<Insert Picture Here> Successful Oracle R12 Upgrade: The Secrets to a Rapid, Cost-Effective Upgrade

SROAUG March 17, 2010

Manoj Machiwal Consulting Manager

Page 2: Oracle R12 Upgrade

Agenda

1. Why Upgrade 2. Challenges

3. Upgrade Planning Methodologies 4. Planning: Important Considerations 5. Customer Case Study

6. R12 Upgrade Checklist 7. About USJade

8. Q&A

Page 2 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 3: Oracle R12 Upgrade

Why Upgrade?

Pull:

• Features; Products, Retire Customizations Push:

• Older versions of applications not supported by Oracle

ROI • New capabilities of R12

Page 3 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 4: Oracle R12 Upgrade

Page 4

Page 5: Oracle R12 Upgrade

Challenges

Upgrade Planning Testing • Clear business drivers • End user training

• Objective • Functional Testing

Narrow Window of Time User Training • Minimizing downtime is • End-user training

crucial for an upgrade & • Implementation & training can make or break of new features success

Avoiding Unexpected Problems • Point of no return scenario

Page 5 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 6: Oracle R12 Upgrade

IT & Business Challenges

The Business & Technical Request Queue Grows Every Day

Page 6 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 7: Oracle R12 Upgrade

A Balance Must Be Achieved

Business IT imperative imperative for data for better integrity, decisions, standards, lower costs lower costs and quicker and quicker results results

Page 7 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 8: Oracle R12 Upgrade

Project Timeline: Traditional vs. Accelerated

Traditional

Planning

Execution

Validation Accelerated

0 5 10 15 Enablers

Page 8 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 9: Oracle R12 Upgrade

Enablers Enablers For a Rapid and Successful Upgrade

1. Plan 2. Create safety-net for narrow upgrade

window 3. ?

Results:

• Reduced downtime: business and user • Reduced business interruption • ROI realized much faster

Page 9 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 10: Oracle R12 Upgrade

Upgrade Planning Methodology

• How

• Feasibility study 2 weeks • 5 Possible Scenarios…

Page 10 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 11: Oracle R12 Upgrade

Upgrade Planning Methodology

Speed Investment Value

P e r c e n t a g e o f W o r k E f f o r t V s . I n i t i a l I m p l e m e n t a t i o n

#3 Phased #1 Technology #2 Full Functional #4 Re- Functional Upgrade Upgrade Implementation Upgrade

• High Speed • Low Speed • Medium Speed • Low Speed • Low Investment • High Investment • Medium • High Investment

Investment • Low Value • High Value • High Value • Medium Value

10% 2 7 % 3 4 % 40%

OR, Option #5…

S T R E T C H I N G Y O U R 1 1 . 5 . X I N V E S T M E N T

Page 11 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 12: Oracle R12 Upgrade

Planning: Important Considerations

• Upgrade Path • Customization Retirement • Testing Cycle

(Technical /Functional) • Upgrade Tuning Plan • Team Requirements & • Cut Over Planning

Capabilities • Ongoing Application • User Training Considerations (post • Tools production)

Page 12 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 13: Oracle R12 Upgrade

Resulting Roadmap

• High Level Time-Lines • Milestones

• Resource Planning

• Business Users, Technical Staff

• Risk Mitigation Plan

Page 13 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 14: Oracle R12 Upgrade

Customer Case Study R12 Upgrade: Technology & Applications

Page 14

Page 15: Oracle R12 Upgrade

R12 Upgrade Case Study

Industry: Industrial

Manufacturing Revenue: $500M

Technology & Application Footprint:

Pre-Upgrade Post-Upgrade

• Oracle c.11i - 11.5.3 • Oracle v. R12.0.1

• Oracle Financials (AP, • Oracle Financials (AP,

AR, GL, WIP)., OSFM, AR, GL, WIP)., OSFM, Inventory, WIP Inventory, WIP

• Platform: • Platform: Oracle Sun Solaris 5.8 Enterprise Linux 4

• RBBMS 8.1.7.3 • RBBMS 10.2.0.4

Page 15

Page 16: Oracle R12 Upgrade

Customer’s Challenges

RISK: Due to Outdated Infrastructure

• Ongoing cost to mitigate this risk

• Risk of de-supported Application and Database • Heavily customized environment

• Scattered Data and Inconsistent Business Processes • Obsolete Business Processes Causing loss of Business

Page 16 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 17: Oracle R12 Upgrade

Customer’s Challenges (cont.)

Downtime vs. Benefits:

• Narrow upgrade window • Fear of significant down-time

• Un-clear of new/enhanced functionality & benefits • Lack of Internal Resources

• Lack of Specialized Skills • Additional Operational Costs

Page 17 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 18: Oracle R12 Upgrade

Customer’s Primary Objectives

• Migrate to new hardware on Linux OS • Upgrade Oracle Applications to v. R12 • Business process re-engineering • Evaluate existing customization against new functionality in R12

• Minimize system down-time • Minimize staff down-time

• Post-upgrade support & maintenance strategy

Page 18 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 19: Oracle R12 Upgrade

Our Customer’s Project: Phased Functional Upgrade Path

Splitting the Upgrade:

• Manage downtime by splitting the database upgrade from application upgrade.

• Separating these two upgrades, downtime is broken down into two smaller segments.

• This path also enables identification of issues with database upgrade separately from applications upgrade.

Page 19 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 20: Oracle R12 Upgrade

Phased Functional Upgrade

Phase 1

• Technology Upgrade • Key Business Process

• Limited Customization Retirement

Phase 2

• Business Process Reengineering • New Business Processes

• Complete Customization Retirement

Page 20 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 21: Oracle R12 Upgrade

Benefits Achieved Streamlined, Up-to-Date, Well Documented Infrastructure & Software

1. Risk Mitigation

• Data Integrity

• Oracle supportability risks • Minimized risk of down-time

• Extended security with increased single sign-on & identity management capabilities

2. Significantly More Functionality

• Identified “Delta’s” for new/enhanced functionality • Reduced requirements for customizations, and

• Integrated customizations & business processes outside of EBS

Page 21 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 22: Oracle R12 Upgrade

Benefits Achieved (cont.)

3. Data Integrity, Centralization of Data

• Speed and accuracy of business processes • Improved Reporting & Analysis

• Timely decisions by seeing integrated system information in real-time

(planning, forecasting, scorecards, consolidations, analysis & modeling). • Improved planning

4. User-friendly web consoles

• Better system performance

• Increased personalization & automation of key tasks

Page 22 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 23: Oracle R12 Upgrade

In Summary: R12 Upgrade Check-List

Project Planning (timeline, resource requirements, mitigation of stumbling blocks)

Assessment of Team Capabilities

Planning Methodology best suited for objectives

Testing (test planning, scripts, scenarios) Tools (evaluate, utilize appropriate tools) Training (from navigation to new functionality) Post-Upgrade (staffing, support, maintenance)

Page 23 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 24: Oracle R12 Upgrade

Page 24

Page 25: Oracle R12 Upgrade

About USJade

A Complete Solutions Provider

• Enterprise System Integrator

• Served more than 50 customers for over 10 years • Oracle Platinum Partner

• Oracle Certified Accelerate Solution Provider • Strategic Partnerships

• Global Implementations & Capability - US, India, China, Israel

• Global Delivery Capability Right Shore Delivery Model • SAS

70 Certified

Page 25 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 26: Oracle R12 Upgrade

Delivery Model

We Deliver Faster, Better, and more Economically

On-Site Offshore

• Planning • Prototyping Boston, MA China

• Assessment Tel Aviv, Israel • Proof of Concept

• Strategy • Development San Jose, CA

• Architecture Pune, India • Testing

• Requirements • Conversion

• Design • Maintenance/ Enhancement • Pilots • Support • Training

Page 26 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 27: Oracle R12 Upgrade

Some of Our Customers

Page 27 © 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com

Page 28: Oracle R12 Upgrade

Next steps for your R12 Upgrade Free pre-upgrade assessment Put you in touch with Oracle Upcoming events

Global Headquarters Manoj Machiwal

1731 Technology Drive, Suite 350 Consulting Manager

(408) 899-7217 San Jose, CA 95110 [email protected] 877-JADE-4IT (523-3448)

http://www.usjadecorp.com

East Coast Office

1900 West Park Drive, Suite# 280 Westborough, MA 01581

(508) 983-1457

Page 28

Page 29: Oracle R12 Upgrade

Page 29