outside the stovepipe - mrwa · outside the stovepipe one community’s solution to including well...
TRANSCRIPT
OUTSIDE THE STOVEPIPEONE COMMUNITY’S SOLUTION TO INCLUDING WELL
HEAD PROTECTION IN PLANNING AND ZONING DECISIONS
MINNESOTA RURAL WATER ASSOCIATIONTECHNCIAL CONFERENCE
MARCH 4, 2020
IT’S JUST WATER, RIGHT?
RICK WAHLENCITY OF EDEN PRAIRIE
MANAGER OF UTILITIESPhone: 952-294-5908
Email: [email protected]
WELLHEAD PROTECTION PLANIS EVERYONE’S BUSINESS
• EDEN PRAIRIE WATER SYSTEM OVERVIEW• EDEN PRAIRIE’S WELLS• QUICK GEOLOGY LESSON• WELLHEAD PROTECTION PLAN PROCESS• CURRENT AND FUTURE PROTECTION AREAS• NEXT STEPS• CHALLENGES WITH LOCAL PLANNING• BUILDING CONSENSUS INTERNALLY• QUESTIONS
UTILITY DIVISION ORGANIZATION OF ASSETS
• WATER• SUPPLY• TREATMENT• STORAGE• DISTRIBUTION
• WASTEWATER COLLECTION
• STORM WATER CONVEYANCE
UTILITY DIVISION ORGANIZATION OF ASSETS
• WATER• SUPPLY• TREATMENT• STORAGE• DISTRIBUTION
• WASTEWATER COLLECTION
• STORM WATER CONVEYANCE
PUBLIC WATER SYSTEM
• WATER SYSTEM($94 MILLION ORIGINAL COST)
15 WELLS28 MGD LIME SOFTENING TREATMENT PLANT3 WATER TOWERS (5 MG), PLANT RESERVOIRS (3.5 MG)327 MILES WATER MAIN4,000 FIRE HYDRANTS20,000 SERVICE CONNECTIONS
EDEN PRAIRIE’S WELLS
• 15 DEEP WELLS (AVERAGING 400 FEET) • FIRST WELL CONSTRUCTED IN 1971• PRAIRIE DU CHIEN – JORDAN AQUIFER• LOWER MINNESOTA RIVER WATERSHED
1,174,350 acres• MISSISSIPPI RIVER-TWIN CITIES WATERSHEDS
644,320 acres• LAKES, PONDS & STREAMS ARE INDEPENDENT
OF THE AQUIFER• DISCONTINUOUS CONFINING LAYER• RECHARGE BY LEAKAGE FROM OVERLYING
MATERIALS SINCE 1953• DESIGN CAPACITY OF 1500 gpm EACH• TOTAL APPROPRIATION OF 3,450 mgy
EDEN PRAIRIE’S SURFICIAL GEOLOGY
EDEN PRAIRIE’S BEDROCK GEOLOGY
WELLHEAD PROTECTION PLANPROCESS
• GOVERNED BY MN DEPT OF HEALTH (MDH)– MDH DIRECTS EACH UPDATE INDIVIDUALLY– CURRENTLY INDIVIDUAL RATHER THAN WHOLISTIC
• UPDATE EVERY 10 YEARS (OR UPON WELL ADDITION)– LAST WELL CONSTRUCTED 2010 – MDH DEFERRED PLAN UPDATE – TWO-PHASED UPDATE PROCESS
• PART 1 - DELINEATION OF WELL HEAD PROTECTION AREA• PART 2 - ACTION PLAN TO PROTECT THE PUBLIC WATER SUPPLY
WELLHEAD PROTECTION PLANPROCESS
• PART 1 COMPLETED OCTOBER 2012– DEFINITION OF THE DWSMA– CONCURRENCE OF LOCAL UNITS OF GOVERNMENT– PUBLIC MEETING
• PART 2 COMPLETION JULY 2015– MANAGEMENT STRATEGIES– 6 MONTH EXTENTION (JULY 2015)– CONCURRENCE OF LOCAL UNITS OF GOVERNMENT– PUBLIC HEARING– DEPARTMENT OF HEALTH APPROVAL
WELLHEAD PROTECTIONAREA
COMPARISON OFWELLHEAD PROTECTION AREAS
DWSMA VULNERABILITY
EMERGENCY RESPONSE AREA
BORDERING COMMUNITIES WITHIN DRINKING WATER SUPPLY MANAGEMENT AREA
POTENTIAL CLASS V WELL LOCATIONSPRIORITIZED WITHIN EXPANDED DWSMA
ACTIVE NON-MUNICIPAL WELLSPRIORITIZED WITHIN EXPANDED DWSMA
KNOWN RELEASE SITESPRIORITIZED WITHIN EXPANDED DWSMA
WHAT’S NEXT
• EVALUATE CLASS V WELLS (FLOOR DRAINS & SEPTIC SYSTEMS)• EVALUATE THE ESTABLISHMENT OF A WELLHEAD PROTECTION OVERLAY
DISTRICT• UNDERGROUND STORAGE TANK LAND USE PROVISIONS WITHIN ERA• COORDINATED SPILL RESPONSE PLAN REVIEW• EVALUATE STORMWATER RUNOFF WITH RESPECT TO INFILTRATION• CONTINUE TO RAISE PUBLIC AWARENESS IN HIGHLY VULNERABLE AREAS• RAISE WELL OWNER AWARENESS• PUBLIC EDUCATION• UPDATE POTENTIAL CONTAMINANT SITE INDEX ANNUALLY• PARTNER WITH MINNETONKA AND CHANHASSEN IN OVERLAPPING DWSMA• PLAN TO NOTIFY WELL OWNERS IF CONTAMINANTS ARE DISCOVERED
IT’S NOT JUST WATER, IS IT?
QUESTIONS?
RICK WAHLENCITY OF EDEN PRAIRIEMANAGER OF UTILTIESPhone: 952-294-5908
Email: [email protected]