Page 1: Overiew of simmco 8 12-12 - copy

A Division of the Blurton GroupHeart Over Matter

Page 2: Overiew of simmco 8 12-12 - copy

• Company Overview• Core Values

• Safety / Employee Training

• Services Summary• Turnaround Services

• Construction Services

• Fabrication Services

• Project Overview• Thyssen Krupp Stainless – Calvert Alabama

AGENDA

Page 3: Overiew of simmco 8 12-12 - copy

At SIMMCO, we believe that continued expansion and growth are realized by being committed to Safety and Quality

throughout all company Employees..

•Safety – SIMMCO’s goal is to provide a safe and healthy work environment for all employees. The safety and well being of each and every employee is the most important aspect of the safety process. Every employee must be responsible for their safety and the safety of their fellow employees.•Quality – SIMMCO is committed to customer satisfaction through performance excellence. To achieve our vision, we must continuously improve the quality of all products and services that we provide to our customers and potential customers. We are committed to doing so by using our most important resource (our employees at every level) to understand and continuously improve our processes. The management team is committed to providing the company with the best tools possible to succeed.

SIMMCO Core Values

Page 4: Overiew of simmco 8 12-12 - copy

Brownsville, TNCorporate Office

Aerial Photo ofCorporate Office

Office Location

Page 5: Overiew of simmco 8 12-12 - copy

Safety / Employee Training

Page 6: Overiew of simmco 8 12-12 - copy

Safety – 7 Points of Light

7. HAVE I LEFT THE AREA CLEAN, SECURE AND RISK FREE?

ASK YOURSELFTHESE SEVENQUESTIONS BEFORE,DURING AND AFTER.

1. HAVE I ASSESSED THE RISKS INVOLVED?

2. HAVE I SUCCESSFULLY REMOVED THE RISK?

3. AM I MY BROTHERS KEEPER?

5. AM I COMMITED TO DOING THE TASK WITH SAFETY BEING THE FIRST PRIORITY?

4. DO I UNDERSTAND THE TASK?

6. DO I HAVE THE PROPER PPE FOR THIS TASK?

Page 7: Overiew of simmco 8 12-12 - copy

Point #1 - HAVE I ASSESSED THE RISKS INVOLVED?

IS ANYONE WORKING OVERHEAD?

IS THERE A ZERO ENERGY STATE?

IS THE AREA CLEAR OF DEBRIS?

Page 8: Overiew of simmco 8 12-12 - copy

Point #2 - HAVE I SUCCESSFULLY REMOVED THE RISKS?

DID I SECURE ANY OPEN HOLES? DO I NEED BARRICADES?

DO I NEED TO LOCKOUT?

DO I HAVE WELDING SCREENS WHERE NEEDED?

Page 9: Overiew of simmco 8 12-12 - copy

Point #3 – AM I MY BROTHERS KEEPER?

Have I taken time to stop and tell him to put his glasses on, or did I just keep on walking?

Will I offer a helping hand when I see a need?

Page 10: Overiew of simmco 8 12-12 - copy

Point #4 – DO I UNDERSTAND THE TASK?

Has my Supervisor explained the task? Do I understand the task?

Page 11: Overiew of simmco 8 12-12 - copy

Point #5 – AM I COMMITETED TO DOING THIS TASK WITH SAFETY AS THE FIRST PRIORITY?

I will NOT take “shortcuts”!!! Is my JSA in order?

Has my equipment been properly inspected?

Page 12: Overiew of simmco 8 12-12 - copy

Point #6 – DO I HAVE THE PROPER PPE FOR THIS TASK?

Is my Fall Protection adequate?I know that my JSA is an

important part of my PPE

Page 13: Overiew of simmco 8 12-12 - copy

PPE EASY AS 1-2-3

1

HAT

2

GLASSES

3

GLOVES

Page 14: Overiew of simmco 8 12-12 - copy

Point #7 – HAVE I LEFT THE AREA CLEAN, SECURE AND RISK FREE ?

I WILL “SEE IT, SAY IT, AND FIX IT.”

Page 15: Overiew of simmco 8 12-12 - copy

Do I feel comfortable that no one will be at risk as a result of my housekeeping?

Page 16: Overiew of simmco 8 12-12 - copy

SO YOU SEE , BY SIMPLY ASKING YOUR SELF THESE SEVEN SIMPLE

QUESTIONS WHEN PLANNING AND PERFORMING YOUR TASKS, TOGETHER

WE CAN VIRTUALLY ELIMINATE INCIDENTS.

Page 17: Overiew of simmco 8 12-12 - copy

SIMMCO - Safety

• SIMMCO 3 Year Safety Record• 1,200,508 Work-Hours

• 1.49 AVG. TRIR• 0.92 AVG EMR

• MSHA Certified• Member of ISNetworld• Zero (0) lost work days • In-house Safety Department• OSHA regulated & compliant

Page 18: Overiew of simmco 8 12-12 - copy

Employee Staffing & Capability

Full-Time Hiring & StaffingCorporate location in Brownsville, TN

Database of 10,000+ Current / Former Craft

Staffing CapabilitiesAverage Daily Workforce 352

Maximum Turnaround Capability 650

Page 19: Overiew of simmco 8 12-12 - copy

• Minimum Training Requirements

• Drug Test / Pre-Employment Physical

• Written Craft Assessment

• Client Site Specific Training

• Each Employee completes “7 Points of Light” Safety

Orientation.

• National Center for Construction Education& Research (NCCER)

•Craft Assessment & Training Program

TRAINING & CERTIFICATION

Page 20: Overiew of simmco 8 12-12 - copy

Turnaround Services

Page 21: Overiew of simmco 8 12-12 - copy

Turnaround Supervision & Staffing Capabilities

• 30 Full Time Project Managers

• 6 Planners & Schedulers

• 5 QA/QC Managers

• 650 work force max. Staffing

• Turnarounds & Revamps• Process Heater Erection & Revamps• Procurement, Planning &

Scheduling• Specialty Welding• Alloy Pipe Specialists• Field Installation & Modification• Tower Work• Heavy Crane & Rigging

Partial listing of SIMMCO’s Services:

Page 22: Overiew of simmco 8 12-12 - copy

SIMMCO delivers to their clients a complete line of services required for safe and successful turnarounds, shutdowns and emergency outages in the Chemical, Petrochemical, Refining, Pulp & Paper, and Steel Mill industries.

We have been successful due to our excellent project management, procurement, planning, scope execution, & subcontractor management for all projects.

Management and workforce stability, constant communication, forward thinking decision making and project oversight are symbols of SIMMCO’s Turnaround Division.

Page 23: Overiew of simmco 8 12-12 - copy

Fabrication Services

Page 24: Overiew of simmco 8 12-12 - copy

SHOP FABRICATION FACILITYOur 80,000 s.f. fabrication shop, outfitted with state of the art equipment, is staffed with qualified welders, highly experienced in performing under the most stringent requirements of ASME code and radiographic inspection for carbon and stainless steel, as well as many of the alloy metals. Prefabricated work is carefully planned and detailed by our engineers and coordinated with the field to meet onsite conditions, resulting in important savings of time and often cost.

- Pressure Vessels

- Power Boilers

- Repair & Alteration

Our Code Stamp capabilities in ASME code work consists of the U, S & R stamps. This makes us one of a very few contractors in the southeast to

hold multiple ASME codes.

Page 25: Overiew of simmco 8 12-12 - copy

SHOP FABRICATION FACILITY (continued)

Our pipe fabrication division is geared toward the furtherance of our construction and mechanical division. We have the capacity and the equipment to handle any size pipe spools that our customers require. We also have fifteen acres of land for material inventory and/ or room to expand our services. Currently, we produce 1200 large spool pieces a month. We pride ourselves on being able to offer the industry welds being made at rate of one (1) diameter inch per minute. With our large bays and 4 cranes with 10 ton crane capacity each gives our shop the ability to fabricate large quantities of pipes, skids or complete modules.

Our engineering division can produce shop spool drawings from our customer’s orthographic or isometric drawings or they may be supplied by our clients.

Quality control begins with our shop personnel with visual inspection and progresses through supervision, authorized inspector, hydrostatic test and x-ray. Any special testing required can be obtained through third party non-interest groups. Separation of common and exotic metals is controlled by isolation and separate bay area techniques. Passivation of stainless welds is available if required.

Page 26: Overiew of simmco 8 12-12 - copy

Construction Services

Page 27: Overiew of simmco 8 12-12 - copy

SIMMCO Construction Capabilities

• Markets Served:• Refining, Chemical, Pulp &

Paper, Food & Beverage, Oil & Natural Gas, Power, Terminal & Storage and Alternative Fuels

• Project Size & Cost:• $5 - $100 Million

Construction Value

• Project Locations:• All Domestic/International

Facilities

Page 28: Overiew of simmco 8 12-12 - copy

• Pipe Support & Structural Fabrication

• Piping

• Process

• Utility

• Sanitary

• Power

• Equipment Setting

• Mechanical Millwrights

• Laser Millwrights

• Vessel Fabrication

• Electrical & Instrumentation

• Modular Fabrication

SIMMCO CONSTRUCTION SERVICES

Page 29: Overiew of simmco 8 12-12 - copy

SIMMCO PROJECT HIGHLIGHTThyssenKrupp Stainless

Calvert, AL

• 800,000 Work-hours/ $80MM• Mechanical /Process Piping,

Instrumentation and Controls, Equipment Millwrights, and Structural Support installation.

• 2009 - Present

• All process piping for: • Melt Shop, Hot & Cold Rolling

Mills• AOD (Argon Oxygen Decarbonizer• Acid Storage Plant• Acid Regeneration Plant

Page 30: Overiew of simmco 8 12-12 - copy

The Food and Beverage industry requires an industrial contractor who understands the critical role in the execution required for a successful project. Maintaining product purity is essential for all Installations, Modifications, Service and Repairs, and Maintenance Work. Equally important is the ability to provide prompt and effective emergency response for all process cooling, and cold storage emergencies.

SIMMCO’s Superintendents and field personnel have over 20 years of experience and have completed projects with a full range of process and piping systems that satisfy the special requirements of ultra-clean and CIP (Clean-In-Place) projects. We can also provide ongoing maintenance with our large workforce of skilled personnel and project managers who have countless years of experience in this field. You will find that our management staff and field employees take extra steps to ensure the quality of their work to sustain long-term relationships with some of the most prominent names in the industry.

Capabilities:

• Sanitary Process Food Piping• Clean-in-Place Systems• Fabrication of Sanitary Platforms• Installation of Process Conveyor Systems• Installation of Process Equipment

Clients• Proctor & Gamble • Kellogg’s• Hershey’s• Unilever• Cargill

Food and Beverage Industry

Page 31: Overiew of simmco 8 12-12 - copy

Using our internal Crane and Rigging division, Trucking capabilities as well as our Facilities and Properties division, SIMMCO offers a turn key solution for the Demo, Transit and Storage of our clients Equipment or Units for later use or installation.

PROJECT HIGHLIGHTPower Plant

Brownsville, Tennessee

Demo and Storage

SIMMCO was contracted to demo their existing Power Plant. The unit was taken out of service, dismantled and separated per the clients instructions. The unit stack was trucked to the US border for final delivery to a client in Venezuela and the balance of the plant was sent to a client in Hobbs New Mexico.

• 50,000 workhours• Crew of 30 craftsmen & project managers• Divisions used

• Crane and Rigging• Field Services• Fleet Services

Page 32: Overiew of simmco 8 12-12 - copy

Crane & Rigging

Page 33: Overiew of simmco 8 12-12 - copy

Crane & Rigging

With over 35 years of industry experience , SIMMCO and its Crane and Rigging division offers a wide and extensive range of crane services for the lifting of machinery, equipment, and other materials associated within a majority of the Industrial Market sectors. Our Crane and Rigging division continues to exceed the industry standards for safety, dependability and performance. We offer 24 - hour service, 7 days a week to ensure that our clients needs are met for any project need. All our cranes and attachments are operated by our own professional operators as well as maintained and serviced by our own maintenance and support people.

We offer cranes ranging from 10 tons to 100 tons. All cranes and booms are inspected annually as well as a daily routine safety checks and inspections. With an inventory of operated hydraulic, rigger, and truck

cranes, our crane service can quickly and efficiently complete projects to their completion.

Crane & Forklift Services We Provide:•Boom Truck Cranes to 15 Tons•Carrier Deck Cranes to 15 •Hydraulic Truck Cranes to 100 Tons •Rough Terrain Cranes to 60 Tons •CCO Operator Certification Program •Crane Mats, Spreader Bars and Specialized Rigging •Emergency Services •Specializing in Plant Turnaround/Outage Planning •Forklift & Removable Boom System to 70 Tons•Telescoping Personnel Lift - 120' & 125‘•4WD/RT Telescoping Forklift to 5 tons

Page 34: Overiew of simmco 8 12-12 - copy

Photos

Page 35: Overiew of simmco 8 12-12 - copy

Photos

Page 36: Overiew of simmco 8 12-12 - copy

Photos

Page 37: Overiew of simmco 8 12-12 - copy

Photos

Page 38: Overiew of simmco 8 12-12 - copy

If you recognize and appreciate sound, no nonsense judgment in project management - the kind developed through years of hands-on field

experience……if you value quality and service – delivered on time and within budget…… then you want SIMMCO