oz minerals page 1 - melbourne mining club · 2016. 12. 15. · note: chart include adjustment for...

15
OZ MINERALS PAGE 1

Upload: others

Post on 10-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OZ MINERALS PAGE 1 - Melbourne Mining Club · 2016. 12. 15. · Note: Chart include adjustment for deposits missing from the database Source: MinEx Consulting Sept 09. OZ MINERALS

OZ MINERALS • PAGE 1

Page 2: OZ MINERALS PAGE 1 - Melbourne Mining Club · 2016. 12. 15. · Note: Chart include adjustment for deposits missing from the database Source: MinEx Consulting Sept 09. OZ MINERALS

OZ MINERALSMELBOURNE MINING CLUB

TERRY BURGESS MANAGING DIRECTOR & CEO

10 June 2010

WWW.OZMINERALS.COM

Page 3: OZ MINERALS PAGE 1 - Melbourne Mining Club · 2016. 12. 15. · Note: Chart include adjustment for deposits missing from the database Source: MinEx Consulting Sept 09. OZ MINERALS

OZ MINERALS • PAGE 3

DISCLAIMER

This presentation has been prepared by OZ Minerals Limited (“OZ Minerals”) and consists of written materials/slides for a presentation concerning OZ Minerals.

By reviewing/attending this presentation, you agree to be bound by the following conditions.

No representation or warranty, express or implied, is made as to the fairness, accuracy, or completeness of the information, contained in the presentation or of

the views, opinions and conclusions contained in this material. To the maximum extent permitted by law, OZ Minerals and its related bodies corporate and

affiliates, and its respective directors, officers, employees, agents and advisers disclaim any liability (including, without limitation any liability arising from fault or

negligence) for any loss or damage arising from any use of this material or its contents, including any error or omission there from, or otherwise arising in

connection with it.

Some statements in this presentation relate to the future and are forward looking statements. Such statements may include, but are not limited to, statements

with regard to intention, capacity, future production and grades, projections for sales growth, estimated revenues and reserves, targets for cost savings, the

construction cost of new projects, projected capital expenditures, the timing of new projects, future cash flow and debt levels, the outlook for minerals and

metals prices, the outlook for economic recovery and trends in the trading environment and may be (but are not necessarily) identified by the use of phrases

such as “will”, “expect”, “anticipate”, “believe” and “envisage”. By their nature, forward-looking statements involve risk and uncertainty because they relate to

events and depend on circumstances that will occur in the future and may be outside OZ Mineral’s control. Actual results and developments may differ

materially from those expressed or implied in such statements because of a number of factors, including levels of demand and market prices, the ability to

produce and transport products profitably, the impact of foreign currency exchange rates on market prices and operating costs, operational problems, political

uncertainty and economic conditions in relevant areas of the world, the actions of competitors, activities by governmental authorities such as changes in

taxation or regulation.

Given these risks and uncertainties, undue reliance should not be placed on forward-looking statements and intentions which speak only as at the date of the

presentation. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, OZ Minerals does not undertake any

obligation to publicly release any updates or revisions to any forward looking statements contained in this presentation, whether as a result of any change in OZ

Minerals expectations in relation to them, or any change in events, conditions or circumstances on which any such statement is based.

Certain statistical and other information included in this presentation is sourced from publicly available third party sources and has not been independently

verified.

Page 4: OZ MINERALS PAGE 1 - Melbourne Mining Club · 2016. 12. 15. · Note: Chart include adjustment for deposits missing from the database Source: MinEx Consulting Sept 09. OZ MINERALS

OZ MINERALS • PAGE 4

• Asset life

• Exploration

• Commodity cycles

• Human capital

MINING: A LONG-TERM BUSINESS

Page 5: OZ MINERALS PAGE 1 - Melbourne Mining Club · 2016. 12. 15. · Note: Chart include adjustment for deposits missing from the database Source: MinEx Consulting Sept 09. OZ MINERALS

OZ MINERALS • PAGE 5

ASSET LIFE ROUTINELY UNDERESTIMATED

Selected assets:

Mine Start up Original

life

Actual mine

life

Projected

life

Henty 1996 4.5 14 1.7

Kanowna Belle 1993 10 17 4

CSA 1964 15* 45 2.5

Kansanshi 1939 ? 41 13

Nkana 1932 ? 78 23

Iduapriem 1992 4 18 14

*estimate

Source: Public Documents, MEG Data

NB: Accuracy of all figures cannot be guaranteed

Page 6: OZ MINERALS PAGE 1 - Melbourne Mining Club · 2016. 12. 15. · Note: Chart include adjustment for deposits missing from the database Source: MinEx Consulting Sept 09. OZ MINERALS

OZ MINERALS • PAGE 6

ASSET LIFE: GIANT COPPER DEPOSITS SIGNIFICANTLY GROW IN SIZE OVER TIME

Source: Minex Consulting based on Company

Annual Reports and Press Releases

Oyu Tolgoi

Pebble

EscondidaOlympic Dam

La Granja

ResolutionReko Diq

Grasberg

Tampakan

Current Resource + Cumulative Production (mt Cu metal)

Years after discovery

Kalumbila

Page 7: OZ MINERALS PAGE 1 - Melbourne Mining Club · 2016. 12. 15. · Note: Chart include adjustment for deposits missing from the database Source: MinEx Consulting Sept 09. OZ MINERALS

OZ MINERALS • PAGE 7

EXPLORATION EXPENDITURE: COPPER DISCOVERIES

Exploration expenditures and amount of metal foundPrimary copper deposits >0.3 Mt found in Western World: 1950-2009

0

30

60

90

120

1950 1960 1970 1980 1990 2000 2010

$0

$1

$2

$3

$4

Exploration Expenditures

Estimates

Pro-rata for Deposits w/out Discovery date

Western World Discoveries

Mt Cu

Exploration Expenditures

(2008 US$B)

Note: Chart include adjustment for deposits missing from the database Source: MinEx Consulting Sept 09

Page 8: OZ MINERALS PAGE 1 - Melbourne Mining Club · 2016. 12. 15. · Note: Chart include adjustment for deposits missing from the database Source: MinEx Consulting Sept 09. OZ MINERALS

OZ MINERALS • PAGE 8

PROMINENT HILL - PROSPECTIVITY

ML

EL4390

EL3795

EL4283 ML6228

EL4429

EL4429

EL4025

EL4132

EL4429

Prominent

Hill

EL

ML

EL

ML

OZ Minerals 100%

OZ Minerals mining lease

IMX exploration lease

IMX Mining lease

Prospect

OZ Minerals & IMX Joint Venture tenements - ~7,000km2 combined

Page 9: OZ MINERALS PAGE 1 - Melbourne Mining Club · 2016. 12. 15. · Note: Chart include adjustment for deposits missing from the database Source: MinEx Consulting Sept 09. OZ MINERALS

OZ MINERALS • PAGE 9

COMMODITY CYCLICITY

Source: LME, ANZ

Global copper prices 1970-2009

0

50

100

150

200

250

300

350

400

450

1970 1975 1980 1985 1990 1995 2000 2005

US c

ents

/lb

Oil crisis

Stagflation

80's boom

90's recession

Tech boom

China boom

Japan boom

Page 10: OZ MINERALS PAGE 1 - Melbourne Mining Club · 2016. 12. 15. · Note: Chart include adjustment for deposits missing from the database Source: MinEx Consulting Sept 09. OZ MINERALS

OZ MINERALS • PAGE 10

HUMAN CAPITAL

Q: What keeps CEO’s awake at night

A: #1 - Sourcing skilled people (52%)

Source: Accenture/Business Spectator survey May 2010

Page 11: OZ MINERALS PAGE 1 - Melbourne Mining Club · 2016. 12. 15. · Note: Chart include adjustment for deposits missing from the database Source: MinEx Consulting Sept 09. OZ MINERALS

OZ MINERALS • PAGE 11

OUTSIDE MELBOURNE TOWN HALL

Page 12: OZ MINERALS PAGE 1 - Melbourne Mining Club · 2016. 12. 15. · Note: Chart include adjustment for deposits missing from the database Source: MinEx Consulting Sept 09. OZ MINERALS

OZ MINERALS • PAGE 12

OZ MINERALS: WOMEN IN MINING STATISTICS

Mining Industry

Women -

office based,

15%

Women - site

based, 3%

Men, 82%

Australian Workforce

Men, 55%Women, 45%

* Does not include contractors

OZ Minerals Australian Workforce*

Women - site

based, 10%

Women -

office based,

12%

Men, 78%

Page 13: OZ MINERALS PAGE 1 - Melbourne Mining Club · 2016. 12. 15. · Note: Chart include adjustment for deposits missing from the database Source: MinEx Consulting Sept 09. OZ MINERALS
Page 14: OZ MINERALS PAGE 1 - Melbourne Mining Club · 2016. 12. 15. · Note: Chart include adjustment for deposits missing from the database Source: MinEx Consulting Sept 09. OZ MINERALS

OZ MINERALSMELBOURNE MINING CLUB

TERRY BURGESS MANAGING DIRECTOR & CEO

10 June 2010

WWW.OZMINERALS.COM

Page 15: OZ MINERALS PAGE 1 - Melbourne Mining Club · 2016. 12. 15. · Note: Chart include adjustment for deposits missing from the database Source: MinEx Consulting Sept 09. OZ MINERALS

OZ MINERALS • PAGE 15