Universal Truisms of Rail
Too much of: Not Enough of:
Infrastructure Problems Maintenance Budget
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
3 | WWW.BENTLEY.COM
Highest Priority Issues
How Do You:
1) Know where to work
2) Know what work to do
3) Prioritize work
4) Monitor work progress, costing and material
5) Extend asset life whilst avoiding run to fail
6) Demonstrate competence to operate
7) Improve safety, reliability and Return on Investment
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
4 | WWW.BENTLEY.COM
IntegrationInterpret
Optram
AnalyzeCollect
Condition
Work
Inspection
Equipment Location & Video
Usage
Finance
Disseminate
Workstation
Reporting
Web (Java)
Handheld/ Tablet
3rd party software:EAM, Google, GIS, Etc.
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
5 | WWW.BENTLEY.COM
Vizualization
• Enterprise or departmental solution• Present decision support information• Unified view of infrastructure data such as:
− Track layout
− Asset information
− Corridor assets
− Work items
− Condition data
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
6 | WWW.BENTLEY.COM
Sample Optram Screen
Track Layout
Designed & Measured
Curve
Work History
Defect History
Geometry History
Mile/KM Post
Roughness History
© 2009 Bentley Systems, Incorporated
7| W
WW
.BE
NT
LEY
.CO
M
Rail G
eometry
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
8 | WWW.BENTLEY.COM
Track Geometry with Roughness and OLE
© 2009 Bentley Systems, Incorporated
9| W
WW
.BE
NT
LEY
.CO
M
Image P
lot
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
10 | WWW.BENTLEY.COM
Video Synchronisation
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
11 | WWW.BENTLEY.COM
Links to Documents and Drawings
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
12 | WWW.BENTLEY.COM
Looking into the FutureAnalysis and Forecasting
• Prioritize and plan work
• Identify areas of rapid deterioration or instable condition
• Evaluate work effectiveness
• Calculate quantitative measures of condition
• Do preventive maintenance by predicting failures
• Plan quarterly/monthly instead of annually
• Forecast when conditions will go out of tolerance
An analytic engine built to automatically turn large amounts of railway data into prioritized actions like:
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
13 | WWW.BENTLEY.COM
InsightOrganized & Correlated Data
OptramScripts
Optram Analysis and Forecasting
UnifiedDatabase
Visualization and
ReportingCondition
Work
Inspection
Assets
Usage
Finance
Optram
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
14 | WWW.BENTLEY.COM
Measurement Alignment
• Automatic
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
15 | WWW.BENTLEY.COM
Measurement Thresholds
• Create event list based on threshold values in measurement data
• Output – event data
Threshold Event
56
56.2
56.4 56.6
56.8
57
57.2
57.4 57.6
57.8
58
0 2 4 6 8 10 12 14 16
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
16 | WWW.BENTLEY.COM
Track Tolerance
• Use look up tables for defect thresholds for different track types
• Tables held in database
• Works on event sets
If track type = Class 1 then Gauge Threshold >57.6
If track type = Class 2 then Gauge Threshold >57.2
If track type = Class 3 then Gauge Threshold >56.8
……
© 2009 Bentley Systems, Incorporated
17| W
WW
.BE
NT
LEY
.CO
M
Scrip
t Co
mm
and
s
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
18 | WWW.BENTLEY.COM
Example: Forecast Tamping
• Forecasts where and when tamping required
• Optram automates 4 steps:– Aligns track measurements – Calculates historic quality indexes every 100m– Extrapolates when tamping is required– Presents results graphically
• Makes prediction over large railways practical
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
19 | WWW.BENTLEY.COM
Aligns Track Measurements
© 2009 Bentley Systems, Incorporated
20| W
WW
.BE
NT
LEY
.CO
M
Tren
d V
isualizatio
n
Tamping HistoryTamping History
Last Measuremen
t
Last Measuremen
t
Recommend Tamping
Recommend Tamping
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
21 | WWW.BENTLEY.COM
Forecast VisualizationHistoric
Forecast
Tamping History
Tamping History
Last Measuremen
t
Last Measuremen
t
Recommend Tamping
Recommend Tamping
Red = FixGreen = OK
Red = FixGreen = OK
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
22 | WWW.BENTLEY.COM
Example: Work Analysis
• Analyzes where tamping work was effective
• Optram automates 4 steps:– Aligns track measurements – Calculate a Track Quality Index for each survey– Determine where Track Quality improved– Compare improved Quality locations with recorded work
• Summarizes amount of– Productive and unproductive work– Unreported work
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
23 | WWW.BENTLEY.COM
Optram Aligns Track Measurements
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
24 | WWW.BENTLEY.COM
Optram Forecast Visualization
Improved TQI
Improved TQI
No change in TQI
No change in TQI
No change in TQI
No change in TQI
Improved TQI
Improved TQI
Recorded work
Recorded work
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
25 | WWW.BENTLEY.COM
Optram Work Analysis Visualization
Recorded Work
Recorded Work
Unproductive work
Unproductive work
Productive work
Productive work
Change in Track Quality
Change in Track Quality
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
26 | WWW.BENTLEY.COM
Other Example Scripts Available
• Data Correlation
• Segmentation Creation
• Segmentation Analysis
• Quality Calculation
• Rate of Change
• Prediction
• Alert Limits
• Channel Derivation
• Channel Filtering
Plus whatever the user wants to write
©20
09 B
entle
y S
yste
ms,
Inco
rpor
ated
27 | WWW.BENTLEY.COM
Look into FutureDevelopment Roadmap
• Field Data System
• Linking to GIS
• Data upload from Bentley Rail design products
• Display and edit survey routes
• Integration with Bentley Platform