Overview of the El Paso Kay Bailey Hutchison Desalination Plant R. Alan Shubert, P.E. Vice President Texas Desal Conference October 1, 2015

Upload: others

Post on 16-Oct-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Overview of the El Paso Kay Bailey Hutchison Desalination

Overview of the El PasoKay Bailey HutchisonDesalination Plant

R. Alan Shubert, P.E.Vice President

Texas Desal Conference

October 1, 2015

Page 2: Overview of the El Paso Kay Bailey Hutchison Desalination

Kay Bailey Hutchison Desalination Plant

Opened in 2007 to deal with: Drought Emergency situations Growth Brackish water intrusion

Page 3: Overview of the El Paso Kay Bailey Hutchison Desalination

Desalination Plant Details

Up to 27.5 MGD capacity Utilizes 5 reverse osmosis skids Year round usually runs at 1-2 skids Operated at full capacity for the first

time in May 2012

Page 4: Overview of the El Paso Kay Bailey Hutchison Desalination

Surface Water PlantsHueco WellsMesilla WellsDesalination Plant

Page 5: Overview of the El Paso Kay Bailey Hutchison Desalination

ProjectWells

Plant

Injection Wells

Page 6: Overview of the El Paso Kay Bailey Hutchison Desalination
Page 7: Overview of the El Paso Kay Bailey Hutchison Desalination

Less costly and lessenvironmental impactthan evaporationponds 3 injection wells Concentrate pipeline

(22 mi)

Remote ConcentrateDisposal Area

Page 8: Overview of the El Paso Kay Bailey Hutchison Desalination

Injection Well Construction

Well 1 (2004)– 3,777 ft deep

Well 3 (2006)– 4,030 ft deep

Well 2 (2007)– 3,720 ft deep

Page 9: Overview of the El Paso Kay Bailey Hutchison Desalination

Surface Injection Facilities

Page 10: Overview of the El Paso Kay Bailey Hutchison Desalination

Wellhead Piping

Page 11: Overview of the El Paso Kay Bailey Hutchison Desalination

Regulatory Concepts

Safe Drinking Water Act (SDWA) prohibitsinjection which endangers an undergroundsource of drinking water.

Injection zone is considered a USDW because theTDS is > 10,000 mg/L.

Current Class V injection well authorization prohibitsinjecting water that does not meet primary drinkingwater standards. (achieved by blending)

Page 12: Overview of the El Paso Kay Bailey Hutchison Desalination

Regulatory Concepts (cont.)

Groundwater from the injection zone does not meetnational and state primary drinking water standards.

Membrane treatment would be required prior to use. Itis not a source of drinking water.

Aquifer Exemption-EPA approval

TCEQ amendment of Class V authorization

Page 13: Overview of the El Paso Kay Bailey Hutchison Desalination

Capital Costs(21 Contracts)

Production wells and collectorsPlant and Near-Plant PipesConcentrate Disposal

Total Cost

$ 32 Million$ 40 Million$ 19 Million$ 91 Million

DisposalProductionWells

Plant

Page 14: Overview of the El Paso Kay Bailey Hutchison Desalination

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

2007 2008 2009 2010 2011 2012 2013

Unprecedented Freeze &Reduction of Surface Water

Thou

sand

Gal

lons

Kay Bailey Hutchison Desalination Plant Production

Page 15: Overview of the El Paso Kay Bailey Hutchison Desalination

0

5

10

15

20

25

30

35

40

4519

6719

6819

6919

7019

7119

7219

7319

7419

7519

7619

7719

7819

7919

8019

8119

8219

8319

8419

8519

8619

8719

8819

8919

9019

9119

9219

9319

9419

9519

9619

9719

9819

9920

0020

0120

0220

0320

0420

0520

0620

0720

0820

0920

1020

1120

1220

13

Mill

ions

of G

allo

ns

Hueco KBH Mesilla Rio Grande

EPWU Water Production

Page 16: Overview of the El Paso Kay Bailey Hutchison Desalination

Finding ways to improve water recovery Beneficial use of concentrate

- EWM Pilot Plant Continued to be a model for other inland cities

considering desalination Feasibility study for expansion of desalination

plant

The Path Forward

Page 17: Overview of the El Paso Kay Bailey Hutchison Desalination

Kay Bailey Hutchison Desalination Plant concentrate

Page 18: Overview of the El Paso Kay Bailey Hutchison Desalination

Contact Information

R. Alan Shubert, P.E.Vice President

El Paso Water Utilities915.594.5501

[email protected]