ors presentation - february 21 st 2012
DESCRIPTION
Thinking Differently in Improvement Projects. ORS Presentation - February 21 st 2012. Judith Sawbridge Knowledge Manager Tony Osborne OD Manager SWM Probation Trust. Business Processes. PEOPLE. PROCESSES. RESULTS. The excellence of results achieved by an organisation - PowerPoint PPT PresentationTRANSCRIPT
ORS Presentation - February 21st 2012
Thinking Differently in Improvement Projects
Judith Sawbridge Knowledge ManagerTony Osborne OD Manager
SWM Probation Trust
PEOPLE PROCESSES RESULTS
The excellence of results achieved by an organisationis determined by how well the people design, operate
and continuously improve the processes
Business Processes
The EFQM Excellence Model – Extract from ‘The SWM Way’ SWM Probation Trust and Tqmi 2009
INCREMENTAL
RADICAL
TRANSFORMATIONAL
Thinking Differently
Thinking Differently
“ Problems cannot be solved by the same level of thinking that
created them…”
Albert Einstein
Brainstorming
FluencyFree
Association
OriginalityAwareness
Drive
Alex Osborne 1940 + J.P Guildford 1950
Thinking DifferentlyDivergent & Convergent Thinking
Divergent ThinkingConvergent Thinking
Thinking Differently1) Step Back
Language shapes our thinking change the language / perspective first…
2) Generate ideasIdea generation tools go for the maximum number
3) Selecting and TestingSelection tools and methods / checklists
4) Piloting and EvaluatingAction planning, follow through, PDSA
NHS Institute for Innovation and Improvement: Thinking Differently 2009 Maher, Plsek, Garrett and Bevan
PEOPLE PROCESSES RESULTS
The excellence of results achieved by an organisationis determined by how well the people design, operate
and continuously improve the processes
Business Processes
EFQM Excellence Model: TQMI and SWM Probation Trust 2009
Experience Based Design
Good !
Stop
Idea
* Customer Journeys* Journals
* Photographs* Stories
Experience Based Design NHS Institute for Innovation and Improvement 2009
Systematic Inventive Thinking• Can we be ‘systematic’ about a ‘creative’
process?
Multiplication
Subtraction
DirectionalityConsolidation
Modification
Experimentation
Segmentation
Allschuller Systematic Inventive Thinking 1940
Impact
CP BidNew pilot for court to order reducing delay from 21 days to
2 days
BTU TeamFour specific ideas to take
forward:e.g. mobile offices
Ops and Perf.3 difficult issues• Reducing
reoffending• Reducing
budgets• National
Standards
Influences• Staff
consultations• Wider
Problem Solving
• Improvement work generally
BTU RoleHow do we
help people to prepare for innovation
Impact
Next Steps…
Education
Environment
Courage
Thinking Differently in Improvement Projects ?
Thank YouJudith Sawbridge Knowledge Manager & Tony Osborne OD Manager
SWM Probation Trust