 'Milestotie: Busement Reno'ation Complete 0, 1 08-Aug-16 :

*42#·:-·f '2095*--i .A •,-„4* .r ..•r .* .,-2#5 .20161, - -.1-, C,-t»-, Si

Nif. . *1, . i[)01 ,_ 3 r L,1.8073SIL.1F* - 12 1 Ma@lit?| APL!22-jun-16 1 23-Jun-16

Install Walkin Fleezer IOT-22-Jun-16 1 06-Jul- 16

1/W M EP Rough-in 3 24-Jun- 16 | 38-Jun-16

Diywall / Tape & Tuxiuie 4 29-Jun-14 L 05-Jul-16

Interior Paint 07-Jul-16

Ceiling Grid It OR-Jut-16 - ()8„Jul-16

0. H MEI> Trim 2, It-Jul-16 1 12-Jul-16

PHZ-iCK-315 Install Flooring 3| 13-Jul- 16 1 15-Jut-16

PH2-ICR-335 hatill Kiachen Equiptnent 10 18-Jul-16 - 29-Jul-lbPHZ-ICI{-355 Final Clean I j 04-Aug-16

PHZ-ICK-345 Kitchen Health Inspections / S ign-offs 3 1 05-Aug- 16

Ple-ICR-325 *Milestone: Kitchen Reno, ation Coinplete OI

Restroom Addition 3 I b..linn- 1(, 1PH2-RD-115 Cut Open& InsTali New Door 3{ 16-Jun-16P!12-RD- l25 Interior Framing. 31 21-Jun-16

Pill-KD-135 1/W MEP Rough-in 3! 24-Jun-l 6

1412-RD-145 Drywall /Tape & TeK[u re 5- 29-Jun- 16

P HZ-RD- 1 55 1 ns[:ill Ceramic Tile 3 07-Jul- 16 , 11-Jul-161'1·C-KD-165 Inst11 Toliet Parlirions & Acce;xories 4 12-Jul-16 L 5-J ul- i 6

PH'.-Itt)-175 InS[all Plumbing Fixtures & Trim 41 1 8-Ji,1- 1 C ' 2 1-Jul-16

PHZ-RD-185 Final Clean 1 22=jul-16 ' 22-jul-[6

PH2-RD-195 *Milestotie: Restrooin Additiun Compl:Ic 22-Jul-16

20-Jun-16 123-Jun- 16 |

28-Jun-16 i06-Jul-16

Project Completion / Turnover

PH2-PLC- 115 Develop McCarthy Completion LIM

PH2-PLC- 125 A/E Pint:hlist & Corrections

PH2-PLC-135 *Milestonc: Phase 2 Substantial Completion

PH2-PLC- 145 Owner Activation

PHZ-PLC-!55 Owner Move-in 8 26-Aug-16

[J 7-5p-It,

04-Aug- 16f ILAug-16

--

12-Aug- 16

25-Aug- 16

07-Sep-16

Demo Ph3 West Classrooms 11, 1 1.Ji,IT-M I . 24-1.116 124-Jun- 16

It-Jul-16

l4-Jul- 16

28-Jul-16

08-\Uu- 1 1-, I2 1 l-Jul-16

I

Run Date -Remaining Level of Effort WiR Remaining Work Wherry Elementary School - Update #1 McCarthy Building 7 of 1423-Oct-15

Actual Lei el of Effort I Critical Remainin.. CompaniesStatus Update Layout - For McCarthy UseData Date- I Actual Work 0 0 Milestone

19-Oct-15

Page 12: p.0.# 40% (034 3 /PAPER 10...Oct 08, 2015  · mccarthy building companies nm, 1717 louisiana blvd ne ste 204, albuquerque nm 87110 albuquerque public schools district #12 p.o. box

Activity ID

Foundations

, - :Origina**'EarR'-1 1- .*»-« 3

49£ 29-'iii-[629-Jul-16

1 ACCOUNTS_PAYABLEI

1)(.()'l. 11

P3-FND-115 01 -Aug-16 iP3-FND-125 03-Aug-16 P3-FND-135 12-Aug-16 1P3-FND-145 12-Aug-16

Pi-FIND-155 23-Aug-16

P3-FND-165 29-Aul- 16

P3-FND-175

P3-FND-185

P3-FND-195

P3-FND-205

P3-FND-215

P3-FND-225

P3-FND-235

P3-AND-245

_ StructureP 3-8-115 10 07-Oct- 16 '

, PJ-S-125 4 21-Oct-16

P3-5-135 51 27-Oct- 16 ------

P;-S- 145 0

Exterior Skin 771 21-1#-16 1P;-ES-115

Pl-ES-125

Pi-ES-135

P)-ES-145

P3-ES-155

P)-6-165

P3-ES-175

P3-ES-185

P]-ES-195

P3-ES-205

P3-125-215

P3-ES-225

__PJ-ES-235P,-ES-245

Activity Name

-31-*0669-&339-'* -91*Y€4*t -M#rED--1-Abil

Site Survey

Sil: Grading 3! 01-Aug-lh--

Muss Over-Ex • Recompact 7 04-Atig- 16

' Milestone: Building Pad Complete OI

1-R P - Concrete Footings 7, 15-Aug-16 1

S[:m Walls 5 23-Aug- 16

Install U/G Plumbing (De:p) 4' 30-Aug- 1 6 02-Sep- 16

ABC Prep 2 06-Sep-16 07-Sep-16

Install U/G Plumbing (In AB) 5· OR-S* 16 T 14-5:216

Ins[all U/G ElectriGI (In AB) 5 13-Sep-16 19-Sip-16

QAQC - Install Vapor Batiier 1 30-Sep-16 T 20-Sep-16

E K·P- Concrew SOG 7' 21-Sep-16 29-Ser 1 6

QA QC - Colicrete Cure 5 30-Sep- 16 06-Oct- 16

*Milestone: SOG Complete 0, 06-Oc[-16

1 42 07-Oct-16 1 113-A.,-16 1Structural Steel

Install Root-Joists

install Roof Decking

*Miles[une: Structure Complete

20-0+- 16

26-Oa-16

02-Nov-16

02-Nov-16

1)9.-Frb-17 Install Clips 31 21-Oct- 16 1

Extlior Fr:uning 8 09-Nov- 16

E.fierior Slieuthing / Insulalion . F» ek 8 15-No,-16 25-Nov-16 |

*Milestone: Exierior Dr>-in Complete 0 25-Nov-16

MI:unry Veneer 16 28-Nov- 1 6 19- De-16 1Stucco Lath & Brown Coat

Slucco Suatch Coat 3' 16-Dee-[6

Q.A'QC - Smcco Cure Time 51 21-Dec/6 1

Stucco Finish Con[ 5: 29-Dec- 16 05-Jan-17 1

Exterior Window Fraining, GIL,Zing & Meal Panels i . , 7, 06-Jon- 17 16-Jan-17 4

Extrio,· Doo, s & Hardware (incl Auu} Openers) 5 17-J:in- 17

Esterior Lighting & -1 rim 3 24-Jun- 17

-- --i;.--.-- .-

Exterior Cuu tking 4 27-Jan- 17

Exterior Puinting (Atili Gralini Coating)

25-Oc[-16

IN-Nor- 16

10 02-Dec- 16 15-Dec-16

20-Dec-16 j2H'-Dec-16 i

23-Jan-17 1

26-Jan- 17

Utfeb- 17 6 02-Fab- 17 , C)9-Feb-17

38-16Roofing [)3.,/'-16

P3-ROOF- 115 Mecti Curbs / Penetratiolis / Roof Dipins 1 03-Nov-16 03-Nov-16 P3-ROOF-125 EXP - Lightweight Concrete Deck 3 04-No,-16 __ - 08-Nov-16 P3-ROOF- 135 ' Panipet Framing Shealliing 4 09-Nui·-16 14-Nuy-16 1

P3-ROOF-145 Install Roofing 8 15-Nm-16 1 25-Nor-16

Run Date - Remaining Level of Effort Remaining Work Wherry Elementary School - Update #1 McCarthy Building 8 of 1423-Oct-15

= Actual Lei el of Effort I Critical Remainin... CompaniesStatus Update Layout -For McCarthy Use

Data Date- 11111111 Actual Work 0 0 Milestone

19-Oct-15

Page 13: p.0.# 40% (034 3 /PAPER 10...Oct 08, 2015  · mccarthy building companies nm, 1717 louisiana blvd ne ste 204, albuquerque nm 87110 albuquerque public schools district #12 p.o. box

Crriginai Early Start,.1 2 Actual„* 'Early. Finish . Actuair*..- -Du gtion 1 <4-„ ''=* '*3614** R ».:. , ..Anish-# "*970¢lt

_ 0/H Rough-ins 19 1441.1-If, B1'3-MP-OH-115 Mech Ul>out ' f 1 40&16 1 14-Oct- 16

P3-MP-OH-135 0 H Fire Sprinkler Rough-m 19-Oc[-16

93-MP-OH-135 0. H Mechanical Piping Rough-in 20-Oct- 16

P'3-Mi'-01-1- 145 0, H lechanical Ductwork 25-Oct-16

1 27-Oct-!6 1

31-Oct-16

01-Nor-16

03-Nov-16 '

09-Nov-16 1

09-Nov- 16 i 1/W Rough-in 20 21-(Id. 11, 17.\Un-ID

P)-MP-1 W- 1 15 Fruming Luyout 31 21-Oct-16 24-Ocr-16 '

P3-M P-1 W-1 25 111:itilli Top Tiack

. P3-MP-IW-135 mt Wall Froming

P3-MP-IW-145 1/W Elect RN#.in

1'3-MP-IM-155 WAI Backing

1'3-Mi'-1 W- 1 65 1.'W plutilbing Rough-in

23-MP-IM-175 Pull F/AWire

L Interior Finishes___P3-MP-INT-11 f Drywall - One Side 4 14-No,-16 17-No,·-16 |1'3-MP-IN'f- 121 1/W insulation 2' 18-Nm -16 , 21-Nov-16

PH-MP-1 Nl= 13'. Drywall - 2nd Side 4 F Skivv- 16 1 T 2*-Nov-16 :

P3-MP-INT- 1 4. Scre„ Inspection 1 29-No,-16 i 29-Nov-[6 ,

P3-MP-[NT-1 51 Tape & Texture 4, 30-Nov-16 1 05-Dec-16 i

P3-MP-IN-r-16f Pritne & Isi Cuitt Pai,it 41 06-Dee- 16 09-Dev- 16 7P3-MP-[NT- 17.' Ceiling Grid 4, 12-Dec-16 15-Dec- 16 1

P3-MP-INT- 183 Fire Alarm Trim 5' 16-Dec-[6 22-Dec-16

P3-MP-INT-195 Sprinklcr Drops 31" 16-Dec- 16 20-Dec- 16

Actteltyl[3 - - - Activity Nama-3®ibe-_31:-**KI.- 3134-321,17Me*§rl'-'imw -7,1 *pri

P]-R001·-155 ' *Milestone: Rot)fDry-in 01

P3-ROOF- 165 [116,311 COping Cup 3, 28-No,-16P3-ROOF-175 lithtall P V Solar 15 | 01-Dcc-16 : 21-Dcc- 16

LMutilpurpose / Corrdior Buildout ,){11 17.(11-In T ' 1=-1b-Ir Demolition 1 1,(©-rl---P)-D-C- 115 Demo Existing Corridor /Mutilpurpose Room 5| 07-Oct-16 1 13-Oct- [6

1 25-Nov-16

, 30-Nov-16

3: 17-Oct-16 '

3 1 18-Oct-16 ,

4 ' 20-Oct- 16

P3-MP-Oil-155 0/H Plumbing Rough-in 31 25-Oct- 16 i1'3-MP-01+165 0,3 Electrical Rough-in 3 1 27-00- 16

1':-MP-OH- 175 QA/OC - OHMEPRough-in 11 6132.- 16P)-MP-OH- IHS HVAC Controls Rough-in 2I 02-No,·-16

1'3·MP-0!1-1 45 Hardlid Framing 4 04-Nov-16

1'3-MP-OH-205 'Milesione: O H MEP Rough-in Inspection 0;

3' 25-Oct- 16

2 i.&,4 -5, 02-Noi-16

3 1 04-Nov- 16

41 07-Nov-16

4 I 11 -Nov- 16

Pl-Ml'-1 W- 1 35 Pull SJS Wire 2' 11-Nov-16

P)-MP-IW-195 Q.4QCMEPI,WRough-in 1 11-Nov-1(,

P)-MP-114'-205 Elect Brmich & System Wire 5 1 1-No JiiP3-MP-1'* -2 15 'Milestotic: 1/W MEP Rough-in Inspect 0!

27-Ow- 16 '

31-0,1-16 |08-Nu,'-16 '

08-No·- 16

10-Nuv-16

le-Nov-16

14-Nov.16 ,

11 -Nu,-16 '

17-Nov46 ,

11-Nov-16 1

34

Run Date - Remaining Level of Effort Remaining Work Wherry Elementary School - Update #1 McCarthy Building 9 of 14

23-Oct-15

= Actual Level of Effort I Critical Remainin... CompaniesStatus Update Layout - For McCarthy Use

Data Date - I Actual Work 0 0 Milestone

19-Oct-15

Page 14: p.0.# 40% (034 3 /PAPER 10...Oct 08, 2015  · mccarthy building companies nm, 1717 louisiana blvd ne ste 204, albuquerque nm 87110 albuquerque public schools district #12 p.o. box

1rov 0 2-2015 ACCOUNISPAYABLE

f: Actilair

'4SiffEActivity ID s-. 9*giriall--**dy Sial€,-1* Actual'--itiaily Fini*h AN//MEE-p« 70*114 <C,='¥winpd> -·:WE-*-· p

31-1!Ple***1%5Ni* s'Fr Digr,- -*.-3CEllii.E*0Kf|RIM- 2*ApriActivity Name

PJ-M P-IN 1--203 Med Trim 3. 16-Dee- 16 L _ 20-De».!6P3-MP-INT-21 '. Special Systems ': 23-Del | 27-D.-16

P3-MP-1 NT-225 Eled Lighting & Trim 3 23-Dec-16 i_ _ 1 28-Dec-16P3-MP-INT-233 Poli.h Floors 41 29-Dec-16 | 04-Jan-17PJ-MP-INT-243 Millwork 5-1--35*17 1 11 -*-17 ,P)-MP-INT-251 Makerboards / Misc Specialties 41 05-Juu-17 10-J,n- 17 TP)-MP-IN'f-261 Flouring (Carpet) 12-Jan-17 1 17-Jan-17

Pl-MP-IN'f-273 Pluinbing Trim 3 12-Jan#7 16-Jan-17

P3 -M P-INT-283 Drop Ceiling Tile 5 12dan-17 ; 3 18-jun-17

1'3 -MP-INT-293 Int Dours & Hardware

P3 -MP-INT-305 Final Paini

P3-MP-INT-31 3 Signage

P3-MP- IN-1--323 Final Clcan

4 IX-Jan-17 23-Jan- 17

3 24-Jan-17 26-Jan-17

1' 27-Joli-/7 1 27-Jan-17

2! 30-Jan-17 1 31-Jan-17

Restroom 151 (16-Dir.,. ' 1 21-L)...11' 71 06-Dec-lf_ 1 14-Dec-16

4 15-Dec-16 1 20-Dcc-16

4 21-Dec- 16 1 27-Dee-16

U 1 27-Dte-16

P3-MP-RR- 115] Restrooms - Ceramic Tile

Pl-MP-RR- 125 Restrooms - Tolict Partitions & Accessories

P3-MP-RK-135 Restiooms - Plumbing Fixtures & Trim

P3-MP-RR-145 *Milestone: Restrooms Complete

Pre-Punch

P3-M P-PP-115 Develup M:Car[hy Cumple[iun List

E-MP-PP-125 A/E Punchlist & Corrections

P3-MP-PP-135 *Milestonc Multipurpose Rooin Complete

Iii-A"I-If, 1

:3 (13-:%'.,'-l<' P)-18-OH-115 Mech Loyout 2 03-Nov- 16 i 04-Nov-16

P3-!13-OH- 125 0,H Fire Sprinkler Rough-in 3 07-Nov-16 09-Nov-It

P3-18-OH-135 ' 0.'H Mechanical Piping Rough-in 5 08-Nov- 16 1 14-Nov-16

P3-IB-OH-145 0/H Mechaiical Ductwork 8' 10-NoJiC] 2 t-No,-16

P3-18-OH-155 0,H Plumbing Rough-iii 5 15-Nov-16 J 21-Nov-16

P)-1 8-OH- 165 0, H Elec[rical Rough-in 15 17-Nov- 16 : 08-Dec- 1 6

P3-18-OH-175 ' QAQC - OH MEP Rougl,-in 1 09-Dec- 16 09-Dec-16

P348-OH-1 %5 HVACControls Rough-in 3' 12-Dec-16 14-Dec-16

- A-IB-oH- 195 Hardlid Framing 4| IS-Dec-16 20-Da- 16

1 P3-18-OH-205 *Milestone: O,H MEP Rough-iii inspection | 20-Dec-16 1

] 1/W Rough-in_ _ 25I 1.-A:,46 LP3-18-!W-115 Framing Layou[ '| 15-Nov-16 1 16-Nuy- 16

P.3-[B-[W- 125 install Top Track 3; 17-No,-16 1 21-No,-16

P3-18-IW-135 Int Wall Framing 5 22-Nov-th 29-Nov-16 93-18-1 W- 145 1/W Elect Rough-in 5 2%-Nop-16 , 02-Dw- 16 T

It) 11:·1·ci,-1- | !.4-h:b- 175 01-Feb-17 I 07-Feb- 17

5 08-feb-17 14-Feb-17

01 14-Feb- 17

1_ff't'11_1_Z[ 1- Un -16

2(ADI--10 1

Run Date- I Remaining Level of Effort Remaining Work Wherry Elementary School - Update #1 McCarthy Building 10 of23-Oct-15

Actual Level of Effort Critical Remainin... Companies 14

Status Update Layout - For McCarthy UseDdta Date - IIIIActual Work 0 * M ilestone

19-OCI-15

Page 15: p.0.# 40% (034 3 /PAPER 10...Oct 08, 2015  · mccarthy building companies nm, 1717 louisiana blvd ne ste 204, albuquerque nm 87110 albuquerque public schools district #12 p.o. box

Activity Name 9*Mi#Rew.# 88#!101.a €Irl*12!*'bl' „Adual.- 31,443- -2..,4, MR,4* 1.- :=e»,414£#*ME-<45 #*4

P)-IB-[W- 155 Wull Backing

P348-]W- 165 [/W Plumbing Rough-inP3-18-IW-175 Pull F/AWirc 07-Dec-16

P3-18-IW-185 Pull S/S Wirc 2. 07-Dec- 16

P3-18-IW- 195 QAQC MEP 1/W Rough-in 1 (17-Dec-16

P3-18-IW-205 Elect Branch & Systein Wire 101 07-Dec-[6P3.18-IW-215 *Miles[unc: 1.'W MEPRough-in Inspect Ol

Interior Finishes (4, t},-|)„-14,P3-18-INT-115 Drywall-One Side

PY-18-IN'l'-125 144' Insulatioti

09-Mar- 17 L

13-Mar- 17 i

Elect / IDF Room 1 4/.lI,-111 07-Nov-16

2I Il-Jan-17

3| .13-Jn-17 _ _ 16-Jan-17 1

LRestroom 15 It-Jan-1- - -1 31-J.in. 1-1P)-IB-RR-1 1 5 Restroolns -Ceramic Tile 19-J.in-17

568-17 7

Activity ID

:1/n =,Slimpur.flie#M**SI|EBR'd3 i 30-No,-16

1 OM-Dec-164

02-Dec-16

06-6246- F-

12-Dec- 16i

03-Dee- 16

07-Dec- 16 i20-Dee-16 1

07-Del>16

13-Alim -l- 7 08-Dec-16 1

2 19-Dec- 1 6

1'3-]B-INT-135 Drywall-2,id Side 5' 21-Dec-16

P3 -1 B-INT-1 45 Screw Inspection 1 29-Dec- 16 1'3-18-IN-1--155' Tape & '1-emire 7 30-Dw- 16

1'3-18-INF-}65 Prinie & Ist(Joutfaint 4 11-Jan-17 Q 16-Jan- 17

PJ-IB-[NT- 175 Ceiling Grid & Clouds 6 17-Jan-17 24-J.,14 7

P]-LB-INT-185 Fire Alarm Trim 27-Jan-[7--

PLIB-IN'f-195 Sprinkler Drops 3' 25-jan-17 27-Jan-17

P3-113-INT-205 Medi Trim

P3 -18-iN r-2 15 Special Systems 30-Jan-17 31-Jan-[7

P3-1 8-INT-225 Elect Lighung & Trim 6, 30-Jan-17 06-Fcb- 17

PJ I!2T-2£] Poihh_Floom 6 07-Feb-!7 P3-!B-INT-245 Install Entrance Mals 3 07-Fcb-17 1

P3-18-IN-1--255 Millwork 1 5 15-Feb-17

P3-18-INT-265 Makerboards/Misc Specialties 4 15-Feb- 17

P3-1 8-INT-275 Flooring (Curpell 4 12-Feb- 17

1'3-IB-IN'[-285 Plumbing Trim 3 23-Feb-17

P3-tB-INT-295 Drop Ceiling Tile 5 22-Feb-1793-18-1NT-305 int Doors & Hardn'are 4 28-Feb- 17

P3-18-IN-1-315 Finul Paini 3, 06-Mar- 17

P3-18-IN'F-325 Signage 1 ' 09-Mur- 17

P)-18-[NT-335 Final Clean 4- 10-Mar-17

16-Dec-16

20-Dec- 16

28-Dec- 16

19-Dec- 16

10-jan- 17

3 25-Jai„-17 27-Jan-l7

14-Feb-17

09-Feb-]7

21-Feb-17

20-Feb- 17

27-Fub- 17

2+1-cb- 17

28-Fet-17

03-Mar- 17 |

08-Mai-17

# 0--M,1·If, ]1'3-1 8-IDF-115 F,RP - Housekeeping Pads 07-Nov- 16 !

P3-113-IDF- 125 Hung & Paint Plynuod 12-Jani-17

P3-18-IDF-135 Panel Rough-in

7 1 I l-Jan-17 1I'3-tB-RR- 125 ' Rcstrooms - Tolict Partition. & Acces:oricb 41 20-Ja,17 1

P,-[B-RR- 1 35 Restroums - Plumbing Fixtures & Trim 4 26-Jun-17 ; 31 -Jan- 17 |P3-18-RR- 145 *Miles[une: Racrooms Complete Oi 1 3 l-Jim-17

Run Date-Remaining Level of Effort = Remaining Work Wherry Elementary School - Update #1 McCarthy Building 11 of

23-Oct-15= Actual Level of Effort Critical Remuinin... Companies 14

Status Update Layout - For McCarthy UseData Date - Actual Work 0 M ilestone

19-Oct- 15

Page 16: p.0.# 40% (034 3 /PAPER 10...Oct 08, 2015  · mccarthy building companies nm, 1717 louisiana blvd ne ste 204, albuquerque nm 87110 albuquerque public schools district #12 p.o. box

855NE- '9· =*2*19*-3-,-r-for.Ts-=1)-33>-77'

HVAC Start-up & Testin,P3-IB-HVAC- i HVAC Controls, Devices, & Programming .

__P3-18-HVAC- · HVAC Bump Start Units & Climatize 3P3-18-HVAC- · *Milestone Clima{,Mion Complete

P3-18-HVAC- , HVAC Test & Balance

I P3-18-HVAC- i Comissioning

Pre-Punch '

P3-IB-PP- 115 ! Develop McCarthy Completion List

P3-18-PP-125 A./E Punchlist & Corrections

P3-18-PP-135 , *Milestonc: Level 1 Complete

__Library Interior Buildout0/H Rough-insP3-LB-OH-115 Mcch Layouz

P3-LB-OH-125 0/H Fire Sprinkler Rough-in

P3-LB-OH- 135 0/11 Mechanical Piping Rough-in

P3-LB-OH-145' 0/1-1 hlechonictiluctn ork--

P3-LB-OH-155 0/H PIU„ihing Rough-iii

P3-LB-OH-165 0/H Electrical Rough-in

PJ-LB-OH-175 : QA/QC - OH MEP Rough-in

P3-LB-OH-1 85 HVAC Controls Rough-in

P)-LB-OH- 195 Paint O/HDuctwork

P3--OH-OOST*dlkiFramidg1 P3-1-8-OH-215, *Milestonc: 0/H MEP Rough-in inspection

1/W Rough-in

P)-LB-IW-1 15 Framing Layout

P3-LB-1W-125 , install Top Track

P3-LB-IW-135 Int Wall Framing

PJ-LB-LW-145 ' 1/W Elect Rough-in

Z - P]-LB-IW-155 - Wall BackingP3-LB-l W- 165 1/W Plumbing Rough-in

Z P)-LB-!W-175 1 Pull F/A Wire

P3-LB-IW-185 Pull S/S Wirc

P3-LB-INT- 1 IS Drywall - One Side

P3-LB-INT-129 1/'W insulation

P]-LB-INT-135 Drywall- 2nd Side

10| 20-Feb-17

') 1-:-,U/1-1. i4{ 14-Mar-17 1

5 20-Mar-17

0

17-Feb-17

03-Mar-17

03-Jan-17

05-Jan-17

09-Jan-17

:/52:908:LA.L:/lau//r* 41!//94*#'1|1{0*2WR|S?*igidiff t.9?11/ef 1.-mE/Blt¥ IryuM*Ki*215 il- 1.,„-i- I 1 '11-\1.11-i- 151 30-Jan-17 1 1 03-Feb-17

5 06-Feb-17 10-Feb-17

3 21-Dec-[6

4 22-Dec-16

4 29-Dec-16

29-Dce-16

1 29-Dec- 16 1

5 29-Dec-16

01

:Ii .;fi-I).,I· it L2 ' 30-Dec-16

2; 04-JQ- 17 12 06-Jan- 17

0--I--

5 13-Feb- 17

10-Fub-17

24-1.11 -1 - I1 17-Mar- 17

24-Mar-17

J 24-Mar-17

1,1.M,"-1- '5 -2-''I'-Ii, 1-Di. 1 t, i

22-Nov-!6 23-Nov- 16

3 25-Nov- 16 29-Nov-16

7 28-Nov-16 06-Dec- 16

51 30-Nov-16 06-Dcc-16

2 01-Dee-16 02-Dec-16

5 , 05-Dec-16 09-Dec-16

1 1- 1 12-Dec-16 131 13-Dcc-16

_4] 164)5> 16 »4 22-Dec-16

0

12-Dec-16

15-Dow-16

21-Dec-16

28-Dec-16

28-Dec-16

2(1 O--LM:· 14 2 07-Dec-163 09-Dcc-16

5' 14-Dec-16 5' 19-Dec-16 |

i 23-Dcc-16

1 28-Dec-16

I 04-Jan-17

30-Dec-16

P3-LB-W-195 QA/QC MEP 1/W Rough-inP3-LB-IW-205 : Elect Branch & System Wire

P3-LB-iW-215 *Milestonc: 1/W MEP Rough-in inspect

03-1 aii-1 7 I08-Dec-16

13-Dec-16

20-Dec-16

23-Dec-16

29-Dec-16

05-Jan-17--

29-Dec-16

Interior Finishes L 11-\1.11-17 i

Run Date - ..=„= Remaining Level of Effort Remaining Work Wherry Elementary School - Update #1 McCarthy Building 12 of23-Oct-15

- Actual Level of Effort I Critical Remainin. Companies 14

Status Update Layout - For McCarthy UseData Date - I Actual Work 0 Milestone

19-Oct-15

1-35([s [E 11 \W IE 2

NOV 0 2 201525

ACCOUNTS PAYABLE

Page 17: p.0.# 40% (034 3 /PAPER 10...Oct 08, 2015  · mccarthy building companies nm, 1717 louisiana blvd ne ste 204, albuquerque nm 87110 albuquerque public schools district #12 p.o. box

ActivityTD Original -Eari, Sta,j'., A*ual. 1Emi¥Finish , Actuar.:K.>421 .,t -'.10152=44- .>';-=11. - · · 'J:U=*'*291* 11.---T-»,»1 1

3 06-Mar- 17 i

1 09-Mar-17 1--

21 10-Mar-17 i ! 13-Mar-17 1

_HVAC Start-up & Tesying 23 (}f,-lei,- 17 1,1.61'"-17 w

=[ Pre-Punch

24-Mar-17

24-Ma,-17 1

41 10-Mar- 17 1

23 111-1·el-17 PH3-HS- 135 ' F,R'P - Musonry Wall Fotings 4' 10-Fet- 17 1 15-Feb- 17 Pt!3-1-13-1 15 tnstall CMU Sile Walls 6 16-Feb-17 1 23-Feb-17 1l'H3-HS- 185 Walerproof CMU Walls 2 24-Fcb-17 27-Fub-17 :PH3-HS-145 Pour Con:rit: Hurdkcape R' 28-Feb-17 1 09-MT,-17 ;

Activity Name

P.-LB-INT-145 Screw Inspection 1 10-Jan-17

P3-LB-INT-155 Tupe & Texture 7 1 1-Jati- 17

P3-LB-INT-165 Prime & lst Coat Piti,it 2 30.Jin- 17 23-Jitn- 17

P)-LB-] NT- 175 Ceiling Grid & Clouds 6 24-Jitn-17 31-Jw -17

P)-LB-INT- 185 Fire Alarm Trim 3 ()1-Feb-17 03-F:b- 17

P3 -LB-INT-195 Sprinkler Drops 3 01-Feb-17 t] 3 - Feb- 17

P3-LB-INT-205 Mcch Trim Ji 01-Feb-17 03-F:b-17 1--

Pi-LB-IN'1-215 Special Systems 2; 06-Feb-17 07-Feb-17 *

P)-LB-INT-225 Elect Lighting & Trim (Including Box Lights) 7' 06-Feb-17 14-Feb-17 ,1Y P3-LB-INT-235 Millwurk 51 15-Fcb-17 21 -Feb-17 ;

P3-LI:1-1 NT-245 Mukerboards / Misc Speciulties 4 15-Feb-17 20-Feb-17 |P3-LB-INT-255 Install Entrance Mats 3, 15-Feb-17 1 17-Feb-17

----- 1-----

1'3-LB-INT-265 Flouring (Carpct) 4< 22-Feb-17 1 27-Feb-17 1 - p)-LB-,4*275 Plumbing Trim 3 22-Feb-17 1 24-Feb-17

-

P3-LB-INT-'85 Drop Ceiling Tile 5 22-Feb-17 28-Feb-17 |P3-LB-IN'1-295 In[ Doors & Hardware 4 28-Fcb-17 1 03-Mar-17 i

P3-LB-IN'1-305 Final Poinl 08-Mar- 17 $

P3-LB-INT-3 1 5 Signage 09-Mar- t7

P3-LB-INT-325 Final Clean

10-Jan- 17

19-Jan-17

P3-LB-HVAC HVAC Controls, Devices. & Programming 51 06-Feb- 17 jM-LB-HVAC HVAC Bump Start Units & ClimatiZe 5| 13-Feb-17 | ! 17-Fub-17

P3-LB-HVAC *Milestone Cliniatizution Complete 01 17-Feb-17

E-LB-HVAC HVAC Tes[ & Billance 5 20-Feb-17 1 24-Feb-/7

P3-LB-HVAC Comissioning 10 27-Feb-17 10-M-17

9

; 10-Feb-17

1 22--Nia-1---11 17-Mai·- 17P3-LB-PP- 115 Develop MCCOrthy Coinple[ion Lis[ 4 14-Mar- 17 |

i P3-LB-PP- !25 NE Punchlist & Corrections 5; 20-Mar-17

1 Pl-LB-PP- 135 *Mil,»to,iL: Libiw)·Cumplde 0I

LHardscape / Landscape 2

Courtyard 14 24-let,-1 - 1 15 M.u-17

PH3-HS-125 1,istall Musonry Site Walls 4 24-Fcb-l7 01-Mar-17 PH3-HS-155 Pour Concrete Hardscape 61 02-Mar- 17 1 09-Mar- 17

PH3-HS- 175 Install Decerative Fencing & Gate 15-Mar-17 -Ampitheather- _ 1 14-NL/-!-

Run Date- -Remaining Level of Effort QiR Remaining Work Wherry Elementary School - Update #1 McCarthy Building 13 of

23-Oct- 15

Companies 14I Actual Level of Effort I Critical Remainin...Status Update Layout - For McCarthy Use

Data Ditte - 111111111 Adul Work 0 0 M ilestone

19-Oct-] S

Page 18: p.0.# 40% (034 3 /PAPER 10...Oct 08, 2015  · mccarthy building companies nm, 1717 louisiana blvd ne ste 204, albuquerque nm 87110 albuquerque public schools district #12 p.o. box

Activity ID ActivityName

1 PH3-HS- 165 ' Install Chainlink Fencing__Project Completion / Turnover

Testing & InspectionsP 1·13-TI· 1 1 5 FA - File Alurm Inter face w, HVAC Con[tois

PHARAP FA - Prognim Fire Alarm Devies

J PH)-TI- 135 FA- Pre-Test Fire Alarin System

Pi13-Tl- 1 +5 FA - Pre-Te Fire Sprinkler / Firc Protic[ion

['1·13-Ti- 155 FA-Fire Marshallinspee[ion

PH3-TI-165 *M ilestone: Cert O f OCCUpaticy

- Substantial Completion

1'3-PLC- 115115 Develop Metarthy Com®ti811-istP3-PLC- 1 15125 A/E Punchlist & Corrections

P3-PLC-115135 'Milestone: Phase 3 Subbtantial Completion

, P3-PLC-115145 Own:1· Activution / Owner Movc-in

Pl-PLC- 115155 'Milcs[one: F'inal Complclion

15 2--\1.i,-17

3| 27-Mar-17 3 i 30-Mar- 17

3 1 04-APR 73' 07-Apr- L71 12-Apr- 17O]

5 27-Mur- 17 1

1 0 03-Apr-17

22 18-Apr-17 1

14-Mar- 17 |

14-,\11,-17

29-Mar-17 |

03-Apr- 17 06-Apr- 17 i

11-Api- l7 1

12-Apr- 17 1

12-Api·-17 14-Apt-17 '

31-Mar-17 L+Apr- 17 |14-Api·-17 <

17-Mu>-17

17-Mar I 7

1 -3| 10-Mar- 17 |

1 E © [E [1 N# IE 1- NOV 02 2015

ACCOUNTS PAYABLE

Run Datu - .Remaining Level of Effort [= Remaining Work Wherry Elementary School - Update #1 McCarthy Building 14 of

23-Oct-15

I Actual Level of Effort i Critical Remuinin. Companies 14

Status Update Layout - For McCarthy UseData Date- I Actual Work 0 Milestone

19-Oct-15