Overview of Environmental Overview of Environmental Permitting for Permitting for
Transportation ProjectsTransportation Projects
Preliminary ReportPreliminary Report
Steve Lerch, JLARC AnalystSteve Lerch, JLARC Analyst
Gary Walvatne, TechLaw Inc.Gary Walvatne, TechLaw Inc.
December 17, 2004December 17, 2004
22December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Scope of ReviewScope of ReviewA A pre-auditpre-audit (overview of issues) (overview of issues) A review of permit streamlining activities in:A review of permit streamlining activities in:
Washington StateWashington State24 state DOTs24 state DOTs
The The beginningbeginning of the audit process, to help of the audit process, to help TPAB consider detailed audit topicsTPAB consider detailed audit topics
Some Some initial management recommendationsinitial management recommendations to agencies, when practical and supportableto agencies, when practical and supportable
33December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Summary of Findings: Summary of Findings: WashingtonWashington
National leader in permit streamlining National leader in permit streamlining
Successes include:Successes include: Multi-Agency Permitting (MAP) Team;Multi-Agency Permitting (MAP) Team; On-line permit applications;On-line permit applications; Programmatic permits for routine Programmatic permits for routine
maintenance;maintenance; WSDOT liaison program. WSDOT liaison program.
44December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Summary of Findings: Other Summary of Findings: Other StatesStates
Interviews with 24 state DOTsInterviews with 24 state DOTs
Two common themes:Two common themes: Create cultural change -- encourage creativity Create cultural change -- encourage creativity
and non-traditional problem solving;and non-traditional problem solving; Create efficiencies through use of technology.Create efficiencies through use of technology.
55December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Objectives of ReviewObjectives of Review
Describe streamlining initiatives in Describe streamlining initiatives in Washington and other statesWashington and other states
Identify successful projects in other states Identify successful projects in other states that could be implemented in Washington that could be implemented in Washington
Determine management-related success Determine management-related success factors that foster effective streamlining factors that foster effective streamlining
Identify options for future TPAB audits Identify options for future TPAB audits and/or evaluationsand/or evaluations
66December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
What is Environmental Permit What is Environmental Permit Streamlining?Streamlining?
Expedited transportation project delivery Expedited transportation project delivery while being good stewards of the while being good stewards of the environment environment
Streamlining Components:Streamlining Components: Reduced TimeReduced Time Reduced CostReduced Cost Maintain or Improve Environmental Maintain or Improve Environmental
PerformancePerformance
77December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
State ReviewsState Reviews
Interviews in Washington, other states Interviews in Washington, other states used the same interview formatused the same interview formatWashington interviews were face-to-faceWashington interviews were face-to-face Included transportation, resource agenciesIncluded transportation, resource agencies
Interviews with other states held by Interviews with other states held by telephonetelephone Limited to State DOT staffLimited to State DOT staff Focus Group of 10 State DOTsFocus Group of 10 State DOTs Additional State DOTsAdditional State DOTs
88December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Streamlining CategoriesStreamlining Categories
Proactive Regulatory Affairs ActivitiesProactive Regulatory Affairs Activities
Process Re-engineeringProcess Re-engineering
Agency ResourcesAgency Resources
TechnologyTechnology
Time ManagementTime Management
99December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Summary TablesSummary Tables
Provided in Appendices 4 and 5Provided in Appendices 4 and 5
Tables identify:Tables identify: Streamlining initiatives and projectsStreamlining initiatives and projects Responsible regulatory authorityResponsible regulatory authority Status of initiative/projectStatus of initiative/project AccomplishmentsAccomplishments Factors leading to successful developmentFactors leading to successful development Factors that were overcomeFactors that were overcome
1010December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Washington State ReviewWashington State Review
Interviews with Transportation Agencies:Interviews with Transportation Agencies: WSDOT Environmental ServicesWSDOT Environmental Services Washington State FerriesWashington State Ferries Washington State RailWashington State Rail US DOT Federal Highway AdministrationUS DOT Federal Highway Administration
1111December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Washington State ReviewWashington State Review
Interviews with Resource Agencies:Interviews with Resource Agencies: Washington Department of EcologyWashington Department of Ecology Washington Department of Fish and WildlifeWashington Department of Fish and Wildlife US Environmental Protection AgencyUS Environmental Protection Agency US Fish and Wildlife ServiceUS Fish and Wildlife Service National Marine Fisheries Service (NOAA National Marine Fisheries Service (NOAA
Fisheries)Fisheries) WSDOT Northwest Region MAP TeamWSDOT Northwest Region MAP Team
1212December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Washington Survey Results:Washington Survey Results:SuccessesSuccesses
WSDOT MAP TeamWSDOT MAP Team
WSDOT liaison programWSDOT liaison program
On-line Joint Aquatic Resource Permit On-line Joint Aquatic Resource Permit Application (JARPA)Application (JARPA)
45-day hydraulic project approval for a 45-day hydraulic project approval for a JARPAJARPA
1313December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Washington Survey Results:Washington Survey Results:SuccessesSuccesses
Development of dispute resolution Development of dispute resolution processesprocesses
Interagency cooperative agreementsInteragency cooperative agreements Dispute resolutionDispute resolution Information sharingInformation sharing CommunicationCommunication
1414December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Washington Survey Results:Washington Survey Results:SuccessesSuccesses
Programmatic permitting for maintenance Programmatic permitting for maintenance and operations activitiesand operations activities TPEAC-initiated permitsTPEAC-initiated permits WSDOT-initiated permitsWSDOT-initiated permits
WSDOT Environmental GIS WorkbenchWSDOT Environmental GIS Workbench
TPEAC activities encouraged individual TPEAC activities encouraged individual agencies to start additional streamlining agencies to start additional streamlining initiativesinitiatives
1515December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Washington Survey Results:Washington Survey Results:Areas Requiring Further AttentionAreas Requiring Further Attention
Workload ForecastingWorkload Forecasting
WSDOT Liaison ProgramWSDOT Liaison Program
Highway RunoffHighway Runoff
““Talent Ruling” – 9Talent Ruling” – 9thth Circuit Court Circuit Court
Signatory Agency CommitteeSignatory Agency Committee
Design-Build InitiativeDesign-Build Initiative
Reader-Friendly DocumentsReader-Friendly Documents
1616December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Washington Survey Results:Washington Survey Results:Areas Requiring Further AttentionAreas Requiring Further Attention
Inconsistent FundingInconsistent Funding Failure to fund proposed initiativesFailure to fund proposed initiatives "Interrupted" funding"Interrupted" funding Start-and-stop fundingStart-and-stop funding Low salaries create employee turnover Low salaries create employee turnover Inadequate funding for proposed mitigation Inadequate funding for proposed mitigation
alternatives for project impacts alternatives for project impacts
1717December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Survey of Other StatesSurvey of Other States
Review streamlining for USDOT priority Review streamlining for USDOT priority transportation projectstransportation projects
Survey streamlining developed or Survey streamlining developed or implemented by other State DOTsimplemented by other State DOTs
Assess management successes for Assess management successes for lessons learned that could be applied in lessons learned that could be applied in Washington Washington
1818December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Review of USDOT Priority ProjectsReview of USDOT Priority Projects
Established by Executive Order 13274Established by Executive Order 13274
Projects nominated by agencies and officialsProjects nominated by agencies and officials
3 selection criteria:3 selection criteria: National or regional significanceNational or regional significance High level of support from elected officialsHigh level of support from elected officials Undue delay or anticipated delay due to slow federal Undue delay or anticipated delay due to slow federal
agency review or coordinationagency review or coordination
Not considered model projects of the Not considered model projects of the streamlining processstreamlining process
1919December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Survey of Other StatesSurvey of Other States
Focus Group of 10 State DOTsFocus Group of 10 State DOTsCaliforniaCalifornia OhioOhio
FloridaFlorida OregonOregon
LouisianaLouisiana PennsylvaniaPennsylvania
MinnesotaMinnesota TexasTexas
North CarolinaNorth Carolina UtahUtah
2020December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Survey of Other StatesSurvey of Other States
14 Additional State DOTs14 Additional State DOTsAlaskaAlaska NevadaNevadaIllinoisIllinois New HampshireNew HampshireIndianaIndiana OklahomaOklahomaIowaIowa South CarolinaSouth CarolinaMaineMaine TennesseeTennesseeMississippiMississippi VirginiaVirginiaMissouriMissouri WisconsinWisconsin
2121December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Other States:Other States:Successful InitiativesSuccessful Initiatives
Two common themes:Two common themes: Create cultural change Create cultural change –– encourage creativity encourage creativity
and non-traditional problem solvingand non-traditional problem solving Create efficiencies through use of technologyCreate efficiencies through use of technology
2222December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Other States:Other States:Successful InitiativesSuccessful Initiatives
Governmental affairs office to track legislationGovernmental affairs office to track legislation
Interagency agreementsInteragency agreements
Programmatic permitsProgrammatic permits
Funding resource agency positionsFunding resource agency positions
Brief, concise, and legally-sufficient EISsBrief, concise, and legally-sufficient EISs
Multi-agency planning and permitting teamsMulti-agency planning and permitting teams
GIS- and technology-based information GIS- and technology-based information management management
2323December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Other States:Other States:Management Success FactorsManagement Success Factors
Sense of urgencySense of urgency
Strong support from Executive and Strong support from Executive and Legislative BranchesLegislative Branches
2424December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Other States:Other States:Lessons LearnedLessons Learned
Standardize data systemsStandardize data systems
Use best-available scientific information to Use best-available scientific information to limit project field survey worklimit project field survey work
Make preliminary environmental Make preliminary environmental assessments prior to project developmentassessments prior to project development
2525December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Other States:Other States:Lessons LearnedLessons Learned
Create quality-improvement teamsCreate quality-improvement teams
Re-design project-delivery processesRe-design project-delivery processes
Assess project risks continuously in terms Assess project risks continuously in terms of cost, scope, and scheduleof cost, scope, and schedule
2626December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Other States:Other States:Lessons LearnedLessons Learned
Secure consistent legislative commitment Secure consistent legislative commitment to streamlining initiatives within natural to streamlining initiatives within natural resource agenciesresource agencies
Purchase right-of-way for environmental Purchase right-of-way for environmental mitigation in advance of needmitigation in advance of need
Provide internships at FHWA Provide internships at FHWA headquarters for DOT staffheadquarters for DOT staff
2727December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Review ConclusionsReview Conclusions
Washington State is a national leader in Washington State is a national leader in permit streamliningpermit streamlining Compares favorably with other advanced Compares favorably with other advanced
streamlining programsstreamlining programs Review identifies initiatives with positive Review identifies initiatives with positive
outcomes outcomes Some activities too new to evaluateSome activities too new to evaluate Successful efforts in other states may hold Successful efforts in other states may hold
promise for Washingtonpromise for Washington
2828December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Management Management RecommendationsRecommendations
11::WSDOT should investigate FL, MN WSDOT should investigate FL, MN project delivery designsproject delivery designs..
22::WSDOT, Ecology, WDFW should WSDOT, Ecology, WDFW should consider standardizing GIS, other data consider standardizing GIS, other data to ease exchangeto ease exchange..
33::WSDOT, Ecology, WDFW should WSDOT, Ecology, WDFW should investigate use of “best available investigate use of “best available scientific data” as substitute for field scientific data” as substitute for field survey worksurvey work..
2929December 17, 2004December 17, 2004 JLARC Overview of Environmental PermittingJLARC Overview of Environmental Permitting
Options for Future Options for Future Audits/ReviewsAudits/Reviews
AA: : Assess WSDOT progress in Assess WSDOT progress in implementing environmental implementing environmental management system (delayed start)management system (delayed start)..
BB: : Determine impact of resource agency Determine impact of resource agency employee turnover on the permitting employee turnover on the permitting process. process.
CC: : Identify additional performance Identify additional performance measures for environmental permittingmeasures for environmental permitting..