This project involves a new 42,223 square foot, single-story,

tilt wall building for use as a K-8 school. The school is being

constructed on 5.25 acres in Denver, North Carolina.

PROJ ECT GOAL S:

1. Ensure the low voltage contractor is providing

the equipment, per RAD specifications

2. Manage the CSUSA –RAD turnover dates

effectively to eliminate delays

3. Closely monitor the amount of exported dirt

from the site.

4. Ensure VCT and base finishes meet RAD

expectations

• Project Size: 42,223 SF

• Project Type: Education

• Project Amenities/Features:

o Fenced Playfield

o Canopy Playground

o Gym/Multi-Purpose Room

o Collaborative Classrooms

o Music, Science and Art labs

Project Description & Goals

Executive Summary – Key Highlights

PROGRESS UPDATE

• Started Site Paving

• Started Ceiling Tile Install

• Started MP Room Lighting

• Continue Plumbing Fixture Install

• Continue Irrigation Install

• Complete Restroom Accessories

Executive Summary – Key Highlights

UPCOMING ACTIVITIES & MILESTONES

• Complete Site Paving

• Complete Striping and Signage

• Complete Plumbing Fixture Install

• Complete Ceiling Tiles

• Complete Interior Paint

• Complete Electrical Install

• Complete Irrigation Install

• Begin Landscape Install

Insert Caption Here – Adjust Box as Needed

Front Elevation Parking Lot Asphalt in Progress

Insert Caption Here – Adjust Box as Needed

Loop Road Asphalt Complete Ceiling Grid and Hallway Lights

Insert Caption Here – Adjust Box as Needed

Tile, Accent Walls, Ceiling Grid and Lights

Insert Caption Here – Adjust Box as Needed

Exit Lights and Ceiling Grid Ceiling Tile Install Started

Insert Caption Here – Adjust Box as Needed

Gym Ceiling Painted Interior Painting in Progress

Insert Caption Here – Adjust Box as Needed

Sinks Being Installed Restroom Fixtures Installed

Client Team

Jim LonerganVice President of Development

Phone: [email protected]

Construction Team

Eric OtradovecProject Manager I

Phone: [email protected]

Mike Migliaccio Jr. Superintendent

Phone: [email protected]

Bill BrandSuperintendent

Phone: [email protected]

Scott StenmanVice President of Construction

Phone: [email protected]

Brad HillDirector of Construction

Phone: [email protected]

John BentleyRegional Field Coordinator

Phone: [email protected]

Chantel NitzkorskiSenior Project Coordinator

Phone: [email protected]

Design Team

Richard LoseeProfessional Engineer – LAI Design Associates

Phone: [email protected]

Aaron MaagPrincipal – Jenkins Maag Associates

Phone: [email protected]

Ken PalczykEngineer – Jenkins Maag Associates

Phone: [email protected]

Steve GrinavicDesign Engineer – LAI Design Associates

Phone: [email protected]

Jeff JenkinsAssociate – Jenkins Maag Associates

Phone: [email protected]

Corey Solich

Phone: [email protected]

Chris BosticP.E.

Phone: [email protected]