over view - metrus · over view 20 midtown has been extensively refurbished, remodelled and...

31

Upload: others

Post on 21-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use
Page 2: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use
Page 3: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

OV E RV I E W

20 Midtown has been extensively refurbished, remodelled and restyled to provide stunning highly efficient & flexible office space in the heart of Midtown, London’s new creative core.

Designed by award-winning architectural practice HUT, the building offers 23,550 sq.ft behind a striking glass façade providing an impressive newly configured reception with partial double height and stunning open plan offices flooded with natural light arranged over first to fifth floors.

Page 4: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

R EM O D EL L ED a n D R Es T y L ED

Page 5: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

s T y L E a n D C H a R aC T ER

Page 6: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

EFFI C I En T a n D FL E X I B L E

Page 7: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

I n s p I R I n g a n D U n I q U E

Page 8: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

p R I VaCy a n D pa n O R a M a

Page 9: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

LO n D O n ’ s M O s TV I B R a n T D I s T R I C T

Midtown has attracted some of the world’s largest occupiers and is seeing a significant inflow of innovative start-ups.

stroll through the area and you’ll pass the offices of google, skype and yahoo standing shoulder to shoulder with corporates names such as Deloitte and goldman sachs and leisure ventures from gymbox to the Rosewood Hotel.

Clusters of creativity are emerging with fast-growing sMEs in the ever-expanding TMT sector sitting alongside the likes of Warner Brothers, Mindshare and MediaCom.

Page 10: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

T H E LO C aT I O n

CO

VE

nT

ga

RD

En

TH

E s

Ha

RD

TO

WE

R B

RID

gE

Ba

RB

ICa

n

CE

nT

RE

pO

InT

BR

ITIs

H M

Us

EU

M

gR

ay

’s I

nn

LIn

CO

Ln

s I

nn

FIE

LD

s

sT

pa

UL’

s C

aT

HE

DR

aL

CE

nT

Ra

L s

T g

ILE

s

RU

ss

EL

L s

qU

aR

E

sO

UT

H B

an

K

20

Mid

to

wn

Page 11: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

MIDTOW n – C R E aT I V E / T EC H / C O R p O R aT E

Med

iaco

m

Cen

tral

st.

gile

s

goo

gle

skyp

e

gre

y Lo

ndon

WeW

ork

Page 12: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

MIDTOW n – R E Ta IL / L EI s U R E

gym

box

Roka

The

Hox

ton

Hot

el H

olbo

rn

The

Rose

woo

dTh

e H

olbo

rn D

inin

g Ro

om

Bou

nce

Page 13: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

T R a n s p O RTL I n K s

all roads lead to Midtown. Following huge investment in major infrastructure and transport links, the area can expect further regeneration, increased capacity and rising influence and demand.

With the opening of Crossrail in 2018, some 100,000 people are set to use Tottenham Court Road station every day. Farringdon will be the only station where Thameslink, Crossrail and tube services meet as well as providing direct links to three of London’s major airports. Holborn station is also set to undergo a major refit in early 2020s.

Page 14: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

‘ T HE MIDTOW n a R E a I s a B O U T TO B EC O ME C O nnECT ED a s n E V ER B EFO R E. C RO s s R a IL W IL L B R In g H U n D R ED s O F T H O U s a nD s M O R E pEO pL E TO T HE a R E a , W I T H T FL RU n C RO s s R a IL s TaT I O n s B O O K EnD In g T HE D I s T R I CT aT TOT T En H a M C O U RT ROa D a nD Fa R R In g D O n .’

sir peter Hendy Transport Commissioner of Transport for London

Page 15: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

C O nnECT ED

Ba

RB

ICa

n

LIV

ER

pO

OL

sT

gO

OD

gE

sT

Fa

RR

Ing

DO

n

pIC

Ca

DIL

Ly C

IRC

Us

LE

ICE

sT

ER

sq

OX

FO

RD

CIR

CU

s

sT

pa

UL’

s

HO

LB

OR

n

20

Mid

to

wn

CO

VE

nT

ga

RD

En

BL

aC

KF

RIa

Rs

Wa

TE

RLO

O

LOn

DO

n B

RID

gE

KIn

gs

CR

Os

s

TO

TT

En

Ha

M C

OU

RT

RO

aD

Page 16: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

C R E aT I V E1 grey London 2 Mediacom UK3 Warner Bros4 WeWork5 Mindshare6 Karmarama

T E C H7 google8 amazon9 skype10 LinkedIn11 Lastminute.com

C O R p O R aT E12 Olswang13 Deloitte14 goldman sachs15 BioMarin pharmaceutical

R E Ta I L / L EI s U R E16 apple17 Bounce18 Roka19 all star Lanes20 The Hoxton Holborn Hotel21 The Rosewood Hotel 22 Holborn Dining Room23 Joe and the Juice24 gymbox

H O L B O R n

C H a n C ERy L a n E

C OV En T g a R D En

TOT T En H a M C O U R T R D

B R I T I S H M U S E U M

R U S S E L LS Q U A R E

L I N C O L N ’ S I N N S F I E L D S

R U s s EL L s q

Fa R R I n g D O n

24

192

3

21 22

18

17 23

13

61

4

20510

711

8 9

15

16

14

12

Page 17: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

C O nnECT ED

C RO s s R a IL s TaT I O n s

HE

aT

HR

OW

Ea

LIn

g B

RO

aD

Wa

y

pa

DD

Ing

TOn

BO

nD

sT

RE

ET

TOT

TE

nH

aM

CO

UR

T R

Oa

D

FaR

RIn

gD

On

20M

idt

ow

n

LIV

ER

pO

OL

sT

RE

ET

WH

ITE

CH

ap

EL

Ca

na

Ry

WH

aR

F

Cg

I of p

ropo

sed

new

cro

ssra

il en

tran

ce a

t To

ttenh

am C

ourt

Roa

d

T R aV EL T IMEs

FRO M 20 M I DTO W n

Holborn station ................. 2mins / 150m

FR O M H O L B O R n Kings Cross .................................... 3 mins

Bond street .................................... 4 mins

Liverpool street ............................ 7 mins

Canary Wharf ............................... 15 mins

City airport .................................. 26 mins

Heathrow ..................................... 50 mins

paris ....................................... 2hr 45 mins

Page 18: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

F LO O Ra R E a s

s C H ED U L E s q . F T n I a

ground floor Reception 550First floor Office space 4,910second floor Office space 5,380Third floor Office space 5,400Fourth floor Office space 4,140Fifth floor Office space 3,170

Total 23,550

Page 19: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

FI V E FLO O R s a n D a R O O F T ER R aC ETOTa L L I n g 23 , 5 5 0 s q . F T n I a

550 sq.FT nIa

LO B By

Page 20: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

FI V E FLO O R s a n D a R O O F T ER R aC ETOTa L L I n g 23 , 5 5 0 s q . F T n I a

4,910 sq.FT nIa

F I R s TF L O O R

Page 21: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

FI V E FLO O R s a n D a R O O F T ER R aC ETOTa L L I n g 23 , 5 5 0 s q . F T n I a

5,380 sq.FT nIa

s E C O n DF L O O R

Page 22: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

FI V E FLO O R s a n D a R O O F T ER R aC ETOTa L L I n g 23 , 5 5 0 s q . F T n I a

5,400 sq.FT nIa

T H I R DF L O O R

Page 23: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

FI V E FLO O R s a n D a R O O F T ER R aC ETOTa L L I n g 23 , 5 5 0 s q . F T n I a

4,140 sq.FT nIa

F O U RT HF L O O R

Page 24: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

FI V E FLO O R s a n D a R O O F T ER R aC ETOTa L L I n g 23 , 5 5 0 s q . F T n I a

3,170 sq.FT nIa

F I F T HF L O O R

R O O F T ER R aC E

Page 25: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

T E C H n I C a Ls p E C I F I C aT I O n

Page 26: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

a n I n T ER V I E W W I T H T H E s C H EM E ’ s a R C H I T E C T s

20 Midtown represents a masterclass in layering and lighting, of working with 2D planes in 3D spaces. “It’s all been about making it a jewel along the street scene,” says HUT. “There is this new, intriguing blend of east London’s rough, textural qualities and west London’s typically more refined, crisper finish. There’s a necessary level of formality to meet client needs, but also a character that many such office spaces lack.”That, HUT explains, has been a result

both of concealing the building’s service structure – hidden away in a ceiling-mounted spine the length of the building – and of the resulting emphasis on the textural qualities and design details. The visually-prominent reception, for example, employs patinated steel, solid oak and exposed polished concrete, while the main flooring uses matt stainless steel tiles to allow maximum flexibility in configuration. Meanwhile, 20 Midtown’s baffled over-

hang provides a motif echoed throughout the office space – in the linearity of the lighting, for instance, or the fifth floor’s tubular aluminium feature ceiling. There is a sense of depth throughout, of being invited into and carried through the building and its modern vision of office style.

“giving 20midtown a new rationale – functionally and aesthetically – has been an exciting challenge,” says HUT. “It’s been a collaborative effort – with the best structural engineers and energy consultants. Innovative design, quality construction and high-spec finishing at 20Midtown have reimagined the building allowing it to become a highly desirable modern workplace.”

project team:andrew WhitingHugo BassRachael Davidson

Page 27: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

‘ Inn OVaT I V E D Es I g n , q Ua L I T y C O n s T RU CT I O n a nD HI g H-s pEC FInI s HIn g aT 20 MIDTOW n H aV E R EIM ag InED T HE B U IL D In g a L LOW In g I T TO B EC O ME a HI g HLy D Es IR a B L E M O D ER n WO R K pL aC E.’

HUT

Page 28: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

T E C H n I C a L s p E C I FI C aT I O n

a comprehensive refurbishment and modernisation in the heart of Midtown.

The front door has been re-located to a sheltered, visually prominent location, set within a new glass frontage. The main entrance has been remodelled with new feature signage, glazing and metal cladding, with overhead feature louvered soffit and integrated linear downlights. The existing balcony at 5th floor level has been enlarged and converted into a high-level roof terrace overlooking procter street, finished in composite timber decking and completed with concealed perimeter lighting.

DRAFT PAGINATION V2 – 14.04.16

Reception area & Core

High quality polished concrete floor to newly refurbished reception area, complete with louvered ceiling, and feature pendant light suspended within double height void. Bespoke reception desk fabricated from solid oak and blackened mild steel, fronting a dramatic full height glazed screen wall with seating to match. a full height solid oak directory board forms a focal point to the space, complete with bespoke, laser cut signage, to be supplied as required by the tenant. Two new lifts have been installed, set within the illuminated feature wall.

The circulation space and stairs have been fully updated with new concrete floor tiles, decorations and vertical linear wall mounted lighting, as well as custom designed way-finding signage to all floors.

WC & shower Facilities

new WC’s to all office floors and shower facilities at 2nd, 3rd and 4th floors. The 3rd floor shower room is fully accessible. accessible WC’s on 1st – 4th floors and two new WC’s to 5th floor accessed from the office floor only.

new modern sanitary ware throughout, including WC, hand basin, shower facilities and hand dryers. new concrete floor tiling running through from the core, and complementary wall mounted tiling to dado height and flush wall mounted mirror over.

services

The M&E services have been rationalised and upgraded to include new air conditioning units throughout and dimmable LED lighting to office spaces. new plant equipment is located at roof level.

general Office areas

The office floors are presented as open plan, whilst providing the tenant with the opportunity to divide the space up into individual offices and meeting rooms as required. The large glazed front elevation provides natural light during the daytime, with linear lighting baffles providing artificial light to the working plane to meet modern office standards.

Doors

grey spray lacquered timber door-sets throughout with satin stainless steel ironmongery. Doors to WC’s are all full height flush doors.

Walls

painted plasterboard with feature polished plaster wall in concrete effect finish.

Ceilings

painted plasterboard ceilings with suspended ‘Blade’ pendant lighting throughout office floors from 1st to 4th floor. White powder coated aluminium service spine complete with integrated acoustic insulation and linear LED lighting covers half of the 1st, and the entirety of the 2nd,3rd & 4th floor ceilings. The 5th floor offers a dramatic curved ceiling profile, measuring 3.4 metres at its highest point, clad with a tubular feature ceiling baffle.

Floors

new stainless steel raised access floor across half of the 1st, all of 2nd, 3rd and 4th floors.

Baffl

ed c

eilin

g

WC

Page 29: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

public Health

Capped connections on soil stacks plus valved and capped connections on drinking water services at each floor of the offices to enable installation of a future tea point.

Electrical Design Loads

Office electrical capacity has been provided in accordance with BCO and BsRIa recommendations small power – 25w/m2Lighting – 10w/m2

sT RU CT U R a L En g InEER ’ s s pEC IFI C aT I O n

The existing 5-storey building comprises a reinforced concrete frame with concrete slabs up to 4th floor level. In 2002/2003 significant redevelopment works took place which included the creation of the additional 5th floor in the form of a curved glulam and steel framed structure. The building has been re-modelled by removing a secondary staircase but the façade is untouched.

The floor Loading are as follows:

Office floors – 3.5kn/m2Terrace – 3.5kn/m2Roof – 0.75kn/m2 Basement – 5kn/m2

MEC H a n I Ca L & EL ECT R I C a L InFO R M aT I O n

Heating and Cooling

VRV fan coil units provide heating and cooling to open plan office floors with roof mounted outdoor condenser units.

Heating is provided to the perimeter by trench heating fed from central boiler plant.

The system is designed to achieve; 21 degrees C +/- 2 degrees in winter24 degrees C +/- 2 degrees in summer.

space exists in the roof top plant area for additional tenant cooling.

Ventilation

Centralised ventilation plant provides fresh air at 12l/s per person, based on an occupancy of 1 person per 10 sqm.

Centralised toilet ventilation provides a minimum air change rate of 6 ac/hr.

Lighting & Electrical

Linear low-energy LED lighting scheme within offices provide a comfortable working environment, in line with BCO and Lg7 guidelines.

Occupancy and light-level sensors provide a maintained illuminance of 350-500 lux.

Each tenant demise is fitted with a dedicated distribution board ready for CaT B fit-out, with local metering.

EpC

EpC rating of C has been achieved

Page 30: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

p R OJ E CTT E a M

F O R FU R T H ER I n F O R M aT I O n O R a V I E W I n g p L E a s E C O n TaC T

Colin Becker+44 (0)20 7079 [email protected]

Joshua Milan+44 (0)20 7079 [email protected]

saul Zulman+44 (0)20 7079 [email protected]

a RC HI T ECT sHUT

s T R U C T U R a L En g I n EER sMorph structures M E C H a n I C a L & ELECTRICa L COnsULTa nTsEnergy Lab

Chris antoniou+44 (0)20 7336 [email protected]

James Taylorson+44 (0)20 7336 [email protected]

Finn Ledwidge+44 (0)20 7336 [email protected]

M I S R E P R E S E N TAT I O N S TAT E M E N TThe information in this brochure is believed to be correct but is intended for guidance only and its accuracy is not guaranteed. It does not constitute an offer and must not be relied upon as a representation of facts or as otherwise forming the basis of a contract. Specific professional or specialist advice should be obtained before doing anything on the basis of the content of this document. This document contains statements that are forward-looking in nature. Forward looking statements involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements implied by such forward-looking statements. We assume no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information in this brochure. This presentation includes images for illustrative purposes where the copyright is not held by Anton Page and/or Metrus. Whilst we have endeavoured to contact all copyright owners and obtain permission for this use, if you believe content has been made available without permission, please contact us.

Page 31: OVER VIEW - Metrus · OVER VIEW 20 Midtown has been extensively refurbished, remodelled and restyled ... With the opening of Crossrail in 2018, some 100,000 people are set to use

2 0 M I DTO W n .C O.U K