os objectives for 2 nd mission reprocessing
DESCRIPTION
OS objectives for 2 nd mission reprocessing. The SMOS L2 OS Team. OS 2 nd reprocessing objectives. New galactic model formulation Roughness models fitted to reprocessed data and validated Stokes 3: optimisation of TEC retrieval, RFI - PowerPoint PPT PresentationTRANSCRIPT
SMOS QWG-7, ESRIN 31 Jan – 1 Feb 2012
OS objectives for 2nd mission reprocessing
1
The SMOS L2 OS Team
SMOS QWG-7, ESRIN 31 Jan – 1 Feb 2012
– New galactic model formulation
– Roughness models fitted to reprocessed data and validated
– Stokes 3: optimisation of TEC retrieval, RFI
– Flags need improvement (better thresholds, simplification?)
– Hopefully reformulated OTT strategy:
2
OS 2nd reprocessing objectives
SMOS QWG-7, ESRIN 31 Jan – 1 Feb 2012
1st reprocessing L2-OS performance summary
3
The SMOS L2 OS Team
SMOS QWG-7, ESRIN 31 Jan – 1 Feb 2012
– L2OS reprocessing not yet started
4
OS 1st reprocessing performance
SMOS QWG-7, ESRIN 31 Jan – 1 Feb 2012
Product performance improvement, investigation avenues and planned
methodology
5
The SMOS L2 OS Team
SMOS QWG-7, ESRIN 31 Jan – 1 Feb 2012
– Reprocessed L2OS will be analysed following (or adapting) the SMOS L2 OS Product Performance Evaluation Plan (SO-PL-ARG-GS-0055 L2OS-PPEP_v4.1_110907):
– Priority 1• Range of retrieved SSS and deviation from climatology data• Regional variations• Land contamination• RFI detection & mitigation• Absolute accuracy of retrieved results; comparison with external sources• Quality fields and flags• Time stability of the results• Sun/moon glint and Galactic Noise• Tuning roughness models 1/2/3
– Issue new Product Performance Status Report
6
OS reprocessing analysis plan
SMOS QWG-7, ESRIN 31 Jan – 1 Feb 2012
– New galactic model formulation
• Don’t know possible impact on algorithm, then processor delivery
– Roughness models fitted to reprocessed data and validated
– Stokes 3: optimisation of TEC retrieval, RFI
• Don’t know possible impact on algorithm, then processor delivery
– Flags need improvement (better thresholds, simplification?)
– Hopefully reformulated OTT strategy:
• Full understanding of reprocessing OTTs
• Examining impact in SSS time series
• Review OTT update strategy in view of L1 improvements
• Status of multiplicative, model-free OTT investigation
7
Investigation for 2nd reprocessing
SMOS QWG-7, ESRIN 31 Jan – 1 Feb 2012
– And on top of this:
Expecting to see significant L1 improvements
Checked efficiency of different land/sea LO calibration rate
8
Investigation for 2nd reprocessing
SMOS QWG-7, ESRIN 31 Jan – 1 Feb 2012
Performance status v550
9
The SMOS L2 OS Team
SMOS QWG-7, ESRIN 31-January – 1 February 2012
New
10
http://www.smos-bec.icm.csic.es/
New SMOS OS L3 maps
• Optimally interpolated salinity maps generated at BEC from DPGS operational L2 products
• 10 days, 1ox1o, updated every 3 days
SMOS QWG-7, ESRIN 31-January – 1 February 2012
Temporal drift in SSS L3 maps
11
16 -25 Nov 2011 25 Nov- 4 Des
1o / 10 days
1-9 Des 16 -25 Des
31 Des - 9 Jan22-31 Des
SSS – SSS_clima.SSS – SSS_clima.
1-1
15 des: L2PP 5.50 in DPGSOTT asc & OTT des
Same behaviour with binned (not OI)Same behaviour with binned (not OI)
SMOS QWG-7, ESRIN 31-January – 1 February 2012
Drifts not geophysical
12
OI 1° x 1° Ave 10 days Freq 3d
Averaging SMOS_OI - ARGO maps
2011
L2PP550
L1PP500L2PP500
L2PP550
L1PP500L2PP500
2011
SMOS QWG-7, ESRIN 31-January – 1 February 2012
Latitudinal average 30 Oct – 18 Jan
SMOS QWG-7, ESRIN 31-January – 1 February 2012
EEvolution of SSS L3 maps
SMOS QWG-7, ESRIN 31-January – 1 February 2012
EEvolution of SSS L3 maps
SMOS QWG-7, ESRIN 31-January – 1 February 2012
EEvolution of SSS L3 maps
SMOS QWG-7, ESRIN 31-January – 1 February 2012
EEvolution of SSS L3 maps
SMOS QWG-7, ESRIN 31-January – 1 February 2012
EEvolution of SSS L3 maps
SMOS QWG-7, ESRIN 31-January – 1 February 2012
EEvolution of SSS L3 maps
SMOS QWG-7, ESRIN 31-January – 1 February 2012
The circular window story
HW-CW TB with MTS, AF-FOV only, 0-40 incidence, 1-15 Dec 2010
SMOS QWG-7, ESRIN 31-January – 1 February 2012
The circular window story
HW-CW TB with L1PP, EAF-FOV only, all angles, June 2010
SMOS QWG-7, ESRIN 31-January – 1 February 2012
The circular window story
SMOS QWG-7, ESRIN 31-January – 1 February 2012
The circular window story
SMOS QWG-7, ESRIN 31-January – 1 February 2012
The circular window story
SMOS QWG-7, ESRIN 31-January – 1 February 2012
The circular window story