otc committee meeting - otcair.org materials... · ic/bc geos_chem cmaq2camx pbl scheme acm2 ysu kz...

26
Modeling Committee Update OTC Committee Meeting April 11, 2017 Washington, DC 1

Upload: others

Post on 12-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

Modeling Committee Update

OTC Committee Meeting

April 11, 2017

Washington, DC

1

Page 2: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

Overview

1. Monitored Results

2. Ozone NAAQS Schedule

3. Enhanced Monitoring Plan (EMP)

4. OTC 2011 Modeling Platform

a) Recent Modeling

b) Emission Inventory

c) Planned Modeling

5. EPA Ozone Contribution Modeling

2

Page 3: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

1. Ozone Trends in OTR

3

204

139

166

172

143142

123

144150

120

126130

110

115

108

117

101

122

111

113114

112116

102

93

104101

102

90

83

96 9892 90

81

87 87

0

20

40

60

80

100

120

140

160

180

200

2201

98

0

19

81

19

82

19

83

19

84

19

85

19

86

19

87

19

88

19

89

19

90

19

91

19

92

19

93

19

94

19

95

19

96

19

97

19

98

19

99

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

20

14

20

15

20

16

P

Co

nce

ntr

atio

n (

pp

b)

4th Maximum 8-Hour Ozone in the OTR

Before the 8-Hour NAAQS 8-Hour Ozone NAAQS

OTR Trendline

Year

Page 4: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

1. Trends for OTR Exceedance Days

4

95

128122

87

110104

78

85

110

83

104

78

44

89

59

75

3936

6357

0

10

20

30

40

50

60

70

80

90

100

110

120

130

1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016P

# D

ays

# Days > 84 # Days > 75 # Days > 70 Linear (# Days > 70)

Year

Page 5: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

1. 2016 4th High 8h Ozone Value (Preliminary)

5

Page 6: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

1. 2014-16 8h Ozone Preliminary Design Value

6

Page 7: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

1. 2014-16 8hr Ozone Preliminary Design Value

7

Page 8: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

2. Ozone NAAQS Planning Timeline

Attainment by (October):2020 - Marginal 2023 - Moderate 2026 - Serious

October 20202015 Ozone Nonattainment SIPs Due

October 2018Infrastructure/Transport SIP for 2015 NAAQS Due

October 2017EPA Nonattainment Area Designations for 2015 NAAQS

January 1, 2017NYC & Greater CT 2008 Ozone Demonstration Due

October 2016Submit 2015 NAAQS Nonattainment Designation Recommendations (2013-15)

December 2015Effective Date for 2015 NAAQS

October 2015Final 2015 NAAQS

8

Page 9: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

3. Enhanced Monitoring Plans (EMP)

• Requires states with moderate or above ozone NAA & OTR states to submit an EMP as part of 2015 Ozone NAAQS process

• Plans due to EPA on 10/1/2019, or 2 years after moderate or above designation

• Effort underway to coordinate between states & EPA through OTC workgroup Gain regional benefits from plans

More knowledge on transport

More knowledge of air/sea affect on ozone

Information to improve model performance

• Will be future updates at OTC meetings and opportunity for comment9

Page 10: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

4. Recent OTC Modeling

2017 Base Case

2017 Near water RRF adjustments

2017 Comparison between photochemical models

10

Page 11: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

4. OTC 2017 Base Case Modeling Results

11

2017 MARAMA Beta Emissions

Page 12: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

4. Land-Water Interface Monitors

• Modeled Results at Monitors near water: Model performance indicates risk of substantial over-

prediction

Monitors can become rigid to control – don’t respond

• Following EPA Guidance, grid cells over water are included in calculations for coastal monitors

• Ozone tends to model higher over water so this can distort the results

• Modeling Committee has developed a different approach that reduces this effect Removes over water model grid cells from the 9-grid

cell calculation 12

Page 13: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

4. 2017 SIP Ready Base Case Modeling Results

13

“No Water” MethodEPA Guidance

Page 14: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

0.4 0.5 0.6 0.7 0.8 0.90.4

0.5

0.6

0.7

0.8

0.9

CMAQ

CA

Mx

R

CMAQ cb5 - CAMx cb5

CMAQ cb5 - CAMx cb6r2

•Models compare favorably with a

good correlation

•CMAQ tends to predict higher

ozone in the OTR

•When RRF is processed, results

are similar

•CAMx runs about 4-5 times faster

on the OTC modeling domain

CMAQ v5.0.2 CAMx 6.40

Met Inputs MCIP wrfcamx

Emissions SMOKE (CB5) cmaq2camx (CB5)

IC/BC Geos_Chem cmaq2camx

PBL Scheme ACM2 YSU

Kz fix KzMIN kvpatch

Chemistry CB5 CB5/CB6r2

Run Time 45 min/day 10/12 min/day

4. CMAQ v5.0.2 Vs. CAMx v6.40

Page 15: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

AQS Code SiteDVC 2011

CMAQ DVF 2017 beta2

CAMxDVF 2017 CB5 beta2 kvpatch

EPA CAMxDVF 2017

Ek090019003 CT Sherwood Island – Westport 83.7 83 78 76240251001 MD Edgewood 90.0 81 81 78360850067 NY SUSAN WAGNER HS 81.3 78 76 75090010017 CT Greenwich Point – Greenwich 80.3 77 74 74090013007 CT Lighthouse-Stratford 84.3 77 76 75090099002 CT Hammonasset – Madison 85.7 77 77 76361030002 NY BABYLON 83.3 77 77 76090011123 CT Western Conn State Univ-Danbury 81.3 74 73 71240053001 MD Essex 80.7 74 73 71340150002 NJ Clarksboro 84.3 74 74 72360810124 NY QUEENS COLLEGE 2 78.0 74 74 73090110124 CT Fort Griswold Park-Groton 80.3 73 72 70240090011 MD Calvert 79.7 73 71 69240150003 MD Fair Hill 83.0 73 73 69

4. CMAQ Vs. CAMx

Page 16: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

608 609 722 711 721 706 820 718 801 7050

20

40

60

80

100

120

140

160

Date

Ozon

e Co

nc (p

pb)

90010017 - CAMx CB5

Obs 8Hr

CAMx 8Hr

9-Grid 8HMX 2011

9-Grid 8HMX 2017

608 711 722 706 606 609 716 820 726 7210

20

40

60

80

100

120

140

160

Date

Ozon

e Co

nc (p

pb)

90010017 - CMAQ CB5

Obs 8Hr

CMAQ 8Hr

9-Grid 8HMX 2011

9-Grid 8HMX 2017

Greenwich, CT609 608 722 531 721 601 729 719 723 7070

20

40

60

80

100

120

140

160

Date

Ozon

e Con

c (pp

b)

240251001 - CMAQ CB5

Obs 8Hr

CMAQ 8Hr

9-Grid 8HMX 2011

9-Grid 8HMX 2017

Edgewood, MD

608 609 722 721 707 729 723 531 607 6010

20

40

60

80

100

120

140

160

Date

Ozon

e Co

nc (p

pb)

240251001 - CAMx CB5

Obs 8Hr

CAMx 8Hr

9-Grid 8HMX 2011

9-Grid 8HMX 2017

4. CMAQ v5.0.2 Vs. CAMx v6.40

Page 17: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

Summary• Over OTR (including VA) ozone monitors, CMAQ & CAMx

had similar performance, with CAMx a little bit better than CMAQ in terms of NMB, NME & R.

• CMAQ & CAMx yielded similar 2017 DVF, but CAMx had lower DVF over CT monitors near coast.

4. CMAQ v5.0.2 Vs. CAMx v6.40

Page 18: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

4. Near-Term OTC/MARAMA Emission Inventories

Gamma Inventory Improvements are Beginning• Project future year to 2023 & 2020

• Upgrade to ERTAC v2.6

• 2023 Mobile: EPA MOVES & Nonroad

• 2020 Mobile: 20172023 Interpolation

• Remove rules no longer considered OTB

• EMF Growth for point & maybe area

• For 2020 some sectors interpolated

• Other updates for 2011/2023 from EPA v6.3

Alpha

• 2011

• 2018

• 2028

Beta

• 2011

• 2017

Gamma

• 2011

• 2020

• 2023

18

Page 19: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

4. Gamma Inventory Photochemical Modeling Plan

2011 Gamma Emission Inventory Base Case

• To ensure consistent inventories and update chemistry

2023 Gamma Emission Inventory Base Case

• For use in transport modeling

2020 Gamma Emission Inventory Base Case

• For use in Serious 2008 NAAQS Ozone SIPs

Update Documentation

19

Beta Modeling Complete & Documented

Page 20: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

4. Current OTC 2020/2023 Modeling

Modeling intended to provide early direction & SIP support

2020 interpolated projection (2008 NAAQS Serious Nonattainment)• Interpolation between Beta 2017 & EPA 2023 inventories• IPM data to be replaced with ERTAC for EGUs• CSAPR-U Cap estimated adjustment factor

20

2023 projection (2015 NAAQS Moderate Nonattainment)• EPA 2023 inventory

• IPM data to be replaced with ERTAC for EGUs

• Non-EGU point to have adjustment factors applied

• CSAPR-U Cap estimated adjustment factor

Page 21: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

5. EPA Contribution Modeling

21

• Considers all monitors currently exceeding:1. The 2015 ozone NAAQS2. The 2008 Ozone NAAQS

• EPA ozone contribution modeling with:1. 2017 emission inventories2. 2023 emission inventories

• Highlighted states contribute 1% or more of the applicable NAAQS

Answers the questions:1. What states contribute to current nonattainment2. What states will still contribute 1% or more should monitors currently in

nonattainment not reach attainment by 2023

Page 22: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

22

Contributors with 2023 Emissions

Contributors with 2017 Emissions

5. 2008 Ozone NAAQS: 75ppb - ≥1% Contributing States

Connecticut

Data Source: USEPA Contribution Modeling

Maryland New York Pennsylvania

Page 23: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

23

Contributors with 2023 Emissions

Data Source: USEPA Contribution Modeling

Pennsylvania

Contributors with 2017 Emissions

5. 2015 Ozone NAAQS: 70ppb - ≥1% Contributing States

Connecticut New Jersey

Page 24: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

24

Contributors with 2023 Emissions

New York

Contributors with 2017 Emissions

5. 2015 Ozone NAAQS: 70ppb - ≥1% Contributing States

Data Source: USEPA Contribution Modeling

Maryland Virginia

Page 25: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

Conclusions & Next Steps

• OTC modeling indicates that:

CMAQ performs reasonably well when modeled values for monitor grid cells are compared to monitored data

CMAQ & CAMx perform comparably

• Ozone exceedances in OTR in 2016 ozone season similar to 2015

• Enhanced Monitoring Plans (EMPs) being discussed

• Emissions inventory projections to 2020 & 2023 being prepared for transport & attainment SIP

Initial modeling will be performed with an interpolated inventory

Improved Gamma emission inventories to be available during summer/fall 2017

25

Page 26: OTC Committee Meeting - OTCAir.org Materials... · IC/BC Geos_Chem cmaq2camx PBL Scheme ACM2 YSU Kz fix KzMIN kvpatch Chemistry CB5 CB5/CB6r2 Run Time 45 min/day 10/12 min/day 4

Questions

Committee Chair:Jeff Underhill (NH)[email protected] (603) 271-1102

Modeling Lead:Mike Ku (NY)[email protected] (518) 402-8402

Emissions Inventory Lead:Julie McDill (MARAMA)[email protected] (443) 901-1882

OTC Committee Lead:Joseph [email protected] (202) 508-3839

26