Oro Atacama High grade low cost Au-Cu vein project
February 2015
120 koz of high grade resources (M,I&I ) with open potential for >350 koz
Ongoing exploration could double project
value
157 koz project highlights
NPV (10%) 28.0
IRR 66%
C1 (US$/oz Au Eq) 508
Initial CAPEX (US$mm) 17.5
Oro Atacama Resources ktons Au (ppm) CuS (%) Au Eq koz
Measured India Coya 179 4.7 1.6 7.6 44
Indicated India Coya 77 5.0 1.5 7.7 19
Inferred India Coya 148 4.3 1.1 7.0 30
Inferred Los Sapos 132 5.9 5.9 26
Total 536 7.0 119
Strong economics for the exploitation of
current resources
*Evaluations based in long term prices of 3.0 US$/Lb for copper and 1.300 US$/oz for gold.
93 koz project highlights
NPV (10%) 14.2
IRR 52%
C1 (US$/oz Au Eq.) 473
Initial CAPEX (US$mm) 17.5
Company owns India Coya, Los Sapos and Pepita projects (Copiapo region, Chile)
Gravitational concentration, flotation of gold oxides and sulphides and agitation leach of copper oxides
Metallurgical tests show good recoveries
High grades imply that low Capex is required to achieve desired production
2nd stage in development, first drilling at India Coya confirms that ore shoots continue at depth
Projects located in mining friendly district, no relevant environmental/community stakeholders
identified
Estimation of 2 years to start production
Access to mineral resources completed at India Coya trough mining ramp
Underground operation by Bench & Fill method at competitive cash cost
High grade, low Capex & Opex project in mining friendly district
-
Ignacio del Rio
CEO Minera Activa
+56 2 2964 2000
Fernando Manterola
Associate Minera Activa
+56 2 2964 3477
Contact Information
India Coya Project
High grade Cu/Au oxide vein, located 25km south from Copiap. Ore shoots 3-5m wide.
1st exploration stage completed: 680m of access tunnels and 4,900m drilled from the tunnel towards the vein. 2 major high grade ore shoots identified
93koz @ 7.4 gpt Au Eq M,I&I Resources (non NI 43-101), including 63koz @ 7.7gpt Au Eq M+I, determined in oxide zone. Structure remains open at depth and along strike.
2nd exploration stage underway, preliminary results of first 3 drills show:
Central shoot resources extend al least 350m below surface
South shoot increases width and grades at depth
Environmental permits ,land use rights and operation of