our ghanewadi talav
DESCRIPTION
Ghanewadi Talav De-Silting Operations.TRANSCRIPT
![Page 1: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/1.jpg)
Our Ghanewadi
![Page 2: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/2.jpg)
Jalna’s Goddess Ganga
![Page 3: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/3.jpg)
Location.
Located in North of Jalna City about 8 Km on Kundlika River. Water flows from Ghanewadi to Jalna by Gravity.
GhanewadiAltitude 502 mt above Mean Sea Level
![Page 4: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/4.jpg)
History of Ghanewadi• Constructed in early 1930 , completed in 1935.
• Construction was initiated by then Nizam of Hyderabad State
• Mr. Bezonji Faridoonji Jalnawalla took the contract of building the Ghanewadi lake and spent rupees two lakhs from his own pockets so that people of Jalna could have enough water for the city.
![Page 5: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/5.jpg)
Specifications Of Dam• Build on Kundlika River.• Dam Height 15 Mt. ( 49 ft ).• Dam Length 836 Mt ( 2743 ft ).• Gross Capacity when built 14440000 Mt3 • Purpose Drinking Water Supply.
Muncipal Muncipal Corporation Corporation Use to draw Use to draw
4 mld of water from 4 mld of water from GhanewadiGhanewadi
![Page 6: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/6.jpg)
Water Supply to Jalna.• 4 mld of water comes to filter bed.
• 1960s there use to be water supply twice a day.
• 1970s Water Supply once a day.
1980s Water Supply Once a day.
1990s Water Supply Alternate Day.
2000s Water Supply Once a Week.
• Now Water Supply Once a Month.
![Page 7: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/7.jpg)
Neglected & Forgotten.• Every one took water flowing from Ghanewadi Granted.
• No up keeping of Dam Done by JMC
• No De-silting from 1935 to 2010 ……… 75 Years.
![Page 8: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/8.jpg)
Water supply once in a week or twois matter of routine
![Page 9: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/9.jpg)
Ghanewadi Jal-Sanrakshan Munch
2010 SummerInitative by Shri. Rameshbhai Patel.
![Page 10: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/10.jpg)
Ghanewadi Jal-Sanrakshan Munch
2010 Summer
![Page 11: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/11.jpg)
First Year 2010• 4 JCB , 2 Pocklain , 25 Tippers & 16 TractorPut to service.
• 45,000 Tractor of Silt Removed.
• 135,000 M3 storage capacity reclaimed.
Rs. 25 Lac Deployed by Munch&
Rs. 25.0 Lac spent by Farmers
![Page 12: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/12.jpg)
First Year 2010• Participation from Society
![Page 13: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/13.jpg)
First Year 2010• Participation from Society
![Page 14: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/14.jpg)
Second Year 2011• 40,000 Tractors Removed.• 22.0 Lac Spent by Munch @ same spent by Farmers.• 120,000 M3 Capacity reclaimed.
No Assistance Received fromGovernment
![Page 15: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/15.jpg)
Third Year 2012• 36,000 Tractors Removed.• 20.0 Lac Spent by Munch @ same spent by Farmers.• 108,000 M3 Capacity reclaimed.
No Assistance Received fromGovernment
![Page 16: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/16.jpg)
Ghanewadi Jal-Sanrakshan Munch
Why Remove Silt ?
Total Water Storage Capacity of Ghanewadi ( As Constructed )14,440,000,000 Liters.
Jalna Municipal Corporation gets 4.0 mld water per day ( 4,000,000 Liters Per Day ).
In a Year JMC gets 365 x 4,000,000 = 1,460,000,000 Liter Water from Ghanewadi.
Evaporation Losses + Seepage in Soil + Loss Due to Gal formation + Theft = 14,440,000,000 - 1,460,000,000 = 12,980,000,000 liter. ( 89% )
We are using only 11 % of Ghanewadi Water.
![Page 17: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/17.jpg)
Ghanewadi Jal-Sanrakshan Munch
Why Remove Silt ?
![Page 18: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/18.jpg)
Ghanewadi Jal-Sanrakshan Munch
Why Remove Silt ?
Save Electric Bill
![Page 19: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/19.jpg)
Forth Year 2013
Work Started on 8 th March “ International Women’s day
2000 Tractors Removed
![Page 20: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/20.jpg)
Challenge This Year.
• Lifting by Farmers Poor.• Reasons 1) Draught Situation 2) Expectation of Subsidy 3) Work started early……… Still there is time.
• Best Opportunity this year to do Big Work. We have three months in hand.
• We will need @ 60 to 80 Lac for three month.
• Small Farmers needs to be given support.
![Page 21: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/21.jpg)
Future Of Project
We plan to continue the work till we recover lost capacity totally.
It may take next 10 Years if we do not receive support from Govt.
Unfortunately we failed to convince our leaders and administration. We request dignitaries to help us in this.
There are sign of “Change in Attitude of Administration” and may be government will take up this project in big way.
![Page 22: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/22.jpg)
Importance of Project for JALNA
Ghanewadi is Ganga Ma for Jalna
![Page 23: Our Ghanewadi Talav](https://reader034.vdocuments.mx/reader034/viewer/2022052315/555ad1b9d8b42a024a8b4825/html5/thumbnails/23.jpg)
Chak De Ghanewadi