Eastern Water Resources Development and Management Plc.
Opportunity DayQ2/2010 Performance Review
20 August 2010 13.15 – 14.30 pm.
Contents
• Company Overview
• Operation Highlights
• Financial Highlights
• Futures Highlights
• Corporate Social Responsibility : CSR
East Water Group Structure
Shareholders Structure
As of 31 July 2010
Note: * PWA : Provincial Waterworks Authority, a state enterprise responsible for waterworks outside BKK
* IEAT : Industrial Estate Authority of Thailand, a state enterprise responsible for establishment industrial estates
* EGCOMP : A public company limited, produce and supply electricity in Thailand
* Utilico : Utilico Emerging Markets Limited, an investment company from UK
10.45%
15.88%
10.18%
18.72%
40.20%
4.57%Retail Investors
Institutions
Utilico
EGCOMP
PWA
IEAT
SET: Energy & Utilities Sector
Paid-up Capital
THB 1,663.73
Retail Investor& Institutions 26.33%
Foreign Investors 18.65%*Foreign Limit 30%
5
Universal Utilities Co., Ltd.(UU)
Nakhonsawan Prathum-Rangsit (PWA)
ChachoengsaoBangpakong
Sattahip Rayong
Samui Island
Phuket
Rachaburi-Samutsongkram
Larn IslandSrichang Island
Borwin
Group 1: 9 Concession Contracts
Group 2: 2 O&M Contracts
Group 3: 1 NRW Contracts
Contents
• Company Overview
• Operation Highlights
• Financial Highlights
• Futures Highlights
• Corporate Social Responsibility : CSR
Pipelines Network and Service Areas
Prasae-Klongyai Pipeline Networks
P
Maptaphut Industrial Estate
Prasae-Klongyai (RID)
Laying pipeline approx. 34 km.
NongKho
NongPlaLai
DokKrai
BangPra
KlongYai
Prasae
P
Pipeline (Completed)
Pipeline (Under Construction)
Pumping Station (Under Construction)
Head Tank (Under Construction)
NongPlaLai - Maptaphut Line 3Project Progress (as of 16 August 2010)
Laying Pipeline from NongPlaLai Pumping Station to MapKah
Head Tank(R1),length 11,759 m., and Pressure Test was
completed
Laying Pipeline from MapKah Head Tank to Phattana
Plantation Crossroads(R2) ,length 828 m., was completed
Laying Pipeline from Phattana Plantation Crossroads to
Sukhumvit Road(R3) was completed 410 m. from total length
21,387 m. .
Actual Progress 76.19% (Laying Pipeline was completed
25,886 m. from 33,974 m.)
NongPlaLai - Maptaphut Line 3
DokKrai
NongPlaLai
KlongYaiPipeline
Completed
Pipeline in Process
NongPlaLai - Maptaphut Line 3
Raw Water Demand
13.57%
Reservoir Storage on 16 August 2010
Forecasting
Aug-Dec 2010
16 Aug. 2010
213.35 MCM (78%)
Raw Water Storage Forecasting from Aug to the End of Dec 2010
(Dokkrai, Nongplalai & Klongyai Reservoir)
Total of Maximum Raw Water Storage (3 Reservoirs) 275.25 MCM
Minimum of Total Raw Water Storage (3 Reservoirs) 19.5 MCM
Tota
l w
ate
r Sto
rage o
f D
okkra
i, N
ongpla
lai&
KkongyaiRese
rvoir
6 August 2010 = 210.4 MCM
Control Volume at the End of a Year = 230 MCM
Average Inflow
In Crisis Year(2005)
In Drought Year (Once in a Decade)
In Crisis Year(2004)Control Level = 160 MCM
0
50
100
150
200
250
300
350
400
450
500
550
600
19
91
19
92
19
93
19
94
19
95
19
96
19
97
19
98
19
99
20
00
20
01
20
02
20
03
20
04
20
05
20
06
20
07
20
08
20
09
20
10
20
11
20
12
20
13
20
14
20
15
20
16
20
17
20
18
20
19
20
20
Ra
w W
ate
r D
em
an
d (
mcm
/yr)
Raw water Demand vs Supply in Chonburi & Rayong
327.3 mcm
467.3 mcm
10 yr : 2020
- Prasae Reservoir 80 mcm
389
244
10 yr : 2020
- Prasae Reservoir 80 mcm
as of 30-June-2010
10 yr : 2020
- Prasae Reservoir 80 mcm
DK+NPL+NK+RY+BPK 247.3 mcm
10 yr : 2020
- Klong Pra Ong Chao Chaiyanuchit 70 mcm- Klong Wang Ta Nod 70 mcm
Raw Water Demand
- Prasae Reservoir 80 mcm
Raw Water Demand vs Supply in Chonburi & Rayong
Contents
• Company Overview
• Operation Highlights
• Financial Highlights
• Futures Highlights
• Corporate Social Responsibility : CSR
Prasae-Klongyai Pipeline Linkage Project In Aug 2005, assigned by the Cabinet
to be responsible for the 31.8 km.
Prasae-Klongyai Pipeline project
(1,680MB) to supply water to
Maptaphut area
Completed construction, on 14 July
2009.
On 2 April 2010, project handed over
to RID.
On 8 April 2010, fully received payment value of ฿1,567 million from
RID.
Previous Agreement RID will pay
the installments by deduct the
raw water cost that East Water
purchase from RID.
-
500.00
1,000.00
1,500.00
2,000.00
2,500.00
3,000.00
2008 2009 Q2/2010
66% 66%
69%
22%
22%
23%
8%
10%
7%
3%
1%
1%
1%
1%
Source of Revenue
Q2/2009
716.73
Revenue(MB) Q2/2010 Q2/2009 %Change
Normal Business
Raw Water 559.68 462 21.14%
Tap Water 185.41 160.85 15.27%
Service and Rental Income 54.07 68.99 -21.63%
Interest&Dividend Income 9.99 10.3 -3.01%
Other Income 3.11 14.59 -78.68%
Total Revenue 812.26 716.73 13.33%
Extra Ordinary
Asset Sales(Prasae) 1567.29 n/a n/a
Total Revenue (Include Prasae)
2379.6 716.73 232.00%
812.26
2,502.00
2,878.50
13.33%
Remark : Q2/2010 For 3 months End 30th June 2010
Revenue from Normal Business excluded Prasae
Source of Revenue
Q2/2009
232%
716.73
Remark 1 : Q2/2010 For 3 months End 30th June 2010
Total Revenue include PrasaeRemark 2 : Analyze Q2/2010 statement by exclude Prasae in the next slide
Revenue(MB) Q2/2010 Q2/2009 %Change
Normal Business
Raw Water 559.68 462 21.14%
Tap Water 185.41 160.85 15.27%
Service and Rental Income 54.07 68.99 -21.63%
Interest&Dividend Income 9.99 10.3 -3.01%
Other Income 3.11 14.59 -78.68%
Total Revenue 812.26 716.73 13.33%
Extra Ordinary
Asset Sales(Prasae) 1567.29 n/a n/a
Total Revenue (Include Prasae)
2379.6 716.73 232.00%
-
50
100
150
200
250
2008 2009 Q2/2010 (3M)
224 221
61
Volume of Raw Water (3 M)
-
500.00
1,000.00
1,500.00
2,000.00
2,500.00
2008 2009 Q2/2010 (3M)
1,747.31
2,007.77
559.68
Sales of Raw Water (3M)
Sales and Volume : Raw Water
Q2/09
51Q2/09
462.00
21.12% YoY 21.14% YoY
฿7.81/CM
฿9.10/CM
฿9.11/CM
Average Tariff
Remark : Q2 For 3 months End 30th June
-
10
20
30
40
50
60
2008 2009 Q2/2010 (3M)
49 53
15
Volume of Tap Water (3M)
-
100
200
300
400
500
600
700
2008 2009 Q2/2010
561 636
185
Sales of Tap Water (3M)
Sales and Volume : Tap Water
15.27% YoY
161
14.32% YoY
Q2/200913
Average Tariff
฿11.45/CM
฿12.00/CM
฿12.04/CMQ2/2009
Remark : Q2 For 3 months End 30th June
20%
2%
32%
30%
16%
Raw Water16%
Labor2%
Electricity36%
Depreciation34%
Other12%
COGS of Raw Water Breakdown
Q2/2009
Q2/2010
0
100
200
300
400
500
600
Q2/2008 Q2/2009 Q2/2010 (3M)
40% 34% 35%
425462
560
Margin COGS
Remark : Q2 For 3 months End 30th JuneCOGS of Raw Water increase because of depreciation effect
60% 66%
65%
0
500
1000
1500
2000
2500
3000
2008 2009 Q2/2010 (6M)
46% 41%
39%
54% 59%
61%
Margin COGS
Million Baht
Sales Revenue vs. COGS
2008 – Q2/2010(6 months) Q2/2008-Q2/2010(3 months)
2,201.76
2,543.54
1,437.88
0
100
200
300
400
500
600
700
800
Q2/2008 Q2/2009 Q2/2010 (3M)
42% 40%40%
58%60%
60%
Margin COGS
566
745
624
Million Baht
1,233.52Q2/2009
13.06% YoY
19.39% YoY
-
500
1,000
1,500
2006 2007 2008 2009 Q2/2010
505 432606
807
297
796 764 917
1,250
467
1,061 1,1331,263
1,603
549
Net Profit EBIT EBITDA
East Water Group Performance
Million Baht
222 341 419
33.36%YoY
30.89%YoY
31.07%YoY
Remark1 : All the figures above were adjusted to the new fiscal year(1 Jan – 31 Dec)Remark2 : The figures of Q2/2010 for 3 months end 30th June 2010 use the amounts that showed in financial statement (Included Prasae)
Financial Ratio
* Remark : All the figures above were adjusted to the new fiscal year(1 Jan – 31 Dec) for comparison proposes only
56.27%54.24%
58.81% 60.55%
17.87%
24.22%
28.04%31.36%
8.15%10.05%
12.96%16.81%
4.36% 6.31%8.73% 11.60%
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
2007 2008 2009 Q2/2010
GPM
NPM
ROE
ROA
Financial Structure
1.17
0.66
0.53 0.54
0.46
0
0.2
0.4
0.6
0.8
1
1.2
1.4
2006 2007 2008 2009 Q2/2010
Consolidated D/E Ratio
1.01
0.550.48
0.490.37
0
0.2
0.4
0.6
0.8
1
1.2
2006 2007 2008 2009 Q2/2010
Separated D/E Ratio
Source of Funds
Remark : As of 16 Aug. 2010 Average MLR (Minimum Loan Rate) = 6.00THB FIX (Thai Baht Interest Rate Fixing) = 1.164%
Contents
• Company Overview
• Operation Highlights
• Financial Highlights
• Futures Highlights
• Corporate Social Responsibility : CSR
Future Projects
Existing Raw Water Projects
1. Pipeline Expansion
NongPlaLai-MapTa Phut Line 3
NongKho-Leamchabang Pipeline
Expansion
Improvement Dokkrai Pumping
Station
Improvement Bangpra Pumping
Station
2. Water Resources Development
Private Pond
3. Potential Project
Off-Stream Reservoir at Tubma
Southern Seaboard Project
Tap water Projects
Existing Contract Expansion
Municipal waterworks Project
O&M and BOT Project
Industrial water / Wastewater Projects
Others Projects
Mini Hydro Turbine Generator (Prasae Reservoir, Nongplalai-Nongkho Pipeline)
Expand to Regional / SE Asia
Capital Expenditure
** Alternative Project is not calculated in the CAPEX as it is a raw water replacement project which will be updated in the future
Projects
TotalMB
2010MB
2011MB
2012MB
2013MB
2014MB
Raw Water Projects(Existing Cap. Enhancement) 3,330 ,520 1,060 250 3 200
Tap Water Projects 44 24 7 7 3 3
Total Capital Expenditure 3,770 ,760 ,13 32 330 23
Contents
• Company Overview
• Operation Highlights
• Financial Highlights
• Futures Highlights
• Corporate Social Responsibility : CSR
Objective
Key IssueEast Water Group
vs.Communities
Misunderstanding about EW Business
Lack of Informationand News
Communities Relationship
CSR activity should meet with
community interest
34
Operation areasTotal 83 districts Chachoengsao province = 25
Chonburi province = 29
Rayong province = 29
Target:Communities along
East Water distribution pipeline324 Kilometers in 3 provinces
East Water Football League 2010
Water Resource and EnvironmentRestoration Project
36
Strategic Approaches
Target Group
EmotionalLead
Engagement Lead
TVC
PR
Ambience
Road show
Contest
OnlinePremium
PR Tie-InEvent Kick Off
Social NetworkFacebook, Twitter, Youtube
Internal Comm.
37
CSR Target Group
Strategic for Target Group in Wide Area Target
Public Company
Department Store
Royal Irrigation Department
Metropolitan Waterworks Authority
Provincial Waterworks Authority
Media & Activities
SpecialCampaign
CSR Plan in Q3-Q4
Young Leader Camp in Chonburi
• 4 – 6 August 2010 ( # 13 )• 19 – 21 August 2010 ( # 14 )
Young Leader Camp in Chacoengsao
• 25 – 27 August 2010 ( # 15 )• 1 – 3 September 2010 ( # 16 )
EWG Family Day in Chonburi & Chacheongsao
23 August 2010
Volunteer Spirit # 4 13 – 16 October 2010
Volunteer Spirit # 5 17 – 20 November 2010
Reduce expense…Increase income
• 4 – 6 communities in every month
Q & A
Eastern Water Resources Development and Management Public Co., Ltd.
Address : 23-26 Floor, East Water Building 1, Vipavadeerangsit Soi 5Vipavadeerangsit Rd., Jompol Jatujak, Bangkok 10900
Tel. : +662 272 1600 Ext. 2332, 2317, 2368
Website : www.eastwater.com
Email : [email protected]