![Page 1: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/1.jpg)
MAINTENANCECalibrate motor current transducer (annual)
![Page 2: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/2.jpg)
MAINTENANCECalibrate capacity/volume slide valve (annual)
![Page 3: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/3.jpg)
Record Keeping Requirements [§5.3]
IIAR 6 Record Keeping RequirementsANSI/IIAR 6-2019 §5.3.3
PSI Documentation RequirementsTitle 8 CCR §5189(d)
Refrigeration flow drawings Block flow diagramP&ID
Defined operating limits Safe upper and lower limits for process variables such as temperatures, pressures, flows, levels and/or compositions
Safety system functional description Safety systems (such as interlocks, detection and suppression systems, etc.)
Relief valve list with PRV manufacturer, PRV model number and set pressure, and where applicable, the three-way valve manufacturer and model number;
Relief system design and design basis
Ventilation system functional description Ventilation system design
Installation, operation, and maintenance manuals; Materials of construction
Manufacturer data reports for all pressure vessels; Materials of construction
Equipment list P&IDs
![Page 4: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/4.jpg)
FLOW DRAWINGS
![Page 5: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/5.jpg)
FLOW DRAWINGS
![Page 6: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/6.jpg)
OPERATING LIMITS
![Page 7: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/7.jpg)
OPERATING LIMITS
![Page 8: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/8.jpg)
SAFETY SYSTEMS
![Page 9: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/9.jpg)
SAFETY SYSTEMS
![Page 10: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/10.jpg)
RELIEF VALVE LIST
![Page 11: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/11.jpg)
VENTILATION SYSTEM
![Page 12: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/12.jpg)
IOMS
![Page 13: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/13.jpg)
DATA REPORTS
![Page 14: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/14.jpg)
EQUIPMENT LISTS
![Page 15: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/15.jpg)
OPERATIONAL LOG
![Page 16: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/16.jpg)
AMMONIA PURITY
![Page 17: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/17.jpg)
OIL LOG
![Page 18: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/18.jpg)
Type of Record Retention Duration
Daily Inspection Records Most current 12 months
Daily Testing Records Most current 12 months
Daily Maintenance Records Most current 12 months
Annual Inspection Records Most current 5 years
Annual Testing Records Most current 5 years
Annual Maintenance Records Most current 5 years
Five Year Inspection Records Two (2) most current
Five Year Testing Records Two (2) most current
Five Year Maintenance Records Two (2) most current
Ten Year Maintenance Records Two (2) most current
![Page 19: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/19.jpg)
Type of Record Retention Duration
Engineering Design Documentation Life of the process
Pressure Vessel U-1, U-1A, U-3, UM Reports Equipment life
Log (Operator Transfer of Information) Most current 12 months
Secondary Coolant Records Most current 12 months
Ammonia Refrigerant Records Most current 5 years
Refrigeration Oil Records Most current 5 years
Lubrication Records Most current 5 years
Pressure Relief Valve (PRV) Records PRV life
Current System Records listed in Section 5.3.3 Life of the process
Instrument and Device Testing and Calibration Most current 5 years
![Page 20: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/20.jpg)
Type of Record Retention Duration
Engineering Design Documentation Life of the process
Pressure Vessel U-1, U-1A, U-3, UM Reports Equipment life
Log (Operator Transfer of Information) Most current 12 months
Secondary Coolant Records Most current 12 months
Ammonia Refrigerant Records Most current 5 years
Refrigeration Oil Records Most current 5 years
Lubrication Records Most current 5 years
Pressure Relief Valve (PRV) Records PRV life
Current System Records listed in Section 5.3.3 Life of the process
Instrument and Device Testing and Calibration Most current 5 years
![Page 21: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/21.jpg)
Break
![Page 22: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/22.jpg)
![Page 23: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/23.jpg)
![Page 24: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/24.jpg)
![Page 25: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/25.jpg)
![Page 26: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/26.jpg)
![Page 27: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/27.jpg)
![Page 28: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/28.jpg)
![Page 29: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/29.jpg)
![Page 30: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/30.jpg)
![Page 31: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/31.jpg)
![Page 32: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/32.jpg)
![Page 33: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/33.jpg)
![Page 34: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/34.jpg)
![Page 35: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/35.jpg)
![Page 36: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/36.jpg)
![Page 37: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/37.jpg)
![Page 38: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/38.jpg)
![Page 39: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/39.jpg)
![Page 40: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/40.jpg)
![Page 41: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/41.jpg)
![Page 42: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/42.jpg)
![Page 43: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/43.jpg)
![Page 44: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/44.jpg)
![Page 45: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/45.jpg)
![Page 46: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/46.jpg)
![Page 47: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/47.jpg)
IIAR 6Part 1 –General
1 –
Purp
ose,
Sco
pe, a
nd A
pplic
.
2 –
Def
initi
ons
3 –
Ref
eren
ce S
tand
ards
4 –
Prog
ram
Adm
inis
tratio
n
Part 2 – Program Requirement5
–G
ener
al
6 –
Com
pres
sors
7 –
Pum
ps
8 –
Con
dens
ers
9 –
Evap
orat
ors
10 –
Vess
els
11 –
Pipi
ng
12 –
Safe
ty S
yste
ms
13 –
Ove
rpre
ssur
e Pr
otec
tion
Dev
ices
14 -
Purg
ers
15 –
Amm
onia
and
Sec
onda
ry
Coo
lant
s
Part 3 Appendices
A –
Expl
anat
ory
Mat
eria
l
B –
Safe
ty C
heck
lists
C –
Wat
er C
onta
min
atio
n
D –
Avoi
ding
Abn
orm
al
Pres
sure
/Sho
ck
E –
Ris
k-Ba
sed
ITM
F -R
efer
ence
s
![Page 48: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/48.jpg)
Providing Solutions. Simplifying Regulation.
ITM Tasks [§6.1]• Inspection, Testing, and Maintenance Tasks. ITM tasks shall be
performed on the different compressor types at the indicated frequencies set forth in Table 6.1 or per manufacturers’ instructions, unless a different frequency is justified in accordance with Section 5.2.1. o Where a history of deficiencies has been recorded, the (ITM) task
frequencies shall be increased. Where a history of fault-free operation has been recorded, the (ITM) task frequencies are permitted to be decreased. In either case, a determined change in a (ITM) task frequency and its technical justification shall be documented. [§5.2.1]
![Page 49: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/49.jpg)
Providing Solutions. Simplifying Regulation.
Types of CompressorsRotary Vane CompressorReciprocating Compressor Rotary Screw Compressor
![Page 50: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/50.jpg)
ITM Task Description Frequency
Inspection Screw Recip Rotary Vane
a) Runtime hours WA-D WA-D WA-D
b) Suction pressure D D D
c) Discharge pressure D D D
d) Oil pressure D D D
e) Oil temperature D WA-D D
f) Discharge temperature D WA-D D
g) Verify oil levels are adequate D D D
h) Oil filter differential pressure D WA-D NA
i) Oil leaks D D D
j) Lubricator oil level and drip rate NA NA D
k) Jacket cooling oil level NA NA D
l) Determine shaft seal leak rate WA-W WA-W WA-W
m) Indicator of Compressor Capacity D WA-D WA-D
n) Motor amperage (current) D WA-D WA-D
o) Recorded Alarms and Shutdowns D WA-D WA-D
p) Free from abnormal sounds and excessive vibration
D D D
ITM Task Frequency
Inspection Screw Recip Rotary Vane
q) Drive guard in place D D D
r) Foundation solid, in place, and free from evidence of deterioration
A A A
s) Visually inspect mounting bolts are in place
A A A
t) Visually inspect metal surfaces for pitting or surface damage
A A A
u) Visually inspect coupling for wear A WA-A WA-A
v) Visually inspect starter connections and associated timers and relays
A A A
w) Operation of oil heaters A A A
x) Operation of unloader M M M
y) Visually inspect alignment of compressor-motor drive shaft
A A A
Testing Screw Recip Rotary Vane
Test safety shutdowns:
a) Low suction pressure cutout A A A
b) High discharge pressure cutout (HPCO)See Section 6.1.1
A A A
![Page 51: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/51.jpg)
ITM Task Description Frequency
Inspection Screw Recip Rotary Vane
a) Runtime hours WA-D WA-D WA-D
b) Suction pressure D D D
c) Discharge pressure D D D
d) Oil pressure D D D
e) Oil temperature D WA-D D
f) Discharge temperature D WA-D D
g) Verify oil levels are adequate D D D
h) Oil filter differential pressure D WA-D NA
i) Oil leaks D D D
j) Lubricator oil level and drip rate NA NA D
k) Jacket cooling oil level NA NA D
l) Determine shaft seal leak rate WA-W WA-W WA-W
m) Indicator of Compressor Capacity D WA-D WA-D
n) Motor amperage (current) D WA-D WA-D
o) Recorded Alarms and Shutdowns D WA-D WA-D
p) Free from abnormal sounds and excessive vibration
D D D
ITM Task Frequency
Inspection Screw Recip Rotary Vane
q) Drive guard in place D D D
r) Foundation solid, in place, and free from evidence of deterioration
A A A
s) Visually inspect mounting bolts are in place
A A A
t) Visually inspect metal surfaces for pitting or surface damage
A A A
u) Visually inspect coupling for wear A WA-A WA-A
v) Visually inspect starter connections and associated timers and relays
A A A
w) Operation of oil heaters A A A
x) Operation of unloader M M M
y) Visually inspect alignment of compressor-motor drive shaft
A A A
Testing Screw Recip Rotary Vane
Test safety shutdowns:
a) Low suction pressure cutout A A A
b) High discharge pressure cutout (HPCO)See Section 6.1.1
A A A
![Page 52: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/52.jpg)
![Page 53: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/53.jpg)
![Page 54: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/54.jpg)
![Page 55: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/55.jpg)
ITM Task Description Frequency
Inspection Screw Recip Rotary Vane
a) Runtime hours WA-D WA-D WA-D
b) Suction pressure D D D
c) Discharge pressure D D D
d) Oil pressure D D D
e) Oil temperature D WA-D D
f) Discharge temperature D WA-D D
g) Verify oil levels are adequate D D D
h) Oil filter differential pressure D WA-D NA
i) Oil leaks D D D
j) Lubricator oil level and drip rate NA NA D
k) Jacket cooling oil level NA NA D
l) Determine shaft seal leak rate WA-W WA-W WA-W
m) Indicator of Compressor Capacity D WA-D WA-D
n) Motor amperage (current) D WA-D WA-D
o) Recorded Alarms and Shutdowns D WA-D WA-D
p) Free from abnormal sounds and excessive vibration
D D D
ITM Task Frequency
Inspection Screw Recip Rotary Vane
q) Drive guard in place D D D
r) Foundation solid, in place, and free from evidence of deterioration
A A A
s) Visually inspect mounting bolts are in place
A A A
t) Visually inspect metal surfaces for pitting or surface damage
A A A
u) Visually inspect coupling for wear A WA-A WA-A
v) Visually inspect starter connections and associated timers and relays
A A A
w) Operation of oil heaters A A A
x) Operation of unloader M M M
y) Visually inspect alignment of compressor-motor drive shaft
A A A
Testing Screw Recip Rotary Vane
Test safety shutdowns:
a) Low suction pressure cutout A A A
b) High discharge pressure cutout (HPCO)See Section 6.1.1
A A A
![Page 56: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/56.jpg)
![Page 57: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/57.jpg)
![Page 58: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/58.jpg)
![Page 59: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/59.jpg)
![Page 60: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/60.jpg)
ITM Task Description Frequency
Inspection Screw Recip Rotary Vane
a) Runtime hours WA-D WA-D WA-D
b) Suction pressure D D D
c) Discharge pressure D D D
d) Oil pressure D D D
e) Oil temperature D WA-D D
f) Discharge temperature D WA-D D
g) Verify oil levels are adequate D D D
h) Oil filter differential pressure D WA-D NA
i) Oil leaks D D D
j) Lubricator oil level and drip rate NA NA D
k) Jacket cooling oil level NA NA D
l) Determine shaft seal leak rate WA-W WA-W WA-W
m) Indicator of Compressor Capacity D WA-D WA-D
n) Motor amperage (current) D WA-D WA-D
o) Recorded Alarms and Shutdowns D WA-D WA-D
p) Free from abnormal sounds and excessive vibration
D D D
ITM Task Frequency
Inspection Screw Recip Rotary Vane
q) Drive guard in place D D D
r) Foundation solid, in place, and free from evidence of deterioration
A A A
s) Visually inspect mounting bolts are in place
A A A
t) Visually inspect metal surfaces for pitting or surface damage
A A A
u) Visually inspect coupling for wear A WA-A WA-A
v) Visually inspect starter connections and associated timers and relays
A A A
w) Operation of oil heaters A A A
x) Operation of unloader M M M
y) Visually inspect alignment of compressor-motor drive shaft
A A A
Testing Screw Recip Rotary Vane
Test safety shutdowns:
a) Low suction pressure cutout A A A
b) High discharge pressure cutout (HPCO)See Section 6.1.1
A A A
![Page 61: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/61.jpg)
![Page 62: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/62.jpg)
![Page 63: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/63.jpg)
ITM Task Description Frequency
Inspection Screw Recip Rotary Vane
a) Runtime hours WA-D WA-D WA-D
b) Suction pressure D D D
c) Discharge pressure D D D
d) Oil pressure D D D
e) Oil temperature D WA-D D
f) Discharge temperature D WA-D D
g) Verify oil levels are adequate D D D
h) Oil filter differential pressure D WA-D NA
i) Oil leaks D D D
j) Lubricator oil level and drip rate NA NA D
k) Jacket cooling oil level NA NA D
l) Determine shaft seal leak rate WA-W WA-W WA-W
m) Indicator of Compressor Capacity D WA-D WA-D
n) Motor amperage (current) D WA-D WA-D
o) Recorded Alarms and Shutdowns D WA-D WA-D
p) Free from abnormal sounds and excessive vibration
D D D
ITM Task Frequency
Inspection Screw Recip Rotary Vane
q) Drive guard in place D D D
r) Foundation solid, in place, and free from evidence of deterioration
A A A
s) Visually inspect mounting bolts are in place
A A A
t) Visually inspect metal surfaces for pitting or surface damage
A A A
u) Visually inspect coupling for wear A WA-A WA-A
v) Visually inspect starter connections and associated timers and relays
A A A
w) Operation of oil heaters A A A
x) Operation of unloader M M M
y) Visually inspect alignment of compressor-motor drive shaft
A A A
Testing Screw Recip Rotary Vane
Test safety shutdowns:
a) Low suction pressure cutout A A A
b) High discharge pressure cutout (HPCO)See Section 6.1.1
A A A
![Page 64: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/64.jpg)
![Page 65: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/65.jpg)
ITM Task Description Frequency
Inspection Screw Recip Rotary Vane
a) Runtime hours WA-D WA-D WA-D
b) Suction pressure D D D
c) Discharge pressure D D D
d) Oil pressure D D D
e) Oil temperature D WA-D D
f) Discharge temperature D WA-D D
g) Verify oil levels are adequate D D D
h) Oil filter differential pressure D WA-D NA
i) Oil leaks D D D
j) Lubricator oil level and drip rate NA NA D
k) Jacket cooling oil level NA NA D
l) Determine shaft seal leak rate WA-W WA-W WA-W
m) Indicator of Compressor Capacity D WA-D WA-D
n) Motor amperage (current) D WA-D WA-D
o) Recorded Alarms and Shutdowns D WA-D WA-D
p) Free from abnormal sounds and excessive vibration
D D D
ITM Task Frequency
Inspection Screw Recip Rotary Vane
q) Drive guard in place D D D
r) Foundation solid, in place, and free from evidence of deterioration
A A A
s) Visually inspect mounting bolts are in place
A A A
t) Visually inspect metal surfaces for pitting or surface damage
A A A
u) Visually inspect coupling for wear A WA-A WA-A
v) Visually inspect starter connections and associated timers and relays
A A A
w) Operation of oil heaters A A A
x) Operation of unloader M M M
y) Visually inspect alignment of compressor-motor drive shaft
A A A
Testing Screw Recip Rotary Vane
Test safety shutdowns:
a) Low suction pressure cutout A A A
b) High discharge pressure cutout (HPCO)See Section 6.1.1
A A A
![Page 66: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/66.jpg)
![Page 67: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/67.jpg)
![Page 68: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/68.jpg)
ITM Task Description Frequency
Inspection Screw Recip Rotary Vane
a) Runtime hours WA-D WA-D WA-D
b) Suction pressure D D D
c) Discharge pressure D D D
d) Oil pressure D D D
e) Oil temperature D WA-D D
f) Discharge temperature D WA-D D
g) Verify oil levels are adequate D D D
h) Oil filter differential pressure D WA-D NA
i) Oil leaks D D D
j) Lubricator oil level and drip rate NA NA D
k) Jacket cooling oil level NA NA D
l) Determine shaft seal leak rate WA-W WA-W WA-W
m) Indicator of Compressor Capacity D WA-D WA-D
n) Motor amperage (current) D WA-D WA-D
o) Recorded Alarms and Shutdowns D WA-D WA-D
p) Free from abnormal sounds and excessive vibration
D D D
ITM Task Frequency
Inspection Screw Recip Rotary Vane
q) Drive guard in place D D D
r) Foundation solid, in place, and free from evidence of deterioration
A A A
s) Visually inspect mounting bolts are in place
A A A
t) Visually inspect metal surfaces for pitting or surface damage
A A A
u) Visually inspect coupling for wear A WA-A WA-A
v) Visually inspect starter connections and associated timers and relays
A A A
w) Operation of oil heaters A A A
x) Operation of unloader M M M
y) Visually inspect alignment of compressor-motor drive shaft
A A A
Testing Screw Recip Rotary Vane
Test safety shutdowns:
a) Low suction pressure cutout A A A
b) High discharge pressure cutout (HPCO)See Section 6.1.1
A A A
![Page 69: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/69.jpg)
![Page 70: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/70.jpg)
ITM Task Description Frequency
Inspection Screw Recip Rotary Vane
a) Runtime hours WA-D WA-D WA-D
b) Suction pressure D D D
c) Discharge pressure D D D
d) Oil pressure D D D
e) Oil temperature D WA-D D
f) Discharge temperature D WA-D D
g) Verify oil levels are adequate D D D
h) Oil filter differential pressure D WA-D NA
i) Oil leaks D D D
j) Lubricator oil level and drip rate NA NA D
k) Jacket cooling oil level NA NA D
l) Determine shaft seal leak rate WA-W WA-W WA-W
m) Indicator of Compressor Capacity D WA-D WA-D
n) Motor amperage (current) D WA-D WA-D
o) Recorded Alarms and Shutdowns D WA-D WA-D
p) Free from abnormal sounds and excessive vibration
D D D
ITM Task Frequency
Inspection Screw Recip Rotary Vane
q) Drive guard in place D D D
r) Foundation solid, in place, and free from evidence of deterioration
A A A
s) Visually inspect mounting bolts are in place
A A A
t) Visually inspect metal surfaces for pitting or surface damage
A A A
u) Visually inspect coupling for wear A WA-A WA-A
v) Visually inspect starter connections and associated timers and relays
A A A
w) Operation of oil heaters A A A
x) Operation of unloader M M M
y) Visually inspect alignment of compressor-motor drive shaft
A A A
Testing Screw Recip Rotary Vane
Test safety shutdowns:
a) Low suction pressure cutout A A A
b) High discharge pressure cutout (HPCO)See Section 6.1.1
A A A
![Page 71: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/71.jpg)
![Page 72: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/72.jpg)
ITM Task Description Frequency
Inspection Screw Recip Rotary Vane
a) Runtime hours WA-D WA-D WA-D
b) Suction pressure D D D
c) Discharge pressure D D D
d) Oil pressure D D D
e) Oil temperature D WA-D D
f) Discharge temperature D WA-D D
g) Verify oil levels are adequate D D D
h) Oil filter differential pressure D WA-D NA
i) Oil leaks D D D
j) Lubricator oil level and drip rate NA NA D
k) Jacket cooling oil level NA NA D
l) Determine shaft seal leak rate WA-W WA-W WA-W
m) Indicator of Compressor Capacity D WA-D WA-D
n) Motor amperage (current) D WA-D WA-D
o) Recorded Alarms and Shutdowns D WA-D WA-D
p) Free from abnormal sounds and excessive vibration
D D D
ITM Task Frequency
Inspection Screw Recip Rotary Vane
q) Drive guard in place D D D
r) Foundation solid, in place, and free from evidence of deterioration
A A A
s) Visually inspect mounting bolts are in place
A A A
t) Visually inspect metal surfaces for pitting or surface damage
A A A
u) Visually inspect coupling for wear A WA-A WA-A
v) Visually inspect starter connections and associated timers and relays
A A A
w) Operation of oil heaters A A A
x) Operation of unloader M M M
y) Visually inspect alignment of compressor-motor drive shaft
A A A
Testing Screw Recip Rotary Vane
Test safety shutdowns:
a) Low suction pressure cutout A A A
b) High discharge pressure cutout (HPCO)See Section 6.1.1
A A A
![Page 73: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/73.jpg)
![Page 74: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/74.jpg)
ITM Task Description Frequency
Inspection Screw Recip Rotary Vane
a) Runtime hours WA-D WA-D WA-D
b) Suction pressure D D D
c) Discharge pressure D D D
d) Oil pressure D D D
e) Oil temperature D WA-D D
f) Discharge temperature D WA-D D
g) Verify oil levels are adequate D D D
h) Oil filter differential pressure D WA-D NA
i) Oil leaks D D D
j) Lubricator oil level and drip rate NA NA D
k) Jacket cooling oil level NA NA D
l) Determine shaft seal leak rate WA-W WA-W WA-W
m) Indicator of Compressor Capacity D WA-D WA-D
n) Motor amperage (current) D WA-D WA-D
o) Recorded Alarms and Shutdowns D WA-D WA-D
p) Free from abnormal sounds and excessive vibration
D D D
ITM Task Frequency
Inspection Screw Recip Rotary Vane
q) Drive guard in place D D D
r) Foundation solid, in place, and free from evidence of deterioration
A A A
s) Visually inspect mounting bolts are in place
A A A
t) Visually inspect metal surfaces for pitting or surface damage
A A A
u) Visually inspect coupling for wear A WA-A WA-A
v) Visually inspect starter connections and associated timers and relays
A A A
w) Operation of oil heaters A A A
x) Operation of unloader M M M
y) Visually inspect alignment of compressor-motor drive shaft
A A A
Testing Screw Recip Rotary Vane
Test safety shutdowns:
a) Low suction pressure cutout A A A
b) High discharge pressure cutout (HPCO)See Section 6.1.1
A A A
![Page 75: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/75.jpg)
![Page 76: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/76.jpg)
![Page 77: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/77.jpg)
ITM Task Description Frequency
Inspection Screw Recip Rotary Vane
a) Runtime hours WA-D WA-D WA-D
b) Suction pressure D D D
c) Discharge pressure D D D
d) Oil pressure D D D
e) Oil temperature D WA-D D
f) Discharge temperature D WA-D D
g) Verify oil levels are adequate D D D
h) Oil filter differential pressure D WA-D NA
i) Oil leaks D D D
j) Lubricator oil level and drip rate NA NA D
k) Jacket cooling oil level NA NA D
l) Determine shaft seal leak rate WA-W WA-W WA-W
m) Indicator of Compressor Capacity D WA-D WA-D
n) Motor amperage (current) D WA-D WA-D
o) Recorded Alarms and Shutdowns D WA-D WA-D
p) Free from abnormal sounds and excessive vibration
D D D
ITM Task Frequency
Inspection Screw Recip Rotary Vane
q) Drive guard in place D D D
r) Foundation solid, in place, and free from evidence of deterioration
A A A
s) Visually inspect mounting bolts are in place
A A A
t) Visually inspect metal surfaces for pitting or surface damage
A A A
u) Visually inspect coupling for wear A WA-A WA-A
v) Visually inspect starter connections and associated timers and relays
A A A
w) Operation of oil heaters A A A
x) Operation of unloader M M M
y) Visually inspect alignment of compressor-motor drive shaft
A A A
Testing Screw Recip Rotary Vane
Test safety shutdowns:
a) Low suction pressure cutout A A A
b) High discharge pressure cutout (HPCO)See Section 6.1.1
A A A
![Page 78: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/78.jpg)
![Page 79: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/79.jpg)
![Page 80: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/80.jpg)
ITM Task Description Frequency
Inspection Screw Recip Rotary Vane
a) Runtime hours WA-D WA-D WA-D
b) Suction pressure D D D
c) Discharge pressure D D D
d) Oil pressure D D D
e) Oil temperature D WA-D D
f) Discharge temperature D WA-D D
g) Verify oil levels are adequate D D D
h) Oil filter differential pressure D WA-D NA
i) Oil leaks D D D
j) Lubricator oil level and drip rate NA NA D
k) Jacket cooling oil level NA NA D
l) Determine shaft seal leak rate WA-W WA-W WA-W
m) Indicator of Compressor Capacity D WA-D WA-D
n) Motor amperage (current) D WA-D WA-D
o) Recorded Alarms and Shutdowns D WA-D WA-D
p) Free from abnormal sounds and excessive vibration
D D D
ITM Task Frequency
Inspection Screw Recip Rotary Vane
q) Drive guard in place D D D
r) Foundation solid, in place, and free from evidence of deterioration
A A A
s) Visually inspect mounting bolts are in place
A A A
t) Visually inspect metal surfaces for pitting or surface damage
A A A
u) Visually inspect coupling for wear A WA-A WA-A
v) Visually inspect starter connections and associated timers and relays
A A A
w) Operation of oil heaters A A A
x) Operation of unloader M M M
y) Visually inspect alignment of compressor-motor drive shaft
A A A
Testing Screw Recip Rotary Vane
Test safety shutdowns:
a) Low suction pressure cutout A A A
b) High discharge pressure cutout (HPCO)See Section 6.1.1
A A A
![Page 81: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/81.jpg)
![Page 82: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/82.jpg)
ITM Task Description Frequency
Inspection Screw Recip Rotary Vane
a) Runtime hours WA-D WA-D WA-D
b) Suction pressure D D D
c) Discharge pressure D D D
d) Oil pressure D D D
e) Oil temperature D WA-D D
f) Discharge temperature D WA-D D
g) Verify oil levels are adequate D D D
h) Oil filter differential pressure D WA-D NA
i) Oil leaks D D D
j) Lubricator oil level and drip rate NA NA D
k) Jacket cooling oil level NA NA D
l) Determine shaft seal leak rate WA-W WA-W WA-W
m) Indicator of Compressor Capacity D WA-D WA-D
n) Motor amperage (current) D WA-D WA-D
o) Recorded Alarms and Shutdowns D WA-D WA-D
p) Free from abnormal sounds and excessive vibration
D D D
ITM Task Frequency
Inspection Screw Recip Rotary Vane
q) Drive guard in place D D D
r) Foundation solid, in place, and free from evidence of deterioration
A A A
s) Visually inspect mounting bolts are in place
A A A
t) Visually inspect metal surfaces for pitting or surface damage
A A A
u) Visually inspect coupling for wear A WA-A WA-A
v) Visually inspect starter connections and associated timers and relays
A A A
w) Operation of oil heaters A A A
x) Operation of unloader M M M
y) Visually inspect alignment of compressor-motor drive shaft
A A A
Testing Screw Recip Rotary Vane
Test safety shutdowns:
a) Low suction pressure cutout A A A
b) High discharge pressure cutout (HPCO)See Section 6.1.1
A A A
![Page 83: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/83.jpg)
![Page 84: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/84.jpg)
![Page 85: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/85.jpg)
![Page 86: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/86.jpg)
ITM Task Description Frequency
Inspection Screw Recip Rotary Vane
a) Runtime hours WA-D WA-D WA-D
b) Suction pressure D D D
c) Discharge pressure D D D
d) Oil pressure D D D
e) Oil temperature D WA-D D
f) Discharge temperature D WA-D D
g) Verify oil levels are adequate D D D
h) Oil filter differential pressure D WA-D NA
i) Oil leaks D D D
j) Lubricator oil level and drip rate NA NA D
k) Jacket cooling oil level NA NA D
l) Determine shaft seal leak rate WA-W WA-W WA-W
m) Indicator of Compressor Capacity D WA-D WA-D
n) Motor amperage (current) D WA-D WA-D
o) Recorded Alarms and Shutdowns D WA-D WA-D
p) Free from abnormal sounds and excessive vibration
D D D
ITM Task Frequency
Inspection Screw Recip Rotary Vane
q) Drive guard in place D D D
r) Foundation solid, in place, and free from evidence of deterioration
A A A
s) Visually inspect mounting bolts are in place
A A A
t) Visually inspect metal surfaces for pitting or surface damage
A A A
u) Visually inspect coupling for wear A WA-A WA-A
v) Visually inspect starter connections and associated timers and relays
A A A
w) Operation of oil heaters A A A
x) Operation of unloader M M M
y) Visually inspect alignment of compressor-motor drive shaft
A A A
Testing Screw Recip Rotary Vane
Test safety shutdowns:
a) Low suction pressure cutout A A A
b) High discharge pressure cutout (HPCO)See Section 6.1.1
A A A
![Page 87: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements](https://reader036.vdocuments.mx/reader036/viewer/2022062307/61033adb6f617918e44fd0d1/html5/thumbnails/87.jpg)