    ORISSA POWER TRANSMISSION CORPORATION LIMITED

    CONSTRUCTION OF

    PACKAGE-61-02 /2012:2X 160 MVA,220/132 KV SUBSTATION AT

    MENDHASAL ALONG WITH 132 KV TRANSMISSION LINES & ASSOCIATEDSYSTEM AT 400/220 KV SUB-STATION,MENDHASAL.

    (PACKAGE SPECIFIC)

    VOL-IIA

    SCOPE OF WORKS

    NOTICE INVITING TENDER-NIT NO. 52/2011-12.

    BID DOCUMENT NO. SR. G.M-CPC-TENDER-PACKAGE- 61-01,61-02 & 61-03 /2011-12

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA 1/35

  • 7/30/2019 Optclvol Iia

    2/171

    IMPORTANT NOTE

    THE BIDDERS ARE ADVISED TO VISIT THE SITE BEFORE QUOTING

    THE BID. THEY SHALL ASCERTAIN ALL THE DATA FOR TURNKEYCOMPLETION OF THE SUBSTATION AND ASSOCIATED

    TRANSMISSION LINES SUCH AS;

    1. SOIL BEARING CAPABILITY.

    2. BENCHING AND FILLING FOR SITE LEVELLING.

    3. TYPE OF STRUCTURES FOR BOTH LINE & SUBSTATION.

    4. QUANTITY OF MATERIALS/STRUCTURES/EQUIPMENT.

    5. TYPE OF FOUNDATIONS FOR LINE TOWERS & SUB STATION

    EQUIPMENT/STRUCTURES.

    6. THE LENGTH OF THE BOUNDARY WALL, FENCING AND ROADS.

    7. ANY OTHER DATA REQUIRED FOR DESIGNING THE LINE &

    SUBSTATION.

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA 2/35

  • 7/30/2019 Optclvol Iia

    3/171

    SCOPE OF WORK:-

    1. General

    The Employer (M/S ORISSA POWER TRANSMISSION CORPOTATION LIMITED.)

    is strengthening their Transmission and Distribution systems by way of constructing 2x

    160 MVA 220/132 KV S/S at Mendhasal & Associated 132 KV Transmission Line at

    400/220 KV substation MENDHASAL in the state of Odisha as outlined in the detailed

    scope of work. The block diagram of the scheme is at Annexure V (at the end of this

    chapter). The works are to be carried out on Turnkey Basis till final commissioning of

    substation (220 KV Bay extension,installation of 02 Nos 160 MVA Auto Transformers,132

    KV Bays ,associated 132 KV transmission lines,its testing,commissioning and handing

    over the same to the owner.

    The scope of the work includes:-

    i) Design, manufacture, testing, supply & commissioning of all equipment for substation

    and transmission lines, as detailed in the specifications and schedule of quantities and in

    subsequent clauses except supply of power transformer and PLCC indoor

    equipmentwhich shall be supplied by the Employer. The contractor shall load, unload,

    transport, erect, connect to the system, test and commission the power transformer & the

    PLCC equipment. Existing 132 KV Transmission line from CHANDAKA KHURDHA is to

    be made LILO arrangement at Proposed MENDHSAL Sub-station. Since the 132 KV Line

    will be made LILO at Mendhasal, the installation of PLCC equipment at remote (existing)

    end and proposed end of the sub-station or any modification shall be under the scope of

    the contractor. A general single line diagram showing installations, removing and erectionof PLCC equipment (Annexure-VI)has been provided in the technical specification. An

    indicative SLD & structural layout (Annexure-VII)of the substation has been provided in

    the technical specification which may be followed as a basis for finalization of the

    substation structural layout in consultation with OPTCL.

    ii) Execution of all civil works as per schedule for erection of all substation equipment,

    structures and foundation of transformers, roads, culverts, rain water harvesting

    arrangements, construction of earth mat, cable trench, drainage system, Fencing etc.

    iii) Erection, testing, commissioning of all equipment and handing over of the substation

    bays complete in all respect as per approved scheme and to the satisfaction of the

    Employer including statutory inspection.

    iv) The makes of the equipment/components/materials shall be from OPTCL approve

    vendor list indicated in this tender and to be approved by the employer before placement

    of the order on the vendor/manufacturer.

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 1 of 29

  • 7/30/2019 Optclvol Iia

    4/171

    v) The contractor(s) shall arrange power supply for construction of the project. The

    expenditure for such arrangement till completion of the project shall be to the

    contractor(s) account.

    vi) The contractor(s) shall arrange clean water for construction and curing to the civil

    works.

    vii) The work as mentioned in the price schedule shall be considered for the evaluation of

    the bid.viii) The contractor shall arrange for security of all the materials including owner supply

    materials (handed over to him) that are required for successful completion of the project

    till final handing over of the entire work to OPTCL.

    ix) Contractor has to obtain Project License in respect of the projects from the Secretary,

    Electrical Licensing Board of Orissa at his own cost, prior to commencement of works.

    x) The contractor shall supply one official copy of each Standard listed in the appropriate

    schedule.

    The contractor shall be fully responsible for providing all equipment, material,

    systems and services which are required to complete the construction and successful

    commissioning of the works in all respects excepting those specifically excluded under

    the clause 1.2 - Specific exclusions in the chapter General Clauses. The

    Contractor shall also refer to the Technical Specification (Vol.-II), for proper

    understanding of the works involved in respect of each substation.

    The scope of work on Turnkey basis includes design, engineering,

    manufacture,

    type testing, (factory testing) supply on FOR destination site basis, transportation,

    handling, storage at site, erection, site testing, commissioning complete in all respects

    and maintenance of plant and equipment until handing over of works in accordance withConditions of Contract and the stipulations under various chapters of this specification at

    the prices stated in the Price Schedule for the following.

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 2 of 29

  • 7/30/2019 Optclvol Iia

    5/171

    (I) BRIEF SCOPE OF WORK:

    i) Supply excluding power transformers and PLCC Equipment (Indoor PLCC Panel

    & RTU )

    ii) Detailed design

    iii) Providing engineering data and drawings, as per specified format, for employers

    review, approval and records.iv) Complete Manufacturing including Type, Acceptance & Routine testing, as

    specified.

    v) Packing and transportation from the manufacturers works to the site including

    transit insurance & customs clearance/ port clearance (if required), port handling,

    for imported goods and further loading (if applicable) As delivered at site basis

    vi) Receipt, Unloading, Storage, Insurance and Preservation of Sub station &

    Transmission Line material & accessories at site.

    vii) (a) Construction of 2x 160 MVA 220/132 KV S/S at Mendhasal & Associated 132

    KV Transmission Line at 400/220 KV substation MENDHASAL on Turnkey basis

    in the State of Odisha(including all civil works).

    SUB-STATION: (I) Following equipped bays.

    (a) 220 KV Transformer Bay:02 Nos.(Bay Extension in 3 Bus Arrangement

    system).

    (b) 132 KV Transformer Bay:02 Nos.(New S/S in Main & Transfer Bus

    Arrangement system).

    (c) 132 KV Bus Coupler Bay: 01 No.

    (d) 132 KV Feeder Bay: 02 nos.(II) Unequipped Bays:

    (e) 132 KV Feeder Bay :Unequipped: 02 Nos.

    vii) (III) TRANSMISSION LINE:

    (1) Construction of 132 KV Double circuit Transmission line on 132 KV DC

    Tower to existing CHANDAKA-KHURDHA 132 KV line for LILO

    arrangement (Approximate Line length is 1.2 Kms.

    (2) Transmission Line route survey of entire stretch, Settlement of all issues

    related to right of Way and laying of line (including all civil works).

    (3) Testing and commissioning of Sub station, Transmission Line & accessories.

    (4) Handing over of the completed system to the Owner

    (5) Satisfactory conclusion of the Contract.

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 3 of 29

  • 7/30/2019 Optclvol Iia

    6/171

    (II) DETAILS ABOUT THE SUB-STATION:

    (a) New substation:- KONARK

    Name of

    Proposed

    S/S

    Bus Arrangement No of Bays in 220 KV

    side

    No of Bays in 132 KV

    side

    2x 160 MVA

    220/132 KVS/S at

    Mendhasal

    (220 KV

    extension

    and

    installation

    of

    Transformer

    andestablishme

    nt of 132 KV

    system)

    Existing 220 KV

    Side Bus

    Arrangement: Two

    Main and one

    Reserve Bus Bar:

    Twin Moose ACSR

    for Main Buses

    and Single Moose

    ACSR for Reserve

    Bus.132 KV System:

    Twin Moose ACSR

    for Main Bus and

    Single Moose

    ACSR for Reserve

    Bus.

    Auto Transformer

    Bay: 02 Nos. (Bay

    Extension).

    Installation of 2X 160

    MVA, 220/132 KV

    Transformers(Transfo

    rmers are owner

    supply item)

    Equipped Bay:

    Feeder: 02 Nos.

    Transformer:02 Nos.

    Bus-Coupler: 01 No.

    Unequipped Bay:

    02 Nos.

    TOTAL No. of Bays:

    07(In the unequipped

    bays, the leveled

    space for futureinstallation of

    equipment and its

    structures )

    (b) In Mendhsal sub-station ,220 KV side has been provided with Bus bar protection

    (Distributed type numerical Siemens make) and sub-station automation of Siemens make

    protection devices have been provided. The Bidder to consider and to adopt Similar

    protection for the 2 Nos 220 KV Bay extension works under this package.

    (III) DETAILS ABOUT THE TRANSMISSION LINE:

    1. 132KV single circuit transmission line from Existing 220/132/33 KV sub-sta

    tion at CHANDAKA- to 132/33 KV Sub-station at KHURDHA to be made LILO ar

    rangement to the proposed MENDHASAL Sub-Station. The Length of Line is 1.2

    Kms approximately. Line Conductor to be used is ACSR Panther & Tower to be

    used: 132 KV double circuit Tower. A power map of Odisha is enclosed at the

    end of this chapter to help bidders to locate the proposed work site.

    2.1. Substation

    2.1.1. Electrical

    The scope includes but is not limited to

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 4 of 29

  • 7/30/2019 Optclvol Iia

    7/171

    i) Supply erection, testing & commissioning of the following equipments:

    I. Circuit breakers

    II. Isolators

    III. Current transformers .

    IV. Voltage transformers (capacitive and inductive)

    V. CT, CVT, IVT console boxes with aluminium alloy having minimum three

    mm thickness.

    VI. All out door kiosks/boxes, shall be GI sheet of minimum 2mm thickness

    with aluminium alloy canopy(rain hood) of 3mm thickness.

    VII. Surge arresters

    VIII. Post insulators

    IX. Protection, control, and metering systems

    X. PLCC systems : Wave Trap,LMU & LMDU,Coaxial

    Cable,EPAX,Telephone sets,Fax m/c etc (but Except indoor PLCC

    Panel)

    XI. Insulator strings with hardware

    XII. Busbar, circuit conductor and all conductor accessories. Other

    interconnection shall be through Moose ACSR .

    XIII. Power and control cables, cabling accessories, cable trays etc. Proper

    sealing of the cable entry (control & Power) at Control Room building, to

    prevent water entering from switch yard/outside to CR Building, preventing

    entry of rats and reptiles, Fire proof etc.

    XIV. AC/DC systems including all distribution boards, battery and charger

    systems, auxiliary transformers.

    XV. Air conditioning plant and systems for control room

    XVI. Fire fighting systems and equipment

    XVII. Steel structures for switchyard gantries and portals (lattice type); and

    equipment (pipe or lattice type) including those for lightning protection.

    XVIII. Earthing system and earthing conductors.

    XIX. Testing and maintenance equipment.

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 5 of 29

  • 7/30/2019 Optclvol Iia

    8/171

    XX. Lighting of substation area and substation buildings. Illumination and

    emergency lighting system at different locations.

    XXI. Control and relay panels as proposed.

    XXII. Event logger panel.(for 220/132/33 KV Sub-station)

    XXIII. AC and DC distribution boards as per requirement and as proposed.

    XXIV. Bus bar protection scheme (for 220kV bus only).

    XXV. Disturbance recorder with Time synchronization. (GPS)

    XXVI. Sub station level PC/Lap top provision for Relay configuration with their

    software.

    XXVII. Any other items required for completion of the project are also in the

    scope of this contract in order to complete the sub-station in all respect.

    XXVIII. Supply of all clamps, connectors and hardware required for

    commissioning of the substation. The quantity and rating of the connectors

    and clamps are dependent on the layout and requirement of the

    substation.

    XXIX. Supply and putting of sub-station illumination system. All the light fittings

    shall be LED type & these fittings shall be mounted on switch yard portal

    structures such as columns & beams. No separate lighting mast is required.

    Entire substation lighting system in the switch yard & colony shall be de

    signed using under ground cables only. No over head conductors are per

    mitted for this purpose. For street lighting one outdoor lighting kiosk with

    two incomers of 200A rating switch fuse units (SFU) & with six feeders of

    32A rating fitted with MCB shall be considered. Similar type of out door

    kiosk shall be considered for colony power supply with 200A SFU & ten out

    going feeder of 32A rating fitted with MCB shall be considered

    ii) Erection, testing & commissioning of the following equipment:(Owner supply

    materials/equipment)

    1. Power transformers /auto transformers2. Indoor PLCC/RTU equipment (PLCC Panels) at both the ends.

    iii) Supply Only of the following equipments:

    1. Mandatory spares for substation equipment being supplied under this contract as

    per Bid proposal Sheet( BPS) schedule-3.

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 6 of 29

  • 7/30/2019 Optclvol Iia

    9/171

    2. Maintenance & testing equipment etc as per the list provided in relevant chapter of

    technical specifications.

    2.1.2. Civil works

    The design, engineering, supply of all materials including cement and steel, consumables,

    as per specification and approved drawings for civil works of the substation including but

    not limited to the following:

    1. Designing, fabrication, galvanizing and erection of structures on respective

    foundations detailed in specification for civil works. Supply of all structural materials

    (columns & beams, hardware & fasteners etc) as per requirement. The contractor

    shall preferably adopt OPTCL designed standard structures for use in various

    substation, the details of which are given at Clause no 12 of this chapter.

    2. Soil testing for soil resistivity and soil bearing capacity before designing.

    3. Site development including leveling, filling & compacting of the sub-station area to

    the desired height.

    4. Wherever pile foundations are required for Control room building, switch yard tower

    columns, Equipment foundation and transmission line towers etc., these are to be

    constructed as per the guideline indicated in the specification elsewhere. The type

    of pile foundations can be ascertained only after soil investigation and approval of

    the same by OPTCL.

    5. Construction of sub-station retaining wall with brick masonry and fencing by GI

    heavy-duty goat mesh fencing as per site requirement.

    6. Construction of boundary wall along the property line of the substation with Main

    gate, security shed and two nos. switch yard gates in the sub-station. Provisions of

    a security shed near the main gate. The structure shall be RCC framed structure.

    There shall be provision of electrical illumination facilities.

    7. Fencing of switch yard area and other areas like station transformer area.

    8. There shall be provision of plantations of fruit bearing plants and water tap

    provision for watering the plants in the sub-stations.

    9. Construction of all foundations for columns, all switchgear such as circuit breakers

    and isolators, CTs, CVTs and other substation equipment such as line traps, post

    insulator, etc.

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 7 of 29

  • 7/30/2019 Optclvol Iia

    10/171

    10.Construction of foundation of transformer including supply and putting of rail from

    the service bay to the transformer plinth, all foundations of columns, equipment

    structures. Separate foundations for the marshaling boxes of the isolators are to be

    considered.

    11.Anti termite treatment of switch yard and colony buildings.

    12.Switch yard buildings such as control room, DG set room and. There shall be

    provision of a water cooler including water purifier inside the control room building.

    Provision of split type air conditioners inside the control room & PLCC room of

    Control Room building and conference area.

    13.There shall be provision of store shed, one Ramp with winch for lifting the materials

    and lowering the materials up to 5 MT and open yard platform to store the materials

    like transformer bushing, CT, CVT and other equipment.

    14.Supply and spreading of uniform 20mm nominal size HG metal of 160mm thick

    inside the switch yard area of the Sub- Stations. The spreading will be done above

    a finished level of switch yard land by plain cement concrete of thickness 75 mm

    (ratio 1:4:8). Anti weed treatment of the switch yard area to be made as per

    prevailing practice before spreading of PCC.

    15.Construction of drainage system of the sub-stations and the newly constructed

    quarters & flood water discharge systems. Miscellaneous works like manholes soak

    pits, RCC trench, fencing, etc. in the switch yard.

    16.Construction of rain water harvesting arrangements in the substation.

    17.Construction of cable trenches with trays & covers & sump pit with pump, as per

    requirement.

    18.Construction of approach road to the new sub-station as per requirement.

    Construction of periphery roads inside the fencing. The roads inside the switch yard

    & at the periphery shall be of 3.75 mtr. wide & the road inside switch yard shall be

    of concrete road as per technical specification. The other roads main and approachroad shall be 7 mtrs wide and shall be bitumen grading.

    19.Designing and providing the earth mat and earthing of the sub-station lighting

    protection, equipment earthing etc. Earth mat shall be designed using 75X10mm GI

    flat. For lightening protection individual spike not less than 2.5mtrs shall be

    provided on each column of the switchyard. Water tap provision shall be provided

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 8 of 29

  • 7/30/2019 Optclvol Iia

    11/171

    for pouring water into the earth pits constructed inside & around the periphery fence

    the switchyard. The earthing shall be extended beyond 2 mtrs from the fencing and

    the fencing earthing are also to be taken care.

    20.Civic amenities for the township including drainage and sewerage systems.

    21.All other materials, which the contractor feels to be required for completion of the

    sub-station.

    22.Plantation of fruit bearing and flower bearing plants and gardens in and around the

    sub-station.

    23. Modular Multi-diameter flexible Cable sealing system consisting of frames, blocks and

    accessories to be installed wherever the electrical / control / communication cables over-

    ground enter or leave from control room building. Cable sealing to be done with Multi-

    diameter type flexible modular based sealing blocks of different sizes ( size 20: 4mm to

    14.5 mm ,size 30 : 10mm to 25 mm ,size 40: 21.5mm to 34.5mm , size 60: 28mm to 54 mm, size 90: 48mm to 71 mm , size 120 : 67.5mm to 99 mm or any convenient size ) to be

    provided for simple, easy and quick to assemble & re-assemble. some spare blocks on the

    frame to be provided with usable Multi-diameter blocks with center plug, so that these

    spare blocks can be used for expansion in future for wide range of cables, solid blocks

    should not be used on frame. Cable sealing system should have been type tested for fire /

    water / smoke tightness and supplier shall have local presence by way of full infrastructure

    having service support, training support and stocks support and also have necessary sales

    support for any change / extension in future. Frames & stay-plate material should be

    galvanized steel and for compression single piece wedge with galvanized steel bolts should

    be used.

    2.2. Transmission lines.

    i) Survey & ROW issues

    Detailed line Survey works as per specification.

    The contractor shall have to solve the entire right of way problem at his own

    cost. Contractor shall also resolve the issues related to the tree cutting in thetransmission line and sub-station at his own cost. However the details of ROW

    issues have been indicated in Special Condition of Contract (SCC) Vol.-1A.

    ii) Design & Manufacturing (as applicable), supply, storage, erection, testing &

    commissioning of following materials

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 9 of 29

  • 7/30/2019 Optclvol Iia

    12/171

    1. Galvanized Structural materials of towers as per requirement. OPTCL adopted

    standard towers shall preferably be used for the transmission line, the details of

    which is given at Clause no.-13 in this chapter.

    2. Insulators, hard wares.

    3. AAAC/ACSR conductors, GI earth wire with accessories etc and their stringing.

    4. Commissioning of transmission lines.

    5. Any other items required are also in the scope of this contract in order to complete

    the proposed transmission lines in all respect.

    3. Electrical System Data of 220/132/33

    1. Nominal System Voltage (KV) 220/132/33

    2. Highest System Voltage (kV) 245/145/36

    3. System Neutral Earthing. Effectively earthed

    4. Basic Insulation Level (kVP)

    i) Bus 1050/650/170

    ii) Equipment other than Transformer 1050/650/170

    iii) Transformer 1050/650/170

    5. Power Frequency withstand voltage (KV rms) 460/275/80

    6. System fault level KA 40/40//25

    7. Creepage distance for insulators (mm) 6125/3625/900

    8. Min. recommended clearance in air (mm) as per CBIP

    i) Phase-to-phase 2160/1300/320

    ii) Phase-to-earth 2160/1300/320

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 10 of 29

  • 7/30/2019 Optclvol Iia

    13/171

    iii) Sectional clearance 5000/4000/3000

    9. Min. ground clearance (as per IE Rules) 5500/5000/4000

    10. Bus configuration for 400/220/132/33 kV

    Selection of ACSR conductor shall be Chosen from Moose, Zebra and panther as per

    requirement and decision of employer.

    11. Phase-to-phase distance:

    i) Along the bay (mm) 4500//3000/1500

    ii) Strung bus (mm) 4500/3000/1500

    12. Reference design temperature 50 Deg. Centigrade.

    Detailed technical particulars of different equipment have been specified in the

    respective specifications in the subsequent section. If any technical particulars are

    missed from this volume the same may please be referred from relevant IS:

    specification for bidding purpose.

    4. Design work

    The Bidder shall furnish detailed design of the substation & transmission lines. The

    design work shall include but not limited to technical calculations, preparation ofdrawings and bill of materials and specifying equipment not specified in the

    specification but necessary for the completion of the substation & transmission

    lines on the turnkey basis. The technical calculation design drawings, etc. shall be

    submitted to the Employer for approval. However the layout drawing furnished by

    OPTCL shall be taken as a guide line.

    5. Standards

    All materials and equipments shall generally comply in all respects with the latest

    edition of the relevant Indian Standards. International Electro-Technical

    Commission (IEC) or any other internationally accepted Standard equivalent or

    better than relevant Indian Standard. Equipment complying with all other

    authoritative standards such as British, ASA, VDE, etc. will also be considered if

    performance equivalent or superior to Indian Standard is ensured.

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 11 of 29

  • 7/30/2019 Optclvol Iia

    14/171

    In the event of supply of equipment confirming to any International or

    internationally recognized Standard other than the Standard listed in the

    Specification. The salient features of comparison shall be brought out and

    furnished along with the bid.

    In case of adopting any standard other than that IS or IEC, a complete set ofadopted standard shall be supplied by the bidder. However it is desirable and

    preferred that the equipment offered shall comply with one consistent set of

    standard unless other than exceptional cases.

    The equipment shall also comply with the latest revision of Indian Electricity Act

    and Indian Electricity Rules and any other Electrical Statutory Provision, Rules and

    Regulations.

    6. Reference Drawings

    Drawings showing indicating scope of work are enclosed. Drawings are

    complementary to specifications and shall be referred to for better understanding

    as well as for estimation of quantities and bill of materials for arising at lump sum

    bid price on turnkey basis.

    The bidder shall submit with the tender, plan of the substation showing broadly the

    scope of work incorporated as per technical specification. All the drawings shall besubmitted in quadruplicate, enumerated in conformity with relevant clause

    stipulated in the Technical Section.

    These drawings shall show proposed layout plan with section. Drawings showing

    overall dimension, clearance etc. required for assembling and dismantling and

    space requirements of all the apparatus are to be supplied to enable the Employer

    to examine the design and layout at the installation.

    7. Packing and Marking

    The bidder shall include and provide for securely protecting and packing the plant

    so as to avoid damage in transit under proper condition and shall be responsible

    for all loss or damage caused by any defect in packing.

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 12 of 29

  • 7/30/2019 Optclvol Iia

    15/171

    Large and heavy items such as 220 kV, 132 kV and 33 KV equipment and

    structural steel shall be packed and shipped as per standard international practice.

    Container/Cartoons, boxes, trunks and other packages shall be strong and sturdy

    in construction to withstand Ocean shipping, loading and unloading, transport on

    rough roads, and storage in tropical area and hauling and handling during erection

    etc. Boxes and packages shall also be protected by suitable packing with the helpof wooden planks/MS frame or galvanized steel strips.

    A layer of waterproof material shall be provided inside the cartoon/boxes/packages

    to protect the equipment from water seepage and to avoid rust.

    The following information shall be marked on the container/boxes/packages etc.

    a. Contractors/manufacturers name, project title and contract reference.

    b. Plant/accessory identification No. and title.

    c. Net/gross weight.

    d. Employers name with other dispatch particulars such as destination.

    The employer shall take no responsibility for any damage done to the plant on

    route to the site of work or place of delivery whichever is applicable.

    8. Tests

    i) Unless otherwise specified in respective section, all equipment shall be subjected

    routine, acceptance and type test as covered and specified in any standard in

    presence of the authorized representative of the employer.

    ii) Bidder shall submit type test report from a recognized laboratory along with the bid.

    iii) At least 15 days advance notice shall be given by the contractor to the employer

    for witness the tests.

    9. Compliance to IE rule 1956

    i) The construction agency shall posses a safety manual duly approved by competent

    authority in the Govt. of his State Governing the safety in work by the personnel and

    staff.

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 13 of 29

  • 7/30/2019 Optclvol Iia

    16/171

    ii) The agency shall possess valid contractors license issued by the Electrical

    Licensing Board of Odisha (ELBO) failing which he will not be allowed to start the

    work.

    iii) Supervisors of works shall posses appropriate valid supervisory certificate of

    competency issued ELBO, Odisha.

    iv) At least 50% of electrical workmen employed in the project shall posses valid

    workmen permit by ELBO.

    10. The Contractor has to follow submission of drawings, data,

    document as per the format given below.

    Sl. No.Description With Bids

    Post Order Final Document

    For

    Review

    For

    Record

    s

    Transp

    arency

    Prints

    (Photostat)

    Electronic

    1. Switchyard single line

    diagram i2. Switchyard layout,

    plan, section & placement of

    various equipment

    3. Switchyard earthing

    and lightning protection

    calculations.

    4. Battery, battery

    charger, DCDB

    sizing calculations.

    5. Switchyard lighting

    calculations

    6. Switchyard earthing

    and lightning layout.

    7. Switchyard lighting

    layout.

    8. Switchyard ,control

    room equipment

    and cable layout.

    9. Switchyard clamps

    and connector details.

    10. Relay, metering and

    control panel block logic

    diagram.

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 14 of 29

  • 7/30/2019 Optclvol Iia

    17/171

    Sl. No.Description With Bids

    Post Order Final Document

    For

    Review

    For

    Record

    s

    Transp

    arency

    Prints

    (Photostat)

    Electronic

    11. Control panel schematic

    drawings.

    12. Logic for castle key

    interlock between

    breaker and isolator.

    13. Relay, metering &

    Control panel and

    ACDB,DCDB GA

    drawings.

    14. Switchyard equipment

    GA drawings and

    control schematics.

    15. Cable schedule.

    16. Interconnection

    diagrams.

    17. Relay setting

    calculations and

    Coordination drawings.

    18. SLDs of ACDB

    and DCDB.

    19. Soak pit and waste

    oil pit layout and

    sizing calculation.

    20. Structural design

    calculations

    super structures.

    21. Civil drawings for

    foundation and

    cable trenches.

    22. Structural fabrication

    drawings of

    equipments gantries etc.

    23. Filled in equipment

    data sheets as perenclosed format.

    24. Complete literature,

    leaflets for all

    equipments.

    25. Operational/

    maintenance manual.

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 15 of 29

  • 7/30/2019 Optclvol Iia

    18/171

    Sl. No.Description With Bids

    Post Order Final Document

    For

    Review

    For

    Record

    s

    Transp

    arency

    Prints

    (Photostat)

    Electronic

    26. Deviation schedule

    w.r.t.

    a) Specification

    b) Document/

    attachments.27. List of spare parts for

    each major equipment.

    28. List of special tools

    and tackles.

    29. List of sub-vendors.

    30. QA plan of vendor

    31. Installation operating

    and maintenance

    instruction.

    32. Inspection Plan andTesting Procedure.

    33. Test Records.

    34. List of commissioning/

    maintenance spares.

    35. Data Book/Manual

    a)Installation Manual

    b) Operating/Mainte-

    nance.

    c)Catalogues/ Brochures.

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 16 of 29

  • 7/30/2019 Optclvol Iia

    19/171

    11. Minimum clearance for substation design shall be as per details given in the table

    below.

    Highest

    system

    voltage

    (kV)

    Insulati

    on

    level

    (kVP)

    Switching

    Impulse

    Voltage

    (KVP)

    Sectional

    Clearance

    (mm)

    Minimum clearance Ground

    Clearance

    (mm)

    Between

    phase &

    ground

    Between

    phases

    36KV 170 - 3000 320 320 3700

    145KV 650 - 4000 1300 1300 4600

    245KV 1050 - 5000 2160 2160 5500

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 17 of 29

  • 7/30/2019 Optclvol Iia

    20/171

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 18 of 29

  • 7/30/2019 Optclvol Iia

    21/171

    12. OPTCL adopted standard switch yard structure:

    The bidders may adopt their own type tested design for switchyard structures with

    approval from OPTCL. However the standard switch yard structures adopted in OPTCL

    switch yards system in different voltage levels are given below.

    A 220 KV SIDE:

    1. COLUMN: P1S TYPE,- HEIGHT-21.5 MTRS,WEIGHT-4.464MT

    2. BEAM:Q1 TYPE,-LENGTH-18 MTRS, WEIGHT-1.473MT

    B 132 KV SIDE:

    1. COLUMN: T1S TYPE,- HEIGHT-15 MTRS,-WEIGHT-1.193 MT

    2. COLUMN: T4S TYPE,-HEIGHT-11 MTRS,-WEIGHT-0.924 MT

    3. BEAM:G1 TYPE,-LENGTH-10.4 MTRS,-WEIGHT-0.613 MT

    4. BEAM:G2 TYPE,-LENGTH-14.9875 MTRS,-WEIGHT-0.906 MT

    5. BEAM:G1X TYPE,-LENGTH-10.4 MTRS,-WEIGHT-1.370 MT

    6. BEAM:G1,2 TYPE,-LENGTH-10.4 MTRS,-WEIGHT-1.25 MT

    C 33 KV SIDE:

    1. COLUMN: T8S TYPE,- HEIGHT-10.5 MTRS,WEIGHT- 0.777 MT

    2. COLUMN: T9S TYPE,-HEIGHT-7.5 MTRS,WEIGHT - 0.592 MT

    3. BEAM:G4 TYPE,-LENGTH-5.5 MTRS,WEIGHT-0.306 MT

    4. BEAM:G4X TYPE,-LENGTH-5.5 MTRS,WEIGHT-0.306 MT

    5. BEAM:G6 TYPE,-LENGTH- MTRS,WEIGHT-7.25 MT

    D

    THE BAY WIDTH OF DIFFERENT VOLTAGE LEVEL ARE AS

    BELOW

    1. 220 KV SYSTEM SHALL BE 18 MTRS2. 132 KV SYSTEM SHALL BE 10.4/13.1MTRS.

    3. 33 KV SYSTEM SHALL BE 5.5 MTRS

    13. OPTCL adopted standard Tower structure for transmission line:

    The contractor may adopt their own type tested design for transmission line

    structures/towers with approval from OPTCL. However the standard tower

    structures adopted in OPTCL for different voltage levels are given below.

    A. 132 KV Transmission line.

    (i) PA type: Unit weight: 3.430 MT.

    (ii) + 3 mtrs: Unit weight: 0.537 MT.

    (iii) + 6 mtrs: Unit weight: 1.349MT.

    (iv) PB type: Unit weight: 4.973 MT.

    (v) + 3 mtrs: Unit weight: 1.018 MT.

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 19 of 29

  • 7/30/2019 Optclvol Iia

    22/171

    (vi) + 6 mtrs: Unit weight: 2.104 MT.

    (vii) PC type: Unit weight: 6.214 MT.

    (viii) + 3 mtrs: Unit weight: 1.119 MT.

    (ix) + 6 mtrs: Unit weight: 2.342 MT.

    (x) Templates for PA- Unit weight: 0.665 MT

    (xi) Templates for PB- Unit weight: 0.602 MT

    (xii) Templates for PC- Unit weight: 1.904 MT

    B. 220 KV Transmission line.

    (i) OA type: Unit weight: 4.351 MT.

    (ii) + 3 mtrs: Unit weight: 0.727 MT.

    (iii) + 6 mtrs: Unit weight: 1.448 MT.

    (iv) OB type: Unit weight: 7.574 MT.

    (v) + 3 mtrs: Unit weight: 1.305 MT.

    (vi) + 6 mtrs: Unit weight: 2.242 MT.

    (vii) OC type: Unit weight: 9.839 MT.

    (viii) + 3 mtrs: Unit weight: 1.436 MT.

    (ix) + 6 mtrs: Unit weight: 2.599 MT.

    (x) +15 mtrs: Unit weight: 6.670 MT

    (xi) UR : Unit weight: 13.585 MT.

    (xii) UR + 3 mtrs type: Unit weight: 17.316 MT.

    (xiii) UR + 6 mtrs type: Unit weight: 4.249 MT.

    (xiv) Templates for OA- Unit weight: 0.597 MT

    (xv) Templates for OB- Unit weight: 0.815 MT

    (xvi) Templates for OC- Unit weight: 1.172 MT

    (xvii) Templates for UR- Unit weight: 1.509 MT

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 20 of 29

  • 7/30/2019 Optclvol Iia

    23/171

    C. No. of Bolts & Nuts used in each of the Tower

    Type of

    Tower

    Normal +3 mtrs +6 mtrs

    PA 1602 142 276

    PB 1097 273 542

    PC 1654 313 592

    OA 1147 180 228

    OB 1299 236 372

    OC 1877 254 402

    UR 2283 357 588

    14. Approved Make Of Equipment & Materials to be used in the Sub-

    station and Transmission lines.The following make of the equipments & materials shall be supplied as per

    approved vendor list.

    VENDOR LIST FOR SUBSTATION AND LINE WORKS OF OPTCL

    Sl No Description of Equipment or material Name of the Vendor

    1 BREAKER

    1.1 400 KV Spring-Spring, SF-6, 3150A,

    50KA

    Siemens/ABB/CGL/AREVA/BHEL

    1.2 220 KV Spring-Spring, SF-6, 3150A,

    40KA

    Siemens/ABB/CGL/AREVA

    1.3 132 KV Spring-Spring, SF-6, 3150A,

    40KA

    Siemens/ABB/CGL/AREVA

    1.4 33 KV Spring-Vacuum, 1600A, 25KA Siemens/ABB/CGL/AREVA/BHEL

    2 CT

    2.1 400 KV & 220 KV( Dead / Live Tank) AREVA/ABB/CGL/BHEL/SIEMENS

    2.3 33 KV, Dead / Live Tank AREVA/ABB/CGL/Pragati/Vishal/Transfield/Indian

    Transformer/Victrans/Vijaya Electricals

    3 CVT

    400KV, 220KV & 132KV AREVA/ABB/CGL/BHEL/SIEMENS

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 21 of 29

  • 7/30/2019 Optclvol Iia

    24/171

    4 PT / IVT

    4.1 400KV & 220KV AREVA/ABB/CGL/BHEL/SIEMENS

    4.2 132KV & 33KV AREVA/ABB/CGL/BHEL/ Indian Transformer

    s/Vijaya Electricals/Victrans

    5 SURGE ARRESTOR

    400KV, 220KV, 132KV & 33KV CGL/OBLUM/AREVA/LAMCO/ELPRO

    International

    6 CR PANEL

    400KV, 220KV, 132KV & 33KV ABB/SIEMENS/AREVA/Other Manufacturers

    using Relays of SIEMENS/AREVA/ABB/ SEL/ GE

    7 ISOLATORS

    400KV, 220KV, 132KV & 33KV ABB/SIEMENS/SWITHGEAR&STRUCTURALS/GR POWER/AREVA/CGL

    8 HARDWARE FITTINGS

    8.1 400KV RASTRIYA UDHYOG/ERITECH/IAC/EMI

    8.2 220KV, 132KV & 33KV RASTRIYAUDHYOG/ERITECH/IAC/EMI/ELECTR

    O TECH AND TRANSTECH

    9 CONDUCTOR APAR, GPIL, ERITECH, STERLITE, VIJAYA/

    LUMINO/CABCON/TIRUPATI

    10 EARTHWIRE BHARAT WIRE ROPES/UIC WIRES/USHA

    MARTIN/GK WIRE

    11 DISC INSULATORS/SOLID CORE

    POST INSULATORS

    BHEL/WS/MODERN INSULATOR/ADITYA BIRLA

    INSULATORS/SRAVANA

    12 LONG ROD INSULATOR MODERN INSULATORS

    13 TOWER & STRUCTURES FOR LINE

    AND SUBSTATION AND

    FOUNDATION

    BOLT(SAIL/TATA/RINL STEEL TO BEUSED)

    KEC/RPG/Jyoti /L&T/EMC/Kalpataru/ NEXO/

    UTKAL GALVANIZER/IVRCL

    INFRASTRUCTURES &PROJECTS LTD,

    NAGPUR/ UNIQUE STRUCTURES&TOWERSLTD BHILAI/TECHNO ENGINEERING &CO LTD

    NEW DELHI/UNISTAR GALVANISERS

    &FABRICATORS(P) LTD JAMSEDPUR/NEW

    MODERN TECHNO MECH PVT. LTD BARIPADA

    / GLOBAL GALVANISER, Khurdha/AGARWAL

    STEEL STRUCTURES(INDIA) PVT

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 22 of 29

  • 7/30/2019 Optclvol Iia

    25/171

    LTD,HYDERABAD , Hyderabad/Sri Ashutos

    Engineering, Raipur/Aster Pvt Limited,

    Hyderabad/Shreem Electricals Pvt Limited,

    Bangalore.

    14 PVC INSULATED POWER AND

    CONTRAL CABLES

    NICCO/GLOSTER/CCI/KEI/CRYSTAL/POLYCAB

    /GPIL/FINOLEX/Universal

    15 HF COAXIAL CABLES ALPHA COMMUNICATION, DELHI/DELTON

    Cables, New Delhi

    16 STATION TRANSFORMER (BEE

    STANDARD)

    AREVA/ALFA/TESLA/OTPL

    17 FIRE FIGHTING EQUIPMENT MINIMAX/CEASE FIRE

    18 LIGHTING FIXTURES PHILPS/CGL/BAJAJ/HAVELSOther make LED

    LIGHTING AS PER BEE STANDARD

    19 CEMENT OPC GRADE -43 ACC/ULTRA TECH/KONARK/LAFARGE

    20 STEEL SAIL/TATA/RINL

    21 GI PIPE TATA/JINDAL

    22 AIR CONDITIONER HITACHI/CARRIER/BLUE STAR/VOLTAS/LG

    23 PVC WIRES L&T/FINOLEX/ANCHOR/KDK/HAVELLS

    24 SWITCHES ANCHOR/ABB/CONA/INDO ASIAN/HAVELS

    25 MCB L&T/ABB/SIEMENS/MDS/ HAVELLS/INDOASIAN

    26 ACB/MCCB L&T/SIEMENS/MERLIN GERIN

    27 ACDB/DCDB/BMK/CONSOLE BOX MAKTEL SYSTEM(Vadodara)/SARVANA

    (Chenai)/Technocrat (Cuttack)

    28 CLAMPS AND CONNECTORS Electromech Transtech/ Rastraudyog

    /Tyco/IAC/Aswini Kumar & Co., Cuttack

    29 GI BOLTS & NUTS NEXO/GKW/ASP

    30 BATTERY & BATTERY CHARGER EXIDE for Battery & CALDYNE for Battery

    Charger.

    31 WAVE TRAP AREVA,ABB,BPL

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 23 of 29

  • 7/30/2019 Optclvol Iia

    26/171

    15. Portable Fire Extinguisher : (ANNEXURE-I)

    Portable fire extinguishers of the following types shall be supplied to each

    sub-station.

    Sl

    No

    Description

    of Items

    Unit capacity Quantit Re uired

    At each

    132/33 kV

    S/S

    At each

    220/132/33

    kV S/S

    At each

    220/33 kV

    S/S

    1 Foam Type Nos 9 ltrs 2 4 4

    2 Dry chemical

    Powder

    Type(Trolley

    mounted)

    Nos 22.5 Kgs 2 4 2

    3 Dry Powder

    Type

    Nos 5 Kgs 2 4 2

    4 Carbon dioxide

    (CO2

    Nos 9Kgs 5 10 5

    5 Carbon

    Dioxide (CO2)

    Nos 4.5Kgs 5 10 5

    6 Carbon dioxide(CO2)

    Trolley

    mounted

    Nos 22.5 Kgs 2 4 2

    7 Fire bucket

    with (a set

    comprises of

    six nos Bucket

    in each stand

    & one stand )

    Set 3 5 3

    The quantities are indicative. Bidders are advised to design as per the

    requirement.

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 24 of 29

  • 7/30/2019 Optclvol Iia

    27/171

    16. Maintenance & Testing Equipment: (ANNEXURE-II)

    Maintenance & testing equipment shall be supplied & installed for each

    substation as per the list given below.

    Sl.

    No

    Description of Items Unit Quantity Required

    At each132/33 KV

    S/S

    At each220/132/33

    KV S/S

    At each220/33 KV

    S/S

    1. 160 kv transformer oil breakdown

    voltage test set

    Nos 1 1 1

    2. Insulation resistance tester (megger) Nos 1 1 1

    3. Oil sampling bottle Nos 4 4 4

    4. SF6 gas leak detector Nos 1 1 1

    5. LCD, digital multimeter Nos 2 2 2

    6. Analogue Multimeter(features same as

    digital multimeter)

    Nos 1 2 1

    7. LCD, clamp on meter Nos 2 2 2

    8. Digital earth tester Nos 1 1 1

    9. Discharge rod as per standard for

    carrying out the switch yard maintenance

    work

    Nos 6 6 6

    10. Rubber gloves of operation of isolators

    and earth switch

    Pairs 2 2 2

    11. Relay tools kit Sets 1 1 1

    12. Portable emergency light Nos 4 4 4

    13. Latest version desktop PC of reputed

    make with all its accessories including

    CPU, Monitor, UPS and having all latest

    loaded software and also its back up in

    shape of CD and separate pen drive .

    Suitable for loading of software as

    recommended by the relay

    manufacturer. It includes supply of one

    no portable laser printer of reputedmake.

    Make of PC and printer: HP/DELL

    Set 1 1 1

    ** The multimeters (both digital and analogue), clamp on meters, earth tester shall of

    Motwane make. Prior approvals of OPTCL for all the testing equipments are to be

    taken.

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 25 of 29

  • 7/30/2019 Optclvol Iia

    28/171

    17. Other Tools and Plants (T&Ps) Requirement: (ANNEXURE-III)

    Following T&Ps of reputed make shall be supplied & installed at each substation.

    Sl

    No

    Description of Items unit Quantity Required

    At each

    132/33 KV

    S/S

    At each

    220/132/33 KV

    S/S

    At each

    220/33 KV

    S/S

    1 Set of D spanner(6mm 42mm) Set 1 1 12 Set of Ring spanner(6mm

    42mm)

    Set 1 1 1

    3 Socket wrench with sockets,

    handles, and other

    attachment(6mm-42mm)

    Set 1 1 1

    4 Insulated cutting plier Nos 2 2 2

    5 Insulated nose plier Nos 2 2 2

    6 Monkey plier Nos 1 1 1

    7 Circlip plier Nos 1 1 1

    8 Pipe wrencha)12 inch 1 no

    b)18 inch 1 no

    Set1 1 1

    9 Sly wrench

    a)12inch 2 nos

    b)18inch 1 no

    Set

    1 1 1

    Insulated handle screw drivers of

    different sizes as per required

    a)12inch plain head 2 nos

    b)8inch plain head 2 nos

    c) 12inch star head 1 no

    d) small size6inch plain and star

    head 2 each

    e)Complete set of different head in

    one box/set -1set

    Set 1 1 1

    11 L-N keys set of different sizes in

    one box/set

    Set 1 1 1

    12 M.S Files(12inch and 6inch sizes)

    Round files and flat files-one each

    of different sizes)

    set 1 1 1

    13 Hammar with handle

    a)1 lb 2 nos

    b)1/2 lb-2 nos

    c)2 lb-1 no

    Set 1 1 1

    14 Crow bar

    a)5 ft 2nos

    b)3ft-2 nos

    set 1 1 1

    15 Steel scale(12inch) Nos 2 2 2

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 26 of 29

  • 7/30/2019 Optclvol Iia

    29/171

    Sl

    No

    Description of Items unit Quantity Required

    At each

    132/33 KV

    S/S

    At each

    220/132/33 KV

    S/S

    At each

    220/33 KV

    S/S

    16 Steel tape

    a)5 mtrs-2 nos

    b)30mtrs-1 no

    Set 1 1 1

    17 Oil cane Nos 2 2 2

    18 Spirit level (8inch) No 2 2 2

    19 Plumb head with string and

    attachment

    No 1 1 1

    20 Maintenance safety belt with all

    attachment and helmets(complete

    one set)

    Set 3 4 3

    21 Hand dril l machine with different

    bits and key.(Wolf make)

    No 1 1 1

    22 Vacuum cleaner having hot blower

    provision with all attachments

    (Eureka Forbes make)

    No 1 1 1

    23 230-250VAC,80W,450mm

    sweep,1400 rpm stand(rugged)

    FAN

    Make: Almonard,CGL

    No 2 4 2

    ** T&Ps shall be of Taparia/Geodre make. The hand drill and vacuum cleaner shall be

    wolf and Eureka Forbes make.

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 27 of 29

  • 7/30/2019 Optclvol Iia

    30/171

    18. Office Furniture: (ANNEXURE-IV)

    Office furniture shall be supplied & installed at each substation as per the list given

    below. All the furniture shall be of Godrej make. Before supply of the furniture to the

    sub-station, approval from OPTCL is required. Details of the scope of supply are as

    indicated below.

    Sl No Description of Items unit Quantity Required

    At each

    132/33 KV

    S/S

    At each

    220/132/33

    KV S/S

    At each 220/33

    KV S/S

    1 5ftX3ft executive table with

    drawer both sides

    Nos 5 6 5

    2 3ftX2&1/2ft Table with one

    side drawer

    Nos 7 8 7

    3 Computer table suitable

    keeping monitor, CPU,UPSand printer with two nos

    revolving arm chair suitable for

    computer use.

    Set 1 1 1

    4 Executive revolving

    ,adjustable(height) chairs with

    arm

    Nos 5 6 5

    5 Cushion fixed S type steel

    chairs with arm

    Nos 18 24 18

    6 6ftX3ft conference table Nos 1 1 1

    7 Cushion arm steel chairs for

    conference table purpose

    Nos 6 8 6

    8 6ft height steel almirah (only

    with selves) for keeping

    records and other valuable

    items

    Nos 4 6 4

    9 6ft height steel almirah with

    glass doors for library purpose

    Nos 2 2 2

    10 6ft height (having minimum 6

    lockers facility) steel cupboard

    with locking arrangement

    Nos 2 2 2

    11 4ft steel rack (minimum three

    selves) for keeping the files

    and other items

    Nos 8 10 8

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 28 of 29

  • 7/30/2019 Optclvol Iia

    31/171

    19. PORTABLE ALUMINIUM LADDER EXTENDABLE TYPE OF 3m+

    3mTO BE USED FOR MAINTENANCE OF EQUIPMENT INSIDE SWITCH

    YARD.

    Heavy duty Two fold with sliding feature aluminium ladder to be used for the maintenance

    work equipment in the switch yard( 220 KV,132 KV & 33 KV: Breaker, CT, CVT, Isolators

    etc) & also street lighting maintenance. Each fold will be of minimum height of 3 Mtrs and

    should have better locking arrangement between each folds for better rigidity.

    20. PEDESTAL MOUNTED WHEEL FITTED DERRICK FOR LIFTING/

    LOWERING OF MATERIALS UP TO 1.5 TON CAPACITY.

    Heavy duty Pedestal mounted wheel fitted derrick for lifting/ lowering of materials up to

    1.5 ton capacity to be used for the maintenance work equipment in the switch yard( 220

    KV,132 KV & 33 KV: Breaker, CT, CVT, Isolators etc) & also other maintenance works.

    The height of the derrick will be suitable for lowering of the top pole of the circuit breaker

    up to 220 KV and other equipments upto 220 KV.

    END OF VOLUME-IIA(SCOPE OF WORK)

    NIT NO. 52/2011-12 (PACKAGE-61-02 /2012) SCOPE DETAILS -VOL-IIA Pg 29 of 29

  • 7/30/2019 Optclvol Iia

    32/171

    ORISSA POWER TRANSMISSION CORPORATION LTD.

    CONSTRUCTION OF

    PACKAGE- 61-01 /2012:220KV DOUBLE CIRCUIT LINE FROMJAYANAGAR 220/132/33KV SUBSTATION OF OPTCL TO 400/220 KV

    SUBSTATION OF PGCIL AT KALIAGAON JEYPORE ALONG WITH 2NOS 220KVFEEDER BAYS EXTENSION EACH AT BOTH ENDS OF SUB-STATION.

    PACKAGE-61-02 /2012:2X 160 MVA,220/132 KV SUBSTATION ATMENDHASAL ALONG WITH 132 KV TRANSMISSION LINES & ASSOCIATED

    SYSTEM AT 400/220 KV SUB-STATION,MENDHASAL.

    PACKAGE-61-03 /2012:2X20 MVA 132/33 KV SUBSTATION AT 132KV SWITCHING SUBSTATION , SOMANATHPUR, BALASORE.

    TECHNICAL SPECIFICATION: GUARANTEED TECHNICAL

    PARTICULARS

    VOLUME-IIA

    NOTICE INVITING TENDER-NIT NO. 52/2011-12.

    BID DOCUMENT NO. SR. G.M-CPC-TENDER-PACKAGE- 61-01,61-02 & 61-03 /2011-12

    NIT NO. 52/2011-12 TS-GTP VOL-II- A Page 1of 2

  • 7/30/2019 Optclvol Iia

    33/171

    COMMON DOCUMENT

    GUARANTEED TECHNICAL PARTCULARS

    (TO BE FILLED AND SUBMITTED BY BIDDERS

    SEPARATELY FOR EACH PACKAGE WITH THE

    TECHNICAL BID)

    PACKAGE- 61-01 /2012:220KV DOUBLE CIRCUIT LINE FROMJAYANAGAR 220/132/33KV SUBSTATION OF OPTCL TO 400/220 KV

    SUBSTATION OF PGCIL AT KALIAGAON JEYPORE ALONG WITH 2NOS 220

    KVFEEDER BAYS EXTENSION EACH AT BOTH ENDS OF SUB-STATION.

    PACKAGE-61-02 /2012:2X 160 MVA,220/132 KV SUBSTATION ATMENDHASAL ALONG WITH 132 KV TRANSMISSION LINES & ASSOCIATED

    SYSTEM AT 400/220 KV SUB-STATION,MENDHASAL.

    PACKAGE-61-03 /2012:2X20 MVA 132/33 KV SUBSTATION AT 132KV SWITCHING SUBSTATION , SOMANATHPUR, BALASORE.

    NOTICE INVITING TENDER-NIT NO. 52/2011-12.BID DOCUMENT NO. SR. G.M-CPC-TENDER-PACKAGE- 61-01,61-02 & 61-03 /2011-12

    NIT NO. 52/2011-12 TS-GTP VOL-II- A Page 2of 2

  • 7/30/2019 Optclvol Iia

    34/171

    GUARANTEED TECHNICAL PARTICULARS

    IVT AND CVT

    NIT NO. 52/2011-12 TS-GTP VOL-II- A Page 1 of 138

  • 7/30/2019 Optclvol Iia

    35/171

    GUARANTEED TECHNICAL PARTICULARS.

    Sl.

    No.

    Description. 220KV

    CVT

    3P/3P/0.2 Accuracy

    Class.

    1 Bidders name and address.

    2 Name and address of the Manufacturer.

    3 Manufacturers type and designation.

    4 Standards applicable.

    5 Type of IVT/CVT

    6 Rated primary voltage (kv).

    7 Rated secondary voltage (volts).

    7.1 Winding-I.

    7.2 Winding-II.

    7.3 Winding-III.

    8 Rated frequency [HZ].

    9 Rated burden:-

    Protection Winding

    Protection Winding

    Metering Winding

    10 Number of secondary windings.

    11 Accuracy class.

    [I] [protection] Winding

    [II] [metering] Winding

    12 Rated voltage factor for continuous operation at rated frequency.

    13 Rated voltage factor for 30 seconds at rated frequency.

    14 One minute dry and wet power frequency withstand voltage for primary

    side

    [kv] rms.

    15 One minute power frequency withstand voltage for secondary winding

    [kv] rms.

    16 1.2/50 micro- second impulse withstand test voltage for primary side

    17 Temperature rise over an ambient temperature of 50C

    [a] With 1.2 times rated primary voltage at rated frequency and at rated

    burdens.

    [I] Winding [C]

    [II] Oil [C]

    [III] Other parts [C]

    [b] With 1.5 times rated primary voltage for 30 seconds at rated frequency and

    at rated burdens.

    NIT NO. 52/2011-12 TS-GTP VOL-II- A Page 2 of 138

  • 7/30/2019 Optclvol Iia

    36/171

    Sl.

    No.

    Description. 220KV

    CVT

    3P/3P/0.2 Accuracy

    Class.

    [I] Winding [C]

    [II] Oil [C]

    [III] Other parts [C]

    18 Class of insulation.

    19 Total creepage distance in (mm)

    20 Maximum radio interference voltage at 1.1 times maximum line to ground

    voltage (micro volts)

    21 Corona inception and extinction voltage (kv) rms

    22 Partial discharge level (piccocoulombs)

    23 Primary.[For 220KV, 132KV & 33KV IVT]

    (a) No. of primary turns

    (b) Material of primary(c) Size of the primary conductor bare/insulated.

    (d) Cross sectional area of primary conductor (sq.mm)

    (e) Current density adopted for primary winding(A/sq.mm)

    (f) Type of primary winding.

    (g) Name of the insulating materials used for primary conductor.

    (h) Weight of primary winding.

    24 Secondary. [For 220KV, 132KV & 33KV IVT]

    (a)No. of secondary turns

    (b) Material of secondary

    Size of the secondary conductor bare /insulated.

    (d)Cross sectional area of secondary conductor (mm)

    (e)Current density adopted for secondary winding(A/mm)

    (f)Type of secondary winding

    (g)Name of the insulating materials used for secondary conductor.

    (h)Weight of secondary winding.

    25. Core. [For 220KV, 132KV & 33KV IVT](a)Shape of the core

    (b)Material and grade of the core laminations

    (c)Thickness of the core lamination (mm)

    (d)Maximum flux density adopted (Tesla)

    (e)Net iron area of the core

    (f)Watt loss/kg. for the core materials at the operating flux density(W/kg)

    (g) Total weight of the core(kg)

    NIT NO. 52/2011-12 TS-GTP VOL-II- A Page 3 of 138

  • 7/30/2019 Optclvol Iia

    37/171

    Sl.

    No.

    Description. 220KV

    CVT

    3P/3P/0.2 Accuracy

    Class.

    (h)Whether B-H curve for core material enclosed?

    (i)Whether specific loss vrs. Flux density curve enclosed ?

    26INSULATION. .[For 220KV, 132KV & 33KV IVT]

    (a) Insulation between core and secondaries.

    (b) Insulation between secondaries.

    Insulation between secondary and primary.

    (d) Insulation between primary .and core.

    27 DIMENSIONS OF CORE AND WINDINGS. .[For 220KV, 132KV &

    33KV IVT]

    (a)Diameter of the core (mm)

    (b)Inner diameter of the secondary windings(mm)

    (c) Outer diameter of the secondary windings (mm)

    (d) Inner diameter of the primary winding(mm)

    (e) Outer diameter of the primary winding(mm)

    (f) Minimum clearance from primary winding to tank(mm)

    (g) Minimum clearance from secondary winding to tank(mm)

    28. Percentage voltage ratio (error)/phase displacement (min.)at 100% rated

    burden at 0.8PF lagging for measuring winding.

    (a) 80% of rated voltage at frequency:-

    (b) 120% of rated voltage at frequency:-

    (c) Accuracy of standard PT to be used. during determination of errors

    (0.05 or better.

    29. Percentage Voltage ratio /phase displacement (min.)at 25% rated burden at0.8PF lagging for measuring winding.

    (a) 80% of rated voltage at rated frequency:-

    (b) 120% of rated voltage at rated frequency:-

    30. Percentage voltage (ratio)error /phase

    displacement (min.) at 100% rated burden at 0.8PF lagging for protection

    winding

    (a)5% of rated voltage.

    (b)1.2 times rated voltage

    ( c)1.5 times rated voltage

    (d) 2% of rated voltage..31. Percentage voltage (ratio) error /phase displacement (min) at 25% of rated

    burden at 0.8PF lagging for protection winding

    (a)5% of rated voltage

    (b)1.2 times rated voltage.

    1.5 times rated voltage.

    (d) 2% of rated voltage.

    32. Whether IVT/CVT is suitable for horizontal transportation.

    NIT NO. 52/2011-12 TS-GTP VOL-II- A Page 4 of 138

  • 7/30/2019 Optclvol Iia

    38/171

    Sl.

    No.

    Description. 220KV

    CVT

    3P/3P/0.2 Accuracy

    Class.

    33. Quantity of oil per IVT/ CVT (Ltrs/kg)

    34. Standard to which oil conforms.

    35. Characteristic of oil(Prior to filling)35.1

    .

    Breakdown voltage (kv-rms)

    35.2

    .

    Dielectric dissipation constant tan delta)

    35.3 Water content(PPM)

    35.4 Gas content(PPM)

    35.5 Interfacial tension at 27 degree C(N/m)

    35.6 Specific resistance.

    35.6.1

    At 90 deg.C(ohm-cm)

    35.6

    .2

    At 27 deg.C(ohm-cm)

    36. Whether IVTS are hermetically sealed ? If so how ?

    37. Total Weight (kg)

    38. Transport weight (kg)

    39. Dimensional details.

    40 Whether IVT characteristic curves enclosed?

    41. TANK AND SECONDARY TERMINAL BOX.41.1 Material of the IVT/ CVT tank

    41.2 Material of the secondary terminal box.

    41.3 Thickness of the IVT/ CVT tank material.

    41.4 Thickness of the secondary terminal box material.

    41.5 Zinc coating of IVT/ CVT tank(g/sq.m)

    41.6 Zinc coating of the secondary terminal box (g/sq.m)

    41.7 Weather proof rating of secondary terminal box.

    41.8 Weight of tank fitting and other accessories.

    TERMINAL CONNECTORS01. Manufacturers name

    02. Applicable standards.,

    03. Type.

    04. Material of connector.

    (a)Clamp body.

    (b)Bolts and Nuts.

    (c ) Spring Washers

    NIT NO. 52/2011-12 TS-GTP VOL-II- A Page 5 of 138

  • 7/30/2019 Optclvol Iia

    39/171

    Sl.

    No.

    Description. 220KV

    CVT

    3P/3P/0.2 Accuracy

    Class.

    05. Rated current.

    06. (a) Rated terminal load(kg)

    (b) Factor of safety.07. Minimum thickness of any part(mm)

    08. Weight of connector complete with hardware.

    09. Type test reports as per IS enclosed.

    10. OGA drawing enclosed.

    BUSHING/SUPPORT INSULATOR

    01 Manufacturers name

    02. Type.

    03. Applicable standards.

    04Dimensions:

    (i)Height(mm)

    (ii)Diameter(top)(mm)

    (iii)Diameter( bottom)(mm)

    05 Total creepage distance (mm).

    06. Rated voltage(KV)(rms)

    07. Power frequency withstand voltage for

    (1 minute dry and wet(KV/rms)

    08.

    1.2/50 micro-second Impulse withstand voltage (KVP)

    09. Corona Extinction voltage(kv)

    10. Weight(kg)

    11. Maximum allowable span (mm)

    12. Cantilever strength(kg)

    13. OGA drawing enclosed.

    NIT NO. 52/2011-12 TS-GTP VOL-II- A Page 6 of 138

  • 7/30/2019 Optclvol Iia

    40/171

    ADDITIONAL TECHNICAL REQUIREMENT FOR 220KV CVT

    1. Rated capacitance of the CVT

    2. High frequency capacitance for entirecarrier frequency range.

    3. Equivalent series resistance over the entire

    frequency.

    4. Stray capacitance and stray conductance of the

    LV terminal over entire carrier frequency range.

    5. Capacitance (PF) /Tan delta between:-

    a) HV-HF point

    b) HF point-Ground point of

    International Transformer.

    c) HV-Ground point of Intermediate

    Transformer winding.

    6. Capacitive reactance of the two parts of

    the divider i.e. High voltage capacitor,

    and Intermediate voltage capacitor,

    connected in parallel.

    7. Total Inductive reactance, offered by CVT.

    8. Voltage ratio of the capacitor divider.

    9. Open circuit Intermediate voltage.

    10. Rated open circuit Intermediate voltage.

    11. Reference range of temperatures within

    which the CVT complies with the relevant

    accuracy requirements.

    12. Protective device, in-corporate in the CVT

    for limiting over voltages and/or to prevent

    sustained Ferro resonance.

    NIT NO. 52/2011-12 TS-GTP VOL-II- A Page 7 of 138

  • 7/30/2019 Optclvol Iia

    41/171

    13. Rated voltage of Surge Arrester, connected

    at the secondary of CVT.

    14. Natural frequency of coupling (KHZ).

    15. Self tuning frequency of CVT (KHZ).

    16. Bandwidth (KHZ).

    17. Temperature rise over ambient.

    18. One minute power frequency test voltage

    of secondary winding (KV).

    19. One minute power frequency test voltage

    of H.F. terminal (KV).

    20. One minute power frequency test voltage

    of capacitor (dry & wet) (KV).

    21. 1.2/50/micro second Impulse withstand test voltage

    of capacitor (KVP).

    22. 250/2500 micro second switching surge

    withstand voltage of capacitor (dry & wet).

    23. Literature

    Whether the followings are enclosed?

    23.1 Type Test reports as per IEC 186.

    23.2 OGA drawing of CVT and terminal

    connector.

    23.3 Characteristic curves.

    23.4 Drawing showing clearance from

    earthed object.

    23.5 Details of Surge Arrester, connected

    at secondary winding of CVT.

    24. ELECTROMAGNENIC UNIT:-

    NIT NO. 52/2011-12 TS-GTP VOL-II- A Page 8 of 138

  • 7/30/2019 Optclvol Iia

    42/171

    24.1 CORE:-

    a) Core diameter (mm)

    b) Window Weight (mm)

    c) Leg centre (mm)

    d) Net cross sectional area of iron

    In the core (mm )

    e) Core lamination thickness (mm)f) Type & grade of core.

    g) Design flux density at rated voltage.

    And rated frequency (Tesla)

    h) Design flux density at highest system voltage

    & lowest system frequency (Tesla).

    i) Minimum knee point voltage (volts).

    24.2 PRIMARY WINDING:-

    a) No. of turns.

    b) Bare size of conductor

    c) Insulated size of conductor.

    d) Area of cross section.

    e) Current density (A/ mm).

    f) Conductor material.

    g) Class of insulation.

    h) Power frequency withstand level.

    (KV-rms).

    i) Impulse withstand level (KVP).

    24.3 Secondary Winding Protection Protection Metering

    Winding Winding Winding.

    a) No.of turns

    b) Bare conductor size (mm)

    c) Insulated conductor size (mm)

    d) Cross-sectional area (sq.mm)

    e) Current density (A/ mm)

    f) Conductor material.

    g) Class of Insulation.h) Power frequency withstand

    Level (KV-rms).

    Signature of the Tenderer

    with seal and date.

    NIT NO. 52/2011-12 TS-GTP VOL-II- A Page 9 of 138

  • 7/30/2019 Optclvol Iia

    43/171

    ANNEXURE B.

    CALIBRATION STATUS OF TESTING EQUIPMENTS AND INSTRUMENTS/METERS.

    Name

    of the

    test.

    Meters

    and

    equipment

    s required

    for the

    correspondi-ng test

    with

    range,

    accuracy,

    make and

    Sl. No.

    Date of

    Calibra-

    tion.

    Due date

    of Cali-

    bration.

    Name of

    the Cali-

    brating

    Agency.

    Whether

    Calibrat-

    ing

    Agency

    is Govt.

    Approv-ed.

    Whether

    documents

    relating to

    Govt.

    Approval

    of the cali-brating

    Agency

    furnished ?

    Whether

    the

    meters/

    equipment

    fulfill the

    accuracyclass as

    per

    calibration

    report

    Whether

    the calibra

    ting

    agency has

    put any

    limitationtowards

    the use

    of the

    particular

    meter/equi

    pment. If

    yes, state

    the

    limitations

    .

    Whether green

    sticker or blue

    sticker or

    yellow sticker

    has been

    affixed on thebody of the

    particular

    equipment/me

    ter. State the

    colour of the

    affixed

    sticker.

    Inspite of

    imposed

    limitations,,

    whether the

    particular

    meter/equipment can

    still be

    used ?

    Justify its

    use for

    correspondi

    ng test(s).

    Rema-

    rks

    1 2 3 4 5 6 7 8 9 10 11 12

    Signature of the tenderer with seal and date.

    NIT NO. 52/2011-12 TS-GTP VOL-II- A - GTP- Page 10 of 140

  • 7/30/2019 Optclvol Iia

    44/171

    ANNEXURE-C

    CHECK LIST TOWARDS TYPE TEST REPORTS.

    Name

    of the

    Type

    Test.

    Date

    of

    Test.

    Name of

    the

    Laboratory

    where the

    Test has

    been

    conducted.

    Whether the

    Laboratory is

    Government

    Approved.

    Whether the

    Test reports

    are valid as

    per Clause

    No.8.1 of T.S.

    Whether the

    copy of Test

    Report in

    complete

    shape

    alongwith

    drawings

    etc.furnished or

    not ?

    Whether the

    Tested

    I.V.T.

    fulfills the

    technical

    require-

    ments as per

    TS.

    If the type testedI.V.T

    does not fulfill the

    technical requirements

    as per this specification,

    whether the bidder

    agrees to conduct the

    particular test(s) again at

    their own cost withoutany financial liability to

    OPTCL in the presence

    of OPTCLs

    representative within the

    specified delivery

    period.

    Re mark

    1 2 3 4 5 6 7 8 9

    Signature of the Tenderer with seal and date.

    NIT NO. 52/2011-12 TS-GTP VOL-II- A - GTP- Page 11 of 140

  • 7/30/2019 Optclvol Iia

    45/171

    GUARANTEED TECHNICAL PARTICULARS

    BATTERY AND BATTERY CHARGER

  • 7/30/2019 Optclvol Iia

    46/171

    SCHEDULE OF GUARANTEED TECHNICAL PARTICULARS

    FOR 220V/48V LEAD ACID PLANTE/Maintenance Free(VRLA) STORAGE

    BATTERY.

    [To be filled in by the bidder]

    Values/Others

    1. Manufacturers Name and address alongwith Fax No. &

    Tele phone No.

    2. Conforming to standards

    3. Type and designation as per ISS

    4. Manufacturers type and designation

    5. AH capacity and voltage of the battery at 27 deg.C.

    [a] At 10 hour rate of discharge.

    [b] At 5 hours rate of discharge.

    [c] At 1 hour rate of discharge

    [d] At 1 minute rate of discharge.

    [e] At hour rate of discharge.

    6. Open circuit voltage of each battery cell.

    [a] Fully charged

    [b] Floating condition.

    [c] When completely discharged at.[i]. 10hr. rate.

    [ii]. 5 hour rate

    [iii] 1 hour rate

    [iv] hr. rate

    [v]. 1 minute rate

    [vi] 1-second rate.

    7. Recommended float charging voltage [volts] across the

    battery terminals.8. Recommended boost charging voltage [volts].

    9. Time required for boost charging from discharged

    conditions [in hours]

    10. Trickle charging

    Current range/cell

    11. AH capacity at 10 hour rate at 10 hour rate at room

    temperatures of :

    [a] 15 deg C.[b] 27 deg C.

  • 7/30/2019 Optclvol Iia

    47/171

    [c] 50 deg C.

    12. CELL DETAILS

    [i]. No. of cells per battery

    [ii]. Total nos. of plates per cell.

    [iii] No. of positive plates per cell.

    (iv) Type of positive plate

    (v) No. of negative plates per cell

    (vi) Type of negative plate

    (vii) Surface area of plates in sq. mm.

    (viii) CONSTRUCTIONAL DETAILS AND DIMENSIONS OF

    (a) Positive plate(b) Negative plate

    (c) Material of the container

    (d) Thickness of the container

    (e) Overall dimensions of each cell (LxBxH)

    ix. Weight per Cell (Kg)

    (a) Active elements-positive

    (b) Active elements-Negative

    (c) Container

    (d) Net dry weight

    (e) Weight with electrolyte

    x. Distance between centre of cells where erected.

    xi. Nominal cell voltage.

    xii. Internal resistance of each cell at

    (a) Fully charged condition

    (b) Fully discharged condition(c) Floating condition

    13. Type, Thickness and materials of the separators

    14. Containers

    (a) Type

    (b) Material

    (c) Outside dimensions (LxBxH)

    15. Cover and its type and material

    16. Clearance in mm between

  • 7/30/2019 Optclvol Iia

    48/171

    (a) Top of plates and top of container

    (b) Bottom of plates and bottom of container

    (c) Edges of plates and inner surface of container.

    17. Sediment space (depth) in mm18. ELECTROLYTE

    (a) Amount of electrolyte and specific gravity at 27

    deg. C for first filling.

    (b) First filling per set with 10% of extra furnished.

    (c) Electrolyte conforms to standard

    (d) Rated specific gravity of electrolyte when fully

    charged at rooms temperature of

    (i) 15 deg. C

    (ii) 27 deg. C

    (iii) 50 deg C.

    (e) Specific gravity of electrolyte at the end of

    discharge at 10 hour discharge rate.

    (f) Maximum electrolyte temp. that the cells can

    withstand without injurious effect.

    (i) Continuously

    (ii) For short period

    19. INTER CELL CONNECTOR

    (a) Whether Inter-cell connector to be furnished ? (Yes

    / No)

    (b) Type of inter-cell connector (bolted or others)

    (c) Materials of inter cell connector

    20.

    (a)

    Inter row, inter-tier connectors and end take-off

    furnished ? (Yes / No)(b) Description, size, current rating, type and material.

    21. RACKS

    (a) No. of racks per battery

    (b) No. of cells per rack

    (c) Type of racks (rows and tiers)

    (d) Material of the rack

    (e) Racks provided with

    (i) Numbering tags for cell

  • 7/30/2019 Optclvol Iia

    49/171

    (ii) Teak wood clamps for cables

    (f) Whether anti-acid coating provided ?

    (g) Description of rack insulators

    (h) Outline dimensions of racks(i) Net weight of racks

    (j) Shipping weight

    22. Recommended rate for charging the battery in 8

    hours.

    Start Finish

    (a) Current

    (b) Voltage

    23. Recommended float charge rate

    24. Resistance of the battery including inter-connector

    between the cells in ohms.

    25.

    (a)

    Maximum short circuit current per battery

    (b) Allowable duration of short circuit

    26. Short circuit current for a dead short across the

    battery terminals when

    (a) Float at 2.1 volts per cell.

    (b) Boost charge to 2.75 volts per cell.

    27.

    (a)

    Time to full charge at finishing rate only

    (b) Time to full charge at higher starting rate

    (c) Time for full charge to charge by two step charging

    at starting up and finishing rates

    28. Guaranteed AH efficiency at 10 hour rate of

    discharge in percent.29. Guaranteed WH efficiency at 10 hour rate of

    discharge in percent.

    30. Instructions for filling and initial charging of the

    battery with finishing and two step charging rates.

    31. Recommended interval at which battery should be

    discharged at 10 hour rate and quick charged.

    32. Recommended floating voltage per cell and the

    minimum variation.

  • 7/30/2019 Optclvol Iia

    50/171

    33. Recommended maximum period of storage before

    the first charge.

    34. Average life in years

    35. Guaranteed life of battery in years.36. Estimated life of battery in years.

    37. Total shipping weight of battery units

    38. Dimensioned lay-out drawings of the rack and

    battery to be attached with the tender. (Whether

    furnished ? Yes / No)

    39. The following characteristic curves, to be furnished

    alongwith the tender (whether furnished)

    (a) Battery discharge curves at various rates between

    one minute and 10 hour rate. (Yes / No.)

    (b) Curves showing the relation between the specific

    gravity and amount of charge in the battery for

    both charging and discharging conditions. (Yes /

    No)

    (c) Curves showing the relation between cell voltage

    and charging current when charged at

    (i) Finishing rate (Yes/ No)

    (ii) High starting rate (Yes/ No)

    (iii) Two step charging by starting and finishing rate

    (Yes / No)

    (d) Curve of internal resistance at the end of various

    discharge rates (Whether furnished (Yes / No)

  • 7/30/2019 Optclvol Iia

    51/171

    GUARANTEED TECHNICAL PARTICULARS FOR

    BATTERY CHARGER (220 V /48 V D.C. SYSTEM) SUITABLE

    FOR SPECIFIED LEAD ACID PLANTE STORAGE BATTERY/VRLA

    Battery

    (To be filled in by the Bidder)

    Values/ Others

    1. Manufacturers Name

    2. Rated output of the charger

    2.1 Voltage (volts)

    2.2 Current (amps)

    2.3 Power factor

    3. Short time rating

    4. Type of cooling

    5. Hottest stack temperature (0C)

    6. Charger dimensions

    6.1 Height (mm)

    6.2 Depth (mm)

    6.3 Width (mm)

    6.4 Sheet thickness (mm)

    7. Charger weight

    8. Charger rated output current

    8.1 Float charging mode

    8.2 Boost charging mode

    9. Load limiter current setting range (Trickle mode)

  • 7/30/2019 Optclvol Iia

    52/171

    10. RECTIFIER TRANSFORMER Float Boost

    Charger Charger

    10.1 Make

    10.2 Type

    10.3 Rated KVA

    10.4 Over current impedance (ohms)

    10.5 Input line winding connection

    in vector representation

    10.6 Rated primary voltage (volts)

    10.7 Rated secondary voltage (volts)

    10.8 Rated frequency (Hertz.)

    10.9 Rated output (amps)

    10.10 Turn ratio

    10.11 Insulation level

    10.12 Impulse withstand test voltage (KVP)

    10.13 One minute power frequency over voltage.

    (a) Primary winding (KV-rms).

    (b) Secondary winding (KV-rms)

    10.14 Material of primary winding conductor

    10.15 Material of secondary winding conductor

    10.16 Size, Cross-sectional area and current density of primary winding conductor.

    10.17 Size, cross-sectional area and current density of secondary winding conductor

    10.18 No. of turns of primary / phase

    10.19 No. of turns of secondary / phase

    10.20 Name of the insulating materials used and class

  • 7/30/2019 Optclvol Iia

    53/171

    10.21 Core

    10.21.I Name of the core material

    10.21.II Grade of the core

    10.21.III Thickness of core material (mm)

    10.22 Maximum temperature rise over an ambient temperature of 500C

    (a) Primary Winding (0C)

    (b) Secondary Winding (0C)

    (c) Core (0C)

    10.23 standards applicable

    11.0 RECTIFIER ASSEMBLY :

    11.1 Make

    11.2 Type of semi conductor material

    11.3 Rated direct current per cell (A)

    11.4 Rated direct voltage (V)

    11.5 Rated input voltage (V)

    11.6 Type of connections of rectifier elements.

    11.7 Forward power loss and reverse power loss (watts).

    11.8 Forward voltage drop and reverse voltage drop (volts)

    11.9 Conversion efficiency (%)

    11.10 Rated DC output voltage (V)

    11.11 Rated AC input voltage (V)

    11.12 Rated output current (A)

    11.13 Ripple factor

    11.14 Voltage factor

    11.15 Current factor

  • 7/30/2019 Optclvol Iia

    54/171

    11.16 Maximum temperature rise over an ambient temperature of 500C (

    0C)

    11.17 Maximum permissible ambient temperature for guaranteed rating (0C)

    11.18 Maximum and minimum permissible humidity rating (%)

    11.19 Life expectancy (years)

    11.20 Standard(s) applicable

    11.21 Characteristic curve of DC output plotted against output current (Whether

    submitted ?) Yes / No.

    12.0 AUTOMATIC VOLTAGE REGULATOR

    12.1 manufacturers name

    12.2 Manufacturers type

    12.3 Percentage stabilisation of the rectifier with the help of AVR when

    (a) Input voltage changes with of its nominal value.

    (b) DC output of the rectifier varies from no-load to full load.

    12.4 Rated output voltage

    12.5 Allowable AC frequency fluctuations

    12.6 Voltage setting range

    12.7 Response time of automatic voltage regulator

    13.0 Manual voltage regular (float mode)

    13.1 Type

    13.2 Voltage setting range

    14.0 Boost charging current setting range

    15.0 Boost charging limit setting range

    16.0 DIODES

    16.1 Manufacturers name

  • 7/30/2019 Optclvol Iia

    55/171

    16.2 Type of circuit

    16.3 Method of construction

    16.4 Continuous current rating (Amps.)

    16.5 Short time current rating (Amps)

    16.6 Type of cooling

    16.7 Forward power loss and reverse power less (W)

    16.8 Life expectancy

    16.9 Forward voltage drop on rated current

    16.10 Resistance offered for reverse current flow

    16.11 Maximum temperature rise over an ambient temperature of 500

    C.

    17.0 CONTACTORS / MOULDED CASE CIRCUIT BREAKERS

    17.1 Type

    17.2 Make

    17.3 Rated voltage (V)

    17.4 Rated continuous currents (A)

    17.5 Contact material

    17.6 Operating coil

    17.6.1Voltage (V)

    17.6.2Voltage range and power for closing and holding

    17.6.3Voltage range and power for drop off.

    17.7 Thermal trip rating

    17.8 Thermal trip time

    17.9 Details of CT if any

    17.10 Auxiliary contacts

  • 7/30/2019 Optclvol Iia

    56/171

    17.10.1 Number

    17.10.2 Current rating

    17.11 Characteristics of back-up HRC fuse

    18.0 RELAYS :

    18.1 Make and type of protective and alarm relays

    (a) Thermal overload relay

    (b) Input under voltage relay

    (c) Single phasing alarm relay

    (d) Phase reversal relay

    (e) D.C. output over-voltage relay

    (f) D.C. output under voltage relay

    (g) Charger failure relay

    (h) Battery earth fault relay

    (i) A.C. input failure relay (for connecting the D.C. load)

    (j) Fuse failure relay

    (k) Alarm accept relay

    18.2 Rated voltage of each of the above

    (a) AC/DC

    (b) Permissible variation

    (c) Frequency

    18.3 VA burden of each of the above

    18.4 Operating time of each of the above

    18.5 Time vs current curves of each of the above.

    (to be enclosed alongwith the offer)

    18.6 Reset time

  • 7/30/2019 Optclvol Iia

    57/171

    18.7 Accuracy

    18.8 Setting range

    18.9 Reset factor

    18.10 Number of contacts

    (a) Normally open

    (b) Normally closed

    18.11 Rating of contacts

    (a) Rated Voltage (V)

    (b) Rated making and breaking

    (c) Continuous rating

    18.12 No. of operations

    18.13 Operation indicator

    19.0 INDICATING LAMPS

    19.1 Manufacturers name

    19.2 Type and designation

    19.3 Permissible voltage variation

    19.4 Rated power consumption (watts).

    19.5 Series resistance, if any

    20.0 SWITCHES:20.1 Manufacturers name

    20.2 Ratings

    (a) Continuous current

    (b)Short circuit making capacity

    (c) Breaking capacity

    (d)Voltage

  • 7/30/2019 Optclvol Iia

    58/171

    20.3 Operating mechanism details

    20.4 Type of visual indication

    (a) OFF and ON position

    (b)Fuse blow out

    21.0 FUSES

    (a) Make

    (b)Type

    (c) Rating (Amps)

    (d)Interrupting rating (KA)

    22.0 INSTRUMENTS

    22.1 Manufacturers Name

    (a) Ammeter

    (b)Voltmeter

    22.2 Type

    (a) Ammeter

    (b) Voltmeter

    22.3 Standard

    (a) Ammeter

    (b) Voltmeter

    22.4 Scale range

    22.4.1Ammeter

    (a) Float charger

    (b)Boost charger

    (c) Battery float(d)Battery boost

  • 7/30/2019 Optclvol Iia

    59/171

    22.4.2Volt meter

    (a) Input supply

    (b)Charger output

    (c) Load

    22.5 Size of dial

    (a) Volt meter

    (b)Ammeter

    22.6 Accuracy class

    (a) Volt meter

    (b)Ammeter

    22.7 Temperature at which calibrated

    22.8 Limit of errors

    22.9 Out line dimensions

    22.10 Type of mounting

    22.11 Selector switch for volt meter (AC & DC)

    (a) Make

    (b)Rating

    23.0 CAPACITOR

    23.1 Manufacturers name

    23.2 Type

    23.3 Capacitance (Farad)

    23.4 Maximum temperature rise over an ambient temperature of 500C.

    24. Reference float voltage at ambient temperature of 270C

    25. Whether protection is given for float voltage to Avoid low battery voltage due

    to sensor or circuit Malfunction. (Yes/ No).

  • 7/30/2019 Optclvol Iia

    60/171

    ANNEXURE IV-A

    (For Testing of Battery)

    (To be filled in by the bidder)

    CALIBRATION STATUS OF TESTING EQUIPMENTS AND INSTRUMENTS/ METERS

    Name of

    the Test

    Meters &

    Equipments

    required for the

    corresponding

    test with range,

    accuracy, make

    & Sl. No.

    Date of

    Calibr-

    ation

    Due date of

    Calibration

    Name of

    the

    Calibratig

    Agency

    Whether

    Calibrating

    Agency is

    Govt.

    approved

    Whether

    documents

    relating to Govt.

    approval of the

    calibrating

    Agency

    furnished

    Whether the

    meters/

    equipments

    ful fil the

    accuracy

    class as per

    calibration

    report.

    Whether the

    calibrating

    agency has

    put any

    limitation

    towards the

    use of the

    particular

    meter/

    equipment. If

    yes, state the

    limitations

    Whether the

    calibrating

    agency has put

    any limitation

    towards the use

    of the

    particular

    meter/equip-

    ment/ meter.

    State the colour

    of the affixed

    sticker

    Inspite of

    imposed

    limitations.

    Whether the

    particular

    meter /

    equipment can

    still be used ?

    Justify its use

    for

    corresponding

    test(s)

    Remarks

    1 2 3 4 5 6 7 8 9 10 11 12

    Signature of the tenderer with seal & date

    NIT NO. 52/2011-12 TS-GTP VOL-II- A GTP- Page 27 of 140

  • 7/30/2019 Optclvol Iia

    61/171

    ANNEXURE IV-B

    (For Testing of Battery Charger)

    (To be filled in by the bidder)

    CALIBRATION STATUS OF TESTING EQUIPMENTS AND INSTRUMENTS/ METERS

    Name of

    the Test

    Meters &

    Equipments

    required for the

    corresponding

    test with range,

    accuracy, make

    & Sl. No.

    Date of

    Calibr-

    ation

    Due date of

    Calibration

    Name of

    the

    Calibratig

    Agency

    Whether

    Calibrating

    Agency is

    Govt.

    approved

    Whether

    documents

    relating to Govt.

    approval of the

    calibrating

    Agency

    furnished

    Whether the

    meters/

    equipments

    fulfil the

    accuracy

    class as per

    calibration

    report.

    Whether the

    calibrating

    agency has

    put any

    limitation

    towards the

    use of the

    particular

    meter/

    equipment. If

    yes state the

    limitations

    Whether the

    calibrating

    agency has put

    any limitation

    towards the use

    of the

    particular

    meter/equip-

    ment/ meter.

    State the colour

    of the affixed

    sticker

    Inspite of

    imposed

    limitations.

    Whether the

    particular meter /

    equipment can

    still be used ?

    Justify its use for

    corresponding

    test(s)

    Remarks

    1 2 3 4 5 6 7 8 9 10 11 12

    Signature of the tenderer with seal & date

    NIT NO. 52/2011-12 TS-GTP VOL-II- A GTP- Page 28 of 140

  • 7/30/2019 Optclvol Iia

    62/171

    ANNEXURE V A

    (To be filled in by the bidder)

    CHECK LIST TOWARDS TYPE TEST REPORTS FOR BATTERY

    Name of the

    Type Test

    Date of

    Test

    Name of the

    Laboratory where

    the Test has been

    conducted

    Whether the

    Laboratory is

    Government

    approved

    Whether the

    Test report is

    valid as per

    Spn.

    Whether the

    Test report in

    complete

    shape

    alongwith

    drawings etc.

    furnished or

    not ?

    Whether the

    type tested

    Plante lead

    acid battery

    fulfil ls the

    technical

    requirements

    as per TS

    If the type tested battery does not

    fulfill the technical requirements as

    per this specification, whether the

    bidder agrees to conduct he particular

    type test again at their own cost

    without any financial liability to

    OPTCL in the presence of OPTCLs

    representative within the specified

    delivery period

    Remarks

    1 2 3 4 5 6 7 8 9

    Signature of the tenderer with seal & date

    NIT NO. 52/2011-12 TS-GTP VOL-II- A GTP- Page 29 of 140

  • 7/30/2019 Optclvol Iia

    63/171

    ANNEXURE V B

    (To be filled in by the bidder)

    CHECK LIST TOWARDS TYPE TEST REPORTS FOR BATTERY CHARGER

    Name of

    the Type

    Test

    Date of

    Test

    Name of the

    Laboratory

    where the Test

    has been

    conducted

    Whether the

    Laboratory is

    Government

    approved

    Whether the

    Test report is

    valid as per

    Spn.

    Whether the

    Test report

    in complete

    shape

    alongwith

    drawings

    etc.

    furnished or

    not ?

    Whether the

    type tested

    battery

    charger

    fulfills the

    technical

    requirements

    as per TS

    If the type tested battery charger does not

    fulfill the technical requirements as per this

    specification, whether the bidder agrees to

    conduct he particular type test again at their

    own cost without any financial liability to

    OPTCL in the presence of OPTCLs

    representative within the specified delivery

    period

    Remarks

    1 2 3 4 5 6 7 8 9

    Signature of the tenderer with seal & date.

    NIT NO. 52/2011-12 TS-GTP VOL-II- A GTP- Page 30 of 140

  • 7/30/2019 Optclvol Iia

    64/171

    GUARANTEED TECHNICAL PARTICULARS

    FOR

    SF6 AND VACUUM CIRCUIT BREAKERS

    NIT NO. 52/2011-12 TS-GTP VOL-II- A Page 31 of 138

  • 7/30/2019 Optclvol Iia

    65/171

    GUARANTEED TECHNICAL PARTICULARS FOR CIRCUIT BREAKERS

    ( To be filled in & furnished by the Bidder , separately for 245 KV SF6 Circuit

    Breakers)