AS LEV D N 1 234 S F D N 16 . 0 % % 0" C O N C R E T E E NC A S C E C O R I SE R , L E L EVE L 1 7 S S T T R R U U C C T T I I O O N N T T E E E D D I N N H H A A A T T C C C H H E E E E D D D D D A A R R R E E A A A 463 S F FF / SE R V C E E L O BB Y 28 4 352 S F P U B L C L O W R S E E L E V L O B B Y 28 5 415 S F P U B L I C H G H R SE E L E V L O BB Y 28 6 474 S S TO T O R R R M M W W A A T T E E R R D D E E T T E E N N T T I I O O N N T T A A T T T N N K K BE B E L L O O W W 24 3" 2 HR R R T E D D D C 1 1 E 14 14 L I I N N N G G G A A T 10 ' AB O VE L EVE L 01 O VE V V R EX I T PA S SA G E E E E E E E E W W W W W W W W W W W A A A Y Y Y A B L A C K R O N R I SE R FO R R ES T A UR A N T EX H A U S T ; RU N S F R O M 4 ' 0 " B E L O W 2ND F L O O R TO 9 T H F L O O R S C R U B B E R R OO M 12 ' - 0" 12 ' - 0" 12 ' - 0" 12 ' - 0" 25 d C O M P A C T N G C O N T A N E R 6 . 0 % 60 S F C C C A R T W AS H 37 7 6 39 39 S S F F F A PA N E L R 36 9 A N N N N D D D E N N 36 6 D N 8 . 1 % R A M P L O W H E A D R O O M A R E A 3 Y D R E C Y CL I N G 3 Y D T R AS H 3 Y D SPA R E E 3 Y D SPA R E E S S O O O R T E R : B O O O D D D D D W I I L L L K K K N S O O O N N N N B I - S S S O O 295 S F T R A S H 36 1 38 b u C A R T 229 S F M A I L R OO M 39 4 OFF O O I C E 39 3 288 2 88 S S F F M M M M E E E E E D D D G G AS AS B B TT TT L L / / M M M M M F F F F F F L L L D D 39 39 2 2 235 S F R M W R E D B A G 39 6 252 25 2 2 S S S S F F F T T T T T T T T T T R R R R R R A A A A A S S S S S S S S S S S H H 39 3 9 7 7 561 S F CL E A N D O C K 39 8 378 S F C O R R D O 39 1 663 S F W AS S T E M A N A G E M E N T T C E N T E R 39 9 123 12 3 DR Y P I PE R 39 39 39 " L O T F U LL " PA R K I N G G A T E 4 BA C K L T A CR Y L C P A N E L S W T H A P P L E D CU S T O M G R AP R R H C S M O UN T E D T O M A NU F A C T UR E R S P R O P R I E T A R Y A A LU M I N U M F R A M I N G S Y S T E M W T H T U BE S T EE L S U PP O R T S A T 10 ' - 0 " O C . A RC H I T E C T U R R R L P R E C AS T C O N C R E T E PA N E L S M O U N T E D D R E C T L Y TO S T R UC T U R A L C O NC R E T E C LU M N S . P A N E L S EX T E N D T O UND E R S D E O F 2ND F L OO R C O N CR E T E S L AB . FO U R C O L O R T E R A R R Z Z A A L T E RN A A E FO R T H C W I T H R E C ES S E D S L A O LU M N C O V E R ( T Y P . ) R A I SE D G R A N T E T R A FF C S T R I P I N G D O W N F R O M P A R K N G U P TO P A R K N G C U S T O M H A R D W O O M M I L L W O R K K E T O P R E C ES S E S L O T W I T S T EE L G R M I NU M A ND G L AS S T B UL E W T H G L AS S O P Y B Y CUR T A I N L M A N U F A C T U R E R T R E N C H D R R R I N T R E N C H D R R R I N PA A A O N FOO T PA R K N G S T A T O N R E S L S T L N E OF BA LC O N Y AB O V E D ES K W T H G R A N T A LU M NU M A ND G L AS S VES T I B UL E W T H B Y CU R T A N W A L L M A N U F A C T U R E R - R O O F OF C A N O P Y SE R VES A S BA L C O N Y A ND L A N D N G FO R S T A R S - R E F E R TO B U LD N G SE C T O N S OUTPATIENT CARE PAVILION Traffic & Parking Study August 2011 Chicago, Illinois Prepared for: Northwestern Memorial Hospital Prepared by: Traffic Analysis & Design, Inc. www.traffic-ad.com

Upload: others

Post on 14-Mar-2020

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

ASLEV

DN

1

114

����� ��������� ��� ��� ��� ���� ���� ��� ��� ��� ����

234 SF

DN 16.0%

%

0"

CONCRETE ENCASCECO RISER, LELEVEL 17

SSTTRRUUCCTTIIOOONNTTEEEDD INN

HHAAATTCCCHHEEEEDDDDD AARRREEAAA

463 SF

FF / SERVICE ELOBBY

284

352 SF

PUBLIC LOW RISE ELEVLOBBY

285

415 SF

PUBLIC HIGH RISE ELEVLOBBY

286

474

SSTOTORRRMMWWAATTEERRDDEETTEENNTTIIOONN TTAATTT NNKKBEBELLOOWW

243"

2 HR RAR TEDDD CC11EE1414

IILLIINNNGGG AAT10' ABOVE LEVEL 01 OOOOVEVV REXIT PASSAGEEEEEEEEWWWWWWWWWWWAAAYYYA

BLACK IRON RISER FORRESTAURANT EXHAUST;RUNS FROM 4'-0" BELOW2ND FLOOR TO 9THFLOOR SCRUBBERROOM

12' - 0" 12' - 0"12' - 0" 12' - 0"

25 ydCOMPACTINGCONTAINER

6.0%

60 SSF

CCCART WWASH37766

3939 SSFF

FA PANEL R369

ANNNNDDD

ENN366

DN 8.1%

RAMP

LOW HEADROOM AREA

3 YDRECYCLING

3 YD TRASH

33Y

DS

PA

REE

33Y

DS

PA

REE

SSOOOORTER: BOOODDDDDWIILLLKKKINSOOONNNN BI-SSSOO

295 SF

TRASH361

38 buCART

229 SF

MAIL ROOM394

OFFOO ICE393

288288 SSFF

MMMMEEEEEDDD GGASAS BBTTTTLL / / MMMMMFFFFFFLLLLDD393922235 SF

RMW RED BAG396

2522522 SSSSFFFF

TTTTTTTTTTRRRRRRAAAAAAASSSSSSSSSSSHH393977

561 SF

CLEAN DOCK398

378 SF

CORRIDO391663 SF

WASSTE MANAGEMENTTCENTER

399

123123

DRY PIPER393939

"LOT FULL"PARKING GATE

4

BACKLIT ACRYLIC PANELS WITH APPLIEDCUSTOM GRAPRR HICS MOUNTED TOMANUFACTURERS PROPRIETARYYAALUMINUM FRAMING SYSTEM WITHTUBE STEEL SUPPORTS AT 10'-0" O.C.

AARCHITECTURARR L PRECASTCONCRETE PANELS MOUNTEDDIRECTLY TO STRUCTURALCONCRETE CLUMNS. PANELSEXTEND TO UNDERSIDE OF2ND FLOOR CONCRETE SLAB.

FOUR COLOR TERARR ZZAALTERNATA E FOR THICWITH RECESSED SLA

OLUMN COVER (TYP.)

RAISED GRANITETRAFFIC STRIPING

DOWN FROM PARKING

UP TO PARKING

CUSTOM HARDWOOM MILLWORKKDESK WITH GRANITE TOP

RECESSESLOT WITSTEEL GR

MINUM AND GLASSTIBULE WITH GLASSOPY BY CURTAINL MANUFACTURERR

TRENCH DRARR IN

TRENCH DRARR IN

PAYAA ON FOOTPARKING STATION

RESLST

LINE OF BALCONY ABOVE

DESK WITH GRANIT

AALUMINUM AND GLASSVESTIBULE WITH BY CURTAINWALL MANUFACTURER - ROOFOF CANOPY SERVES ASBALCONY AND LANDING FORSTAIRS - REFER TO BUILDINGSECTIONS

OUTPATIENT CARE PAVILIONTraffic & Parking Study

August 2011

Chicago, Illinois

Prepared for:

Northwestern Memorial Hospital

Prepared by:

Traffic Analysis & Design, Inc.www.traffic-ad.com

Page 2: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

INT

Tracon1,0speFai

The

Themebetforind

ThepartheErialsoimp

Thiinflsumsurstretran

rthwestern Me

gust 2011 

TRODUCTI

affic Analysnduct a traf21,858-squarecialized meirbanks Cou

e proposed O

Medica Institut Outpati Imagin Ground

e proposed edical staff. tween Erie S all valet an

door through

e on-site parking on-sitee OCP eitherie Street. Two proposed pacting stree

is report prluence the mmarizes thrrounding seets, as necnsportation

emorial Hospita

ION 

sis & Designffic impact re foot buil

edical care, srt between E

Outpatient C

al Office te - Specializient Surgeryg/Testing

d-Floor Neig

facility incl All employStreet and Ond pick-up/h-block conn

rking spacee will park ir at street-lewo pedestria to facilitateet-level vehi

esents and proposed s

he analysesstudy area, essary, to m system.

al ‐ Outpatient

n, Inc., (TAstudy for

lding provisurgery, andErie Street an

Care Pavilio

zed Care y

ghborhood R

ludes off-stryees will par

Ontario Stree/drop-off acnection for p

s will be deimmediatelyevel or via aan bridges spe movementicle and ped

documents site design s of traffic and identifi

manage pote

t Care Pavilion

ADI) was rethe propos

iding a vard imaging. Tnd Ontario S

n includes th

Retail

reet parkingrk off-site. At will serve ctivity, shor

pedestrians b

edicated for y east of the a proposed ppanning Erit of physiciaestrian flow

TADI’s datawhile refle

conditions ies OCP-speential traffic

etained by Ned Outpatieiety of outpThe subject sStreet in Chi

he following

271,362162,664

81,33240,66613,700

g for 575 veA two-way as an access

rt-term spacbetween Erie

use by pati site in the E

pedestrian bie Street andans and pat

ws.

a collection,ecting chara associated ecific recomc impacts th

Northwesterent Care Papatient servsite, illustraticago, Illinoi

g uses (minu

2 sf 4 sf 2 sf 6 sf 0 sf

ehicles, primnorth-south

s to parkingces for parce Street and

ients and seErie-Ontario

bridge spannd connectingtients amon

, discusses hacteristics u with the

mmendationshe proposed

rn Memoriaavilion (OCvices includted in Exhibis.

us parking and

marily servinh access drivg and providcel delivery Ontario Stre

elect physicio parking ganing Fairbang the OCP tong other cam

how transponique to thproposed d

s at the sited OCP may

al Hospital CP), an appding physicibit 1, is loca

d mechanical

ng patients veway throude an off-stre

(FedEx/UPeet.

ans only. Parage and mnks Court juo Feinberg Pmpus faciliti

ortation conhe OCP andevelopmene and on th have on th

Page 1

(NMH) to proximately ian offices, ted west of

floors):

and select ugh the site eet location

PS), and an

Patients not may walk to ust south of Pavilion are ies without

nsiderations d the site,

nt and the he adjacent he adjacent

Page 3: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

SITE LOCATION MAP

EXHIBIT 1

Pearson St.

Chicago Ave.

Superior St.

LEGEND

XX - Study Area Streets

- Site Location

Huron St.

Erie St.M

ich

iga

n A

ve

.

Ru

sh S

t.

Ontario St.

Ohio St.

Illionis St.

Grand Ave.

North Water St.

Fa

irb

an

ks

Ct.

Co

lum

bu

s D

r.

St.

Cla

ir S

t.

SITE

Mc

Clu

rg C

t.

La

ke

Sh

ore

Dr.

Page 4: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

EX

TAsurroaroa

Exi

ThebuiandUnCh

TheoffiimmeassouE. Owe

Exi

TheClaHuDe

EritheandsitefroporloaEriStre

Onsite

rthwestern Me

gust 2011 

XISTING CO

ADI conductrrounding aradway lane adway chara

isting Land 

e proposed sildings, comd academic

niversity (NUhildren’s Hos

e proposed ice uses, themediate norst side of Fairuth and westOntario Stree

est of the site

isting Road

e area roadwair Street, anuron Street, Gscriptions of

ie Street is a e study interd McClurg Ce, on-street pm Michiganrtions Erie S

ading/delivee Street accoeet is under

ntario Street e. Ontario St

emorial Hospita

ONDITIONS

ted a field rea, the adjac

configuratioacteristics. Th

Uses 

site is locatemmercial offic

institutionaU), The Rehspital of Chic

site is currene NMH Chith. The Erierbanks Court of the site. et. Streeterv at 233 E. Eri

dway Netwo

ways servingnd Ohio StreGrand Avenf each roadw

one-way earsections, EriCourt. The Eparking is pn Avenue toStreet througery zones, anommodates the jurisdict

is a one-waytreet extends

al ‐ Outpatient

visit to cocent street syons at nearhis section o

ed in a densece buildings,al uses as phabilitation cago (Lurie C

ntly occupieild Care Cene-Ontario part. A mix of A residenti

ville Center, aie Street.

ork 

g the proposeeet. Other stnue, Illinois Sway are summ

stbound streie Street ma

Erie Street/Stprohibited. Mo St. Clair Stghout the stund a taxi stanambulance ion of the Ci

y westbounds west from I

t Care Pavilion

llect relevanystem, currenrby intersectf the report d

e, urban, mix, hotels, restapart of the Institute of

Children’s).

ed by two vanter, and Kaarking garag restaurant, rial condominan office and

ed site primatreets includStreet, McClumarized belo

eet along theintains signat. Clair StreeMetered on-treet and fro

udy area accnd (north sidand patient ity of Chicag

d street with Inner Lake S

nt informatint traffic volutions, on-strdetails inform

xed-use neigaurants, retaNorthwesteChicago (R

acant buildinamehachi re

ge with grouretail, office, nium buildind residential

arily includeded in the stuurg Court, Inow.

e northern sialized interst intersection-street parkiom Fairbankommodate cde of Erie Str walk-in traf

go.

two lanes ofShore Drive w

ion pertainiumes and opreet parkingmation on th

ghborhood oail establishmern Campus

RIC), and th

ings that weestaurant. Fund-floor res and hotel ung is located condominiu

e Erie Street, udy area arenner Lake S

ite boundarysections at Mn includes aling is availaks Court to curbside actireet immediffic to the N

f travel alongwith signaliz

ing to existperating cong, transit sehese existing

of Chicago thments, and as, including

he future An

ere formerly Feinberg Pavstaurant and

uses are locatd immediatelum building,

Ontario Stree Chicago A

Shore Drive,

y providing Michigan Avll-way stop c

able along bo Inner Lakeivity includiiately east of

NMH Level 1

g the southezed intersect

ting land unditions, traffervices, and g conditions.

hat includesa wide rangeg NMH, Nonn & Rober

occupied byvilion is loc

d bank tenanted along Only west of the, is located im

eet, FairbankAvenue, Supe

and Michiga

two lanes ofvenue, Fairbacontrol. Adjoth sides of

e Shore Driving pick-upsf St. Clair Str1 Trauma C

ern border oftions at McC

Page 3

uses in the fic controls, other key

s residential e of medical orthwestern rt H. Lurie

y NMH for ated to the

nts is on the ntario Street e site at 230 mmediately

ks Court, St. erior Street, an Avenue.

f travel. At anks Court, acent to the Erie Street

ve. Several s/drop-offs, reet). Also,

Center. Erie

f the subject Clurg Court,

Page 5: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

FaiStreat FshatwosidadjOn

FaiAvFailanIllinOnund

St. typincperloaCit

OhprointelanlanbotemCh

MilanAvis pups

ChiMewe

rthwestern Me

gust 2011 

irbanks Coureet at its inteFairbanks Cared thru/rigo thru lanes,

des of Ontarijacent hotels

ntario Street i

irbanks Couvenue, alongirbanks Cou

nes in each dnois Street.

n-street parkider the jurisd

Clair Streetpical 33-footcluding a hormitted aloading/delivety of Chicago

hio Street is aovides threeersection wi

ne, a shared ne. The eastth include t

mergency vehhicago.

chigan Avennes in each dvenue maintaprohibited as/drops-offs

icago Avenuetered on-strest of Fairba

emorial Hospita

rt, St. Clair Sersections w

Court includeght-turn lane, and a separio Street eass, restaurantis under the

urt serves as g the easternrt generally irection fromEach interseing is prohibdiction of the

t is a two-wt cross-sectioospital patienong St. Claery zones foro.

a one-way eae travel laneith Michigan thru/left-tutbound appthree thru lhicle access r

nue is a northdirection anains signalizlong Michigs. Michigan

ue is a two-wreet parkinganks Court.

al ‐ Outpatient

Street, and Mwith McClurg

es a separatee. At Michigrate right-tust of St. Claits, and retajurisdiction

a main nortn site boun provides on

m Huron Streection along Fbited along be City of Chi

way north/soon, St. Clairnt pick-up/dair Street, r nearby rest

astbound stres with meten Avenue, t

urn lane, oneroaches at ilanes with route to the

h/south artend a striped zed intersectgan Avenue,n Avenue is u

way east/weg is available At its sign

t Care Pavilion

Michigan Avg Court and Se left-turn lagan Avenue,urn lane. Onir Street. Cuil businesseof the City o

th/south stredary, and cne lane in eeet to Ohio SFairbanks Cboth sides oicago.

outh street lr Street prodrop-off areseveral portaurants and

reet one blocered on-strethe eastboune thru lane, its signalizedshared left- Medical Ca

erial roadwa or raised ptions at Erie , yet curbsidunder the jur

est street loce on both sidnalized inte

venue. Two-St. Clair Stre

ane, a shared the westbou

n-street parkiurbside actives, particularof Chicago.

eet through connecting tach directionStreet, and thourt through

of the street t

located approvides one lea north of Ertions of td businesses

ck south of teet parking ond approach a shared thd intersectio- and right-ampus. Ohio

ay approximlanter medi Street, Onta

de activity inrisdiction of

cated approxdes of the strersection wit

-lane approaeet. The wesd thru/left-tund approacing is meterevity on bothrly between

the study ato Columbun from Chichree lanes inh the study athroughout

roximately olane in eachErie Street. the corridors. This roadw

the subject son both sidh of Ohio Sthru/right-tuons with St.-turn movemo Street is u

mately 2 blockian accommario Street, ancludes reguf the Illinois

ximately thrreet east of th Fairbank

aches are mastbound appturn lane, a ch includes aed along var

h sides of thn St. Clair a

area, extendinus Drive soucago Avenun each directarea is contrthe study ar

one block wh direction Although or include way is unde

site. In the sides of the str

treet providurn lane, and

Clair Streements. Ohi

under the jur

ks west of thmodating left

and Ohio Strular CTA bus Department

ree blocks noFairbanks C

ks Court, the

aintained aloproach of Onsingle thru

a separate lefrious segmen

he street accoand Michiga

ng south frouth of Grane to Huron

tion from Oholled by a trrea. Fairban

west of the siwith curbsi

on-street parvalet opera

er the jurisdi

ite vicinity, Oreet. At its

des a separad a separatet and Fairbaio Street serisdiction of

he site, provt-turn lanes.reet. On-stres service andt of Transpo

orth of the sCourt, but is e eastbound

Page 4

ong Ontario ntario Street lane, and a ft-turn lane, nts on both ommodates an Avenue.

om Chicago nd Avenue.

Street, two hio Street to raffic signal. nks Court is

ite. With a ide activity rking is not ations and ction of the

Ohio Street s signalized ate left-turn e right-turn anks Court

erves as an the City of

viding three Michigan eet parking d taxi pick-

ortation.

subject site. prohibited

d approach

Page 6: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

incOhis u

SupCoCoproAnleftCh

HuStrweHuund

MconewithowShoturStrapp

InnproOnapptur

GraGraturCoof t

IlliproIllin

rthwestern Me

gust 2011 

cudes one thhio Street, Chunder the jur

perior Streeturt, on-streeurt. At its

ovides two tnn & Robert t-turn lane,

hicago.

uron Street iseet, on-stree

est of Fairbanuron Street ider the juris

cClurg Courte-way northth one travewever, a taxore Drive. Arn lane andeet/McClurproaches pro

ner Lake Shoovides two lntario Streetproach inclurn lanes. Inn

and Avenue and Avenuern lane, threurt, on-streethe City of C

inois Street ioposed site. nois Street p

emorial Hospita

hru lane andhicago Avenrisdiction of

t is a one-waet parking i signalized thru lanes wH. Lurie Chone thru lan

s a one-way et parking isnks Court. includes twodiction of th

t is a north/hbound streeel lane in e

xi stand is avAt its signald a thru larg Court intoviding a sin

ore Drive islanes in eacht. At its nudes a left-tuner Lake Sho

is a one-waye/Fairbanksee thru laneset parking isChicago.

is a one-way At the Illinprovides thr

al ‐ Outpatient

d the westbonue providesf the City of C

ay eastboundis available intersection

with shared lhildren’s Hosne, and a rig

westbound available on At its signao thru lanes

he City of Ch

/south streetet segment freach directiovailable on tlized interseane while ttersection inngle-lane. M

a north/soh direction, north/south urn lane andore Drive is u

y westbound Court inters, and a righs available on

y eastbound nois Street/ee thru lane

t Care Pavilion

ound approas emergencyChicago.

d street locaon both sid

n with Fairbleft-turn andspital of Chight-turn lan

street locaten both sidesalized interss with sharehicago.

t located onrom Ohio Ston. On-strethe east sideection with the southbo

ncludes all-wMcClurg Cou

outh street lexcept for o stop-controd one thru lunder the ju

d street locarsection, theht-turn lanen the north

street, coupColumbus D

es with share

ach includes y vehicle acc

ted two blocdes of the stbanks Courtd right-turn icago, the eae. Superior

ed one block of the streeection with ed left-turn

e block easttreet to Ontaeet parking of the streeOntario Stre

ound approway stop court is under t

located two one-way norolled interseane while thrisdiction of

ated two bloce westbound. On the blside of the s

pled with GrDrive signaled left-turn a

a left-turn lcess to the M

cks north oftreet while it, the eastbo movements

astbound apr Street is un

k north of tht east of Fair Fairbanks C and right-t

t of the subjeario Street, Mis prohibite

et just north eet, the nortoach includontrol with the jurisdict

blocks eastrthbound traection withhe southbouf the Illinois

cks south ofd approach locks immedstreet. Gran

rand Avenuelized interseand right-tu

lane and onMedical Cam

f the subject it is prohibiound appros. However

pproach will nder the juri

he subject sirbanks CourCourt, the wturn movem

ect site. WiMcClurg Coed along bo of Erie Streethbound ap

des a right-the northbo

tion of the C

t of the subjaffic flow beh Ontario Sund approac Departmen

f the subject of Grand A

diately east nd Avenue is

e, located thection, the eurn moveme

ne thru lane. mpus. Chica

site. East ofited west ofach of Super, upon cons be striped tisdiction of

ite. Similar trt while it is

westbound aments. Huro

ith the excepourt is a twooth sides of et to serve 6proach inclu-turn lane. ound and sity of Chicag

bject site thaetween OhioStreet, the nch provides

nt of Transpo

site. At theAvenue inclu

and west ofs under the j

hree blocks seastbound aents. On-stre

Page 5

Similar to ago Avenue

f Fairbanks f Fairbanks erior Street struction of to include a the City of

to Superior prohibited

approach of on Street is

ption of the -way street the street;

680 N. Lake udes a left- The Erie outhbound go.

at generally o Street and northbound dual right-ortation.

e signalized udes a left-f Fairbanks jurisdiction

south of the approach of eet parking

Page 7: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

is pavathe

Exi

TheCh

CuExhAv

TheGra

In shuUn

Morepcom

Exi

In inte

rthwestern Me

gust 2011 

prohibited oailable on the City of Chi

isting Trans

e proposed hicago Transi

2 - 3 - 66 - 157 -

urrent daily hibit 7. Add

venue, and Il

e site is locaand/State an

addition to uttle servicenion Station,

ode of travelport) indicatmponents of

isting Traffi

order to uersection tra

Fairban Fairban Fairban Fairban Fairban Fairban Fairban Fairban Erie Str

emorial Hospita

on both sidehe north sidecago.

sit Service 

site, along wit Authority

Hyde Park EKing Drive Chicago Streeterville

boardings aditional busllinois Street

ated within nd Chicago/

CTA bus a between th Ogilvie Tran

l informationes that publ

f the multim

ic and Pede

update prevaffic and ped

nks Court / Cnks Court / Snks Court / Hnks Court / Enks Court / Onks Court / Onks Court / Gnks Court / Ireet / Michig

al ‐ Outpatient

es of Illinoise of the stre

with the sur (CTA) oper

Express

e/Taylor

and alightins routes opert to serve the

approximat/State.

and rail servhe institutionnsportation

n for hospitalic transport

modal transpo

estrian Volu

vious trafficdestrian coun

Chicago AveSuperior StrHuron StreeErie Street Ontario StreOhio Street Grand AvenIllinois Streegan Avenue

t Care Pavilion

s Street; howet east of Co

rrounding arrates several

- Servic- Servic- Servic- Servic

ngs at stopsrate in the ve surroundin

tely ½-mile

vice, NMH,nal campus Center, LaS

al medical sttation and cortation syst

umes 

c and pedents were per

enue eet

et

eet

nue et

wever, curbsolumbus Dr

rea, is well bus routes a

ce between Nce between Fce between Nce between C

adjacent tovicinity alonng neighborh

(ten-minute

in partnersand the fou

Salle Street, a

taff, employeommuter shtem serving

estrian counrformed in M

side pick-uprive. Illinois

served by padjacent to t

Navy Pier anFairbanks/ENavy Pier anChestnut/LS

o the site arng Fairbankshood and th

e walk) of t

ship with Nur downtowand Millenni

ees, patientshuttle option the site and

nt data at May 2010 at

Erie Stre Erie Stre Ontario Ontario Ontario Ontario Ohio Str Ohio Str

p/drop-off s Street is un

public transpthe site, as ou

nd 60th/CottErie and 95th/nd Chicago/SD and Ogd

re detailed s Court, Mic

he institution

two CTA Re

NU and RICwn Metra com

ium Station.

s, and visitorns are well u

d surroundin

the adjacenthe followin

eet / St. Claireet / McClurStreet / MicStreet / St. CStreet / McCStreet / Inn

reet / Michigreet / St. Cla

and loadingnder the juri

portation oputlined belo

tage Grove /St. Lawren/Austin den/Californ

later in thischigan Avennal campus.

ed Line rail

C, operate a mmuter rail.

rs (detailed lutilized and

ng campus ar

nt study inng intersectio

r Street rg Court chigan AvenClair Street Clurg Courter Lake Shorgan Avenueair Street

Page 6

g zones are isdiction of

ptions. The ow:

nce

nia

s report on nue, Grand

stations at

commuter stations at

later in this d important rea.

tersections, ons:

nue

t re Drive

Page 8: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

The- 6trafcouevesho

It sgenTrahavstecouins

rthwestern Me

gust 2011 

e traffic coun:00 PM) peaffic count daunt data collening. The own on Exhi

should be nonerally similaffic and Pave increasedady. Furtheunts performstitutional an

emorial Hospita

nts were conak periods, cata collectedlected, the r existing traibit 3.

oted that revlar to the trrking Study

d and othersermore, the med in 2002nd non-instit

al ‐ Outpatient

nducted in Mcoinciding w

d in the area esulting pea

affic volume

view of the rraffic countsy, despite cos have decretraffic volum

2 as part of tutional grow

t Care Pavilion

May 2010 duwith the pea for previouak hours arees are illustr

recent traffics conductedontinued groeased; howemes indicate the traffic wth in the su

uring weekdak hours of us studies at e 8:00 - 9:00 rated on Ex

c counts indd in 2006 anowth amongever, traffic ved in the recstudy prepa

urrounding

ay morning the adjacen the instituti AM in the m

xhibit 2, and

dicates the trnd 2007 as pg the instituvolumes in cent traffic cared for Pre neighborho

(7:00 - 9:00 t roadway nional campumorning and existing p

raffic volumepart of the Nutions. Som the area hacounts are alentice Womod.

AM) and evnetwork basus. Based ond 5:00 - 6:00

pedestrian vo

es collected Northwestere intersectio

ave remainedlso generally

men’s Hospit

Page 7

vening (4:00 sed on past n the traffic 0 PM in the olumes are

in 2010 are rn Campus on volumes d generally y similar to tal, despite

Page 9: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

ILLINOIS ST

GRAND AVE

OHIO ST

McC

LURG

CT

LAKE SHORE DRIVEFA

IRBA

NKS

CT

ST. C

LAIR

ST

MIC

HIG

AN

AVE

ONTARIO ST

ERIE ST

HURON ST

SUPERIOR ST

CHICAGO AVE

SITE

LEGEND

XX - AM Peak Hour (8:00 - 9:00 AM)

(XX) - PM Peak Hour (5:00 - 6:00 PM)

- Existing Traffic Signal

- Existing Stop Sign

(815

) 695

(225

) 235

(150) 95(710) 475(235) 180

840 (

1170

)23

0 (32

5) (365

) 205

(600

) 585

105 (100)870 (760)250 (395)

100 (

190)

820 (

1100

)

(105

) 180

(165

) 300

205 (135)140 (200)

90 (60)675(480)75

(35)

315 (

465)

85 (1

55)

(495

) 520

(205

) 170

(115) 110(320) 395(280) 255

(105) 125(505) 665

(85) 85(180) 140(510) 560(170) 220

(70) 30(160) 165

(15) 10(55) 105

(200) 245(85) 65

665 (

1010

)55

(65)

25 (3

0)50

(15)

(140

) 130

(70)

85

(180

) 200

(560

) 495

(145

) 120

(112

0) 93

5

(65)

75(1

70) 1

70

45 (85)295 (385)400 (610)

100 (60)405 (455)65 (85)

85 (75)405 (440)90 (75)

(505

) 345

(140

) 195

(108

5) 91

5(1

20) 2

40

(130

) 120

(55)

50

(110

0) 88

5(9

5) 13

5

(60) 40(125) 210(185) 150

(65) 65(175) 100

(45) 45

240 (

315)

40 (3

0)

1385

(124

5)11

5 (85

)

85 (1

05)

50 (8

5)

1205

(109

0)75

(65)

110 (

160)

45 (5

5)

(130

) 190

(435

) 195

40 (95)190 (115)80 (85)

65 (165)30 (50)

110 (

80)

200 (

260)

205 (

180)

1190

(108

0)

175 (

140)

95 (9

0)

(470

) 165

(60)

70

(140

) 175

(90)

95

(250) 65(90) 95

(165) 120

(410) 85(140) 195

(320

) 180

(400

) 50

190 (

175)

35 (1

5)

(405) 560

EXISTING TRAFFIC VOLUMES

EXHIBIT 2

Nnot to scale

Page 10: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

ILLINOIS ST

GRAND AVE

OHIO ST

McC

LURG

CT

LAKE SHORE DRIVEFA

IRBA

NKS

CT

ST. C

LAIR

ST

MIC

HIG

AN

AVE

ONTARIO ST

ERIE ST

HURON ST

SUPERIOR ST

CHICAGO AVE

SITE

205 (340)

250 (265)28

5 (33

5)

215 (

320)

270 (380)

315 (415)

280 (

315)

195 (

225)

210 (370)

260 (415)

390 (

350)

175 (

300)

250 (280)

320 (365)

305 (

350)

275 (

300)

315 (510)

345 (570)

280 (

1690

)

520 (

1685

)

240 (500)

180 (550)

650 (

1620

)

610 (

1705

)

135 (325)

220 (415)

285 (

335)

290 (

500)

195 (370)

160 (345)

275 (

380)

135 (

310)

170 (190)

210 (310)

250 (

340)

215 (

275)

330 (360)

315 (365)

315 (

575)

355 (

380)

245 (305)

235 (285)

370 (

595)

350 (

360)

130 (185)

215 (260)

300 (

250)

185 (

280)

140 (200)

135 (155)

240 (

265)

90 (1

40)

- (-)

- (-)

35 (1

50)

180 (425)

345 (425)

435 (

685)

390 (

390)

305 (420)

315 (

360)

- (-)

** UnderConstruction

EXISTING PEDESTRIAN COUNTS

EXHIBIT 3

LEGEND

XX - AM Peak Hour (8:00 - 9:00 AM)

(XX) - PM Peak Hour (5:00 - 6:00 PM)

- Existing Traffic Signal

- Existing Stop Sign

Nnot to scale

Page 11: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

FU

Thisite

No

PredevnonCitincbut

Duecoproprobe bacChestiRivBar

Ins

ThestudatsuminstheprogroOCowpro

rthwestern Me

gust 2011 

UTURE BAC

is section of e, but located

on‐Institutio

evious traffivelopment in-institutionty of Chicagcludes project are expecte

ue to limitedonomy, the dojects includoject. Thus, completed

ckground nohicago River

imates for thver East Arearton-Aschma

stitutional G

e campus iudents, and pted May 16,mmarized exstitution has e scheduled ojections ideowth that wCP is also exwned buildinojections are

emorial Hospita

CKGROUND

the report sd in the surro

on Develop

ic studies oinformation nal developmgo was contcts either uned to be appr

d funding todatabase pro

ded in the m the list of idby Year 201on-institutio on the southe non-instita Traffic andan Associate

Growth 

institutions patients. As, 2007 and pxisting (Yea updated the occupancy entified by Nould be acco

xpected to angs and not summarize

al ‐ Outpatient

D DEVELOP

summarizes ounding area

pment 

on the instit provided b

ment projectsacted to reqder construcroved and c

o maintain ovided by th

most recent ddentified pro14 or relativonal projectsth, Lake Mictutional backd Parking Opes, Inc.

have revisis part of a pprepared by

ar 2006) and eir current leof the prop

NMH for Yeaommodated

attract medicincluded in d in Table 2

t Care Pavilion

PMENT 

informationa.

tutional camby the Chicas in the Streequest the latction, approvonstructed i

the databashe City wasdatabase areojects summely soon the are includechigan on thkground deperation Rev

ited their gprevious stuy Metro Tra future (Yeaevels and prosed Outpaar 2014, in te

d by initial ocal staff, em the Year 202.

n on potentia

mpus have ago Departmeterville aretest version ved but not in approxim

se and redu last updatee most likely

marized in Tereafter. Coed for the arhe east, and velopment p

view, dated

rowth projedy, the Nornsportation

ar 2012) projrepared newatient Care Perms of medoccupancy of

mployees, an014 growth p

al developm

included bment of Coma and the N of the data yet under co

mately the nex

uced levels oed at the endy to occur wable 1, to thonsistent wirea bound b Rush Streetprojects are November

ections of frthwestern C Group, Incjections. Fo

w future projePavilion). Itdical staff, emf the propos

nd outpatienprojections.

ment not asso

background mmunity Deear North Si

abase maintaonstruction,xt ten years.

of developmd of 2008 anwithin the ahe extent posith past traf

by Pearson St on the wesbased on da1997 and p

faculty, medCampus Trafc., each of thor the purpoections for Yt should be mployees, ansed OCP. H

nts not curre The previo

ociated with

growth derevelopment ide. For thisained by th, and not yet.

ment due tond it is not canalysis horissible, are es

ffic studies iStreet on thest. The trip ata reference

prepared for

dical staff, ffic and Parhe campus ioses of this sYear 2014 (renoted that t

nd outpatienHowever, theently locatedus and curr

Page 10

the subject

rived from (DCD), for

s study, the he City that t approved,

the recent clear which izon of this stimated to in the area, e north, the generation ed from the r CDOT by

employees, rking Study institutions study, each epresenting the growth nts, include e proposed d in NMH-ent growth

Page 12: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

North

Augu

Tabl

1  ‐

2  ‐

Stree

Ritz C

850 L

Lofts 

535 N

Cityfr

Inter

Onte

Rona

hwestern Memoria

ust 2011 

le 1.  Trip Gene

‐  Non‐Institution de

included in this tab

and the RIC Emplo

approved in 2008, 

units and 211,766 

Development of th

‐  Senior Living Resid

Developme

eter Place 

Carlton Residences

Lake Shore Drive 

at River East Art C

N. St. Clair Hotel 

ront Plaza Tower P

Continental Chicag

rie Centre 

ald McDonald Hous

al Hospital ‐ Outpat

ration Estimate

evelopment projects 

ble as construction a

oyee Parking Lot pro

was not included in 

sf of medical office) 

he site is not anticipa

dential trip rate refer

nt 

35

s 66

Av

85

Center  43

53

Phase III  22

go 50

Av

44

se  21

tient Care Pavilion

e ‐ Background N

provided from DCD 

and occupancy by Yea

operty on the east sid

the DCD Year‐End 20

included in the mos

ted by Year 2014.   

enced the “residenti

Address 

55 E. Ohio Street 

64 N. Michigan 

venue 

50 Lake Shore Driv

35 E. Illinois Street

35 N. St. Clair Stree

20 E. Illinois Street

05 N. Michigan 

venue 

46 E. Ontario Stree

11 E. Grand Avenue

Total 

Non‐Institution

Year‐End 2008 Cent

ar 2014 is not anticip

de of McClurg Court

008 Central Area Dat

st recent study (NMH

al” category used for

Land 

Use 

Residentia

Retail 

Residentia

e Senior 

Residentia

Residentia

et Residentia

Retail 

Residentia

Hotel 

Retail 

et  Residentia

e  Hotel 

nal Developmen

tral Area Database.   

pated and/or current

t between Ohio Stree

abase.  It should also

H Parking Structure ‐

r typical residential ty

Units 

al  481 du 

10,000 sf 

al  86 units 

l2 139 du 

al  241 du 

al  261 du 

7,700 sf 

al  200 du 

150 Rooms 

11,000 sf 

al  77 du 

90 rooms 

nt (Estimated Co

Based on current un

t development plans

et and Grand Avenu

o be noted that the G

January, 2010) is no

ypes including condo

AM Pe

In  O

105  2

20 

30  1

55  1

55  1

45  1

40  2

5  1

25  1

380  1

ompletion by Y

nderstanding of stat

s are unknown; the C

ue.   The Waldorf‐Ast

Golub & Co. project a

o longer planned as it

ominiums and apartm

eak Hour

Out Total

25  130 

0  0 

5  25 

10  40 

15  65 

15  65 

0  0 

10  55 

25  65 

0  0 

15  20 

10  35 

30  510 

ear 2014)1 

us and planning, two

Chicago Spire at 400 

oria development at

at the WBBM Studio 

t was included in a tr

ments. 

PM Peak

In Ou

75  45

10  5

15  10

20  15

40  25

40  25

5  5

30  20

40  20

10  5

10  5

25  10

320  190

Page 11 

o projects were not 

N. Lake Shore Drive 

t Illinois/New, while 

site (757 residential 

ransaction with RIC. 

k Hour

ut Total

5  120 

15 

0  25 

5  35 

5  65 

5  65 

10 

0  50 

0  60 

15 

15 

0  35 

0  510 

 

Page 13: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

Tab

Nor

Fac

Stud

Nor

Med

Res

Emp

Med

Hos

Out

Chil

Med

Res

Emp

Hos

Hos

Reh

Med

Emp

Hos

Hos

rthwestern Me

gust 2011 

ble 2.  Instit

Ins

rthwestern Uni

ulty / Employe

dents 

rthwestern Mem

dical Staff 

idents / Fellow

ployees / Volun

dical Staff Offic

spital Beds 

tpatient Visits (

ldren’s Memori

dical Staff 

idents/Fellows

ployees / Volun

spital Beds 

spital Outpatien

habilitation Inst

dical Staff 

ployees / Volun

spital Beds 

spital Outpatien

emorial Hospita

ution Growt

stitution 

versity ‐ Chicag

es 

morial Hospita

ws 

nteers 

ce Employees 

annual) 

ial Hospital ‐ Li

nteers 

nt Visits (annua

titute of Chicag

nteers 

nt Visits (annua

al ‐ Outpatient

th Projectio

P

2

go Campus 

1,0

ncoln Park Cam

al)  2

go 

al) 

t Care Pavilion

ns 

Previous BaselinProjections

2006  20

2,660 

2,205 

1,235 

570 

6,715 

1,400 

775 

063,880  1,39

mpus (2006 and

645 

225 

3,500 

250 

229,710  28

75  

1,710 

165  

50,000  5

ne & s 

Cu

012  20

3,565  3

2,405  2

1,545  1

595 

8,570  6

1,820  1

1,085 

96,805  1,425

d 2010) 

740 

255 

3,815  3

275 

87,500  195

85 

1,965  1

175 

57,500  57

urrent BaselineProjections

010  201

3,506  3

2,300  2

1,445  1

645 

6,970  7

1,715  1

890 

5,885  1,711

670 

235 

3,465  3

250 

5,770  23

85 

1,965  1

175 

7,500  57

e & 

14 

3,800 

2,530 

1,625 

725 

7,755 

1,925 

945 

1,545 

750 

270 

3,670 

288 

7,960

85 

1,965 

175 

7,500 

Page 12

Page 14: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

Yea

To asstrafamCarin Yestirep

Exh

rthwestern Me

gust 2011 

ar 2014 Bac

develop a bsociated withffic resulting

mong other thre Center anYear 2012. Wimated incre

present, in pa

hibit 4 prese

emorial Hospita

ckground T

base level oh the proposg from the uhings, includ

nd EmployeeWhile the exeases in NMart, the propo

ents the Year

al ‐ Outpatient

Traffic Proje

of traffic volsed OCP, muupdated traffdes Ann & e Parking Faxpected NU

MH medical osed OCP an

r 2014 Backgr

t Care Pavilion

ections 

lumes for Yeultiple compfic counts. TRobert H. L

acility, both cincreases in

staff, residend will be de

round Traffi

ear 2014 thaponents are cThe second i

Lurie Childrecurrently un

n faculty andents, medicaetailed later i

ic Volumes.

at representscombined. Tis projected en’s Hospita

nder construcd students oual staff officein this repor

s future conThe first com traffic growal of Chicagction and scutlined in Tae employeesrt.

nditions withmponent is t

wth to Year 2go and the Ncheduled forable 2 are ins, and outpa

Page 13

hout traffic the existing 2014 which, NMH Child r occupancy ncluded, the atient visits

Page 15: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

ILLINOIS ST

GRAND AVE

OHIO ST

McC

LURG

CT

LAKE SHORE DRIVEFA

IRBA

NKS

CT

ST. C

LAIR

ST

MIC

HIG

AN

AVE

ONTARIO ST

ERIE ST

HURON ST

SUPERIOR ST

CHICAGO AVE

SITE

LEGEND

XX - AM Peak Hour (8:00 - 9:00 AM)

(XX) - PM Peak Hour (5:00 - 6:00 PM)

- Existing Traffic Signal

- Existing Stop Sign

- Access Driveway

YEAR 2014 BACKGROUND TRAFFIC VOLUMES

EXHIBIT 4

(845

)755

(235

)250

(150) 95(740) 500(235) 180

860 (

1210

)23

5 (33

5) (375

) 225

(620

) 625

110 (100)915 (805)250 (395)

100 (

190)

84

5 (11

50)

(110

) 215

(165

) 300

140 (185)765 (680)75

(35)

360 (

495)

85 (1

55)

(510

) 550

(210

) 185

(135) 135(400) 565(280) 255

(105) 125(605) 860

(95) 95

(195) 165(600) 730(170) 220

(70) 30(160) 165

(15) 10

(55) 105(205) 265

(85) 65

690 (

1060

)95

(85)

25 (3

0)50

(15)

(205

) 160

(130

) 105

(185

) 200

(585

) 535

(145

) 120

(112

5) 94

(65)

75(1

70) 1

70

45 (85)340 (540)

805 (1275)420 (650)100 (60)450 (610)65 (85)

85 (75)450 (595)90 (75)

(530

) 380

(140

) 200

(109

0) 92

0(1

20) 2

45

(130

) 120

(55)

50

(112

5) 92

0(9

5) 14

0

(60) 40(130) 230(185) 150

(300) 470 (65) 65(175) 100

(45) 45

285 (

345)

40 (3

0)

1425

(130

5)13

0 (90

)

85 (1

05)

50 (8

5)

1210

(109

5)90

(75)

110 (

160)

45 (5

5)

(135

) 195

(455

) 225

40 (95)190 (115)80 (85)

75 (190)30 (50)

110 (

80)

245 (

290)

225 (

220)

1210

(109

5)

175 (

140)

95 (9

0)

(490

) 195

(60)

70

(140

) 175

(95)

95

(275) 90(105) 105(175) 125

(415) 90(140) 195

(350

) 235

(415

) 50

230 (

195)

35 (1

5)

(420) 590

140(200)

205(135)

ERIE ST.

ONTARIO ST.

FAIR

BANK

S CT.

SITE

(385) 410

615 (755)

Page 16: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

DE

Thispepro

De

The

Sit

Accpropro

rthwestern Me

gust 2011 

EVELOPME

is section ofecific traffic oposed OCP

evelopment

e proposed O

Outpatient S

The majoritoffices, diamedical ser

A portion oto relocate occupied blater point such as inp

Retail 

ApproximaOntario Stneighborhotime.

Parking and

The remainspace. Thefor select mOntario papedestrian parking wi441 E. Ontmaintain ex

e Access an

cess to/fromoperty at-graoperty to ma

emorial Hospita

ENT TRAFF

f the report and parkin on the surro

t Character

OCP consist

Services / Me

ty of the spaagnostic serrvices, and s

of the serviceto the propoy services th in time, som

patient beds,

ately 13,700 treet frontagood and cam

d Mechanical/

nder of the e parking wimedical staff.arking garag bridge spaill occur off-ario Street, xcess capacit

nd Circulati

m the propoade betweenaximize dist

al ‐ Outpatient

IC AND PA

outlines theng characterounding stre

istics  

ts of the follo

edical Office 

ace in the OCvices (i.e., l

same-day ou

es and physosed facility,hat may locame of those in comparis

square feet oge in the smpus emplo

/Support 

building coll primarily . Additionage east of t

anning Fairbsite at eitheror at one orty.

ion 

osed site is n Erie Streetance from F

t Care Pavilion

ARKING CH

e site’s proporistics, and eeet system.

owing comp

CP is focuselab testing,

utpatient sur

ician offices, so not all aate to the OC services areson to highe

of ground-flsoutheast cooyees and v

onsists of sev serve OCP p

al patient andthe site, whbanks Courtr the NMH er more off-c

planned viat and Ontar

Fairbanks Co

HARACTERI

osed develoestimates th

ponents:

d on provid ultrasoundrgery.

are alreadyctivity will b

CP will likelye expected tr turnover o

loor retail/reorner of theisitors. Spe

ven parkingpatients (selfd medical st

here they mt just southemployee paampus park

a a two-wayrio Street. Tourt (approx

ISTICS 

opment planhe future tra

ding programd, x-ray, MR

y on campusbe new to thy be reused to be less inoutpatient se

estaurant spe site is plecific tenant

g levels (575f-park and vtaff parking

may walk toh of Erie Strarking faciliking facilitie

y north/souThe drivewaximately 180

ns, presents aaffic volume

mmed servicRI, and CT

in other buihe area. Whi for other ho

ntensive in teervices.

pace along thlanned to sts have not

5 spaces) anvalet) except will be accoo the OCP reet or at sty, currently

es generally

uth drivewaay, located a0 feet), allow

a summary es associate

ces including imaging),

ildings and ile the space

ospital servicerms of acti

he Fairbanksserve the subeen identif

nd mechanict for one flooommodated either via a

street-level. y under cons south of ca

y passing that the west

ws vehicles to

Page 15

of the site-d with the

g physician specialized

is expected es currently ces at some ivity levels,

s Court and urrounding fied at this

cal/support or available at the Erie-a proposed Employee struction at

ampus, that

hrough the side of the o enter and

Page 17: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

eximoneiup/appThefrostaind

Growepedflooto/

Sit

TypTraoutof altedevchadaibeh

In aammame

Thetripocc

rthwestern Me

gust 2011 

it at both Erotorists, avoiighborhood,/drop-off anproximate me parking com the internck without

door through

ound-floor pell as the indestrian ingor lobby ar

/from the Er

e Trip Gene

pically, traffansportationtpatient servdata sourceernative appvelopment caracteristics ily patient haviors, and

addition, momended Instianagement pedical staff, e

e mode splitp generationcupancy of th

emorial Hospita

rie Street anids generati, and limitsnd valet act

midpoint of omponent onal access drimpacting t

h-block pede

pedestrian anternal driv

gress/egress rea is also prie-Ontario p

eration 

fic impact stun Engineers vices and thees referencedproach was tcharacteristiprovided byvolume, v

d an expected

ode split datitutional Plaplanning effemployees, a

t data for Nn projectionhe OCP, are

al ‐ Outpatient

nd Ontario Sng unnecess

s impacts ontivity are prthe internal f the plan priveway to ttraffic flow estrian conn

access to theveway. The via both Faplanned viaparking gara

udies includ(ITE) manuae differentiad in the ITEtaken to devics. TADI y NMH tha

visit length,d distributio

ta collected anned Deveforts, was reand outpatie

MH collectens, along wi presented i

t Care Pavilion

Street. Thissary traffic cn and fromrovided on driveway, r

provides appthe parking aalong the aection betwe

e lobby is plae ground-flairbanks Co

a two propoage and anot

de trip general titled Tripl of floor areE publicatiovelop trafficestimated t

at reflect the physician/

on of arrivals

in Spring 20elopment Noeferenced toents.

ed in Spring ith the site n Table 4.

s flexibility circulation a

m Fairbanks both sides oramps exten

proximately access contr

access driveween Erie Stre

anned via thloor neighboourt and Onosed pedestther spannin

ration estimap Generationea between tn for the “m projectionsrip generati

e specific flo/staffing nus and depart

010, as part oo. 3 and on

o incorporate

2010 is sumvariables a

maximizes around the b Court. Shof the drivend east and 200 feet of rol gates, alloway. The aeet and Onta

he north sidorhood reta

ntario Street.trian bridgeng Erie Stree

ates based on. Howeverthat of the pmedical/den

s that are moion based o

oor-by-floor umbers, optures during

of the campungoing mone the non-au

mmarized in and assump

access and block or thr

hort-term paeway within up to servequeuing capowing approaccess driveario Street fo

de of the buiail space is. Pedestrians; one span

et to/from Fe

n data publir, due to the

proposed OCntal office” ore represenon key vari program ofperating hog peak hours

us institutionitoring of cuto travel c

Table 3. Thptions repres

circulation rough the suarking lane

n the buildine the off-strepacity alongoximately 8 eway also por the neighb

ilding on Er proposed n access to

nning Fairbaeinberg Pavi

ished in the e specific pr

CP and the aland use ca

ntative of theiables and of the facilityurs, pick-u

s.

ns’ obligatiocampus tran

characteristic

he resultingsenting full

Page 16

options for urrounding s for pick-ng. At the eet parking. g the ramps vehicles to

provides an borhood.

rie Street as to include the second

anks Court ilion.

Institute of rogrammed average size ategory, an e proposed operational

y, including up/drop-off

on from the nsportation cs of NMH

g peak hour functional

Page 18: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

Tab

P

Aut

Aut

CTA

CTA

Met

Met

Met

NU 

CM

Tax

Pac

Wa

Bike

Wo

Oth

1 2 

rthwestern Me

gust 2011 

ble 3.  Mode

Primary Model 

to (drive alone)

to (carpool/dro

A Train 

A Bus 

tra + Shuttle 

tra + CTA Bus 

tra + Walk 

Intercampus S

H 155 E. Super

e Paratransit 

lk 

rk at Home 

her 

Total3 

‐  Faculty resp‐  Carpool  coroutpatient s

‐  Sum of perc

emorial Hospita

e Split Surve

of Travel 

 

op‐off)2 

huttle 

rior Shuttle 

onses (63) are inresponds with murveys. entages may no

al ‐ Outpatient

ey Summary

Medical Staf(122 response

46% 

2% 

6% 

10% 

12% 

2% 

2% 

1% 

1% 

1% 

0% 

12% 

2% 

0% 

3% 

100% 

ncluded with Memedical  staff/em

t equal 100% du

t Care Pavilion

 (Year 2010)

ff1 

es) Empl

(2,169 re

34

4

9

15

14

4

4

1

0

1

0

6

1

0

6

10

edical Staff mployee  surveys

ue to rounding 

) ‐ NMH 

oyees esponses)  (1,

4% 

4% 

9% 

5% 

4% 

4% 

4% 

1% 

0% 

1% 

0% 

6% 

1% 

0% 

6% 

00% 

s and drop‐off  c

Outpatient 133 responses)

45% 

13% 

6% 

11% 

0% 

0% 

0% 

N/A 

N/A 

9% 

1% 

13% 

0% 

N/A 

2% 

100% 

corresponds wit

th 

Page 17

Page 19: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Northw

August 

Table 

Physic

Institu

Surge

Imagin

Neigh

n/a  ‐  N

1  ‐  F

a

p

2  ‐  F

s

p

3  ‐  A

o

4  ‐  A

o

5  ‐  A

a

6  ‐  A

A

7  ‐  T

western Memorial H

2011 

4.  Estimated T

Use 

cian Offices3 

ute (Medical Specia

ry5 

ng / Testing6 

borhood Retail7 

Not applicable 

For AM Peak Hour, a

and employees arriv

percent (outpatient).

For PM Peak Hour, a

staff and employees 

percent (outpatient).

Assumes 5.7 visits/ro

operation are 8 AM ‐

Assumes 4.9 visits/ro

operation are 8 AM ‐

Assumes 110,500 pro

are 6 AM ‐ 6 PM.  Ass

Assumes 110,500 pro

AM peak hour and 30

Trip generation rates

Hospital ‐ Outpatie

Trip Generation 

Floor Area

(sf)

271,362 

alist)4  162,664 

81,332 

40,666 

13,700 

ssume 48 percent au

ving based on hourly

assume 48 percent a

leaving based on ho

oom/day x 3 rooms; a

 5 PM. 

oom/day x 3 rooms.  

 5 PM. 

ocedures or 438 pati

sume 10 percent of p

ocedures or 438 pati

0 percent depart in P

s referenced from the

ent Care Pavilion

Patients

/ Day 

Avg

Len

(ho

2,437

1,341

277 1

139 1

n/a n

Tota

uto (medical staff), 3

y parking distribution

uto (medical staff), 

ourly parking distribu

assumes 150 physicia

Assumes 96 physicia

ients/day.  Assumes 

patients arrive in AM

ients/day.  Assumes 

PM peak hour. 

e River East Area Traf

Patients 

. Visit

ngth 

ours) 

Sessions

/ Day 

1 9

1 9

10 1

14 1

n/a n/a

al 

38 percent auto (emp

n.   Assume outboun

38 percent auto (em

tion.  Assume inbou

ans (21 per floor) + 3

ans (24 per floor) + 2

6.7 FTE x 18 operati

 peak hour and 30 pe

95 percent functiona

affic and Parking Ope

Max

PhyPatients 

/ Session 

271

149

277

139

n/a

ployee), 58 percent a

d  trips as a percent

mployee), 58 percent

nd trips as a percent

3.5 staff per physicia

.5 staff per physician

ng rooms at full occ

ercent depart in PM 

al capacity. Expected

ration Review, dated

x. No. of 

ysicians 

Max. N

of 

Employ

143  499

91 228

‐ 115

‐ 54

n/a  n/a

auto (outpatient), on

age of  inbound  trips

t auto (outpatient), o

tage of outbound tri

n at full occupancy; 

n at full occupancy.  A

upancy.  Assumes 95

peak hour.  Medical 

d hours of operation 

d November 1997 an

No. 

yees 

AM Pea

In  O

245 7

140 4

30 1

15 5

430  12

ne patient session inb

s are 4 percent  (me

one patient session 

ps are 4 percent (me

assumes 95 percent

Assumes 95 percent

5 percent functional 

staff is already on ca

 are 7 AM ‐ 9 PM.  A

d prepared for CDOT

Projected Trip Ge

ak Hour2 

Out  Total  I

70 315 7

40 180 4

10 40 2

5 20 1

‐ ‐ 5

25  555  14

bound, and 40 perce

dical staff), 11 perce

out bound, and 30 p

edical staff), 11 perc

functional capacity. 

functional capacity. 

capacity. Expected h

ampus. 

Assume 10 percent o

T by Barton‐Aschman

Page 18 

eneration 

PM Peak Hour3 

n  Out  To

70 245 31

40 140 18

20 70 9

10 30 4

5 10 1

40  485  62

ent of medical staff 

ent  (employee) 33 

percent of medical 

cent (employee) 33 

Expected hours of 

Expected hours of 

hours of operation 

of patients arrive in 

n Associates, Inc. 

tal 

15 

80 

25 

Page 20: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

Dir

Theandchaovepregen

Tab

We

We

We

We

We

Sou

Sou

Sou

Nor

We

Sit

Theintedispatgro

rthwestern Me

gust 2011 

rectional D

e estimated d departs tharacteristics er various sevious trafficnerated traff

ble 5.  Direct

Orientat

st on Erie Stree

st on Ontario S

st on Ohio Stre

st on Grand Av

st on Illinois St

uth on Michiga

uth on Fairbank

uth on Lake Sho

rth on Lake Sho

st on Chicago A

e Traffic As

e site traffic ersections, i

stribution (Ttients in muoup and the

emorial Hospita

istribution 

distributionhe site is a of street sy

sections of tc studies prefic for the pr

tional Distri

tion To / From 

et 

Street 

eet 

venue 

treet 

n Avenue 

ks Court 

ore Drive 

ore Drive 

Avenue 

Total 

ssignment 

assignment,is a functionable 5). Due

ultiple locatio expected av

al ‐ Outpatient

n of site-genfunction of

ystem such athe system, epared for thoposed OCP

bution  

, representinn of the estie to the propons, the site

vailability of

t Care Pavilion

nerated traffi several varas one-way and prevailhe campus iP is outlined

Inbo

10%

30%

10%

5%

5%

5%

25%

10%

100

ng traffic volimated trip posed plan te traffic assig parking dur

ic on the surriables, suchand two-wa

ling traffic vnstitutions,

d in Table 5.

Percen

und 

0% 

lumes associgeneration

to accommodgnment reflring the AM

rrounding rh as site accay streets, evolumes/pa the anticipa

t Distribution

iated with th(Table 4) in

date parkinglects the des

M and PM pe

roadway netcess locationease at whicatterns. Genated direction

Outbound 

‐ 

40% 

‐ 

10% 

‐ 

5% 

5% 

5% 

25% 

10% 

100% 

he proposedn conjunctiog for medicasignated pareak hours.

twork as it ans and confch motoristsnerally consnal distribut

d OCP at theon with the al staff, emprking locatio

Page 19

approaches figurations, s can travel sistent with tion of site-

e study area directional loyees, and

ons by user

Page 21: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

Patof tgenpeagar

Melimme

EmCenat tcamYeaprinotthe

Exh

Tot

Thecontrafand

Pro

In demparandcampar

Usipar

rthwestern Me

gust 2011 

tients are prthe trip gennerated traffak hour, therage.

edical staff amited spaces edical staff tr

mployees in nter/Emplothe NMH Chmpus growthar 2014 Backmarily southt expected toeir off-campu

hibit 5 illust

tal Traffic A

e total traffnstruction anffic assignmd the site tra

ojected Par

addition tomand was arking demand the institumpus in Yearking deman

ing the samrking deman

emorial Hospita

roposed to pneration estimfic during the patient-gen

are also pla available forips are assig

the OCP wyee Parkinghildcare Cenh projection

kground Trah of the camo contribute us parking lo

trates the site

Assignment

fic assignmend occupanc

ment, illustraaffic assignm

rking Dema

o estimatingalso projectend rates, obttional growtar 2014 wasnd projection

e peak parknd specific to

al ‐ Outpatient

park on-site amate and thhe AM peak nerated trips

anned to paror physiciangned to and

will not parg Facility or nter/Employ

ns and incorpaffic Volume

mpus area, thto the study

ocation or po

e traffic assi

ent represency of the pro

ated in Exhibment (Exhibit

and 

g the future ed for the stained from th projections estimated.ns for each y

king demando the propos

t Care Pavilion

and at the Ehe number o hour is exps are expect

rk both on-ns on-site rel from the on

k on-site; that an off-camyee Parkingporated in t

es (Exhibit 4)hey will not y area interseotentially util

gnment for t

nts the futuoposed Outpbit 6, includt 5).

traffic volusite as well previous pans (outlined Table 6 s

year.

d ratios for Nsed OCP dev

Erie-Ontario of spaces exppected to entted to be sp

-site and at lative to the

n-site parking

hey are plampus parkin

g Facility, thehe traffic stu). For emplobe driving t

ections. Thelize the camp

the propose

ure traffic vpatient Care

des the Year

umes associas the over

arking utiliz in Table 2), summarizes

NMH medicvelopment is

parking garpected to beter and exit

plit between

the Erie-One medical stg.

anned to pang location. eir trips willudy for thatoyees parkin

to the site anese employeepus shuttle s

d OCP.

volumes at e Pavilion, ar 2014 Backg

iated with trall institutiozation statist the peak pa the growth

cal staff, emps presented

rage. Basede available fothe site. Ho the site and

ntario parkintaff-generate

ark either in If employeel replace thot project, andng in off-camnd their peakes will eithersystem.

the study ianticipated iground Traff

the proposeonal camputics providedarking demah projection

ployees, andin Table 7.

d on the patior patients, owever, durd Erie-Ontar

ng garage. ed trips, the

n the NMHes are assignose already id thus, inclumpus parkink hour vehicr walk to the

intersectionsin Year 2014fic Volumes

ed OCP, peaus. Using pd by Standarand for the inns and assoc

d outpatient

Page 20

ent portion all patient-ing the PM rio parking

Given the peak hour

H Childcare ned to park included in uded in the ng facilities, cle trips are e OCP from

s upon the 4. The total (Exhibit 4)

ak parking peak period rd Parking, nstitutional ciated peak

ts, the peak

Page 22: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

ILLINOIS ST

GRAND AVE

OHIO ST

McC

LURG

CT

LAKE SHORE DRIVEFA

IRBA

NKS

CT

ST. C

LAIR

ST

MIC

HIG

AN

AVE

ONTARIO ST

ERIE ST

HURON ST

SUPERIOR ST

CHICAGO AVE

SITE

LEGEND

XX - AM Peak Hour (8:00 - 9:00 AM)

(XX) - PM Peak Hour (5:00 - 6:00 PM)

- Existing Traffic Signal

- Existing Stop Sign

- Access Driveway

(5) 1

5(10) 15

5 (20

)5 (

20)

(15)

30

15 (5)

- (20

)10

(40)

80 (35)

30 (1

5)10

(20)

(5) 1

5

(60) 120 (65) 135

5 (20

)

(5) 1

5

(5) 1

5

80 (120)80 (35)- (40)55 (155)

15 (15)50 (135)5 (20)

(5) 1

5

(15) 15(35) 30(20) 10

(35) 30 (20) -(85) 30

(15)

15

- (20)

- (12

5)

30 (1

5)

(35)

15

(70)

-

(5) 1

5

(15) 30

(35)

15

30 (1

5)

(35) 80

30 (1

5)

(20)

45

(5) 1

5

15 (1

5)

(20)

45

10 (6

0)

ERIE ST.

ONTARIO ST.

FAIR

BANK

S CT.

SITE TRAFFIC ASSIGNMENT

EXHIBIT 5

Nnot to scale

SITE

(70)

55

(20) 10

70 (8

5)

155 (70)- (85)

Page 23: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

ILLINOIS ST

GRAND AVE

OHIO ST

McC

LURG

CT

LAKE SHORE DRIVEFA

IRBA

NKS

CT

ST. C

LAIR

ST

MIC

HIG

AN

AVE

ONTARIO ST

ERIE ST

HURON ST

SUPERIOR ST

CHICAGO AVE

SITE

LEGEND

XX - AM Peak Hour (8:00 - 9:00 AM)

(XX) - PM Peak Hour (5:00 - 6:00 PM)

- Existing Traffic Signal

- Existing Stop Sign

- Access Driveway

(850

)770

(235

)250

(160) 110(740) 500(235) 180

865 (

1230

)24

0 (35

5) (375

) 225

(635

) 655

125 (105)915 (805)250 (395)

100 (

210)

85

5 (11

90)

(110

) 215

(165

) 300

140 (185)845 (715)10

5 (50

)37

0 (51

5)

85 (1

55)

(530

) 595

(210

) 185

(135) 135(400) 565(280) 255

(105) 125(605) 860

(95) 95

(195) 165(600) 730(170) 220

(70) 30(220) 285

(15) 10

(55) 105(270) 400

(85) 65

700 (

1120

)95

(85)

25 (3

0)50

(15)

(205

) 160

(130

) 105

(205

) 245

(585

) 535

(145

) 120

(113

0) 95

5

(65)

75(1

75) 1

85

45 (85)420 (660)

885 (1310)420 (690)100 (60)505 (765)80 (100)

85 (75)500 (730)95 (95)

(530

) 380

(140

) 200

(109

5) 93

5(1

20) 2

45

(135

) 135

(55)

50

(112

5) 92

0(1

00) 1

55

(75) 55(165) 260(205) 160

(335) 500 (85) 65(260) 130

(45) 45

315 (

360)

40 (3

0)

1425

(130

5)13

0 (90

)

85 (1

05)

50 (8

5)

1215

(111

5)90

(75)

125 (

175)

45 (5

5)

(135

) 195

(470

) 240

40 (115)190 (115)80 (85)

75 (190)30 (50)

110 (

80)

- (12

5)

275 (

305)

225 (

220)

1210

(109

5)

175 (

140)

95 (9

0)

(525

) 210

(60)

70

(70)

-

(140

) 175

(100

) 110

(275) 90(105) 105(175) 125

(415) 90(155) 225

(385

) 250

(415

) 50

260 (

210)

35 (1

5)

YEAR 2014 TOTAL TRAFFIC ASSIGNMENT

EXHIBIT 6

(455) 670

140(200)

205(135)

ERIE ST.

ONTARIO ST.

FAIR

BANK

S CT.

SITE

(70)

55

(385) 410

70 (8

5)

155 (70)615 (840)

(70) 150

Page 24: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

N

A

T

N

Fa

St

N

M

Re

Em

M

H

O

Ch

M

Re

Em

H

H

Re

M

Em

H

H

10

orthwestern M

ugust 2011 

able 6.  Pea

I

Northwestern U

aculty / Employ

tudents 

Northwestern M

Medical Staff3 

esidents / Fello

mployees / Vol

Medical Staff Of

ospital Beds 

utpatient Visits

hildren’s Memo

Medical Staff 

esidents/Fellow

mployees / Vol

ospital Beds 

ospital Outpati

ehabilitation In

Medical Staff 

mployees / Vol

ospital Beds 

ospital Outpati

‐  Based on e

‐  Calculated

‐  Includes p

‐  Includes R

‐  Includes m

‐  Includes v

‐  All CMH p

‐  Adjusted f

‐  Additional

0  ‐  Adjusted f

Memorial Hosp

k Parking De

nstitution 

niversity ‐ Chica

yees 

Memorial Hospit

ows4 

unteers 

ffice Employees

s (annual)3, 6 

orial Hospital ‐ 

ws 

unteers 

ient Visits (ann

nstitute of Chica

unteers 

ient Visits (ann

estimate of park

d as “Percent Gro

proposed OCP 

RIC residents/fell

medical staff offi

isits to NMH and

arking is new to

from previous de

l parking deman

from existing de

pital ‐ Outpatie

emand Proje

ago Campus 

tal 

s3, 5 

1

Lincoln Park Ca

ual) 

ago 

ual) 

T

king demand pro

owth 2006 ‐ 201

lows 

ce employees in

d NMH‐owned b

 the study area a

emand to reflect

d projected, bas

mand to reflect 

nt Care Pavilio

ection (Insti

Previous BaseUnit Project

2006 

2,660 

2,205 

1,235 

570 

6,715 

1,400 

775 

1,063,880  1,

ampus (2006 a

645 

225 

3,500 

250 

229,710 

75  

1,710 

165  

50,000 

TOTAL 

ovided by Standa

12” x “Adjusted P

n NMH‐owned b

buildings 

and is included i

t anticipated mo

sed on input fro

110 patient/visi

on 

itutional Cam

eline & tions 

2012 

3,565 

2,405 

1,545 

595 

8,570 

1,820 

1,085 

,396,805 

and 2010)7 

740 

255 

3,815 

275 

287,500 

85 

1,965 

175 

57,500 

ard Parking from

Previous Deman

buildings 

in the increase i

ode split adjustm

m CMH, to refle

itor peak parkin

mpus) 

Percent Grow2006 ‐ 201

34% 

9% 

25% 

4% 

28% 

30% 

40% 

31% 

15% 

13% 

9% 

10% 

25% 

13% 

15% 

6% 

15% 

m between Febru

nd 2006” 

n parking dema

ment by CMH da

ect additional on

g demand that w

wth 2 

PreP

Dem

20

23%         

26% 

30% 

40% 

31% 

10% 

25% 

15% 

15% 

uary 2006 and F

nd for Year 2012

ay shift medical s

n‐street parkers 

will continue to 

evious Peak mand1 

AdjuPrevDem

006  20

1,120 

1,940 

 100 

 215 

 875 

1,040 

515 

305 

60 

6,170 

February 2007 

staff and employ

in Lincoln Park t

occur at the CM

usted vious mand 

Chan2006‐2

06 

1,120 

1,940 

 100 

 215 

 875 

7758 

40510 

305 

60 

5,795  +1

yees at new loca

that may drive to

MH Clark/Deming

nge 20122 

ProjecPea

Dem

201

+255  1

+500  2

+30 

+85 

+275  1

+80 

+100 

+45 

+10 

1,380  7

ation consistent 

o the Northwest

g outpatient faci

cted ak and 

CurrUn

2  2010

,375 3,5

2,3

,440 

1,4

6

6,9

130  1,7

300  8

,150  1,425,8

855 

6

2

3,4

505 2

195,7

350 1,9

70 1

57,5

,175 

with NMH med

tern Campus. 

lity in Lincoln Pa

rent Baseline &it Projections

0  2014

506  3,80

300  2,53

445  1,62

645  72

970  7,75

715  1,92

890  94

885  1,711,54

670  75

235  27

465  3,67

250  28

770  237,9

85  8

965  1,96

175  17

500  57,50

 

ical staff and em

ark and not reloc

& Perc20

00  7

30 

25 

25 

55  ‐10

25 

45  ‐13

45  23

50  1

70  6

70  ‐4

88  5

960 ‐1

85 

65 

75 

00 

 

mployees 

cate to Streeterv

cent Growth 012 ‐ 2014 

% 6

р% 

‐62% 0% 

6

3%  ‐13

3%  23

1% 

‐26% 

4% 

5% ‐17

17% 

‐ 

‐ 

‐ 

‐ 

 

ville 

Change 2012‐201

6%  +8

6%  ‐14

6%  +1

3%  ‐4

3%  +26

2%  +125

7%  ‐8

‐ 

‐ 

 

14 

ProjectedPeak

Demand

2014 

85  1,46

40  2,30

10  14

40  26

60  1,41

59  98

85  42

‐  35

‐  7

  7,39

Page 23 

Peter
Typewritten Text
Peter
Typewritten Text
-10%
Peter
Typewritten Text
Peter
Rectangle
Peter
Rectangle
Peter
Rectangle
Peter
Rectangle
Peter
Rectangle
Peter
Rectangle
Peter
Rectangle
Peter
Rectangle
Peter
Rectangle
Peter
Rectangle
Peter
Rectangle
Peter
Rectangle
Peter
Typewritten Text
Peter
Typewritten Text
5%
Peter
Rectangle
Peter
Typewritten Text
22%
Peter
Typewritten Text
5%
Peter
Typewritten Text
-10%
Peter
Typewritten Text
6%
Peter
Typewritten Text
-13%
Peter
Typewritten Text
23%
Peter
Typewritten Text
1%
Peter
Typewritten Text
6%
Peter
Typewritten Text
-4%
Peter
Typewritten Text
5%
Peter
Typewritten Text
-17%
Page 25: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

Tab

Use

Me

Emp

Out

rthwestern Me

gust 2011 

ble 7.  Peak 

er 

dical Staff 

ployees 

tpatient Visits 

‐  Based  on  ra

levels in Yea

emorial Hospita

Parking Dem

U

234

896

1,100,000 

To

atio  of  peak  pe

r 2006 (as prese

al ‐ Outpatient

mand Projec

Unit 

4 daily 

6 daily 

annual visits 

otal 

eriod  parking  de

ented in Table 6)

t Care Pavilion

ction (OCP) ‐

Peak Parki

Demand Ra

0.22770

0.00082

emand  compare

‐ Full Occupa

ing 

ate1  Initial O

ed  to  institutio

ancy 

Peak Parking 

Occupancy 

176 

619 

795 

onal  activity 

 Demand 

Full Occupanc

257 

905 

1,162 

cy 

Page 24

Page 26: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

AN

Thievaroa

Ca

CapinteabiaveLOLOdenCh

TheCapanddes

Tab

Theintenot

rthwestern Me

gust 2011 

NALYSES A

is section ofaluate the padway system

pacity Anal

pacity analyersections dility to accoerage vehicle

OS A as the hOS F as the lonse urban n

hicago, it is n

e LOS gradpacity Manud travel timescription of e

ble 8.  Level 

Level of Se

‐  Based on Hig

e range of coersections ate that highe

emorial Hospita

ND RECOM

f the report otential impm and serve

lysis 

yses were cduring the wommodate tre delay per vhighest (besowest (oversneighborhoo

not uncommo

des shown bual (HCM), es experienceach LOS ra

of Service D

ervice 

ghway Capacity 

ontrol delayre expected

er delays are

al ‐ Outpatient

MMENDAT

summarizespact of the pe as a basis o

conducted toweekday mor

raffic volumvehicle passst traffic flowsaturated conods, similar on for inters

below, whic quantify an

ced as a resuting can be f

Descriptions

Description 

Minimal cont

within traffic 

Minor contro

slightly restric

Moderate con

formation of q

Considerable 

average trave

High control d

Extremely hig

traffic flow. 

Manual, 2000 

for each rat to carry a l

e tolerated fo

t Care Pavilion

TIONS 

s the traffic proposed Ouof potential im

o assess therning and ev

mes, is expreing through

w and least nditions). D to Streeter

sections to op

ch are provnd categorizult of intersecfound in Tab

s1 

rol delay; traff

stream. 

l delay at signa

cted movemen

ntrol delay; mo

queues contrib

control delay t

el speeds conti

delay; average 

gh control dela

ting (as detalarger volumor the corres

and parkingutpatient Camprovemen

e existing anvening peakessed in ter

h an intersectdelay), LOS

Due to the trarville and operate at LO

vided in theze the driverction controble 8.

fic operates at 

alized intersect

nt within traffic

ovement withi

butes to lower 

that may be su

nue to decreas

travel speed n

y; extensive qu

ailed in the Hme of vehiclponding LO

g analysis ofare Pavilion nt measures

nd future ok hours. Therms of Levetion. Levels

S E as saturaaffic charact

other neighbOS E or LOS

e Transportr’s discomfo

ol and the res

primarily free‐

tions; traffic op

c stream. 

n traffic stream

 average trave

ubstantially inc

se. 

no more than 3

ueuing and hig

HCM) is sholes and stop

OS ratings.

f existing an developmeto mitigate s

operating coe capacity oel of Services of Service rated or at-cateristics and borhoods or F during pe

tation Reseaort, frustratisulting traff

‐flow condition

peration at a fa

m more restric

el speeds. 

creased by sma

33 percent of f

gh volumes cre

own in Tablepping is requ

nd future coent on the susuch impact

onditions ofof an intersece (LOS), barange from Aapacity cond physical conr business

eak periods.

arch Board’sion, fuel confic queuing.

ns; unimpeded

airly unimpede

ted than at LO

all increases in

free flow speed

eate exceeding

e 9. Becauseuired during

Page 25

onditions to urrounding t.

f the study ction, or its sed on the

A to F, with ditions, and nstraints of districts in

s Highway nsumption, A detailed

d movement 

ed level with 

OS B; 

 flow; 

d. 

gly restricted 

e signalized g red time,

Page 27: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

Tab

Le

It sa rinteor t

Basand

Tab

Inte

Chic

  No

  Ea

  W

  Ov

Sup

No

  So

Ea

  Ov

 

 

 

rthwestern Me

gust 2011 

ble 9. Level o

evel of Service

‐  Based on Hig

should be norealistic assersection apto bypass lef

sed on thesed evening pe

ble 10.  Inte

ersection 

cago Avenue/

orthbound App

stbound Appro

estbound App

verall Intersect

perior Street/F

orthbound App

outhbound App

stbound Appro

verall Intersect

‐  Signalized

‐  Minor‐Leg

‐  All‐Way St

emorial Hospita

of Service G

 Un

ghway Capacity 

oted that somessment of

pproach withft-turning ve

e assumptioneak periods

rsection Cap

Fairbanks Cou

proach 

oach 

roach 

tion 

Fairbanks Cour

proach 

proach 

oach 

tion 

d Intersection 

g Stop‐Controlle

top‐Controlled I

al ‐ Outpatient

Grading Crite

nsignalized Inte

0 – 10 

> 10 – 1

> 15 – 2

> 25 – 3

> 35 – 5

> 50 

Manual, 2000 

me assumptlane geom

h a bus stopehicles is ass

ns and the Hare reported

pacity Analy

rt   

 

 

 

 

rt   

 

 

 

 

d Intersection 

ntersection 

t Care Pavilion

eria1 

Control Dela

ersections 

ions were inmetry and u

or no parkisumed to ha

HCM standard in Table 10

ysis 

Ex

AM Peak H

Avg. Delay 

(sec/veh) 

 

20‐

12

6

14

 

8

19

22

16

ay Per Vehicle (

ncorporated utilization ating zone tha

ave a short ri

rds, the capa0 for both ex

isting Conditio

our  PM 

LOS Avg. D

(sec/v

   

B 63

B 40

A 7

B 46

   

A 15

B 14

C 55

B 31

(sec/veh) 

Signalized In

0 –

> 10 

> 20 

> 35 

> 55 

> 8

into the capt the studyat is commoight-turn or

acity analysixisting and Y

on 

Peak Hour 

Delay 

veh) LOS 

 

3 E

0 D

A

6 D

 

5 B

4 B

5‐ D

1 C

ntersections 

– 10 

– 20 

– 35 

– 55 

– 80 

80 

pacity analyy intersectioonly used by left-turn lan

is results forYear 2014 co

AM Peak H

Avg. Delay 

(sec/veh) 

 

41 

13 

6

23 

 

15 

16 

22 

18 

ses in orderons. For exy right-turninne, respective

r the weekdanditions.

Year 2014 

our  PM 

LOS Avg. D

(sec/v

   

D  79

B  40

A  7

C  54

   

B  25

B  15

C  72

B  42

Page 26

r to provide xample, an ng vehicles ely.

ay morning

Peak Hour 

Delay 

veh) LOS 

 

9 E

0 D

A

4 D

 

5 C

5 B

2 E

2 D

Page 28: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

Tab

Inte

Hur

No

So

We

Ov

Erie

No

So

Ea

Ov

Erie

No

So

Ea

Ov

Erie

No

So

Ea

Ov

Erie

No

  So

Ea

  Ov

Erie

No

Ont

So

 

 

 

rthwestern Me

gust 2011 

ble 10.  Inte

ersection 

ron Street/Fair

orthbound App

outhbound App

estbound App

verall Intersect

e Street/Michi

orthbound App

outhbound App

stbound Appro

verall Intersect

e Street/St. Cla

orthbound App

outhbound App

stbound Appro

verall Intersect

e Street/Fairba

orthbound App

outhbound App

stbound Appro

verall Intersect

e Street/McClu

orthbound App

outhbound App

stbound Appro

verall Intersect

e Street/NMH 

orthbound App

tario Street/N

outhbound App

‐  Signalized

‐  Minor‐Leg

‐  All‐Way St

emorial Hospita

rsection Cap

rbanks Court 

proach 

proach 

roach 

tion 

gan Avenue 

proach 

proach 

oach 

tion 

air Street 

proach 

proach 

oach 

tion 

anks Court 

proach 

proach 

oach 

tion 

urg Court 

proach 

proach 

oach 

tion 

OCP Access 

proach 

MH OCP Acces

proach 

d Intersection 

g Stop‐Controlle

top‐Controlled I

al ‐ Outpatient

pacity Analy

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ss   

 

d Intersection 

ntersection

t Care Pavilion

ysis (continu

Ex

AM Peak H

Avg. Delay 

(sec/veh) 

 

16

10+

15

14

 

5

9

49

10+

 

11

10+

11

11

 

25

11

11

17

 

9

9

8

9

 

 

ued) 

isting Conditio

our  PM 

LOS Avg. D

(sec/v

 

B 13

B 12

B 12

B 12

 

A 5

A 9

D 50

B 11

 

B 10+

B 10+

B 10

B 10+

 

C 6

B 9

B 9

B 7

   

A 9

A 8

A 8

A 9

   

n/a

 

n/a

on 

Peak Hour 

Delay 

veh) LOS 

 

3 B

2 B

2 B

2 B

 

A

A

0 D

1 B

 

+ B

+ B

0‐ A

+ B

 

A

A

A

7 A

 

A

A

A

A

 

 

AM Peak H

Avg. Delay 

(sec/veh) 

 

6

12 

22 

12 

 

7

12 

49 

14 

 

13 

11 

13 

13 

 

13 

7

13 

11 

 

10‐ 

9

9

9

 

11 

 

10‐ 

Year 2014 

our  PM 

LOS Avg. D

(sec/v

 

A  7

B  14

C  16

B  11

 

A  6

B  10+

D  49

B  12

 

B  11

B  11

B  10+

B  11

 

B  13

A  7

B  10

B  10

   

A  12

A  9

A  10+

A  11

   

B  10+

 

A  10

Page 27

Peak Hour 

Delay 

veh) LOS 

 

A

4 B

6 B

1 B

 

A

+ B

9 D

2 B

 

1 B

1 B

+ B

1 B

 

3 B

A

0‐ A

0 B

 

2 B

A

+ B

1 B

 

+ B

 

0‐ A

Page 29: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

Tab

Inte

Ont

No

So

We

Ov

Ont

No

So

We

Ov

Ont

No

So

We

Ov

Ont

No

So

We

Ov

Ont

No

  So

Ov

Ohi

No

So

Ea

Ov

n/a 

 

 

 

rthwestern Me

gust 2011 

ble 10.  Inte

ersection 

tario Street/M

orthbound App

outhbound App

estbound App

verall Intersect

tario Street/St

orthbound App

outhbound App

estbound App

verall Intersect

tario Street/Fa

orthbound App

outhbound App

estbound App

verall Intersect

tario Street/M

orthbound App

outhbound App

estbound App

verall Intersect

tario Street/In

orthbound App

outhbound App

verall Intersect

io Street/Mich

orthbound App

outhbound App

stbound Appro

verall Intersect

‐  Not applic

‐  Signalized

‐  Minor‐Leg

‐  All‐Way St

emorial Hospita

rsection Cap

Michigan Avenu

proach 

proach 

roach 

tion 

t. Clair Street 

proach 

proach 

roach 

tion 

airbanks Court

proach 

proach 

roach 

tion 

McClurg Court 

proach 

proach 

roach 

tion 

nner Lake Shor

proach 

proach 

tion 

higan Avenue 

proach 

proach 

oach 

tion 

cable 

d Intersection 

g Stop‐Controlle

top‐Controlled I

al ‐ Outpatient

pacity Analy

ue   

 

 

 

 

 

 

 

 

 

t   

 

 

 

 

 

 

 

 

 

e Drive   

 

 

 

 

 

 

 

 

d Intersection 

ntersection 

t Care Pavilion

ysis (continu

Ex

AM Peak H

Avg. Delay 

(sec/veh) 

 

13

13

43

18

 

38

13

9

16

 

8

27

15

15

 

18

4

12

14

 

9

8

9

 

13

8

46

20‐

ued) 

isting Conditio

our  PM 

LOS Avg. D

(sec/v

 

B 13

B 13

D 45

B 19

 

D 40

B 20

A 9

B 18

 

A 11

C 21

B 27

B 21

 

B 15

A 8

B 10+

B 11

   

A 9

A 7

A 8

B 15

A 8

D 49

B 21

on 

Peak Hour 

Delay 

veh) LOS 

 

3 B

3 B

5 D

9 B

 

0 D

0‐ B

A

8 B

 

1 B

1 B

7 C

1 C

 

5 B

A

+ B

1 B

 

A

A

A

5 B

A

9 D

1 C

AM Peak H

Avg. Delay 

(sec/veh) 

 

14 

12 

46 

20‐ 

 

39 

15 

10‐ 

17 

 

10+ 

30 

17 

17 

 

20‐ 

9

14 

16 

 

9

9

9

15 

9

54 

25 

Year 2014 

our  PM 

LOS Avg. D

(sec/v

 

B  18

B  13

D  77

B  31

 

D  41

B  24

A  12

B  19

 

B  19

C  24

B  41

B  31

 

B  15

A  15

B  13

B  14

   

A  9

A  8

A  8

   

B  15

A  8

D  54

C  24

Page 28

Peak Hour 

Delay 

veh) LOS 

 

8 B

3 B

7 E

1 C

 

1 D

4 C

2 B

9 B

 

9 B

4 C

1 D

1 C

 

5 B

5 B

3 B

4 B

 

A

A

A

5 B

A

4 D

4 C

Page 30: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

Tab

Inte

Ohi

No

So

Ea

Ov

Ohi

No

So

Ea

Ov

Gra

No

So

We

Ov

Illin

No

So

We

Ov

 

 

 

BasserareappStr

Dewoexp

rthwestern Me

gust 2011 

ble 10.  Inte

ersection 

io Street/St. Cl

orthbound App

outhbound App

stbound Appro

verall Intersect

io Street/Fairb

orthbound App

outhbound App

stbound Appro

verall Intersect

and Avenue/Fa

orthbound App

outhbound App

estbound App

verall Intersect

nois Street/Col

orthbound App

outhbound App

estbound App

verall Intersect

‐  Signalized

‐  Minor‐Leg

‐  All‐Way St

sed on the carvice for the e generally proaches indeet at Michig

tailed revieorksheets propected to ex

emorial Hospita

rsection Cap

lair Street 

proach 

proach 

oach 

tion 

banks Court 

proach 

proach 

oach 

tion 

airbanks Court

proach 

proach 

roach 

tion 

lumbus Drive 

proach 

proach 

roach 

tion 

d Intersection 

g Stop‐Controlle

top‐Controlled I

apacity anal future condsimilar to tdicate LOS gan Avenue

w of indiviovided in thperience lev

al ‐ Outpatient

pacity Analy

 

 

 

 

 

 

 

 

 

 

t   

 

 

 

 

 

 

 

 

 

d Intersection 

ntersection 

lysis of studyditions (incluthe current D or better

e and Colum

idual intershe Technical vels of servic

t Care Pavilion

ysis (continu

Ex

AM Peak H

Avg. Delay 

(sec/veh) 

 

24

20

9

13

 

11

7

18

12

 

10‐

22

22

19

 

24

14

21

20‐

y intersectiouding the pr

conditions.r with the e

mbus Drive a

section mov Appendix) ce below LO

ued) 

isting Conditio

our  PM 

LOS Avg. D

(sec/v

 

C 24

C 26

A 8

B 15

 

B 12

A 9

B 21

B 13

 

A 50

C 30

C 41

B 39

 

C 30

B 118

C 26

B 65

ons, in most roposed OCP As shown

exception oft Illinois Stre

vements (wiindicates th

OS D. While

on 

Peak Hour 

Delay 

veh) LOS 

 

4 C

6 C

A

5 B

 

2 B

A

1 C

3 B

 

0 D

0 C

1 D

9 D

 

0 C

8 F

6 C

5 E

cases, the avP and non-sn in Table

f some appreet.

ith details ihat select moe most indiv

AM Peak H

Avg. Delay 

(sec/veh) 

 

25 

23 

10‐ 

13 

 

13 

7

23 

15 

 

11 

25 

23 

20+ 

 

26 

18 

22 

22 

verage vehicite-generate10, most s

roaches alon

included in ovements at vidual inters

Year 2014 

our  PM 

LOS Avg. D

(sec/v

 

C  25

C  31

A  9

B  15

 

B  8

A  9

C  24

B  13

 

B  24

C  23

C  45

C  31

 

C  32

B  32

C  27

C  30

cle delays aned backgrountudy area ing westboun

the capacit study interssection mov

Page 29

Peak Hour 

Delay 

veh) LOS 

 

5 C

1 C

A

5 B

 

A

A

4 C

3 B

 

4 C

3 C

5 D

1 C

 

2 C

2 C

7 C

0 C

nd levels of nd growth) intersection nd Ontario

ty analysis sections are

vements are

Page 31: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

antser

In cappedintefro

Alosouvolthecomsigporaddped

If inteevewoincof Fintethe

Thelegpedres

rthwestern Me

gust 2011 

ticipated to rvice that are

Ontario Ohio St Grand A Erie Str

many locatpacity issuedestrians inersections alm the crossi

ong Ontariouth. This lilume (420 ine pedestrianmpeting mo

gnificant delartion of thatdressing thidestrian mov

pedestrian ersection, thening peak ould improvconvenience Fairbanks Cersection an

e north side o

ere is precedg of Chicagodestrians asstriction for a

emorial Hospita

exhibit accee expected to

o Street/Fairtreet/MichigAvenue/Illireet / Michig

ions that ex is the con

n the adjacelong Michiging streets of

o Street, Fairmitation on

n AM peak, n crossings (ovements vieay. While tht phase allows specific isvements from

movementshe capacity fhour, when

ve from LOS for those w

Court at the inyways and of Ontario S

dent for thiso Avenue at ssociated wa trial period

al ‐ Outpatient

eptable levelo accommod

rbanks Courgan Avenue:nois Street: gan Avenue

xhibit poor nflict betweeent crosswalgan Avenue eften experien

rbanks Courn traffic circu 690 in PM p(210 in AM e for a limihe westbounws turns wisue at the Fm this confli

s were profor westbou

n the vehicuS F (101.7 se

who cross theintersection would not b

Street and wo

s approach i Fairbanks Cith potentia

d to evaluate

t Care Pavilion

ls of servicedate some sit

rt: WB Lef: EB Thru

SB Left-: SB Left-

levels of seen vehicles lk, the capaexperience snce delay w

rt representsulation in thpeak) from peak, 310 ited availabind left-turn mithout yieldFairbanks Coict point.

hibited at und left-turnlar delay is

ec/veh) to Le south leg o may alreadbe greatly imould be inco

in the neighCourt to helal improveme the resultin

e, some indivte-generated

ft-Turn -u --Turn --turn -

ervice within and pedesacity for vesignificant phile waiting

s the first ohe neighborOntario Strein PM peakility of signmovement ding to pedeourt/Ontari

the south ning vehicles highest, the

LOS C (27.5 of the intersey be crossin

mpacted; yeonvenienced

borhood; pep facilitate n

ment, one png benefits, p

ividual movd traffic inclu

- LOS F - LOS E - LOS F - LOS E

n the studystrians. Asehicular trafpedestrian crg for pedestr

opportunity rhood resulteet to Fairbak) on the sonal time anddoes have a estrians. Thio Street int

leg of the s is expectede level of se sec/veh). ection. Som

ng in advanct, others ma by the pede

edestrian cronorthboundpotential oppedestrian im

vements withude:

during PM p during AM during PM p during AM

y area, a mas turning vffic is negatrossing volumians to comp

west of Lakts in a heavanks Court. outh leg of d the vehicupermitted/p

herefore, onetersection in

Fairbanks d to improvervice for thClearly, the

me of those wce of or subsay have no iestrian cross

ossings are pd left-turns. ption includmpacts, and

h poor futur

peak hour peak hour peak hour and PM pea

ajor componvehicles mustively impames; thus, tuplete their cr

ke Shore Drvy westboun

When confthe intersec

ular traffic eprotected phe option to c

ncludes elim

Court/Ontve significanhe westboune tradeoff is who cross thsequent to cintention of swalk remov

prohibited o Given the tdes implem

d other issue

Page 30

re levels of

ak hours

nent of the st yield to

acted. The urns to and rossing.

rive to turn nd left-turn flicted with ction, these experiences hase, only a consider in

minating the

tario Street ntly. In the nd left-turn pedestrian

he south leg crossing the

crossing to val.

on the west tradeoff for

menting the s.

Page 32: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

Ob

Whmacon

Baspedseropeana

 

rthwestern Me

gust 2011 

bserved Ope

hile the capaintain accepnditions dur

sed on the destrian volrvice are prerations thaalysis. Key o

Residua

One chqueues FairbanOntariohours, vstreet tlimitingeffectivuntil latraffic fsignal c

Bus stop

The subtranspowhile thintersecturnaroCourt d

CTA bublockinOntarioFairbanCTA roseem m

The busnorth a

emorial Hospita

erational A

acity analysptable levelsring the peak

analysis oumes, type

rimarily witat impact traobservations

al Vehicle Que

haracteristic extending b

nks Court (ao Street betwvehicle queu

traffic flow g the cross-

vely reducinte in the sigflows recovcycles; howe

ps and Bus Tu

bject site, inortation. In phe excellent ction along Found/lay-bydoes impact

uses occupyng heavy righo), and prevnks at Huronoutes, multip

magnified by

s turnarounat this route

al ‐ Outpatient

Analysis 

ses indicate s of service,k hours with

f traffic voof traffic co

thin acceptaaffic flow as regarding t

eues and Inte

that impactback from doapproximateween Michigues can extein a couple-street thru g capacity.

gnal phase afer from int

ever, other oc

urning Maneu

nstitutional particular, th transit acceFairbanks C

y area at the traffic flow i

ying near-sidht-turn locat

vent traffic fn and southbple buses ar the relative

d area just e terminus an

t Care Pavilion

that most s, field obser

hin portions

olumes, the ontrol, and iable ranges.nd vehicle these charac

ersection Bloc

ts traffic flowownstream ily 300 feet),an Avenue aend to and te of ways. traffic, resu At other tifter the dowersection blccurrences m

uvers 

campus, anhe CTA operss is a benef

Court betweeground flooin various w

de stops limtions (i.e., nofrom bypassbound Fairbe also often ly short nort

east of Fairbnd avoid ex

study intersrvations sugof the study

travel laneif signalized. Howeverqueues, but

cteristics or c

cking 

w in the stuintersections St. Clair Strand St. Clairthrough upsOne exampulting in skimes, the lef

wnstream vehlocking and may continu

nd surroundrates severafit, the comben Ohio Streor of the Erieways.

mit traffic floorthbound Fsing vehiclesbanks at Erie observed bth-south blo

banks Court xtra operatin

sections andggest otherwy area.

es available d, the signal r, there aret are not acconditions a

udy area is ts, particularlreet (approxr Street (appstream interple is traffickipped or pft-turns andhicle queues extended q

ue for longer

ding neighboal bus routes bination of beet and Chice-Ontario pa

ow when blFairbanks at s waiting toe). Since Faibunched togeocks along Fa

allows the #ng expenses

d directionalwise as there

at each in phasing an

e several chccurately refare outlined b

the occurrenly along shoximately 300proximately rsections whc completelypartially us

d right-turnss begin to suqueue lengt periods of t

orhood are along Fairb

bus stops in cago Avenuearking garag

locking a th Erie and so

o make left-tirbanks Couether. Thesairbanks Co

#3 - King Ds and potent

l approachee are conge

ntersection, nd timing, thharacteristicsflected in thbelow:

nce of residort blocks su0 feet), and 400 feet). D

hich then imy blocking osed signal ps cannot be ubside. Somths within otime.

well-servedbanks Court.each directie coupled w

ge just east o

hru lane, creuthbound Fturns (i.e., n

urt accommose two condiourt.

rive route totial traffic im

Page 31

s generally ested traffic

conflicting he levels of s of traffic he capacity

dual vehicle uch as along

westbound During peak mpact cross-

or partially phases and completed

metimes the one or two

d by public However, on at every

with the bus f Fairbanks

eate queues Fairbanks at northbound odates three itions often

o turn back mpacts that

Page 33: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

rthwestern Me

gust 2011 

would street dof the OtypicallcontinuOntario

Curbside

One tradowntoas taxi lparkingAt timecurbsidat that Within east of M

Inconsis

The crowide) tto five lthe studirectiotraffic fsouthboErie Str

This inintersecblocks calculaton upst

Anothewestboulane droturningtraffic gthru/leapproac

emorial Hospita

result from during driveOntario Strely requires ue its route o Street at Fa

e Activity 

affic charactown Chicagoloading/unlg for quick ees, these act

de activities ointersection the study aMichigan Av

stent Lane Ut

oss-section oo four laneslanes just sody area, the

on. Howeveflow and capound betweereet.

consistent action capacitalong Fairb

ted levels oftream interse

er location wund approacop (and far

g vehicles togenerally aveft-turn and ch.

al ‐ Outpatient

circulating r breaks. H

eet/Fairbankbuses to blonorthbound

airbanks Cou

teristic that o region is thloading of perrands, valtivities can roccur just be

n is reduced area, these isvenue, and n

tilization 

of Fairbanks s north of Onuth of Ontare faded laneer, during ppacity, obseren Erie Stree

and underutty and availbanks Courf service andections, as p

with inconsisch of Ontariside CTA bu

o yield righvoids use of separate th

t Care Pavilion

around the However, theks Court intock multipld on Fairbaurt.

is commonlhe presence assengers, ta

let services freduce a twefore or beyo and driversssues appeanear McClur

Court transntario Streetrio Street (59e striping in

peak hours wrvations indet and Ontar

tilization of lable vehiclet. In turn,

d observed cpreviously de

tent observeio Street at Fus stop) just

ht-of-way tof the sharedhru lanes, th

block whilee exit for theersection ane westboun

anks Court

ly observed of curbside axi staging, for restauran

wo-lane or thond an inters begin expear most prevrg Court at E

sitions from t (47 feet wi9 feet wide).ndicates, anwhen full u

dicate that drrio Street, an

the two trae queue stor, this charaonditions inescribed.

ed lane utilizFairbanks Cot west of Fai pedestrian

d thru/righthus limiting

e also provide bus turnarond the bus tnd travel lanand thus im

in the stud activity. Th loading/delnts and hotehree-lane strsection, theeriencing incvalent alongErie and Ont

three lanes ide, includin. As the stred drivers ty

utilization ofrivers utilize

nd to a lesser

avel lanes inrage betwee

acteristic expn addition to

zation is theourt. Due toirbanks Cou

ns crossing Ft-turn lane ag westboun

ding a placeound is appturning mannes on Ontampact the w

dy area andhis includes livery vehiclels, and othreet to a on

e traffic flowcreased dela

g St. Clair Sttario Streets

south of Chng 5-foot wieet widens trypically utilf a four-lanee only 1 lanr extent betw

n each direcen the relatiplains some

o cascading r

e shared thruo the almost

urt and the coFairbanks Cand typicalld capacity

e for buses toproximately neuver exitinario Street iwestbound c

other locata variety of le activities,

her pick-upsne-lane stree and resultinay and vehitreet, in the s.

hicago Avende mountabraveling soulize, two lane cross-secti

ne at times, pween Huron

ction result vely short ne differentiaresidual que

u/right-turn immediate ommon nee

Court, westbly uses just of the mov

Page 32

o stage off-65 feet east ng the lane in order to capacity of

tions in the forms such short-term /drop-offs.

et. If these ng capacity cle queues. blocks just

nue (33 feet ble median) uth through nes in each on benefits particularly n Street and

in reduced north-south al between eue impacts

n lane of the westbound d for right-

bound thru the shared

vement and

Page 34: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

Co

In rReppro

Thewit

rthwestern Me

gust 2011 

ordination 

recent yearsports for thoposed site:

Northw Childre McClur Northw NMH C Northw

e following th respect to

In the Nof estabpropertimprovprovidefoot of a

ConsistChicago

The Nobridgeson surr

The Nostops althe imppublic t

As an ophase wintenderesiduafundingmodific

Based onorthboFairbanby redu

emorial Hospita

with Camp

s, several effohe following

western Camen’s Memorirg Court On

western CamChildcare anwestern Cam

summarizeso the propose

Northwesterblishing an aties redevel

vements, roaed outside oa tree grate)tent with NMo, all loadingorthwestern s between caounding int

orthwestern long Fairbanpact of stoptransportatioobligation fowill be addeed to improval queuing thg for the imcation in mid

on review anound left-tunks Court anucing vehicle

al ‐ Outpatient

pus Transpo

orts have beg efforts (wi

mpus Traffic ial Hospital Te-Way/Two

mpus Transpond Parking G

mpus Mode-S

s key plannied site:

rn Campus Tapproximatelop. The padway improf the R.O.W must be proMH past prag/unloading Campus Trampus buildersections. Campus Tr

nks Court, ops and bus bon. or approval ed to the Faive northbounhrough upst

mprovementd-late May 2

nd observatiurn phase snd improvese-pedestrian

t Care Pavilion

ortation Pla

een undertakith the lates

and ParkingTraffic and Po-Way Studyortation Man

Garage StudySplit Study (

ing initiative

Traffic and Pe 15-foot peproposed provements,

W., a minimuovided in thactices and tg for patientansportation

dings and pa affic and Pa

one of whichbunching on

of the NMHirbanks Cound traffic flotream interst to the City2011.

ons of trafficsignificantly s pedestrian n conflicts.

anning Obje

ken to studyst report dat

g Study (MayParking Study (June 2009)nagement Py (January 20November 2

es or commi

Parking Studedestrian-levlan incorpoand wider

um 9-foot cle public sidethe plan for ts, employeen Managemarking struct

arking Studyh may be then traffic flow

H Childcareurt/Huron Sow along theections at Ey of Chicag

c conditions improves n safety on th

ectives 

y traffic and tes) have be

y 2007) dy (Septemb) lan (Septem010) 2010)

itments that

dy, one recomvel building orates this

pedestrian lear pedestriewalk. Ann & Robes, and deliv

ment Plan suptures to limi

y recommene stop immedw, but still

e and ParkinStreet intersee Fairbanks rie Street an

go and CDO

s after the signorthbound

he west leg o

parking issueen reviewe

ber 2007)

mber 2009)

t influence tr

mmendation setback alosetback to

zones. Whian zone wi

bert H. Lure veries are offpports the pt the impact

nded the condiately adjacmaintaining

ng Garage, aection. This Court corridnd Ontario SOT impleme

gnal modificd traffic flowof Huron Str

ues in the caed with resp

ransportatio

n includes coong Fairbank

allow for hile sidewaidth (includi

Children’s Hf-street. provision of t pedestrians

nsolidation ocent to the sg convenien

a northbouns signal moddor and helpStreet. NMHented the tra

cation, the nw and queureet at Fairb

Page 33

ampus area. pect to the

on planning

ontinuation ks Court as streetscape

alk may be ing up to 1

Hospital of

pedestrian s may have

of CTA bus site, to limit nt access to

nd left-turn dification is p to reduce H provided affic signal

new lagging uing along

banks Court

Page 35: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

Fai

Faisurincpedcap

Hobotadjof pavmavehFai

CTA

In opppro

BascooCTFai

rthwestern Me

gust 2011 

irbanks Cou

irbanks Courrounding ncreased roaddestrian volupacity often i

owever, the pth pedestriajacent to theFairbanks Cvement andarkings provhicle queue irbanks Cou

A Bus Stop

coordinationportunities oposed site a

Maintaiwho ma

Preferenboardin

Provisiominimu

Maintai

sed on the Cordination in

TA bus stopirbanks Cou

emorial Hospita

urt Widenin

urt serves aneighborhooddway capaciumes that coincludes com

proposed sitan and traffe site. The wCourt. In ad replacemen

vides wider storage. Trt up to 10 fe

 Evaluation

n with the Cto consolid

and surroun

ining the cuaintains the nce for far

ng/alightingon of ampleum) in stops at e

CTA’s evalun reviewing

ps adjacent rt at Ontario

al ‐ Outpatient

ng/Striping

as the majod. Physicallity, particulonflict with tmpeting inte

te plan for thfic improvem

widened pedddition, widnt of the mo and more The proposeet mid-bloc

CTA, TADI ate select s

nding neighb

rrent numbe shelters and-side bus s

g and to avoie curbside s

very other in

uation of cug existing stto the site

o Street.

t Care Pavilion

g Improvem

or north/soly, the widthlarly north the auto traf

erests with e

he OCP provments on F

destrian zonedening of Faountable me

comfortablesed plan, inck.

evaluated tstops while borhood. Ke

er of bus shed manages thstops vs. neid blocking rspace for up

ntersection i

rrent ridershtop locationsby removin

ments 

outh corridoh of the corrof Ohio Strffic flows. Imnhancing th

vides an appFairbanks Coe improves cairbanks Codian just noe travel lan

ncluded in t

the bus stoppreserving

ey considera

elters per thhe related adear-side storight-turn or

p to two bu

in each direc

hip, operatis, Exhibit 7

ng the north

or through ridor is consreet. In themplementin

he pedestrian

proximatelyourt betweeconditions f

ourt to the worth of Onta

nes to increathe Technic

p and shelte excellent tr

ations includ

e City of Chdvertising ops to limitr left-turn by

uses at each

ction.

ional charac7 illustrates hbound and

the Northwstrained ande same areang improvemn experience

y 15-foot builen Erie Strefor pedestriawest, along ario Street wase lane utical Append

er locations ransit servi

de:

hicago’s agre

t buses stoypass traffic stop (100-fo

cteristics, phthe propose

d southboun

western Cad allows littla, there are ments to incre.

lding setbaceet and Ontans along th with restrip

with hatchedlization, capix, includes

in the site vce and acce

eement with

opped at sigc while at a boot preferen

hysical consted plan to cnd near-sid

Page 34

ampus and le room for significant rease traffic

ck to enable tario Street

he west side ping of the d pavement pacity, and s widening

vicinity for ess for the

h JCDecaux,

gnals after bus stop nce; 85-foot

traints, and consolidate e stops on

Page 36: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

OHIO ST

McC

LURG

CT

FAIR

BAN

KS C

T

ST. C

LAIR

ST

ONTARIO ST

ERIE ST

SITE

LEGEND

- Existing Bus Stop With Shelter

- Existing Bus Stop Without Shelter

- Eliminated Bus Stop

Fairbanks/ErieSB Near-Side#66 / N66 / 157Riders: 67 on 71 off

Fairbanks/OntarioSB Near-Side#66 / N66 Riders: 27 on 183 off

Ontario/FairbanksWB Far-Side#2 / 157Riders: 133 on 7 off

Fairbanks/OhioSB Far-Side#2 / 66 / N66Riders: 19 on 213 off

Fairbanks/OhioNB Near-Side#2 / 66 / N66Riders: 88 on 20 off

Fairbanks/OntarioNB Near-Side#66 / N66 / 157Riders: 45 on 118 off

Fairbanks/ErieNB Near-Side#3 / 66 / N66 / 157Riders: 323 on 103 off

CTA BUS STOP CONSOLIDATION PLAN

EXHIBIT 7

Page 37: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

TheFai

Sit

Theandacc

Wientarotheavo

By theapp

Thesitecur

Accappconaccaccrecwhtripnotpar

rthwestern Me

gust 2011 

e proposed irbanks Cou

Improvcurbsid

Expectethe site

Improvstop thpotenti

Fewer s

e Access an

e proposed d circulationcess drivewa

ith ingress ater and exit tound the bloe property tooid certain s

locating thee Fairbanks proach to lim

e internal ace on the adjrbside capac

cess to/fromproximatelyntrol gates wcommodate cess drivewacommended hen the on-sips entering, tification is rking ramp

emorial Hospita

plan to cort at Ontario

ved traffic fde lane. ed increase to improve

ved transit ehan it does t

ally time stostops for tran

nd Circulati

site plan intn options foay through th

and egress athe site usin

ock and throo the north treets and in

e access drivCourt inter

mit the impa

ccess drivewjacent curbs

city for appro

m the on-sit 400 feet (16

without impaadditional vay before ex that exterioite patient p u-turning, not recomminternal to

al ‐ Outpatient

onsolidate tho Street has s

flow along

in lane utili queue capac

efficiency; it to split themopped at trafnsit riders to

ion Review

tegrates a coor the site, he site as far

available viang the most dough the sur and south, ntersections

veway as far rsections wi

act of vehicle

way also locaside areas anoximately 10

te parking is6 vehicles) oacting trafficvehicles at axiting and p

or signs, in sparking is fu

and exitingmended at th

the site and

t Care Pavilion

he northbouseveral bene

Fairbanks C

ization and city. requires les

m among twffic signals. o wait throu

omprehensivaccommodar as possible

both Erie Sdirect and corrounding ne those who depending o

west on theith Erie Stre queues on

ates all picknd intersect0 vehicles to

s located atof queuing cc flow alonga point in timproceeding esome form, bull and to dirg the site whhe Ontario d continue n

und and soefits as detail

Court with

limited bus

ss time to bowo stops du

gh while alr

ve approachating pick-ue from the Fa

Street and Oonvenient roeighborhooddrive mainton traffic con

e site as feasieet and Oneach locatio

k-up/drop-otions. The io pick-up/dr

the approxapacity alon

g the access me, drivers east to the be providedrect them eahen they arStreet entra

north to Eri

uthbound bled below:

fewer bus

blockages a

oard/alight ue to lost tim

ready on the

h to the buildup/drop-off airbanks Cou

Ontario Streeoute withoutd. Considertain the abilnditions at t

ible, the distntario Streeton in either d

off activity ointernal accerop-off patie

ximate midpng the ramp driveway. may drop-oErie-Ontario

d at the Erie ast to the Erre not able tance as those Street and

bus stops a

blockages o

along Fairba

the same nume accelerat

e bus

ding design activities ourt intersect

et, motoristst requiring uring the onelity to travethat time, if d

tance from tt is maximidirection.

off-street to ess drivewa

ents or be us

point of the ps leading up

Also, if the off passengeo parking g Street entrarie-Ontario pto park on-

se motorists d east to the

djacent to t

of traffic ut

anks Court

umber of ridting, deceler

n by maximiff-street, prions.

s have the flunnecessary e-way streetsel in any dirdesired.

the site acceszed as a be

limit the imay provides ed by the va

access drivp to the parkon-site parkers off-stree

garage. Howance to notifyparking gara-site. Such can be notie Erie-Ontar

Page 36

the site on

tilizing the

adjacent to

ders at one rating, and

zing access oviding an

lexibility to circulation s bordering rection and

ss points to est-practice

mpact of the short-term alet service.

veway with king access

king cannot et along the wever, it is y motorists age to limit a sign and ified at the rio parking

Page 38: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

gartrafCla

Ca

Theloc

Tab

Loc

Ow

Hur

Erie

Erie

NM

275

Ohi

Hur

560

Ark

RIC 

Tot

Out

Tot

1  ‐

2  ‐

3  ‐

Bastheprofloomeimm

rthwestern Me

gust 2011 

rage. A signffic bypassinair Street and

mpus Parki

e following ation, and th

ble 11.  Insti

ation 

ned Parking Fa

ron‐Superior P

e‐Ontario Parki

e‐McClurg Park

MH Child Care / 

5 E. Chestnut S

o‐McClurg Sur

ron‐McClurg Su

0 N. Fairbanks C

es Pavilion1 

Side Driveway

al (Year 2014 C

tpatient Care P

al (Year 2014 C

‐  Lot is currently 

‐  Redevelopmen

‐  Assumes 100%

will ultimately 

occupied.  The 

the site’s peak 

sed on reviee projected oposed on-sor of the on

edical staff mediate eas

emorial Hospita

n at the Ontang the site od Erie Street

ing Evaluat

table summhe campus p

itution‐Cont

acilities 

arking Garage 

ing Garage 

king Garage1 

Employee Par

elf‐Park 

rface Lot (RIC)1

urface Lot (NU 

Court 

y1 

 

Campus‐Wide 

 

Pavilion 

 

Campus‐Wide 

open to institutio

t of this property 

 occupancy of OC

be  replaced with

OCP is expected t

parking demand u

ew of Table peak parkiite will prim

n-site parkinparking is

st of the site

al ‐ Outpatient

ario Street enon Ontario St.

tion 

marizes the iparking dem

trolled Parki

rking Facility1 

1, 2 

Lot A)1 

Projections) 

Projections + O

onal uses only. 

is being pursued b

CP  in addition to Y

 other  services.   

to be approximate

upon opening in Ye

11, the planng demand

marily accomg is plannedplanned fore. Employe

t Care Pavilion

ntrance indicStreet and un

institution-comand represe

ing Facilities

Ca

(sp

2

2

1

1

4

1

1

1

7

5

OCP)3  7

by the current own

Year 2014 campus

However, when  t

ely 65 percent occ

ear 2014 will be le

nned capacityd generated mmodate a pd to be allocr the Erie-Oees who com

cating that onnecessarily

ontrolled paenting with a

s vs. Peak De

pacity 

paces) Fac

Em

,000 

,186 

,050 

,118 

438 

172 

110 

105 

20 

22 

,221 

575 

,796 

ner. 

s projections and 

the OCP  is planne

cupied in Year 201

ess than the projec

y in institut by the camportion of thcated for selOntario parmmute by a

on-site parkiy circulating

arking facilitand without

emand Proje

ulty / Medical 

mployees / Stud

 

 

 

 

 

 

 

 

 

 

5,230 

257 

5,487 

that any activity r

ed  to open  in Yea

14 and reach its fu

ction outlined abo

tion-controllmpus instituhe patient plect medicalrking garageauto will pa

ing is full ma clockwise a

ties, the numt the propose

ections 

Demand 

Staff / 

dents Pat

7,390 

8,552 

relocated from NM

ar 2014,  the build

unctional capacity

ove. 

ed parking utions. Th

peak parkingl staff. The e, which is ark either in

ay result in around the b

mber of spaed OCP.

tients / Visitors

 

 

 

 

 

 

 

 

 

  

2,160 

 

905  

3,065 

MH‐owned buildin

ding will not be  fu

y in Year 2018.  Th

facilities wilhe 575 parkg demand. remaining p easily accen the NMH

Page 37

westbound block on St.

aces at each

ngs 

ully 

hus, 

ll not serve king spaces

Up to one-patient and essible and

H Childcare

Page 39: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

Cencap

Pe

As voltermsidoppIn walevCo

SimspaStrCambristreandto app

At StrPlaenvwitpedof t

Loa

A fviadiswemamaand

rthwestern Me

gust 2011 

nter/Emplopacity.

destrian Ci

presented lumes. Thems of impro

dewalk alongportunity toaddition, th

alkway betwvel pedestriaurt (neighbo

milar to othanning Fairbeet to link thmpus Traffidges would eet-level pedd access for Feinberg P

pointments/

this time, peeet/Fairban

anned Develvironment, hth CDOT efdestrian envthe site’s blo

ading Acces

four-bay loaa Ontario Strsposal truck est of the doaterials to thaterials to thd serve the s

emorial Hospita

yee Parking

rculation 

in Exhibit e proposed sovements to g the west sio enhance sthe internal

ween Erie Stran access to torhood retai

her facilitiesbanks Court he OCP andic Managem provide condestrian-vehthose patien

Pavilion hel/procedures

edestrian conks Court inlopment #3,have fundedfforts to retrvironment, Tock at the On

ss 

ading dock areet east of and three bck on Ontar

he OCP wile site will ut

site via a pro

al ‐ Outpatient

g Facility at 4

3, the intersite plan intthe street-leide of Fairbareetscape elaccess drivereet and Onthe site is avl), and Onta

s on the No to connect

d Feinberg Pment Plan, lnvenient andhicle conflictnts and medlps to facils/testing or o

ountdown sintersections, and consisd the installrofit signalizTADI recommntario Street/

area is plann the site accbays to serverio Street bell not accesstilize the loa

oposed tunne

t Care Pavilion

441 E. Ontar

rsections witegrates mulvel pedestrianks Court, lements andeway servin

ntario Street vailable via ario Street (n

orthwesternthe OCP an

Pavilion. Colast updatedd safe paths ts. The bridical staff not

litate of paother busine

gnals are ins. The cam

stent with calation of thezed intersectmends the in/St. Clair Str

ned off-streecess drivewae standard 3efore backings the site’s ading facilityel system ex

rio Street or

thin the stultiple pedesan environm in part, thro provide a w

ng the prop for the camErie Street l

neighborhood

n Campus, td the Erie-Onsistent witd Septembe to/from thege to/from t able to par

atients, medess in both b

stalled at thempus institu

ampus planese and othetions with pnstallation oreet intersec

et at the grouay. The doc30-foot singlg into the doproposed lo

y on St. Claixpansion und

r at an off-ca

udy area exstrian accessment, the proough a 15-fowider and mposed OCP mpus and sulobby), the ad retail).

three pedesOntario parkth the objecter 30, 2009, e second floo the parkingrk on-site whdical staff, buildings.

e Erie Streetutions, as pnning effortser pedestriapedestrian cof pedestrianction.

und floor onck plan inclle-unit truckock. Largeroading dockir Street at thder Erie Stre

ampus parki

xperience cos locations aoposed planoot buildingmore comfor

provides a urrounding access drivew

strian bridgking garage atives as state the two seor lobby witg garage incrhile the bridand emplo

t/Fairbanks art of the

s to promotean countdowcountdown sn countdown

n south sideludes one b

ks. Deliveryr semi-truckk. Rather, he Huron-Sueet.

ing facility w

onsiderable and improven includes wig setback to rtable pedes mid-block neighborhooway (lobby)

ges are propand two spaed in the Noecond-level hout furtherreases the co

dges connectoyees who

Court and tamended Ine a pedestri

wn signals. signals to imn signal at th

e of the site wbay for a 40-y vehicles wiks providing

semi-trucksuperior park

Page 38

with excess

pedestrian ements. In idening the provide an

strian zone. pedestrian

od. Street-, Fairbanks

posed; one anning Erie orthwestern

pedestrian r impacting onvenience ting the site may have

the Ontario nstitutional an-friendly Consistent mprove the he west end

with access -foot waste ill stop just

g additional s providing king garage

Page 40: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

BasthetruappThedel

In adriproFedEri

In ohasbeton

Altpubconproresof E

Re

In andand

rthwestern Me

gust 2011 

sed on a mae proposed Oucks on a peaproximatelyese vehiclesliveries, and

addition to iveway are oposed OCPdEx/UPS truie Street.

order to lims committedtween the do the north sid

though it wblic alley thnnection to loperties. Thstaurants, retErie Street.

commenda

order to mad recommend their antici

emorial Hospita

aterials manaOCP is expeak weekday 19 cars, vans will trans waste mate

the dock spexpected to

P as well asucks may re

mit the impacd to restrict ock and Fairde of Ontari

will not direchat currentlylink the pub

he public alletail tenants,

ations 

anage futurendations weripated benef

al ‐ Outpatient

agement stuected to gen

y. With the ns, and singsport clean erials.

aces, it shouo be availab other nearb

educe some o

ct of loading dock hourrbanks Courio Street adja

ctly serve thy terminates blic alley to ey will conti hotels, and

e traffic condre identifiedfit(s) are pre

t Care Pavilion

udy preparednerate approapproximat

gle-unit truckand soiled

uld be notedble for shortby businessof the curbsi

maneuvers s to off-peart to accommacent to the s

he proposed at the westErie Street ainue to serv residential u

ditions on sud as a part oesented in Ta

d for NMH oximately 7 ely 7 additioks are expec

d linens, me

d that two spt-term parkises. Thus, tide activity

at the dock ak hours. Tmodate the wsite.

d OCP, an et end of the and improve 230 E. Ontuses along t

urrounding rf this study.able 12.

by Lerch Bacars/vans,

onal trucks cted to utilizedical supp

paces near thing for parcto benefit trthat current

on traffic floThe plannedwestbound

easement is subject site

ve alley accetario Street, the north sid

roadway sy. A brief su

ates Inc., dat12 single-unaccessing th

ze the off-strplies, office

he south endcel deliverieraffic flow, utly occurs alo

ow along thd dock locafar-side CTA

planned to and provid

ess and circu 233 E. Erie de of Ontario

ystem, a numummary of th

ted Decembnit trucks, ahe St. Clair Sreet OCP loa

supplies, F

d of the intees (FedEx/Uuse of theseong Ontario

he Ontario Sttion maintaA bus stop

o eliminate ade a publiclyulation for nStreet, and to Street and

mber of desihese recomm

Page 39

er 22, 2010, and 7 semi-Street dock, ading dock. FedEx/UPS

ernal access UPS) to the e spaces by o Street and

treet, NMH ains 85 feet and shelter

a dead-end y accessible neighboring the various

d south side

gn features mendations

Page 41: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

Tab

Rec

rthwestern Me

gust 2011 

ble 12.  Stud

commended Im

Provide a 15‐

Court 

Widen Fairba

Ontario Stree

Replace mou

Fairbanks Co

pavement ma

Stripe  two 

Fairbanks Cou

Increase side

provide a 9‐fo

Consolidate C

(NB and SB Fa

Provide a sign

relaying infor

on‐site and, if

Ontario parki

Limit/Minimi

parking locat

Incorporate a

to strongly di

Restrict loadi

Install pedest

Ontario Stree

Provide publi

dead‐end alle

emorial Hospita

dy Recomme

mprovement / 

‐foot building s

anks Court betw

et adjacent to t

untable media

urt at Ontario

arkings 

travel  lanes 

urt adjacent to

walk width adj

oot minimum c

CTA bus stops a

airbanks Court

n at the Erie St

rmation on the

f necessary, di

ng garage 

ze signs identif

ion on the buil

a patient valida

scourage use a

ng dock hours 

trian countdow

et/St. Clair Stre

c alley easeme

ey west of the 

al ‐ Outpatient

endation an

Design Feature

setback on Fair

ween Erie Stre

the site 

n  on  the  nort

o Street with c

in  each  dire

o the site

jacent to site t

clear zone 

adjacent to the

t at Ontario Str

treet access dri

e availability of

rect motorists 

fying the site a

lding exterior 

ation system at

as public parki

to off‐peak ho

wn signals at th

eet intersection

ent connecting

site to Erie Str

t Care Pavilion

d Benefits

e  An

rbanks 

et and 

th  leg  of 

centerline 

ction  on 

e site 

reet) 

iveway 

f parking 

to Erie‐

as a 

t the site 

ng 

ours 

he 

g the 

eet 

nticipated Bene

Provides sp

Provides sp

adjacent to

Offers a mo

increased la

queue stora

Court 

Clearly deli

underutiliz

Improves p

extend stre

Court corrid

Improves tr

site with re

and increas

Improves tr

Limits the n

even when

Promotes d

necessary

Limits traff

and select m

Limits the i

Ontario Str

Promotes p

pedestrians

Improves s

adjacent bu

at the west

efit 

pace to widen 

paces to widen

o site 

ore comfortab

ane utilization

age on the sho

ineates vehicle

zation of pavem

pedestrian env

eetscape enhan

dor 

raffic flow alon

educed bus blo

sed queuing ca

ransit efficienc

number of veh

 on‐site parkin

direct route to

ic entering and

medical staff 

mpact of loadi

reet 

pedestrian com

s in the crossw

ervice and del

uildings by elim

t site property 

Fairbanks Cou

n and enhance 

le travel lane w

, intersection c

ort north‐south

e space for trav

ment width 

ironment and 

ncements sout

ng Fairbanks C

ockages, increa

apacity. 

cy 

hicles entering 

ng is full 

o secondary pa

d exiting the si

ing/delivery ve

mpliance with t

walk when sign

ivery access an

minating a dea

line. 

rt 

pedestrian fac

width to promo

capacity, and v

h blocks of Fair

vel lanes to av

presents oppo

th along the Fa

ourt adjacent t

ased lane utiliza

and exiting the

rking location,

te to only OCP

ehicle maneuve

the walk signal

al phases chan

nd circulation f

d‐end alley ter

Page 40

cilities 

ote 

vehicle 

rbanks 

oid 

ortunity to 

airbanks 

to the 

ation, 

e site 

 as 

P patients 

ers on 

l and limit 

nge 

for 

rminating 

Page 42: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

NMimpinc

In impwilocc

rthwestern Me

gust 2011 

MH, along wprovements

cluding, but

Fundinand ped

Modifyreduce

Increasaccomm

RemovaPavilion

Installa Limited Promot

policies Increas

commu Provide

facilitie

addition to provementsll assist in lcupancy of th

emorial Hospita

with the NU to addressnot limited t

ng of Traffic destrian con

y the Fairban northbounde commute

modate growal of the son during the

ation of peded loading dote use of s/activities e secure ind

uters ed dedicatedes

the ongoing in Table 12limiting andhe proposed

al ‐ Outpatient

U, RIC, ands transportato, the follow

Control Aidnditions nks Court/H

d queuing aloer shuttle swing commuouthbound Fe PM peak pestrian countock hours to

public tra

door and ou

d parking sp

g efforts of 2, in conjuncd addressind OCP.

t Care Pavilion

d CMH, havation issues wing:

des (TCAs) a

Huron Streeong Fairbanservices for

uter ridershipFairbanks Ceriod to avotdown signa restrict delivnsportation

utdoor bicycl

paces for I-G

NMH, NU,ction with k

ng impacts t

ve implemeon the cam

at key camp

et traffic signnks Court r faculty, mp

Court emplooid impact onals to improvveries durin through

le parking o

Go and Zipc

RIC, and Ckey site desito the trans

ented or commpus and in

us intersecti

nal to add

medical sta

oyee commun traffic flowve pedestria

ng peak hourpre-tax tra

options alon

car car-shar

CMH, it is aign featuressportation sy

mmitted to n the surro

ions to man

a northboun

aff, employe

uter shuttle w an safety andrs of traffic iansit fare p

ng with othe

re services in

anticipated ts regarding ystem after

implement ounding nei

nage peak pe

nd left-turn

ees, and s

bus stop a

d information the neighbpurchases

er amenities

n institution

that the recoaccess and constructio

Page 41

numerous ighborhood

eriod traffic

phase and

tudents to

at Feinberg

n borhood and other

for bicycle

nal parking

ommended circulation,

on and full

Page 43: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

CO

Basassimpcapsur

TAtheKeydirFaiadjquealsotheimp

WhthesitestaparCencap

rthwestern Me

gust 2011 

ONCLUSION

sed on TADsociated wiprovements pacity of thrrounding tr

ADI has worke building dey recommen

rection and lirbanks Coujacent to theeuing capaco coordinate

e Fairbanks prove traffic

hile the prope proposed oe. The on-sff. The remrking garagnter/Emplopacity and w

emorial Hospita

DI’s evaluatioith the pr identified in

he adjacent ransportation

ked with NMesign from andations inclimit unnece

urt as possibl site betweeity, and proed with the Court/Onta

c flow by lim

posed OCP ioff-street parsite parking maining patige. Employee Parking

walk to the si

al ‐ Outpatient

on of the upoposed Oun this reportintersectionn system.

MH and the a transportatclude site dessary trafficle, integrate n Erie Streetvision of on CTA to evaario Street in

miting bus bl

ncludes a prrking is not e will primarients and moyees who

g Facility at 4ite.

t Care Pavilion

pdated traffiutpatient Ct and incorps during th

project desition perspectdesign compc circulation roadway wt and Ontari

n-site circulataluate opporntersection tlockages and

rovision of 5expected to rily serve pa

medical staff commute 441 E. Ontar

ic counts, caCare Pavilio

oration of kehe peak hou

gn team to etive and reflponents suc

n around thewidening for

io Street to ption keep pirtunities thato continue

d queuing be

575 off-street accommodaatients, with are planned

by auto rio Street or

ampus and non, implemey site desigurs and lim

evaluate altelect charactech as flexibie block, loca Fairbanks Cpromote impick-up/dropat consolidat excellent acetween Erie

t parking spate the peak h limited pad to park ewill park

r at an off-ca

non-institutimentation ogn characteri

mit the impa

ernative desieristics uniquility to entete the access

Court on theproved lane p-off activitiete bus stopsccess to pub Street and O

paces within parking dem

arking availaast of the seither in

ampus parki

ion growth, of the recoistics will heact of the s

ign options ue to the proer/exit the ss driveway

e west side o utilization aes off-street.s adjacent toblic transporOhio Street.

the buildingmand generable for seleite in the Ethe NMH

ing facility w

Page 42

and traffic ommended elp increase site on the

and inform oposed site. site in any as far from

of the street and vehicle . TADI has o the site at rtation, yet

g envelope, ated by the ect medical

Erie-Ontario Childcare with excess

Page 44: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

Gro

Exi

Yea

Tra

rthwestern Me

gust 2011 

ound Floor S

isting Condi

Existing

Existing

ar 2014 Sync

Year 20

Year 20

affic Count D

emorial Hospita

Site Plan

ition Synchr

g Weekday M

g Weekday E

chro Capacit

014 Weekday

014 Weekday

Data

al ‐ Outpatient

o Capacity R

Morning Pea

Evening Pea

ty Reports

y Morning P

y Evening Pe

t Care Pavilion

AP

Reports

ak Hour

ak Hour

Peak Hour

eak Hour

 

PPENDIX

Page 43

Peter
Rectangle
Page 45: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

rthwestern Me

gust 2011 emorial Hospitaal ‐ Outpatient

GR

 

t Care Pavilion

ROUND F

 

FLOOR SITTE PLAN

Page 46: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th
Page 47: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

rthwestern Me

gust 2011 emorial Hospita

EXISTI

al ‐ Outpatient

ING CON

Ex

Ex

t Care Pavilion

DITION S

xisting Weekd

xisting Weekd

 

SYNCHRO

day Morning 

day Evening 

O CAPACIT

Peak Hour 

Peak Hour 

TY REPORRTS 

Page 48: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions3: Chicago Avenue & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 1

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (vph) 85 195 30 65 180 50Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Width (ft) 11 12 10 11 11 12Storage Length (ft) 0 110 135 0Storage Lanes 1 1 1 1Taper Length (ft) 75 110 60 25Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.58 0.64 0.47Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1322 1163 1486 1621 1540 1163Flt Permitted 0.699 0.950Satd. Flow (perm) 1322 678 702 1621 1540 545Right Turn on Red Yes YesSatd. Flow (RTOR) 205 53Link Speed (mph) 30 30 30Link Distance (ft) 194 438 357Travel Time (s) 4.4 10.0 8.1Confl. Peds. (#/hr) 305 305 315Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 46 46 0 0 0 46Shared Lane Traffic (%)Lane Group Flow (vph) 89 205 32 68 189 53Turn Type Perm pm+pt pm+ovProtected Phases 4 3 8 2 3Permitted Phases 4 8 2Minimum Split (s) 36.0 36.0 23.0 59.0 26.0 23.0Total Split (s) 36.0 36.0 23.0 59.0 26.0 23.0Total Split (%) 42.4% 42.4% 27.1% 69.4% 30.6% 27.1%Maximum Green (s) 32.0 32.0 20.0 55.0 22.0 20.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 0.0 1.0 1.0 0.0Lost Time Adjust (s) 1.0 1.0 1.0 0.0 0.0 1.0Total Lost Time (s) 5.0 5.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes YesWalk Time (s) 24.0 24.0 24.0 10.0Flash Dont Walk (s) 8.0 8.0 8.0 12.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 31.0 31.0 55.0 55.0 22.0 41.0Actuated g/C Ratio 0.36 0.36 0.65 0.65 0.26 0.48v/c Ratio 0.18 0.54 0.05 0.06 0.47 0.12Control Delay 19.7 9.1 5.9 5.8 24.3 4.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.7 9.1 5.9 5.8 24.3 4.3LOS B A A A C AApproach Delay 12.3 5.8 19.9Approach LOS B A B

Page 49: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions3: Chicago Avenue & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 2

Lane Group EBT EBR WBL WBT NBL NBRStops (vph) 55 32 10 23 99 11Fuel Used(gal) 1 1 0 0 2 0CO Emissions (g/hr) 54 58 14 30 135 17NOx Emissions (g/hr) 11 11 3 6 26 3VOC Emissions (g/hr) 13 13 3 7 31 4Dilemma Vehicles (#) 0 0 0 0 0 0Queue Length 50th (ft) 32 0 5 12 48 0Queue Length 95th (ft) 66 58 15 26 100 10Internal Link Dist (ft) 114 358 277Turn Bay Length (ft) 110 135Base Capacity (vph) 482 378 629 1049 399 428Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.18 0.54 0.05 0.06 0.47 0.12

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 23 (27%), Referenced to phase 2:NBL, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.54Intersection Signal Delay: 14.2 Intersection LOS: BIntersection Capacity Utilization 52.5% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 3: Chicago Avenue & Fairbanks Court

Page 50: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions7: Superior Street & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 3

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 65 95 120 0 0 0 0 165 70 35 190 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 11 11 11 12 12 12 12 12 12 12 12 12Storage Length (ft) 0 0 0 0 0 50 50 0Storage Lanes 1 0 0 0 0 1 1 1Taper Length (ft) 25 25 25 25 25 25 100 25Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.52 0.67 0.36 0.52Frt 0.916 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1540 995 0 0 0 0 0 1676 1163 1593 1368 0Flt Permitted 0.950 0.634Satd. Flow (perm) 803 995 0 0 0 0 0 1676 420 550 1368 0Right Turn on Red No No No NoSatd. Flow (RTOR)Link Speed (mph) 30 30 30 30Link Distance (ft) 177 529 308 357Travel Time (s) 4.0 12.0 7.0 8.1Confl. Peds. (#/hr) 180 345 435 435Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 46 0 46 0Shared Lane Traffic (%)Lane Group Flow (vph) 68 226 0 0 0 0 0 174 74 37 200 0Turn Type Perm Perm PermProtected Phases 4 2 6Permitted Phases 4 2 6Minimum Split (s) 41.0 41.0 44.0 44.0 44.0 44.0Total Split (s) 41.0 41.0 0.0 0.0 0.0 0.0 0.0 44.0 44.0 44.0 44.0 0.0Total Split (%) 48.2% 48.2% 0.0% 0.0% 0.0% 0.0% 0.0% 51.8% 51.8% 51.8% 51.8% 0.0%Maximum Green (s) 37.0 37.0 40.0 40.0 40.0 40.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 37.0 37.0 40.0 40.0 40.0 40.0Actuated g/C Ratio 0.44 0.44 0.47 0.47 0.47 0.47v/c Ratio 0.19 0.52 0.22 0.37 0.14 0.31Control Delay 16.8 22.9 6.2 11.5 18.4 18.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 16.8 22.9 6.2 11.5 18.4 18.5LOS B C A B B BApproach Delay 21.5 7.8 18.5Approach LOS C A B

Page 51: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions7: Superior Street & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 4

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRStops (vph) 40 158 32 18 24 120Fuel Used(gal) 1 2 1 0 0 2CO Emissions (g/hr) 37 152 55 30 25 133NOx Emissions (g/hr) 7 30 11 6 5 26VOC Emissions (g/hr) 9 35 13 7 6 31Dilemma Vehicles (#) 0 0 0 0 0 0Queue Length 50th (ft) 22 85 19 8 11 63Queue Length 95th (ft) 49 156 32 17 m28 132Internal Link Dist (ft) 97 449 228 277Turn Bay Length (ft) 50 50Base Capacity (vph) 350 433 789 198 259 644Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.19 0.52 0.22 0.37 0.14 0.31

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 20 (24%), Referenced to phase 2:NBT and 6:SBTL, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.52Intersection Signal Delay: 16.2 Intersection LOS: BIntersection Capacity Utilization 46.4% ICU Level of Service AAnalysis Period (min) 15m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 7: Superior Street & Fairbanks Court

Page 52: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions11: Huron Street & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 80 190 40 190 195 0 0 200 110Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12Storage Length (ft) 0 0 0 0 80 0 0 50Storage Lanes 0 0 0 1 1 0 0 1Taper Length (ft) 25 25 25 25 25 25 25 25Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.80 0.75 0.64Frt 0.981 0.850Flt Protected 0.987 0.950Satd. Flow (prot) 0 0 0 0 2870 0 1593 1368 0 0 1676 1163Flt Permitted 0.987 0.595Satd. Flow (perm) 0 0 0 0 2482 0 752 1368 0 0 1676 748Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 24 116Link Speed (mph) 30 30 30 30Link Distance (ft) 356 349 130 308Travel Time (s) 8.1 7.9 3.0 7.0Confl. Peds. (#/hr) 235 245 350 350Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 46 0 0 0 46Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 0 0 326 0 200 205 0 0 211 116Turn Type Perm Perm PermProtected Phases 8 2 6Permitted Phases 8 2 6Minimum Split (s) 41.0 41.0 44.0 44.0 44.0 44.0Total Split (s) 0.0 0.0 0.0 41.0 41.0 0.0 44.0 44.0 0.0 0.0 44.0 44.0Total Split (%) 0.0% 0.0% 0.0% 48.2% 48.2% 0.0% 51.8% 51.8% 0.0% 0.0% 51.8% 51.8%Maximum Green (s) 37.0 37.0 40.0 40.0 40.0 40.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 37.0 40.0 40.0 40.0 40.0Actuated g/C Ratio 0.44 0.47 0.47 0.47 0.47v/c Ratio 0.30 0.56 0.32 0.27 0.28Control Delay 15.3 19.3 11.1 13.5 4.7Queue Delay 0.0 0.2 0.9 0.0 0.0Total Delay 15.3 19.5 12.0 13.5 4.7LOS B B B B AApproach Delay 15.3 15.7 10.4Approach LOS B B B

Page 53: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions11: Huron Street & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRStops (vph) 178 135 136 92 15Fuel Used(gal) 3 2 2 2 0CO Emissions (g/hr) 195 135 115 108 32NOx Emissions (g/hr) 38 26 22 21 6VOC Emissions (g/hr) 45 31 27 25 7Dilemma Vehicles (#) 0 0 0 0 0Queue Length 50th (ft) 52 83 82 55 5Queue Length 95th (ft) 83 146 144 90 21Internal Link Dist (ft) 276 269 50 228Turn Bay Length (ft) 80 50Base Capacity (vph) 1094 354 644 789 413Starvation Cap Reductn 0 12 235 0 0Spillback Cap Reductn 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.30 0.58 0.50 0.27 0.28

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 20 (24%), Referenced to phase 2:NBTL and 6:SBT, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.56Intersection Signal Delay: 13.9 Intersection LOS: BIntersection Capacity Utilization 51.6% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 11: Huron Street & Fairbanks Court

Page 54: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions14: Erie Street & Michigan Avenue AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 7

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 30 165 10 0 0 0 0 885 135 115 1385 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 10 12 12 12 12 12 11 12 9 11 12Storage Length (ft) 0 0 0 0 0 0 60 0Storage Lanes 0 0 0 0 0 0 1 0Taper Length (ft) 25 25 25 25 25 25 60 25Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 0.91 0.91 1.00 0.91 1.00Ped Bike Factor 0.93 0.96 0.93Frt 0.992 0.980Flt Protected 0.993 0.950Satd. Flow (prot) 0 2877 0 0 0 0 0 4151 0 1433 3834 0Flt Permitted 0.993 0.950Satd. Flow (perm) 0 2726 0 0 0 0 0 4151 0 1331 3834 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 5 42Link Speed (mph) 30 30 30 30Link Distance (ft) 516 405 285 147Travel Time (s) 11.7 9.2 6.5 3.3Confl. Peds. (#/hr) 313 278 531 531Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 100 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 217 0 0 0 0 0 1074 0 121 1458 0Turn Type Perm ProtProtected Phases 4 2 1 6Permitted Phases 4Detector Phase 4 4 2 1 6Switch PhaseMinimum Initial (s) 4.0 4.0 4.0 4.0 4.0Minimum Split (s) 28.0 28.0 61.0 10.0 71.0Total Split (s) 28.0 28.0 0.0 0.0 0.0 0.0 0.0 61.0 0.0 16.0 77.0 0.0Total Split (%) 26.7% 26.7% 0.0% 0.0% 0.0% 0.0% 0.0% 58.1% 0.0% 15.2% 73.3% 0.0%Maximum Green (s) 24.0 24.0 57.0 12.0 73.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 5.0 4.0 4.0Lead/Lag Lag LeadLead-Lag Optimize? Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0Recall Mode None None C-Max None C-MaxWalk Time (s) 7.0 7.0 37.0 37.0Flash Dont Walk (s) 10.0 10.0 7.0 7.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 13.5 64.7 13.8 83.5Actuated g/C Ratio 0.13 0.62 0.13 0.80v/c Ratio 0.61 0.42 0.64 0.48Control Delay 49.4 5.0 58.5 4.4

Page 55: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions14: Erie Street & Michigan Avenue AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRQueue Delay 0.0 0.1 0.0 0.1Total Delay 49.4 5.2 58.5 4.5LOS D A E AApproach Delay 49.4 5.2 8.7Approach LOS D A AStops (vph) 186 267 106 415Fuel Used(gal) 4 5 2 5CO Emissions (g/hr) 274 335 146 358NOx Emissions (g/hr) 53 65 28 70VOC Emissions (g/hr) 64 78 34 83Dilemma Vehicles (#) 0 0 0 0Queue Length 50th (ft) 72 77 78 93Queue Length 95th (ft) 107 97 135 144Internal Link Dist (ft) 436 325 205 67Turn Bay Length (ft) 60Base Capacity (vph) 627 2575 195 3049Starvation Cap Reductn 0 539 0 0Spillback Cap Reductn 0 0 0 426Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.35 0.53 0.62 0.56

Intersection SummaryArea Type: CBDCycle Length: 105Actuated Cycle Length: 105Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of GreenNatural Cycle: 100Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.64Intersection Signal Delay: 10.4 Intersection LOS: BIntersection Capacity Utilization 68.7% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 14: Erie Street & Michigan Avenue

Page 56: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions15: Erie Street & St. Clair St. AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 9

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 105 245 65 0 0 0 0 175 95 50 85 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.977 0.952Flt Protected 0.987 0.982Satd. Flow (prot) 0 2867 0 0 0 0 0 1490 0 0 1537 0Flt Permitted 0.987 0.982Satd. Flow (perm) 0 2867 0 0 0 0 0 1490 0 0 1537 0Link Speed (mph) 30 30 30 30Link Distance (ft) 405 325 280 150Travel Time (s) 9.2 7.4 6.4 3.4Confl. Peds. (#/hr) 250 320 305 305Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 0 437 0 0 0 0 0 284 0 0 142 0Sign Control Stop Stop Stop Stop

Intersection SummaryArea Type: CBDControl Type: UnsignalizedIntersection Capacity Utilization 52.4% ICU Level of Service AAnalysis Period (min) 15

Page 57: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions16: Erie Street & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 10

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 40 210 150 0 0 0 0 345 195 40 240 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 10 12 12 12 12 12 10 12 12 10 12Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 0.95 0.95 0.95 0.95 1.00Ped Bike Factor 0.86 0.92 0.99Frt 0.944 0.946Flt Protected 0.995 0.993Satd. Flow (prot) 0 2470 0 0 0 0 0 2578 0 0 2681 0Flt Permitted 0.995 0.836Satd. Flow (perm) 0 2395 0 0 0 0 0 2578 0 0 2226 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 158 81Link Speed (mph) 30 30 30 30Link Distance (ft) 340 690 285 165Travel Time (s) 7.7 15.7 6.5 3.8Confl. Peds. (#/hr) 330 315 315 315Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 46 0 46 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 421 0 0 0 0 0 568 0 0 295 0Turn Type Perm PermProtected Phases 4 2 6Permitted Phases 4 6Minimum Split (s) 41.0 41.0 44.0 44.0 44.0Total Split (s) 41.0 41.0 0.0 0.0 0.0 0.0 0.0 44.0 0.0 44.0 44.0 0.0Total Split (%) 48.2% 48.2% 0.0% 0.0% 0.0% 0.0% 0.0% 51.8% 0.0% 51.8% 51.8% 0.0%Maximum Green (s) 37.0 37.0 40.0 40.0 40.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 18.0 18.0 28.0 28.0 28.0Flash Dont Walk (s) 8.0 8.0 8.0 8.0 8.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 37.0 40.0 40.0Actuated g/C Ratio 0.44 0.47 0.47v/c Ratio 0.37 0.45 0.28Control Delay 10.8 23.8 10.5Queue Delay 0.0 0.9 0.0Total Delay 10.8 24.7 10.5LOS B C BApproach Delay 10.8 24.7 10.5Approach LOS B C BStops (vph) 161 572 111Fuel Used(gal) 4 7 2CO Emissions (g/hr) 269 488 130

Page 58: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions16: Erie Street & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 11

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRNOx Emissions (g/hr) 52 95 25VOC Emissions (g/hr) 62 113 30Dilemma Vehicles (#) 0 0 0Queue Length 50th (ft) 45 112 33Queue Length 95th (ft) 80 165 61Internal Link Dist (ft) 260 610 205 85Turn Bay Length (ft)Base Capacity (vph) 1132 1256 1048Starvation Cap Reductn 0 400 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.37 0.66 0.28

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBTL, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.45Intersection Signal Delay: 16.9 Intersection LOS: BIntersection Capacity Utilization 69.7% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 16: Erie Street & Fairbanks Court

Page 59: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions17: Erie Street & McClurg Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 65 100 45 0 0 0 0 130 85 50 25 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.968 0.947Flt Protected 0.985 0.968Satd. Flow (prot) 0 2835 0 0 0 0 0 1482 0 0 1515 0Flt Permitted 0.985 0.968Satd. Flow (perm) 0 2835 0 0 0 0 0 1482 0 0 1515 0Link Speed (mph) 30 30 30 30Link Distance (ft) 690 339 282 148Travel Time (s) 15.7 7.7 6.4 3.4Confl. Peds. (#/hr) 130 215 300 300Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 0 220 0 0 0 0 0 226 0 0 79 0Sign Control Stop Stop Stop Stop

Intersection SummaryArea Type: CBDControl Type: UnsignalizedIntersection Capacity Utilization 44.7% ICU Level of Service AAnalysis Period (min) 15

Page 60: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions19: Ontario Street & Michigan Avenue AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 90 405 85 120 935 0 0 1190 205Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 12 12 9 11 12 12 11 12Storage Length (ft) 0 0 60 60 80 0 0 0Storage Lanes 0 0 1 1 1 0 0 0Taper Length (ft) 25 25 40 40 40 25 25 25Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.91 1.00 1.00 0.91 0.91Ped Bike Factor 0.62 0.63 0.94 0.93Frt 0.850 0.978Flt Protected 0.950 0.950Satd. Flow (prot) 0 0 0 1593 3185 1425 1433 3834 0 0 4042 0Flt Permitted 0.950 0.950Satd. Flow (perm) 0 0 0 994 3185 900 1351 3834 0 0 4042 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 60 50Link Speed (mph) 30 30 30 30Link Distance (ft) 456 405 292 285Travel Time (s) 10.4 9.2 6.6 6.5Confl. Peds. (#/hr) 345 315 520 520Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 100 0 0 0 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 0 95 426 89 126 984 0 0 1469 0Turn Type Perm Perm ProtProtected Phases 8 5 2 6Permitted Phases 8 8Detector Phase 8 8 8 5 2 6Switch PhaseMinimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0Minimum Split (s) 28.0 28.0 28.0 10.0 71.0 61.0Total Split (s) 0.0 0.0 0.0 28.0 28.0 28.0 16.0 77.0 0.0 0.0 61.0 0.0Total Split (%) 0.0% 0.0% 0.0% 26.7% 26.7% 26.7% 15.2% 73.3% 0.0% 0.0% 58.1% 0.0%Maximum Green (s) 24.0 24.0 24.0 12.0 73.0 57.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 5.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead LagLead-Lag Optimize? Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode None None None None C-Max C-MaxWalk Time (s) 5.0 5.0 5.0 5.0 5.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 19.5 19.5 19.5 12.2 77.5 60.3Actuated g/C Ratio 0.19 0.19 0.19 0.12 0.74 0.57v/c Ratio 0.52 0.72 0.41 0.76 0.35 0.63Control Delay 47.9 47.1 20.6 81.5 3.6 12.4

Page 61: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions19: Ontario Street & Michigan Avenue AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 14

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRQueue Delay 0.0 0.0 0.0 0.0 0.1 0.1Total Delay 47.9 47.1 20.6 81.5 3.6 12.5LOS D D C F A BApproach Delay 43.4 12.5 12.5Approach LOS D B BStops (vph) 79 369 32 109 185 937Fuel Used(gal) 2 7 1 3 4 12CO Emissions (g/hr) 112 504 56 200 268 825NOx Emissions (g/hr) 22 98 11 39 52 161VOC Emissions (g/hr) 26 117 13 46 62 191Dilemma Vehicles (#) 0 0 0 0 0 0Queue Length 50th (ft) 58 142 16 91 50 236Queue Length 95th (ft) 107 187 62 m#195 57 289Internal Link Dist (ft) 376 325 212 205Turn Bay Length (ft) 60 60 80Base Capacity (vph) 227 728 252 171 2830 2344Starvation Cap Reductn 0 0 0 0 563 112Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.42 0.59 0.35 0.74 0.43 0.66

Intersection SummaryArea Type: CBDCycle Length: 105Actuated Cycle Length: 105Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of GreenNatural Cycle: 100Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.76Intersection Signal Delay: 18.4 Intersection LOS: BIntersection Capacity Utilization 82.9% ICU Level of Service EAnalysis Period (min) 15# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 19: Ontario Street & Michigan Avenue

Page 62: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions20: Ontario Street & St. Clair St. AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 15

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 65 405 100 75 170 0 0 95 175Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 10 12 12 16 12 12 16 12Storage Length (ft) 0 0 0 0 50 0 0 30Storage Lanes 0 0 0 0 1 0 0 1Taper Length (ft) 25 25 25 25 25 25 25 25Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.94 0.85 0.82Frt 0.974 0.850Flt Protected 0.994 0.950Satd. Flow (prot) 0 0 0 0 2744 0 1593 1900 0 0 1900 1425Flt Permitted 0.994 0.692Satd. Flow (perm) 0 0 0 0 2678 0 983 1900 0 0 1900 1164Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 51 177Link Speed (mph) 30 30 30 30Link Distance (ft) 405 448 286 280Travel Time (s) 9.2 10.2 6.5 6.4Confl. Peds. (#/hr) 260 210 175 175Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 7 7 0 0 0 0 0 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 0 0 599 0 79 179 0 0 100 184Turn Type Perm Perm PermProtected Phases 8 2 6Permitted Phases 8 2 6Minimum Split (s) 59.0 59.0 31.0 31.0 31.0 31.0Total Split (s) 0.0 0.0 0.0 59.0 59.0 0.0 31.0 31.0 0.0 0.0 31.0 31.0Total Split (%) 0.0% 0.0% 0.0% 65.6% 65.6% 0.0% 34.4% 34.4% 0.0% 0.0% 34.4% 34.4%Maximum Green (s) 55.0 55.0 27.0 27.0 27.0 27.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 46.0 46.0 20.0 20.0 20.0 20.0Flash Dont Walk (s) 9.0 9.0 7.0 7.0 7.0 7.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 55.0 27.0 27.0 27.0 27.0Actuated g/C Ratio 0.61 0.30 0.30 0.30 0.30v/c Ratio 0.36 0.27 0.31 0.18 0.39Control Delay 8.6 37.3 36.5 24.4 7.1Queue Delay 0.0 0.0 1.1 0.0 0.0Total Delay 8.6 37.3 37.5 24.4 7.1LOS A D D C AApproach Delay 8.6 37.5 13.2Approach LOS A D B

Page 63: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions20: Ontario Street & St. Clair St. AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 16

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRStops (vph) 242 66 148 68 27Fuel Used(gal) 5 1 2 1 1CO Emissions (g/hr) 370 77 172 74 55NOx Emissions (g/hr) 72 15 33 14 11VOC Emissions (g/hr) 86 18 40 17 13Dilemma Vehicles (#) 0 0 0 0 0Queue Length 50th (ft) 73 41 94 42 3Queue Length 95th (ft) 105 85 157 81 52Internal Link Dist (ft) 325 368 206 200Turn Bay Length (ft) 50 30Base Capacity (vph) 1656 295 570 570 473Starvation Cap Reductn 0 0 211 0 0Spillback Cap Reductn 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.36 0.27 0.50 0.18 0.39

Intersection SummaryArea Type: CBDCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBT, Start of GreenNatural Cycle: 90Control Type: PretimedMaximum v/c Ratio: 0.39Intersection Signal Delay: 16.3 Intersection LOS: BIntersection Capacity Utilization 83.0% ICU Level of Service EAnalysis Period (min) 15

Splits and Phases: 20: Ontario Street & St. Clair St.

Page 64: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions21: Ontario Street & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 400 295 45 200 495 0 0 315 75Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 13 12 10 11 12 12 11 12Storage Length (ft) 0 0 100 100 50 0 0 0Storage Lanes 0 0 1 1 1 0 0 0Taper Length (ft) 25 25 25 25 100 25 25 25Lane Util. Factor 1.00 1.00 1.00 0.86 0.86 0.91 1.00 0.95 1.00 1.00 0.95 0.95Ped Bike Factor 0.72 0.87 0.89 0.95Frt 0.988 0.971Flt Protected 0.950 0.982 0.950Satd. Flow (prot) 0 0 0 1370 4237 0 1486 2956 0 0 2780 0Flt Permitted 0.950 0.982 0.380Satd. Flow (perm) 0 0 0 984 3755 0 527 2956 0 0 2780 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 18 32Link Speed (mph) 30 30 30 30Link Distance (ft) 217 695 271 285Travel Time (s) 4.9 15.8 6.2 6.5Confl. Peds. (#/hr) 210 170 215 215Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 20 0 0 13 13Shared Lane Traffic (%) 50%Lane Group Flow (vph) 0 0 0 210 569 0 211 521 0 0 411 0Turn Type custom pm+ptProtected Phases 8 7 8 5 2 6Permitted Phases 7 2Minimum Split (s) 14.0 24.0 47.0 23.0Total Split (s) 0.0 0.0 0.0 14.0 38.0 0.0 24.0 47.0 0.0 0.0 23.0 0.0Total Split (%) 0.0% 0.0% 0.0% 16.5% 44.7% 0.0% 28.2% 55.3% 0.0% 0.0% 27.1% 0.0%Maximum Green (s) 10.0 20.0 43.0 20.0Yellow Time (s) 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 0.0Lost Time Adjust (s) 0.0 0.0 0.0 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 5.0 3.0 4.0 4.0 4.0 4.0 4.0 3.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesWalk Time (s) 7.0 17.0 17.0Flash Dont Walk (s) 12.0 7.0 7.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 28.0 32.0 43.0 43.0 20.0Actuated g/C Ratio 0.33 0.38 0.51 0.51 0.24v/c Ratio 0.58 0.38 0.43 0.35 0.61Control Delay 21.5 13.1 12.1 6.1 26.5Queue Delay 0.0 0.0 0.0 0.3 0.0Total Delay 21.5 13.1 12.1 6.4 26.5LOS C B B A CApproach Delay 15.4 8.0 26.5Approach LOS B A C

Page 65: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions21: Ontario Street & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 18

Lane Group ø7Lane ConfigurationsVolume (vph)Ideal Flow (vphpl)Lane Width (ft)Storage Length (ft)Storage LanesTaper Length (ft)Lane Util. FactorPed Bike FactorFrtFlt ProtectedSatd. Flow (prot)Flt PermittedSatd. Flow (perm)Right Turn on RedSatd. Flow (RTOR)Link Speed (mph)Link Distance (ft)Travel Time (s)Confl. Peds. (#/hr)Peak Hour FactorBus Blockages (#/hr)Shared Lane Traffic (%)Lane Group Flow (vph)Turn TypeProtected Phases 7Permitted PhasesMinimum Split (s) 24.0Total Split (s) 24.0Total Split (%) 28%Maximum Green (s) 22.0Yellow Time (s) 2.0All-Red Time (s) 0.0Lost Time Adjust (s)Total Lost Time (s)Lead/Lag LeadLead-Lag Optimize? YesWalk Time (s) 5.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s)Actuated g/C Ratiov/c RatioControl DelayQueue DelayTotal DelayLOSApproach DelayApproach LOS

Page 66: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions21: Ontario Street & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 19

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRStops (vph) 108 217 126 133 269Fuel Used(gal) 3 6 2 2 4CO Emissions (g/hr) 179 390 113 167 311NOx Emissions (g/hr) 35 76 22 33 61VOC Emissions (g/hr) 41 90 26 39 72Dilemma Vehicles (#) 0 0 0 0 0Queue Length 50th (ft) 55 44 20 26 72Queue Length 95th (ft) 97 65 77 36 121Internal Link Dist (ft) 137 615 191 205Turn Bay Length (ft) 100 50Base Capacity (vph) 365 1487 492 1495 679Starvation Cap Reductn 0 0 0 454 0Spillback Cap Reductn 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.58 0.38 0.43 0.50 0.61

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 29 (34%), Referenced to phase 2:NBTL and 6:SBT, Start of 1st GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.61Intersection Signal Delay: 15.0 Intersection LOS: BIntersection Capacity Utilization 76.6% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 21: Ontario Street & Fairbanks Court

Page 67: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions21: Ontario Street & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 20

Lane Group ø7Stops (vph)Fuel Used(gal)CO Emissions (g/hr)NOx Emissions (g/hr)VOC Emissions (g/hr)Dilemma Vehicles (#)Queue Length 50th (ft)Queue Length 95th (ft)Internal Link Dist (ft)Turn Bay Length (ft)Base Capacity (vph)Starvation Cap ReductnSpillback Cap ReductnStorage Cap ReductnReduced v/c Ratio

Intersection Summary

Page 68: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions22: Ontario Street & McClurg Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 0 675 90 180 300 0 0 0 85Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 10 12 9 16 12 12 12 10Storage Length (ft) 0 0 0 0 90 0 0 0Storage Lanes 0 0 0 0 1 0 0 1Taper Length (ft) 25 25 25 25 100 25 25 25Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.98 0.91 0.90Frt 0.982 0.865Flt Protected 0.950Satd. Flow (prot) 0 0 0 0 2857 0 1433 1900 0 0 0 1353Flt Permitted 0.950Satd. Flow (perm) 0 0 0 0 2857 0 1307 1900 0 0 0 1220Right Turn on Red Yes Yes Yes Yes YesSatd. Flow (RTOR) 28 177 107Link Speed (mph) 30 30 30 30Link Distance (ft) 695 815 419 282Travel Time (s) 15.8 18.5 9.5 6.4Confl. Peds. (#/hr) 140 90 90Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 0 0 806 0 189 316 0 0 0 89Turn Type Perm customProtected Phases 6 8Permitted Phases 8 4Minimum Split (s) 52.0 33.0 33.0 33.0Total Split (s) 0.0 0.0 0.0 0.0 52.0 0.0 33.0 33.0 0.0 0.0 0.0 33.0Total Split (%) 0.0% 0.0% 0.0% 0.0% 61.2% 0.0% 38.8% 38.8% 0.0% 0.0% 0.0% 38.8%Maximum Green (s) 48.0 29.0 29.0 29.0Yellow Time (s) 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 29.0 16.0 16.0 16.0Flash Dont Walk (s) 7.0 10.0 10.0 10.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 48.0 29.0 29.0 29.0Actuated g/C Ratio 0.56 0.34 0.34 0.34v/c Ratio 0.50 0.34 0.49 0.18Control Delay 12.0 5.8 25.3 4.1Queue Delay 0.0 0.0 0.0 0.0Total Delay 12.0 5.8 25.3 4.1LOS B A C AApproach Delay 12.0 18.0Approach LOS B BStops (vph) 421 28 231 10

Page 69: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions22: Ontario Street & McClurg Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 22

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRFuel Used(gal) 9 1 4 0CO Emissions (g/hr) 634 67 266 22NOx Emissions (g/hr) 123 13 52 4VOC Emissions (g/hr) 147 16 62 5Dilemma Vehicles (#) 0 0 0 0Queue Length 50th (ft) 122 4 132 0Queue Length 95th (ft) 168 48 208 24Internal Link Dist (ft) 615 735 339 202Turn Bay Length (ft) 90Base Capacity (vph) 1626 563 648 487Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.50 0.34 0.49 0.18

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 70 (82%), Referenced to phase 6:WBT, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.50Intersection Signal Delay: 13.7 Intersection LOS: BIntersection Capacity Utilization 72.2% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 22: Ontario Street & McClurg Court

Page 70: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions23: Ontario Street & Lake Shore Drive (Inner) AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 23

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (vph) 0 0 205 140 0 560Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.88Ped Bike FactorFrt 0.850Flt Protected 0.950Satd. Flow (prot) 0 0 1486 1565 0 2341Flt Permitted 0.950Satd. Flow (perm) 0 0 1486 1565 0 2341Link Speed (mph) 30 30 30Link Distance (ft) 815 307 151Travel Time (s) 18.5 7.0 3.4Confl. Peds. (#/hr) 35 35Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 216 147 0 589Sign Control Stop Stop Stop

Intersection SummaryArea Type: CBDControl Type: UnsignalizedIntersection Capacity Utilization 44.1% ICU Level of Service AAnalysis Period (min) 15

Page 71: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions24: Ohio Street & Michigan Avenue AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 24

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 140 560 220 0 0 0 0 915 240 75 1205 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 11 11 11 12 12 12 12 11 12 9 11 12Storage Length (ft) 0 0 0 0 0 0 60 0Storage Lanes 1 1 0 0 0 0 1 0Taper Length (ft) 25 25 25 25 25 25 55 25Lane Util. Factor 0.86 0.81 0.86 1.00 1.00 1.00 1.00 0.91 0.91 1.00 0.91 1.00Ped Bike Factor 0.70 0.98 0.76 0.93 0.94Frt 0.989 0.850 0.969Flt Protected 0.950 0.999 0.950Satd. Flow (prot) 1324 3824 1151 0 0 0 0 4004 0 1433 3840 0Flt Permitted 0.950 0.999 0.950Satd. Flow (perm) 923 3797 871 0 0 0 0 4004 0 1351 3840 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 9 97 99Link Speed (mph) 30 30 30 30Link Distance (ft) 448 409 959 292Travel Time (s) 10.2 9.3 21.8 6.6Confl. Peds. (#/hr) 240 180 650 650Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 7 0 0 0 0 0 0 0 99 0Shared Lane Traffic (%) 10% 20%Lane Group Flow (vph) 132 650 186 0 0 0 0 1216 0 79 1268 0Turn Type Perm Perm ProtProtected Phases 4 2 1 6Permitted Phases 4 4Detector Phase 4 4 4 2 1 6Switch PhaseMinimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0Minimum Split (s) 28.0 28.0 28.0 61.0 10.0 71.0Total Split (s) 28.0 28.0 28.0 0.0 0.0 0.0 0.0 61.0 0.0 16.0 77.0 0.0Total Split (%) 26.7% 26.7% 26.7% 0.0% 0.0% 0.0% 0.0% 58.1% 0.0% 15.2% 73.3% 0.0%Maximum Green (s) 24.0 24.0 24.0 57.0 12.0 73.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 5.0 4.0 4.0Lead/Lag Lag LeadLead-Lag Optimize? Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode None None None C-Max None C-MaxWalk Time (s) 17.0 17.0 17.0 47.0 32.0Flash Dont Walk (s) 7.0 7.0 7.0 10.0 10.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 22.3 22.3 22.3 62.7 9.1 74.7Actuated g/C Ratio 0.21 0.21 0.21 0.60 0.09 0.71v/c Ratio 0.67 0.80 0.71 0.50 0.64 0.46Control Delay 55.6 46.8 34.4 13.0 78.1 3.5

Page 72: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions24: Ohio Street & Michigan Avenue AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 25

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRQueue Delay 0.0 0.0 0.0 0.0 0.0 0.1Total Delay 55.6 46.8 34.4 13.0 78.1 3.5LOS E D C B E AApproach Delay 45.6 13.0 7.9Approach LOS D B AStops (vph) 114 563 85 598 75 166Fuel Used(gal) 2 11 2 15 2 5CO Emissions (g/hr) 174 780 163 1049 124 315NOx Emissions (g/hr) 34 152 32 204 24 61VOC Emissions (g/hr) 40 181 38 243 29 73Dilemma Vehicles (#) 0 0 0 0 0 0Queue Length 50th (ft) 93 165 62 165 58 46Queue Length 95th (ft) #184 216 #179 210 m93 51Internal Link Dist (ft) 368 329 879 212Turn Bay Length (ft) 60Base Capacity (vph) 211 875 274 2430 150 2733Starvation Cap Reductn 0 0 0 0 0 284Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.63 0.74 0.68 0.50 0.53 0.52

Intersection SummaryArea Type: CBDCycle Length: 105Actuated Cycle Length: 105Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of GreenNatural Cycle: 100Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.80Intersection Signal Delay: 20.0 Intersection LOS: BIntersection Capacity Utilization 82.9% ICU Level of Service EAnalysis Period (min) 15# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 24: Ohio Street & Michigan Avenue

Page 73: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions25: Ohio Street & St. Clair St. AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 125 665 85 0 0 0 0 120 50 45 110 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 10 12 12 12 12 12 16 12 12 16 12Lane Util. Factor 0.91 0.91 0.91 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.94 0.91 0.94Frt 0.986 0.960Flt Protected 0.993 0.986Satd. Flow (prot) 0 4034 0 0 0 0 0 1664 0 0 1873 0Flt Permitted 0.993 0.878Satd. Flow (perm) 0 3906 0 0 0 0 0 1664 0 0 1565 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 37 24Link Speed (mph) 30 30 30 30Link Distance (ft) 409 680 292 286Travel Time (s) 9.3 15.5 6.6 6.5Confl. Peds. (#/hr) 270 315 280 280Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 7 7 0 0 0 0 0 0 0 0 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 921 0 0 0 0 0 179 0 0 163 0Turn Type Perm PermProtected Phases 4 2 6Permitted Phases 4 6Minimum Split (s) 59.0 59.0 31.0 31.0 31.0Total Split (s) 59.0 59.0 0.0 0.0 0.0 0.0 0.0 31.0 0.0 31.0 31.0 0.0Total Split (%) 65.6% 65.6% 0.0% 0.0% 0.0% 0.0% 0.0% 34.4% 0.0% 34.4% 34.4% 0.0%Maximum Green (s) 55.0 55.0 27.0 27.0 27.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 46.0 46.0 19.0 19.0 19.0Flash Dont Walk (s) 9.0 9.0 7.0 7.0 7.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 55.0 27.0 27.0Actuated g/C Ratio 0.61 0.30 0.30v/c Ratio 0.38 0.35 0.35Control Delay 9.0 23.5 20.4Queue Delay 0.0 0.0 0.0Total Delay 9.0 23.5 20.4LOS A C CApproach Delay 9.0 23.5 20.4Approach LOS A C CStops (vph) 396 112 120Fuel Used(gal) 7 2 2CO Emissions (g/hr) 461 127 116

Page 74: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions25: Ohio Street & St. Clair St. AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 27

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRNOx Emissions (g/hr) 90 25 22VOC Emissions (g/hr) 107 29 27Dilemma Vehicles (#) 0 0 0Queue Length 50th (ft) 84 68 75Queue Length 95th (ft) 110 124 130Internal Link Dist (ft) 329 600 212 206Turn Bay Length (ft)Base Capacity (vph) 2401 516 470Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.38 0.35 0.35

Intersection SummaryArea Type: CBDCycle Length: 90Actuated Cycle Length: 90Offset: 23 (26%), Referenced to phase 2:NBT and 6:SBTL, Start of GreenNatural Cycle: 90Control Type: PretimedMaximum v/c Ratio: 0.38Intersection Signal Delay: 12.6 Intersection LOS: BIntersection Capacity Utilization 86.7% ICU Level of Service EAnalysis Period (min) 15

Splits and Phases: 25: Ohio Street & St. Clair St.

Page 75: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions26: Ohio Street & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 28

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 110 395 255 0 0 0 0 520 170 55 665 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 10 12 12 12 12 12 11 11 10 12 12Storage Length (ft) 0 0 0 0 0 0 50 0Storage Lanes 0 0 0 0 0 1 1 0Taper Length (ft) 25 25 25 25 25 25 100 25Lane Util. Factor 0.91 0.91 0.91 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Ped Bike Factor 0.85 0.66 0.89Frt 0.950 0.850Flt Protected 0.993 0.950Satd. Flow (prot) 0 3591 0 0 0 0 0 2999 1306 1486 3185 0Flt Permitted 0.993 0.341Satd. Flow (perm) 0 3432 0 0 0 0 0 2999 867 475 3185 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 172 156Link Speed (mph) 30 30 30 30Link Distance (ft) 680 339 280 271Travel Time (s) 15.5 7.7 6.4 6.2Confl. Peds. (#/hr) 205 250 285 285Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 13 13 0 0 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 800 0 0 0 0 0 547 179 58 700 0Turn Type Perm Perm pm+ptProtected Phases 4 2 1 6Permitted Phases 4 2 6Minimum Split (s) 36.0 36.0 40.0 40.0 9.0 49.0Total Split (s) 36.0 36.0 0.0 0.0 0.0 0.0 0.0 40.0 40.0 9.0 49.0 0.0Total Split (%) 42.4% 42.4% 0.0% 0.0% 0.0% 0.0% 0.0% 47.1% 47.1% 10.6% 57.6% 0.0%Maximum Green (s) 32.0 32.0 36.0 36.0 6.0 45.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 0.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesWalk Time (s) 5.0 5.0 5.0 5.0 5.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 32.0 36.0 36.0 45.0 45.0Actuated g/C Ratio 0.38 0.42 0.42 0.53 0.53v/c Ratio 0.57 0.43 0.39 0.19 0.42Control Delay 18.1 12.6 4.9 5.2 6.4Queue Delay 0.0 0.2 0.0 0.0 0.6Total Delay 18.1 12.8 4.9 5.2 7.0LOS B B A A AApproach Delay 18.1 10.9 6.9Approach LOS B B A

Page 76: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions26: Ohio Street & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 29

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRStops (vph) 461 199 14 19 298Fuel Used(gal) 9 4 1 0 4CO Emissions (g/hr) 655 249 43 20 274NOx Emissions (g/hr) 127 49 8 4 53VOC Emissions (g/hr) 152 58 10 5 64Dilemma Vehicles (#) 0 0 0 0 0Queue Length 50th (ft) 94 48 0 10 88Queue Length 95th (ft) 134 84 m20 m17 107Internal Link Dist (ft) 600 259 200 191Turn Bay Length (ft) 50Base Capacity (vph) 1399 1270 457 311 1686Starvation Cap Reductn 0 226 0 0 574Spillback Cap Reductn 2 0 0 0 105Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.57 0.52 0.39 0.19 0.63

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 23 (27%), Referenced to phase 2:NBT and 6:SBTL, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.57Intersection Signal Delay: 12.1 Intersection LOS: BIntersection Capacity Utilization 76.6% ICU Level of Service DAnalysis Period (min) 15m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 26: Ohio Street & Fairbanks Court

Page 77: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions30: Grand Avenue & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 30

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 250 870 105 205 585 0 0 820 100Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (ft) 0 0 0 0 55 0 0 0Storage Lanes 0 0 1 0 1 0 0 0Taper Length (ft) 25 25 10 10 95 25 25 25Lane Util. Factor 1.00 1.00 1.00 0.86 0.86 0.91 0.86 0.86 1.00 1.00 0.91 0.91Ped Bike Factor 0.69 0.97 0.94 0.99 0.96Frt 0.984 0.984Flt Protected 0.950 0.999 0.950 0.994Satd. Flow (prot) 0 0 0 1278 3875 0 1278 4013 0 0 4049 0Flt Permitted 0.950 0.999 0.183 0.757Satd. Flow (perm) 0 0 0 882 3845 0 232 3036 0 0 4049 0Right Turn on Red No No No NoSatd. Flow (RTOR)Link Speed (mph) 30 30 30 30Link Distance (ft) 338 330 302 280Travel Time (s) 7.7 7.5 6.9 6.4Confl. Peds. (#/hr) 220 135 290 290Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%) 10% 36%Lane Group Flow (vph) 0 0 0 237 1053 0 138 694 0 0 968 0Turn Type custom pm+ptProtected Phases 4 3 4 5 2 6Permitted Phases 3 2Minimum Split (s) 9.0 14.0 45.0 31.0Total Split (s) 0.0 0.0 0.0 9.0 40.0 0.0 14.0 45.0 0.0 0.0 31.0 0.0Total Split (%) 0.0% 0.0% 0.0% 10.6% 47.1% 0.0% 16.5% 52.9% 0.0% 0.0% 36.5% 0.0%Maximum Green (s) 5.0 10.0 41.0 28.0Yellow Time (s) 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 0.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 2.0 4.0 4.0 4.0 4.0 4.0 3.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesWalk Time (s) 5.0 5.0Flash Dont Walk (s) 11.0 11.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 32.0 36.0 41.0 41.0 28.0Actuated g/C Ratio 0.38 0.42 0.48 0.48 0.33v/c Ratio 0.67 0.65 0.59 0.44 0.73Control Delay 30.7 20.2 18.9 7.5 21.7Queue Delay 0.0 0.0 0.0 0.1 0.6Total Delay 30.7 20.2 18.9 7.7 22.3LOS C C B A CApproach Delay 22.1 9.5 22.3Approach LOS C A CStops (vph) 163 729 74 143 707Fuel Used(gal) 3 11 1 3 10

Page 78: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions30: Grand Avenue & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 31

Lane Group ø3Lane ConfigurationsVolume (vph)Ideal Flow (vphpl)Storage Length (ft)Storage LanesTaper Length (ft)Lane Util. FactorPed Bike FactorFrtFlt ProtectedSatd. Flow (prot)Flt PermittedSatd. Flow (perm)Right Turn on RedSatd. Flow (RTOR)Link Speed (mph)Link Distance (ft)Travel Time (s)Confl. Peds. (#/hr)Peak Hour FactorShared Lane Traffic (%)Lane Group Flow (vph)Turn TypeProtected Phases 3Permitted PhasesMinimum Split (s) 31.0Total Split (s) 31.0Total Split (%) 36%Maximum Green (s) 29.0Yellow Time (s) 2.0All-Red Time (s) 0.0Lost Time Adjust (s)Total Lost Time (s)Lead/Lag LeadLead-Lag Optimize? YesWalk Time (s) 5.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s)Actuated g/C Ratiov/c RatioControl DelayQueue DelayTotal DelayLOSApproach DelayApproach LOSStops (vph)Fuel Used(gal)

Page 79: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions30: Grand Avenue & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 32

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRCO Emissions (g/hr) 202 749 85 234 697NOx Emissions (g/hr) 39 146 17 46 136VOC Emissions (g/hr) 47 174 20 54 162Dilemma Vehicles (#) 0 0 0 0 0Queue Length 50th (ft) 101 159 19 32 152Queue Length 95th (ft) #181 206 m33 47 219Internal Link Dist (ft) 258 250 222 200Turn Bay Length (ft) 55Base Capacity (vph) 355 1631 235 1579 1334Starvation Cap Reductn 0 0 0 211 108Spillback Cap Reductn 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.67 0.65 0.59 0.51 0.79

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 20 (24%), Referenced to phase 2:NBTL and 6:SBT, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.73Intersection Signal Delay: 18.8 Intersection LOS: BIntersection Capacity Utilization 48.4% ICU Level of Service AAnalysis Period (min) 15# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 30: Grand Avenue & Fairbanks Court

Page 80: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions30: Grand Avenue & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 33

Lane Group ø3CO Emissions (g/hr)NOx Emissions (g/hr)VOC Emissions (g/hr)Dilemma Vehicles (#)Queue Length 50th (ft)Queue Length 95th (ft)Internal Link Dist (ft)Turn Bay Length (ft)Base Capacity (vph)Starvation Cap ReductnSpillback Cap ReductnStorage Cap ReductnReduced v/c Ratio

Intersection Summary

Page 81: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions36: Illinois Street & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 34

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 95 475 180 0 0 0 0 695 235 230 840 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (ft) 0 0 0 0 0 0 55 0Storage Lanes 0 0 0 0 0 0 1 0Taper Length (ft) 10 25 25 25 25 25 95 25Lane Util. Factor 0.91 0.91 0.91 1.00 1.00 1.00 1.00 0.91 0.91 0.86 0.86 1.00Ped Bike Factor 0.90 0.92 0.95 1.00Frt 0.964 0.962Flt Protected 0.994 0.950 0.997Satd. Flow (prot) 0 3836 0 0 0 0 0 3764 0 1278 4025 0Flt Permitted 0.994 0.187 0.823Satd. Flow (perm) 0 3689 0 0 0 0 0 3764 0 238 3312 0Right Turn on Red No No No NoSatd. Flow (RTOR)Link Speed (mph) 30 30 30 30Link Distance (ft) 334 330 302 302Travel Time (s) 7.6 7.5 6.9 6.9Confl. Peds. (#/hr) 195 160 275 275Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%) 24%Lane Group Flow (vph) 0 789 0 0 0 0 0 979 0 184 942 0Turn Type Perm pm+ptProtected Phases 4 2 1 6Permitted Phases 4 6Minimum Split (s) 38.0 38.0 37.0 10.0 47.0Total Split (s) 38.0 38.0 0.0 0.0 0.0 0.0 0.0 37.0 0.0 10.0 47.0 0.0Total Split (%) 44.7% 44.7% 0.0% 0.0% 0.0% 0.0% 0.0% 43.5% 0.0% 11.8% 55.3% 0.0%Maximum Green (s) 34.0 34.0 33.0 7.0 43.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 0.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 3.0 4.0 4.0Lead/Lag Lag LeadLead-Lag Optimize? Yes YesWalk Time (s) 5.0 5.0 5.0 5.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 34.0 33.0 44.0 43.0Actuated g/C Ratio 0.40 0.39 0.52 0.51v/c Ratio 0.53 0.67 0.88 0.55Control Delay 21.1 24.3 54.5 5.9Queue Delay 0.0 0.0 0.0 0.5Total Delay 21.1 24.3 54.5 6.4LOS C C D AApproach Delay 21.1 24.3 14.3Approach LOS C C BStops (vph) 548 738 147 203Fuel Used(gal) 8 11 3 4

Page 82: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions36: Illinois Street & Fairbanks Court AM Peak Hout

7/19/2011 Synchro 7 - Reportpcl Page 35

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRCO Emissions (g/hr) 574 760 221 301NOx Emissions (g/hr) 112 148 43 59VOC Emissions (g/hr) 133 176 51 70Dilemma Vehicles (#) 0 0 0 0Queue Length 50th (ft) 115 154 53 46Queue Length 95th (ft) 153 202 m#86 51Internal Link Dist (ft) 254 250 222 222Turn Bay Length (ft) 55Base Capacity (vph) 1476 1461 209 1726Starvation Cap Reductn 0 0 0 361Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.53 0.67 0.88 0.69

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 30 (35%), Referenced to phase 2:NBT and 6:SBTL, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.88Intersection Signal Delay: 19.5 Intersection LOS: BIntersection Capacity Utilization 48.4% ICU Level of Service AAnalysis Period (min) 15# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 36: Illinois Street & Fairbanks Court

Page 83: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions3: Chicago Avenue & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 1

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (vph) 410 140 50 165 320 400Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Width (ft) 11 12 10 11 11 12Storage Length (ft) 0 110 135 0Storage Lanes 1 1 1 1Taper Length (ft) 75 110 60 25Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.48 0.77 0.45Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1322 1163 1486 1621 1540 1163Flt Permitted 0.340 0.950Satd. Flow (perm) 1322 552 411 1621 1540 525Right Turn on Red Yes YesSatd. Flow (RTOR) 147 10Link Speed (mph) 30 30 30Link Distance (ft) 203 517 363Travel Time (s) 4.6 11.8 8.3Confl. Peds. (#/hr) 420 420 360Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 46 46 0 0 0 46Adj. Flow (vph) 432 147 53 174 337 421Shared Lane Traffic (%)Lane Group Flow (vph) 432 147 53 174 337 421Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(ft) 0 10 12Link Offset(ft) 0 0 0Crosswalk Width(ft) 16 16 16Two way Left Turn LaneHeadway Factor 1.53 1.47 1.25 1.19 1.19 1.47Turn Type Perm pm+pt pm+ovProtected Phases 4 3 8 2 3Permitted Phases 4 8 2Minimum Split (s) 36.0 36.0 23.0 59.0 26.0 23.0Total Split (s) 36.0 36.0 23.0 59.0 26.0 23.0Total Split (%) 42.4% 42.4% 27.1% 69.4% 30.6% 27.1%Maximum Green (s) 32.0 32.0 20.0 55.0 22.0 20.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 0.0 1.0 1.0 0.0Lost Time Adjust (s) 1.0 1.0 1.0 0.0 0.0 1.0Total Lost Time (s) 5.0 5.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes YesWalk Time (s) 23.0 23.0 24.0 10.0Flash Dont Walk (s) 8.0 8.0 8.0 12.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 31.0 31.0 55.0 55.0 22.0 41.0

Page 84: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions3: Chicago Avenue & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 2

Lane Group EBT EBR WBL WBT NBL NBRActuated g/C Ratio 0.36 0.36 0.65 0.65 0.26 0.48v/c Ratio 0.90 0.50 0.10 0.17 0.84 1.05Control Delay 49.6 10.1 7.1 6.4 50.9 73.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 49.6 10.1 7.1 6.4 50.9 73.4LOS D B A A D EApproach Delay 39.6 6.6 63.4Approach LOS D A EQueue Length 50th (ft) 214 0 9 33 184 ~204Queue Length 95th (ft) #393 51 21 57 m#266 m#280Internal Link Dist (ft) 123 437 283Turn Bay Length (ft) 110 135Base Capacity (vph) 482 295 506 1049 399 401Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.90 0.50 0.10 0.17 0.84 1.05

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 7 (8%), Referenced to phase 2:NBL, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 1.05Intersection Signal Delay: 46.3 Intersection LOS: DIntersection Capacity Utilization 69.9% ICU Level of Service CAnalysis Period (min) 15~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 3: Chicago Avenue & Fairbanks Court

Page 85: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions7: Superior Street & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 3

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 250 90 165 0 0 0 0 470 60 15 175 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 11 11 11 12 12 12 12 12 12 12 12 12Storage Length (ft) 0 0 0 0 0 50 50 0Storage Lanes 1 0 0 0 0 1 1 1Taper Length (ft) 25 25 25 25 25 25 100 25Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.37 0.59 0.23 0.77Frt 0.903 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1555 873 0 0 0 0 0 1527 1174 1608 1203 0Flt Permitted 0.950 0.325Satd. Flow (perm) 582 873 0 0 0 0 0 1527 272 425 1203 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 137 31Link Speed (mph) 30 30 30 30Link Distance (ft) 481 546 300 363Travel Time (s) 10.9 12.4 6.8 8.3Confl. Peds. (#/hr) 425 425 685 685Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Heavy Vehicles (%) 1% 1% 1% 2% 2% 2% 2% 12% 1% 1% 16% 2%Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 46 0 46 0Adj. Flow (vph) 263 95 174 0 0 0 0 495 63 16 184 0Shared Lane Traffic (%)Lane Group Flow (vph) 263 269 0 0 0 0 0 495 63 16 184 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(ft) 11 11 12 12Link Offset(ft) 0 0 0 0Crosswalk Width(ft) 16 16 16 16Two way Left Turn LaneHeadway Factor 1.19 1.19 1.19 1.14 1.14 1.14 1.14 1.14 1.47 1.14 1.47 1.14Turn Type Perm Perm PermProtected Phases 4 2 6Permitted Phases 4 2 6Minimum Split (s) 41.0 41.0 44.0 44.0 44.0 44.0Total Split (s) 41.0 41.0 0.0 0.0 0.0 0.0 0.0 44.0 44.0 44.0 44.0 0.0Total Split (%) 48.2% 48.2% 0.0% 0.0% 0.0% 0.0% 0.0% 51.8% 51.8% 51.8% 51.8% 0.0%Maximum Green (s) 37.0 37.0 40.0 40.0 40.0 40.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0

Page 86: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions7: Superior Street & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 4

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRAct Effct Green (s) 37.0 37.0 40.0 40.0 40.0 40.0Actuated g/C Ratio 0.44 0.44 0.47 0.47 0.47 0.47v/c Ratio 1.04 0.59 0.69 0.44 0.08 0.33Control Delay 95.1 14.8 14.2 12.8 11.9 14.0Queue Delay 0.0 0.0 1.1 0.0 0.0 0.0Total Delay 95.1 14.8 15.3 12.8 11.9 14.0LOS F B B B B BApproach Delay 54.5 15.0 13.9Approach LOS D B BQueue Length 50th (ft) ~154 48 75 2 4 55Queue Length 95th (ft) #300 132 127 m10 m8 70Internal Link Dist (ft) 401 466 220 283Turn Bay Length (ft) 50 50Base Capacity (vph) 253 457 719 144 200 566Starvation Cap Reductn 0 0 74 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 1.04 0.59 0.77 0.44 0.08 0.33

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 20 (24%), Referenced to phase 2:NBT and 6:SBTL, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 1.04Intersection Signal Delay: 31.1 Intersection LOS: CIntersection Capacity Utilization 56.8% ICU Level of Service BAnalysis Period (min) 15~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 7: Superior Street & Fairbanks Court

Page 87: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions11: Huron Street & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 85 115 95 130 435 0 0 260 80Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12Storage Length (ft) 0 0 0 0 50 0 0 50Storage Lanes 0 0 0 1 1 0 0 1Taper Length (ft) 25 25 25 25 25 25 25 25Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.69 0.79 0.64Frt 0.952 0.850Flt Protected 0.986 0.950Satd. Flow (prot) 0 0 0 0 2439 0 1593 1368 0 0 1676 1163Flt Permitted 0.986 0.531Satd. Flow (perm) 0 0 0 0 2053 0 702 1368 0 0 1676 745Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 100 74Link Speed (mph) 30 30 30 30Link Distance (ft) 381 366 142 300Travel Time (s) 8.7 8.3 3.2 6.8Confl. Peds. (#/hr) 285 305 360 360Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 46 0 0 0 46Adj. Flow (vph) 0 0 0 89 121 100 137 458 0 0 274 84Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 0 0 310 0 137 458 0 0 274 84Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(ft) 0 0 12 12Link Offset(ft) 0 0 0 0Crosswalk Width(ft) 16 16 16 16Two way Left Turn LaneHeadway Factor 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.47 1.14 1.14 1.14 1.47Turn Type Perm Perm PermProtected Phases 8 2 6Permitted Phases 8 2 6Minimum Split (s) 41.0 41.0 44.0 44.0 44.0 44.0Total Split (s) 0.0 0.0 0.0 41.0 41.0 0.0 44.0 44.0 0.0 0.0 44.0 44.0Total Split (%) 0.0% 0.0% 0.0% 48.2% 48.2% 0.0% 51.8% 51.8% 0.0% 0.0% 51.8% 51.8%Maximum Green (s) 37.0 37.0 40.0 40.0 40.0 40.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 37.0 40.0 40.0 40.0 40.0

Page 88: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions11: Huron Street & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRActuated g/C Ratio 0.44 0.47 0.47 0.47 0.47v/c Ratio 0.33 0.42 0.71 0.35 0.22Control Delay 11.5 7.9 13.6 12.8 4.5Queue Delay 0.0 0.0 0.2 0.8 0.0Total Delay 11.5 7.9 13.9 13.6 4.5LOS B A B B AApproach Delay 11.5 12.5 11.5Approach LOS B B BQueue Length 50th (ft) 35 12 41 64 2Queue Length 95th (ft) 65 21 94 115 m19Internal Link Dist (ft) 301 286 62 220Turn Bay Length (ft) 50 50Base Capacity (vph) 950 330 644 789 390Starvation Cap Reductn 0 0 0 274 0Spillback Cap Reductn 0 0 16 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.33 0.42 0.73 0.53 0.22

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 21 (25%), Referenced to phase 2:NBTL and 6:SBT, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.71Intersection Signal Delay: 12.0 Intersection LOS: BIntersection Capacity Utilization 46.5% ICU Level of Service AAnalysis Period (min) 15m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 11: Huron Street & Fairbanks Court

Page 89: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions14: Erie Street & Michigan Avenue PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 7

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 70 160 15 0 0 0 0 1100 95 85 1245 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 10 12 12 12 12 12 11 12 9 11 12Storage Length (ft) 0 0 0 0 0 0 60 0Storage Lanes 0 0 0 0 0 0 1 0Taper Length (ft) 25 25 25 25 25 25 60 25Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 0.91 0.91 1.00 0.91 1.00Ped Bike Factor 0.85 0.96 0.92Frt 0.991 0.988Flt Protected 0.986 0.950Satd. Flow (prot) 0 2864 0 0 0 0 0 3956 0 1448 3621 0Flt Permitted 0.986 0.950Satd. Flow (perm) 0 2506 0 0 0 0 0 3956 0 1326 3621 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 6 21Link Speed (mph) 30 30 30 30Link Distance (ft) 516 405 285 147Travel Time (s) 11.7 9.2 6.5 3.3Confl. Peds. (#/hr) 531 369 1693 1693Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Heavy Vehicles (%) 1% 1% 1% 2% 2% 2% 2% 9% 1% 1% 8% 2%Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 100 0Adj. Flow (vph) 74 168 16 0 0 0 0 1158 100 89 1311 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 258 0 0 0 0 0 1258 0 89 1311 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(ft) 0 0 15 6Link Offset(ft) 0 0 0 0Crosswalk Width(ft) 16 16 16 16Two way Left Turn LaneHeadway Factor 1.14 1.25 1.14 1.14 1.14 1.14 1.14 1.19 1.14 1.30 1.42 1.14Turning Speed (mph) 15 9 15 9 15 9 15 9Turn Type Perm ProtProtected Phases 4 2 1 6Permitted Phases 4Detector Phase 4 4 2 1 6Switch PhaseMinimum Initial (s) 4.0 4.0 4.0 4.0 4.0Minimum Split (s) 28.0 28.0 61.0 10.0 71.0Total Split (s) 28.0 28.0 0.0 0.0 0.0 0.0 0.0 61.0 0.0 16.0 77.0 0.0Total Split (%) 26.7% 26.7% 0.0% 0.0% 0.0% 0.0% 0.0% 58.1% 0.0% 15.2% 73.3% 0.0%Maximum Green (s) 24.0 24.0 57.0 12.0 73.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 5.0 4.0 4.0Lead/Lag Lag Lead

Page 90: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions14: Erie Street & Michigan Avenue PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLead-Lag Optimize? Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min C-Max None C-MaxWalk Time (s) 7.0 7.0 37.0 37.0Flash Dont Walk (s) 10.0 10.0 7.0 7.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 15.8 67.8 10.5 81.2Actuated g/C Ratio 0.15 0.65 0.10 0.77v/c Ratio 0.67 0.49 0.61 0.47Control Delay 49.7 4.7 62.4 5.2Queue Delay 0.0 0.1 0.0 0.1Total Delay 49.7 4.7 62.4 5.3LOS D A E AApproach Delay 49.7 4.7 8.9Approach LOS D A AQueue Length 50th (ft) 85 91 58 93Queue Length 95th (ft) 122 109 108 147Internal Link Dist (ft) 436 325 205 67Turn Bay Length (ft) 60Base Capacity (vph) 577 2563 166 2800Starvation Cap Reductn 0 243 0 0Spillback Cap Reductn 0 0 0 257Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.45 0.54 0.54 0.52

Intersection SummaryArea Type: CBDCycle Length: 105Actuated Cycle Length: 105Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of GreenNatural Cycle: 100Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.67Intersection Signal Delay: 10.7 Intersection LOS: BIntersection Capacity Utilization 66.9% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 14: Erie Street & Michigan Avenue

Page 91: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions15: Erie Street & St. Clair St. PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 9

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 55 200 85 0 0 0 0 140 95 85 105 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.963 0.945Flt Protected 0.992 0.978Satd. Flow (prot) 0 2840 0 0 0 0 0 1479 0 0 1530 0Flt Permitted 0.992 0.978Satd. Flow (perm) 0 2840 0 0 0 0 0 1479 0 0 1530 0Link Speed (mph) 30 30 30 30Link Distance (ft) 405 351 280 150Travel Time (s) 9.2 8.0 6.4 3.4Confl. Peds. (#/hr) 280 365 350 350Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Adj. Flow (vph) 58 211 89 0 0 0 0 147 100 89 111 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 358 0 0 0 0 0 247 0 0 200 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(ft) 0 0 0 0Link Offset(ft) 0 0 0 0Crosswalk Width(ft) 16 16 16 16Two way Left Turn LaneHeadway Factor 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25Sign Control Stop Stop Stop Stop

Intersection SummaryArea Type: CBDControl Type: UnsignalizedIntersection Capacity Utilization 53.0% ICU Level of Service AAnalysis Period (min) 15

Page 92: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions16: Erie Street & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 10

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 60 125 185 0 0 0 0 505 140 30 315 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 10 12 12 12 12 12 10 12 12 10 12Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 0.95 0.95 0.95 0.95 1.00Ped Bike Factor 0.80 0.93 0.99Frt 0.925 0.968Flt Protected 0.992 0.996Satd. Flow (prot) 0 2295 0 0 0 0 0 2674 0 0 2689 0Flt Permitted 0.992 0.869Satd. Flow (perm) 0 2180 0 0 0 0 0 2674 0 0 2323 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 195 56Link Speed (mph) 30 30 30 30Link Distance (ft) 345 721 285 159Travel Time (s) 7.8 16.4 6.5 3.6Confl. Peds. (#/hr) 360 365 575 575Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 46 0 46 0Adj. Flow (vph) 63 132 195 0 0 0 0 532 147 32 332 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 390 0 0 0 0 0 679 0 0 364 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(ft) 0 0 0 0Link Offset(ft) 0 0 0 0Crosswalk Width(ft) 16 16 16 16Two way Left Turn LaneHeadway Factor 1.14 1.25 1.14 1.14 1.14 1.14 1.14 1.25 1.14 1.14 1.40 1.14Turn Type Perm PermProtected Phases 4 2 6Permitted Phases 4 6Minimum Split (s) 41.0 41.0 44.0 44.0 44.0Total Split (s) 41.0 41.0 0.0 0.0 0.0 0.0 0.0 44.0 0.0 44.0 44.0 0.0Total Split (%) 48.2% 48.2% 0.0% 0.0% 0.0% 0.0% 0.0% 51.8% 0.0% 51.8% 51.8% 0.0%Maximum Green (s) 37.0 37.0 40.0 40.0 40.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 18.0 18.0 28.0 28.0 28.0Flash Dont Walk (s) 8.0 8.0 8.0 8.0 8.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 37.0 40.0 40.0Actuated g/C Ratio 0.44 0.47 0.47v/c Ratio 0.37 0.53 0.33Control Delay 8.8 5.4 9.1

Page 93: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions16: Erie Street & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 11

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRQueue Delay 0.0 0.1 0.0Total Delay 8.8 5.5 9.1LOS A A AApproach Delay 8.8 5.5 9.1Approach LOS A A AQueue Length 50th (ft) 33 11 27Queue Length 95th (ft) 65 21 49Internal Link Dist (ft) 265 641 205 79Turn Bay Length (ft)Base Capacity (vph) 1059 1288 1093Starvation Cap Reductn 0 82 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.37 0.56 0.33

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 20 (24%), Referenced to phase 2:NBT and 6:SBTL, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.53Intersection Signal Delay: 7.3 Intersection LOS: AIntersection Capacity Utilization 63.8% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 16: Erie Street & Fairbanks Court

Page 94: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions17: Erie Street & McClurg Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 65 175 45 0 0 0 0 140 70 15 30 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.976 0.955Flt Protected 0.989 0.984Satd. Flow (prot) 0 2870 0 0 0 0 0 1494 0 0 1540 0Flt Permitted 0.989 0.984Satd. Flow (perm) 0 2870 0 0 0 0 0 1494 0 0 1540 0Link Speed (mph) 30 30 30 30Link Distance (ft) 721 350 270 158Travel Time (s) 16.4 8.0 6.1 3.6Confl. Peds. (#/hr) 185 260 250 250Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Adj. Flow (vph) 68 184 47 0 0 0 0 147 74 16 32 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 299 0 0 0 0 0 221 0 0 48 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(ft) 0 0 0 0Link Offset(ft) 0 0 0 0Crosswalk Width(ft) 16 16 16 16Two way Left Turn LaneHeadway Factor 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25Sign Control Stop Stop Stop Stop

Intersection SummaryArea Type: CBDControl Type: UnsignalizedIntersection Capacity Utilization 36.5% ICU Level of Service AAnalysis Period (min) 15

Page 95: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions19: Ontario Street & Michigan Avenue PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 75 440 75 145 1120 0 0 1080 180Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 12 12 9 11 12 12 11 12Storage Length (ft) 0 0 60 60 80 0 0 0Storage Lanes 0 0 1 1 1 0 0 0Taper Length (ft) 25 25 40 40 40 25 25 25Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.91 1.00 1.00 0.91 0.91Ped Bike Factor 0.54 0.56 0.91 0.92Frt 0.850 0.979Flt Protected 0.950 0.950Satd. Flow (prot) 0 0 0 1490 3217 1439 1448 3621 0 0 3815 0Flt Permitted 0.950 0.950Satd. Flow (perm) 0 0 0 798 3217 800 1324 3621 0 0 3815 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 49 48Link Speed (mph) 30 30 30 30Link Distance (ft) 456 405 297 285Travel Time (s) 10.4 9.2 6.8 6.5Confl. Peds. (#/hr) 570 510 1685 1685Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Heavy Vehicles (%) 2% 2% 2% 9% 1% 1% 1% 8% 2% 2% 7% 6%Bus Blockages (#/hr) 0 0 0 0 0 0 0 100 0 0 0 0Adj. Flow (vph) 0 0 0 79 463 79 153 1179 0 0 1137 189Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 0 79 463 79 153 1179 0 0 1326 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(ft) 12 12 6 14Link Offset(ft) 0 0 0 0Crosswalk Width(ft) 16 16 16 16Two way Left Turn LaneHeadway Factor 1.14 1.14 1.14 1.14 1.14 1.14 1.30 1.42 1.14 1.14 1.19 1.14Turning Speed (mph) 15 9 15 9 15 9 15 9Turn Type Perm Perm ProtProtected Phases 8 5 2 6Permitted Phases 8 8Detector Phase 8 8 8 5 2 6Switch PhaseMinimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0Minimum Split (s) 28.0 28.0 28.0 10.0 71.0 61.0Total Split (s) 0.0 0.0 0.0 28.0 28.0 28.0 16.0 77.0 0.0 0.0 61.0 0.0Total Split (%) 0.0% 0.0% 0.0% 26.7% 26.7% 26.7% 15.2% 73.3% 0.0% 0.0% 58.1% 0.0%Maximum Green (s) 24.0 24.0 24.0 12.0 73.0 57.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 5.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag

Page 96: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions19: Ontario Street & Michigan Avenue PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 14

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLead-Lag Optimize? Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min None C-Max C-MaxWalk Time (s) 5.0 5.0 5.0 5.0 5.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 20.3 20.3 20.3 13.9 76.7 57.8Actuated g/C Ratio 0.19 0.19 0.19 0.13 0.73 0.55v/c Ratio 0.51 0.74 0.41 0.80 0.45 0.62Control Delay 49.3 47.5 22.9 81.3 3.7 12.9Queue Delay 0.0 0.0 0.0 0.0 0.0 0.1Total Delay 49.3 47.5 22.9 81.3 3.8 13.0LOS D D C F A BApproach Delay 44.6 12.7 13.0Approach LOS D B BQueue Length 50th (ft) 47 154 17 111 55 210Queue Length 95th (ft) 95 203 62 m#230 m69 259Internal Link Dist (ft) 376 325 217 205Turn Bay Length (ft) 60 60 80Base Capacity (vph) 182 735 221 191 2645 2123Starvation Cap Reductn 0 0 0 0 225 120Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.43 0.63 0.36 0.80 0.49 0.66

Intersection SummaryArea Type: CBDCycle Length: 105Actuated Cycle Length: 105Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of GreenNatural Cycle: 100Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.80Intersection Signal Delay: 18.8 Intersection LOS: BIntersection Capacity Utilization 82.3% ICU Level of Service EAnalysis Period (min) 15# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 19: Ontario Street & Michigan Avenue

Page 97: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions20: Ontario Street & St. Clair St. PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 15

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 85 455 60 65 170 0 0 90 140Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 10 12 12 16 12 12 16 12Storage Length (ft) 0 0 0 0 50 0 0 30Storage Lanes 0 0 0 0 1 0 0 1Taper Length (ft) 25 25 25 25 25 25 25 25Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.92 0.74 0.69Frt 0.985 0.850Flt Protected 0.993 0.950Satd. Flow (prot) 0 0 0 0 2776 0 1593 1900 0 0 1900 1425Flt Permitted 0.993 0.695Satd. Flow (perm) 0 0 0 0 2644 0 856 1900 0 0 1900 986Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 24 77Link Speed (mph) 30 30 30 30Link Distance (ft) 405 448 300 280Travel Time (s) 9.2 10.2 6.8 6.4Confl. Peds. (#/hr) 415 370 300 300Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 7 7 0 0 0 0 0 0Adj. Flow (vph) 0 0 0 89 479 63 68 179 0 0 95 147Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 0 0 631 0 68 179 0 0 95 147Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(ft) 12 12 12 12Link Offset(ft) 0 0 0 0Crosswalk Width(ft) 16 16 16 16Two way Left Turn LaneHeadway Factor 1.14 1.14 1.14 1.14 1.27 1.14 1.14 0.97 1.14 1.14 0.97 1.14Turn Type Perm Perm PermProtected Phases 8 2 6Permitted Phases 8 2 6Minimum Split (s) 59.0 59.0 31.0 31.0 31.0 31.0Total Split (s) 0.0 0.0 0.0 59.0 59.0 0.0 31.0 31.0 0.0 0.0 31.0 31.0Total Split (%) 0.0% 0.0% 0.0% 65.6% 65.6% 0.0% 34.4% 34.4% 0.0% 0.0% 34.4% 34.4%Maximum Green (s) 55.0 55.0 27.0 27.0 27.0 27.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 46.0 46.0 19.0 19.0 19.0 19.0Flash Dont Walk (s) 9.0 9.0 7.0 7.0 7.0 7.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 55.0 27.0 27.0 27.0 27.0

Page 98: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions20: Ontario Street & St. Clair St. PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 16

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRActuated g/C Ratio 0.61 0.30 0.30 0.30 0.30v/c Ratio 0.39 0.26 0.31 0.17 0.42Control Delay 9.4 40.3 39.0 24.2 16.8Queue Delay 0.0 0.0 1.1 0.0 0.0Total Delay 9.4 40.3 40.1 24.2 16.8LOS A D D C BApproach Delay 9.4 40.2 19.7Approach LOS A D BQueue Length 50th (ft) 84 36 96 40 30Queue Length 95th (ft) 117 78 159 77 85Internal Link Dist (ft) 325 368 220 200Turn Bay Length (ft) 50 30Base Capacity (vph) 1625 257 570 570 350Starvation Cap Reductn 0 0 214 0 0Spillback Cap Reductn 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.39 0.26 0.50 0.17 0.42

Intersection SummaryArea Type: CBDCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBT, Start of GreenNatural Cycle: 90Control Type: PretimedMaximum v/c Ratio: 0.42Intersection Signal Delay: 18.4 Intersection LOS: BIntersection Capacity Utilization 81.5% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 20: Ontario Street & St. Clair St.

Page 99: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions21: Ontario Street & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 610 385 85 180 560 0 0 465 35Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 13 12 10 11 12 12 11 12Storage Length (ft) 0 0 100 100 50 0 0 0Storage Lanes 0 0 1 1 1 0 0 0Taper Length (ft) 25 25 25 25 100 25 25 25Lane Util. Factor 1.00 1.00 1.00 0.86 0.86 0.91 1.00 0.95 1.00 1.00 0.95 0.95Ped Bike Factor 0.68 0.88 0.88 0.98Frt 0.984 0.989Flt Protected 0.950 0.981 0.950Satd. Flow (prot) 0 0 0 1370 4234 0 1486 2956 0 0 2902 0Flt Permitted 0.950 0.981 0.320Satd. Flow (perm) 0 0 0 927 3795 0 441 2956 0 0 2902 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 27 9Link Speed (mph) 30 30 30 30Link Distance (ft) 262 716 312 285Travel Time (s) 6.0 16.3 7.1 6.5Confl. Peds. (#/hr) 310 190 275 275Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 20 0 0 13 13Adj. Flow (vph) 0 0 0 642 405 89 189 589 0 0 489 37Shared Lane Traffic (%) 50%Lane Group Flow (vph) 0 0 0 321 815 0 189 589 0 0 526 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(ft) 12 12 11 11Link Offset(ft) 0 0 0 0Crosswalk Width(ft) 16 16 16 16Two way Left Turn LaneHeadway Factor 1.14 1.14 1.14 1.14 1.10 1.14 1.25 1.26 1.14 1.14 1.23 1.14Turn Type custom pm+ptProtected Phases 8 7 8 5 2 6Permitted Phases 7 2Minimum Split (s) 14.0 20.0 47.0 27.0Total Split (s) 0.0 0.0 0.0 14.0 38.0 0.0 20.0 47.0 0.0 0.0 27.0 0.0Total Split (%) 0.0% 0.0% 0.0% 16.5% 44.7% 0.0% 23.5% 55.3% 0.0% 0.0% 31.8% 0.0%Maximum Green (s) 10.0 16.0 43.0 24.0Yellow Time (s) 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 0.0Lost Time Adjust (s) 0.0 0.0 0.0 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 5.0 3.0 4.0 4.0 4.0 4.0 4.0 3.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesWalk Time (s) 7.0 17.0 16.0Flash Dont Walk (s) 12.0 7.0 7.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 28.0 32.0 43.0 43.0 24.0

Page 100: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions21: Ontario Street & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 18

Lane Group ø7Lane ConfigurationsVolume (vph)Ideal Flow (vphpl)Lane Width (ft)Storage Length (ft)Storage LanesTaper Length (ft)Lane Util. FactorPed Bike FactorFrtFlt ProtectedSatd. Flow (prot)Flt PermittedSatd. Flow (perm)Right Turn on RedSatd. Flow (RTOR)Link Speed (mph)Link Distance (ft)Travel Time (s)Confl. Peds. (#/hr)Peak Hour FactorBus Blockages (#/hr)Adj. Flow (vph)Shared Lane Traffic (%)Lane Group Flow (vph)Enter Blocked IntersectionLane AlignmentMedian Width(ft)Link Offset(ft)Crosswalk Width(ft)Two way Left Turn LaneHeadway FactorTurn TypeProtected Phases 7Permitted PhasesMinimum Split (s) 24.0Total Split (s) 24.0Total Split (%) 28%Maximum Green (s) 22.0Yellow Time (s) 2.0All-Red Time (s) 0.0Lost Time Adjust (s)Total Lost Time (s)Lead/Lag LeadLead-Lag Optimize? YesWalk Time (s)Flash Dont Walk (s)Pedestrian Calls (#/hr)Act Effct Green (s)

Page 101: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions21: Ontario Street & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 19

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRActuated g/C Ratio 0.33 0.38 0.51 0.51 0.28v/c Ratio 0.91 0.54 0.45 0.39 0.64Control Delay 54.3 16.9 18.4 7.8 20.1Queue Delay 0.0 0.0 0.0 0.2 0.5Total Delay 54.3 16.9 18.4 8.0 20.6LOS D B B A CApproach Delay 27.4 10.5 20.6Approach LOS C B CQueue Length 50th (ft) 118 88 42 42 66Queue Length 95th (ft) #260 120 98 55 112Internal Link Dist (ft) 182 636 232 205Turn Bay Length (ft) 100 50Base Capacity (vph) 352 1502 420 1495 826Starvation Cap Reductn 0 0 0 328 71Spillback Cap Reductn 0 0 0 0 1Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.91 0.54 0.45 0.50 0.70

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 25 (29%), Referenced to phase 2:NBTL and 6:SBT, Start of 1st GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.91Intersection Signal Delay: 20.6 Intersection LOS: CIntersection Capacity Utilization 82.1% ICU Level of Service EAnalysis Period (min) 15# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Splits and Phases: 21: Ontario Street & Fairbanks Court

Page 102: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions21: Ontario Street & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 20

Lane Group ø7Actuated g/C Ratiov/c RatioControl DelayQueue DelayTotal DelayLOSApproach DelayApproach LOSQueue Length 50th (ft)Queue Length 95th (ft)Internal Link Dist (ft)Turn Bay Length (ft)Base Capacity (vph)Starvation Cap ReductnSpillback Cap ReductnStorage Cap ReductnReduced v/c Ratio

Intersection Summary

Page 103: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions22: Ontario Street & McClurg Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 0 480 60 105 165 0 0 0 155Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 10 12 9 16 12 12 12 10Storage Length (ft) 0 0 0 0 90 0 0 0Storage Lanes 0 0 0 0 1 0 0 1Taper Length (ft) 25 25 25 25 100 25 25 25Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.97 0.86 0.85Frt 0.983 0.865Flt Protected 0.950Satd. Flow (prot) 0 0 0 0 2841 0 1433 1900 0 0 0 1353Flt Permitted 0.950Satd. Flow (perm) 0 0 0 0 2841 0 1237 1900 0 0 0 1155Right Turn on Red Yes Yes Yes Yes YesSatd. Flow (RTOR) 26 111 132Link Speed (mph) 30 30 30 30Link Distance (ft) 716 794 161 270Travel Time (s) 16.3 18.0 3.7 6.1Confl. Peds. (#/hr) 200 140 140Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Adj. Flow (vph) 0 0 0 0 505 63 111 174 0 0 0 163Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 0 0 568 0 111 174 0 0 0 163Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(ft) 12 12 9 9Link Offset(ft) 0 0 0 0Crosswalk Width(ft) 16 16 16 16Two way Left Turn LaneHeadway Factor 1.14 1.14 1.14 1.14 1.25 1.14 1.30 0.97 1.14 1.14 1.14 1.25Turn Type Perm customProtected Phases 6 8Permitted Phases 8 4Minimum Split (s) 40.0 30.0 30.0 30.0Total Split (s) 0.0 0.0 0.0 0.0 52.0 0.0 33.0 33.0 0.0 0.0 0.0 33.0Total Split (%) 0.0% 0.0% 0.0% 0.0% 61.2% 0.0% 38.8% 38.8% 0.0% 0.0% 0.0% 38.8%Maximum Green (s) 48.0 29.0 29.0 29.0Yellow Time (s) 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 29.0 16.0 16.0 16.0Flash Dont Walk (s) 7.0 10.0 10.0 10.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 48.0 29.0 29.0 29.0Actuated g/C Ratio 0.56 0.34 0.34 0.34

Page 104: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions22: Ontario Street & McClurg Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 22

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRv/c Ratio 0.35 0.22 0.27 0.34Control Delay 10.3 5.5 21.7 8.1Queue Delay 0.0 0.0 0.0 0.0Total Delay 10.3 5.5 21.7 8.1LOS B A C AApproach Delay 10.3 15.4Approach LOS B BQueue Length 50th (ft) 76 0 67 11Queue Length 95th (ft) 108 34 116 55Internal Link Dist (ft) 636 714 81 190Turn Bay Length (ft) 90Base Capacity (vph) 1616 495 648 481Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.35 0.22 0.27 0.34

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 70 (82%), Referenced to phase 6:WBT, Start of GreenNatural Cycle: 70Control Type: PretimedMaximum v/c Ratio: 0.35Intersection Signal Delay: 11.4 Intersection LOS: BIntersection Capacity Utilization 68.1% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 22: Ontario Street & McClurg Court

Page 105: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions23: Ontario Street & Lake Shore Drive (Inner) PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 23

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (vph) 0 0 135 200 0 405Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.88Ped Bike FactorFrt 0.850Flt Protected 0.950Satd. Flow (prot) 0 0 1486 1565 0 2341Flt Permitted 0.950Satd. Flow (perm) 0 0 1486 1565 0 2341Link Speed (mph) 30 30 30Link Distance (ft) 794 273 137Travel Time (s) 18.0 6.2 3.1Confl. Peds. (#/hr) 150 150Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95Adj. Flow (vph) 0 0 142 211 0 426Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 142 211 0 426Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(ft) 0 10 10Link Offset(ft) 0 0 0Crosswalk Width(ft) 16 16 16Two way Left Turn LaneHeadway Factor 1.25 1.25 1.25 1.25 1.25 1.25Sign Control Stop Stop Stop

Intersection SummaryArea Type: CBDControl Type: UnsignalizedIntersection Capacity Utilization 37.8% ICU Level of Service AAnalysis Period (min) 15

Page 106: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions24: Ohio Street & Michigan Avenue PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 24

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 180 510 170 0 0 0 0 1085 120 65 1090 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 11 11 11 12 12 12 12 11 12 9 11 12Storage Length (ft) 0 0 0 0 0 0 60 0Storage Lanes 1 1 0 0 0 0 1 0Taper Length (ft) 25 25 25 25 25 25 55 25Lane Util. Factor 0.86 0.81 0.86 1.00 1.00 1.00 1.00 0.91 0.91 1.00 0.91 1.00Ped Bike Factor 0.63 0.98 0.61 0.96 0.93Frt 0.995 0.850 0.985Flt Protected 0.950 0.998 0.950Satd. Flow (prot) 1250 3892 1163 0 0 0 0 3950 0 1448 3594 0Flt Permitted 0.950 0.998 0.950Satd. Flow (perm) 786 3844 711 0 0 0 0 3950 0 1343 3594 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 4 123 28Link Speed (mph) 30 30 30 30Link Distance (ft) 448 400 953 297Travel Time (s) 10.2 9.1 21.7 6.8Confl. Peds. (#/hr) 500 550 1620 1620Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Heavy Vehicles (%) 8% 1% 1% 2% 2% 2% 2% 8% 6% 1% 9% 2%Bus Blockages (#/hr) 0 0 7 0 0 0 0 0 0 0 99 0Adj. Flow (vph) 189 537 179 0 0 0 0 1142 126 68 1147 0Shared Lane Traffic (%) 10% 10%Lane Group Flow (vph) 170 574 161 0 0 0 0 1268 0 68 1147 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(ft) 11 11 15 6Link Offset(ft) 0 0 0 0Crosswalk Width(ft) 16 16 16 16Two way Left Turn LaneHeadway Factor *1.00 1.19 1.24 1.14 1.14 1.14 1.14 1.19 1.14 1.30 1.42 1.14Turning Speed (mph) 25 9 15 9 15 9 15 9Turn Type Perm Perm ProtProtected Phases 4 2 1 6Permitted Phases 4 4Detector Phase 4 4 4 2 1 6Switch PhaseMinimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0Minimum Split (s) 28.0 28.0 28.0 61.0 10.0 71.0Total Split (s) 28.0 28.0 28.0 0.0 0.0 0.0 0.0 61.0 0.0 16.0 77.0 0.0Total Split (%) 26.7% 26.7% 26.7% 0.0% 0.0% 0.0% 0.0% 58.1% 0.0% 15.2% 73.3% 0.0%Maximum Green (s) 24.0 24.0 24.0 57.0 12.0 73.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 5.0 4.0 4.0Lead/Lag Lag Lead

Page 107: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions24: Ohio Street & Michigan Avenue PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 25

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLead-Lag Optimize? Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode None None None C-Max None C-MaxWalk Time (s) 17.0 17.0 17.0 47.0 32.0Flash Dont Walk (s) 7.0 7.0 7.0 10.0 10.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 23.7 23.7 23.7 61.5 8.7 73.3Actuated g/C Ratio 0.23 0.23 0.23 0.59 0.08 0.70v/c Ratio 0.96 0.66 0.63 0.54 0.57 0.46Control Delay 99.1 40.8 22.9 14.9 74.4 3.6Queue Delay 0.0 0.0 0.0 0.0 0.0 0.1Total Delay 99.1 40.8 22.9 14.9 74.4 3.6LOS F D C B E AApproach Delay 48.6 14.9 7.6Approach LOS D B AQueue Length 50th (ft) 131 143 24 186 49 40Queue Length 95th (ft) #287 190 115 239 m81 45Internal Link Dist (ft) 368 320 873 217Turn Bay Length (ft) 60Base Capacity (vph) 180 882 257 2327 152 2509Starvation Cap Reductn 0 0 0 0 0 231Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.94 0.65 0.63 0.54 0.45 0.50

Intersection SummaryArea Type: CBDCycle Length: 105Actuated Cycle Length: 105Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of GreenNatural Cycle: 100Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.96Intersection Signal Delay: 21.3 Intersection LOS: CIntersection Capacity Utilization 82.3% ICU Level of Service EAnalysis Period (min) 15* User Entered Value# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 24: Ohio Street & Michigan Avenue

Page 108: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions25: Ohio Street & St. Clair St. PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 105 505 85 0 0 0 0 130 55 55 160 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 10 12 12 12 12 12 16 12 12 16 12Lane Util. Factor 0.91 0.91 0.91 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.91 0.91 0.94Frt 0.982 0.960Flt Protected 0.992 0.987Satd. Flow (prot) 0 3946 0 0 0 0 0 1655 0 0 1875 0Flt Permitted 0.992 0.878Satd. Flow (perm) 0 3760 0 0 0 0 0 1655 0 0 1575 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 51 24Link Speed (mph) 30 30 30 30Link Distance (ft) 400 719 331 300Travel Time (s) 9.1 16.3 7.5 6.8Confl. Peds. (#/hr) 380 415 315 315Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 7 7 0 0 0 0 0 0 0 0 0Adj. Flow (vph) 111 532 89 0 0 0 0 137 58 58 168 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 732 0 0 0 0 0 195 0 0 226 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(ft) 0 0 12 12Link Offset(ft) 0 0 0 0Crosswalk Width(ft) 16 16 16 16Two way Left Turn LaneHeadway Factor 1.14 1.26 1.14 1.14 1.14 1.14 1.14 0.97 1.14 1.14 0.97 1.14Turn Type Perm PermProtected Phases 4 2 6Permitted Phases 4 6Minimum Split (s) 59.0 59.0 31.0 31.0 31.0Total Split (s) 59.0 59.0 0.0 0.0 0.0 0.0 0.0 31.0 0.0 31.0 31.0 0.0Total Split (%) 65.6% 65.6% 0.0% 0.0% 0.0% 0.0% 0.0% 34.4% 0.0% 34.4% 34.4% 0.0%Maximum Green (s) 55.0 55.0 27.0 27.0 27.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Walk Time (s) 46.0 46.0 19.0 19.0 19.0Flash Dont Walk (s) 9.0 9.0 7.0 7.0 7.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 55.0 27.0 27.0Actuated g/C Ratio 0.61 0.30 0.30v/c Ratio 0.32 0.38 0.48Control Delay 8.2 24.3 24.8

Page 109: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions25: Ohio Street & St. Clair St. PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 27

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRQueue Delay 0.0 0.0 1.6Total Delay 8.2 24.3 26.4LOS A C CApproach Delay 8.2 24.3 26.4Approach LOS A C CQueue Length 50th (ft) 61 76 100Queue Length 95th (ft) 82 136 170Internal Link Dist (ft) 320 639 251 220Turn Bay Length (ft)Base Capacity (vph) 2318 513 473Starvation Cap Reductn 0 0 117Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.32 0.38 0.63

Intersection SummaryArea Type: CBDCycle Length: 90Actuated Cycle Length: 90Offset: 23 (26%), Referenced to phase 2:NBT and 6:SBTL, Start of GreenNatural Cycle: 90Control Type: PretimedMaximum v/c Ratio: 0.48Intersection Signal Delay: 14.5 Intersection LOS: BIntersection Capacity Utilization 90.2% ICU Level of Service EAnalysis Period (min) 15

Splits and Phases: 25: Ohio Street & St. Clair St.

Page 110: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions26: Ohio Street & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 28

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 115 320 280 0 0 0 0 495 205 65 1010 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 10 12 12 12 12 12 11 11 10 12 12Storage Length (ft) 0 0 0 0 0 0 50 0Storage Lanes 0 0 0 0 0 1 1 0Taper Length (ft) 25 25 25 25 25 25 100 25Lane Util. Factor 0.91 0.91 0.91 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Ped Bike Factor 0.82 0.65 0.88Frt 0.941 0.850Flt Protected 0.992 0.950Satd. Flow (prot) 0 3472 0 0 0 0 0 2999 1306 1486 3185 0Flt Permitted 0.992 0.355Satd. Flow (perm) 0 3278 0 0 0 0 0 2999 846 488 3185 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 75 156Link Speed (mph) 30 30 30 30Link Distance (ft) 719 357 317 312Travel Time (s) 16.3 8.1 7.2 7.1Confl. Peds. (#/hr) 340 265 335 335Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 13 13 0 0 0Adj. Flow (vph) 121 337 295 0 0 0 0 521 216 68 1063 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 753 0 0 0 0 0 521 216 68 1063 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(ft) 0 0 10 10Link Offset(ft) 0 0 0 0Crosswalk Width(ft) 16 16 16 16Two way Left Turn LaneHeadway Factor 1.14 1.25 1.14 1.14 1.14 1.14 1.14 1.23 1.28 1.25 1.14 1.14Turn Type Perm Perm pm+ptProtected Phases 4 2 1 6Permitted Phases 4 2 6Minimum Split (s) 36.0 36.0 40.0 40.0 9.0 49.0Total Split (s) 36.0 36.0 0.0 0.0 0.0 0.0 0.0 40.0 40.0 9.0 49.0 0.0Total Split (%) 42.4% 42.4% 0.0% 0.0% 0.0% 0.0% 0.0% 47.1% 47.1% 10.6% 57.6% 0.0%Maximum Green (s) 32.0 32.0 36.0 36.0 6.0 45.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 0.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesWalk Time (s) 5.0 5.0 5.0 5.0 5.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 32.0 36.0 36.0 45.0 45.0

Page 111: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions26: Ohio Street & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 29

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRActuated g/C Ratio 0.38 0.42 0.42 0.53 0.53v/c Ratio 0.59 0.41 0.48 0.21 0.63Control Delay 21.2 13.5 9.0 5.1 8.3Queue Delay 0.0 0.3 0.1 0.0 0.5Total Delay 21.2 13.8 9.2 5.1 8.8LOS C B A A AApproach Delay 21.2 12.4 8.6Approach LOS C B AQueue Length 50th (ft) 103 125 65 12 135Queue Length 95th (ft) 143 144 m144 m18 m185Internal Link Dist (ft) 639 277 237 232Turn Bay Length (ft) 50Base Capacity (vph) 1281 1270 448 317 1686Starvation Cap Reductn 0 277 18 0 231Spillback Cap Reductn 0 0 0 0 43Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.59 0.52 0.50 0.21 0.73

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 21 (25%), Referenced to phase 2:NBT and 6:SBTL, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.63Intersection Signal Delay: 13.3 Intersection LOS: BIntersection Capacity Utilization 82.1% ICU Level of Service EAnalysis Period (min) 15m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 26: Ohio Street & Fairbanks Court

Page 112: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions30: Grand Avenue & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 30

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 395 760 100 365 600 0 0 1100 190Ideal Flow (vphpl) 1900 1900 1900 2000 1900 1900 2000 1900 1900 1900 1900 2000Storage Length (ft) 0 0 0 0 55 0 0 0Storage Lanes 0 0 1 0 1 0 0 0Taper Length (ft) 25 25 25 25 95 25 25 25Lane Util. Factor 1.00 1.00 1.00 0.86 0.86 0.91 0.86 0.86 1.00 1.00 0.91 0.91Ped Bike Factor 0.63 0.93 0.94Frt 0.984 0.978Flt Protected 0.950 0.995 0.950 0.988Satd. Flow (prot) 0 0 0 1346 3807 0 1346 3988 0 0 3929 0Flt Permitted 0.950 0.995 0.109 0.668Satd. Flow (perm) 0 0 0 845 3677 0 154 2697 0 0 3929 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 25 20Link Speed (mph) 30 30 30 30Link Distance (ft) 364 579 316 317Travel Time (s) 8.3 13.2 7.2 7.2Confl. Peds. (#/hr) 415 325 500 500Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Adj. Flow (vph) 0 0 0 416 800 105 384 632 0 0 1158 200Shared Lane Traffic (%) 22% 50%Lane Group Flow (vph) 0 0 0 324 997 0 192 824 0 0 1358 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(ft) 10 10 10 10Link Offset(ft) 0 0 0 0Crosswalk Width(ft) 16 16 16 16Two way Left Turn LaneHeadway Factor 1.25 1.25 1.25 1.17 1.25 1.25 1.17 1.25 1.25 1.25 1.25 1.17Turning Speed (mph) 10 9 10 9 10 9 10 9Turn Type custom pm+ptProtected Phases 4 3 4 5 2 6Permitted Phases 3 2Minimum Split (s) 9.0 11.0 49.0 38.0Total Split (s) 0.0 0.0 0.0 9.0 36.0 0.0 11.0 49.0 0.0 0.0 38.0 0.0Total Split (%) 0.0% 0.0% 0.0% 10.6% 42.4% 0.0% 12.9% 57.6% 0.0% 0.0% 44.7% 0.0%Maximum Green (s) 5.0 7.0 45.0 35.0Yellow Time (s) 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 0.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 2.0 4.0 4.0 4.0 4.0 4.0 3.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesWalk Time (s) 5.0 5.0 5.0Flash Dont Walk (s) 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 28.0 32.0 45.0 45.0 35.0Actuated g/C Ratio 0.33 0.38 0.53 0.53 0.41

Page 113: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions30: Grand Avenue & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 31

Lane Group ø3Lane ConfigurationsVolume (vph)Ideal Flow (vphpl)Storage Length (ft)Storage LanesTaper Length (ft)Lane Util. FactorPed Bike FactorFrtFlt ProtectedSatd. Flow (prot)Flt PermittedSatd. Flow (perm)Right Turn on RedSatd. Flow (RTOR)Link Speed (mph)Link Distance (ft)Travel Time (s)Confl. Peds. (#/hr)Peak Hour FactorAdj. Flow (vph)Shared Lane Traffic (%)Lane Group Flow (vph)Enter Blocked IntersectionLane AlignmentMedian Width(ft)Link Offset(ft)Crosswalk Width(ft)Two way Left Turn LaneHeadway FactorTurning Speed (mph)Turn TypeProtected Phases 3Permitted PhasesMinimum Split (s) 37.0Total Split (s) 27.0Total Split (%) 32%Maximum Green (s) 25.0Yellow Time (s) 2.0All-Red Time (s) 0.0Lost Time Adjust (s)Total Lost Time (s)Lead/Lag LeadLead-Lag Optimize? YesWalk Time (s) 5.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s)Actuated g/C Ratio

Page 114: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions30: Grand Avenue & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 32

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRv/c Ratio 1.05 0.71 1.07 1.02dl 0.83Control Delay 95.0 23.7 117.6 33.1 25.0Queue Delay 0.0 0.0 0.0 0.6 4.8Total Delay 95.0 23.7 117.6 33.7 29.9LOS F C F C CApproach Delay 41.2 49.5 29.9Approach LOS D D CQueue Length 50th (ft) ~175 158 ~120 164 157Queue Length 95th (ft) #353 208 m#186 206 219Internal Link Dist (ft) 284 499 236 237Turn Bay Length (ft) 55Base Capacity (vph) 308 1411 180 1534 1630Starvation Cap Reductn 0 0 0 338 90Spillback Cap Reductn 0 1 0 0 212Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 1.05 0.71 1.07 0.69 0.96

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBT, Start of GreenNatural Cycle: 95Control Type: PretimedMaximum v/c Ratio: 1.07Intersection Signal Delay: 39.3 Intersection LOS: DIntersection Capacity Utilization 58.1% ICU Level of Service BAnalysis Period (min) 15~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.dl Defacto Left Lane. Recode with 1 though lane as a left lane.

Splits and Phases: 30: Grand Avenue & Fairbanks Court

Page 115: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions30: Grand Avenue & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 33

Lane Group ø3v/c RatioControl DelayQueue DelayTotal DelayLOSApproach DelayApproach LOSQueue Length 50th (ft)Queue Length 95th (ft)Internal Link Dist (ft)Turn Bay Length (ft)Base Capacity (vph)Starvation Cap ReductnSpillback Cap ReductnStorage Cap ReductnReduced v/c Ratio

Intersection Summary

Page 116: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions36: Illinois Street & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 34

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 150 710 235 0 0 0 0 815 225 325 1170 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 2000 1900 1900Storage Length (ft) 0 0 0 0 0 0 55 0Storage Lanes 0 0 0 0 0 0 1 0Taper Length (ft) 25 25 25 25 25 25 95 25Lane Util. Factor 0.91 0.91 0.91 1.00 1.00 1.00 1.00 0.91 0.91 0.86 0.86 1.00Ped Bike Factor 0.88 0.92 0.96 1.00Frt 0.968 0.968Flt Protected 0.993 0.950 0.997Satd. Flow (prot) 0 3794 0 0 0 0 0 3807 0 1346 4025 0Flt Permitted 0.993 0.137 0.747Satd. Flow (perm) 0 3607 0 0 0 0 0 3807 0 186 3007 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 43 32Link Speed (mph) 30 30 30 30Link Distance (ft) 362 877 434 316Travel Time (s) 8.2 19.9 9.9 7.2Confl. Peds. (#/hr) 370 345 380 380Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Adj. Flow (vph) 158 747 247 0 0 0 0 858 237 342 1232 0Shared Lane Traffic (%) 25%Lane Group Flow (vph) 0 1152 0 0 0 0 0 1095 0 256 1318 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(ft) 0 0 10 10Link Offset(ft) 0 0 0 0Crosswalk Width(ft) 16 16 16 16Two way Left Turn LaneHeadway Factor 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.17 1.25 1.25Turning Speed (mph) 10 9 10 9 10 9 10 9Turn Type Perm pm+ptProtected Phases 4 2 1 6Permitted Phases 4 6Minimum Split (s) 38.0 38.0 34.0 13.0 47.0Total Split (s) 38.0 38.0 0.0 0.0 0.0 0.0 0.0 34.0 0.0 13.0 47.0 0.0Total Split (%) 44.7% 44.7% 0.0% 0.0% 0.0% 0.0% 0.0% 40.0% 0.0% 15.3% 55.3% 0.0%Maximum Green (s) 34.0 34.0 30.0 10.0 43.0Yellow Time (s) 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 0.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 3.0 4.0 4.0Lead/Lag Lag LeadLead-Lag Optimize? Yes YesWalk Time (s) 5.0 5.0 5.0 5.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 34.0 30.0 44.0 43.0Actuated g/C Ratio 0.40 0.35 0.52 0.51

Page 117: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings Existing Conditions36: Illinois Street & Fairbanks Court PM Peak Hour

7/19/2011 Synchro 7 - Reportpcl Page 35

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRv/c Ratio 0.78 0.80 1.10 0.81Control Delay 26.1 29.5 89.4 20.2Queue Delay 0.0 0.0 0.0 103.5Total Delay 26.1 29.5 89.4 123.7LOS C C F FApproach Delay 26.1 29.5 118.1Approach LOS C C FQueue Length 50th (ft) 185 185 ~126 273Queue Length 95th (ft) 242 240 m#180 m308Internal Link Dist (ft) 282 797 354 236Turn Bay Length (ft) 55Base Capacity (vph) 1469 1364 233 1629Starvation Cap Reductn 0 0 0 555Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.78 0.80 1.10 1.23

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 36 (42%), Referenced to phase 2:NBT and 6:SBTL, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 1.10Intersection Signal Delay: 65.0 Intersection LOS: EIntersection Capacity Utilization 58.1% ICU Level of Service BAnalysis Period (min) 15~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 36: Illinois Street & Fairbanks Court

Page 118: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Nor

Aug

rthwestern Me

gust 2011 emorial Hospita

Y

al ‐ Outpatient

YEAR 201

Yea

Yea

t Care Pavilion

14 SYNCH

ar 2014 Week

ar 2014 Wee

 

HRO CAPA

kday Morning

kday Evening

ACITY REP

g Peak Hour

g Peak Hour

PORTS 

Page 119: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings100: Chicago Avenue & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 1

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (vph) 90 225 30 75 250 50Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Width (ft) 11 12 10 11 11 12Storage Length (ft) 0 110 135 0Storage Lanes 1 1 1 1Taper Length (ft) 75 110 60 25Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.58 0.64 0.47Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1322 1163 1486 1621 1540 1163Flt Permitted 0.695 0.950Satd. Flow (perm) 1322 678 701 1621 1540 545Right Turn on Red Yes YesSatd. Flow (RTOR) 237 53Link Speed (mph) 30 30 30Link Distance (ft) 194 438 357Travel Time (s) 4.4 10.0 8.1Confl. Peds. (#/hr) 305 305 315Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 46 46 0 0 0 46Shared Lane Traffic (%)Lane Group Flow (vph) 95 237 32 79 263 53Turn Type Perm pm+pt pm+ovProtected Phases 4 3 8 2 3Permitted Phases 4 8 2Minimum Split (s) 36.0 36.0 23.0 59.0 26.0 23.0Total Split (s) 36.0 36.0 23.0 59.0 26.0 23.0Total Split (%) 42.4% 42.4% 27.1% 69.4% 30.6% 27.1%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 0.0 1.0 1.0 0.0Lost Time Adjust (s) 1.0 1.0 1.0 0.0 0.0 1.0Total Lost Time (s) 5.0 5.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes YesAct Effct Green (s) 31.0 31.0 55.0 55.0 22.0 41.0Actuated g/C Ratio 0.36 0.36 0.65 0.65 0.26 0.48v/c Ratio 0.20 0.60 0.05 0.08 0.66 0.12Control Delay 19.9 9.9 5.9 5.8 47.0 9.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.9 9.9 5.9 5.8 47.0 9.0LOS B A A A D AApproach Delay 12.8 5.8 40.6Approach LOS B A DQueue Length 50th (ft) 34 0 5 14 141 3Queue Length 95th (ft) 69 68 15 29 222 22Internal Link Dist (ft) 114 358 277Turn Bay Length (ft) 110 135

Page 120: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings100: Chicago Avenue & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 2

Lane Group EBT EBR WBL WBT NBL NBRBase Capacity (vph) 482 398 629 1049 399 428Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.20 0.60 0.05 0.08 0.66 0.12

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 7 (8%), Referenced to phase 2:NBL, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.66Intersection Signal Delay: 23.4 Intersection LOS: CIntersection Capacity Utilization 52.5% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 100: Chicago Avenue & Fairbanks Court

Page 121: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings200: Superior Street & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 3

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 90 105 125 0 0 0 0 210 70 35 260 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 11 11 11 12 12 12 12 12 12 12 12 12Storage Length (ft) 0 0 0 0 0 50 50 0Storage Lanes 1 0 0 0 0 1 1 1Taper Length (ft) 25 25 25 25 25 25 100 25Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.52 0.68 0.36 0.57Frt 0.919 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1540 1011 0 0 0 0 0 1676 1163 1593 1368 0Flt Permitted 0.950 0.585Satd. Flow (perm) 803 1011 0 0 0 0 0 1676 420 558 1368 0Right Turn on Red No No No NoSatd. Flow (RTOR)Link Speed (mph) 30 30 30 30Link Distance (ft) 177 529 308 357Travel Time (s) 4.0 12.0 7.0 8.1Confl. Peds. (#/hr) 180 345 435 435Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 46 0 46 0Shared Lane Traffic (%)Lane Group Flow (vph) 95 243 0 0 0 0 0 221 74 37 274 0Turn Type Perm Perm PermProtected Phases 4 2 6Permitted Phases 4 2 6Minimum Split (s) 41.0 41.0 44.0 44.0 44.0 44.0Total Split (s) 41.0 41.0 0.0 0.0 0.0 0.0 0.0 44.0 44.0 44.0 44.0 0.0Total Split (%) 48.2% 48.2% 0.0% 0.0% 0.0% 0.0% 0.0% 51.8% 51.8% 51.8% 51.8% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Act Effct Green (s) 37.0 37.0 40.0 40.0 40.0 40.0Actuated g/C Ratio 0.44 0.44 0.47 0.47 0.47 0.47v/c Ratio 0.27 0.55 0.28 0.37 0.14 0.43Control Delay 18.1 23.8 13.1 19.4 13.5 15.9Queue Delay 0.0 0.0 0.4 0.0 0.0 0.0Total Delay 18.1 23.8 13.6 19.4 13.5 15.9LOS B C B B B BApproach Delay 22.2 15.0 15.6Approach LOS C B BQueue Length 50th (ft) 31 93 43 15 11 90Queue Length 95th (ft) 67 170 89 39 m17 116Internal Link Dist (ft) 97 449 228 277Turn Bay Length (ft) 50 50

Page 122: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings200: Superior Street & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 4

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRBase Capacity (vph) 350 440 789 198 263 644Starvation Cap Reductn 0 0 246 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.27 0.55 0.41 0.37 0.14 0.43

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 20 (24%), Referenced to phase 2:NBT and 6:SBTL, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.55Intersection Signal Delay: 17.8 Intersection LOS: BIntersection Capacity Utilization 47.2% ICU Level of Service AAnalysis Period (min) 15m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 200: Superior Street & Fairbanks Court

Page 123: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings300: Huron Street & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 80 190 40 195 240 0 0 275 110Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12Storage Length (ft) 0 0 0 0 80 0 0 50Storage Lanes 0 0 0 1 1 0 0 1Taper Length (ft) 25 25 25 25 25 25 25 25Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.80 0.80 0.64Frt 0.981 0.850Flt Protected 0.987 0.950Satd. Flow (prot) 0 0 0 0 2870 0 1593 1368 0 0 1676 1163Flt Permitted 0.987 0.509Satd. Flow (perm) 0 0 0 0 2482 0 685 1368 0 0 1676 748Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 20 90Link Speed (mph) 30 30 30 30Link Distance (ft) 356 349 130 308Travel Time (s) 8.1 7.9 3.0 7.0Confl. Peds. (#/hr) 235 245 350 350Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 46 0 0 0 46Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 0 0 326 0 205 253 0 0 289 116Turn Type Perm pm+pt PermProtected Phases 8 5 2 6Permitted Phases 8 2 6Minimum Split (s) 41.0 41.0 8.0 44.0 44.0 44.0Total Split (s) 0.0 0.0 0.0 32.0 32.0 0.0 12.0 53.0 0.0 0.0 41.0 41.0Total Split (%) 0.0% 0.0% 0.0% 37.6% 37.6% 0.0% 14.1% 62.4% 0.0% 0.0% 48.2% 48.2%Yellow Time (s) 3.0 3.0 3.5 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 0.5 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lead LeadLead-Lag Optimize? Yes Yes YesAct Effct Green (s) 28.0 49.0 49.0 37.0 37.0Actuated g/C Ratio 0.33 0.58 0.58 0.44 0.44v/c Ratio 0.39 0.43 0.32 0.40 0.31Control Delay 22.2 6.9 4.4 13.8 5.2Queue Delay 0.0 0.7 0.3 0.6 0.0Total Delay 22.2 7.7 4.6 14.4 5.2LOS C A A B AApproach Delay 22.2 6.0 11.7Approach LOS C A BQueue Length 50th (ft) 65 16 21 66 5Queue Length 95th (ft) 102 25 30 111 23Internal Link Dist (ft) 276 269 50 228Turn Bay Length (ft) 80 50

Page 124: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings300: Huron Street & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRBase Capacity (vph) 831 480 789 730 376Starvation Cap Reductn 0 94 168 176 0Spillback Cap Reductn 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.39 0.53 0.41 0.52 0.31

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 21 (25%), Referenced to phase 2:NBTL and 6:SBT, Start of GreenNatural Cycle: 95Control Type: PretimedMaximum v/c Ratio: 0.43Intersection Signal Delay: 12.4 Intersection LOS: BIntersection Capacity Utilization 51.9% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 300: Huron Street & Fairbanks Court

Page 125: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings400: Erie Street & Michigan Avenue 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 7

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 30 285 10 0 0 0 0 920 155 130 1425 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 10 12 12 12 12 12 11 12 9 11 12Storage Length (ft) 0 0 0 0 0 0 60 0Storage Lanes 0 0 0 0 0 0 1 0Taper Length (ft) 25 25 25 25 25 25 60 25Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 0.91 0.91 1.00 0.91 1.00Ped Bike Factor 0.96 0.95 0.93Frt 0.995 0.978Flt Protected 0.995 0.950Satd. Flow (prot) 0 2910 0 0 0 0 0 4126 0 1433 3834 0Flt Permitted 0.995 0.950Satd. Flow (perm) 0 2814 0 0 0 0 0 4126 0 1339 3834 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 3 49Link Speed (mph) 30 30 30 30Link Distance (ft) 516 405 285 147Travel Time (s) 11.7 9.2 6.5 3.3Confl. Peds. (#/hr) 313 278 531 531Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 100 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 343 0 0 0 0 0 1131 0 137 1500 0Turn Type Perm ProtProtected Phases 4 2 1 6Permitted Phases 4Detector Phase 4 4 2 1 6Switch PhaseMinimum Initial (s) 4.0 4.0 4.0 4.0 4.0Minimum Split (s) 28.0 28.0 61.0 10.0 71.0Total Split (s) 28.0 28.0 0.0 0.0 0.0 0.0 0.0 61.0 0.0 16.0 77.0 0.0Total Split (%) 26.7% 26.7% 0.0% 0.0% 0.0% 0.0% 0.0% 58.1% 0.0% 15.2% 73.3% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 5.0 4.0 4.0Lead/Lag Lag LeadLead-Lag Optimize? Yes YesRecall Mode None None C-Max None C-MaxAct Effct Green (s) 17.9 60.2 13.9 79.1Actuated g/C Ratio 0.17 0.57 0.13 0.75v/c Ratio 0.71 0.47 0.72 0.52Control Delay 48.9 6.4 66.2 6.4Queue Delay 0.0 0.2 0.0 0.1Total Delay 48.9 6.6 66.2 6.5LOS D A E AApproach Delay 48.9 6.6 11.5Approach LOS D A B

Page 126: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings400: Erie Street & Michigan Avenue 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRQueue Length 50th (ft) 114 90 87 124Queue Length 95th (ft) 155 109 #200 191Internal Link Dist (ft) 436 325 205 67Turn Bay Length (ft) 60Base Capacity (vph) 646 2388 189 2889Starvation Cap Reductn 0 415 0 0Spillback Cap Reductn 0 0 0 402Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.53 0.57 0.72 0.60

Intersection SummaryArea Type: CBDCycle Length: 105Actuated Cycle Length: 105Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of GreenNatural Cycle: 100Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.72Intersection Signal Delay: 13.9 Intersection LOS: BIntersection Capacity Utilization 69.7% ICU Level of Service CAnalysis Period (min) 15# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Splits and Phases: 400: Erie Street & Michigan Avenue

Page 127: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings500: Erie Street & St. Clair St. 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 9

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 105 400 65 0 0 0 0 175 110 50 85 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.983 0.948Flt Protected 0.991 0.982Satd. Flow (prot) 0 2896 0 0 0 0 0 1483 0 0 1537 0Flt Permitted 0.991 0.982Satd. Flow (perm) 0 2896 0 0 0 0 0 1483 0 0 1537 0Link Speed (mph) 30 30 30 30Link Distance (ft) 405 265 280 150Travel Time (s) 9.2 6.0 6.4 3.4Confl. Peds. (#/hr) 250 320 305 305Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 0 600 0 0 0 0 0 300 0 0 142 0Sign Control Stop Stop Stop Stop

Intersection SummaryArea Type: CBDControl Type: UnsignalizedIntersection Capacity Utilization 58.1% ICU Level of Service BAnalysis Period (min) 15

Page 128: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings510: Erie Street & NMH Hospital Access 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 10

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsVolume (vph) 1 560 0 0 1 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00FrtFlt Protected 0.950Satd. Flow (prot) 0 3303 0 0 1652 0Flt Permitted 0.950Satd. Flow (perm) 0 3303 0 0 1652 0Link Speed (mph) 30 30 20Link Distance (ft) 265 185 218Travel Time (s) 6.0 4.2 7.4Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 0 590 0 0 1 0Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 25.5% ICU Level of Service AAnalysis Period (min) 15

Page 129: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings520: Erie Street & OCP Access 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 11

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (vph) 410 150 0 0 0 55Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00Frt 0.960 0.865Flt ProtectedSatd. Flow (prot) 3171 0 0 0 0 1504Flt PermittedSatd. Flow (perm) 3171 0 0 0 0 1504Link Speed (mph) 30 30 20Link Distance (ft) 185 215 284Travel Time (s) 4.2 4.9 9.7Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 590 0 0 0 0 58Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 26.2% ICU Level of Service AAnalysis Period (min) 15

Page 130: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings600: Erie Street & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 55 260 160 0 0 0 0 380 200 40 315 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 10 12 12 12 12 12 10 12 12 10 12Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 0.95 0.95 0.95 0.95 1.00Ped Bike Factor 0.86 0.92 0.99Frt 0.950 0.948Flt Protected 0.994 0.994Satd. Flow (prot) 0 2517 0 0 0 0 0 2594 0 0 2683 0Flt Permitted 0.994 0.848Satd. Flow (perm) 0 2428 0 0 0 0 0 2594 0 0 2267 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 133 68Link Speed (mph) 30 30 30 30Link Distance (ft) 215 350 285 165Travel Time (s) 4.9 8.0 6.5 3.8Confl. Peds. (#/hr) 330 315 315 315Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 46 0 46 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 500 0 0 0 0 0 611 0 0 374 0Turn Type Perm PermProtected Phases 4 2 6Permitted Phases 4 6Minimum Split (s) 41.0 41.0 44.0 44.0 44.0Total Split (s) 41.0 41.0 0.0 0.0 0.0 0.0 0.0 44.0 0.0 44.0 44.0 0.0Total Split (%) 48.2% 48.2% 0.0% 0.0% 0.0% 0.0% 0.0% 51.8% 0.0% 51.8% 51.8% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Act Effct Green (s) 37.0 40.0 40.0Actuated g/C Ratio 0.44 0.47 0.47v/c Ratio 0.44 0.49 0.35Control Delay 13.4 12.6 6.7Queue Delay 0.0 0.1 0.0Total Delay 13.4 12.7 6.7LOS B B AApproach Delay 13.4 12.7 6.7Approach LOS B B AQueue Length 50th (ft) 67 51 26Queue Length 95th (ft) 108 59 42Internal Link Dist (ft) 135 270 205 85Turn Bay Length (ft)Base Capacity (vph) 1132 1257 1067Starvation Cap Reductn 0 82 0Spillback Cap Reductn 0 0 0

Page 131: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings600: Erie Street & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRStorage Cap Reductn 0 0 0Reduced v/c Ratio 0.44 0.52 0.35

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 20 (24%), Referenced to phase 2:NBT and 6:SBTL, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.49Intersection Signal Delay: 11.4 Intersection LOS: BIntersection Capacity Utilization 72.6% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 600: Erie Street & Fairbanks Court

Page 132: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings610: Erie Street & Parking Garage Access 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 14

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (vph) 500 1 0 0 0 1Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00Frt 0.865Flt ProtectedSatd. Flow (prot) 3303 0 0 0 0 1504Flt PermittedSatd. Flow (perm) 3303 0 0 0 0 1504Link Speed (mph) 30 30 20Link Distance (ft) 350 340 279Travel Time (s) 8.0 7.7 9.5Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 527 0 0 0 0 1Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 23.9% ICU Level of Service AAnalysis Period (min) 15

Page 133: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings700: Erie Street & McClurg Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 15

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 65 130 45 0 0 0 0 160 105 50 25 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.972 0.946Flt Protected 0.987 0.968Satd. Flow (prot) 0 2852 0 0 0 0 0 1480 0 0 1515 0Flt Permitted 0.987 0.968Satd. Flow (perm) 0 2852 0 0 0 0 0 1480 0 0 1515 0Link Speed (mph) 30 30 30 30Link Distance (ft) 340 339 282 148Travel Time (s) 7.7 7.7 6.4 3.4Confl. Peds. (#/hr) 130 215 300 300Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 0 252 0 0 0 0 0 279 0 0 79 0Sign Control Stop Stop Stop Stop

Intersection SummaryArea Type: CBDControl Type: UnsignalizedIntersection Capacity Utilization 47.8% ICU Level of Service AAnalysis Period (min) 15

Page 134: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings800: Ontario Street & Michigan Avenue 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 16

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 95 500 85 120 955 0 0 1210 225Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 12 12 9 11 12 12 11 12Storage Length (ft) 0 0 60 60 80 0 0 0Storage Lanes 0 0 1 1 1 0 0 0Taper Length (ft) 25 25 40 40 40 25 25 25Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.91 1.00 1.00 0.91 0.91Ped Bike Factor 0.62 0.63 0.95 0.93Frt 0.850 0.976Flt Protected 0.950 0.950Satd. Flow (prot) 0 0 0 1593 3185 1425 1433 3834 0 0 4015 0Flt Permitted 0.950 0.950Satd. Flow (perm) 0 0 0 994 3185 900 1355 3834 0 0 4015 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 49 56Link Speed (mph) 30 30 30 30Link Distance (ft) 456 405 292 285Travel Time (s) 10.4 9.2 6.6 6.5Confl. Peds. (#/hr) 345 315 520 520Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 100 0 0 0 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 0 100 526 89 126 1005 0 0 1511 0Turn Type Perm Perm ProtProtected Phases 8 5 2 6Permitted Phases 8 8Detector Phase 8 8 8 5 2 6Switch PhaseMinimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0Minimum Split (s) 28.0 28.0 28.0 10.0 71.0 61.0Total Split (s) 0.0 0.0 0.0 28.0 28.0 28.0 16.0 77.0 0.0 0.0 61.0 0.0Total Split (%) 0.0% 0.0% 0.0% 26.7% 26.7% 26.7% 15.2% 73.3% 0.0% 0.0% 58.1% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 5.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead LagLead-Lag Optimize? Yes YesRecall Mode None None None None C-Max C-MaxAct Effct Green (s) 21.6 21.6 21.6 11.1 75.4 59.2Actuated g/C Ratio 0.21 0.21 0.21 0.11 0.72 0.56v/c Ratio 0.49 0.80 0.40 0.83 0.37 0.66Control Delay 44.9 49.4 23.2 90.0 4.1 11.5Queue Delay 0.0 0.0 0.0 0.0 0.1 0.1Total Delay 44.9 49.4 23.2 90.0 4.2 11.6LOS D D C F A BApproach Delay 45.5 13.8 11.6Approach LOS D B B

Page 135: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings800: Ontario Street & Michigan Avenue 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRQueue Length 50th (ft) 59 174 22 91 57 247Queue Length 95th (ft) 111 233 69 m#188 m64 302Internal Link Dist (ft) 376 325 212 205Turn Bay Length (ft) 60 60 80Base Capacity (vph) 227 728 244 157 2752 2289Starvation Cap Reductn 0 0 0 0 533 69Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.44 0.72 0.36 0.80 0.45 0.68

Intersection SummaryArea Type: CBDCycle Length: 105Actuated Cycle Length: 105Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of GreenNatural Cycle: 100Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.83Intersection Signal Delay: 19.5 Intersection LOS: BIntersection Capacity Utilization 83.9% ICU Level of Service EAnalysis Period (min) 15# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 800: Ontario Street & Michigan Avenue

Page 136: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings900: Ontario Street & St. Clair St. 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 18

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 80 505 100 75 185 0 0 95 175Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 10 12 12 16 12 12 16 12Storage Length (ft) 0 0 0 0 50 0 0 30Storage Lanes 0 0 0 0 1 0 0 1Taper Length (ft) 25 25 25 25 25 25 25 25Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.95 0.85 0.82Frt 0.978 0.850Flt Protected 0.994 0.950Satd. Flow (prot) 0 0 0 0 2771 0 1593 1900 0 0 1900 1425Flt Permitted 0.994 0.692Satd. Flow (perm) 0 0 0 0 2703 0 983 1900 0 0 1900 1164Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 39 140Link Speed (mph) 30 30 30 30Link Distance (ft) 405 450 286 280Travel Time (s) 9.2 10.2 6.5 6.4Confl. Peds. (#/hr) 260 210 175 175Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 7 7 0 0 0 0 0 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 0 0 721 0 79 195 0 0 100 184Turn Type Perm Perm PermProtected Phases 8 2 6Permitted Phases 8 2 6Minimum Split (s) 59.0 59.0 31.0 31.0 31.0 31.0Total Split (s) 0.0 0.0 0.0 59.0 59.0 0.0 31.0 31.0 0.0 0.0 31.0 31.0Total Split (%) 0.0% 0.0% 0.0% 65.6% 65.6% 0.0% 34.4% 34.4% 0.0% 0.0% 34.4% 34.4%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Act Effct Green (s) 55.0 27.0 27.0 27.0 27.0Actuated g/C Ratio 0.61 0.30 0.30 0.30 0.30v/c Ratio 0.43 0.27 0.34 0.18 0.41Control Delay 9.7 38.3 38.0 24.4 10.6Queue Delay 0.0 0.0 1.2 0.0 0.0Total Delay 9.7 38.3 39.2 24.4 10.6LOS A D D C BApproach Delay 9.7 39.0 15.4Approach LOS A D BQueue Length 50th (ft) 97 42 105 42 18Queue Length 95th (ft) 135 86 171 81 73Internal Link Dist (ft) 325 370 206 200Turn Bay Length (ft) 50 30

Page 137: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings900: Ontario Street & St. Clair St. 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 19

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRBase Capacity (vph) 1667 295 570 570 447Starvation Cap Reductn 0 0 209 0 0Spillback Cap Reductn 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.43 0.27 0.54 0.18 0.41

Intersection SummaryArea Type: CBDCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBT, Start of GreenNatural Cycle: 90Control Type: PretimedMaximum v/c Ratio: 0.43Intersection Signal Delay: 17.2 Intersection LOS: BIntersection Capacity Utilization 83.0% ICU Level of Service EAnalysis Period (min) 15

Splits and Phases: 900: Ontario Street & St. Clair St.

Page 138: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings990: Ontario Street & OCP Access 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 20

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsVolume (vph) 0 0 615 155 0 70Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00Frt 0.970 0.865Flt ProtectedSatd. Flow (prot) 0 0 3204 0 0 1504Flt PermittedSatd. Flow (perm) 0 0 3204 0 0 1504Link Speed (mph) 30 30 20Link Distance (ft) 450 138 284Travel Time (s) 10.2 3.1 9.7Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 810 0 0 74Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 32.9% ICU Level of Service AAnalysis Period (min) 15

Page 139: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1000: Ontario Street & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 420 420 45 245 535 0 0 370 105Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 13 12 10 11 12 12 11 12Storage Length (ft) 0 0 100 100 50 0 0 0Storage Lanes 0 0 1 1 1 0 0 0Taper Length (ft) 25 25 25 25 100 25 25 25Lane Util. Factor 1.00 1.00 1.00 0.86 0.86 0.91 1.00 0.95 1.00 1.00 0.95 0.95Ped Bike Factor 0.72 0.89 0.91 0.95Frt 0.990 0.967Flt Protected 0.950 0.985 0.950Satd. Flow (prot) 0 0 0 1370 4277 0 1486 2956 0 0 2748 0Flt Permitted 0.950 0.985 0.303Satd. Flow (perm) 0 0 0 984 3880 0 429 2956 0 0 2748 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 14 40Link Speed (mph) 30 30 30 30Link Distance (ft) 77 350 271 285Travel Time (s) 1.8 8.0 6.2 6.5Confl. Peds. (#/hr) 210 170 215 215Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 20 0 0 13 13Shared Lane Traffic (%) 48%Lane Group Flow (vph) 0 0 0 230 701 0 258 563 0 0 500 0Turn Type custom pm+ptProtected Phases 8 7 8 5 2 6Permitted Phases 7 2Minimum Split (s) 14.0 24.0 47.0 23.0Total Split (s) 0.0 0.0 0.0 14.0 38.0 0.0 24.0 47.0 0.0 0.0 23.0 0.0Total Split (%) 0.0% 0.0% 0.0% 16.5% 44.7% 0.0% 28.2% 55.3% 0.0% 0.0% 27.1% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 0.0Lost Time Adjust (s) 0.0 0.0 0.0 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 5.0 3.0 4.0 4.0 4.0 4.0 4.0 3.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesAct Effct Green (s) 28.0 32.0 43.0 43.0 20.0Actuated g/C Ratio 0.33 0.38 0.51 0.51 0.24v/c Ratio 0.63 0.46 0.55 0.38 0.74Control Delay 24.5 14.5 17.2 6.5 24.9Queue Delay 0.0 0.0 0.0 0.3 0.0Total Delay 24.5 14.5 17.2 6.8 24.9LOS C B B A CApproach Delay 17.0 10.1 24.9Approach LOS B B CQueue Length 50th (ft) 65 60 58 30 83Queue Length 95th (ft) 126 94 m107 40 132Internal Link Dist (ft) 1 270 191 205Turn Bay Length (ft) 100 50

Page 140: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1000: Ontario Street & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 22

Lane Group ø7Lane ConfigurationsVolume (vph)Ideal Flow (vphpl)Lane Width (ft)Storage Length (ft)Storage LanesTaper Length (ft)Lane Util. FactorPed Bike FactorFrtFlt ProtectedSatd. Flow (prot)Flt PermittedSatd. Flow (perm)Right Turn on RedSatd. Flow (RTOR)Link Speed (mph)Link Distance (ft)Travel Time (s)Confl. Peds. (#/hr)Peak Hour FactorBus Blockages (#/hr)Shared Lane Traffic (%)Lane Group Flow (vph)Turn TypeProtected Phases 7Permitted PhasesMinimum Split (s) 24.0Total Split (s) 24.0Total Split (%) 28%Yellow Time (s) 2.0All-Red Time (s) 0.0Lost Time Adjust (s)Total Lost Time (s)Lead/Lag LeadLead-Lag Optimize? YesAct Effct Green (s)Actuated g/C Ratiov/c RatioControl DelayQueue DelayTotal DelayLOSApproach DelayApproach LOSQueue Length 50th (ft)Queue Length 95th (ft)Internal Link Dist (ft)Turn Bay Length (ft)

Page 141: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1000: Ontario Street & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 23

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRBase Capacity (vph) 365 1521 466 1495 677Starvation Cap Reductn 0 0 0 416 0Spillback Cap Reductn 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.63 0.46 0.55 0.52 0.74

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 29 (34%), Referenced to phase 2:NBTL and 6:SBT, Start of 1st GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.74Intersection Signal Delay: 16.2 Intersection LOS: BIntersection Capacity Utilization 83.1% ICU Level of Service EAnalysis Period (min) 15m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 1000: Ontario Street & Fairbanks Court

Page 142: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1000: Ontario Street & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 24

Lane Group ø7Base Capacity (vph)Starvation Cap ReductnSpillback Cap ReductnStorage Cap ReductnReduced v/c Ratio

Intersection Summary

Page 143: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1010: Ontario Street & Parking Garage Access 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 25

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsVolume (vph) 0 0 885 1 0 1Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00Frt 0.865Flt ProtectedSatd. Flow (prot) 0 0 3303 0 0 1504Flt PermittedSatd. Flow (perm) 0 0 3303 0 0 1504Link Speed (mph) 30 30 20Link Distance (ft) 350 345 279Travel Time (s) 8.0 7.8 9.5Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 933 0 0 1Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 34.5% ICU Level of Service AAnalysis Period (min) 15

Page 144: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1100: Ontario Street & McClurg Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 0 845 140 215 300 0 0 0 85Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 10 12 9 16 12 12 12 10Storage Length (ft) 0 0 0 0 90 0 0 0Storage Lanes 0 0 0 0 1 0 0 1Taper Length (ft) 25 25 25 25 100 25 25 25Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.97 0.91 0.90Frt 0.979 0.865Flt Protected 0.950Satd. Flow (prot) 0 0 0 0 2835 0 1433 1900 0 0 0 1353Flt Permitted 0.950Satd. Flow (perm) 0 0 0 0 2835 0 1307 1900 0 0 0 1220Right Turn on Red Yes Yes Yes Yes YesSatd. Flow (RTOR) 36 137 69Link Speed (mph) 30 30 30 30Link Distance (ft) 345 815 419 282Travel Time (s) 7.8 18.5 9.5 6.4Confl. Peds. (#/hr) 140 90 90Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 0 0 1036 0 226 316 0 0 0 89Turn Type Perm customProtected Phases 6 8Permitted Phases 8 4Minimum Split (s) 52.0 33.0 33.0 33.0Total Split (s) 0.0 0.0 0.0 0.0 52.0 0.0 33.0 33.0 0.0 0.0 0.0 33.0Total Split (%) 0.0% 0.0% 0.0% 0.0% 61.2% 0.0% 38.8% 38.8% 0.0% 0.0% 0.0% 38.8%Yellow Time (s) 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Act Effct Green (s) 48.0 29.0 29.0 29.0Actuated g/C Ratio 0.56 0.34 0.34 0.34v/c Ratio 0.64 0.42 0.49 0.19Control Delay 14.4 11.5 25.3 8.5Queue Delay 0.0 0.0 0.0 0.0Total Delay 14.4 11.5 25.3 8.5LOS B B C AApproach Delay 14.4 19.5Approach LOS B BQueue Length 50th (ft) 177 33 132 7Queue Length 95th (ft) 242 92 208 39Internal Link Dist (ft) 265 735 339 202Turn Bay Length (ft) 90Base Capacity (vph) 1617 536 648 462

Page 145: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1100: Ontario Street & McClurg Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 27

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRStarvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.64 0.42 0.49 0.19

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 70 (82%), Referenced to phase 6:WBT, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.64Intersection Signal Delay: 15.8 Intersection LOS: BIntersection Capacity Utilization 76.3% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 1100: Ontario Street & McClurg Court

Page 146: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1200: Ontario Street & Lake Shore Drive (Inner) 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 28

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (vph) 0 0 205 140 0 670Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.88Ped Bike FactorFrt 0.850Flt Protected 0.950Satd. Flow (prot) 0 0 1486 1565 0 2341Flt Permitted 0.950Satd. Flow (perm) 0 0 1486 1565 0 2341Link Speed (mph) 30 30 30Link Distance (ft) 815 307 151Travel Time (s) 18.5 7.0 3.4Confl. Peds. (#/hr) 35 35Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 216 147 0 705Sign Control Stop Stop Stop

Intersection SummaryArea Type: CBDControl Type: UnsignalizedIntersection Capacity Utilization 48.4% ICU Level of Service AAnalysis Period (min) 15

Page 147: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1300: Ohio Street & Michigan Avenue 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 29

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 165 730 220 0 0 0 0 935 245 90 1215 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 11 11 11 12 12 12 12 11 12 9 11 12Storage Length (ft) 0 0 0 0 0 0 60 0Storage Lanes 1 1 0 0 0 0 1 0Taper Length (ft) 25 25 25 25 25 25 55 25Lane Util. Factor 0.86 0.81 0.86 1.00 1.00 1.00 1.00 0.91 0.91 1.00 0.91 1.00Ped Bike Factor 0.70 0.99 0.76 0.93 0.94Frt 0.996 0.850 0.969Flt Protected 0.950 0.999 0.950Satd. Flow (prot) 1324 3891 1151 0 0 0 0 4004 0 1433 3840 0Flt Permitted 0.950 0.999 0.950Satd. Flow (perm) 923 3866 871 0 0 0 0 4004 0 1354 3840 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 3 95 98Link Speed (mph) 30 30 30 30Link Distance (ft) 448 409 959 292Travel Time (s) 10.2 9.3 21.8 6.6Confl. Peds. (#/hr) 240 180 650 650Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 7 0 0 0 0 0 0 0 99 0Shared Lane Traffic (%) 10% 10%Lane Group Flow (vph) 157 808 209 0 0 0 0 1242 0 95 1279 0Turn Type Perm Perm ProtProtected Phases 4 2 1 6Permitted Phases 4 4Detector Phase 4 4 4 2 1 6Switch PhaseMinimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0Minimum Split (s) 28.0 28.0 28.0 61.0 10.0 71.0Total Split (s) 28.0 28.0 28.0 0.0 0.0 0.0 0.0 61.0 0.0 16.0 77.0 0.0Total Split (%) 26.7% 26.7% 26.7% 0.0% 0.0% 0.0% 0.0% 58.1% 0.0% 15.2% 73.3% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 5.0 4.0 4.0Lead/Lag Lag LeadLead-Lag Optimize? Yes YesRecall Mode None None None C-Max None C-MaxAct Effct Green (s) 23.9 23.9 23.9 58.4 9.7 73.1Actuated g/C Ratio 0.23 0.23 0.23 0.56 0.09 0.70v/c Ratio 0.75 0.92 0.77 0.55 0.71 0.48Control Delay 60.9 55.9 40.8 14.9 82.4 3.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.1Total Delay 60.9 55.9 40.8 14.9 82.4 3.8LOS E E D B F AApproach Delay 53.9 14.9 9.2Approach LOS D B A

Page 148: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1300: Ohio Street & Michigan Avenue 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 30

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRQueue Length 50th (ft) 115 218 84 175 69 46Queue Length 95th (ft) #236 #306 #227 217 m105 52Internal Link Dist (ft) 368 329 879 212Turn Bay Length (ft) 60Base Capacity (vph) 211 886 272 2270 150 2675Starvation Cap Reductn 0 0 0 0 0 327Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.74 0.91 0.77 0.55 0.63 0.54

Intersection SummaryArea Type: CBDCycle Length: 105Actuated Cycle Length: 105Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of GreenNatural Cycle: 100Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.92Intersection Signal Delay: 24.9 Intersection LOS: CIntersection Capacity Utilization 83.9% ICU Level of Service EAnalysis Period (min) 15# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 1300: Ohio Street & Michigan Avenue

Page 149: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1400: Ohio Street & St. Clair St. 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 31

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 125 860 95 0 0 0 0 135 50 45 125 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 10 12 12 12 12 12 16 12 12 16 12Lane Util. Factor 0.91 0.91 0.91 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.95 0.92 0.95Frt 0.987 0.963Flt Protected 0.994 0.987Satd. Flow (prot) 0 4052 0 0 0 0 0 1682 0 0 1875 0Flt Permitted 0.994 0.883Satd. Flow (perm) 0 3948 0 0 0 0 0 1682 0 0 1587 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 33 21Link Speed (mph) 30 30 30 30Link Distance (ft) 409 680 292 286Travel Time (s) 9.3 15.5 6.6 6.5Confl. Peds. (#/hr) 270 315 280 280Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 7 7 0 0 0 0 0 0 0 0 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 1137 0 0 0 0 0 195 0 0 179 0Turn Type Perm PermProtected Phases 4 2 6Permitted Phases 4 6Minimum Split (s) 59.0 59.0 31.0 31.0 31.0Total Split (s) 59.0 59.0 0.0 0.0 0.0 0.0 0.0 31.0 0.0 31.0 31.0 0.0Total Split (%) 65.6% 65.6% 0.0% 0.0% 0.0% 0.0% 0.0% 34.4% 0.0% 34.4% 34.4% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Act Effct Green (s) 55.0 27.0 27.0Actuated g/C Ratio 0.61 0.30 0.30v/c Ratio 0.47 0.38 0.38Control Delay 10.0 24.6 22.3Queue Delay 0.0 0.0 1.0Total Delay 10.0 24.6 23.2LOS A C CApproach Delay 10.0 24.6 23.2Approach LOS A C CQueue Length 50th (ft) 113 77 79Queue Length 95th (ft) 145 137 142Internal Link Dist (ft) 329 600 212 206Turn Bay Length (ft)Base Capacity (vph) 2426 519 476Starvation Cap Reductn 0 0 129Spillback Cap Reductn 0 0 0

Page 150: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1400: Ohio Street & St. Clair St. 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 32

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRStorage Cap Reductn 0 0 0Reduced v/c Ratio 0.47 0.38 0.52

Intersection SummaryArea Type: CBDCycle Length: 90Actuated Cycle Length: 90Offset: 23 (26%), Referenced to phase 2:NBT and 6:SBTL, Start of GreenNatural Cycle: 90Control Type: PretimedMaximum v/c Ratio: 0.47Intersection Signal Delay: 13.4 Intersection LOS: BIntersection Capacity Utilization 87.6% ICU Level of Service EAnalysis Period (min) 15

Splits and Phases: 1400: Ohio Street & St. Clair St.

Page 151: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1500: Ohio Street & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 33

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 135 565 255 0 0 0 0 595 185 95 700 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 10 12 12 12 12 12 11 11 10 12 12Storage Length (ft) 0 0 0 0 0 0 50 0Storage Lanes 0 0 0 0 0 1 1 0Taper Length (ft) 25 25 25 25 25 25 100 25Lane Util. Factor 0.91 0.91 0.91 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Ped Bike Factor 0.87 0.66 0.91Frt 0.960 0.850Flt Protected 0.993 0.950Satd. Flow (prot) 0 3719 0 0 0 0 0 2999 1306 1486 3185 0Flt Permitted 0.993 0.298Satd. Flow (perm) 0 3558 0 0 0 0 0 2999 867 424 3185 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 124 106Link Speed (mph) 30 30 30 30Link Distance (ft) 680 339 280 271Travel Time (s) 15.5 7.7 6.4 6.2Confl. Peds. (#/hr) 205 250 285 285Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 13 13 0 0 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 1005 0 0 0 0 0 626 195 100 737 0Turn Type Perm Perm pm+ptProtected Phases 4 2 1 6Permitted Phases 4 2 6Minimum Split (s) 36.0 36.0 40.0 40.0 9.0 49.0Total Split (s) 36.0 36.0 0.0 0.0 0.0 0.0 0.0 40.0 40.0 9.0 49.0 0.0Total Split (%) 42.4% 42.4% 0.0% 0.0% 0.0% 0.0% 0.0% 47.1% 47.1% 10.6% 57.6% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 0.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesAct Effct Green (s) 32.0 36.0 36.0 45.0 45.0Actuated g/C Ratio 0.38 0.42 0.42 0.53 0.53v/c Ratio 0.71 0.49 0.46 0.35 0.44Control Delay 22.9 14.2 8.6 6.5 5.8Queue Delay 0.0 0.3 0.1 0.0 0.9Total Delay 22.9 14.4 8.6 6.5 6.7LOS C B A A AApproach Delay 22.9 13.1 6.6Approach LOS C B AQueue Length 50th (ft) 144 65 13 17 81Queue Length 95th (ft) 194 91 m32 m25 104Internal Link Dist (ft) 600 259 200 191Turn Bay Length (ft) 50

Page 152: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1500: Ohio Street & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 34

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRBase Capacity (vph) 1417 1270 428 287 1686Starvation Cap Reductn 0 179 11 0 617Spillback Cap Reductn 1 0 0 0 123Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.71 0.57 0.47 0.35 0.69

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 23 (27%), Referenced to phase 2:NBT and 6:SBTL, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.71Intersection Signal Delay: 14.8 Intersection LOS: BIntersection Capacity Utilization 83.1% ICU Level of Service EAnalysis Period (min) 15m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 1500: Ohio Street & Fairbanks Court

Page 153: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1600: Grand Avenue & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 35

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 250 915 125 225 655 0 0 855 100Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (ft) 0 0 0 0 55 0 0 0Storage Lanes 0 0 1 0 1 0 0 0Taper Length (ft) 25 25 10 10 95 25 25 25Lane Util. Factor 1.00 1.00 1.00 0.86 0.86 0.91 0.86 0.86 1.00 1.00 0.91 0.91Ped Bike Factor 0.69 0.97 0.95 0.99 0.96Frt 0.982 0.984Flt Protected 0.950 0.999 0.950 0.995Satd. Flow (prot) 0 0 0 1278 3856 0 1278 4017 0 0 4055 0Flt Permitted 0.950 0.999 0.170 0.745Satd. Flow (perm) 0 0 0 882 3829 0 217 2991 0 0 4055 0Right Turn on Red No No No NoSatd. Flow (RTOR)Link Speed (mph) 30 30 30 30Link Distance (ft) 338 330 302 280Travel Time (s) 7.7 7.5 6.9 6.4Confl. Peds. (#/hr) 220 135 290 290Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%) 10% 35%Lane Group Flow (vph) 0 0 0 237 1121 0 154 772 0 0 1005 0Turn Type custom pm+ptProtected Phases 4 3 4 5 2 6Permitted Phases 3 2Minimum Split (s) 9.0 14.0 45.0 31.0Total Split (s) 0.0 0.0 0.0 9.0 40.0 0.0 14.0 45.0 0.0 0.0 31.0 0.0Total Split (%) 0.0% 0.0% 0.0% 10.6% 47.1% 0.0% 16.5% 52.9% 0.0% 0.0% 36.5% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 0.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 2.0 4.0 4.0 4.0 4.0 4.0 3.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesAct Effct Green (s) 32.0 36.0 41.0 41.0 28.0Actuated g/C Ratio 0.38 0.42 0.48 0.48 0.33v/c Ratio 0.67 0.69 0.67 0.49 0.75Control Delay 30.7 21.1 24.6 8.5 24.4Queue Delay 0.0 0.0 0.0 0.2 0.6Total Delay 30.7 21.1 24.6 8.7 25.0LOS C C C A CApproach Delay 22.8 11.3 25.0Approach LOS C B CQueue Length 50th (ft) 101 174 22 36 174Queue Length 95th (ft) #181 224 m45 65 230Internal Link Dist (ft) 258 250 222 200Turn Bay Length (ft) 55Base Capacity (vph) 355 1624 229 1563 1336Starvation Cap Reductn 0 0 0 203 100

Page 154: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1600: Grand Avenue & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 36

Lane Group ø3Lane ConfigurationsVolume (vph)Ideal Flow (vphpl)Storage Length (ft)Storage LanesTaper Length (ft)Lane Util. FactorPed Bike FactorFrtFlt ProtectedSatd. Flow (prot)Flt PermittedSatd. Flow (perm)Right Turn on RedSatd. Flow (RTOR)Link Speed (mph)Link Distance (ft)Travel Time (s)Confl. Peds. (#/hr)Peak Hour FactorShared Lane Traffic (%)Lane Group Flow (vph)Turn TypeProtected Phases 3Permitted PhasesMinimum Split (s) 31.0Total Split (s) 31.0Total Split (%) 36%Yellow Time (s) 2.0All-Red Time (s) 0.0Lost Time Adjust (s)Total Lost Time (s)Lead/Lag LeadLead-Lag Optimize? YesAct Effct Green (s)Actuated g/C Ratiov/c RatioControl DelayQueue DelayTotal DelayLOSApproach DelayApproach LOSQueue Length 50th (ft)Queue Length 95th (ft)Internal Link Dist (ft)Turn Bay Length (ft)Base Capacity (vph)Starvation Cap Reductn

Page 155: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1600: Grand Avenue & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 37

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRSpillback Cap Reductn 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.67 0.69 0.67 0.57 0.81

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 20 (24%), Referenced to phase 2:NBTL and 6:SBT, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.75Intersection Signal Delay: 20.2 Intersection LOS: CIntersection Capacity Utilization 50.8% ICU Level of Service AAnalysis Period (min) 15# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 1600: Grand Avenue & Fairbanks Court

Page 156: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1600: Grand Avenue & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 38

Lane Group ø3Spillback Cap ReductnStorage Cap ReductnReduced v/c Ratio

Intersection Summary

Page 157: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1700: Illinois Street & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 39

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 110 500 180 0 0 0 0 770 250 240 865 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (ft) 0 0 0 0 0 0 55 0Storage Lanes 0 0 0 0 0 0 1 0Taper Length (ft) 10 25 25 25 25 25 95 25Lane Util. Factor 0.91 0.91 0.91 1.00 1.00 1.00 1.00 0.91 0.91 0.86 0.86 1.00Ped Bike Factor 0.90 0.92 0.96 1.00Frt 0.966 0.963Flt Protected 0.993 0.950 0.997Satd. Flow (prot) 0 3853 0 0 0 0 0 3778 0 1278 4025 0Flt Permitted 0.993 0.158 0.793Satd. Flow (perm) 0 3691 0 0 0 0 0 3778 0 204 3192 0Right Turn on Red No No No NoSatd. Flow (RTOR)Link Speed (mph) 30 30 30 30Link Distance (ft) 334 330 302 302Travel Time (s) 7.6 7.5 6.9 6.9Confl. Peds. (#/hr) 195 160 275 275Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%) 25%Lane Group Flow (vph) 0 831 0 0 0 0 0 1074 0 190 974 0Turn Type Perm pm+ptProtected Phases 4 2 1 6Permitted Phases 4 6Minimum Split (s) 38.0 38.0 37.0 10.0 47.0Total Split (s) 38.0 38.0 0.0 0.0 0.0 0.0 0.0 37.0 0.0 10.0 47.0 0.0Total Split (%) 44.7% 44.7% 0.0% 0.0% 0.0% 0.0% 0.0% 43.5% 0.0% 11.8% 55.3% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 0.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 3.0 4.0 4.0Lead/Lag Lag LeadLead-Lag Optimize? Yes YesAct Effct Green (s) 34.0 33.0 44.0 43.0Actuated g/C Ratio 0.40 0.39 0.52 0.51v/c Ratio 0.56 0.73 0.98 0.58Control Delay 21.6 25.8 78.7 5.9Queue Delay 0.0 0.0 0.0 0.6Total Delay 21.6 25.8 78.7 6.5LOS C C E AApproach Delay 21.6 25.8 18.3Approach LOS C C BQueue Length 50th (ft) 123 175 67 46Queue Length 95th (ft) 162 227 m#103 51Internal Link Dist (ft) 254 250 222 222Turn Bay Length (ft) 55Base Capacity (vph) 1476 1467 194 1674Starvation Cap Reductn 0 0 0 327

Page 158: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1700: Illinois Street & Fairbanks Court 7/19/2011

2014 Build 8:00 am AM Peak Hour Synchro 7 - Reportpcl Page 40

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRSpillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.56 0.73 0.98 0.72

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 30 (35%), Referenced to phase 2:NBT and 6:SBTL, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.98Intersection Signal Delay: 21.8 Intersection LOS: CIntersection Capacity Utilization 50.8% ICU Level of Service AAnalysis Period (min) 15# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 1700: Illinois Street & Fairbanks Court

Page 159: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings100: Chicago Avenue & Fairbanks Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 1

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (vph) 415 155 50 190 385 415Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Width (ft) 11 12 10 11 11 12Storage Length (ft) 0 110 135 0Storage Lanes 1 1 1 1Taper Length (ft) 75 110 60 25Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.48 0.77 0.45Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1322 1163 1486 1621 1540 1163Flt Permitted 0.335 0.950Satd. Flow (perm) 1322 552 406 1621 1540 525Right Turn on Red Yes YesSatd. Flow (RTOR) 163 10Link Speed (mph) 30 30 30Link Distance (ft) 203 517 363Travel Time (s) 4.6 11.8 8.3Confl. Peds. (#/hr) 420 420 360Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 46 46 0 0 0 46Shared Lane Traffic (%)Lane Group Flow (vph) 437 163 53 200 405 437Turn Type Perm pm+pt pm+ovProtected Phases 4 3 8 2 3Permitted Phases 4 8 2Minimum Split (s) 36.0 36.0 23.0 59.0 26.0 23.0Total Split (s) 36.0 36.0 23.0 59.0 26.0 23.0Total Split (%) 42.4% 42.4% 27.1% 69.4% 30.6% 27.1%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 0.0 1.0 1.0 0.0Lost Time Adjust (s) 1.0 1.0 1.0 0.0 0.0 1.0Total Lost Time (s) 5.0 5.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes YesAct Effct Green (s) 31.0 31.0 55.0 55.0 22.0 41.0Actuated g/C Ratio 0.36 0.36 0.65 0.65 0.26 0.48v/c Ratio 0.91 0.53 0.11 0.19 1.02 1.09Control Delay 51.1 10.7 7.1 6.6 74.1 82.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 51.1 10.7 7.1 6.6 74.1 82.7LOS D B A A E FApproach Delay 40.2 6.7 78.6Approach LOS D A EQueue Length 50th (ft) 218 0 9 38 ~239 ~230Queue Length 95th (ft) #398 57 21 66 m#314 m#264Internal Link Dist (ft) 123 437 283Turn Bay Length (ft) 110 135

Page 160: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings100: Chicago Avenue & Fairbanks Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 2

Lane Group EBT EBR WBL WBT NBL NBRBase Capacity (vph) 482 305 504 1049 399 401Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.91 0.53 0.11 0.19 1.02 1.09

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 7 (8%), Referenced to phase 2:NBL, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 1.09Intersection Signal Delay: 54.2 Intersection LOS: DIntersection Capacity Utilization 70.9% ICU Level of Service CAnalysis Period (min) 15~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 100: Chicago Avenue & Fairbanks Court

Page 161: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings200: Superior Street & Fairbanks Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 3

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 275 105 175 0 0 0 0 525 60 15 210 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 11 11 11 12 12 12 12 12 12 12 12 12Storage Length (ft) 0 0 0 0 0 50 50 0Storage Lanes 1 0 0 0 0 1 1 1Taper Length (ft) 25 25 25 25 25 25 100 25Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.37 0.61 0.23 0.82Frt 0.906 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1555 897 0 0 0 0 0 1527 1174 1608 1203 0Flt Permitted 0.950 0.275Satd. Flow (perm) 582 897 0 0 0 0 0 1527 272 383 1203 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 124 27Link Speed (mph) 30 30 30 30Link Distance (ft) 481 546 300 363Travel Time (s) 10.9 12.4 6.8 8.3Confl. Peds. (#/hr) 425 425 685 685Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Heavy Vehicles (%) 1% 1% 1% 2% 2% 2% 2% 12% 1% 1% 16% 2%Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 46 0 46 0Shared Lane Traffic (%)Lane Group Flow (vph) 289 295 0 0 0 0 0 553 63 16 221 0Turn Type Perm Perm PermProtected Phases 4 2 6Permitted Phases 4 2 6Minimum Split (s) 41.0 41.0 44.0 44.0 44.0 44.0Total Split (s) 41.0 41.0 0.0 0.0 0.0 0.0 0.0 44.0 44.0 44.0 44.0 0.0Total Split (%) 48.2% 48.2% 0.0% 0.0% 0.0% 0.0% 0.0% 51.8% 51.8% 51.8% 51.8% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Act Effct Green (s) 37.0 37.0 40.0 40.0 40.0 40.0Actuated g/C Ratio 0.44 0.44 0.47 0.47 0.47 0.47v/c Ratio 1.14 0.64 0.77 0.44 0.09 0.39Control Delay 127.4 18.1 24.0 20.0 12.9 15.3Queue Delay 0.0 0.0 1.9 0.0 0.0 0.0Total Delay 127.4 18.1 25.9 20.0 12.9 15.3LOS F B C C B BApproach Delay 72.2 25.3 15.2Approach LOS E C BQueue Length 50th (ft) ~183 67 138 7 4 69Queue Length 95th (ft) #335 163 #339 m24 m9 89Internal Link Dist (ft) 401 466 220 283

Page 162: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings200: Superior Street & Fairbanks Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 4

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Bay Length (ft) 50 50Base Capacity (vph) 253 460 719 142 180 566Starvation Cap Reductn 0 0 67 0 0 0Spillback Cap Reductn 0 1 0 0 0 11Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 1.14 0.64 0.85 0.44 0.09 0.40

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 20 (24%), Referenced to phase 2:NBT and 6:SBTL, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 1.14Intersection Signal Delay: 42.7 Intersection LOS: DIntersection Capacity Utilization 61.4% ICU Level of Service BAnalysis Period (min) 15~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 200: Superior Street & Fairbanks Court

Page 163: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings300: Huron Street & Fairbanks Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 85 115 115 135 470 0 0 305 80Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12Storage Length (ft) 0 0 0 0 50 0 0 50Storage Lanes 0 0 0 1 1 0 0 1Taper Length (ft) 25 25 25 25 25 25 25 25Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.67 0.82 0.64Frt 0.945 0.850Flt Protected 0.987 0.950Satd. Flow (prot) 0 0 0 0 2351 0 1593 1368 0 0 1676 1163Flt Permitted 0.987 0.477Satd. Flow (perm) 0 0 0 0 2002 0 654 1368 0 0 1676 745Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 121 59Link Speed (mph) 30 30 30 30Link Distance (ft) 381 366 142 300Travel Time (s) 8.7 8.3 3.2 6.8Confl. Peds. (#/hr) 285 305 360 360Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 46 0 0 0 46Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 0 0 331 0 142 495 0 0 321 84Turn Type Perm pm+pt PermProtected Phases 8 5 2 6Permitted Phases 8 2 6Minimum Split (s) 41.0 41.0 8.0 44.0 44.0 44.0Total Split (s) 0.0 0.0 0.0 32.0 32.0 0.0 12.0 53.0 0.0 0.0 41.0 41.0Total Split (%) 0.0% 0.0% 0.0% 37.6% 37.6% 0.0% 14.1% 62.4% 0.0% 0.0% 48.2% 48.2%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lead LeadLead-Lag Optimize? Yes Yes YesAct Effct Green (s) 28.0 49.0 49.0 37.0 37.0Actuated g/C Ratio 0.33 0.58 0.58 0.44 0.44v/c Ratio 0.45 0.31 0.63 0.44 0.23Control Delay 16.1 4.2 6.9 15.2 6.0Queue Delay 0.1 0.0 0.5 1.0 0.0Total Delay 16.1 4.2 7.3 16.3 6.0LOS B A A B AApproach Delay 16.1 6.7 14.1Approach LOS B A BQueue Length 50th (ft) 43 9 33 81 3Queue Length 95th (ft) 82 16 46 143 m24Internal Link Dist (ft) 301 286 62 220Turn Bay Length (ft) 50 50

Page 164: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings300: Huron Street & Fairbanks Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRBase Capacity (vph) 741 465 789 730 358Starvation Cap Reductn 0 0 49 205 0Spillback Cap Reductn 21 0 68 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.46 0.31 0.69 0.61 0.23

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 21 (25%), Referenced to phase 2:NBTL and 6:SBT, Start of GreenNatural Cycle: 95Control Type: PretimedMaximum v/c Ratio: 0.63Intersection Signal Delay: 11.1 Intersection LOS: BIntersection Capacity Utilization 49.7% ICU Level of Service AAnalysis Period (min) 15m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 300: Huron Street & Fairbanks Court

Page 165: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings400: Erie Street & Michigan Avenue 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 7

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 70 220 15 0 0 0 0 1125 100 90 1305 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 10 12 12 12 12 12 11 12 9 11 12Storage Length (ft) 0 0 0 0 0 0 60 0Storage Lanes 0 0 0 0 0 0 1 0Taper Length (ft) 25 25 25 25 25 25 60 25Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 0.91 0.91 1.00 0.91 1.00Ped Bike Factor 0.88 0.96 0.92Frt 0.993 0.988Flt Protected 0.989 0.950Satd. Flow (prot) 0 2893 0 0 0 0 0 3953 0 1448 3621 0Flt Permitted 0.989 0.950Satd. Flow (perm) 0 2602 0 0 0 0 0 3953 0 1331 3621 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 5 21Link Speed (mph) 30 30 30 30Link Distance (ft) 516 405 285 147Travel Time (s) 11.7 9.2 6.5 3.3Confl. Peds. (#/hr) 531 369 1693 1693Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Heavy Vehicles (%) 1% 1% 1% 2% 2% 2% 2% 9% 1% 1% 8% 2%Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 100 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 322 0 0 0 0 0 1289 0 95 1374 0Turn Type Perm ProtProtected Phases 4 2 1 6Permitted Phases 4Detector Phase 4 4 2 1 6Switch PhaseMinimum Initial (s) 4.0 4.0 4.0 4.0 4.0Minimum Split (s) 28.0 28.0 61.0 10.0 71.0Total Split (s) 28.0 28.0 0.0 0.0 0.0 0.0 0.0 61.0 0.0 16.0 77.0 0.0Total Split (%) 26.7% 26.7% 0.0% 0.0% 0.0% 0.0% 0.0% 58.1% 0.0% 15.2% 73.3% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 5.0 4.0 4.0Lead/Lag Lag LeadLead-Lag Optimize? Yes YesRecall Mode Min Min C-Max None C-MaxAct Effct Green (s) 18.0 63.5 10.4 79.0Actuated g/C Ratio 0.17 0.60 0.10 0.75v/c Ratio 0.71 0.54 0.66 0.50Control Delay 49.2 5.5 66.9 6.4Queue Delay 0.0 0.1 0.0 0.1Total Delay 49.2 5.6 66.9 6.5LOS D A E AApproach Delay 49.2 5.6 10.4

Page 166: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings400: Erie Street & Michigan Avenue 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 8

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRApproach LOS D A BQueue Length 50th (ft) 106 100 62 112Queue Length 95th (ft) 147 117 #125 176Internal Link Dist (ft) 436 325 205 67Turn Bay Length (ft) 60Base Capacity (vph) 599 2401 162 2724Starvation Cap Reductn 0 183 0 0Spillback Cap Reductn 0 0 0 304Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.54 0.58 0.59 0.57

Intersection SummaryArea Type: CBDCycle Length: 105Actuated Cycle Length: 105Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of GreenNatural Cycle: 100Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.71Intersection Signal Delay: 12.4 Intersection LOS: BIntersection Capacity Utilization 67.2% ICU Level of Service CAnalysis Period (min) 15# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Splits and Phases: 400: Erie Street & Michigan Avenue

Page 167: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings500: Erie Street & St. Clair St. 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 9

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 55 270 85 0 0 0 0 140 100 85 105 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.969 0.944Flt Protected 0.993 0.978Satd. Flow (prot) 0 2861 0 0 0 0 0 1477 0 0 1530 0Flt Permitted 0.993 0.978Satd. Flow (perm) 0 2861 0 0 0 0 0 1477 0 0 1530 0Link Speed (mph) 30 30 30 30Link Distance (ft) 405 265 280 150Travel Time (s) 9.2 6.0 6.4 3.4Confl. Peds. (#/hr) 280 365 350 350Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 0 431 0 0 0 0 0 252 0 0 200 0Sign Control Stop Stop Stop Stop

Intersection SummaryArea Type: CBDControl Type: UnsignalizedIntersection Capacity Utilization 55.1% ICU Level of Service BAnalysis Period (min) 15

Page 168: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings510: Erie Street & NMH Hospital Access 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 10

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsVolume (vph) 1 455 0 0 1 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00FrtFlt Protected 0.950Satd. Flow (prot) 0 3303 0 0 1652 0Flt Permitted 0.950Satd. Flow (perm) 0 3303 0 0 1652 0Link Speed (mph) 30 30 20Link Distance (ft) 265 86 202Travel Time (s) 6.0 2.0 6.9Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 0 480 0 0 1 0Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 22.6% ICU Level of Service AAnalysis Period (min) 15

Page 169: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings520: Erie Street & OCP Access 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 11

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (vph) 385 70 0 0 0 70Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00Frt 0.977 0.865Flt ProtectedSatd. Flow (prot) 3227 0 0 0 0 1504Flt PermittedSatd. Flow (perm) 3227 0 0 0 0 1504Link Speed (mph) 30 30 20Link Distance (ft) 99 246 284Travel Time (s) 2.3 5.6 9.7Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 479 0 0 0 0 74Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 23.9% ICU Level of Service AAnalysis Period (min) 15

Page 170: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings600: Erie Street & Fairbanks Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 12

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 75 165 205 0 0 0 0 530 140 30 360 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 10 12 12 12 12 12 10 12 12 10 12Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 0.95 0.95 0.95 0.95 1.00Ped Bike Factor 0.81 0.93 0.99Frt 0.931 0.969Flt Protected 0.992 0.996Satd. Flow (prot) 0 2344 0 0 0 0 0 2684 0 0 2689 0Flt Permitted 0.992 0.874Satd. Flow (perm) 0 2222 0 0 0 0 0 2684 0 0 2339 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 216 52Link Speed (mph) 30 30 30 30Link Distance (ft) 246 319 285 159Travel Time (s) 5.6 7.3 6.5 3.6Confl. Peds. (#/hr) 360 365 575 575Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 46 0 46 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 469 0 0 0 0 0 705 0 0 411 0Turn Type Perm PermProtected Phases 4 2 6Permitted Phases 4 6Minimum Split (s) 41.0 41.0 44.0 44.0 44.0Total Split (s) 41.0 41.0 0.0 0.0 0.0 0.0 0.0 44.0 0.0 44.0 44.0 0.0Total Split (%) 48.2% 48.2% 0.0% 0.0% 0.0% 0.0% 0.0% 51.8% 0.0% 51.8% 51.8% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Act Effct Green (s) 37.0 40.0 40.0Actuated g/C Ratio 0.44 0.47 0.47v/c Ratio 0.43 0.55 0.37Control Delay 9.9 12.4 6.5Queue Delay 0.0 0.1 0.0Total Delay 9.9 12.5 6.5LOS A B AApproach Delay 9.9 12.5 6.5Approach LOS A B AQueue Length 50th (ft) 43 71 25Queue Length 95th (ft) 82 78 42Internal Link Dist (ft) 166 239 205 79Turn Bay Length (ft)Base Capacity (vph) 1089 1291 1101Starvation Cap Reductn 0 60 0Spillback Cap Reductn 1 0 23

Page 171: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings600: Erie Street & Fairbanks Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRStorage Cap Reductn 0 0 0Reduced v/c Ratio 0.43 0.57 0.38

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 20 (24%), Referenced to phase 2:NBT and 6:SBTL, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.55Intersection Signal Delay: 10.2 Intersection LOS: BIntersection Capacity Utilization 64.9% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 600: Erie Street & Fairbanks Court

Page 172: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings610: Erie Street & Parking Garage Access 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 14

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (vph) 335 1 0 0 0 70Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 0.95 0.95 1.00 1.00 1.00 1.00Frt 0.865Flt ProtectedSatd. Flow (prot) 3303 0 0 0 0 1504Flt PermittedSatd. Flow (perm) 3303 0 0 0 0 1504Link Speed (mph) 30 30 20Link Distance (ft) 319 402 279Travel Time (s) 7.3 9.1 9.5Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 354 0 0 0 0 74Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 20.3% ICU Level of Service AAnalysis Period (min) 15

Page 173: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings700: Erie Street & McClurg Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 15

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 85 260 45 0 0 0 0 205 130 15 30 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike FactorFrt 0.983 0.948Flt Protected 0.989 0.984Satd. Flow (prot) 0 2890 0 0 0 0 0 1483 0 0 1540 0Flt Permitted 0.989 0.984Satd. Flow (perm) 0 2890 0 0 0 0 0 1483 0 0 1540 0Link Speed (mph) 30 30 30 30Link Distance (ft) 402 350 270 158Travel Time (s) 9.1 8.0 6.1 3.6Confl. Peds. (#/hr) 185 260 250 250Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 0 410 0 0 0 0 0 353 0 0 48 0Sign Control Stop Stop Stop Stop

Intersection SummaryArea Type: CBDControl Type: UnsignalizedIntersection Capacity Utilization 44.0% ICU Level of Service AAnalysis Period (min) 15

Page 174: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings800: Ontario Street & Michigan Avenue 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 16

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 95 730 75 145 1130 0 0 1095 220Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 12 12 9 11 12 12 11 12Storage Length (ft) 0 0 60 60 80 0 0 0Storage Lanes 0 0 1 1 1 0 0 0Taper Length (ft) 25 25 40 40 40 25 25 25Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.91 1.00 1.00 0.91 0.91Ped Bike Factor 0.54 0.56 0.92 0.91Frt 0.850 0.975Flt Protected 0.950 0.950Satd. Flow (prot) 0 0 0 1490 3217 1439 1448 3621 0 0 3745 0Flt Permitted 0.950 0.950Satd. Flow (perm) 0 0 0 798 3217 800 1333 3621 0 0 3745 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 30 54Link Speed (mph) 30 30 30 30Link Distance (ft) 456 405 297 285Travel Time (s) 10.4 9.2 6.8 6.5Confl. Peds. (#/hr) 570 510 1685 1685Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Heavy Vehicles (%) 2% 2% 2% 9% 1% 1% 1% 8% 2% 2% 7% 6%Bus Blockages (#/hr) 0 0 0 0 0 0 0 100 0 0 0 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 0 100 768 79 153 1189 0 0 1385 0Turn Type Perm Perm ProtProtected Phases 8 5 2 6Permitted Phases 8 8Detector Phase 8 8 8 5 2 6Switch PhaseMinimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0Minimum Split (s) 28.0 28.0 28.0 10.0 71.0 61.0Total Split (s) 0.0 0.0 0.0 28.0 28.0 28.0 16.0 77.0 0.0 0.0 61.0 0.0Total Split (%) 0.0% 0.0% 0.0% 26.7% 26.7% 26.7% 15.2% 73.3% 0.0% 0.0% 58.1% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 5.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead LagLead-Lag Optimize? Yes YesRecall Mode Min Min Min None C-Max C-MaxAct Effct Green (s) 24.0 24.0 24.0 11.0 73.0 57.0Actuated g/C Ratio 0.23 0.23 0.23 0.10 0.70 0.54v/c Ratio 0.55 1.04 0.38 1.01 0.47 0.67Control Delay 48.7 85.6 28.7 124.2 4.5 13.0Queue Delay 0.0 0.0 0.0 0.0 0.1 0.1Total Delay 48.7 85.6 28.7 124.2 4.6 13.1LOS D F C F A BApproach Delay 77.0 18.2 13.1

Page 175: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings800: Ontario Street & Michigan Avenue 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRApproach LOS E B BQueue Length 50th (ft) 60 ~295 27 ~113 63 226Queue Length 95th (ft) 118 #416 75 m#226 m73 279Internal Link Dist (ft) 376 325 217 205Turn Bay Length (ft) 60 60 80Base Capacity (vph) 182 735 206 152 2517 2058Starvation Cap Reductn 0 0 0 0 230 49Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.55 1.04 0.38 1.01 0.52 0.69

Intersection SummaryArea Type: CBDCycle Length: 105Actuated Cycle Length: 105Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of GreenNatural Cycle: 100Control Type: Actuated-CoordinatedMaximum v/c Ratio: 1.04Intersection Signal Delay: 31.4 Intersection LOS: CIntersection Capacity Utilization 83.0% ICU Level of Service EAnalysis Period (min) 15~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 800: Ontario Street & Michigan Avenue

Page 176: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings900: Ontario Street & St. Clair St. 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 18

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 100 765 60 65 175 0 0 90 140Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 10 12 12 16 12 12 16 12Storage Length (ft) 0 0 0 0 50 0 0 30Storage Lanes 0 0 0 0 1 0 0 1Taper Length (ft) 25 25 25 25 25 25 25 25Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.94 0.74 0.69Frt 0.990 0.850Flt Protected 0.995 0.950Satd. Flow (prot) 0 0 0 0 2828 0 1593 1900 0 0 1900 1425Flt Permitted 0.995 0.695Satd. Flow (perm) 0 0 0 0 2725 0 856 1900 0 0 1900 986Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 14 36Link Speed (mph) 30 30 30 30Link Distance (ft) 405 450 300 280Travel Time (s) 9.2 10.2 6.8 6.4Confl. Peds. (#/hr) 415 370 300 300Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 7 7 0 0 0 0 0 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 0 0 973 0 68 184 0 0 95 147Turn Type Perm Perm PermProtected Phases 8 2 6Permitted Phases 8 2 6Minimum Split (s) 59.0 59.0 31.0 31.0 31.0 31.0Total Split (s) 0.0 0.0 0.0 59.0 59.0 0.0 31.0 31.0 0.0 0.0 31.0 31.0Total Split (%) 0.0% 0.0% 0.0% 65.6% 65.6% 0.0% 34.4% 34.4% 0.0% 0.0% 34.4% 34.4%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Act Effct Green (s) 55.0 27.0 27.0 27.0 27.0Actuated g/C Ratio 0.61 0.30 0.30 0.30 0.30v/c Ratio 0.58 0.26 0.32 0.17 0.46Control Delay 12.1 40.5 39.4 24.2 24.5Queue Delay 0.0 0.0 1.2 0.0 0.0Total Delay 12.2 40.5 40.6 24.2 24.5LOS B D D C CApproach Delay 12.2 40.6 24.4Approach LOS B D CQueue Length 50th (ft) 157 36 99 40 50Queue Length 95th (ft) 213 78 164 77 109Internal Link Dist (ft) 325 370 220 200Turn Bay Length (ft) 50 30

Page 177: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings900: Ontario Street & St. Clair St. 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 19

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRBase Capacity (vph) 1671 257 570 570 321Starvation Cap Reductn 0 0 214 0 0Spillback Cap Reductn 6 0 0 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.58 0.26 0.52 0.17 0.46

Intersection SummaryArea Type: CBDCycle Length: 90Actuated Cycle Length: 90Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBT, Start of GreenNatural Cycle: 90Control Type: PretimedMaximum v/c Ratio: 0.58Intersection Signal Delay: 19.1 Intersection LOS: BIntersection Capacity Utilization 81.5% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 900: Ontario Street & St. Clair St.

Page 178: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings990: Ontario Street & OCP Access 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 20

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsVolume (vph) 0 0 840 70 0 85Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00Frt 0.988 0.865Flt ProtectedSatd. Flow (prot) 0 0 3264 0 0 1504Flt PermittedSatd. Flow (perm) 0 0 3264 0 0 1504Link Speed (mph) 30 30 20Link Distance (ft) 450 138 284Travel Time (s) 10.2 3.1 9.7Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 958 0 0 89Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 37.4% ICU Level of Service AAnalysis Period (min) 15

Page 179: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1000: Ontario Street & Fairbanks Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 690 660 85 205 585 0 0 515 50Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 13 12 10 11 12 12 11 12Storage Length (ft) 0 0 100 100 50 0 0 0Storage Lanes 0 0 1 1 1 0 0 0Taper Length (ft) 25 25 25 25 100 25 25 25Lane Util. Factor 1.00 1.00 1.00 0.86 0.86 0.91 1.00 0.95 1.00 1.00 0.95 0.95Ped Bike Factor 0.68 0.91 0.90 0.97Frt 0.988 0.987Flt Protected 0.950 0.985 0.950Satd. Flow (prot) 0 0 0 1370 4292 0 1486 2956 0 0 2879 0Flt Permitted 0.950 0.985 0.271Satd. Flow (perm) 0 0 0 927 3939 0 380 2956 0 0 2879 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 17 12Link Speed (mph) 30 30 30 30Link Distance (ft) 122 305 312 285Travel Time (s) 2.8 6.9 7.1 6.5Confl. Peds. (#/hr) 310 190 275 275Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 20 0 0 13 13Shared Lane Traffic (%) 49%Lane Group Flow (vph) 0 0 0 370 1140 0 216 616 0 0 595 0Turn Type custom pm+ptProtected Phases 8 7 8 5 2 6Permitted Phases 7 2Minimum Split (s) 14.0 20.0 47.0 27.0Total Split (s) 0.0 0.0 0.0 14.0 38.0 0.0 20.0 47.0 0.0 0.0 27.0 0.0Total Split (%) 0.0% 0.0% 0.0% 16.5% 44.7% 0.0% 23.5% 55.3% 0.0% 0.0% 31.8% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 0.0Lost Time Adjust (s) 0.0 0.0 0.0 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 5.0 3.0 4.0 4.0 4.0 4.0 4.0 3.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesAct Effct Green (s) 28.0 32.0 43.0 43.0 24.0Actuated g/C Ratio 0.33 0.38 0.51 0.51 0.28v/c Ratio 1.05 0.74 0.54 0.41 0.72Control Delay 86.4 19.7 19.0 8.1 22.9Queue Delay 14.5 0.1 29.7 0.3 0.7Total Delay 100.9 19.8 48.6 8.4 23.6LOS F B D A CApproach Delay 39.7 18.9 23.6Approach LOS D B CQueue Length 50th (ft) ~145 126 29 44 97Queue Length 95th (ft) #343 167 m95 58 151Internal Link Dist (ft) 42 225 232 205Turn Bay Length (ft) 100 50

Page 180: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1000: Ontario Street & Fairbanks Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 22

Lane Group ø7Lane ConfigurationsVolume (vph)Ideal Flow (vphpl)Lane Width (ft)Storage Length (ft)Storage LanesTaper Length (ft)Lane Util. FactorPed Bike FactorFrtFlt ProtectedSatd. Flow (prot)Flt PermittedSatd. Flow (perm)Right Turn on RedSatd. Flow (RTOR)Link Speed (mph)Link Distance (ft)Travel Time (s)Confl. Peds. (#/hr)Peak Hour FactorBus Blockages (#/hr)Shared Lane Traffic (%)Lane Group Flow (vph)Turn TypeProtected Phases 7Permitted PhasesMinimum Split (s) 24.0Total Split (s) 24.0Total Split (%) 28%Yellow Time (s) 2.0All-Red Time (s) 0.0Lost Time Adjust (s)Total Lost Time (s)Lead/Lag LeadLead-Lag Optimize? YesAct Effct Green (s)Actuated g/C Ratiov/c RatioControl DelayQueue DelayTotal DelayLOSApproach DelayApproach LOSQueue Length 50th (ft)Queue Length 95th (ft)Internal Link Dist (ft)Turn Bay Length (ft)

Page 181: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1000: Ontario Street & Fairbanks Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 23

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRBase Capacity (vph) 352 1539 400 1495 822Starvation Cap Reductn 0 0 182 330 57Spillback Cap Reductn 13 25 0 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 1.09 0.75 0.99 0.53 0.78

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 29 (34%), Referenced to phase 2:NBTL and 6:SBT, Start of 1st GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 1.05Intersection Signal Delay: 30.5 Intersection LOS: CIntersection Capacity Utilization 89.8% ICU Level of Service EAnalysis Period (min) 15~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 1000: Ontario Street & Fairbanks Court

Page 182: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1000: Ontario Street & Fairbanks Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 24

Lane Group ø7Base Capacity (vph)Starvation Cap ReductnSpillback Cap ReductnStorage Cap ReductnReduced v/c Ratio

Intersection Summary

Page 183: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1010: Ontario Street & Parking Garage Access 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 25

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsVolume (vph) 0 0 1310 1 0 125Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00Frt 0.865Flt ProtectedSatd. Flow (prot) 0 0 3303 0 0 1504Flt PermittedSatd. Flow (perm) 0 0 3303 0 0 1504Link Speed (mph) 30 30 20Link Distance (ft) 305 411 279Travel Time (s) 6.9 9.3 9.5Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 1380 0 0 132Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 50.7% ICU Level of Service AAnalysis Period (min) 15

Page 184: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1100: Ontario Street & McClurg Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 0 715 185 110 165 0 0 0 155Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 12 12 12 10 12 9 16 12 12 12 10Storage Length (ft) 0 0 0 0 90 0 0 0Storage Lanes 0 0 0 0 1 0 0 1Taper Length (ft) 25 25 25 25 100 25 25 25Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.95 0.86 0.85Frt 0.969 0.865Flt Protected 0.950Satd. Flow (prot) 0 0 0 0 2732 0 1433 1900 0 0 0 1353Flt Permitted 0.950Satd. Flow (perm) 0 0 0 0 2732 0 1237 1900 0 0 0 1155Right Turn on Red Yes Yes Yes Yes YesSatd. Flow (RTOR) 62 116 72Link Speed (mph) 30 30 30 30Link Distance (ft) 411 794 161 270Travel Time (s) 9.3 18.0 3.7 6.1Confl. Peds. (#/hr) 200 140 140Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 0 0 948 0 116 174 0 0 0 163Turn Type Perm customProtected Phases 6 8Permitted Phases 8 4Minimum Split (s) 40.0 30.0 30.0 30.0Total Split (s) 0.0 0.0 0.0 0.0 52.0 0.0 33.0 33.0 0.0 0.0 0.0 33.0Total Split (%) 0.0% 0.0% 0.0% 0.0% 61.2% 0.0% 38.8% 38.8% 0.0% 0.0% 0.0% 38.8%Yellow Time (s) 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Act Effct Green (s) 48.0 29.0 29.0 29.0Actuated g/C Ratio 0.56 0.34 0.34 0.34v/c Ratio 0.60 0.23 0.27 0.37Control Delay 13.3 5.4 21.7 14.7Queue Delay 0.0 0.0 0.0 0.0Total Delay 13.3 5.4 21.7 14.7LOS B A C BApproach Delay 13.3 15.2Approach LOS B BQueue Length 50th (ft) 152 0 67 34Queue Length 95th (ft) 211 35 116 86Internal Link Dist (ft) 331 714 81 190Turn Bay Length (ft) 90Base Capacity (vph) 1570 498 648 441

Page 185: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1100: Ontario Street & McClurg Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 27

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRStarvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.60 0.23 0.27 0.37

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 70 (82%), Referenced to phase 6:WBT, Start of GreenNatural Cycle: 70Control Type: PretimedMaximum v/c Ratio: 0.60Intersection Signal Delay: 13.9 Intersection LOS: BIntersection Capacity Utilization 68.5% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 1100: Ontario Street & McClurg Court

Page 186: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1200: Ontario Street & Lake Shore Drive (Inner) 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 28

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (vph) 0 0 135 200 0 455Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.88Ped Bike FactorFrt 0.850Flt Protected 0.950Satd. Flow (prot) 0 0 1486 1565 0 2341Flt Permitted 0.950Satd. Flow (perm) 0 0 1486 1565 0 2341Link Speed (mph) 30 30 30Link Distance (ft) 794 273 137Travel Time (s) 18.0 6.2 3.1Confl. Peds. (#/hr) 150 150Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%)Lane Group Flow (vph) 0 0 142 211 0 479Sign Control Stop Stop Stop

Intersection SummaryArea Type: CBDControl Type: UnsignalizedIntersection Capacity Utilization 39.7% ICU Level of Service AAnalysis Period (min) 15

Page 187: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1300: Ohio Street & Michigan Avenue 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 29

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 195 600 170 0 0 0 0 1095 120 75 1115 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 11 11 11 12 12 12 12 11 12 9 11 12Storage Length (ft) 0 0 0 0 0 0 60 0Storage Lanes 1 1 0 0 0 0 1 0Taper Length (ft) 25 25 25 25 25 25 55 25Lane Util. Factor 0.86 0.81 0.86 1.00 1.00 1.00 1.00 0.91 0.91 1.00 0.91 1.00Ped Bike Factor 0.63 0.98 0.61 0.96 0.93Frt 0.996 0.850 0.985Flt Protected 0.950 0.998 0.950Satd. Flow (prot) 1250 3904 1163 0 0 0 0 3952 0 1448 3594 0Flt Permitted 0.950 0.998 0.950Satd. Flow (perm) 786 3858 711 0 0 0 0 3952 0 1345 3594 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 3 117 28Link Speed (mph) 30 30 30 30Link Distance (ft) 448 400 953 297Travel Time (s) 10.2 9.1 21.7 6.8Confl. Peds. (#/hr) 500 550 1620 1620Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Heavy Vehicles (%) 8% 1% 1% 2% 2% 2% 2% 8% 6% 1% 9% 2%Bus Blockages (#/hr) 0 0 7 0 0 0 0 0 0 0 99 0Shared Lane Traffic (%) 10% 10%Lane Group Flow (vph) 184 671 161 0 0 0 0 1279 0 79 1174 0Turn Type Perm Perm ProtProtected Phases 4 2 1 6Permitted Phases 4 4Detector Phase 4 4 4 2 1 6Switch PhaseMinimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0Minimum Split (s) 28.0 28.0 28.0 61.0 10.0 71.0Total Split (s) 28.0 28.0 28.0 0.0 0.0 0.0 0.0 61.0 0.0 16.0 77.0 0.0Total Split (%) 26.7% 26.7% 26.7% 0.0% 0.0% 0.0% 0.0% 58.1% 0.0% 15.2% 73.3% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 5.0 4.0 4.0Lead/Lag Lag LeadLead-Lag Optimize? Yes YesRecall Mode None None None C-Max None C-MaxAct Effct Green (s) 24.0 24.0 24.0 61.0 9.1 73.0Actuated g/C Ratio 0.23 0.23 0.23 0.58 0.09 0.70v/c Ratio 1.02 0.76 0.64 0.55 0.63 0.47Control Delay 115.0 44.1 24.5 15.2 75.6 3.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.1Total Delay 115.0 44.1 24.5 15.2 75.6 3.8LOS F D C B E AApproach Delay 53.8 15.2 8.3

Page 188: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1300: Ohio Street & Michigan Avenue 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 30

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRApproach LOS D B AQueue Length 50th (ft) ~153 173 27 192 57 45Queue Length 95th (ft) #317 225 #124 242 m87 49Internal Link Dist (ft) 368 320 873 217Turn Bay Length (ft) 60Base Capacity (vph) 180 884 253 2307 152 2499Starvation Cap Reductn 0 0 0 0 0 307Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 1.02 0.76 0.64 0.55 0.52 0.54

Intersection SummaryArea Type: CBDCycle Length: 105Actuated Cycle Length: 105Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of GreenNatural Cycle: 100Control Type: Actuated-CoordinatedMaximum v/c Ratio: 1.02Intersection Signal Delay: 23.8 Intersection LOS: CIntersection Capacity Utilization 83.0% ICU Level of Service EAnalysis Period (min) 15~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 1300: Ohio Street & Michigan Avenue

Page 189: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1400: Ohio Street & St. Clair St. 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 31

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 105 605 95 0 0 0 0 135 55 55 175 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 10 12 12 12 12 12 16 12 12 16 12Lane Util. Factor 0.91 0.91 0.91 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.92 0.91 0.95Frt 0.982 0.961Flt Protected 0.993 0.988Satd. Flow (prot) 0 3955 0 0 0 0 0 1661 0 0 1877 0Flt Permitted 0.993 0.884Satd. Flow (perm) 0 3794 0 0 0 0 0 1661 0 0 1593 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 49 23Link Speed (mph) 30 30 30 30Link Distance (ft) 400 719 331 300Travel Time (s) 9.1 16.3 7.5 6.8Confl. Peds. (#/hr) 380 415 315 315Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 7 7 0 0 0 0 0 0 0 0 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 848 0 0 0 0 0 200 0 0 242 0Turn Type Perm PermProtected Phases 4 2 6Permitted Phases 4 6Minimum Split (s) 59.0 59.0 31.0 31.0 31.0Total Split (s) 59.0 59.0 0.0 0.0 0.0 0.0 0.0 31.0 0.0 31.0 31.0 0.0Total Split (%) 65.6% 65.6% 0.0% 0.0% 0.0% 0.0% 0.0% 34.4% 0.0% 34.4% 34.4% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Act Effct Green (s) 55.0 27.0 27.0Actuated g/C Ratio 0.61 0.30 0.30v/c Ratio 0.36 0.39 0.51Control Delay 8.7 24.7 29.1Queue Delay 0.0 0.0 2.0Total Delay 8.7 24.7 31.1LOS A C CApproach Delay 8.7 24.7 31.1Approach LOS A C CQueue Length 50th (ft) 75 79 115Queue Length 95th (ft) 99 140 191Internal Link Dist (ft) 320 639 251 220Turn Bay Length (ft)Base Capacity (vph) 2338 514 478Starvation Cap Reductn 0 0 122Spillback Cap Reductn 0 0 0

Page 190: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1400: Ohio Street & St. Clair St. 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 32

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRStorage Cap Reductn 0 0 0Reduced v/c Ratio 0.36 0.39 0.68

Intersection SummaryArea Type: CBDCycle Length: 90Actuated Cycle Length: 90Offset: 23 (26%), Referenced to phase 2:NBT and 6:SBTL, Start of GreenNatural Cycle: 90Control Type: PretimedMaximum v/c Ratio: 0.51Intersection Signal Delay: 15.4 Intersection LOS: BIntersection Capacity Utilization 91.1% ICU Level of Service FAnalysis Period (min) 15

Splits and Phases: 1400: Ohio Street & St. Clair St.

Page 191: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1500: Ohio Street & Fairbanks Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 33

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 135 400 280 0 0 0 0 530 210 85 1120 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width (ft) 12 10 12 12 12 12 12 11 11 10 12 12Storage Length (ft) 0 0 0 0 0 0 50 0Storage Lanes 0 0 0 0 0 1 1 0Taper Length (ft) 25 25 25 25 25 25 100 25Lane Util. Factor 0.91 0.91 0.91 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Ped Bike Factor 0.84 0.65 0.89Frt 0.948 0.850Flt Protected 0.992 0.950Satd. Flow (prot) 0 3561 0 0 0 0 0 2999 1306 1486 3185 0Flt Permitted 0.992 0.334Satd. Flow (perm) 0 3356 0 0 0 0 0 2999 846 464 3185 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 55 130Link Speed (mph) 30 30 30 30Link Distance (ft) 719 357 317 312Travel Time (s) 16.3 8.1 7.2 7.1Confl. Peds. (#/hr) 340 265 335 335Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Bus Blockages (#/hr) 0 0 0 0 0 0 0 13 13 0 0 0Shared Lane Traffic (%)Lane Group Flow (vph) 0 858 0 0 0 0 0 558 221 89 1179 0Turn Type Perm Perm pm+ptProtected Phases 4 2 1 6Permitted Phases 4 2 6Minimum Split (s) 36.0 36.0 40.0 40.0 9.0 49.0Total Split (s) 36.0 36.0 0.0 0.0 0.0 0.0 0.0 40.0 40.0 9.0 49.0 0.0Total Split (%) 42.4% 42.4% 0.0% 0.0% 0.0% 0.0% 0.0% 47.1% 47.1% 10.6% 57.6% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 1.0 0.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesAct Effct Green (s) 32.0 36.0 36.0 45.0 45.0Actuated g/C Ratio 0.38 0.42 0.42 0.53 0.53v/c Ratio 0.66 0.44 0.51 0.29 0.70Control Delay 23.5 8.9 5.4 4.7 7.8Queue Delay 0.0 0.3 0.1 0.0 1.0Total Delay 23.5 9.2 5.5 4.7 8.8LOS C A A A AApproach Delay 23.5 8.1 8.5Approach LOS C A AQueue Length 50th (ft) 127 34 1 14 142Queue Length 95th (ft) 173 69 m16 m15 m150Internal Link Dist (ft) 639 277 237 232Turn Bay Length (ft) 50

Page 192: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1500: Ohio Street & Fairbanks Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 34

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRBase Capacity (vph) 1298 1270 433 306 1686Starvation Cap Reductn 0 249 12 0 256Spillback Cap Reductn 0 0 0 0 20Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.66 0.55 0.52 0.29 0.82

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 24 (28%), Referenced to phase 2:NBT and 6:SBTL, Start of GreenNatural Cycle: 85Control Type: PretimedMaximum v/c Ratio: 0.70Intersection Signal Delay: 12.8 Intersection LOS: BIntersection Capacity Utilization 89.8% ICU Level of Service EAnalysis Period (min) 15m Volume for 95th percentile queue is metered by upstream signal.

Splits and Phases: 1500: Ohio Street & Fairbanks Court

Page 193: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1600: Grand Avenue & Fairbanks Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 35

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 0 0 0 395 805 105 375 635 0 0 1190 210Ideal Flow (vphpl) 1900 1900 1900 2000 1900 1900 2000 1900 1900 1900 1900 2000Storage Length (ft) 0 0 0 0 55 0 0 0Storage Lanes 0 0 1 0 1 0 0 0Taper Length (ft) 25 25 25 25 95 25 25 25Lane Util. Factor 1.00 1.00 1.00 0.86 0.86 0.91 0.86 0.86 1.00 1.00 0.91 0.91Ped Bike Factor 0.63 0.94 0.94Frt 0.984 0.978Flt Protected 0.950 0.996 0.950 0.989Satd. Flow (prot) 0 0 0 1346 3809 0 1346 3993 0 0 3925 0Flt Permitted 0.950 0.996 0.105 0.671Satd. Flow (perm) 0 0 0 845 3701 0 149 2709 0 0 3925 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 26 18Link Speed (mph) 30 30 30 30Link Distance (ft) 364 579 316 317Travel Time (s) 8.3 13.2 7.2 7.2Confl. Peds. (#/hr) 415 325 500 500Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%) 19% 50%Lane Group Flow (vph) 0 0 0 337 1037 0 197 866 0 0 1474 0Turn Type custom pm+ptProtected Phases 4 3 4 5 2 6Permitted Phases 3 2Minimum Split (s) 9.0 11.0 49.0 38.0Total Split (s) 0.0 0.0 0.0 9.0 36.0 0.0 11.0 49.0 0.0 0.0 38.0 0.0Total Split (%) 0.0% 0.0% 0.0% 10.6% 42.4% 0.0% 12.9% 57.6% 0.0% 0.0% 44.7% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 0.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 2.0 4.0 4.0 4.0 4.0 4.0 3.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesAct Effct Green (s) 28.0 32.0 45.0 45.0 35.0Actuated g/C Ratio 0.33 0.38 0.53 0.53 0.41v/c Ratio 1.09 0.73 1.11 1.06dl 0.91Control Delay 107.9 24.4 107.8 4.0 20.1Queue Delay 0.0 0.0 0.0 0.9 3.1Total Delay 107.9 24.4 107.8 5.0 23.2LOS F C F A CApproach Delay 44.8 24.0 23.2Approach LOS D C CQueue Length 50th (ft) ~194 167 ~104 30 197Queue Length 95th (ft) #374 218 m#159 m33 #206Internal Link Dist (ft) 284 499 236 237Turn Bay Length (ft) 55Base Capacity (vph) 308 1418 177 1540 1627Starvation Cap Reductn 0 0 0 385 89

Page 194: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1600: Grand Avenue & Fairbanks Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 36

Lane Group ø3Lane ConfigurationsVolume (vph)Ideal Flow (vphpl)Storage Length (ft)Storage LanesTaper Length (ft)Lane Util. FactorPed Bike FactorFrtFlt ProtectedSatd. Flow (prot)Flt PermittedSatd. Flow (perm)Right Turn on RedSatd. Flow (RTOR)Link Speed (mph)Link Distance (ft)Travel Time (s)Confl. Peds. (#/hr)Peak Hour FactorShared Lane Traffic (%)Lane Group Flow (vph)Turn TypeProtected Phases 3Permitted PhasesMinimum Split (s) 37.0Total Split (s) 27.0Total Split (%) 32%Yellow Time (s) 2.0All-Red Time (s) 0.0Lost Time Adjust (s)Total Lost Time (s)Lead/Lag LeadLead-Lag Optimize? YesAct Effct Green (s)Actuated g/C Ratiov/c RatioControl DelayQueue DelayTotal DelayLOSApproach DelayApproach LOSQueue Length 50th (ft)Queue Length 95th (ft)Internal Link Dist (ft)Turn Bay Length (ft)Base Capacity (vph)Starvation Cap Reductn

Page 195: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1600: Grand Avenue & Fairbanks Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 37

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRSpillback Cap Reductn 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 1.09 0.73 1.11 0.75 0.96

Intersection SummaryArea Type: CBDCycle Length: 85Actuated Cycle Length: 85Offset: 24 (28%), Referenced to phase 2:NBTL and 6:SBT, Start of GreenNatural Cycle: 95Control Type: PretimedMaximum v/c Ratio: 1.11Intersection Signal Delay: 31.0 Intersection LOS: CIntersection Capacity Utilization 61.2% ICU Level of Service BAnalysis Period (min) 15~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.m Volume for 95th percentile queue is metered by upstream signal.dl Defacto Left Lane. Recode with 1 though lane as a left lane.

Splits and Phases: 1600: Grand Avenue & Fairbanks Court

Page 196: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1600: Grand Avenue & Fairbanks Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 38

Lane Group ø3Spillback Cap ReductnStorage Cap ReductnReduced v/c Ratio

Intersection Summary

Page 197: OUTPATIENT CARE PAVILION - Brendan Reillydocuments ite design of traffic and identifi anage pote Care Pavilion DI) was re the propos ding a var imaging. T d Ontario S n includes th

Lanes, Volumes, Timings1700: Illinois Street & Fairbanks Court 7/19/2011

2014 Build 5:00 pm PM Peak Hour Synchro 7 - Reportpcl Page 39

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 160 740 235 0 0 0 0 850 235 355 1230 0Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (ft) 0 0 0 0 0 0 55 0Storage Lanes 0 0 0 0 0 0 1 0Taper Length (ft) 25 25 25 25 25 25 95 25Lane Util. Factor 0.91 0.91 0.91 1.00 1.00 1.00 1.00 0.91 0.91 0.86 0.86 1.00Ped Bike Factor 0.88 0.92 0.96 1.00Frt 0.969 0.968Flt Protected 0.993 0.950 0.996Satd. Flow (prot) 0 3808 0 0 0 0 0 3808 0 1278 4021 0Flt Permitted 0.993 0.149 0.729Satd. Flow (perm) 0 3617 0 0 0 0 0 3808 0 192 2933 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 37 27Link Speed (mph) 30 30 30 30Link Distance (ft) 362 877 434 316Travel Time (s) 8.2 19.9 9.9 7.2Confl. Peds. (#/hr) 370 345 380 380Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Shared Lane Traffic (%) 27%Lane Group Flow (vph) 0 1194 0 0 0 0 0 1142 0 273 1396 0Turn Type Perm pm+ptProtected Phases 4 2 1 6Permitted Phases 4 6Minimum Split (s) 38.0 38.0 34.0 13.0 47.0Total Split (s) 38.0 38.0 0.0 0.0 0.0 0.0 0.0 34.0 0.0 13.0 47.0 0.0Total Split (%) 44.7% 44.7% 0.0% 0.0% 0.0% 0.0% 0.0% 40.0% 0.0% 15.3% 55.3% 0.0%Yellow Time (s) 3.0 3.0 3.0 3.0 3.0All-Red Time (s) 1.0 1.0 1.0 0.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 3.0 4.0 4.0Lead/Lag Lead LagLead-Lag Optimize? Yes YesAct Effct Green (s) 34.0 30.0 44.0 43.0Actuated g/C Ratio 0.40 0.35 0.52 0.51v/c Ratio 0.81 0.84 1.20 0.87Control Delay 27.4 31.6 127.5 9.4Queue Delay 0.0 0.0 0.0 3.4Total Delay 27.4 31.6 127.5 12.8LOS C C F BApproach Delay 27.4 31.6 31.6Approach LOS C C CQueue Length 50th (ft) 197 198 ~156 67Queue Length 95th (ft) 256 256 m#180 m74Internal Link Dist (ft) 282 797 354 236Turn Bay Length (ft) 55Base Capacity (vph) 1469 1361 227 1599Starvation Cap Reductn 0 0 0 131